KEGIATAN

GORONG-GORONG PLAT BETON RT 1 RW 1 PEMBANGUNAN SARANA


PRASARANA DESA TA
PANJANG (M): 4.0
2017

PROPINSI
JAWA TENGAH
4.00 KABUPATEN
KENDAL
0.20 KECAMATAN
KALIWUNGU
0.90 1.50 DESA
DENAH PENULANGAN PLAT NOLOKERTO
LOKASI
DENAH GORONG-GORONG
RT 1 RW 1
0.30 PAS BATA MERAH 1:3 0.30 1.50
PAS BATA BELAH1:5 JENIS SARANA
PLAT BETON BERTULANG 1:2:3
0.50
0.20 Gorong-Gorong Plat Beton

0.70
GAMBAR
0.20
POTONGAN
0.30 0.30
DIBUAT OLEH
0.30 0.30
0.40 0.90 0.40 PELAKSANA KEGIATAN
DIPERIKSA OLEH
POTONGAN B - B POTONGAN A - A

CARIK
DIKETAHUI OLEH

KADES
Kabupaten KENDAL Jenis Prasarana Gorong-Gorong Plat Beton
Kecamatan KALIWUNGU Take Off Sheet Lokasi RT 1 RW 1
Desa NOLOKERTO Volume 4 X 0.4 X 0.3

a Volume galian tanah


Panjang = 4.0 m
Lebar = 0.4 m
Tebal = 0.3 m
Volume galian
= 4 X 0.4 X 0.3 = 1.0 m³

b Volume urugan pasir


Panjang = 4.0 m
Lebar = 0.4 m
Tebal = 0.05 m
Volume urugan
= 4 X 0.4 X 0.05 X 2 = 0.2 m³
Panjang = 4.0 m
Lebar = 0.9 m
Tebal = 0.05 m
Volume urugan
= 4 X 0.9 X 0.05 = 0.2 m³
Volume urugan total = 0.3 m³

c Volume pasangan batu belah


I {(0.3 + 0.4)/2} X (0.7+0.2) x 4 X 2 = 2.5 m³
II 0.4 X 0.3 X 4 X 2 = 1.0 m³
III 0.9 X 0.2 X 4 = 0.7 m³
Total = 4.2 m³

d Volume beton bertulang


1.5 X 0.2 X 4 = 1.2 m³

e Besi tulangan (besi Ø 12 - 15)


I ((1.5 / 0,15)+1) X (4+4+0.2+0.2) = 92.4 m
II ((4 / 0,15)+1) X (1.5+1.5+0.2+0.2) = 94.0666666667 m
Total = 186.5 m
= 15.5 btg

f Volume bekisting
(4 + 0.2 + 0.2) X 0.9 = 3.96 m²

g Perhitungan leneng (pasangan batu bata)


0.3 X 0.5 X 1.5 X 2 = 0.45 m³

h Perhitungan plesteran
I 0.3 X 0.5 X 2 X 2 = 0.6 m²
II 1.5 X 0.5 X 2 X 2 = 3.0 m²
III 0.3 X 1.5 X 2 = 0.9 m²
Total = 4.5 m²

i Perhitungan acian
I 0.3 X 0.5 X 2 X 2 = 0.6 m²
II 1.5 X 0.5 X 2 X 2 = 3.0 m²
III 0.3 X 1.5 X 2 = 0.9 m²
Total = 4.5 m²

j Langsiran material
Pekerja langsiran (1 m³ = 0,5 HOK)
Bahan = 11.1 m³
Pekerja = 5.5 HOK

Tanggal Survei : Dibuat oleh : TPK

Formulir untuk Desa


PERHITUNGAN VOLUME PEKERJAAN, ANALISA HARGA SATUAN & BIAYA
Uraian pekerjaan Volume Satuan Harga satuan Total biaya

I Pekerjaan galian tanah 1.0 m³


(SNI A.2.3.1.1, 2016)
0.7500 Pekerja 0.7 HOK 55,000 39,600
0.0250 Mandor 0.02 HOK 60,000 1,440
Total biaya 41,040

II Pekerjaan urugan pasir 0.3 m³


(SNI A.2.3.1.11, 2016)
1.2000 Pasir urug 0.4 m³ 170,000 69,360
0.3000 Pekerja 0.10 HOK 55,000 5,610
0.0100 Mandor 0.003 HOK 60,000 204
Total biaya 75,174

III Pasangan batu belah 1 : 5 4.2 m³


(SNI A.3.2.1.3, 2016)
1.2000 Batu belah 5.0 m³ 245,000 1,234,800
2.7200 Semen 50 Kg 11.4 Zak 90,000 1,028,160
0.5440 Pasir muntilan 2.3 m³ 390,000 891,072
1.5000 Pekerja 6.3 HOK 55,000 346,500
0.7500 Tukang 3.2 HOK 75,000 236,250
0.0750 Mandor 0.3 HOK 60,000 18,900
Total biaya 3,755,682

IV Beton 1 : 2 : 3 1.2 m³
(SNI 2009, Bab 8, hal 37)
0.8100 Batu pecah ⅔ 1.0 m³ 370,000 359,640
0.5400 Pasir muntilan 0.6 m³ 390,000 252,720
6.7200 Semen 50 Kg 8.1 Zak 90,000 725,760
2.0000 Pekerja 2.4 HOK 55,000 132,000
0.3500 Tukang 0.4 HOK 75,000 31,500
1.0000 Kepala Tukang 1.20 HOK 75,000 90,000
1.0000 Mandor 1.2 HOK 60,000 72,000
Total biaya 1,663,620

V Pekerjaan besi tulangan


(SNI 03 - 7394 - 2008)
Besi Ǿ 12 15.5 Batang 160,000 2,486,222
1.0500 Besi Ǿ 12 (0,89 kg/m) 174.3 Kg
0.0150 Kawat beton 2.6 Kg 28,000 73,186
0.0070 Pekerja 0.0 HOK 55,000 1,006
0.0070 Tukang 1.2 HOK 75,000 91,483
0.0004 Mandor 0.07 HOK 60,000 4,182
Total biaya 2,656,080

VI Pekerjaan bekisting 4.0 m²


(SNI 03 - 7394 - 2008)
(ditaksir) Papan cor 15.0 Lembar 15,000 225,000
(ditaksir) Kayu glugu 6/12 5.0 Batang 85,000 425,000
0.4000 Paku 1.6 Kg 23,000 36,432
0.2000 Minyak bekisting 0.8 Liter 5,000 3,960
0.6600 Pekerja 2.6 HOK 45,000 117,612
0.3300 Tukang 1.3 HOK 55,000 71,874
0.0330 Mandor 0.13 HOK 55,000 7,187
Total biaya 887,065
VII Pasangan bata merah 1 : 3 0.5 m³
Analisa P.02.a
500 Bata merah 225.0 Buah 900 202,500
2.6400 Semen 50 Kg 1.2 Zak 63,000 74,844
0.3700 Pasir muntilan 0.2 m³ 390,000 64,935
2.4000 Pekerja 1.1 HOK 55,000 59,400
1.2000 Tukang 0.5 HOK 75,000 40,500
0.2400 Kepala Tukang 0.1 HOK 80,000 8,640
0.2400 Mandor 0.108 HOK 60,000 6,480
Total biaya 457,299

VIII Plesteran 1 : 4 tebal 1,5 cm 4.5 m²


(SNI A.4.4.2.4, 2016)
0.0240 Pasir muntilan 0.1 m³ 390,000 42,120
0.1250 Semen 50 Kg 0.6 Zak 63,000 35,438
0.3000 Pekerja 1.4 HOK 55,000 74,250
0.1500 Tukang 0.7 HOK 75,000 50,625
0.0150 Kepala Tukang 0.07 HOK 80,000 5,400
0.0150 Mandor 0.0675 HOK 60,000 207,833
Total biaya

IX Pekerjaan acian 4.5 m²


(SNI 03 - 2837 - 2008)
0.0650 Semen 50 Kg 0.3 Zak 63,000 18,428
0.2000 Pekerja 0.9 HOK 55,000 49,500
0.1000 Tukang 0.5 HOK 75,000 33,750
0.0100 Mandor 0.05 HOK 60,000 2,700
Total biaya 104,378
REKAP KEBUTUHAN BAHAN, ALAT DAN TENAGA
No Uraian Volume Satuan

1 Pasir urug 0.4 = 1.0 m³


2 Batu belah 5.0 = 5.0 m³
3 Semen 50 Kg 21.5 = 18.0 Zak
4 Pasir muntilan 3.2 = 3.0 m³
5 Batu pecah ⅔ 1.0 = 1.0 m³
6 Besi Ǿ 12 15.5 = 14.0 batang
7 Kawat beton / bindrad 2.6 = 3.0 Kg
8 Papan cor 15.0 = 15.0 Lembar
9 Kayu glugu 6/12 5.0 = 5.0 batang
10 Paku 1.6 = 3.0 Kg
11 Minyak bekisting 0.8 = 2.0 Liter
12 Bata merah 225.0 = 225.0 Buah
13 Pekerja 15.5 = 15.0 HOK
14 Tukang 7.8 = 8.0 HOK
15 Kepala tukang 1.4 = 2.0 HOK
16 Mandor 2.0 = 3.0 HOK
17 Pekerja langsiran 5.5 = 5.0 HOK
RENCANA ANGGARAN BIAYA
DESA NOLOKERTO KECAMATAN KALIWUNGU
TAHUN ANGGARAN 2017

Bidang : Pelaksanaan Pembangunan Desa


Kegiatan : Gorong-Gorong Plat Beton
Waktu Pelaksanaan :
Sumber dana :
Output :

Rincian Pendanaan

Harga Satuan Jumlah


No Kode Rekening Uraian Volume Satuan
Rp Rp

Gorong-Gorong Plat Beton RT 1 RW 1 Vol= 4 X 4 m 13,540,000

Belanja Barang dan Jasa 8,990,000


Upah Tenaga Kerja 8,990,000
Pekerja 73.0 HOK 55,000 4,015,000
Tukang 32.0 HOK 75,000 2,400,000
Kepala tukang 5.0 HOK 80,000 400,000
Mandor 6.0 HOK 60,000 360,000
Pekerja langsiran 33.0 HOK 55,000 1,815,000

Belanja Modal 4,550,000


Matrial 3,834,000
Pasir urug 1.0 m³ 170,000 170,000
Batu belah 5.0 m³ 290,000 1,450,000
Semen 50 Kg 18.0 Zak 63,000 1,134,000
Pasir muntilan 3.0 m³ 360,000 1,080,000
Batu pecah ⅔ 1.0 m³ 370,000 370,000
Besi Ǿ 12 14.0 batang 160,000 2,240,000
Kawat beton / bindrad 3.0 Kg 28,000 84,000
Papan cor 15.0 Lembar 15,000 225,000
Kayu glugu 6/12 5.0 batang 85,000 425,000
Paku 3.0 Kg 23,000 69,000
Minyak bekisting 2.0 Liter 5,000 10,000
Bata merah 225.0 Buah 900 202,500

Alat 216,000
Cetok 1.0 Set 14,000 14,000
Ember plastik (5 liter) 2.0 Buah 10,000 20,000
Sekop 1.0 Buah 91,000 91,000
Cangkul 1.0 Buah 91,000 91,000

Sewa molen Hari 250,000 -


Prasasti 1.0 Ls 300,000 300,000
Papan Proyek 1.0 Ls 200,000 200,000

JUMLAH 25,765,500

Nolokerto,

Disetujui/ Mengesahkan Telah Verifikasi Pelaksana Kegiatan


Kepala Desa Sekretaris Desa

KADES CARIK PELAKSANA KEGIATAN


RENCANA ANGGARAN BIAYA (RAB)
Propinsi : Jawa Tengah No. RAB : 01
Kabupaten : Kendal Lokasi RT 1 RW 1
Kecamatan KALIWUNGU Jenis Kegiatan Gorong-Gorong Plat Beton
Desa NOLOKERTO Ukuran/ Dimensi : 1 unit
Harga
Volume Jumlah Jumlah
Dari Dari Kategori
URAIAN Satuan Satuan Swadaya Pendanaan
Total Biaya
Swadaya Pendanaan Rp Rp
a b c=a-b d e fRp g=bxf h=cxf
BAHAN
1 Pasir urug 1.0 - 1.0 m³ I-a 170,000 - 170,000
2 Batu belah 5.0 - 5.0 m³ I-a 245,000 - 1,225,000
3 Semen 50 Kg 18.0 - 18.0 Zak I-b 90,000 - 1,620,000
4 Pasir muntilan 3.0 - 3.0 m³ I-a 390,000 - 1,170,000
5 Batu pecah ⅔ 1.0 - 1.0 m³ I-a 370,000 - 370,000
6 Besi Ǿ 12 14.0 - 14.0 batang I-b 160,000 - 2,240,000
7 Kawat beton / bindrad 3.0 - 3.0 Kg I-b 28,000 - 84,000
8 Papan cor 15.0 - 15.0 Lembar I-a 15,000 - 225,000
9 Kayu glugu 6/12 5.0 - 5.0 batang I-a 85,000 - 425,000
10 Paku 3.0 - 3.0 Kg I-b 23,000 - 69,000
11 Minyak bekisting 2.0 - 2.0 Liter I-b 5,000 - 10,000
12 Bata merah 225.0 - 225.0 Buah I-a 900 - 202,500
13

Sub Total 1) - 7,810,500


ALAT
1 Cetok 1.0 - 1.0 Set II-a 14,000 - 14,000
2 Ember plastik (5 liter) 2.0 - 2.0 Buah II-a 7,500 - 15,000
3 Sekop 1.0 - 1.0 Buah II-a 91,000 - 91,000
4 Cangkul 1.0 - 1.0 Buah II-a 91,000 - 91,000
5 Prasasti 1.0 - 1.0 Buah II-b 350,000 - 350,000
6

Sub Total 2) - 561,000


UPAH
1 Pekerja 15.0 - 15.0 HOK III-a 55,000 - 825,000
2 Tukang 8.0 - 8.0 HOK III-a 75,000 - 600,000
3 Kepala tukang 2.0 - 2.0 HOK III-a 75,000 - 150,000
4 Mandor 3.0 - 3.0 HOK III-a 60,000 - 180,000
5 Pekerja langsiran 5.0 - 5.0 HOK III-a 55,000 - 275,000
6

Sub Total 3) - 2,030,000


Total Biaya (Pendanaan + Swadaya) 10,401,500
Total Biaya Pendanaan 10,401,500
Sumber Dana
Total Biaya Swadaya -
Kategori biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Diketahui Dibuat oleh
Kepala Desa ................... Ketua TPK

...................................... ……………………