Tunnelvortriebstechnik
TAB L E O F C ON T E NT S
DES IGN AND FUNCTION
I V. D e s i g n a n d F u n c t i o n
Tunnelvortriebstechnik
FU NC TION AL PR IN CIP LE EA RT H P RE SS UR E B A LAN CE
DES IGN AND FUNCTION
Tunnelvortriebstechnik
FU NC TION AL PR IN CIP LE EA RT H P RE SS UR E B A LAN CE
DES IGN AND FUNCTION
4
1 8
2 6 7
3
Earth-pressure-balance-shield: General
Tunnelvortriebstechnik
FU NC TION AL PR IN CIP LE EA RT H P RE SS UR E B A LAN CE
DES IGN AND FUNCTION
The excavation material is conveyed with the screw conveyor [6] from
the pressurised excavation chamber into the tunnel which is under
atmospheric pressure. To allow for a lock-free material transfer from the
screw conveyor output to the belt conveyor, the soil should show a low
degree of water permeability in order to prevent the initiation of a flow
process by the screw conveyor.
The tunnel is usually lined with reinforced-concrete segments [7], which
are mounted under atmospheric pressure conditions in the shield area
behind the pressure bulkhead.
The remaining gap between the outside of the segments and the
excavation diameter is continuously filled with grout which is pressed
through injection openings in the tail skin [8].
• Advance speed
• Excavation volume
• Addition of substances for soil conditioning
Tunnelvortriebstechnik
FU NC TION AL PR IN CIP LE EA RT H P RE SS UR E B A LAN CE
DES IGN AND FUNCTION
1.2 Control
All data and controls required for the tunnelling machine's operation are
accommodated in the control cabin. The advance, cutting wheel and
screw conveyor speed can be set there.
Also the direction of drive is controlled via the control cabin. Based on the
thrust cylinder groups [5] pressure control, the shield can be controlled
in accordance with the directions specified by the control system.
DOCUMENT: 6170-001