Problem
1
You have been given the task to estimate how many studs and rafters are to be used
in the creation of the given scaled floor plan, which will require extra studs at net openings of
4'-0"H X 6-0"L windows at (4) - 2 x 4 x 9'-0" studs, of 4'-0"H x 5'-0"L windows at (3) -
2 x 4 x 9'-0" studs, 3'-0"H x 4'-0"L windows at (2) - 2 x 4 x 9'-0" studs of 2'-
0"H x 4'-0"L windows at (1) - 2 x 4 x 9-0" stud, and neglect door-ways in
estimate. In total, perform a quantity take-off of items of the above estimate
and provide carpenter and laborer cost in order to calculate the total direct cost of this
building assignment. Use scaled figures as a supplement diagrams to aid in
your estimate.
Problem
2
How many 4-foot by 8-foot sheets of 5/8 inch OSB are needed to sheet
the outside roof plane found in scaled figures, and calculate the amount of
board feet of sill and double plates required. Use scaled figures as a
supplement diagrams to aid in your estimate.
48-04
1
-15-10%
5.70
--13-704
-12-11
762
5-64
-5-11_
72-542 -642 -11
-2-5-
6
3-
7
-04
TEMPERED GLASS 4020 SL DER
GUHU SLIDER
6040 SLIDER
5040 SUDER
o 101
-24*18 ACCESS
-7-02
LIVING ROOM
BEDROOM THREE
BEDROOM TWO
BEDROOM TWO
11704
12-04
5040 SLIDER
3040 SLIDER
9-3%
2868
2668
2862
3068
2-14
42-04
-25-04 -11-02
PATIO
103
— 25-01
-11-34
-119
2-112
DRYER
_WASHER
SOLAR INVERTERS
AND METERS
2000
2-64
3040 SLIDER
30' REF
-14-6
5040 SLIDER
DINING ROOM
KITCHEN
-10
304 RANGE
MASTER BEDROOM
3
-7--0
2868
SINIS
-4'-6"
---3-
10
6040 SLIDER
3053
4040 SLIDER
4020 SLIDER TEMPERED GLASS
5040 SLIDER
PATIO
CRAWL SPACE VENT CALCULATIONS:
1200 SF OF ATTIC SPACE 1200/150 = 8 SF OF VENT OPENING REQUIRED PROVIDE (1)
18 x 24" CRAWL SPACE ACCESS AND PROVIDE (9) 6" X 74" CRAWL SPACE VENT
FOR A TOTAL OF 8.22 SF OF VENTILATION
-5-3
5-11
15-10%
-10-10
---12-17
-
48-04
SCALE: /
to l'o"
i
WWWWWWWWWWWWWWWWWWWWWW
W
WWWWWWWWWWWWWWWWWWWWWWWW
TERVET
-15-6
1-2-0-
5-04
6-0"
0-
TULUI UTIFTITITI MILTUMITITE IH TILLITI TIL UTILIDIRTTITIETOITLUL TITILLTARTING LITT
STRIPILITARI ITE ITI TU
TTE TILLITEILU
MITTITUTIT TIITTI TELLILULILILL MITTLUNTIL ITU TIITLLLL LLLLLLLLL LLLLLLLL LLLLLLLLLL 0-6
LUNI UIN LII T UTIILIT
MITIL ITT TITUITIITTIT MUUTTUULUUT NIITTIMET LIILTELLIT
LUTUT LA LILILITIMI TITULLI III ITTIT LIITTI
LLLLLLLLLLL LL LITT UT TILL MILLILI
I TTITUITI TITLULIL IN MUL
T ITU TIITTI TUTTI ITILITI TI TI TIM
TULITTILILIMLILLI LUMIT TILL TIL MILILILLIR M INDRUNITITUITI ULIT TIITLITI
TILTELITIL TITI MINUTITTI TUTTI TUTTI ITUTUNUTTI TITIT
HUNTINL IITTITUTIILTI UTILI
ITTIM ITT TETTIITI IN
TUTTI TUTTI TUTTI TUTTI ITU ITIL ITT TIIMIIIIIIITUM MITTITI TITULLI I TU I TIMU ITU
TIITLILILLELLILLLLLLLL LLLL LLLLLLL LLLLLLL LLLLLLLL LLLLLLLLL LLLLLLLL
TTTTTTTTTTTTTTTIIINNITURIT N IITITI TUDIMI TI TULU TIIT MUUT V1 TI TIIT LIT MILLI
M IT
TITTI UTILI TIL UTLET
RUMUTITITI TITTIITTI TIITTI TILILTRUTTI TUTTI I TUTTILILILOTULITUM
U NITI TILTALTUMITINTI ITU TITTI ILTIITTI TU
חחחחח חחחחח חחחחחחחחחחחחחחחחחחחחח ורוד ורוד חולמחרתודודודודודו חמודה חן ורחו ודרך ח ח חח חחחח ווחר
חודר חח חחח חח חח ודח חום ורוד ורווחה
-CLASS A ROOF COVERING
7
- 2х10 Cobe QAPCey
е о-с., ту.
-CLASS A ROOF COVERING
-g'-0" —
HALL
BEDROOM
2x/0 боку. Тоѕt
(24чо,с., - 4х10 Вт. Fore &aper - (Ps'-оо.с.,
2xЧ
ОХХХХХХХХ
HIILI
Н2-0"
1'-08
1-О?
1'-0,
Schle Yy" to 10
Problem 3
56-0
#5 A.B. X 36"
32" O.C.
-
(2) - #4 CONT. BARS TOP AND BOTTOM
(2) - #4 CONT, BARS TOP AND BOTTOM
2'-0"
2-0"
Figure 3
Problem
4
A 450-hp diesel truck is used for hauling gravel from the rock quarry to a stockpile at
a paving operation. The crankcase capacity is 8 gal and the expected time between oil
changes is 120 hr.
a
.
-
Calculate the gallons per hour of
lubricating oil consumed.
b
.
The fuel consumption for this operation of the truck, if the truck were dumping its
bin with excavated soil at 1 minute per cycle operated at full-power,
with the rest of its 9 minute round-trip cycle at 12% rated power
between quarry and dump site locations (Assume a time factor of 1 on
average per day of usage).
CE
315
constr
uction
Exam
It
Rotts,
San
Yg
HAFT
ERS
L rafters a
14.5'
p
e
r
sc
al
e
mea
s.
a
u
p
#
-
round
ev
en
nex
t
I building = 481 + 2x 1
overhang = 50
na + 1 = 17.5 +1
38.5 SAY
39 pcs/side
x 2 sides = 78 pest 14.5" 2x10 BF =
131'x en tot 1885 bf rafters
Stud
s
- + 1 = 109.5 +
1
© 3 = 6 x
0 2 2x 110t/
- 12V + 2 sovery han
comer x 4 corners = 8 + 111
22
studs
for winday SAY 120
14
6
=
119
too
little
WWW
CE
315
Ex
am
Potts,
som
Interi
or
from Problem
#2
ling 106.5'
n
=
+
1
~
8
5
shods for
interior
acc
ont
doorways on the
interior,
Unfortunately, I did take
into
just letting you
now.
227 x 9% = 2043
IF
MATER
IAL x
30.55/4f
2043 &
249
L = 1362
bf
Cn
c
~ $750
LOC
KO
R
+ 1036.75 for rafter
Table 12.10
sity
$1040
exy @ 164
o.C.
Carpenter = 20425 hrs x 1367 af 34.05) urs
senons -
Helper to his x 1362 bf - 8. 17 urs Assume carpenter @
$28/ur $953,4 SAY $955 vatten $240
helpur @ $21/or $171.57 SAY 8175
lumber @ gost/of $750
rathers
81320
TO
TAL
DIRECT -
$2600
(DIR
ECT)
$1
88
0
faft
ers
COS
T
soun
ds
TOTAL 4400 ok
CE
315
Exa
mn
प
Potts,
sam
A
2
HORROR
14%'
I secant par scale
measurement =
Visu
os
1 = 725
i
B = 48 + 2(1 overmany) L Building
: 50 A que plane = (50) (14
%) = 725 sf
x 2 planes = 1450
SF
no e = 45.3 87 mit pas - SAY 40 pcs for %
OSB, 4x4
Per
elevation,
DBL
Plate, & SILL
PLATES ONLY
o
n
exteri
or
Lext = Perimeter = 25x2 +
48*2
- tol +961
3
146
I don't alla
corn
er
=144.63' 3 KPL by
pared
WWWWWWWWWWOORD
4'-6"
34'42
9
10l-
81 21-
64 81-
64
106+
more
+2.51
3-ou
21
32.5
WWWWWWWWWWWWWWWWWWW
nou
108.5 24
72.3 bf sice 144.7 bf Dol plase
alou
2'-6"
e-6414
p-on
tlou
TO
TA
L
SILL
PLATE
DOUBLE
PLATE
72.3 + 96.6 =
169 bf
= 338 bf
L
W WWWWWWWWWWWWWWWWWWW
CE
315
CE
315
constr
uction
Ex
am
I
Potts,
sam
tugine
ering
Proble
m3
INTERNETO
ç
meth
od
4
0
24
WWWWWWWW
58
weg
5
8
-3
corners
+1
corner
S
o
-4
corners
40
Corner
s
88 LF-4
(1.25')
186 LF - 2 corners
-2 (1.25) - 2.51
1L+2h
=
W
1 = 83
LF
Vic
on
e
Lex Ax-
sec
WWWWWWWWWWWWWWWWWWWWW
AA (1-
347/200)
- (1.28')
(2.097 2
2.5 SE
I
foo
tin
g
Ag = AB
foundational & Ap
stem
= (11-3 n) (21-04)+ (
16") <(") 2 2.5 SF +
(1.5 X 0,8') = 2.5 SF +
0.75 SF
= 3.25
SF
CE
315
Constr
uction
Ex
am
I
Potts,
sam
1
5
Veon
e, A
Engin
eering
CATAA 3
(183.5") (1.5
SF)
• 458.75
CF
V come, B = E.
* AB
= (83) (3.25 sf) = 269.75 cF
total = VA
+ VB
= 458.75 CF +
269.75 CF
727.5 CE
Vest - Veoter (1 +
waste 7)
2 728.5 C (170.08)
= 786.78 CF
[107]
( 27 CF 1 = 29.14 cy
L SAY 29.25 cy
of
concret
e
Form
work
5
0
a 29-22
12
t 58 t=
1.25l per
detail
t = 05' per detail
x = 1.25 os'=0.75
A
cove
r)
Bfeetin
g
(ater)
trinner) $8-t so-2t 40 2t
Couter) 2-x
20
18+
E
30-
2+
24-
26
30-
26 2
E
24-x
30-8
2-X 88-5x
2 30-x-2t 24-x-t 30-6-24 2-8A
186
LF
186
LF
4
89 LF
88-66
84.25
LF
88-5x
_ 66
94.15-
6(0.5)
1815275
9
81.25
LF
CE
315
Constr
uction
CE
315
Ex
am
#
Engin
eerin
g
Potts,
sam
Rob
ow
21
+18=4
21
CI
NT
POO
LING
ta2
SIE
M
4 - 83 LF -
-2
CLR
82.5 LF ие 1 - 1
= Ч 24es
Lay (STEM) = 82.5 + 4 caps
(2/eap )
- 32.5+ 8' = 90.5 LF
taun 15 bars
- 4 rows x 3 rows Lalu Ko = 293.5+90.5 LF
LA4
(TOTAL)
14
45
5
= LF 20' lengths LF # 4 DAR
order (74) #4
BAR
20
12
CE ZK
CE 315
Constr
uction
Engine
ering
Ex
am
I
Potts,
sam
#
5
Anchors
Bolts
A #5
=183.5
! -2
((LR)
18
39
q = 83
LF
-2
CLR
82.5 LF
82.
5
n
n: 68.625 +
1 n = 70 pcs
34 #5
BAR
n = 30.9 + 1 n = 32 pcs
- 48" #5 BAR
Its = 70x3 =
2101
Lts : 32*4 =
1281
WEIGH
T
part
a).
wbricat
Q = hp 0.680.006 8/up-
hr
7.4
Zal
+
[Egn 5.9]
a = (450 hp) (0.6) (0.006 et
hup-her? Sal
+4 /44. Q= 0.286 galfur of evericating oil
consumed
Par
t6
TFE Full power win/ min ende & 100% =
0.1111 Purrial power I min
th/train cycle
12%
11
2
=
0.1067
i
n
- EF = 2218 • 2178
operating Factor (op) = TFX EF .
= i x 0.2176
= 0.2178 Diesel fuel consumed (OF)
(up) x 0.04 gal/up.hr
= (0.1978) (450 up) x
0.04 gal/no-hr = 3.92
gallur