Download as pdf
Download as pdf
You are on page 1of 12
Soructont Kisy California State University Northridge Department of Civil Engineering & Construction Management Prof. Ananian: CE315 ~ Mid Term Exam #2a Spring 2015 (1 hour and 45 minute exam, no questions allowed, open book and notes) Problem 1 You have been given the task to estimate how many rafters are to be used in the creation of the fen barn’s roof plan, which will require raised ridge beams at different elevations found in Figure 1. Also, you are required to determine the size of RIDGE BEAM for the most economical. Calculate the most economical size of girder that will be used to carry the rafters, with a span found between bearing points of as seen between post to post. The requirements for the design are for bending and shear stress capacities to be within 90%, whereby trial sizes are given as: 4x12, 6x10, 6x12, 6x14, 8x10, & 8x12. Governing load case is Wo. + Wi, whereby DL; = 14 psf & LL, = 20 psf ‘The material properties of the timber members to be used are: E=1.6x 10° psi, Fy = 170 psi, & Fy = 1350 ps Governing Deflection ratio is L/240, whereby Uniform loading deflection formula at mid-span is SwI‘/(384EI) Pre | 282 ful. 2 —— 20/ Pab. 3 —— 38] . Pol. 4 —— 20/ Problem 2 How many 4-foot by 8-foot sheets of 5/8 inch OSB are needed to sheet the outside roof plane found in Figure 2A and calculate the amount of board feet of 2x Truss Members (including top and bottom chords) required. Use Figure as a supplement diagrams to aid in your estimate. oe bent.020" (232 + 2.667 4 4000 + £.223 + 6667 + B+ A oe aed eats 4667) = 220" FE oF tems: 2 to Wh ls, igu renee. = Ox Ib) = 8-0 . to = Bbwxl4.o2% = 2-0 IM renter. 9.333 + 10.067 Problem 3 Determine the volume of concrete in cubic yards, the lineal feet of forms, and the rebar needed (in tons) to complete the footings shown in Figure 3A. Include 8% waste in the calculated volume of concrete, and express the volume in quarter-yard increments. Provide 3 inches of cover for the rebar in the footings. The continuous rebar is purchased in 20-foot lengths, whereby lap lengths are specified in given figure. @Qar toe me Problem 4 A 300-hp diesel truck is used for hauling gravel from the rock quarry to a stockpile at a paving operation. The crankcase capacity is 6 gal and the expected time between oil changes is 100 hr. a Calculate the gallons per hour of lubricating oil consumed. b. The fuel consumption for this operation of the truck, ifthe truck were dumping its bin with excavated soil at 1 minute per cycle operated at full-power, with the rest of its 12 minute round-trip cycle at 15% rated power between quarry and dump site locations (Assume a time factor of 1 on average per day of usage). Sorte S | ear aed a Gear 42S fase Arrnetvial Oar. la DL. = Mpc Slat s eS" ‘ pO Urs 20 Te wth By 1S. Biappa teeters St Ceartiem) a etal Xr woth : 12 2! ean Cnet Cerri) Ea sep vee (ee leet ath = S10 LE Pnge © af > Manes & Goo). a8 Vee = Heb ate) patie Ben Lene Corea ov ue hy Tet - 10.6 > Tay = 40.67 ee 2.36.0 { a 3 > hw Gwe) BOOK™ < Agige b1Sb SHeme 1¢ Ole Ue 612 ane Bern: fhsterese: SSI S Tare 683u4 MES er Get De Otero: | ries a LSeany Dericetinnt Corterd : y Anaxe * Sod, 4 Wels ga ie BayeL Zo 40 =e sleoNV38) ae ace sek = 247, Bbmt< TL, 2 bS3m ee Se, OK, Gruss Career Curteres | 602 Beart one it MEET Meciaat | Certeek + Is THE see Enver | Qe achen at 18.25 Nurace of — PaPrens: Pe ee tan a 32,690. Stic = 36! 0.0 Fuge aloe. @ ran) “FEZ tai) r+!) ©) mm BSS a) = | Oki (8) pe | f bet Mnerce’ ot SA1S.0 Flow = () 4x10 Refine . = 3 = 16H coe ego ) ae faves wlth tors: os eH () YxXB tolers Orda (422) Ke oF xe Mewes om HNN SS Penn [ | h ee he ee ee Y= acter (4) = M020" tr. of Ya Ranle ag 14.026 bree of 2 Rate frond, thao Rae! 17.63 (ut) = ost 3 eee tT 2(sse) = (718.0 x Ur Sp” 068 © 4x8 sueers At pee; OS SBCs Yd peop pele drone ori [si] see] Lo" (5h) | Hoe Tce ee Pea Temes Syeeemy : Barn dio = 3I-0 = (2) tof — ceonos 2x83 = () Mone nersce =12287S = " 1 (2a) vineyinil, menace = 2x 2.000 = Tre Como Foot «f “Tae Menasat? (38% 114 xe 25 3 = [S976 Pl 6 Tour Movers BU yis's in - 4 = 1304 cou Ti Al [a 20 2100 38.06 3.68" 44.00! aA Melume of Garett (iL. 2a Ise 24 trea" 14 7/62 PA 2.0 ip aa if Lwem Fer s (s'+ Spe Se ei40 “Fea” aro i ; =, / = '8l.00 72" " tet spat" + 6'x 18" 2 3.256. 144 in? fp, o( 34 sad} m1 ->(3)=ons Heese bering? Laser FET + eu,6" + Amun, 9 Fe et), et hone > Vol tenets * Lnsem Fear ve Band: | Gur, Bx lat + 2(2- > 26.5 - 2.5 x18] + 3:28 x Go.S0: 27 so -2('8) +40- 28) +20 sie a) Gy 20) aCe) 29-0 e(B) = )) + 24! IE | = AC yd” o| anc Meters 24C x 1.08 = ee ‘ f . toy | h bers ar eclig! Gian 4 leneaeesal 2 (2) +2020" | | pad 30.87 ot: | heed +78] eee cf a fo } 30.25 ‘i eee e+ ou wei L2G Baer en a0 &) +24- 2(gf+#)] - 62! ley my Lotyad-4 Lise. feer of ung? 2My =O + 284-0 + 88-0 F Sect t of Un? Hot mle t " eT peu), Ctuele (air eg TA % tee = S14 pes 20 eee Seetunnt vf LP ieee pds © ae + a Sent. = (3.6 ps a4 eal 20) wee he Se 7S pes » 72 pes oF ari-o! — FH eek of Ante Gace: (3 00| e +l = 684 (ect) ex's Order: TO0pee oF de ue AS AB, Hot mutter Batt: g0.5d' 6 —— +) = 32ps @hes) en's" in i Ors 32 oF 4a" a, AS AB " Soe) te | eve Se pe Ga ences ' V2 pe KO x 0.48 Pe Tops x B x hous Ae eer «= x oy PL LW 2 0,66 Teton Meme See Rak ae era AY cate bat. #0 x20! AL. 4S 5 46" AB. 6 hh A é) > 9) futl hp 2 200 (eke) Feel Cotrmarl = (Ops Ful= \(ip (0-04 got pt) Fe. Yo, hp = 300 cz ¢ sel. be Woke. Q pro. x 0.606 yoke = 74 "Leal © ees Bode re torte L wy Joo > lQ- 0206 gIA. of hrertins eficbasste Tre Rebs = | Poe f sel: (%~\(voo2.) = 0,083 Boe of egele : Che Vist.) = 013TS Saye Getic + 9.22057 Opts Retin > (Tne Fate Verge facts.) 2 0.2207 > | fel cnsnad = Gres oe font) = 24sl ees

You might also like