Professional Documents
Culture Documents
Legend: 1.2 New Design Features A. Plan Symbols
Legend: 1.2 New Design Features A. Plan Symbols
LEGEND
1.2 NEW DESIGN FEATURES
EXISTING TOPOGRAPHIC FEATURES
A. PLAN SYMBOLS
- CUT - -BENCHMARK
65 63.00
.00
64.00 62.00
65.00 61.00
64.00 66.00 60.00
66. 63.00 59.00
00 62.00
67.
00
68.
00
-CONTOUR 69
.00
67
.00
63.00
66
.00 65.0
0
64.
00
63
.00
62
.00
61
.00
.00
70.00 64.00
69
-RIVER
- HAND-LAID ROCK EMBANKMENT - N
-NORTH ARROW
-CONTROL STATION
B. PROFILE SYMBOLS
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED/SUBMITTED: REVIEWED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
CONSTRUCTION/IMPROVEMENT OF LEGENDS
ANAO-AON FLOOD CONTROL HORIZONTAL AND VERTICAL CONTROL REPUBLIC OF THE PHILIPPINES
STRUCTURE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C 13
FELIX T. CHUA JR. POBLACION, SAN FRANCISCO, REGION - XIII ARNEL C. CAPILA ROMMEL A. PIAPE DOHJIE B. MORALES, MPA MARCELINO M. OPERARIO
CONTRACTOR SURIGAO DEL NORTE
SURIGAO DEL NORTE PROJECT ENGINEER / CHIEF, PLANNING AND DESIGN SECTION OIC, ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 12 24
DATE: SOURCE OF FUND: REGULAR INFRASTRUCTURE 2021 2ND DISTRICT ENGINEERING OFFICE OIC - CHIEF, CONSTRUCTION SECTION DATE: DATE: DATE:
CV CONSTRUCTION & DEVELOPMENT SURIGAO CITY DATE: