Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

LEGEND

LEGEND
1.2 NEW DESIGN FEATURES
EXISTING TOPOGRAPHIC FEATURES
A. PLAN SYMBOLS

- CUT - -BENCHMARK
65 63.00
.00
64.00 62.00
65.00 61.00
64.00 66.00 60.00
66. 63.00 59.00
00 62.00
67.
00
68.
00

-CONTOUR 69
.00

67
.00

63.00
66
.00 65.0
0
64.
00
63
.00
62
.00

61
.00

.00
70.00 64.00

69
-RIVER
- HAND-LAID ROCK EMBANKMENT - N
-NORTH ARROW

-CONTROL STATION

- GROUTED RIPRAP - -HOUSE H


-STORE S
- LEVEL CUT OR FILL -
-RICE FIELD
RF
- STONE MASONRY -

B. PROFILE SYMBOLS

- LENGTH OF VERTICAL CURVE


- -
VERTICAL POINT OF INTERSECTION
- -
WATER LEVEL

HORIZONTAL CONTROL VERTICAL CONTROL


THE DATUM FOR THE PROJECT IS AN ASSUMED ELEVATION WHICH
THE AZIMUTH OF THIS PROJECT IS AN ASSUMED AZIMUTH
HAS NO REFERENCE TO SEA LEVEL. THE BENCH MARK (B.M.) NO. 1 WITH AN
ESTABLISHED BY THE MAGNETIC COMPASS, FOR THE TANGENT FROM P.I. NO. 0 AT
ASSUMED ELEVATION OF 8.205 m, MARKED "X" AT ROAD JUNCTION ESTABLISHED
STA. 0+000.00 AND HAS AN AZIMUTH OF 20° 36' 05.60" AND A DISTANCE OF 60.00
DURING THE PRELIMINARY SURVEY.
METERS TO THE NEXT P.I. NO. 1 AT STA. 0+060.00 THE AZIMUTH OF THE
SUCCEEDING TANGENTS WERE DETERMINED BY ADDING OR SUBTRACTING
MEASURED ANGLE.

PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED/SUBMITTED: REVIEWED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

CONSTRUCTION/IMPROVEMENT OF LEGENDS
ANAO-AON FLOOD CONTROL HORIZONTAL AND VERTICAL CONTROL REPUBLIC OF THE PHILIPPINES
STRUCTURE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C 13
FELIX T. CHUA JR. POBLACION, SAN FRANCISCO, REGION - XIII ARNEL C. CAPILA ROMMEL A. PIAPE DOHJIE B. MORALES, MPA MARCELINO M. OPERARIO
CONTRACTOR SURIGAO DEL NORTE
SURIGAO DEL NORTE PROJECT ENGINEER / CHIEF, PLANNING AND DESIGN SECTION OIC, ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 12 24
DATE: SOURCE OF FUND: REGULAR INFRASTRUCTURE 2021 2ND DISTRICT ENGINEERING OFFICE OIC - CHIEF, CONSTRUCTION SECTION DATE: DATE: DATE:
CV CONSTRUCTION & DEVELOPMENT SURIGAO CITY DATE:

You might also like