Professional Documents
Culture Documents
Appendix - Propgress Report I
Appendix - Propgress Report I
1 Equipment Type
3 Material of Construction
10 PWHT
11 Cladding Material
12 Lining Material
14 Corrosion History
15 External Corrosion Rate
16 Margin (Plant Production) Production Loss
17 Repair Time
18 Reduced Repair Rate Reduction Rate (%)
Certification Document
Certification Document
TDM Report Daily
Assumption: adopted from previous DNV RBI Assessment (Onshore)
-
Certification Document
Data/Document Sources
Piping
PID Document
-
-
-
-
TDM Report Daily
rom previous DNV RBI Assessment (Onshore)
-
-
No. RBI Critical Data Parameter
1 Equipment Type
3 Material of Construction
10 PWHT
11 Cladding Material
12 Lining Material
14 Corrosion History
15 External Corrosion Rate
16 Margin (Plant Production) Production Loss
17 Repair Time
18 Reduced Repair Rate Reduction Rate (%)
Inspection Record
PID Document
- Vendor Document (As Built Drawing; U1/MDR;etc)
- Data Sheet
- Certification Document
- RLA Report
Inspection Record
Data/Document Sources
Piping
RLA Report
Inspection Record
PID Document
Inspection Record
Inspection Record
TDM Report Daily
from previous DNV RBI Assessment (Onshore)
Inspection Record
No. Parameters
3 Release Quantity
4 Operating Condition
7 Fluid Composition
8 Margin Plant
Equipment and Piping Asset which has no year built is assumed as 1 Dec-2015
(based on Plant comissioning date, December 2015)
For piping, if the data is not available then it is assumed similar with operating
conditions of equipment attached.
- All Insulation Type is assumed as Calcium Cilicate
- Insulation Condition of assets in Bangkanai Field assumed as Average, with
Insulation Complexity assumed as Average.
- Fluid composition of Utility Water, Raw Water, Potable Water, Demin Water,
Fire Water are assumed as Water.
- Glycol type which used in Bangkanai is TEG (based on HMB)
- Line with no Fluid Composition available is assumed had light fraction (for
Top Outlet) and heavy fraction (for Bottom Outlet) of upstream line
Used data as proposed by LAPI ITB, adopted from previous DNV RBI
Assessment (Onshore), value of each equipment type depends on its heat
treatment condition (with or without PWHT)
Reference
3 Release Quantity
4 Operating Condition
7 Fluid Composition
8 Margin Plant
Equipment and Piping Asset which has no year built is assumed as 1 Apr-2010 (based on
Plant comissioning date, April 2015)
- Release Quantity of Air Cooler is assumed as 25% of Volume, which the volume is based
on volume of the Tubes multiply by number of Tubes.
- Piping with unavailable Length data will be assumed to have a similar length with other
piping in the same looping.
- For piping, if the data is not available then it is assumed similar with operating conditions
of equipment attached.
- If data is not available, operating condition is assumed 90% of design condition.
- Equipment and piping which have a direct impact on production (no redundant or by-pass
line available) are assumed to have a 100% reduced repair rate.
- Equipment and piping which does not have a direct impact on production (for example
have a by-pass line) are assumed to have a 0% reduced repair rate.
- Fluid composition of Utility Water, Raw Water, Potable Water, Demin Water, Fire Water
are assumed as Water.
- Amine type which used in Bangkanai is MDEA
- Glycol type which used in Lematang is TEG (based on HMB)
- Chemical Waste Water assumed contain of water and chemical content of upstream
- Fluid Composition of Waste Water Oil assumed contain of Water and Heavy Fraction of
upstream line
- Line with no Fluid Composition available is assumed had light fraction (for Top Outlet) and
heavy fraction (for Bottom Outlet) of upstream line
Used data as proposed by LAPI ITB, adopted from previous DNV RBI Assessment (Onshore),
value of each equipment type depends on its heat treatment condition (with or without
PWHT)
Reference
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
No. Location Asset Type Asset Tag Number
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Non-Hydrocarbon System
Hydrocarbon System
Hydrocarbon System
Hydrocarbon System
Hydrocarbon System
Hydrocarbon System
Hydrocarbon System
→ New Level Hierarchy on PCMS
LEFT HEAD
TANK COURSE 1
→ New Level Hierarchy on PCMS