Transition Between EW2 Viaduct (P-254) and EW2 UG (Shahpur) Plinth Details Are Missing and Will Be Published After Inputs Available
Transition Between EW2 Viaduct (P-254) and EW2 UG (Shahpur) Plinth Details Are Missing and Will Be Published After Inputs Available
← OHCI
13.000
(P-254) and EW2 UG (Shahpur)
Plinth details are missing and will be
published after inputs available.
6386
RAMP
HSR
BRACKET
LINE
BRACKET
POWER
SPLICE POWER
FEED
FEED LINE
MPA
BRAC KET
5000
HSR
BRACKET SPLICE
RAMP BRACKET FEED
RAMP FEED
POWER
POWER
BRAC
MPAKET
LINE
NOTES
BOQ: UNDER GROUND
1: RAILS LENGHT= 15 mtr.
LEGEND LEGEND ITEM NOS 2: NOMINAL SUPPORTS SPACING = 5 mtr.
ITEM NOS
3: EXPANSION JOINT SUPPORTS SPACING FROM 1940 mm TO 2750 mm
CONDUCTOR RAIL 785 MID POINT ANCHOR 170 4: NO MORE THAN 5 FULL CONDUCTOR RAILS TO BE INSTALLED WITHOUT AN EXPANSION JOINT
i. e. HIGH OR LOW SPEED RAMP + 5 CONDUCTOR RAILS AND ONE EXPANSION JOINT.
HIGH SPEED RAMP 20 EXPANSION JOINT 160 5: EXPANSION JOINTS TO BE SPACED EQUALLY BETWEEN MID POINT ANCHORS
6: NO CABLE TERMINAL TO BE INSTALLED WITHIN 1000 mm OF ANOTHER CABLE TERMINAL, Page N°002 →
POWER
FEED
POWER FEED 40 SPLICE 960 SPLICE JOINT OR OF AN INSULATOR SUPPORT BRACKET.
7: PLINTHS DETAILS AS PER;
DOC UID- MEGA-EP1-PSY-ATB000-PA-TD-00327 Shahpur →