NO DATE TIME PLANT TAG NUMBER EQUIPMENT

624 21/09/2018 Column3 Column4 Column5 Column6

Pompa vertical RO A dan RO


1 1/15/2020 13.07 - 17.46 WTP -
B

2 1/22/2020 08.15 - 11.55 WTP PU103C dan PU103D Pompa Sentrifugal


3 1/23/2020 13.15 - 16.00 WTP PU1535 A-C Vertikal pump
4 1/27/2020 09.00 - 11.30 WTP PU1535D Pompa Sentrifugal

5 1/31/2020 20.16 - 23.00 WTP PU1535E Pompa Sentrifugal

6 2/2/2020 23.00 - 01.30 WTP PU1535E Pompa Sentrifugal

7 2/7/2020 03.00 - 04.30 WTP PU103A Pompa Sentrifugal


8 2/13/2020 08.20 - 11.00 WTP PU103D, PU1535D Pompa Sentrifugal

9 2/18/2020 16.00 - 18.00 WTP PU103B Pompa Sentrifugal

10 2/19/2020 20.00 - 23.00 WTP PU1547A Pompa Vertical

11 2/20/2020 20.16 - 24.00 WTP PU1547A Pompa Vertical

12 2/26/2020 13.00 - 15.00 WTP PU103C dan PU103D Pompa Sentrifugal


13 3/9/2020 14.00 - 15.00 WTP - Pompa
14 3/23/2020 09.00 - 12.00 WTP - Pompa Sentrifugal
15 3/24/2020 09.00 - 12.00 WTP PU1535E Pompa Domestic
16 3/27/2020 09.00 - 12.00 WTP - Pompa Sentrifugal
17 4/10/2020 09.00 - 12.00 WTP - baut kaki motoran
18 4/10/2020 16.00 - 17.20 WTP PU1535E Pompa Domestic
19 4/12/2020 20.00 - 22.00 WTP PU103A dan B RO pump
20 4/16/2020 02.00 - 02.30 WTP PU1535D Pompa Domestic
21 4/19/2020 09.30 - 12.00 WTP PU103D Demin pump
22 4/23/2020 09.00 - 12.00 WTP PU103A Demin pump
23 4/24/2020 09.00 - 16.00 WTP PU103A Demin pump

24 4/29/2020 09.30 - 12.00 WTP PU103C Demin pump

25 5/20/2020 19.00 - 22.00 WTP PU1535E domestic pump

26 5/21/2020 19.00 - 23.00 WTP PU1540A RO feed pump

27 6/1/2020 10.00 - 11.00 WTP PU1535E domestic pump


28 6/4/2020 09.30 - 10.30 WTP PU1535E dan D domestic pump

29 6/7/2020 20.00 - 24.00 WTP PU1540A RO feed pump

30 6/20/2020 20.00 - 24.00 WTP PU1540A RO feed pump

31 6/27/2020 09.30 - 16.00 WTP - Pompa Sentrifugal

32 7/8/2020 14.00 - 16.00 WTP - Pompa dan manual valve

33 7/13/2020 09.00 - 10.00 WTP PU1540A RO feed pump

34 7/25/2020 09.00 - 10.00 WTP PU1540A RO feed pump

35 7/30/2020 09.00 - 10.00 WTP PU1535E domestic pump

36 8/4/2020 14.00 - 15.00 WTP PU1540A RO feed pump

37 8/11/2020 19.00 - 20.00 WTP PU1540A RO feed pump

38 8/19/2020 10.00 - 11.00 WTP PU1540A RO feed pump

39 9/1/2020 10.00 - 11.00 WTP PU1540A RO feed pump


: MAINTENANCE AREA WATER TREATMENT PLANT
LATEST
PROBLEM ACTION REPLACE. TYPE

Column7 Column8 Column9 Column10


Pengencangan jalur suction
Pre-comm RO water pump dan discharge, dynabolt, - RM
pengecekan gasket
Alignment pump - PM
Check Valve terbalik Ubah arah check valve - RM
- Alignment pump - RM dan PM

Motoran panas karena setting valve discharge sampai


ampere tinggi ampere motor sesuai (55A) - PM

temperature mencapai 70°C Preventif maintenance (cek


untuk pengecekan pertama temperature dan vibrasi) .
dan vibrasi dititik horizontal
mencapai 13 [rms], untuk Analisa titik horizontal
mencapai vibrasi tinggi - PM
pengecekan kedua kemungkinan dikarenakan base
temperature turun menjadi frame pompa kurang rigid dan
50°C tetapi vibrasi di titik
horizontal masih tinggi juga tertarik pipa jalur suction

- Alignment pump - PM
PU103D baut sight glass ganti oli pompa demin dan 2/13/2020 PM
patah, dan oli kotor domestic
Horizontal parallel belum Alignment pump - PM
dapat
cek vibrasi tinggi, dikarenakan
Vibrasi tinggi indikasi kipas motoran tidak - PM
balance

Shaft bending dikarenakan


saat instalasi terjatuh
sehingga mengakibatkan cek analisa vibrasi tinggi (25-30
komponen dalam lama rms) - PM
kelamaan tidak mampu
beroperasi normal
oli terkontaminasi air ganti oil baru 2/26/2020 PM
update list spare bearing ukur diameter shaft pompa - PM
dan motor
cek alignment list missalignment pompa PM
missalignment (indikasi
ketarik jalur) Realignment 3/24/2020 PM
oli terkontaminasi air ganti oli baru 2/27/2020 PM
korosif luasi pakai oli bekas - PM
bunyi asing di daerah kopling
(misalignment) realignment - PM
oli jelek ganti oli baru 4/12/2020 PM
air rembes divolute casing tightening baut volute casing - PM
dikarenakan baut kendor
misalignment dan baut cover realignment dan lengkapi baut
kopling tidak ada cover kopling 4/19/2020 RM
bearing motoran kasar bongkar motoran - RM
ganti bearing motoran yang assembly, install, dan
4/24/2020 RM/PM
rusak alignment motoran vs pump

Gap kopling terlalu longgar setting ulang gap kopling dan - RM


realignment

Vibrasi tinggi cek kekencangan baut dan - RM


realignment. (ok)

dilakukan pengecekan strainer


(hasilnya strainer bersih), lalu
bongkar jalur suction dan
pressure drop, vibrasi tinggi, discharge, ternyata setelah
dan trip (jammed) dibongkar terdapat kerak di - RM
bagian impeller, lalu
dibersihkan. (ok) sudah tidak
jammed.

bunyi bearing kasar di top up grase (ok) - PM


mototran
oli jelek ganti oli - PM

Jammed bongkar suction discharge dan - RM


cek impeller, putar manual (ok)

Jammed bongkar suction discharge dan - RM


cek impeller, putar manual (ok)

Cek preventif maintenance cek alignment, dan - PM


pompa sentrifugal plant ETP kekencangan baut

korosif lubrikasi dengan oli bekas - PM

bongkar suction discharge dan


Jammed cek impeller, putar manual (ok) - RM

bongkar suction discharge dan


Jammed cek impeller, putar manual (ok) - RM

flow pompa tidak bisa


mencapai separator refinery support atur bukaan valve - RM
2 discharge

bongkar suction discharge dan


Jammed cek impeller, putar manual (ok) - RM

Jammed bongkar suction discharge dan - RM


cek impeller, putar manual (ok)

bongkar suction discharge dan


Jammed cek impeller, putar manual (ok) - RM

Jammed bongkar suction discharge dan - RM


cek impeller, putar manual (ok)
Dept : Engineering
Effect. Date : 15 Januari 2020
Revisi : 0

MATERIAL MO NUMBER PIC

Column11 Column12 Column13

- N/A Tulus dan Aziz

Shim plate SKF N/A Aziz dan Team MA 1


- N/A Tulus dan Team MA 1
Shim plate SKF N/A Team MA 1

- N/A Aziz

- N/A Aziz dan Fariz

- N/A Aziz dan Fariz


oli bechem staroil g-100 N/A Aziz dan Fariz

Shim plate SKF N/A Adit

- N/A Daniel dan Fariz

- N/A Aziz, Daniel, dan Fariz

oli bechem staroil g-100 N/A Aziz


- N/A Adit dan Aziz
- N/A Tulus
Shim plate SKF N/A Team MA 1
oli bechem staroil g-100 N/A Team MA 1
oli bekas N/A Aziz dan Adit
- N/A Aziz dan Adit
oli bechem staroil g-100 N/A Tulus dan Rian
- N/A Aziz dan Adit
Shim plate SKF N/A Tulus dan Rian
- N/A Tulus dan Rian
bearing 6212 c3/6312 c3 dan shimplate
N/A Team MA 1
SKF

Shim plate SKF N/A Aziz dan Adit

- N/A Daniel dan Fariz

- N/A Daniel dan Fariz

grease N/A Tulus dan Rian


oli bechem staroil g-100 N/A Tulus dan Rian

- N/A Daniel dan Fariz

- N/A Daniel dan Fariz

- N/A
Adit
oli bekas N/A Fariz dan Aziz

- N/A Daniel dan Adit

- N/A Team MA 1

- N/A Aziz dan Afreiza

- N/A Tulus dan Rian

- N/A Team MA 1

- N/A Fariz dan Rian

- N/A Team MA 1
SUB: MAINTENANCE ARE
PT. MNA-SERANG

NO DATE TIME PLANT TAG NUMBER EQUIPMENT

624 21/09/2018 Column3 Column4 Column5 Column6

1 12/25/2019 08.15/16.00 ETP - Pompa sentrifugal

Pompa Chemical dan


2 1/15/2020 13.00/18.05 ETP - Sentrifugal

3 1/16/2020 08.35/11.45 ETP - Pompa Sentrifugal

4 1/19/2020 08.23/16.00 ETP - Pompa Sentrifugal

5 1/23/2020 13.20/14.20 ETP - Crusher

6 1/28/2020 09.00/14.00 ETP PU1831A & PU1841A Pompa sentrifugal

7 1/28/2020 14.00/16.00 ETP BW1830C Blower

8 1/29/2020 09.00/16.00 ETP - Pompa sentrifugal


9 2/1/2020 21.00/22.00 ETP PU1801A Pompa sentrifugal
10 2/3/2020 08.15 - 11.00 ETP - AG/PU/CR

11 2/4/2020 08.15 - 16.16 ETP - Pompa sentrifugal

12 2/6/2020 20.00 - 22.00 ETP FP001 PowerPack Filter Press

13 2/9/2020 08.20 - 11.00 ETP FP001 Filter Press

14 2/10/2020 21.00 - 21.30 ETP BW1830B Blower

15 2/12/2020 08.30 - 10.00 ETP BW1830B Blower

16 2/13/2020 14.00 - 16.00 ETP PU1841B Pompa Sentrifugal


17 2/14/2020 09.00 - 10.00 ETP BW1830B Blower
18 2/14/2020 13.20 - 17.00 ETP PU1812 A dan B Pompa Sentrifugal
19 2/15/2020 08.30 - 17.00 ETP - Pompa sentrifugal

20 2/16/2020 20.00 - 23.00 ETP - Blower


21 2/17/2020 09.00 - 20.16 ETP PU1812 A dan B Pompa sentrifugal
22 2/22/2020 09.00 - 16.00 ETP PU1815A dosing Pump

23 2/24/2020 14.00 - 22.00 ETP PU1815A dosing Pump

24 3/3/2020 08.30-16.00 ETP BW 1801 C blower

25 3/4/2020 09.00 - 16.00 ETP BW 1801 C blower

26 3/5/2020 09.00 - 16.00 ETP BW 1801 C Blower

27 3/9/2020 08.30 - 10.00 ETP BW 1801 C Blower

28 3/9/2020 14.00 - 15.00 ETP - Pompa


29 3/12/2020 09.30 - 12.00 ETP - Selenoid Valve

30 3/13/2020 09.00 - 12.00 ETP PU1812 A dan B Pompa Lime

31 3/14/2020 09.00 - 12.00 ETP - Pompa sentrifugal

32 3/14/2020 14.00 - 16.00 ETP PU1821A Pompa Lime


33 3/15/2020 09.00 - 12.00 ETP PU1812B Pompa Lime
34 4/15/2020 14.00 - 16.00 ETP - Sliding Valve

35 4/15/2020 20.00 - 22.00 ETP PU1812B Pompa Lime


36 3/16/2020 03.00 - 08.00 ETP Sliding Valve
37 3/17/2020 08.30 - 12.00 ETP BW1830B Blower
38 3/18/2020 08.30 - 12.00 ETP PU1841A dan B pompa sentrifugal

39 3/18/2020 14.00 - 16.00 ETP BW1830B Blower

40 3/19/2020 08.30 - 12.00 ETP PU1841A dan B pompa sentrifugal

41 3/20/2020 09.00 - 12.00 ETP PU1801A dan PU1841B Acc pump dan sumpit pump

42 3/20/2020 20.00 - 24.00 ETP FP001 filter press


PU1801A dan B,
43 3/21/2020 09.00 - 22.00 ETP PU1802A dan B acc pump dan equal pump
44 3/21/2020 01.00 - 04.00 ETP BW1830A Blower
45 3/22/2020 09.00 - 12.00 ETP - pompa clarifier
46 3/22/2020 14.00 - 16.00 ETP BW1830A dan B blower
47 3/23/2020 09.00 - 12.00 ETP PU1841A pompa clarifier
48 3/23/2020 20.00 - 23.00 ETP BW1830A Blower
49 3/30/2020 09.00 - 12.00 ETP BW1830B Blower

50 3/31/2020 09.00 - 12.00 ETP PU1812B Pompa Lime

51 4/1/2020 09.00 - 12.00 ETP PU1812A Pompa Lime

52 4/2/2020 09.00 - 12.00 ETP BW1830C Blower


53 4/3/2020 09.00 - 12.00 ETP BW1830C dan B Blower

54 4/4/2020 09.00- 12.00 ETP BW1830C dan B Blower

55 4/7/2020 09.00 - 12.00 ETP AG1814A Agitator


56 4/10/2020 14.00 - 16.00 ETP - baut equipment
57 4/12/2020 20.00 - 22.00 ETP - Agitator clarifier dan CAF
58 4/13/2020 09.00 - 12.00 ETP PU1831A pompa clarifier
59 4/13/2020 14.00 - 16.00 ETP PU1812A lime pump
60 4/16/2020 09.00 - 12.00 ETP PU1815 dosing Pump
61 4/17/2020 09.30 - 12.00 ETP PU1814B dosing Pump
62 4/22/2020 10.00 - 12.00 ETP CAF Scrapper

63 4/28/2020 09.30 - 10.00 ETP AG1814A


agitator chemical
64 5/1/2020 09.00 - 12.00 ETP AG1840A agitator clarifier
65 5/7/2020 09.00 - 12.00 ETP PU1812A lime pump
66 5/9/2020 09.00 -12.00 ETP PU1812B lime pump
67 5/12/2020 09.00 - 12.00 ETP PU1812A lime pump
68 5/15/2020 09.00 - 12.00 ETP PU1812B lime pump

69 5/19/2020 13.00 - 16.00 ETP BW1830B dan C Blower

70 5/22/2020 09.00 - 12.00 ETP PU1812A lime pump


71 5/26/2020 02.30 - 03.30 ETP AG1840A Agitator clarifier
72 6/1/2020 09.00 - 12.00 ETP PU1812B lime pump
73 6/3/2020 09.00 - 12.00 ETP PU1812A lime pump
74 6/5/2020 09.00 - 12.00 ETP PU1812B lime pump
75 6/11/2020 09.30 - 16.00 ETP ACH1815 Feeder Machine
76 6/12/2020 09.00 - 12.00 ETP PU1812A lime pump

77 6/13/2020 09.00 - 20.00 ETP - All pump centrifugal


78 6/15/2020 16.00 - 18.00 ETP PU1831B Clarifer pump

79 6/19/2020 09.00 - 12.00 ETP PU1812B lime pump

80 6/24/2020 14.00 - 16.00 ETP - Valve CAF

81 6/25/2020 09.00 - 12.00 ETP BW1830B Blower

82 6/26/2020 09.00 - 12.00 ETP PU1812A lime pump

83 6/27/2020 09.00 - 12.00 ETP BW1830B Blower

84 6/29/2020 09.00 - 12.00 ETP BW1830C Blower

85 6/30/2020 09.00 - 12.00 ETP BW1830B Blower

86 7/1/2020 09.00 - 12.00 ETP BW1830B Blower

87 7/1/2020 14.00 - 14.30 ETP BW1830C Blower

88 7/1/2020 14.30 - 15.00 ETP PU1831B pompa clarifier

89 7/2/2020 09.00 - 12.00 ETP PU1814B dan PU1831B dosing dan clarifier pump

90 7/3/2020 09.00 - 12.00 ETP PU1812B lime pump


91 7/8/2020 14.00 - 16.00 ETP - Pompa dan manual valve
92 7/10/2020 09.00 - 12.00 ETP PU1812A lime pump

93 7/10/2020 09.00 - 12.00 ETP PU1831B Clarifier pump

94
MAINTENANCE AREA EFFLUENT TREATMENT PLANT
LATEST
PROBLEM ACTION REPLACE. TYPE

Column7 Column8 Column9 Column10

Belum adanya jacking bolt follow up kepada team project


dan slot untuk menyetting dan utility untuk segera full
alignment pompa, dan base weld terkait base frame, - PM
plate pompa belum di full dipasang jacking bolt, dan
weld dibuatkan alur kaki motoran

Top up Oli chemical pump dan


- checking lubricant agitator; Cek - RM/PM
instalasi pompa sentrifugal

Slot kaki motoran kurang pas Dibuat alur yang sesuai oleh
dengan settingan pihak kontraktor - PM

- Alignment pump - PM
Repair baut dengan
Baut drain oli rembes menambahkan red seal agar - RM
tidak bocor

Slot kaki motoran kurang pas slot dibuat dengan gerinda


dengan settingan botol dan bisa dilakukan - PM
alignment
check valve blower pasang check valve yang baru - RM
ngejammed
Slot kaki motoran kurang pas Pembuatan slot dengan
dengan settingan gerinda, las acetylene - FAB
- Alignment pump - PM
oli belum leveling filling oli di equipment clarifier - PM

cover coupling mentok fabrikasi, memperlebar celah - FAB


diputaran koplingnya cover kopling pompa

kasih redseal dicover tutup


oli power pack bocor, dan bagian powerpack dan kasih
- RM & PM
kurang level sealtape di lubang drain, dan
top up oli sampai level (65liter)

belum terpasang connecting pasang connerctor hidrolik


filter press filter press - RM

v-belt blower gosong dan stop kerja blower dan amankan


putus v belt dan pulley - RM

v-belt blower gosong dan ganti v belt baru 2/12/2020 RM


putus

o-ring check valve putus ganti dengan red seal dan - RM


tambah gasket
Misalignment Alignment dan change v belt - RM & PM
Slot kaki motoran kurang pas
dengan settingan perbesar slot dengan gerinda - RM
Pabrikasi bolt untuk jacking perbesar slot dengan gerinda - RM
chek alignment blower A,B cek pully blower
pasang pasang bolt jacking - RM
jacking bolt etp
setting seal cover mechseal setting kebocoran mechseal - RM
ngejammed indikasi piston bongkar dan cek - RM
macet

ngejammed dikarenakan
piston masuk bram/kotoran
oil didalam penggantian oli dosing pump
dosing pump sudah kotor dengan oli yang baru - RM
mengetahui tes run
hasil repair dosing pump
PU1815A

beli spare V-belt untuk


V-belt belum ada spare - PM
dipasang
V-belt dan pulley belum pasang V-belt dan alignment - PM
tersetting
monitoring kinerja blower cek kondisi blower - RM
panas
setting clearence pully konfirmasi untuk panggil
teknisi - RM
blower kurang
Update List Spare bearing ukur diameter shaft motor dan - PM
pompa
Passing Valve Support cek selenoid Valve - RM

Mechseal rembes, indikasi


tidak adanya/terpasang jalur membuka seal cover dan
flushing/cooling mechseal di
pompa tersebut menjadikan setting ulang mechseal, tetap - RM
masih rembes karena spring
kapur mengendap di mechseal sudah tidak main
mechseal dan mengakibatkan
bocor

bongkar pompa/mechseal
rembes check mechseal rusak / oring - RM
instalasi ulang (Ampere Setting impeleer ngejamed - RM
tinggi)
Mechseal Rusak ganti mechseal 15.03.2020 RM
susah terbuka karena macet bersihkan sliding valve RM

pompa belum terinstal dan


alignment instalasi dan alignment - RM
bukaan valve seret kasih pelumas / greese/ oli - PM
V-belt putus change V-belt c ke b 17.03.2020 RM
pompa running support running pompa sumpit - RM

Blower B overheat monitoring kondisi blower A - RM


dan B

pompa running support running pompa sumpit - RM

Alignment not ok cek kondisi alignment - RM

main cylinder mentok


dikarenakan sensor balik selang dan setting ulang - RM
Alignment not ok realignment - PM
monitoring blower A cek temprature - PM
cek kopling cek missalignment - PM
trial kinerja blower a dan b cek temprature pulley (3.30) - PM
missalignment realignment - RM
belt kendor setting ulang belt - RM
overheat dengan cepat cek kondisi putaran pulley, - RM
ketika nyala pulley ok
ampere tinggi (11A), max cek ulang kondisi pompa, check
ampere yang disetting 3A valve dan cek jalur - RM

Mechseal bocor ganti mechseal 4/1/2020 RM

pulley jammed cek pulley - RM


Jammed blower, lobe blower lepas pulley, cek bearing - RM
kotor karena korosi danlubricant lobe blower
masih overheat dan pompa cek kondisi blower - RM
miss alignment
baut blade korosif dan lepas ganti baut baru - RM
korosif lumasi dengan oli bekas - PM
top up grase dan oli pada
pelumasan kurang masing masing equipment - PM
misalignment realignment 4/13/2020 PM
cari kode bearing bongkar pompa - PM
bearing motoran rusak ganti bearing 4/16/2020 RM
bearing motoran rusak ganti bearing 4/17/2020 RM
oli rembes dari gearbox, tightening baut gearbox - RM
indikasi baut kendor
blade lepas karena baut
korosif ganti baut 28/04.2020 RM

bearing kasar bongkar dan ganti bearing 5/1/2020 RM


mechanical seal bocor ganti mechseal dan instal 5/7/2020 RM
mechanical seal bocor ganti mechseal dan instal 5/9/2020 RM
mechanical seal bocor ganti mechseal dan instal 5/12/2020 RM
schedule cleaning mechseal cleaning mechseal - RM

buka flexibel joint dan di


mainkan tanpa connect ke
header selama 2 jam, suhu
cek dan simulasi blower B normal dan ok, setelah - RM
dan C
disambungkan kembali suhu
langsung naik cepat sampai
80°, dan v belt bau

schedule cleaning mechseal cleaning mechseal - RM


Bearing eksentrik kasar bongkar agitator 5/1/2020 RM
schedule cleaning mechseal cleaning mechseal - RM
mechanical seal bocor ganti mechseal dan instal 6/3/2020 RM
schedule cleaning mechseal cleaning mechseal - RM
bearing motoran rusak bongkar dan ganti bearing 6/11/2020 RM
schedule cleaning mechseal cleaning mechseal - RM

cek misalignment realignment pompa yang - PM


sudah misalignment
mechseal rusak bongkar pompa - RM

schedule cleaning mechseal cleaning mechseal - RM

handle valve kepentok


pijakan vabrikasi ubah arah handle valve - RM

Lepas rubber joint dan jalankan


Trial kinerja Blower B blower tanpa beban, ampere - RM
aman dan suhu pulley set
aman

schedule cleaning mechseal cleaning mechseal - RM

sambung ulang rubber joint


Trial kinerja blower B dan setting ulang v belt, suhu - RM
pulley set tidak normal
Jammed blower, lobe blower Cleaning lobe blower (ok) - RM
kotor karena korosi
lepas disk check valve, suhu
Trial kinerja blower B - RM
pulley set tetap tidak aman
belum terpasang disk check pasang kembali disk check - RM
valve valve

lepas flexibel joint, suhu pulley


Trial kinerja blower C set aman, lalu pasang kembali - RM

ganti mechseal baru ganti mechseal dan install - RM

kopling dosing pump belum


pasang kopling dosing dan
terpasang dan clarifier pump alignment clarifier pump - RM
belum alignment

schedule cleaning mechseal cleaning mechseal - RM


korosif lubrikasi dengan oli bekas - PM
schedule cleaning mechseal cleaning mechseal - RM

volute casing bocor tightening baut volute casing - RM


Dept : Engineering
T Effect. Date : 25 Desember 2019
Revisi : 0

MATERIAL MO NUMBER PIC

Column11 Column12 Column13

- N/A Aziz dan Team MA 1

Oli bechem G100 non food grade N/A Fariz, Rian, Adit, dan Daniel

- N/A Team MA 1

Shim plate SKF N/A Team MA 1

Red seal N/A Fariz dan Daniel

Shim plate SKF N/A Team MA 1

Check Valve 6 inch N/A Team MA 1

Oksigen dan Accetylene N/A Fabrikasi dan Team MA 1


Shim plate SKF N/A Aziz dan Fariz
oli bechem G100 non food grade220
N/A Team MA 1
nevastane

Mata Gerinda N/A Team MA 1

oli bechem staroil G100 N/A Tulus dan Team MA1

connector oli N/A Tulus

- N/A Daniel dan Adit

v-belt bando B-63 N/A Tulus

red seal dan gaket teflon N/A Daniel dan Adit


v belt mitsuboshi B-62 N/A Tulus dan Rian
mata gerinda baby N/A Rian
mata gerinda baby N/A Tulus dan Rian

Bolt N/A Tulus dan Rian


- N/A Daniel dan Adit
- N/A Tulus

Oli N/A Daniel dan Adit

v-belt N/A fariz rian dan aziz

V-belt N/A Rian fariz dan aziz

- N/A Adit

- N/A Aziz

- N/A Adit
- N/A Daniel dan Fariz

- N/A Team MA 1

- N/A Daniel dan Fariz

- N/A Tulus dan Rian


- N/A Aziz
- N/A Adit

- N/A Daniel dan Fariz


- N/A Tulus
V-belt B62 N/A Daniel
- N/A Tulus

- N/A Daniel

- N/A Tulus

- N/A Tulus

- N/A Aziz
- N/A Aziz dan adit
- N/A Adit
- N/A Tulus dan Rian
- N/A Adit
- N/A Tulus dan Rian
- N/A Daniel dan Fariz
- N/A Team MA 1

- N/A Team MA 1

mechseal eagle burgman 33 N/A Team MA 1

- N/A Team MA 1
- N/A Team MA 1

- N/A Team MA 1

- N/A Team MA 1
oli bekas N/A Aziz dan adit
grease dan oli N/A Tulus dan Rian
Shim plate SKF N/A Daniel dan Fariz
- N/A Daniel dan Fariz
bearing NSK 6204 z N/A Daniel dan Fariz
bearing NSK 6204 z N/A Daniel dan Fariz
- N/A Aziz dan adit

baut M9 x 20 N/A Aziz dan adit

bearing 6204 z (2 buah, untuk motoran) N/A Aziz dan adit


mechseal eagle burgman 33 N/A Team MA 1
mechseal eagle burgman 33 N/A Team MA 1
mechseal eagle burgman 33 N/A Team MA 1
- N/A Tulus dan Rian

- N/A Daniel dan Fariz

- N/A Aziz dan Adit


- N/A Aziz dan adit
- N/A Tulus dan Rian
mechseal eagle burgman 33 N/A Team MA 1
- N/A Tulus dan Rian
6202-ZZ (2) N/A Daniel dan Aziz
- N/A Aziz dan Adit

- N/A Team MA 1
- N/A Team MA 1

- N/A Aziz dan Fariz

- N/A Tulus dan Aziz

- N/A Team MA 1

- N/A Team MA 1

- N/A Tulus dan Rian

- N/A Tulus dan Rian

- N/A Team MA 1

- N/A Tulus dan Rian

- N/A Team MA 1

mechseal 560 ø35 N/A Aziz

- N/A Tulus, Rian, dan Aziz

- N/A Tulus dan Rian


oli bekas N/A Team MA 1
- N/A Tulus dan Rian

- N/A Aziz
SUB: MAIN
PT. MNA-SERANG

NO DATE TIME PLANT TAG NUMBER

624 21/09/2018 Column3 Column4 Column5


1 1/15/2020 08.15 - 11.00 BOILER -

2 1/16/2020 13.15 - 18.35 BOILER BC0053

3 1/23/2020 08.15 - 11.15 BOILER -

4 1/31/2020 08.15 - 11.15 BOILER -

5 2/2/2020 08.20 - 16.00 BOILER -

6 2/3/2020 20.16 - 21.00 BOILER -

7 2/5/2020 24.00 - 05.00 BOILER CR051A

8 2/24/2020 09.00 - 12.00 BOILER -

9 2/28/2020 08.30 - 12.00 BOILER FN 1002


10 2/28/2020 20.31 - 22.00 BOILER PU 0001
11 2/29/2020 08.30 - 12.00 BOILER FN 1003
12 3/2/2020 08.00 - 12.00 BOILER PU 0001 dan PU 0002
13 3/2/2020 14.00 - 16.00 BOILER FN 1002
14 3/4/2020 09.00 - 12.00 BOILER PU 0001 dan PU 0002
15 3/5/2020 09.00 - 12.00 BOILER PU 0001 dan PU 0002
16 3/11/2020 09.00 - 12.00 BOILER -

FN1001, FN 1002, FN
17 3/13/2020 14.00 - 17.00 BOILER 1003, dan FN1004

18 3/15/2020 09.00 - 12.00 BOILER -


19 3/27/2020 09.00 - 10.00 BOILER -
20 4/5/2020 09.00 - 12.00 BOILER -
21 4/6/2020 10.00 - 16.00 BOILER FN2003
22 4/6/2020 13.00 - 16.00 BOILER -

BC0051, BC0052,
23 4/7/2020 09.00 - 16.00 BOILER BC0053, dan BC0054
24 4/8/2020 14.00 - 15.00 BOILER BC0052
25 4/9/2020 14.00 - 16.00 BOILER BC0053 dan BC0054
26 4/14/2020 09.30 - 12.00 BOILER -
27 5/15/2020 09.00 - 12.00 BOILER -
28 5/20/2020 19.00 - 19.30 BOILER PU0082A

29 5/30/2020 16.00 - 18.00 BOILER CR051A

30 6/3/2020 22.00 - 24.00 BOILER -

31 6/9/2020 09.00 - 12.00 BOILER FN1004 dan FN2004

32 6/19/2020 16.00 - 17.00 BOILER -

33 6/20/2020 14.00 - 17.00 BOILER -


34 6/22/2020 09.00 - 10.00 BOILER BC0051

35 7/1/2020 21.00 - 22.00 BOILER BC0054

36 7/4/2020 16.00 - 16.30 BOILER FN2004


37 7/6/2020 15.30 - 20.00 BOILER BC0052
SUB: MAINTENANCE AREA BOILER
LATEST
EQUIPMENT PROBLEM ACTION REPLACE.
Column6 Column7 Column8 Column9
Monitoring motor belt
Belt Conveyor conveyor dan all conveyor Top Up grease -

Belt Conveyor 3 Arah putaran terbalik Arah putaran telah diperbaiki -

Pressure gauge rusak di


Pump dan Conveyor Return Air Fan Preventif Maintenance -

Preventif Maintenance, All


All Equipment Temuan di blower RAF Equipment running dengan -
FN2004 pressure gauge rusak temperature dan vibrasi yang
standar dan aman

steam trap belum semua


Steam trap terpasang pemasangan steam trap -

water hammer pada jalur buka/drain kondensat jalur


Steam trap steam plan steam trap -

crusher ngeblok dikarenakan cleaning crusher dan pasang v-


Crusher Batubara terlalu banyak batubara belt -
masuk, v-belt lepas

Fan dan Pompa Belum di tes run oleh pihak support tes run di boiler plan 1 -
elektrik

secon Fan Alignment Fan Boiler FN 1002 Alignment laser SKF TKSA41 -
Centrifugal Pump Alignment Pompa BFWP Laser Alignment -
Fan Alignment Fan ID Laser Alignment -
Centrifugal Pump Uncouple dan couple couple dan uncouple -
Fan Uncouple realignment -
Multistage Pump uncouple untuk slowfiring uncouple -
wuxi
Multistage Pump posisi pompa uncouple pemasangan coupling -
Coal Feeder dan Crusher Ngeblok batubara Cleaning batubara -

Belum di tes run oleh pihak support tes run di boiler plan 1,
Fan boiler dan blower elektrik, dan kondisi uncouple dan pasang kopling -

Coal Yard vibrating support sering cek material support vibrating -


patah
Fan Boiler plant 1 dan BFWP Monitoring kinerja FAN cek vibrasi -
Cek alignment dan lubrikasi
Fan dan Pompa equipment agenda stop plant boiler 2 -
IDFAN Missalignment realignment -
Conveyour 3,4 dan sludge cooler, Lubrikasi kurang Top Up grease -
bfwp

lubrikasi kurang dan baut regreasing bearing dan


Conveyor batubara roller kendur tightening baut roller -
conveyour
Conveyor batubara belt miring support wuxi setting belt -
Conveyor batubara Baut roller kurang Tambah baut dan tightening -
steam trap ngeblok steam trap prepare for change -
All Equipment lubrikasi kurang top up grease 5/15/2020
Dosing pump chemical level oli kurang top up oli -

bunyi asing dicrusher bagian support change crusher A ke B,


Crusher Batubara -
dalam trip di B lalu cleaning BB (ok)

Bean Pump Cek preventif/ kinerja bean Cek fly ash bean pump (tidak -
pump ada blocking)
Vibrasi tinggi di FN1004, dan
Return Air Fan Cleaning filter FN2004 cek vibrasi dan cleaning filter -

Vibrator hopper coal yard Trip disalah satu vibrasi dan bongkar dan prepare change -
indikasi bearing kasar bearing
install dan support test run
Vibrator hopper coal yard ganti bearing vibrator 6/20/2020
Conveyor 1 Roller macet repair roller -

Adjusting lengan feeder ash


Conveyor 4 setting ulang -
conveyor 4 berubah settingan

Return Air Fan Oli jelek change oli 7/4/2020


Conveyor Roller macet Cleaning roller -
Dept : Engineering
Effect. Date : 15 Januari 2020
Revisi : 0

TYPE MATERIAL MO NUMBER PIC

Column10 Column11 Column12 Column13


RM/PM Grease N/A Team MA 1

RM/PM - N/A Team MA 1

PM - N/A Aziz dan Daniel

PM - N/A Aziz

RM baut N/A Team MA 1

RM - N/A Aziz dan Fariz

RM - N/A Aziz dan Fariz

PM - N/A Rian dan Tulus

PM shimplate SKF N/A Tulus dan Daniel


PM shimplate SKF N/A Aziz
PM shimplate SKF N/A Daniel dan Adit
RM - N/A Fariz
PM - N/A Aziz
PM - N/A Daniel dan Adit
RM - N/A Adit
RM - N/A Adit

RM/PM - N/A Team MA 1

PM - N/A Daniel dan Faris


PM - N/A Aziz
PM - N/A Adit dan Aziz
PM - N/A Adit dan Aziz
PM - N/A Team MA 1

PM - N/A Team MA 1
RM - N/A Team MA 1
RM M12 x 40 N/A Team MA 1
RM - N/A Daniel dan Fariz
PM grease N/A Team MA 1
PM oli total nevastane 220 N/A Daniel dan Fariz

RM - N/A Daniel

PM - N/A Daniel dan Fariz

PM - N/A Daniel dan Aziz

RM - N/A Fariz dan Aziz

RM 6305 (2) N/A Fariz dan Aziz


RM - N/A Adit

RM - N/A Fariz

PM oli total nevastane 220 N/A Tulus dan Aziz


PM WD 40 N/A Team MA 1
SUB: MAINTEN
PT. MNA-SERANG

NO DATE TIME PLANT TAG NUMBER EQUIPMENT

624 21/09/2018 Column3 Column4 Column5 Column6

1 1/23/2020 09.00 - 18.00 Hydrant - Pompa Jockey, Elektrik,


Diesel

2 1/30/2020 14.00 - 17.00 Hydrant - Diesel pump

3 2/24/2020 14.00 - 18.00 Hydrant - Diesel pump

4 2/25/2020 08.00 - 17.00 Hydrant Jockey Pump 2 Jockey pump

5 3/2/2020 14.00 - 18.00 Hydrant - Diesel pump


SUB: MAINTENANCE AREA HYDRANT
LATEST
PROBLEM ACTION REPLACE. TYPE

Column7 Column8 Column9 Column10

Pompa jockey (mechseal Untuk jockey pump akan


Jockey pump 1 bocor) diganti mechseal oleh pihak
vendor; Untuk elektrik pump - RM/PM
Elektrik pump (motoran akan diperiksa kenapa motor
ngetrip) bisa ngetrip
gasket flange bocor dan aki support auto start pompa
belum terinstal diesel - PM

pressure tidak dapat sesuai


settingan, check valve cek suction discharge dan balik - RM
arahnya terbalik arah check valve

Monitoring pressure hydrant monitoring jalur dan kinerja


sesuai settingan 10 bar pompa jockey - PM

Diesel pump eror setting diesel pump dan aki - RM


Dept : Engineering
Effect. Date : 23 Januari 2020
Revisi : 0

MATERIAL MO NUMBER PIC

Column11 Column12 Column13

- N/A Aziz, Fariz, dan Daniel

- N/A Aziz dan Fariz

- N/A Adit

- N/A Aziz

- N/A Team MA 1
SUB: MAINTENA
PT. MNA-SERANG

NO DATE TIME PLANT TAG NUMBER EQUIPMENT

624 21/09/2018 Column3 Column4 Column5 Column6


1 12/25/2019 09.00 - 16.00 Utility - Compressor
CMP001 (ZT 315 VFD);
CMP002 (ZT 275);
2 1/9/2020 09.00 - 16.00 Utility Compressor
CMP003 (ZT 275);
CMP004 (ZT 275)

3 3/9/2020 09.00 - 12.00 Utility compressor 4 Compressor


4 3/10/2020 09.00 - 12.00 Utility Compressor 3 compressor
5 3/11/2020 08.30 - 12.00 Utility compressor 1,2 dan 4 Compressor
6 3/12/2020 09.30 - 12.00 Utility Compressor 4 Compressor

7 5/28/2020 11.30 - 14.30 Utility Compressor 4 Compressor

8 6/8/2020 14.00 - 16.00 Utility - Compressor


SUB: MAINTENANCE AREA COMPRESSOR
LATEST
PROBLEM ACTION REPLACE. TYPE

Column7 Column8 Column9 Column10


- Startup Compressor - RM/PM

Maintenance : Ganti Oli dan


Maintenance - PM
Filter Oli

fan radial bermasalah / pemanggilan teknisi untuk


unbalance repair - RM
fan radial unbalance ganti fan oleh vendor 3/10/2020 RM
fan radial unbalance change fan by vendor 3/11/2020 RM
Support start up compressor monitoring compressor - RM
4

Fan Radial bising support atlas copco untuk ganti 5/28/2020 RM


fan radial
cek schedule prventif lihat schedule prventif atlas
maintenance copco - PM
Dept : Engineering
Effect. Date : 25 Desember 2019
Revisi : 0

MATERIAL MO NUMBER PIC

Column11 Column12 Column13


- N/A Vendor dan Team

Oli : Atlas Copco/ROTO Z FLUID 80 Liter N/A Vendor dan Team

- N/A Adit
Fan Radial N/A Fariz
Fan Radial N/A Daniel
- N/A Tulus

Fan Radial N/A Daniel dan Fariz

- N/A Daniel
SUB: MAINTE
PT. MNA-SERANG

NO DATE TIME PLANT TAG NUMBER EQUIPMENT

624 21/09/2018 Column3 Column4 Column5 Column6


1 12/25/2019 08.15 - 11.00 Genset - Viking Pump

2 2/14/2020 14.00 - 16.00 Genset - Genset

3 2/17/2020 19.00 - 24.00 Genset PUGEN01 dan 02 Pompa solar


4 2/18/2020 09.00 - 12.00 Genset - Strainer
5 2/20/2020 09.00 - 16.00 Genset - Genset

6 2/21/2020 09.00 - 12.00 Genset - Genset


7 3/20/2020 09.00 - 12.00 Genset PUGEN01 dan 02 Pompa Solar
8 7/9/2020 09.00 - 12.00 Genset CPC - Genset
9 7/10/2020 14.00 - 16.00 Genset CPC - Genset
SUB: MAINTENANCE AREA GENSET
LATEST
PROBLEM ACTION REPLACE. TYPE

Column7 Column8 Column9 Column10


persiapan untuk dilakukan
test noload by elektrik Uncouple pump RM

pre comm genset cummins by schedule change ganti oli,


- PM
Altrak 1978 coolant radiator, all filter
alignment pompa (laser
alignment pump alignment) - PM
Strainer terbalik Balik arah strainer - RM
maintenance genset cummins ganti oli, filter oli, dan instalasi
2/20/2020 PM
by altrak aki
lanjut maintenance genset support maintenance - RM/PM
cummins dan solar masuk
alignment not ok realignment - RM/PM
Level oli kurang top up oli sampai high level - PM
Uji Emisi Gas buang support - PM
Dept : Engineering
Effect. Date : 25 Desember 2019
Revisi : 0

MATERIAL MO NUMBER PIC

Column11 Column12 Column13


N/A Tulus dan Team MA 1

oli SAE 15W40 N/A Fariz

shim plate SKF N/A Team MA 1


- N/A Team MA 1
oli valvoline SAE 15W40 dan filter oli N/A Aziz dan Adit

- N/A Team MA 1
Shim plate SKF N/A Team MA 1
oli bechem G-staroil 100 N/A Fariz
- N/A Rian
SUB: MAINTEN
PT. MNA-SERANG

NO DATE TIME PLANT TAG NUMBER EQUIPMENT

624 21/09/2018 Column3 Column4 Column5 Column6

1 1/29/2020 11.00 - 16.00 NITROGEN - OIL-X EVOLUTION FILTER

2 1/30/2020 09.00 - 12.00 NITROGEN T001 discharge nitrogen


SUB: MAINTENANCE AREA NITROGEN
LATEST
PROBLEM ACTION REPLACE. TYPE

Column7 Column8 Column9 Column10

dikarenakan belum adanya o-


ring spare, jadi sementara
dengan cara menambahkan
Kebocoran pada O-ring filter red gasket sealant, tatapi - RM
masih terdapat kebocoran. Jadi
kesimpulannya menunggu
spare o-ring filternya dari
vendor

bocor di jalur nitrogen T001 bongkar dan tambahkan seal - RM


discharge tape
Dept : Engineering
Effect. Date : 29 Januari 2020
Revisi : 0

MATERIAL MO NUMBER PIC

Column11 Column12 Column13

- N/A Tulus dan Team MA 1

seal tape N/A Daniel dan Adit