MES Impact Analysis (Production)
MES Impact Analysis (Production)
MES Impact Analysis (Production)
eUCALYPTUS PROJECT
MES Implementation at PT. IKPP - Perawang
List of Content
• KPI Data
– Sales
– Production Planning
– Production (PM, Winder, Converting, & Finishing)
– Packaging Material
– Warehouse
– Shipping
– Claim
• Tangible Benefit & Other Benefits
eUCALYPTUS PROJECT
MES Implementation at PT. IKPP - Perawang
Sales Area – Lead Time (Export)
Reason:
Inquiry to Quotation Lead Time become worst after MES, because the following reasons:
1. Container Drawing must be completed before Inquiry planned into TIPS
2. Tighten validation up front for minimizing order revision, ie, Inquiry must be planned into TIPS in order to convert to Quota tion
3. Unstable backend system ie. unable to provide planned order on time, due to certain error, VC characters not maintain in
TIPS.
4. CRM System performance is slow in Mill -> VC Material usage leads to excess load for IPC server.
5. Unclear procedure beyond system control:
a. Extend material for tradco.
b. VC Characteristic maintenance
6. Revision on SO after Run created, makes the process become longer.
A v e r a g e In q u ir y - Q u o t a t io n - C o n f ir m a t io n L e a d T im e ( E x p o r t )
Ja n -0 5 Fe b -0 5 M a r-0 5 A p r-0 5 M a y -0 5 Ju n -0 5 J u l- 0 5 A u g -0 5 S e p -0 5 O c t- 0 5 No v -0 5 De c -0 5 Ja n -0 6
0 .0 0
0 .5 0
1 .0 0
1 .5 0
Days
2 .0 0
Formula:
Inquiry to Quotation Lead Time = Before MES After MES
Quotation Date – Inquiry Date 2 .5 0
Jan 05 - Sep 05 Oct 05 - Jan 06
Ja n -0 5 Fe b -0 5 M a r-0 5 A p r-0 5 M a y -0 5 Ju n -0 5 J u l- 0 5 A u g -0 5 S e p -0 5 O c t- 0 5 No v -0 5 De c -0 5 Ja n -0 6
A v e r a g e In q u ir y t o Q u o t a t io n L e a d T im e 1 .2 9 1 .7 0 1 .3 0 1 .1 0 1 .8 0 0 .8 0 0 .8 0 1 .3 0 1 .6 0 2 .7 0 2 .9 0 1 .6 0 2 .0 0
A v e r a g e Q u o t a t io n t o C o n f ir m a t io n L e a d T im e 1 .2 4 1 .1 0 0 .9 0 1 .2 0 1 .3 0 0 .8 0 0 .9 0 0 .9 0 0 .9 0 2 .3 0 1 .6 0 1 .5 0 1 .4 0
eUCALYPTUS PROJECT
MES Implementation at PT. IKPP - Perawang
Sales Area – Lead Time (Local)
Reason:
The improvement in inq. to quo lead time more likely from very bad performance in January
2005. (It means MES did not contribute yet).
A v e r a g e In q u ir y - Q u o t a t io n - C o n f ir m a t io n L e a d T im e ( L o c a l)
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
0
10
Days
15
Formula: 20
Before MES After MES
Inquiry to Quotation Lead Time =
Quotation Date – Inquiry Date Jan 05 - Sep 05 Oct 05 - Jan 06
25 Inq to Quo 13.12 11.02
Quotation to Confirmation Lead Time =
Confirmation Date – Inquiry Date Quo to Conf 5.79 6.52
30
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
A v e r a g e In q u ir y t o Q u o t a t io n L e a d T im e 2 8 .1 4 6 .6 7 1 5 .8 0 7 .7 5 1 4 .6 7 1 0 .2 3 1 0 .5 4 1 3 .3 4 1 0 .9 2 1 1 .3 5 1 0 .4 0 1 2 .3 3 1 0 .0 0
A v e r a g e Q u o t a t io n t o C o n f ir m a t io n L e a d T im e 5 .4 1 1 2 .2 2 6 .8 0 0 .8 8 3 .6 7 5 .4 2 3 .1 8 6 .9 7 7 .5 4 5 .9 6 5 .2 0 1 2 .0 8 2 .8 3
eUCALYPTUS PROJECT
MES Implementation at PT. IKPP - Perawang
Sales Area – On Time Delivery (Export)
Reason:
On Time Delivery become worst after MES, because MES system is not stable yet. It impacts in
production operational, which make the delivery become late. For example, MES cannot prevent
excess quantity per order. It make the next order lack of base paper, so the order need to wait
the next cycle.
Formula:
O n T im e D e liv e r y ( E x p o r t ) On Time Delivery =
(Count If (BL Date – RDD)<=0) / Delivery Count
90
80
70
Percentage
60
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
A v erage 7 1 .5 1 7 4 .2 3 7 0 .3 5 6 9 .3 0 6 9 .0 2 7 2 .1 6 7 3 .6 6 7 4 .9 8 7 3 .3 3 7 4 .4 3 4 7 .7 4 5 0 .7 3 4 8 .9 0
- . V IC 8 5 .7 1 8 1 .5 2 7 6 .6 5 7 0 .0 7 7 2 .5 9 7 6 .4 0 8 0 .1 8 8 5 .3 8 8 2 .8 7 8 1 .0 1 4 9 .4 6 5 3 .4 6 5 6 .8 5
- . N o n V IC 5 7 .3 0 6 6 .9 5 6 4 .0 6 6 8 .5 3 6 5 .4 4 6 7 .9 2 6 7 .1 3 6 4 .5 8 6 3 .7 9 6 7 .8 6 4 6 .0 2 4 8 .0 1 4 0 .9 5
eUCALYPTUS PROJECT
MES Implementation at PT. IKPP - Perawang
Sales Area – On Time Delivery (Local)
Reason:
Same as previous reason in KPI for On Time Delivery (Export)
Formula:
O n T im e D e liv e r y (L o c a l) On Time Delivery =
(Count If (BL Date – RDD)<=0) / Delivery Count
60
50
Jan 05 - Sep 05 Oct 05 - Jan 06
Average 19.07 16.98
40
VIC 22.97 10.70
Non VIC 15.17 23.25
Percentage
30
Before MES After MES
Jan 05 - Sep 05 Oct 05 - Jan 06
20
72.06 55.45
Formula:
79.04 60.20 On Time Delivery =
10
65.08 50.71 (Count If(BL Date – RDD)<=0)/Delivery Count
0
Ja n - 0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n - 0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n - 0 6
Ja n - 0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n - 0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n - 0 6
A v erage 1 7 .6 0 4 1 .7 0 2 1 .5 1 1 9 .0 4 1 9 .4 6 1 0 .9 6 1 7 .9 8 1 4 .7 3 8 .6 6 1 6 .4 1 1 5 .4 7 1 6 .5 1 1 9 .5 1
- . V IC 2 2 .7 0 5 1 .5 5 2 6 .2 6 2 1 .3 1 2 1 .6 2 1 4 .6 3 2 1 .1 4 1 7 .8 0 9 .7 0 1 5 .0 8 1 2 .7 3 6 .0 9 8 .9 0
- . N o n V IC 1 2 .5 0 3 1 .8 5 1 6 .7 6 1 6 .7 7 1 7 .3 1 7 .2 8 1 4 .8 2 1 1 .6 6 7 .6 1 1 7 .7 4 1 8 .2 1 2 6 .9 4 3 0 .1 2
eUCALYPTUS PROJECT
MES Implementation at PT. IKPP - Perawang
Sales Area – Delivery Date Variance (Export)
Reason:
According to the formula, the main components of this KPI (BL Date and RDD) are the same with
On Time Delivery KPI. This KPI want to track the date variance rather than the percentage of on
time delivery. Therefore the reason of this KPI is the same with the previous reason in KPI for On
Time Delivery (Export).
Formula:
A v e r a g e D e liv e r y D a t e V a r ia n c e ( E x p o r t ) Delivery Date Variance = BL Date - RDD
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
0
10
Days
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
A v erage 6 .3 8 4 .6 4 4 .9 5 4 .1 6 5 .7 2 4 .8 3 5 .3 6 4 .2 5 3 .5 0 8 .6 4 1 3 .7 2 1 2 .3 6 1 4 .0 5
- . V IC 7 .5 6 3 .7 5 4 .7 0 4 .6 7 5 .0 9 4 .3 1 3 .7 6 1 .0 2 0 .7 7 7 .1 7 1 4 .3 9 9 .9 9 7 .9 5
- . N o n V IC 5 .2 1 5 .5 3 5 .2 0 3 .6 6 6 .3 4 5 .3 5 6 .9 5 7 .4 7 6 .2 4 1 0 .1 1 1 3 .0 5 1 4 .7 3 2 0 .1 6
eUCALYPTUS PROJECT
MES Implementation at PT. IKPP - Perawang
Sales Area – Delivery Date Variance (Local)
Reason:
Same as previous reason in KPI for On Time Delivery (Export)
Formula:
A v e r a g e D e liv e r y D a t e V a r ia n c e ( L o c a l) Delivery Date Variance = BL Date - RDD
-1 0
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
0
10
Days
20
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
A v erage 8 .7 7 6 .6 3 8 .0 4 1 2 .4 0 1 0 .8 2 1 2 .4 5 6 .7 6 6 .6 0 7 .3 7 1 2 .0 5 1 1 .1 4 9 .3 2 1 2 .8 0
- . V IC 1 0 .5 3 5 .6 3 8 .5 5 1 2 .1 4 1 6 .9 8 2 0 .6 8 1 0 .6 2 1 0 .2 0 1 1 .1 1 1 9 .3 0 1 7 .8 7 1 9 .0 5 2 6 .8 3
- . N o n V IC 7 .0 1 7 .6 3 7 .5 4 1 2 .6 7 4 .6 7 4 .2 1 2 .8 9 3 .0 1 3 .6 3 4 .8 0 4 .4 2 - 0 .4 1 - 1 .2 4
eUCALYPTUS PROJECT
MES Implementation at PT. IKPP - Perawang
Sales Area – Delivery Quantity Accuracy
Reason:
January 06 data is not stable yet, since not all order have achieved full delivery.
Overall, the performance become worst after MES, related with the previous reason in On Time
Delivery (MES cannot prevent excess quantity order).
D e liv e r y Q u a n tity A c c u r a c y
100
95
90
Percentage
80
Formula:
Delivery Quantity Accuracy =
(Count If (Abs(GI Weight – SO Weight)<(0.1*SO Weight))) / Order Count
75
Ja n - 0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n - 0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n - 0 6
Ja n - 0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n - 0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n - 0 6
Ex p o r t 9 9 .7 5 9 8 .1 7 9 9 .1 2 9 8 .1 7 9 6 .9 4 9 8 .8 1 9 6 .8 7 9 8 .4 3 9 8 .7 9 7 .1 7 9 5 .2 5 9 0 .7 9 8 5 .2 9
Local 100 100 100 100 100 100 100 100 100 100 9 9 .8 6 100 9 8 .8
eUCALYPTUS PROJECT
MES Implementation at PT. IKPP - Perawang
Sales Area – Over/Under Quantity Fulfillment (Export)
Reason:
According to the formula, the main components of this KPI (SO Weight and GI Weight) are the
same with Delivery Quantity Accuracy KPI. This KPI want to track the tonnage (over/under)
rather than the percentage of quantity accuracy. Therefore the reason of this KPI is the same
with the previous reason in KPI for Delivery Quantity Accuracy
O v e r /U n d e r Q u a n t it y F u lf ilm e n t ( E x p o r t )
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
0 .0 0
2 0 0 .0 0
4 0 0 .0 0
6 0 0 .0 0
Tonnage
1 0 0 0 .0 0
Under 38.38 344.84
Formula:
1 2 0 0 .0 0 Delivery Quantity Accuracy =
(Count If (Abs(GI Weight – SO Weight)<(0.1*SO Weight))) / Order Count
1 4 0 0 .0 0
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
O v e r Q u a n t it y F u lf ilm e n t 0 .0 0 1 9 2 .2 6 8 0 .8 8 2 8 4 .3 0 5 1 7 .0 2 1 3 6 .7 5 3 0 0 .4 0 6 3 .7 5 1 7 6 .9 4 5 6 9 .6 9 2 8 8 .6 2 3 9 0 .2 6 2 9 .3 4
U n d e r Q u a n t it y F u lf ilm e n t 3 .7 4 2 7 .9 5 2 2 .1 2 4 .1 7 0 .0 0 0 .0 0 2 9 .5 6 9 2 .8 0 1 6 5 .0 4 1 3 8 .5 8 0 .0 0 0 .0 0 1 2 4 0 .8 0
eUCALYPTUS PROJECT
MES Implementation at PT. IKPP - Perawang
Sales Area – Over/Under Quantity Fulfillment (Local)
Reason:
Same as previous reason in KPI for Delivery Quantity Accuracy.
O v e r /U n d e r Q u a n t it y F u lf ilm e n t ( L o c a l)
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
0 .0 0
5 0 0 0 .0 0
1 0 0 0 0 .0 0
Tonnage
2 5 0 0 0 .0 0
Formula:
Delivery Quantity Accuracy =
(Count If (Abs(GI Weight – SO Weight)<(0.1*SO Weight))) / Order Count
3 0 0 0 0 .0 0
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
O v e r Q u a n t it y F u lf ilm e n t 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0
U n d e r Q u a n t it y F u lf ilm e n t 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 1 1 .1 6 0 .0 0 2 6 3 9 8 .7 9
eUCALYPTUS PROJECT
MES Implementation at PT. IKPP - Perawang
Planning Area – Winder Machine Trim Efficiency
Reason:
There’s decreasing trend in the month of Jun – Aug 05 for PPM#1, because it follows the trend of
the orders from Marketing. Since it is the low season, so it impacted the trend.
In the month of Dec 05 – Jan 06, the trend is decreasing for PPM#2. This because there are a lot
of production for stock and it should not be counted as waste, because it will impacted in
decreasing trends.
A v e r a g e W in d e r M a c h in e T r im E f f ic ie n c y
100
90
80
Percentage
A v erage 9 6 .9 8 9 5 .2 3 9 7 .1 3 9 7 .8 8 9 8 .1 9 9 5 .6 9 9 3 .1 7 9 1 .8 2 9 7 .8 6 9 5 .6 7 9 6 .6 6
- . PPM # 1 9 5 .3 1 9 4 .0 2 9 5 .6 2 9 5 .8 2 9 7 .5 8 8 7 .8 0 8 4 .1 8 7 6 .6 4 9 6 .1 6 9 5 .7 4 9 6 .9 4
- . PPM # 2 9 6 .1 5 9 2 .2 2 9 8 .2 8 9 8 .2 7 9 7 .2 6 9 9 .6 0 9 5 .9 3 9 9 .3 0 9 9 .4 9 9 8 .2 5 9 3 .2 5
- . PPM # 3 9 9 .4 7 9 9 .4 5 9 7 .4 9 9 9 .5 5 9 9 .7 2 9 9 .6 6 9 9 .4 2 9 9 .5 3 9 7 .9 5 9 3 .0 3 9 9 .7 8
eUCALYPTUS PROJECT
MES Implementation at PT. IKPP - Perawang
Planning Area – Trim Over Run Efficiency
Reason:
Major contribution of better performance in PPM#1, because over run before MES (June, July,
and August) is so high.
It happened, because PPIC needed to plan export stock for minimizing waste, since there was
low order condition at that month.
A v e r a g e T r im O v e r R u n E f f ic ie n c y
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
0.00
5.00
10.00
15.00
Percentage
A v erage 2 .5 5 4 .2 9 2 .4 2 1 .6 5 1 .2 5 3 .7 6 6 .0 9 7 .6 2 1 .1 3 3 .3 4 2 .4 4
- . PPM # 1 4 .1 4 5 .3 7 3 .8 9 3 .5 4 1 .3 9 1 1 .2 8 1 4 .5 9 2 2 .5 4 1 .3 9 1 .9 3 0 .8 9
- . PPM # 2 3 .5 0 7 .3 2 1 .2 6 1 .4 2 2 .3 5 0 .0 0 3 .6 7 0 .3 2 0 .2 2 1 .4 1 6 .4 1
- . PPM # 3 0 .0 0 0 .1 9 2 .1 3 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 1 .7 9 6 .6 9 0 .0 0
eUCALYPTUS PROJECT
MES Implementation at PT. IKPP - Perawang
Planning Area – Trim Waste Efficiency
Reason:
Waste in PPM#1 is higher than PPM#2 and PPM#3, because order with special quality (LEO,
GTP, Embosindo, etc.) in PPM#1 is higher that other PPM.
Before MES, all kind of order (normal order and special quality order) can be planned in same
run. (which MES cannot)
Therefore, trimming in PPM#1 cannot be more optimize than other PPM.
A v e r a g e T r im W a s t e E f f ic ie n c y
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
0.00
0.50
1.00
1.50
Percentage
A v erage 0 .4 9 0 .5 1 0 .4 6 0 .4 8 0 .5 8 0 .5 9 0 .8 2 0 .6 4 1 .0 4 1 .0 3 0 .9 4
- . PPM # 1 0 .5 8 0 .6 5 0 .5 2 0 .6 6 1 .0 6 1 .0 4 1 .4 7 1 .0 6 2 .5 5 2 .4 3 2 .2 3
- . PPM # 2 0 .3 6 0 .5 1 0 .4 7 0 .3 2 0 .4 0 0 .4 0 0 .4 2 0 .3 8 0 .3 0 0 .3 5 0 .3 6
- . PPM # 3 0 .5 3 0 .3 6 0 .4 0 0 .4 5 0 .2 8 0 .3 4 0 .5 8 0 .4 7 0 .2 7 0 .3 0 0 .2 2
eUCALYPTUS PROJECT
MES Implementation at PT. IKPP - Perawang
Production – Mill Output Efficiency
Reason is not submitted yet
M ill O u t p u t E f f ic ie n c y
100
92
90
88
86
84
82
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
M ill O u t p u t Ef f ic ie n c y 9 1 .6 9 9 1 .6 3 9 0 .8 0 9 2 .4 8 9 2 .1 9 9 0 .7 1 8 9 .4 2 9 2 .1 2 9 0 .6 7 8 8 .2 2 8 8 .8 5 8 9 .4 9 9 0 .2 2
M ill O u t p u t Ef f ic ie n c y ( O n ly A ) 9 0 .0 8 8 7 .8 3 8 2 .9 4 8 6 .4 2 8 8 .5 6 8 2 .5 6 8 2 .8 4 8 7 .1 0 8 5 .8 1 8 4 .5 4 8 4 .7 6 8 5 .4 5 8 5 .3 9
eUCALYPTUS PROJECT
MES Implementation at PT. IKPP - Perawang
Production – Total Over Run (Winder)
Reason is not submitted yet
T o t a l O v e r r u n ( W in d e r )
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
0
5000
10000
Tonnage
15000
Before MES After MES
Jan 05 - Sep 05 Oct 05 - Jan 06
20000
Average 9385.99 9048.73
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
T o ta l 6 3 6 9 .5 8 7 2 7 5 .8 1 8 7 4 7 .1 0 1 1 5 2 5 .6 9 3 5 0 4 .1 0 1 5 8 8 1 .0 1 7 5 1 9 .4 4 9 0 2 0 .0 6 1 4 6 3 1 .1 0 1 3 2 1 9 .3 0 5 9 7 7 .8 4 6 6 1 1 .3 5 1 0 3 8 6 .4 5
- . PPM # 1 8 4 5 .5 1 0 .0 0 1 1 9 1 .4 5 1 6 8 9 .4 5 4 4 6 .3 2 1 7 8 0 .0 6 2 4 6 .1 4 1 1 5 9 .8 5 0 .0 0 0 .0 0 4 7 8 .4 0 0 .0 0 7 6 2 .1
- . PPM # 2 2 2 5 9 .8 6 4 0 5 3 .3 4 1 9 3 .1 1 3 5 1 2 .3 9 9 0 2 .7 7 4 4 0 7 .6 9 0 .0 0 3 7 4 7 .9 2 5 0 0 2 .5 9 6 9 8 5 .9 7 0 .0 0 0 .0 0 3 6 5 3 .1
- . PPM # 3 3 2 6 4 .2 1 3 2 2 2 .4 7 7 3 6 2 .5 4 6 3 2 3 .8 5 2 1 5 5 .0 1 9 6 9 3 .2 6 7 2 7 3 .3 0 4 1 1 2 .2 9 9 6 2 8 .5 1 6 2 3 3 .3 3 5 4 9 9 .4 4 6 6 1 1 .3 5 5 9 7 1 .2 5
eUCALYPTUS PROJECT
MES Implementation at PT. IKPP - Perawang
Production – Total Under Run (Winder)
Reason is not submitted yet
T o t a l U n d e r r u n ( W in d e r )
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
0
200
400
600
Tonnage
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
T o ta l 0 .0 0 8 5 .8 7 0 .0 0 0 .0 0 0 .0 0 0 .0 0 2 8 4 .6 5 0 .0 0 6 7 3 .6 6 4 6 1 .5 7 1 2 9 3 .7 0 2 4 2 .9 0 0 .0 0
- . PPM # 1 0 .0 0 8 5 .8 7 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 6 7 3 .6 6 4 6 1 .5 7 0 .0 0 0 .0 0 0 .0 0
- . PPM # 2 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 2 8 4 .6 5 0 .0 0 0 .0 0 0 .0 0 1 2 9 3 .7 0 2 4 2 .9 0 0 .0 0
- . PPM # 3 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0 0 .0 0
eUCALYPTUS PROJECT
MES Implementation at PT. IKPP - Perawang
Production – Sheeter Machine Efficiency
Reason is not submitted yet
A v e r a g e S h e e t e r M a c h in e E f f ic ie n c y
80
Before
MES After MES 70
Jan 05 - Oct 05 -
60
Sep 05 Jan 06
Average 40.27 40.41 50
Percentage
10
Formula:
Sheeter Machine Efficiency =
0
Yield Efficiency * Time Efficiency * Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
Capacity Efficiency
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
A v e r a g e S h e e t e r M a c h in e Ef f ic ie n c y 4 0 .2 2 3 8 .1 5 3 9 .7 1 3 9 .5 2 3 9 .6 4 3 9 .9 0 3 8 .1 2 4 6 .1 5 4 0 .9 9 3 3 .9 4 4 2 .8 7 4 2 .2 0 3 9 .8 0
A v e r a g e C / V # 1 C u t S h e e t e r M a c h in e Ef f ic ie n c y 3 5 .7 7 3 5 .3 7 3 6 .9 0 3 6 .6 3 4 1 .7 7 4 4 .8 0 3 7 .3 0 4 4 .1 3 4 4 .6 3 3 6 .0 3 4 4 .0 3 4 6 .8 7 5 4 .0 3
A v e r a g e C / V # 3 C u t S h e e t e r M a c h in e Ef f ic ie n c y 3 6 .0 1 3 4 .1 4 3 2 .5 3 3 5 .8 1 3 5 .0 7 3 4 .1 1 3 7 .1 4 4 0 .0 0 3 9 .0 3 3 6 .1 0 3 5 .8 1 3 9 .7 3
A v e r a g e F / N # 1 F o lio S h e e t e r M a c h in e Ef f ic ie n c y 3 1 .2 5 2 7 .7 8 2 8 .9 2 3 3 .2 0 2 7 .6 7 2 9 .0 5 2 8 .0 8 2 7 .3 0 3 2 .5 3 3 4 .0 7 3 5 .4 8 3 4 .7 8 3 1 .2 5
A v e r a g e F / N # 3 F o lio S h e e t e r M a c h in e Ef f ic ie n c y 5 7 .8 7 5 5 .3 0 6 0 .4 9 5 2 .4 4 5 4 .0 8 5 1 .6 4 4 9 .9 7 7 3 .1 7 4 7 .7 5 2 9 .5 4 5 6 .1 4 4 7 .4 4 3 4 .1 1
eUCALYPTUS PROJECT
MES Implementation at PT. IKPP - Perawang
Production – Sorter Waste Efficiency
Reason is not submitted yet Formula: Before MES After MES
Sorter Waste Efficiency =
Jan 05 - Sep 05 Oct 05 - Jan 06
Total Waste in Sorter Area /
Total Sheet into Sorter Area Average 19.40 17.46
C/V#1 28.32 24.41
C/V#3 27.87 30.09
F/N#1 9.74 10.28
F/N#3 11.68 6.57
A v e r a g e S o r t e r W a s t e E f f ic ie n c y
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
0
10
15
Percentage
20
25
30
35
40
45
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
A v erage 1 6 .5 3 2 0 .4 7 1 9 .7 4 1 9 .4 9 2 3 .5 6 2 0 .5 2 2 2 .3 8 1 6 .9 7 1 4 .9 6 1 6 .7 3 1 9 .2 0 1 8 .6 1 1 2 .9 6
- . C /V # 1 2 3 .7 3 3 8 .5 8 3 4 .0 3 3 1 .0 3 3 8 .5 5 2 2 .7 1 3 1 .7 7 2 1 .5 8 1 2 .9 0 2 2 .2 1 2 7 .2 7 2 6 .5 6 2 1 .5 9
- . C /V # 3 2 0 .2 5 2 1 .6 4 2 7 .5 8 2 8 .2 2 3 3 .9 6 3 7 .4 0 3 5 .8 2 2 2 .7 3 2 3 .2 4 2 8 .8 7 3 2 .1 5 2 9 .2 4
- . F /N # 1 9 .9 4 1 1 .1 5 9 .7 4 8 .3 9 .0 5 1 0 .1 6 8 .0 7 1 0 .9 4 1 0 .2 9 8 .5 2 1 1 .9 2 1 1 .7 8 .9 9
- . F /N # 3 1 2 .2 1 1 0 .4 9 7 .5 9 1 0 .4 1 1 2 .6 9 1 1 .8 2 1 3 .8 7 1 2 .6 4 1 3 .4 1 7 .3 1 5 .4 7 6 .9 3 8 .3 1
eUCALYPTUS PROJECT
MES Implementation at PT. IKPP - Perawang
Production – Sheet through Sorter
Reason is not submitted yet Formula: Before MES After MES
Sheet through Sorter =
Jan 05 - Sep 05 Oct 05 - Jan 06
Total Sheet into Sorter Area /
Total Sheet Produce by Average 24.42 29.90
Sheeter Machine
C/V#1 5.58 6.86
C/V#3 2.58 2.63
F/N#1 49.76 58.03
F/N#3 39.74 49.05
A v e r a g e S h e e t th r o u g h S o r te r
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
0
10
20
Percentage
30
40
50
60
70
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
A v eraged 2 7 .6 1 2 4 .8 4 2 2 .9 5 2 4 .6 9 2 4 .7 2 2 4 .7 5 2 4 .5 0 2 1 .7 6 2 3 .9 4 2 8 .9 9 2 9 .4 2 2 9 .2 5 4 2 .4 2
- . C /V # 1 5 .3 2 7 .5 2 6 .1 9 5 .6 4 5 .5 0 6 .3 5 5 .3 2 4 .1 4 4 .2 5 7 .3 3 9 .0 8 6 .5 2 4 .5 1
- . C /V # 3 3 .4 4 2 .8 7 2 .3 2 2 .4 5 2 .8 3 2 .7 8 2 .5 5 1 .9 4 2 .0 6 2 .3 6 2 .2 2 3 .3
- . F /N # 1 5 8 .6 8 4 8 .4 9 4 1 .9 7 4 4 .5 1 5 3 .1 7 4 4 .8 5 1 .1 4 5 0 .3 9 5 4 .6 6 5 6 .7 9 5 6 .5 1 5 9 .4 5 9 .4
- . F /N # 3 4 2 .9 9 4 0 .4 6 4 1 .3 1 4 6 .1 5 3 7 .3 8 4 5 .0 6 3 8 .9 7 3 0 .5 8 3 4 .8 1 4 9 .4 7 4 9 .8 8 4 7 .7 9 6 3 .3 5
eUCALYPTUS PROJECT
MES Implementation at PT. IKPP - Perawang
Production – Intermediate Storage
Reason is not submitted yet Formula: Before MES After MES
Intermediate Storage =
Jan 05 - Sep 05 Oct 05 - Jan 06
Total Stock in Production Area
(Converting and Finishing) Average 26687.85 32321.67
C/V#1 14120.18 16015.11
C/V#3 1711.69 2712.31
F/N#1 6200.43 8172.93
F/N#3 4655.55 8132.53
In t e r m e d ia t e S t o r a g e
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
0
5000
10000
15000
Tonnage
20000
25000
30000
35000
40000
Ja n -0 5 Fe b -0 5 Mar-05 A pr-05 May -05 Ju n -0 5 J u l- 0 5 A ug-05 Sep-05 O c t- 0 5 Nov -05 Dec -05 Ja n -0 6
T o t a l In t e r m e d ia t e S t o r a g e 2 5 6 2 8 .6 3 2 0 9 0 1 .3 4 2 5 6 5 9 .2 8 2 6 6 4 3 .9 9 3 2 5 0 8 .2 8 2 2 2 2 2 .1 0 2 2 7 4 6 .5 4 3 2 5 4 8 .3 2 3 1 3 3 2 .1 5 3 3 6 9 1 .1 3 3 0 6 3 0 .1 3 3 7 6 4 4 .3 4 3 4 1 8 3 .1 8
- . C /V # 1 1 0 9 7 6 .8 0 8 7 7 3 .6 0 1 1 7 6 3 .3 1 1 3 8 9 5 .2 9 1 9 4 1 0 .3 3 1 0 4 7 9 .1 8 1 1 4 9 4 .7 2 2 0 0 2 6 .3 3 2 0 2 6 2 .0 9 1 6 8 2 0 .7 3 1 1 3 3 4 .9 5 1 7 1 9 8 .3 0 1 8 7 0 6 .4 7
- . C /V # 3 3 2 7 2 .3 9 7 7 3 .0 4 2 1 5 0 .9 4 1 3 7 1 .8 7 1 9 5 4 .8 8 8 1 4 .1 5 3 5 0 .8 7 2 5 3 2 .9 5 2 1 8 4 .1 4 3 0 2 9 .6 6 2 8 6 6 .5 7 2 2 4 0 .6 9
- . F /N # 1 7 6 1 1 .0 8 6 7 5 9 .6 5 7 0 4 4 .5 5 5 9 1 8 .8 5 2 1 9 .6 8 6 4 2 7 .6 1 6 5 4 9 .7 3 5 7 9 1 .3 8 4 4 8 1 .3 7 6 9 7 5 .9 7 8 3 6 0 .4 6 8 7 4 0 .6 7 8 6 1 4 .6 3
- . F /N # 3 3 7 6 8 .3 5 7 4 5 9 5 .0 4 8 4 7 0 0 .4 8 1 5 4 5 8 .0 3 2 5 9 2 3 .3 8 9 4 5 0 1 .1 6 4 4 3 5 1 .2 2 1 4 1 9 7 .6 6 6 4 4 0 4 .5 4 6 6 8 6 4 .7 7 1 8 0 6 8 .1 5 5 9 4 6 4 .6 7 8 6 8 6 2 .0 8 3
eUCALYPTUS PROJECT
MES Implementation at PT. IKPP - Perawang