Given data:
N0 = -750
Solution:
R = N - N 0 = 56 – (-750) = 806
Self-weight of purlins = 10 kg / m2
Miscellaneous = 5 kg / m2
2
Steel Structures Lab
𝑤 𝐿 140 31.2
Self-weight of truss = √ 𝑠 (8.5 + 0.5) = √4.62 ( 8.5 + 0.5) = 22.96kg / m2
Plw = -15.82 KN
3
Steel Structures Lab
Pww = -15.82 KN
4
Steel Structures Lab
5
Steel Structures Lab
So, the values required for the table of forces are as follows:
Table of forces
Member Member Member Member (1.2Pd+1.6 (1.2Pd+ (1.2Pd+ (0.9Pd)* (0.9Pd)*Col2 Max Max Remarks
Name Force Force Force Pl)*Col2 0.5Pl)* 0.5Pl)* Col2+ + (1.3Pww)* Factored Factored
Under Under Under Col2+ Col2+ (1.3Pww) Col4+ Tension Compression
Unit Unit Wind Unit (1.3Pww* (1.3Pww* *Col3+ (1.3Plw)*
Gravity Load On Wind Col3)+ Col4)+ (1.3Plw)* Col3
Load Hinge Load On (1.3Plw)* (1.3Plw)* Col4
Side Roller Col4 Col3
Side
6
Steel Structures Lab
FG 7.2 2.47 4.68 299.8368 12.7643 12.7643 -74.9245 -74.9245 299.837 74.925 Tension
L89X76X
7.9
GH 4.67 1.37 3.27 194.47748 8.22908 8.22908 -48.64685 -48.64685 194.477 48.647 Tension
L89X76X
7.9
HI 0 0 0 0 0 0 0 0 0.000 0.000
IK -4 -1.03 -2.95 -166.576 -6.93132 -6.93132 41.78468 41.78468 41.785 166.576 Compr…
L89X76X
7.9
KM -4.68 -1.38 -3.32 -194.89392 -7.21708 -7.21708 49.78064 49.78064 49.781 194.894 Compr…
L89X76X
7.9
MO -7.22 -2.48 -4.82 -300.66968 -10.12332 -10.12332 77.80906 77.80906 77.809 300.670 Compr…
L102X89
X9.5
OQ -8.21 -3.38 -4.96 -341.89724 -10.70872 -10.70872 89.28087 89.28087 89.281 341.897 Compr…
L102X89
X9.5
QR -8.03 -4.13 -4.09 -334.40132 -9.18136 -9.18136 88.61601 88.61601 88.616 334.401 Compr…
L102X89
X9.5
RP -8.03 -4.09 -4.13 -334.40132 -9.18136 -9.18136 88.61601 88.61601 88.616 334.401 Compr…
L102X89
X9.5
PN -8.21 -4.96 -3.38 -341.89724 -10.70872 -10.70872 89.28087 89.28087 89.281 341.897 Compr…
L102X89
X9.5
NL -7.22 -4.82 -2.48 -300.66968 -10.12332 -10.12332 77.80906 77.80906 77.809 300.670 Compr…
L102X89
X9.5
LJ -4.68 -3.32 -1.38 -194.89392 -7.21708 -7.21708 49.78064 49.78064 49.781 194.894 Compr…
L89X76X
7.9
JA -4 -2.95 -1.03 -166.576 -6.93132 -6.93132 41.78468 41.78468 41.785 166.576 Compr…
L89X76X
7.9
JB 5.61 3.93 1.65 233.62284 9.76128 9.76128 -58.56291 -58.56291 233.623 58.563 Tension
L89X76X
7.9
LB -3.11 -2.18 -0.91 -129.51284 -5.48062 -5.48062 32.39607 32.39607 32.396 129.513 Compr…
L89X76X
7.9
LC 3.17 1.77 1.37 132.01148 5.78408 5.78408 -32.82335 -32.82335 132.011 32.823 Tension
L89X76X
7.9
NC -1.9 -1.06 -0.82 -79.1236 -3.50832 -3.50832 19.63178 19.63178 19.632 79.124 Compr…
L89X76X
7.9
ND 1.28 0.08 1.17 53.30432 2.70338 2.70338 -12.88574 -12.88574 53.304 12.886 Tension
L89X76X
7.9
PD -0.82 -0.05 -0.75 -34.14808 -1.74792 -1.74792 8.23886 8.23886 8.239 34.148 Compr…
L89X76X
7.9
PE -0.25 -1.29 1.02 -10.411 0.00382 0.00382 3.04857 3.04857 3.049 10.411 Compr…
L89X76X
7.9
RE 0.33 0.18 0.18 13.74252 -0.07908 -0.07908 -4.09815 -4.09815 13.743 4.098 Tension
L89X76X
7.9
QE -0.25 1.02 -1.29 -10.411 0.00382 0.00382 3.04857 3.04857 3.049 10.411 Tension
L89X76X
7
Steel Structures Lab
7.9
QF -0.82 -0.75 -0.05 -34.14808 -1.74792 -1.74792 8.23886 8.23886 8.239 34.148 Compr…
L89X76X
7.9
OF 1.28 1.17 0.08 53.30432 2.70338 2.70338 -12.88574 -12.88574 53.304 12.886 Tension
L89X76X
7.9
OG -1.9 -0.82 -1.06 -79.1236 -3.50832 -3.50832 19.63178 19.63178 19.632 79.124 Compr…
L89X76X
7.9
MG 3.17 1.37 1.77 132.01148 5.78408 5.78408 -32.82335 -32.82335 132.011 32.823 Tension
L89X76X
7.9
MH -3.11 -0.91 -2.18 -129.51284 -5.48062 -5.48062 32.39607 32.39607 32.396 129.513 Compr…
L89X76X
7.9
KH 5.61 1.65 3.93 233.62284 9.76128 9.76128 -58.56291 -58.56291 233.623 58.563 Tension
L89X76X
7.9
Given data:
N0 = -750
8
Steel Structures Lab
Solution:
R = N - N 0 = 56 – (-750) = 806
Miscellaneous = 9 kg / m2
9
Steel Structures Lab
Dead Load = (25 * 6 * 9) * 3.9 * 9.81 + (21 * 3.9 * 9.81) = (1530.36 + 803.44) N/m
Now
Mx = 16377.61 N/m
Mx (assumed)= Mx + 15My
10
Steel Structures Lab
= 36851.11 Nm
C250 * 30
dmin. Check:
d = 254 mm >dmin. OK.
Applied Stress Check:
Sx = 259 * 103 mm3
Sy = 21.6 * 103 mm3
fb = Mx / Sx + My / (Sy /2) + My / Sy
= (16377.61 * 1000) / (259 * 103 ) + (1186.87 * 1000) / ((21.6/2) * 103 ) +
(178.03 * 1000) / (21.6 * 103 )
fb = 181.37MPa>Fb NOT OK.
C250 * 37
dmin. Check:
d = 254 mm >dmin. OK.
Applied Stress Check:
Sx = 298 * 103 mm3
Sy = 24.3 * 103 mm3
fb = Mx / Sx + My / (Sy /2) + My / Sy
= (16377.61 * 1000) / (298 * 103 ) + (1186.87 * 1000) / ((24.3/2) * 103 ) +
(178.03 * 1000) / (24.3 * 103 )
fb = 159.97 MPa<Fb OK.
11
Steel Structures Lab
Compactness Check:
bf / tf = 73 / 11.1 = 6.6 < 10.7 OK.
Check for self-weight of purlin:
Actual Self-Weight of purlin = 37 * 10 / 31.2 = 11.86 Kg / m2 < 1.2 * 21 OK.
Mx (assumed)= Mx + 15My
= 36851.11 Nm
W310 * 21
dmin. Check:
d = 302 mm >dmin. OK.
Applied Stress Check:
Sx = 244 * 103 mm3
Sy = 19.5 * 103 mm3
fb = Mx / Sx + My / (Sy /2) + My / Sy
= (16377.61 * 1000) / (244 * 103 ) + (1186.87 * 1000) / ((19.5/2) * 103 ) +
(178.03 * 1000) / (19.5 * 103 )
fb = 197.98 MPa>Fb NOT OK.
12
Steel Structures Lab
W250 * 28.4
dmin. Check:
d = 259 mm >dmin. OK.
Applied Stress Check:
Sx = 308 * 103 mm3
Sy = 35.1 * 103 mm3
fb = Mx / Sx + My / (Sy /2) + My / Sy
= (16377.61 * 1000) / (308 * 103 ) + (1186.87 * 1000) / ((35.1/2) * 103 ) +
(178.03 * 1000) / (35.1 * 103 )
fb = 125.87MPa<Fb OK.
Compactness Check:
bf / tf = 102 / 10 = 10.2< 10.7 OK.
Check for self-weight of purlin:
Actual Self-Weight of purlin = 28.4 * 10 / 31.2 = 9.10 Kg / m2 < 1.2 * 21 OK.
13
Steel Structures Lab
Given data:
N0 = -750
Solution:
R = N - N 0 = 56 – (-750) = 806
Miscellaneous load = 6 kg / m2
14
Steel Structures Lab
Live load from design aids (for Ө = 4.764 ○) = 100 kg / m (For 1 m wide strip)
Number of trusses = 9
L1 = (1* 3.9 / cos 4.7640 ) + 0.2 = 4.11 m (Not possible because 1.5 m < L < 4 m)
L2 = (2 * 3.9 / cos 4.7640 ) + 0.2 = 8.03 m (Not possible because 1.5 m < L < 4 m)
L3 = (3 * 3.9 / cos 4.7640 ) + 0.2 = 11.94 m (Not possible because 1.5 m < L < 4 m)
15
Steel Structures Lab
Now;
So
L2 = (2 * 1.95 / cos 4.7640 ) + 0.2 = 4.11 m (Not possible because 1.5 m < L < 4 m)
L3 = (3 * 1.95 / cos 4.7640 ) + 0.2 = 6.07 m (Not possible because 1.5 m < L < 4 m)
(Sx )Required = Mmax * 1000 / 0.6 Fy = 592.24 * 1000 / 0.6 * 250 = 3.95 * 103 mm3
16
Steel Structures Lab
Now
Number of sheet panels required for 100 m2 of roof area = N 100 = 108 / C (L-E)
Now
The inclined roof area on one side = A = ((L / 2 + Sheet projection) * (N t – 1) * S) / cos Ө
17
Steel Structures Lab
A = 589.7 m2
= 589.7 * 88 / 100
= 519
Final Results:
18