Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

GENERAL SPECIFICATIONS:

1. ALL MATERIALS USED IN THIS PROJECT SHALL BE GOOD


S I D E W A L K S I D E W A L K STANDARD QUALITY
2. DO NOT COMBINE ELECTRONICS OUTLET TO ELECTRICAL
OUTLET
3. ALL INSTALLATION SHALL BE UNDER THE DIRECT SUPERVISION
OF A DULY LICENSE PROFESIONAL ELECTRONICS PLAN SHALL BE
SIGNED AND SEALED BY A PROFESSIONAL ELECTRONICS
FEMALE TOILET RENTABLE RENTABLE RENTABLE RENTABLE RENTABLE ENGINEER UNDER R.A. 9292.
11 m² 5 m² 4 m² 5 m² 5 m² 5 m² PANTRY
16 m² 5. ALL ELECTRONICS INSTALLATIONS SHALL BE IN ACCORDANCE
LOUNGE
HOLDING AREA PRE-DEPARTURE AREA 10 m² WITH THE LATEST
20 m² 240 m²
PROVISIONS OF THE PHILIPPINE ELECTRONICS CODE.
TOILET 6. ELECTRONICS CONVENIENCE OUTLET: 0.30M ABOVE FINISH
1 m²
FLOOR LEVEL UNLESS SPECIFIED FOR OTHER PURPOSES.

MALE TOILET
MANAGER'S
OFFICE
CCTV NOTES:
10 m² 5 m²
1. Use 4 pairs CAT6 UTP Cable
MALE TOILET
12 m² 2. Use 20/63mm DIA PVC conduits with 20mm
IATF OFFICE
17 m²
flexible hose
3. Use powder coated pullbox (400x400x150)mm

TICKETING BOOTH

F
4. Use NVR with 4TB storage and 32" monitor

R
25 m²
5. Use dome and bullet network cameras (Minimum

U
THERMAL SCANNING
DEPARTURE AREA
THERMAL SCANNER
of 1 MP Resolution)

T
240 m²

RESTAURANT/
6. Use 8/24 port POE switch

PWD
RENTABLE SPACE

3 m²
ARRIVAL AREA 29 m²
240 m²

ELECTRICAL /
CCTV SYSTEM
ELECTRONICS
ROOM
3 m²
SYMBOLS DESCRIPTION OF ITEM

CCTV CAMERA BULLET TYPE

S I D E W A L K S I D E W A L K NVR NETWORK VIDEO RECORDER


PB W/ POE
SWITCH PULL BOX WITH POE SWITCH

TV TELEVISION

T U R F T U R F T U R F
ROUTER ROUTER

COMPUTER COMPUTER (WORK STATION)

UPS UNINTERRUPTED POWER SUPPLY


R A M P U P COMPUTER

PB
UPS NVR w/POE
CCTV LAYOUT
SCALE : 1:100 mts
Switch

ROUTER

RISER DIAGRAM
PROJECT TITLE: CERTIFIED BY : PRC NO. : PREPARED BY : CHECKED & REVIEWED BY : RECOMMENDING APPROVAL : APPROVED BY : SHEET CONTENTS : SHEET NO. :
VALIDITY :
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF AGRICULTURE
PHILIPPINE RURAL DEVELOPMENT PROJECT
REPUBLIC OF THE PHILIPPINES
REGION VI-WESTERN VISAYAS
PROVINCE OF ILOILO
REHABILITATION AND EXPANSION
OF PUNTALES FEEDER PORT
P T R NO. :

DATE ISSUED :
CCTV LAYOUT
ES02
BONIFACIO DRIVE , ILOILO CITY 5000
EVA MAE V. PARRENAS ROMEO ANDIG RAUL N. BANIAS M.D.,MPA ATTY. SUZETTE A. MAMON ARTHUR R. DEFENSOR JR.
PROJECT SP ID NP.:
PRDP-IB-R006-ILO-010-000-000-2019-AF
PROJECT LOCATION: BRGY. NIPA , CONCEPCION , ILOILO
PLACE ISSUED :

T I N:
M U N I C I P A L E N G I N E E R ACTING PROVINCIAL ENGINEER MUNICIPAL MAYOR , MUNICIPALITY OF CONCEPCION PROVINCIAL ADMINISTRATOR P R O V I N C I A L G O V E R N O R 50-59

You might also like