Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

ERECTION CONTROL FORM

11 KV SWITCHGEAR

PROJECT : QATAR POWER TRANSMISSION SYSTEM EXPANSION, PHASE VI-PART 2

CONTRACT NO : GTC/05/2004 SBSTATION :

CUSTOMER : KAHRAMA SUPPLIER :


CONSULTANT : EFC INSPECTION REQUEST REF :
LOCATION : DRAWING REF :
Checked
Item Description of Check Remarks
Yes No N/A

Check the panels / components erected as per relevant drawings in


1
correct sequence

2 Check the doors to ensure that it can be opened and closed smoothly

3 Check that all bolts and nuts are securely bolted

4 Check that all inter panel gape are sealed

5 Check all grounding connection are secure

Check the mechanical / electrical interlock properly as per


6
specification to prevent any incorrect operation of switchgear

Check magnetic coupling lever to ready for service indicator


7
smoothly movable

8 Check ready for service indicator whether showing green color

9 Check ON & OFF operation of circuit breaker carried out manually

10 Check whether voltage transformer housing got earthed

11 Check whether secondary wiring of voltage transformer is earthed

12 Check the pad locking facilities to be provided as per specification

Check the busbar connection tightness and screw tightness using


13
torque wrench
ERECTION CONTROL FORM

11 KV SWITCHGEAR

PROJECT : QATAR POWER TRANSMISSION SYSTEM EXPANSION, PHASE VI-PART 2

CONTRACT NO : GTC/05/2004 SBSTATION :

CUSTOMER : KAHRAMA SUPPLIER :


CONSULTANT : EFC INSPECTION REQUEST REF :
LOCATION : DRAWING REF :
Checked
Item Description of Check Remarks
Yes No N/A

Ensure rack in / rack out of breaker in proper alignment and


14
smoothness operation

Check for proper status indication for spring charged, discharged,


15
breaker open / close during breaker operation.

16 Tightness of all terminal connections shall be checked

The fixed and moving contacts should be clean and grease applied to
17
the contacts, also ensure proper contact engagement

18 Insulation shrouds shall be provided on all busbar joints.

19 Accessories like handle tools etc shall be available near panels

CT/VT connections / polarity shall be done as per KHARAMAA’s


20
approved drawing / specification

21

22

23

ABB EFC
NAME OF ENGINEER : NAME OF ENGINEER :

DATE : DATE :

SIGNATURE : SIGNATURE :

You might also like