ERECTION CONTROL FORM

160/40 MVA POWER TRANSFORMER / E/A TRANSFORMER

PROJECT : QATAR POWER TRANSMISSION SYSTEM EXPANSION, PHASE VI-PART 2

CONTRACT NO : GTC/05/2004 SBSTATION :

CUSTOMER : KAHRAMA SUPPLIER :


CONSULTANT : EFC INSPECTION REQUEST REF :
LOCATION : DRAWING REF :
Checked
Item Description of Check Remarks
Yes No N/A

1 All components are erected properly, as per relevant drawing.

2 Radiator assembly & piping with valves are properly installed

3 Check for proper locking of rollers onto rails

4 Check for proper fixing of HV, LV & Neutral

5 Check pressure relief device in position

6 Check oil level for main tank piping with valves fitted

7 Check oil level for main tank and OLTC

8 Check for oil leakage at all joints, radiator, conservator etc.

9 Check all valves open except draining and sampling valves

Check for proper mounting of buchholz ready ( arrow towards


10
conservator)
Check tank earthing as per the manufacturer recommendation /
11
drawing

12 Check HV neutrals effectively earthed

13 Check for proper function of oil level indicator

14 Check for proper operation of tap position switch

15 Check for proper connection of WTI CT’s

16 Marshalling box have been erected properly and earthed

Check for proper termination of control cables as per relevant


17
drawing

18 Check for identification ferrules in position

19 Check silicagel breathers, in position and filled with oil

20 Check silicagel, in breather, is active and in specified color


ERECTION CONTROL FORM

160/40 MVA POWER TRANSFORMER / E/A TRANSFORMER

PROJECT : QATAR POWER TRANSMISSION SYSTEM EXPANSION, PHASE VI-PART 2

CONTRACT NO : GTC/05/2004 SBSTATION :

CUSTOMER : KAHRAMA SUPPLIER :


CONSULTANT : EFC INSPECTION REQUEST REF :
LOCATION : DRAWING REF :
Checked
Item Description of Check Remarks
Yes No N/A

21 Air released from individual compartments and from buchholz relay

22 Check identification labels

23 Check cooling fan rotation marking

24

25

26

27

28

29

ABB EFC
NAME OF ENGINEER : NAME OF ENGINEER :

DATE : DATE :

SIGNATURE : SIGNATURE :