ERECTION CONTROL FORM

LVAC

PROJECT : QATAR POWER TRANSMISSION SYSTEM EXPANSION, PHASE VI-PART 2

CONTRACT NO : GTC/05/2004 SBSTATION :

CUSTOMER : KAHRAMA SUPPLIER :


CONSULTANT : EFC INSPECTION REQUEST REF :
LOCATION : DRAWING REF :
Checked
Item Description of Check Remarks
Yes No N/A

1 Check for the location of panel as per layout drawing

2 Inspection for physical damage / defect

Inspection coupling, alignment and tightness (torque wrench


3
method)

4 Check the busbar connection tightness using torque wrench

Verify that all front panel mounted devices (meters, selector


5 switches, push buttons, timers and indication lights) are installed as
per layout drawing and correctly labeled.

Ensure rack in / rack out of breaker in proper alignment and


6
smoothness operation.

7 Ensure the CT polarity as per the approved schematics

8 Check the equipment earthing

9 Check cabling arrangement & identification.

10 Check the cable connection in accordance with drawings

11 Check gland tightness


ERECTION CONTROL FORM

LVAC

PROJECT : QATAR POWER TRANSMISSION SYSTEM EXPANSION, PHASE VI-PART 2

CONTRACT NO : GTC/05/2004 SBSTATION :

CUSTOMER : KAHRAMA SUPPLIER :


CONSULTANT : EFC INSPECTION REQUEST REF :
LOCATION : DRAWING REF :
Checked
Item Description of Check Remarks
Yes No N/A

12 Ensure the wiring identification of the panel

13 Ensure the equipment identification as per the approved drawing

14 Check the cleanliness of the panel

15 Check the gland earthing of all the compartments

16

17

18

ABB EFC
NAME OF ENGINEER : NAME OF ENGINEER :

DATE : DATE :

SIGNATURE : SIGNATURE :