APPENDIX-F

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Based on MRS Ist Quarter 2009 Actual Alloted Tender Rates &
Work yet to be Alotted Based on MRS Ist Bi-annual 2016

Distribution System
Table F-1: SUMMARY OF COST

Sr. Ref Rate Amount


Descriptions Unit Quantity
No. Table (Rs.) (Rs.)
New Tube Wells
Tube Well boring and Conversion (8
1 F-4 18,125,388
Nos.) (Detail attached)
2 Pumping Chambers (12'x12')
i) Civil work (8Nos.) F-7 2,490,422
iiI) Electrical Works (8 Job.) F-10 6,672,453
iii) Pumping Equipment (8 sets) F-13 18,653,168

3 New RCC Over Head Reservoir F-22

i) Capacity (100,000 Gallons) (6 Nos.) 51,750,000


ii) Capacity (50,000 Gallons) (1 No) 4,750,000

Rising Main and Distribution System


4
(Zone-II & V)

i) Main Lines F-16


Part - I (Alloted Rates) 116,895,901
Part - II (Revised Rates 2016) 56,436,975
ii) Tertiary Lines F-17
Part - I (Alloted Rates) 7,099,212
Part - II (Revised Rates 2016) 16,339,622

5 House Connection
Part - I F-25 16,730,912
6 P/F Hypo Cholrinator (20 Nos.) F-28 702,000

7 Lum Sum Provision


Other Lum Sum Provision (M.S Pipe
i 3,992,616
and Railing OHR)

Total Cost in Rupees Group-I (Zone-II & V) 320,638,669

F1-1
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Detail of Specials (Part - I)

Length 45o Bend 90o Bend Tee Equal Tee Reducer Sluice Valve
Nullah
Zone Name of Line
Crossing

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d 6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4"8"x8"x4"8"x8"x6"10"x10"x4"10"x10"x6"10"x10"x8"12"x12"x8"
12"x12"x10" 4" 6" 8" 10" 12" 6"x4"8"x6"10"x6"10"x8"8"x4" 12"x8"12"x10" 12" 10" 8" 6"

II TW 5/OHR 8/ 347-504 811 - - - - 4


3 1 2
504-501 - - 2395 - - 5 1 1 1 1 2 3
504-505 - 1019 - - - 1 2
505-509 - 809 - - -
509-510 - - - 861 - 2 1
509-517 - 1068 - - - 4
517-606 - 316 - - - 1 2 3 1
601-602 - - 386 - - 3 1 2 3 1
520-515 - - - 1049 - 6 1
515-516 - - - 414 - 2
515-513 - - - 775 - 2 2
512-506 - - - 1087 - 3 2
513-523 - - - 1218 - 7 2 1 1
523-514 - - - 215 - 2 1
606.607 - - 1251 - - 3 3
602-607 - - - 1329 - 4 5 5
607-608 - - 1109 - - 1 1
603-608 - - - 1283 - 4 3 3
608-609 - - 952 - - 2 1 1 2
628-627 - - 705 - 4
627-626 - - 900 - 3
626-625 - - 706 - - 2 2
Tw 6-631 - - 395 - - 2 5 5 5
TW 6-624 - - 1439 - - 4 3 3
TW 7/23-715-716 1448 - - - - 2 5 5 5 5 1
716-712 - - 1768 - - 2 3 3 3
716-710 - - 1268 - -
710-709 - - 2910 - - 9 8 13 13
709-708 - - 465 - - 1
709-714 - - - 880 - 2 2 1
714-713 - - - 539 - 2 2
704-705 - - - 2979 - 6 8 8
703-706 - - 2500 - - 3 4 6 6 1
II 705-706 - - - 1604 - 3 1 3 1
705-702 - - - 1847 - 10 10 1
621-622 - - 1138 - - 1 1
622-623 - - 340 - - 3 1
623-624 - - 500 - - 5 3 3
TW2-OHR - - 200 - -
501-503 - 3800 - - - 3 1 1 1 1
626-Tw.3 - - - 2682 - 2 8 7 2
706-712 - - 1009 - - 1
631-200 - - - 1568 - 1
201-202 - - 2500 - -
501-203 - - 6500 - - 2 3 3 3
517-513 - - - 2500 - 9 4 2 1
2.220 - - - - 160

F16-1
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Detail of Specials (Part - I)

Length 45o Bend 90o Bend Tee Equal Tee Reducer Sluice Valve
Nullah
Zone Name of Line
Crossing

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d 6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4"8"x8"x4"8"x8"x6"10"x10"x4"10"x10"x6"10"x10"x8"12"x12"x8"
12"x12"x10" 4" 6" 8" 10" 12" 6"x4"8"x6"10"x6"10"x8"8"x4" 12"x8"12"x10" 12" 10" 8" 6"

2.230 - - - - 40
2.240 - - - - 50

F16-2
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Detail of Specials (Part - I)

Length 45o Bend 90o Bend Tee Equal Tee Reducer Sluice Valve
Nullah
Zone Name of Line
Crossing

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d 6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4"8"x8"x4"8"x8"x6"10"x10"x4"10"x10"x6"10"x10"x8"12"x12"x8"
12"x12"x10" 4" 6" 8" 10" 12" 6"x4"8"x6"10"x6"10"x8"8"x4" 12"x8"12"x10" 12" 10" 8" 6"

2.250 - - - - 475
2.260 - - - - 212
2.270 - - - - 586
2.280 - - - - 232
2.290 - - - - 221
2.300 - - - - 345
2.310 - - - - 56
2.320 - - - - 306
2.330 - - - - 244
2.340 - - - - 178
2.350 - - - - 1098
2.360 - - - - 200
2.370 - - - - 231
2.390 - - - - 242
2.400 - - - - 222
2.410 - - - - 100
2.420 - - - - 780
2.430 - - - - 208
2.440 - - - - 422
2.450 - - - - 201
2.460 - - - - 210
2.470 - - - - 730
2.480 - - - - 290
2.490 - - - - 1029
2.500 - - - - 547
2.510 - - - - 20
2.520 - - - - 218
2.530 - - - - 200
2.540 - - - - 341
2.550 - - - - 154
2.560 - - - - 121
2.570 - - - - 203
2.580 - - - - 784
2.590 - - - - 164
2.600 - - - - 340
2.610 - - - - 220
2.620 - - - - 205
2.630 - - - - 208
2.63A - - - - 210
2.640 - - - - 193
2.650 - - - - 210
2.660 - - - - 126
2.670 - - - - 170
2.680 - - - - 300
2.690 - - - - 1415
2.700 - - - - 262
2.710 - - - - 295

F16-3
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Detail of Specials (Part - I)

Length 45o Bend 90o Bend Tee Equal Tee Reducer Sluice Valve
Nullah
Zone Name of Line
Crossing

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d 6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4"8"x8"x4"8"x8"x6"10"x10"x4"10"x10"x6"10"x10"x8"12"x12"x8"
12"x12"x10" 4" 6" 8" 10" 12" 6"x4"8"x6"10"x6"10"x8"8"x4" 12"x8"12"x10" 12" 10" 8" 6"

2.720 - - - - 379
2.730 - - - - 403
2.750 - - - - 282
2.740 - - - - 602
2.760 - - - - 548
2.770 - - - - 548
2.780 - - - - 513
2.790 - - - - 688
2.800 - - - - 150
2.810 - - - - 156
2.820 - - - - 120
2.830 - - - - 1888
9.080 - - - - 2480
9.100 - - - - 300
9.110 - - - - 551
9.120 - - - - 108
9.130 - - - - 128
9.140 - - - - 124
9.150 - - - - 208
9.160 - - - - 258
9.170 - - - - 786
2.840 - - - - 141
2.850 - - - - 142
2.860 - - - - 756
2.870 - - - - 111
2.880 - - - - 180
2.890 - - - - 70
2.900 - - - - 70
2.910 - - - - 700
2.920 - - - - 100
2.930 - - - - 150
2.940 - - - - 220
2.94A - - - - 1500
2.950 - - - - 206
2.95A - - - - 3100
2.960 - - - - 368
2.970 - - - - 408
9.010 - - - - 1100
9.020 - - - - 300
9.030 - - - - 300
9.040 - - - - 300
9.050 - - - - 380
9.060 - - - - 400
9.070 - - - - 300
9.230 - - - - 1780
9.270 - - - - 2500
2.106 - - - - 500
2.107 - - - - 298

F16-4
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Detail of Specials (Part - I)

Length 45o Bend 90o Bend Tee Equal Tee Reducer Sluice Valve
Nullah
Zone Name of Line
Crossing

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d 6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4"8"x8"x4"8"x8"x6"10"x10"x4"10"x10"x6"10"x10"x8"12"x12"x8"
12"x12"x10" 4" 6" 8" 10" 12" 6"x4"8"x6"10"x6"10"x8"8"x4" 12"x8"12"x10" 12" 10" 8" 6"

2.108 - - - - 551
2.109 - - - - 249
V Tw17-426-628 - 315 - - -
628-626 - 525 - - -
626-800 - 1285 - - -
628-625 - - 1687 - - 2 2 2 1
625-624 - - 560 - - 2 1 1
624-623 - - 2390 - - 2 6 2 0 4
623-622 - - 2100 - - 2 3 3 3
622-621 - - 190 - -
627-605 - - 2602 - - 3
605-604 - - 440 - - 1 1
604-603 - - 1864 - - 2 1 2 1 2
603-602 - - - 325 - 2 2 2
602-601 - - - 2300 - 7 9 8 1
604-612 - - 2828 - -
612-617 - - 1342 - - 1 0 1 1
617-616 - - 136 - - 1 1 1
616-615 - - 1945 - - 5 5 5
615-614 NC - - 3624 - - 1 2 1
614-601 NC - - 1052 - - 1 2 1 2 1
601-507 - - 1750 - -
611-614 - - 2773 - 10 8 5
TW 20 2 -502 1100 - - - - 1 2 1
506-603 - - 2158 - - 2 1 1 1
501-627 - - 7827 - - 7 1 1 1 1 1
TW 19 / OHR 26 150 - - - -
DR26-415 250 - - - -
411-615 NC - - 764 - - 1 1 1
417-616 - - - 2387 - 7 2 2
608-609 - - 1044 - -

Tw 18/OHR 25-421-424 909 - - - -


4 1 2
421-420 1468 - - - - 2 1 2 1
TW 11-432 - - - 1969 - 6 1 1
424-423 - 800 - - -
432-424 - - 1669 - - 4
Tw 17-423 - 2706 - - - 1 1 1 1 3
408-407 - - - 1326 - 5 6 4
Tw 9/403-401 - - - 1856 - 10 8 1
401-402 - - - 712 - 1
427-428 - - 800 - -
401-TW47 - - - 5213 - 12 4 3 1
427-428 - - 2721 - - 3 1 3 1 1
428-429 - - 2076 - -
506-507 NC - - 1521 - - 3 1
609-610 - - 1527 - - 3 1
610-616 - - 1745 - - 5 2 2 2 2

F16-5
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Detail of Specials (Part - I)

Length 45o Bend 90o Bend Tee Equal Tee Reducer Sluice Valve
Nullah
Zone Name of Line
Crossing

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d 6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4"8"x8"x4"8"x8"x6"10"x10"x4"10"x10"x6"10"x10"x8"12"x12"x8"
12"x12"x10" 4" 6" 8" 10" 12" 6"x4"8"x6"10"x6"10"x8"8"x4" 12"x8"12"x10" 12" 10" 8" 6"

419-420 - 353 - - - 1
420-423 - 1267 - - - 3 1 1 1 2
419-418 - - 1112 - -
418-417 NC - - 519 - - 1 1 1
417-415 - - 512 - - 1
415-412 - - 333 - - 1 1 2
412-411 NC - - 975 - - 2 1 1
408-431 - - 873 - - 2 1 0 1 1 1
431-405 NC - - - 1981 - 1 1 1 1
405-403 - - - 1505 - 9 9
431-430 - - 1289 - - 1 1 1 1 1

430-TW10 - 274 - - -

TW10-434/TW 21/ OHR27 - 1700 - - - 1


1 1 1
434-429 - - 2274 - - 1 1 3 1 1 2 0 1 1
425-426 - - 2296 - - 4 4 4 1
426-427 - - 2230 - - 5 4 4
417-416TW 36 - - 340 - - 1
800-801 (P) - 3375 - - - 3 1 2
Tw19-OHR26 150 - - - -
OHR26-415 250 - - - - 1
505-507 - - - 2186.00 - 8.0 8 8
5.1 - - - - 572
5.2 - - - - 511
5.3 - - - - 166
5.4 - - - - 176
5.5 - - - - 278
5.6 - - - - 391
5.91 - - - - 103
5.10 - - - - 155
5.11 - - - - 511
5.12 - - - - 572
5.13 - - - - 460
5.14 - - - - 330
5.15 - - - - 286
5.16 - - - - 155
5.19 - - - - 335
5.20 - - - - 155
5.21 - - - - 103
5.22 - - - - 327
5.23 - - - - 141
5.24 - - - - 213
5.25 - - - - 429
5.26 - - - - 227
5.27 - - - - 408
5.28 - - - - 108
5.29 - - - - 248
5.30 - - - - 189

F16-6
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Detail of Specials (Part - I)

Length 45o Bend 90o Bend Tee Equal Tee Reducer Sluice Valve
Nullah
Zone Name of Line
Crossing

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d 6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4"8"x8"x4"8"x8"x6"10"x10"x4"10"x10"x6"10"x10"x8"12"x12"x8"
12"x12"x10" 4" 6" 8" 10" 12" 6"x4"8"x6"10"x6"10"x8"8"x4" 12"x8"12"x10" 12" 10" 8" 6"
5.31 - - - - 123
5.32 - - - - 1358
5.33 - - - - 271
5.34 - - - - 622
5.35 - - - - 412
5.36 - - - - 616
5.37 - - - - 147
5.38 - - - - 142
5.39 - - - - 373
5.40 - - - - 235
5.41 - - - - 399
5.42 - - - - 326
5.1B - - - - 310
5.1C - - - - 180
5.2A - - - - 477
5.2B - - - - 282
5.2C - - - - 222
5.3A - - - - 612
5.3B - - - - 190
5.43 - - - - 242
5.44 - - - - 422
5.45 - - - - 251
5.46 - - - - 340
5.47 - - - - 205
5.48 - - - - 270
5.49 - - - - 188
5.50 - - - - 380
5.51 - - - - 358
5.52 - - - - 198
5.4A - - - - 290
5.4B - - - - 580
5.58 - - - - 266
5.60 - - - - 520
5.62 - - - - 724
5.63 - - - - 760
5.64 - - - - 420
5.65 - - - - 192
5.66 - - - - 283
5.67 - - - - 389
5.68 - - - - 158
5.69 - - - - 139
5.70 - - - - 462
5.71 - - - - 344
5.72 - - - - 572
5.73 - - - - 297
5.74 - - - - 218
5.75 - - - - 138
5.76 - - - - 92

F16-7
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Detail of Specials (Part - I)

Length 45o Bend 90o Bend Tee Equal Tee Reducer Sluice Valve
Nullah
Zone Name of Line
Crossing

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d 6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4"8"x8"x4"8"x8"x6"10"x10"x4"10"x10"x6"10"x10"x8"12"x12"x8"
12"x12"x10" 4" 6" 8" 10" 12" 6"x4"8"x6"10"x6"10"x8"8"x4" 12"x8"12"x10" 12" 10" 8" 6"
5.77 - - - - 310
5.78 - - - - 298
5.80 - - - - 275
5.81 - - - - 428
5.82 - - - - 287
5.83 - - - - 398
5.84 - - - - 103
5.85 - - - - 128
5.86 - - - - 1089
5.87 - - - - 340
5.88 - - - - 290
5.89 - - - - 280
5.90 - - - - 231
5.91 - - - - 998
5.92 - - - - 152
5.93 - - - - 183
5.94 - - - - 285
5.95 - - - - 200
5.96 - - - - 220
5.97 - - - - 201
5.96A - - - - 222
5.98 - - - - 200
5.99 - - - - 415
5.100 - - - - 135
5.101 - - - - 250
5.103 - - - - 112
5.104 - - - - 444
5.105 - - - - 105
5.106 - - - - 1000
5.107 - - - - 161
5.108 - - - - 315
5.117 - - - - 381
5.118 - - - - 380
5.119 - - - - 392
5.120 - - - - 380
5.121 - - - - 392
5.122 - - - - 480
5.123 - - - - 108
5.124 - - - - 100
5.125 - - - - 1100
5.126 - - - - 300
5.127 - - - - 208
5.128 - - - - 260
5.129 - - - - 248
5.130 - - - - 2531
5.131 - - - - 105
5.132 - - - - 109
5.133 - - - - 659

F16-8
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Detail of Specials (Part - I)

Length 45o Bend 90o Bend Tee Equal Tee Reducer Sluice Valve
Nullah
Zone Name of Line
Crossing

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d 6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4"8"x8"x4"8"x8"x6"10"x10"x4"10"x10"x6"10"x10"x8"12"x12"x8"
12"x12"x10" 4" 6" 8" 10" 12" 6"x4"8"x6"10"x6"10"x8"8"x4" 12"x8"12"x10" 12" 10" 8" 6"
5.134 - - - - 508
5.135 - - - - 1081
5.136 - - - - 927
5.137 - - - - 1018
5.138 - - - - 1760
5.139 - - - - 951
5.140 - - - - 902
5.141 - - - - 1186
5.142 - - - - 180
5.145 - - - - 986
5.146 - - - - 115
5.147 - - - - 112
5.148 - - - - 117
5.149 - - - - 117
5.150 - - - - 823
5.151 - - - - 452
5.152 - - - - 986
5.153 - - - - 93
5.154 - - - - 134
5.155 - - - - 307
5.156 - - - - 78
5.157 - - - - 196
5.158 - - - - 230
5.159 - - - - 315
5.160 - - - - 210
5.161 - - - - 205
5.162 - - - - 239
5.163 - - - - 82
5.164 - - - - 152
5.165 - - - - 228
5.166 - - - - 93
5.167 - - - - 88
5.168 - - - - 148
5.169 - - - - 291
5.170 - - - - 57
5.171 - - - - 254
5.172 - - - - 770
5.173 - - - - 149
5.174 - - - - 266
5.175A - - - - 305
5.175 - - - - 466
5.176 - - - - 311
5.177 - - - - 354
5.178 - - - - 136
5.179 - - - - 875
5.180 - - - - 266
5.181 - - - - 168
5.182 - - - - 357

F16-9
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Detail of Specials (Part - I)

Length 45o Bend 90o Bend Tee Equal Tee Reducer Sluice Valve
Nullah
Zone Name of Line
Crossing

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d 6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4"8"x8"x4"8"x8"x6"10"x10"x4"10"x10"x6"10"x10"x8"12"x12"x8"
12"x12"x10" 4" 6" 8" 10" 12" 6"x4"8"x6"10"x6"10"x8"8"x4" 12"x8"12"x10" 12" 10" 8" 6"
5.183 - - - - 400
5.184 - - - - 225
5.185 - - - - 206
5.186 - - - - 277
5.187 - - - - 192
5.188 - - - - 432
5.189 - - - - 216
5.190 - - - - 556
5.191 - - - - 170
5.192 - - - - 643
5.193 - - - - 4200
5.194 - - - - 210

F16-10
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Detail of Specials (Part - I)

Length 45o Bend 90o Bend Tee Equal Tee Reducer Sluice Valve
Nullah
Zone Name of Line
Crossing

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d 6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4"8"x8"x4"8"x8"x6"10"x10"x4"10"x10"x6"10"x10"x8"12"x12"x8"
12"x12"x10" 4" 6" 8" 10" 12" 6"x4"8"x6"10"x6"10"x8"8"x4" 12"x8"12"x10" 12" 10" 8" 6"
5.195 - - - - 156
5.196 - - - - 543
5.198 - - - - 128
5.199 - - - - 148
5.200 - - - - 310
5.201 - - - - 256
5.202 - - - - 451
5.203 - - - - 198
5.204 - - - - 172
5.205 - - - - 478
5.206 - - - - 139
5.207 - - - - 484
5.208 - - - - 480
5.209 - - - - 480
5.210 - - - - 297
5.211 - - - - 659
5.212 - - - - 207
5.213 - - - - 147
5.214 - - - - 97
5.215 - - - - 56
5.216 - - - - 172
5.217 - - - - 151
5.218 - - - - 152
5.219 - - - - 410
5.220 - - - - 320
5.239 - - - - 140
5.240 - - - - 130
5.256 - - - - 228
5.257 - - - - 84
5.258 - - - - 102
5.259 - - - - 96
5.260 - - - - 262
5.261 - - - - 745
5.115 - - - - 190
5.116 - - - - 186
5.158A - - - - 850
5.158B - - - - 976
5.158C - - - - 66
5.158E - - - - 900
5.158F - - - - 200
5.158B - - - - 375
5.192A - - - - 112
5.192B - - - - 97
5.114 A - - - - 1500
5.7 - - - - 213

Grand total G-I 6536 19612 92451 47363 129420 0 49 0 0 1 95 7 14 6 0 0 27 0 0 5 0 0 0 123 96 17 15 173 92 0 17 4 8 4 6 6 16 15 7

F16-11
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Part - I

45 o Bend 90o Bend Tee Equal Tee Reducer


Zone Name of Line

6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4" 8"x8"x4" 8"x8"x6" 10"x10"x4" 10"x10"x6"10"x10"x8" 12"x12"x8" 12"x12"x10" 4" 6" 8" 10" 12" 6"x4" 8"x6" 10"x6" 10"x8" 12"x6" 12"x8" 12"x10"

II TW 5/OHR 8/ 347-504

504-501 4 1 1
504-505 1 1

505-509 1

509-510 2 4

509-517 2 1.00

517-606 2

601-602 2 1.00

520-515 3.0 4 1
515-516 2

515-513 2

512-506 2 2
513-523 3.0 3 1
523-514 1

514-506

606.607 1.00

602-607 3 2.0 4

607-608 1.00

603-608 2 3

608-609 4

628-627 1.0 2

627-626 2.0 1 1.00 1


626-625 1
Tw 6-631 1 4 1
TW 6-624 7

TW 7/23-715-716 4 3 1 1
716-712 5 2

716-710 2 3 1.00

710-709 11

709-708 1 1.00

709-714 4

714-713 4

704-705 2 11

703-706 1 6

II 705-706 2

705-702 4

621-622 1 4

622-623 3

623-624 1

F16-1
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Part - I

45 o Bend 90o Bend Tee Equal Tee Reducer


Zone Name of Line

6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4" 8"x8"x4" 8"x8"x6" 10"x10"x4" 10"x10"x6"10"x10"x8" 12"x12"x8" 12"x12"x10" 4" 6" 8" 10" 12" 6"x4" 8"x6" 10"x6" 10"x8" 12"x6" 12"x8" 12"x10"

TW2-OHR 1

501-502 4 4

502-503 1

626-Tw.3 16

706-712 1

631-200

201-202 1 5

501-203 2

501-203

517-513 13.00
2.22 1

2.23

2.24

2.25

2.26

2.27 1

2.28

2.29

2.30

2.31

2.32 1
2.33

2.34

2.35

2.36

2.37

2.39

2.40

2.41

2.42 1

2.43

2.44

2.45

2.46

2.47

2.48

2.49 1
2.50 1

2.51

F16-2
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Part - I

45 o Bend 90o Bend Tee Equal Tee Reducer


Zone Name of Line

6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4" 8"x8"x4" 8"x8"x6" 10"x10"x4" 10"x10"x6"10"x10"x8" 12"x12"x8" 12"x12"x10" 4" 6" 8" 10" 12" 6"x4" 8"x6" 10"x6" 10"x8" 12"x6" 12"x8" 12"x10"
2.52 1 4
2.53

2.54 3
2.55

2.56

2.57

2.58 4
2.59

2.60

2.61

2.62

2.63

2.63A

2.64

2.65

2.66

2.67

2.68

2.69 5

2.70

2.71

2.72

2.73

2.75 1

2.74 2
2.76

2.77

2.78

2.79

2.80

2.81

2.82

2.83 6
9.08 1

9.10

9.11

9.12

9.13

9.14

F16-3
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Part - I

45 o Bend 90o Bend Tee Equal Tee Reducer


Zone Name of Line

6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4" 8"x8"x4" 8"x8"x6" 10"x10"x4" 10"x10"x6"10"x10"x8" 12"x12"x8" 12"x12"x10" 4" 6" 8" 10" 12" 6"x4" 8"x6" 10"x6" 10"x8" 12"x6" 12"x8" 12"x10"
9.15 1
9.16

9.17 2

2.84

2.85

2.86 3
2.87

2.88

2.89

2.90

2.91

2.92

2.93

2.94

2.94A

2.95

2.95A

2.96

2.97

9.01 6
9.02 1
9.03 1
9.04 1

9.05 2

9.06

9.07 1
9.23

9.27

2.106

2.107

2.108

2.109

V Tw17-426-628 1 1 1
628-626 3

626-607 6 15

628-625 3

625-624 2

624-623 1 8

623-622 3

F16-4
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Part - I

45 o Bend 90o Bend Tee Equal Tee Reducer


Zone Name of Line

6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4" 8"x8"x4" 8"x8"x6" 10"x10"x4" 10"x10"x6"10"x10"x8" 12"x12"x8" 12"x12"x10" 4" 6" 8" 10" 12" 6"x4" 8"x6" 10"x6" 10"x8" 12"x6" 12"x8" 12"x10"

622-621 1

627-605 1
605-604 1
604-603

603-602 2 1
602-601 3.0 2 1.00 1
604-612

612-617

617-616 1
616-615 2 1 1
615-614 1 1
614-601 1

601-507 3 1
TW 20 2 -502 1 1
506-603 2 2

501-627 3

TW 19 / OHR 26

DR26-415 1 1
411-615 1 1
417-616 2 1.0

608-609 1

Tw 18/OHR 25-421-424 1 2 2
421-420 1 1
TW 11-432 1

432-424

Tw 17-423 1

408-407 1 2.0 7

Tw 9/403-401 5

401-402

401-TW47 2 5.0 4

427-428

428-429

506-507 4

609-610 1

610-617 6

419-420

420-423 1
419-418

418-417

F16-5
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Part - I

45 o Bend 90o Bend Tee Equal Tee Reducer


Zone Name of Line

6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4" 8"x8"x4" 8"x8"x6" 10"x10"x4" 10"x10"x6"10"x10"x8" 12"x12"x8" 12"x12"x10" 4" 6" 8" 10" 12" 6"x4" 8"x6" 10"x6" 10"x8" 12"x6" 12"x8" 12"x10"

417-415 2 1
415-412

412-411

408-431 1

431-405 2

405-403 6

431-430

430-TW10 1
TW10-434/TW 21/
4
OHR27
434-429 5

425-426 4

426-427 4

417-416TW 36

800-801 (P)

Tw19-OHR26

OHR26-415

505-507
5.1 4
5.2 1

5.3

5.4

5.5

5.6 1
5.91

5.10

5.11 1

5.12 1
5.13 3
5.14 1

5.15

5.16

5.19

5.20

5.21

5.22 1
5.23

5.24 1

5.25 1
5.26

F16-6
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Part - I

45 o Bend 90o Bend Tee Equal Tee Reducer


Zone Name of Line

6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4" 8"x8"x4" 8"x8"x6" 10"x10"x4" 10"x10"x6"10"x10"x8" 12"x12"x8" 12"x12"x10" 4" 6" 8" 10" 12" 6"x4" 8"x6" 10"x6" 10"x8" 12"x6" 12"x8" 12"x10"
5.27 1
5.28

5.29 1

5.30 1

5.31

5.32 11
5.33

5.34

5.35

5.36 1
5.37

5.38

5.39 1

5.40

5.41

5.42

5.1B

5.1C

5.2A

5.2B

5.2C

5.3A

5.3B

5.43

5.44 2

5.45 4
5.46

5.47 1
5.48

5.49

5.50

5.51 4 2
5.52

5.4A

5.4B

5.58

5.60 1

5.62

5.63 3

F16-7
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Part - I

45 o Bend 90o Bend Tee Equal Tee Reducer


Zone Name of Line

6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4" 8"x8"x4" 8"x8"x6" 10"x10"x4" 10"x10"x6"10"x10"x8" 12"x12"x8" 12"x12"x10" 4" 6" 8" 10" 12" 6"x4" 8"x6" 10"x6" 10"x8" 12"x6" 12"x8" 12"x10"
5.64 2

5.65

5.66

5.67 1
5.68

5.69

5.70 1 1
5.71

5.72 2
5.73

5.74

5.75 1
5.76

5.77 1

5.78 1
5.80 1
5.81

5.82

5.83

5.84

5.85

5.86 4
5.87

5.88

5.89

5.90

5.91 10
5.92

5.93

5.94

5.95

5.96

5.97

5.96A

5.98

5.99

5.100

5.101

5.103 1

F16-8
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Part - I

45 o Bend 90o Bend Tee Equal Tee Reducer


Zone Name of Line

6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4" 8"x8"x4" 8"x8"x6" 10"x10"x4" 10"x10"x6"10"x10"x8" 12"x12"x8" 12"x12"x10" 4" 6" 8" 10" 12" 6"x4" 8"x6" 10"x6" 10"x8" 12"x6" 12"x8" 12"x10"
5.104

5.105

5.106 1
5.107

5.108 1
5.117

5.118

5.119

5.120

5.121

5.122 2
5.123

5.124

5.125 3
5.126

5.127

5.128

5.129

5.130

5.131

5.132

5.133

5.134

5.135 2
5.136

5.137

5.138 10
5.139

5.140

5.141 2
5.142

5.145

5.146

5.147

5.148

5.149

5.150 1
5.151

5.152 1 3

F16-9
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Part - I

45 o Bend 90o Bend Tee Equal Tee Reducer


Zone Name of Line

6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4" 8"x8"x4" 8"x8"x6" 10"x10"x4" 10"x10"x6"10"x10"x8" 12"x12"x8" 12"x12"x10" 4" 6" 8" 10" 12" 6"x4" 8"x6" 10"x6" 10"x8" 12"x6" 12"x8" 12"x10"
5.153

5.154

5.155

5.156

5.157

5.158

5.159

5.160 3

5.161 2

5.162

5.163

5.164

5.165

5.166

5.167

5.168

5.169

5.170

5.171

5.172

5.173

5.174 1
5.175A

5.175

5.176

5.177

5.178

5.179

5.180 1

5.181

5.182

5.183

5.184

5.185

5.186

5.187 1
5.188

5.189 1
5.190 1

F16-10
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Part - I

45 o Bend 90o Bend Tee Equal Tee Reducer


Zone Name of Line

6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4" 8"x8"x4" 8"x8"x6" 10"x10"x4" 10"x10"x6"10"x10"x8" 12"x12"x8" 12"x12"x10" 4" 6" 8" 10" 12" 6"x4" 8"x6" 10"x6" 10"x8" 12"x6" 12"x8" 12"x10"
5.191

5.192 1 1
5.193

5.194

5.195

5.196

5.198

5.199

5.200

5.201

5.202

5.203

5.204

5.205

5.206

5.207

5.208

5.209

5.210

5.211

5.212

5.213

5.214

5.215

5.216

5.217

5.218

5.219

5.220

5.239

5.240

5.256

5.257

5.258

5.259

5.260

5.261

5.115

5.116

F16-11
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Part - I

45 o Bend 90o Bend Tee Equal Tee Reducer


Zone Name of Line

6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4" 8"x8"x4" 8"x8"x6" 10"x10"x4" 10"x10"x6"10"x10"x8" 12"x12"x8" 12"x12"x10" 4" 6" 8" 10" 12" 6"x4" 8"x6" 10"x6" 10"x8" 12"x6" 12"x8" 12"x10"
5.158A 2

5.158B 5 4
5.158C

5.158E

5.158F

5.158B

5.192A

5.192B

5.114 A

5.7

5.114B

Grand total G-I 16 20 0 0 53 18 5 111 102 25 3 5 3 119 5 11 3 0 1 4 0 1 0 1 2

F16-12
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Dismantling Detail (Part - I)
Dismantlling
Length Width of Trench Road P.C.C R.C.C Solling
Zone Name of Line Length Depth Quantity Quantity Length Depth Quantity Length Depth Quantity Length Quantity

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d (ft) (ft) (ft) (Sft) (Cft) (ft) (ft) (Cft) (ft) (ft) (Cft) (ft) (Sft)

II TW 5/OHR 8/ 347-504 811 - - - - 3 - - 0 - - - - -

504-501 - - 2395 - - 2.5 36 1 90 90 63 0.83 131 - - - 116 290


504-505 - 1019 - - - 3.0 48 1 144 144 154 1.00 462 - - - 300 900
505-509 - 809 - - - 3.0 - - - - 94 0.33 93 - - - 320 960
509-510 - - - 861 - 2.5 861 1 2152.5 2152.5 861 0.33 1,076 - - - - -
509-517 - 1068 - - - 3.0 - - - - - - - - - - 147 441
517-606 - 316 - - - 3.0 316 2 948 1896 - - - - - - - -
601-602 - - 386 - - 2.5 98 0.83 245 203 100 0.60 150 - - - - -
520-515 - - - 1049 - 2.5 - - - - 1,049 0.33 865 - - - - -
515-516 - - - 414 - 2.5 - - - - 414 0.33 342 - - - - -
515-513 - - - 775 - 3.0 - - - - 775 0.33 767 - - - - -
512-506 - - - 1087 - 2.5 - - - - 1,087 0.33 897 - - - - -
513-523 - - - 1218 - 2.5 - - - - 1,218 0.33 1,005 - - - - -
523-514 - - - 215 - 2.5 - - - - 215 0.33 177 - - - - -
606.607 - - 1251 - - 2.5 1251 2 3127.5 6255 1,251 0.33 1,032 - - - - -
602-607 - - - 1329 - 2.5 - - - 1,329 0.33 1,096 300 0.75 563 - -
607-608 - - 1109 - - 2.5 1109 2 2772.5 5545 - - - - - - - -
603-608 - - - 1283 - 2.5 - - - - 1,283 0.67 2,149 - - - - -
608-609 - - 952 - - 2.5 952 2 2380 4760 - - - - - - - -
628-627 - - 705 - 2.5 - - - - - - - - - -
627-626 - - 900 - 2.5 - - - 900 0.60 1,350 - - - - -
626-625 - - 706 - - 2.5 - - - - - - - - - - -
Tw 6-631 - - 395 - - 2.5 395 0.8 988 790 - - - - - - - -
TW 6-624 - - 1439 - - 2.5 1439 0.8 3598 2878 - - - - - - - -
TW 7/23-715-716 1448 - - - - 3.0 - - - - - - - - - -
716-712 - - 1768 - - 3.0 - - 1,768 0.60 3,182 - - - - -
716-710 - - 1268 - - 3.0 470 1 1410 1410 - - - - - - - -
710-709 - - 2910 - - 2.5 - - - 2,910 0.50 3,638 - - - - -
709-708 - - 465 - - 2.5 - - - - - - - - - - -
709-714 - - - 880 - 2.5 - - - 880 0.33 726 - - - -
714-713 - - - 539 - 2.5 - - - 539 0.33 445 - - - - -
704-705 - - - 2979 - 2.5 500 1 1250 1250 350 0.33 289 - - - 300 750
703-706 - - 2500 - - 2.5 500 1 1250 1250 0 - - - - -
II 705-706 - - - 1604 - 2.5 250 0.83 625 519 500 0.42 525 - - - 100 250
705-702 - - - 1847 - 2.5 150 1 375 375 800 0.33 660 - - - - -
621-622 - - 1138 - - 2.5 1138 1 2845 2845 - - - - - - - -

F16-1
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Dismantling Detail (Part - I)
Dismantlling
Length Width of Trench Road P.C.C R.C.C Solling
Zone Name of Line Length Depth Quantity Quantity Length Depth Quantity Length Depth Quantity Length Quantity

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d (ft) (ft) (ft) (Sft) (Cft) (ft) (ft) (Cft) (ft) (ft) (Cft) (ft) (Sft)

622-623 - - 340 - - 2.5 340 0.5 850 425 - - - - - - 640 1600


623-624 - - 500 - - 2.5 300 0.5 750 375 - - - - - - 200 500
TW2-OHR - - 200 - - 2.5 - - - - - - - - - - -
501-503 - 3800 - - - 2.5 2200 1 5500 5500 - - - - - - - -
626-Tw.3 - - - 2682 - 2.5 - - - - 2,682 0.33 2,213 - - - - -
706-712 - - 1009 - - 2.5 - - - - 1,009 0.33 832 - - - - -
631-200 - - - 1568 - 2.5 - - - - 1568 0.33 1,294 - - - - -
201-202 - - 2500 - - 2.5 - - - - 2500 0.33 2,063 - - - - -
501-203 - - 6500 - - 2.5 6500 1 16250 16250 300 0.67 503 800 0.75 1,500 - -
517-513 - - - 2500 - 2.5 - - - - 2,500 1 6,250 - - - - -
2.220 - - - - 160 2 - - - - 160 0.33 106 - - - - -
2.230 - - - - 40 2 - - - - 40 0.33 26 - - - - -
2.240 - - - - 50 2 - - - - 50 0.33 33 - - - - -
2.250 - - - - 475 2 - - - - - - - - - - - -
2.260 - - - - 212 2 - - - - 212 0.33 140 - - - - -
2.270 - - - - 586 2 - - - - 586 0.33 387 - - - 586 1172
2.280 - - - - 232 2 - - - - 232 0.33 153 - - - - -
2.290 - - - - 221 2 - - - - 221 0.33 146 - - - - -
2.300 - - - - 345 2 - - - - 345 0.33 228 - - - - -
2.310 - - - - 56 2 - - - - 56 0.33 37 - - - - -
2.320 - - - - 306 2 - - - - 306 0.33 202 - - - - -
2.330 - - - - 244 2 - - - - 244 0.33 161 - - - - -
2.340 - - - - 178 2 - - - - 178 0.33 117 - - - - -
2.350 - - - - 1098 2 - - - - - - - - - - - -
2.360 - - - - 200 2 - - - - - - - - - - 200 400
2.370 - - - - 231 2 - - - - 231 0.33 152 - - - 242 484
2.390 - - - - 242 2 - - - - 242 0.33 160 - - - 222 444
2.400 - - - - 222 2 - - - - 222 0.33 147 - - - - -
2.410 - - - - 100 2 - - - - 100 0.33 66 - - - - -
2.420 - - - - 780 2 - - - - 780 0.50 780 - - - - -
2.430 - - - - 208 2 - - - - 208 0.33 137 - - - - -
2.440 - - - - 422 2 - - - - 422 0.33 279 - - - - -
2.450 - - - - 201 2 - - - - 201 0.33 133 - - - - -
2.460 - - - - 210 2 - - - - 210 0.33 139 - - - - -
2.470 - - - - 730 2 - - - - 730 0.33 482 - - - - -
2.480 - - - - 290 2 - - - - 290 0.33 191 - - - - -

F16-2
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Dismantling Detail (Part - I)
Dismantlling
Length Width of Trench Road P.C.C R.C.C Solling
Zone Name of Line Length Depth Quantity Quantity Length Depth Quantity Length Depth Quantity Length Quantity

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d (ft) (ft) (ft) (Sft) (Cft) (ft) (ft) (Cft) (ft) (ft) (Cft) (ft) (Sft)

2.490 - - - - 1029 2 - - - - 1,029 0.33 679 - - - 1029 2058


2.500 - - - - 547 2 - - - - 547 0.33 361 - - - - -
2.510 - - - - 20 2 - - - - 20 0.33 13 - - - - -
2.520 - - - - 218 2 - - - - 218 0.33 144 - - - 200 400
2.530 - - - - 200 2 - - - - 200 0.33 132 - - - - -
2.540 - - - - 341 2 - - - - 341 0.33 225 - - - - -
2.550 - - - - 154 2 - - - - 154 0.33 102 - - - - -
2.560 - - - - 121 2 - - - - 121 0.33 80 - - - - -
2.570 - - - - 203 2 - - - - 203 0.33 134 - - - - -
2.580 - - - - 784 2 - - - - 784 0.33 517 - - - - -
2.590 - - - - 164 2 - - - - 164 0.33 108 - - - - -
2.600 - - - - 340 2 - - - - 340 0.33 224 - - - - -
2.610 - - - - 220 2 - - - - - - - - - - - -
2.620 - - - - 205 2 - - - - - - - - - - - -
2.630 - - - - 208 2 - - - - - - - - - - - -
2.63A - - - - 210 2 - - - - - - - - - - - -
2.640 - - - - 193 2 - - - - 193 0.33 127 - - - - -
2.650 - - - - 210 2 - - - - 210 0.33 139 - - - 210 420
2.660 - - - - 126 2 - - - - 126 0.33 83 - - - 126 252
2.670 - - - - 170 2 - - - - 170 0.33 112 - - - 170 340
2.680 - - - - 300 2 - - - - 300 0.33 198 - - - - -
2.690 - - - - 1415 2 - - - - 1,415 0.33 934 - - - - -
2.700 - - - - 262 2 - - - - 262 0.33 173 - - - - -
2.710 - - - - 295 2 - - - - 295 0.33 195 - - - - -
2.720 - - - - 379 2 - - - - 379 0.33 250 - - - - -
2.730 - - - - 403 2 - - - - 403 0.33 266 - - - - -
2.750 - - - - 282 2 - - - - 282 0.33 186 - - - - -
2.740 - - - - 602 2 - - - - 602 0.33 397 - - - - -
2.760 - - - - 548 2 - - - - 548 0.33 362 - - - - -
2.770 - - - - 548 2 - - - - 548 0.33 362 - - - - -
2.780 - - - - 513 2 - - - - - - - - - - 513 1026
2.790 - - - - 688 2 - - - - - - - - - - 688 1376
2.800 - - - - 150 2 - - - - - - - - - - 150 300
2.810 - - - - 156 2 - - - - - - - - - - - -
2.820 - - - - 120 2 120 0.83 199 199 - - - - - - - -
2.830 - - - - 1888 2 - - - - 1888 0.33 1,246 - - - - -

F16-3
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Dismantling Detail (Part - I)
Dismantlling
Length Width of Trench Road P.C.C R.C.C Solling
Zone Name of Line Length Depth Quantity Quantity Length Depth Quantity Length Depth Quantity Length Quantity

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d (ft) (ft) (ft) (Sft) (Cft) (ft) (ft) (Cft) (ft) (ft) (Cft) (ft) (Sft)

9.080 - - - - 2480 2 - - - - 2480 0.33 1,637 - - - 1200 2400


9.100 - - - - 300 2 - - - - 300 0.33 198 - - - - -
9.110 - - - - 551 2 - - - - 551 0.33 364 - - - - -
9.120 - - - - 108 2 - - - - 108 0.33 71 - - - - -
9.130 - - - - 128 2 - - - - 128 0.33 84 - - - - -
9.140 - - - - 124 2 - - - - 124 0.33 82 - - - - -
9.150 - - - - 208 2 - - - - 208 0.33 137 - - - - -
9.160 - - - - 258 2 - - - - 258 0.33 170 - - - - -
9.170 - - - - 786 2 - - - - 786 0.33 519 - - - - -
2.840 - - - - 141 2 - - - - 141 0.33 93 - - - - -
2.850 - - - - 142 2 - - - - 142 0.33 94 - - - - -
2.860 - - - - 756 2 - - - - 756 0.33 499 - - - 756 1512
2.870 - - - - 111 2 - - - - 111 0.33 73 - - - 111 222
2.880 - - - - 180 2 - - - - 180 0.33 119 - - - - -
2.890 - - - - 70 2 - - - - 70 0.33 46 - - - - -
2.900 - - - - 70 2 - - - - 70 0.33 46 - - - - -
2.910 - - - - 700 2 - - - - 700 0.50 700 - - - - -
2.920 - - - - 100 2 - - - - 100 0.33 66 - - - - -
2.930 - - - - 150 2 - - - - 150 0.33 99 - - - - -
2.940 - - - - 220 2 - - - - 220 0.33 145 - - - - -
2.94A - - - - 1500 2 - - - - 1,500 0.33 990 - - - - -
2.950 - - - - 206 2 - - - - 206 0.33 136 - - - - -
2.95A - - - - 3100 2 - - - - - - - - - - - -

2.960 - - - - 368 2 - - - - 368 0.33 243 - - - - -


2.970 - - - - 408 2 - - - - 408 0.33 269 - - - - -
9.010 - - - - 1100 2 - - - - 1,100 0.41 902 - - - - -
9.020 - - - - 300 2 - - - - 300 0.33 198 - - - - -
9.030 - - - - 300 2 - - - - 300 0.33 198 - - - - -
9.040 - - - - 300 2 - - - - 300 0.33 198 - - - - -
9.050 - - - - 380 2 - - - - 380 0.33 251 - - - - -
9.060 - - - - 400 2 - - - - 400 0.33 264 - - - - -
9.070 - - - - 300 2 - - - - 300 0.33 198 - - - - -
9.230 - - - - 1780 2 - - - - 1,780 0.33 1,175 - - - - -
9.270 - - - - 2500 2 - - - - 2,500 0.33 1,650 - - - - -
2.106 - - - - 500 2 - - - - 500 0.33 330 - - - - -
2.107 - - - - 298 2 - - - - 298 0.33 197 - - - - -

F16-4
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Dismantling Detail (Part - I)
Dismantlling
Length Width of Trench Road P.C.C R.C.C Solling
Zone Name of Line Length Depth Quantity Quantity Length Depth Quantity Length Depth Quantity Length Quantity

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d (ft) (ft) (ft) (Sft) (Cft) (ft) (ft) (Cft) (ft) (ft) (Cft) (ft) (Sft)

2.108 - - - - 551 2 - - - - 551 0.33 364 - - - - -


2.109 - - - - 249 2 - - - - 249 0.33 164 - - - - -
V Tw17-426-628 - 315 - - - 3.0 220 0.75 660 495 - - - - - - - -
628-626 - 525 - - - 3.0 - - - - 525 1.00 1,575 - - - - -
626-800 - 1285 - - - 3.0 - - - - 908 1.00 2,724 - - - - -
628-625 - - 1687 - - 2.5 1 0 0 - - - - - - 328 820
625-624 - - 560 - - 2.5 560 1 1400 1400 - - - - - - - -
624-623 - - 2390 - - 2.5 2390 1 5975 5975 - - - - - - - -
623-622 - - 2100 - - 2.5 2100 1 5250 5250 - - - - - - - -
622-621 - - 190 - - 2.5 - - - - - - - - - - - -
627-605 - - 2602 - - 2.5 1400 1 3500 3500 - - - - - - - -
605-604 - - 440 - - 2.5 250 1 625 625 - - - - - - - -
604-603 - - 1864 - - 2.5 - - - - 764 0.50 955 - - - 200 500
603-602 - - - 325 - 2.5 - - - - 325 0.50 406 - - - - -
602-601 - - - 2300 - 2.5 - - - - 2300 0.50 2,875 - - - - -
604-612 - - 2828 - - 2.5 1500 1 3750 3750 - - - - - - - -
612-617 - - 1342 - - 2.5 1342 1 3355 3355 300 0.33 248 - - - - -
617-616 - - 136 - - 2.5 136 1 340 340 - - - - - - - -
616-615 - - 1945 - - 2.5 1945 1 4863 4863 - - - - - - - -
615-614 NC - - 3624 - - 2.5 100 1 250 250 200 0.50 500 - - - 3624 9060
614-601 NC - - 1052 - - 2.5 - - - - 100 0.50 250 - - - 1052 2630
601-507 - - 1750 - - 2.5 - - - - 200 0.50 500 - - - 1750 4375
611-614 - - 2773 - 2.5 - - - - 0.50 0 1,000 0.75 3,750 0
TW 20 2 -502 1100 - - - - 3.0 900 1 2700 2700 - - - - - - - -
506-603 - - 2158 - - 2.5 1700 1 4250 4250 - - - - - - - -
501-627 - - 7827 - - 2.5 2000 1 5000 5000 3,200 0.50 4,000 - - - - -
TW 19 / OHR 26 150 - - - - 3.0 - - - - - - - - - - - -
DR26-415 250 - - - - 3.0 - - - - - - -
411-615 NC - - 764 - - 2.5 764 2 1910 3820 - - - 764 0.75 1432.5 - -
417-616 - - - 2387 - 2.5 - - - - 2,387 0.50 2,984 - - - - -
608-609 - - 1044 - - 2.5 - - - - 1,044 0.50 1,305 - - - - -
Tw 18/OHR 25-421-424 909 - - - - 3.0 909 0.83 2727 2263 - - - - - - - -
421-420 1468 - - - - 3.0 925 0.83 2775 2303 - - - - - - - -
TW 11-432 - - - 1969 - 2.5 590 1 1475 1475 1,379 0.34 1,172 - - - 60 150
424-423 - 800 - - - 2.5 0 0 0 - - - 0
432-424 - - 1669 - - 2.5 1669 1.5 4173 6259 200 0.50 250 - - - 100 250

F16-5
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Dismantling Detail (Part - I)
Dismantlling
Length Width of Trench Road P.C.C R.C.C Solling
Zone Name of Line Length Depth Quantity Quantity Length Depth Quantity Length Depth Quantity Length Quantity

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d (ft) (ft) (ft) (Sft) (Cft) (ft) (ft) (Cft) (ft) (ft) (Cft) (ft) (Sft)

Tw 17-423 - 2706 - - - 3.0 85 0.83 255 212 114 0.58 198 - - - 45 135
408-407 - - - 1326 - 2.5 1326 1 3315 3315 90 0.33 74 - - - - -
Tw 9/403-401 - - - 1856 - 2.5 - - - - 368 0.92 846 - - - - -
401-402 - - - 712 - 2.5 - - - - 712 0.67 1,193 - - - - -
427-428 - - 800 - - 2.5 800 1 2000 2000 0.50 0 - - - - -
401-TW47 - - - 5213 - 2.5 3000 0.83 7500 6225 1,163 0.25 727 - - - - -
427-428 - - 2721 - - 2.5 2,721 1 6802.5 6803 530 0.50 663 - - - - -
428-429 - - 2076 - - 2.5 1,400 1 3500 3500 - - - - - - - -
506-507 NC - - 1521 - - 2.5 - - - - 1,521 0.5 1,901 - - - - -
609-610 - - 1527 - - 2.5 300 1 750 750 1,527 0.5 1,909 - - - - -
610-616 - - 1745 - - 2.5 1,745 1 4362.5 4363 1,745 0.5 2,181 - - - - -
419-420 - 353 - - - 3.0 353 2 1059 2118 - - - - - - - -
420-423 - 1267 - - - 3.0 1,267 1 3801 3801 - - - - - - - -
419-418 - - 1112 - - 2.5 1,112 2 2780 5560 - - - - - - 145 363
418-417 NC - - 519 - - 2.5 519 1.5 1297.5 1946 - - - - - - 519 2595
417-415 - - 512 - - 2.5 512 1 1280 1280 - - - - - - 512 2560
415-412 - - 333 - - 2.5 333 1 832.5 833 - - - - - - 333 1665
412-411 NC - - 975 - - 2.5 975 1.5 2438 3656 - - - 975 0.75 1828 - -
408-431 - - 873 - - 2.5 873 1 2183 2183 - - - - - - - -
431-405 NC - - - 1981 - 2.5 1950 1.67 8141 8141 1,635 0.50 2,044 - - - - -
405-403 - - - 1505 - 2.5 1505 1.67 6283 6283 - - - - - - - -
431-430 - - 1289 - - 2.5 386 1.83 1766 1766 - - - - - - - -
430-TW10 - 274 - - - 3.0 - - - - - - - - - - - -
TW10-434/TW 21/
- 1700 - - - 3.0 - - - - 26 0.58 45 - - - - -
OHR27
434-429 - - 2274 - - 2.5 674 1 1685 1685 50 0.58 73 - - - - -
425-426 - - 2296 - - 2.5 76 1 190 190 120 0.50 150 - - - - -
426-427 - - 2230 - - 2.5 100 1 250 250 200 0.33 165 - - - - -
417-416TW 36 - - 340 - - 2.5 340 1 850 850 - - - - - - - -
800-801 (P) - 3375 - - - 2.5 - - - - 3,575 0.50 4,469 - - - 1000 2500
Tw19-OHR26 150 - - - - 2.5 - - - - - - - - - - - -
OHR26-415 250 - - - - 2.5 175 2 875 875 - - - - - - - -
505-507 - - - 2186.00 - 2.5 2186 1 5465 5465 4,372 0.67 7,323 - - - - -
5.1 - - - - 572 2 - - - - 572 0.41 469 - - - - -
5.2 - - - - 511 2 - - - - 511 0.41 419 - - - - -
5.3 - - - - 166 2 - - - - 166 0.33 110 - - - - -

F16-6
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Dismantling Detail (Part - I)
Dismantlling
Length Width of Trench Road P.C.C R.C.C Solling
Zone Name of Line Length Depth Quantity Quantity Length Depth Quantity Length Depth Quantity Length Quantity

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d (ft) (ft) (ft) (Sft) (Cft) (ft) (ft) (Cft) (ft) (ft) (Cft) (ft) (Sft)
5.4 - - - - 176 2 - - - - 176 0.33 116 - - - - -
5.5 - - - - 278 2 - - - - 278 0.33 183 - - - - -
5.6 - - - - 391 2 - - - - 391 0.33 258 - - - - -
5.91 - - - - 103 2 - - - - 103 0.33 68 - - - - -
5.10 - - - - 155 2 - - - - 155 0.33 102 - - - - -
5.11 - - - - 511 2 - - - - 511 0.33 337 - - - - -
5.12 - - - - 572 2 - - - - 572 0.33 378 - - - - -
5.13 - - - - 460 2 - - - - 460 0.33 304 - - - - -
5.14 - - - - 330 2 - - - - 330 0.33 218 - - - - -
5.15 - - - - 286 2 - - - - 286 0.33 189 - - - - -
5.16 - - - - 155 2 - - - - 155 0.33 102 - - - - -
5.19 - - - - 335 2 - - - - - - - - - - 335 670
5.20 - - - - 155 2 - - - - 155 0.33 102 - - - - -
5.21 - - - - 103 2 - - - - - - - - - - - -
5.22 - - - - 327 2 - - - - 327 0.33 216 - - - - -
5.23 - - - - 141 2 - - - - 141 0.33 93 - - - - -
5.24 - - - - 213 2 - - - - 213 0.33 141 - - - - -
5.25 - - - - 429 2 - - - - 429 0.33 283 - - - - -
5.26 - - - - 227 2 - - - - 227 0.33 150 - - - - -
5.27 - - - - 408 2 - - - - 408 0.33 269 - - - - -
5.28 - - - - 108 2 - - - - - - - - - - 108 216
5.29 - - - - 248 2 - - - - - - - - - - 248 496
5.30 - - - - 189 2 - - - - - - - - - - 189 378
5.31 - - - - 123 2 - - - - 123 0.33 81 - - - - -
5.32 - - - - 1358 2 1358 1 2716 2716 - - - - - - - -
5.33 - - - - 271 2 - - - - 271 0.33 179 - - - - -
5.34 - - - - 622 2 - - - - - - - - - - 622 1,244
5.35 - - - - 412 2 - - - - 412 0.33 272 - - - - -
5.36 - - - - 616 2 - - - - 616 0.33 407 - - - - -
5.37 - - - - 147 2 - - - - 147 0.33 97 - - - - -
5.38 - - - - 142 2 - - - - 142 0.33 94 - - - - -
5.39 - - - - 373 2 - - - - - - - - - - 373 746
5.40 - - - - 235 2 - - - - 235 0.33 155 - - - - -
5.41 - - - - 399 2 - - - - 399 0.33 263 - - - - -
5.42 - - - - 326 2 - - - - 326 0.33 215 - - - - -
5.1B - - - - 310 2 - - - - 310 0.33 205 - - - - -

F16-7
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Dismantling Detail (Part - I)
Dismantlling
Length Width of Trench Road P.C.C R.C.C Solling
Zone Name of Line Length Depth Quantity Quantity Length Depth Quantity Length Depth Quantity Length Quantity

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d (ft) (ft) (ft) (Sft) (Cft) (ft) (ft) (Cft) (ft) (ft) (Cft) (ft) (Sft)
5.1C - - - - 180 2 - - - - 180 0.33 119 - - - 200 400
5.2A - - - - 477 2 - - - - 477 0.50 477 - - - - -
5.2B - - - - 282 2 - - - - 282 0.33 186 - - - - -
5.2C - - - - 222 2 - - - - 222 0.33 147 - - - - -
5.3A - - - - 612 2 - - - - 612 0.50 612 - - - - -
5.3B - - - - 190 2 - - - - 190 0.33 125 - - - - -
5.43 - - - - 242 2 - - - - 242 0.33 160 - - - - -
5.44 - - - - 422 2 - - - - 422 0.33 279 - - - - -
5.45 - - - - 251 2 - - - - 251 0.33 166 - - - - -
5.46 - - - - 340 2 - - - - 340 0.33 224 - - - - -
5.47 - - - - 205 2 - - - - 205 0.33 135 - - - - -
5.48 - - - - 270 2 - - - - 270 0.33 178 - - - - -
5.49 - - - - 188 2 - - - - 188 0.33 124 - - - - -
5.50 - - - - 380 2 - - - - 380 0.33 251 - - - - -
5.51 - - - - 358 2 - - - - 358 0.33 236 - - - - -
5.52 - - - - 198 2 - - - - 198 0.33 131 - - - - -
5.4A - - - - 290 2 - - - - 290 0.33 191 - - - - -
5.4B - - - - 580 2 - - - - 580 0.33 383 - - - - -
5.58 - - - - 266 2 - - - - 266 0.33 176 - - - - -
5.60 - - - - 520 2 - - - - 520 0.50 520 - - - - -
5.62 - - - - 724 2 724 0.83 1202 1202 - - - - - - - -
5.63 - - - - 760 2 - - - - 760 0.50 760 - - - - -
5.64 - - - - 420 2 - - - - 420 0.33 277 - - - - -
5.65 - - - - 192 2 - - - - 192 0.33 127 - - - - -
5.66 - - - - 283 2 - - - - 283 0.33 187 - - - - -
5.67 - - - - 389 2 - - - - 389 0.33 257 - - - - -
5.68 - - - - 158 2 - - - - 158 0.33 104 - - - - -
5.69 - - - - 139 2 - - - - 139 0.33 92 - - - - -
5.70 - - - - 462 2 - - - - - - - - - - 462 924
5.71 - - - - 344 2 - - - - - - - - - - 344 688
5.72 - - - - 572 2 - - - - 572 0.50 572 - - - - -
5.73 - - - - 297 2 - - - - 297 0.33 196 - - - - -
5.74 - - - - 218 2 - - - - 218 0.33 144 - - - - -
5.75 - - - - 138 2 - - - - 138 0.33 91 - - - - -
5.76 - - - - 92 2 - - - - 92 0.33 61 - - - - -
5.77 - - - - 310 2 - - - - 310 0.33 205 - - - - -

F16-8
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Dismantling Detail (Part - I)
Dismantlling
Length Width of Trench Road P.C.C R.C.C Solling
Zone Name of Line Length Depth Quantity Quantity Length Depth Quantity Length Depth Quantity Length Quantity

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d (ft) (ft) (ft) (Sft) (Cft) (ft) (ft) (Cft) (ft) (ft) (Cft) (ft) (Sft)
5.78 - - - - 298 2 - - - - 298 0.33 197 - - - - -
5.80 - - - - 275 2 - - - - 275 0.33 182 - - - - -
5.81 - - - - 428 2 - - - - 428 0.33 282 - - - - -
5.82 - - - - 287 2 - - - - 287 0.33 189 - - - - -
5.83 - - - - 398 2 - - - - 398 0.33 263 - - - - -
5.84 - - - - 103 2 - - - - 103 0.33 68 - - - - -
5.85 - - - - 128 2 - - - - 128 0.33 84 - - - - -
5.86 - - - - 1089 2 - - - - 1,089 0.50 1,089 - - - - -
5.87 - - - - 340 2 - - - - 340 0.33 224 - - - - -
5.88 - - - - 290 2 - - - - 290 0.33 191 - - - - -
5.89 - - - - 280 2 - - - - 280 0.33 185 - - - - -
5.90 - - - - 231 2 - - - - 231 0.33 152 - - - - -
5.91 - - - - 998 2 - - - - 998 0.50 998 - - - 998 1996
5.92 - - - - 152 2 - - - - 152 0.33 100 - - - - -
5.93 - - - - 183 2 - - - - 183 0.33 121 - - - - -
5.94 - - - - 285 2 - - - - 285 0.33 188 - - - - -
5.95 - - - - 200 2 - - - - 200 0.33 132 - - - - -
5.96 - - - - 220 2 - - - - 220 0.33 145 - - - - -
5.97 - - - - 201 2 - - - - 201 0.33 133 - - - - -
5.96A - - - - 222 2 - - - - 222 0.33 147 - - - - -
5.98 - - - - 200 2 - - - - 200 0.33 132 - - - - -
5.99 - - - - 415 2 - - - - 415 0.33 274 - - - - -
5.100 - - - - 135 2 - - - - 135 0.33 89 - - - - -
5.101 - - - - 250 2 - - - - 250 0.33 165 - - - - -
5.103 - - - - 112 2 - - - - 112 0.33 74 - - - - -
5.104 - - - - 444 2 - - - - 444 0.33 293 - - - - -
5.105 - - - - 105 2 - - - - 105 0.33 69 - - - - -
5.106 - - - - 1000 2 - - - - 1,000 0.50 1,000 - - - - -
5.107 - - - - 161 2 - - - - 161 0.33 106 - - - - -
5.108 - - - - 315 2 - - - - 315 0.33 208 - - - - -
5.117 - - - - 381 2 - - - - - - - - - - 381 762
5.118 - - - - 380 2 - - - - - - - - - - 380 760
5.119 - - - - 392 2 - - - - - - - - - - 392 784
5.120 - - - - 380 2 - - - - 380 0.33 251 - - - - -
5.121 - - - - 392 2 - - - - 392 0.33 259 - - - - -
5.122 - - - - 480 2 - - - - 480 0.50 480 - - - - -

F16-9
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Dismantling Detail (Part - I)
Dismantlling
Length Width of Trench Road P.C.C R.C.C Solling
Zone Name of Line Length Depth Quantity Quantity Length Depth Quantity Length Depth Quantity Length Quantity

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d (ft) (ft) (ft) (Sft) (Cft) (ft) (ft) (Cft) (ft) (ft) (Cft) (ft) (Sft)
5.123 - - - - 108 2 - - - - 108 0.33 71 - - - - -
5.124 - - - - 100 2 - - - - 100 0.33 66 - - - - -
5.125 - - - - 1100 2 - - - - 1,100 0.50 1,100 - - - - -
5.126 - - - - 300 2 - - - - 300 0.33 198 - - - - -
5.127 - - - - 208 2 - - - - 208 0.33 137 - - - - -
5.128 - - - - 260 2 - - - - 260 0.33 172 - - - - -
5.129 - - - - 248 2 - - - - 248 0.33 164 - - - - -
5.130 - - - - 2531 2 2531 1 5062 5062 - - - - - - 1000 2000
5.131 - - - - 105 2 - - - - 105 0.33 69 - - - - -
5.132 - - - - 109 2 - - - - 109 0.33 72 - - - - -
5.133 - - - - 659 2 - - - - 659 0.50 659 - - - - -
5.134 - - - - 508 2 - - - - 508 0.50 508 - - - - -
5.135 - - - - 1081 2 - - - - 1,081 0.50 1,081 - - - - -
5.136 - - - - 927 2 - - - - 927 0.50 927 - - - - -
5.137 - - - - 1018 2 - - - - 1,018 0.50 1,018 - - - - -
5.138 - - - - 1760 2 - - - - 1,760 0.50 1,760 - - - - -
5.139 - - - - 951 2 - - - - 951 0.50 951 - - - - -
5.140 - - - - 902 2 - - - - 902 0.50 902 - - - - -
5.141 - - - - 1186 2 - - - - 1,186 0.50 1,186 - - - - -
5.142 - - - - 180 2 - - - - 180 0.33 119 - - - - -
5.145 - - - - 986 2 - - - - 986 0.50 986 - - - - -
5.146 - - - - 115 2 - - - - - - - - - - 115 230
5.147 - - - - 112 2 - - - - - - - - - - 112 224
5.148 - - - - 117 2 - - - - - - - - - - - -
5.149 - - - - 117 2 - - - - - - - - - - - -
5.150 - - - - 823 2 - - - - 823 0.50 823 - - - - -
5.151 - - - - 452 2 - - - - 452 0.33 298 - - - - -
5.152 - - - - 986 2 - - - - 986 0.50 986 - - - - -
5.153 - - - - 93 2 - - - - 93 0.33 61 - - - - -
5.154 - - - - 134 2 - - - - 134 0.33 88 - - - - -
5.155 - - - - 307 2 - - - - 307 0.33 203 - - - - -
5.156 - - - - 78 2 - - - - 78 0.33 51 - - - - -
5.157 - - - - 196 2 - - - - 196 0.33 129 - - - - -
5.158 - - - - 230 2 - - - - 230 0.33 152 - - - - -
5.159 - - - - 315 2 - - - - 315 0.33 208 - - - - -
5.160 - - - - 210 2 - - - - 210 0.33 139 - - - - -

F16-10
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Dismantling Detail (Part - I)
Dismantlling
Length Width of Trench Road P.C.C R.C.C Solling
Zone Name of Line Length Depth Quantity Quantity Length Depth Quantity Length Depth Quantity Length Quantity

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d (ft) (ft) (ft) (Sft) (Cft) (ft) (ft) (Cft) (ft) (ft) (Cft) (ft) (Sft)
5.161 - - - - 205 2 - - - - - - - - - - 205 410
5.162 - - - - 239 2 - - - - 239 0.33 158 - - - - -
5.163 - - - - 82 2 - - - - 82 0.33 54 - - - - -
5.164 - - - - 152 2 - - - - 152 0.33 100 - - - - -
5.165 - - - - 228 2 - - - - 228 0.33 150 - - - - -
5.166 - - - - 93 2 - - - - 93 0.33 61 - - - - -
5.167 - - - - 88 2 - - - - 88 0.33 58 - - - - -
5.168 - - - - 148 2 - - - - 148 0.33 98 - - - - -
5.169 - - - - 291 2 - - - - - - - - - - 291 582
5.170 - - - - 57 2 - - - - 57 0.33 38 - - - - -
5.171 - - - - 254 2 - - - - - - - - - - 254 508
5.172 - - - - 770 2 - - - - 770 0.50 770 - - - - -
5.173 - - - - 149 2 - - - - 149 0.33 98 - - - - -
5.174 - - - - 266 2 - - - - 266 0.33 176 - - - - -
5.175A - - - - 305 2 - - - - 305 0.33 201 - - - - -
5.175 - - - - 466 2 - - - - 466 0.33 308 - - - - -
5.176 - - - - 311 2 - - - - 311 0.33 205 - - - - -
5.177 - - - - 354 2 - - - - - - - - - - 354 708
5.178 - - - - 136 2 - - - - 136 0.33 90 - - - - -
5.179 - - - - 875 2 - - - - 875 0.50 875 - - - - -
5.180 - - - - 266 2 - - - - - - - - - - 266 532
5.181 - - - - 168 2 - - - - 168 0.33 111 - - - - -
5.182 - - - - 357 2 - - - - 357 0.33 236 - - - - -
5.183 - - - - 400 2 - - - - 400 0.33 264 - - - - -
5.184 - - - - 225 2 - - - - - - - - - - 225 450
5.185 - - - - 206 2 - - - - 206 0.33 136 - - - - -
5.186 - - - - 277 2 - - - - 277 0.33 183 - - - - -
5.187 - - - - 192 2 192 0.83 319 319 - - - - - - - -
5.188 - - - - 432 2 432 0.83 717 717 - - - - - - - -
5.189 - - - - 216 2 - - - - 216 0.33 143 - - - - -
5.190 - - - - 556 2 - - - - - - - - - - 556 1112
5.191 - - - - 170 2 - - - - - - - - - - 170 340
5.192 - - - - 643 2 - - - - 643 0.50 643 - - - - -
5.193 - - - - 4200 2 - - - - 4,200 0.50 4,200 - - - - -
5.194 - - - - 210 2 - - - - - - - - - - - -
5.195 - - - - 156 2 - - - - 156 0.33 103 - - - - -

F16-11
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Dismantling Detail (Part - I)
Dismantlling
Length Width of Trench Road P.C.C R.C.C Solling
Zone Name of Line Length Depth Quantity Quantity Length Depth Quantity Length Depth Quantity Length Quantity

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d (ft) (ft) (ft) (Sft) (Cft) (ft) (ft) (Cft) (ft) (ft) (Cft) (ft) (Sft)
5.196 - - - - 543 2 - - - - 543 0.50 543 - - - - -
5.198 - - - - 128 2 - - - - 128 0.33 84 - - - - -
5.199 - - - - 148 2 - - - - 148 0.33 98 - - - - -
5.200 - - - - 310 2 - - - - 310 0.33 205 - - - - -
5.201 - - - - 256 2 - - - - 256 0.33 169 - - - - -
5.202 - - - - 451 2 - - - - 451 0.50 451 - - - - -
5.203 - - - - 198 2 - - - - 198 0.33 131 - - - - -
5.204 - - - - 172 2 - - - - 172 0.33 114 - - - - -
5.205 - - - - 478 2 - - - - - - - - - - - -
5.206 - - - - 139 2 - - - - - - - - - - - -
5.207 - - - - 484 2 - - - - - - - - - - - -
5.208 - - - - 480 2 - - - - - - - - - - 480 960
5.209 - - - - 480 2 - - - - - - - - - - 480 960
5.210 - - - - 297 2 - - - - 297 0.33 196 - - - - -
5.211 - - - - 659 2 - - - - 659 0.50 659 - - - - -
5.212 - - - - 207 2 - - - - 207 0.33 137 - - - - -
5.213 - - - - 147 2 - - - - 147 0.33 97 - - - - -
5.214 - - - - 97 2 - - - - 97 0.33 64 - - - - -
5.215 - - - - 56 2 - - - - 56 0.33 37 - - - - -
5.216 - - - - 172 2 - - - - 172 0.33 114 - - - - -
5.217 - - - - 151 2 - - - - 151 0.33 100 - - - - -
5.218 - - - - 152 2 - - - - 152 0.33 100 - - - - -
5.219 - - - - 410 2 - - - - 410 0.33 271 - - - - -
5.220 - - - - 320 2 - - - - 320 0.33 211 - - - - -
5.239 - - - - 140 2 - - - - 140 0.50 140 - - - - -
5.240 - - - - 130 2 - - - - 130 0.50 130 - - - - -
5.256 - - - - 228 2 - - - - 228 0.33 150 - - - - -
5.257 - - - - 84 2 - - - - 84 0.33 55 - - - - -
5.258 - - - - 102 2 - - - - - - - - - - 102 204
5.259 - - - - 96 2 - - - - - - - - - - 96 192
5.260 - - - - 262 2 - - - - 262 0.33 173 - - - - -
5.261 - - - - 745 2 - - - - - - - - - - - -
5.115 - - - - 190 2 - - - - - - - - - - - -
5.116 - - - - 186 2 - - - - - - - - - - - -
5.158A - - - - 850 2 - - - - - - - - - - 850 1700
5.158B - - - - 976 2 - - - - - - - - - - 976 1952

F16-12
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Dismantling Detail (Part - I)
Dismantlling
Length Width of Trench Road P.C.C R.C.C Solling
Zone Name of Line Length Depth Quantity Quantity Length Depth Quantity Length Depth Quantity Length Quantity

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d (ft) (ft) (ft) (Sft) (Cft) (ft) (ft) (Cft) (ft) (ft) (Cft) (ft) (Sft)
5.158C - - - - 66 2 - - - - - - - - - - 66 132
5.158E - - - - 900 2 - - - - - - - - - - - -
5.158F - - - - 200 2 - - - - - - - - - - - -
5.158B - - - - 375 2 - - - - - - - - - - - -
5.192A - - - - 112 2 - - - - - - - - - - - -
5.192B - - - - 97 2 - - - - - - - - - - - -
5.114 A - - - - 1500 2 - - - - - - - - - - - -
5.7 - - - - 213 2 - - - - 213 0.33 141 - - - - -

Grand total G-I 6536 19612 92451 47363 129420 70323 182402 197049 162134 155182 3839 9073 29824 69360

F16-13
APPENDIX F

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Based on MRS Ist Quarter 2009 Actual Alloted Tender Rates

Table F-16: Distribution System (Part - I)


MRS 1st Qtr.
Sr.
Descriptions 2009 Ref. Unit Qty. Rate Amount
No.
Ch/Item
1 Dismantling and removing of road
4/45 100 Cft. 1,970.49 442.40 871,745
metalling.

2 Dismantling Plain cement


4/19c 100 Cft. 1,551.82 2,323.20 3,605,188
concrete 1:2:4

3 Dismantling Plain cement


4/19a 100 Cft. 1,241.45 633.60 786,583
concrete 1:7:20

4 Dismantling of flagged flooring 4/29 100 Sft. 693.60 179.50 124,500

5 Dismantling of Reinforcement
4/20 100 Cft. 90.73 3,801.60 344,924
concrete 1:2:4

6 Excavation of trenches in all kinds


of soil, except cuttingrock, for
watersupply pipelines upto 5 ft.
(1.5 m) depthfrom ground level,
including trimming, dressing
sides, levelling the beds of 3/44 1000 Cft 2,704.17 1,565.50 4,233,385
trenches to correct grade cutting
pits for joints, etc. complete in all
respects.

7 Rehandling of earthwork:
Lead upto a single throw of Kassi,
phaorah or shovel and ramming 3/13a,3/24 (c ) 1000 Cft 2,163.34 798.60 1,727,643
earthwork (all types of soil) (80%
of item 6)

8 Transportation of earth all types


when the total distance, including
the lead covered in the item of
work, is more than
1000 ft. (300 m)
b) for every 330 ft. (100 m) 3/17b 1000 Cft 30.00 1,603.30 48,099
additional lead or part thereof,
beyond ¼ mile (400 m) upto one
mile. (1.6 Km.)

9 Providing, laying, cutting, jointing,


testing and disinfecting P.V.C
Pipe line of B.S.S with 'B'class
working pressure pipe,in
trenches, complete in all respect.

a) 12" dia 23/26 Rft. 6,536.00 868.47 5,676,320


b) 10" dia " Rft. 19,612.00 624.83 12,254,166
c) 8" dia " Rft. 92,451.00 398.97 36,885,175
d) 6" dia " Rft. 47,363.00 251.66 11,919,373

F16-1
APPENDIX F

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Based on MRS Ist Quarter 2009 Actual Alloted Tender Rates

Table F-16: Distribution System (Part - I)


MRS 1st Qtr.
Sr.
Descriptions 2009 Ref. Unit Qty. Rate Amount
No.
Ch/Item
e) 4"dia " Rft. 129,420.00 119.10 15,413,922

F16-2
APPENDIX F

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Based on MRS Ist Quarter 2009 Actual Alloted Tender Rates

Table F-16: Distribution System (Part - I)


MRS 1st Qtr.
Sr.
Descriptions 2009 Ref. Unit Qty. Rate Amount
No.
Ch/Item

10 Providing and fixing follwing


uPVC specials of B.S.S Class 'B'
( such as bend, tee cross collar,
reducer, tail piece, flanged spigot,
cap, flanged socket, taper, angle NS
branch, plug etc.) with flanged
and flanged joints, complete in all
respect.

45 Bend
8" (Imported USA made) Tender Rates No. 49 8,146.00 399,154

90 bend
4" 23/37 (i) e No. 250 313.80 78,450
6" 23/37 (i) g No. 95 786.85 74,751
8" (Imported USA made) Tender Rates No. 7 8,146.00 57,022
10" ( - do - ) " No. 14 36,090.00 505,260
12" ( - do - ) " No. 6 48,405.00 290,430

Tees
8"x8"x6" (Imported USA made) Tender Rates No. 27 10,215.00 275,805
10"x10''x8" " No. 5 60,127.50 300,638

Equal Tee
6" 23/38 (i) d No. 123 1,881.65 231,443
8" (Imported USA made) Ref Appendix I
No. 96 11,526.00 1,106,496
RA (8 of 45)
10" ( - do - ) " No. 17 44,928.00 763,776
12" ( - do - ) " No. 15 66,426.00 996,390
Reducer
6"x 4" No. 173 1,966.32 340,173
8"x4" (Imported USA made) Ref Appendix I
No. 4 4,386.00 17,544
RA (9 of 45)
8"x6" (Imported USA made) Ref Appendix I
No. 92 4,386.00 403,512
RA (9 of 45)
10"x8" ( - do - ) " No. 17 14,471.00 246,007
12x8" ( - do - ) " No. 8 19,983.00 159,864
12x10"( - do - ) " No. 4 20,397.00 81,588

11 Restoration of metalled road,on


laid service line,including
compaction. (The specification
of restoration will match those of
existing roads)

F16-3
APPENDIX F

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Based on MRS Ist Quarter 2009 Actual Alloted Tender Rates

Table F-16: Distribution System (Part - I)


MRS 1st Qtr.
Sr.
Descriptions 2009 Ref. Unit Qty. Rate Amount
No.
Ch/Item
i) Carpetted Road with 2" (38
mm) carpet and 10" (150mm)
depth of stone metal, for base 21/12-a 100Sft 197.05 5,195.85 1,023,842
and sub base.Quantity as per
statement.

F16-4
APPENDIX F

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Based on MRS Ist Quarter 2009 Actual Alloted Tender Rates

Table F-16: Distribution System (Part - I)


MRS 1st Qtr.
Sr.
Descriptions 2009 Ref. Unit Qty. Rate Amount
No.
Ch/Item

12 Cement concrete plain including


placing,compacting, finishing and
curing complete (including
screening and washing of stone
aggregate)Quantity as per length
statement.

i) Ratio1:2:4 6/5(f) 100 Cft 387.95 12,946.55 5,022,614


ii) Ratio1:7:20 6/5(i) 100 Cft 310.36 9,765.35 3,030,774

13-A Restoration of dry brick soling 21/10, 100Sft 693.60 1,595.35 1,106,527
13-B Restoration of R.C.C 1:2:4 6/6 (a-i-3), Cft 2,268.28 191.50 434,376

13-C Restoration of PCC 1:4:8 100Cft 5.00 9,765.36 48,827

14 Fabrication of mild steel


reinforcement for cement
concrete, including cutting,
bending, laying in position,
making joints and fastenings,
including cost of binding wire and 6/9 100 Kg 69.45 7,601.65 527,933
labour charges for binding of steel
reinforcement (also includes
removal of rust from bars):-
(b) deformed bars

15 Sluice (gate) valve with chamber


as per drawings and
specifications complete in all
respect.

a)12" dia Ref Appendix I


No. 6.00 55,505 333,028
(RA 11 of 45)
b) 10" dia Ref Appendix I
No. 6.00 49,296 295,776
(RA 12 of 45)
c) 8" dia Ref Appendix I
No. 16.00 42,410 678,555
(RA 13 of 45)
d) 6" dia Ref Appendix I
No. 15.00 34,360 515,393
(RA 14 of 45)
e) 4" dia Ref Appendix I
No. 10.00 31,019 310,189
(RA 15 of 45)

16 Supplying and filling sand under


floor; or plugging in wells. 7/30 100 Cft 1,412.33 838.00 1,183,533

17 Fire hydrant with chamber as per


drawing and specificatons Ref Appendix I No. 4.00 23,781 95,123
complete in all respect. (RA 16 of 45)

F16-5
APPENDIX F

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Based on MRS Ist Quarter 2009 Actual Alloted Tender Rates

Table F-16: Distribution System (Part - I)


MRS 1st Qtr.
Sr.
Descriptions 2009 Ref. Unit Qty. Rate Amount
No.
Ch/Item
18 Wash out with chamber as per
drawing and specificatons Ref Appendix I No. 6.00 36,394 218,366
complete in all respect. (RA 17 of 45)

19 Air valve with chamber as per


drawing and specificatons Ref Appendix I No. 7.00 27,017 189,120
complete in all respect. (RA 18 of 45)

20 Providing and erection of Ref Appendix I


Indication Plates. No 10.00 1,325 13,250
(RA 19 of 45)

21 Providing and fixing Gabault joint. Ref Appendix I


12" (RA 16 of 45) No 2.00 2,556 5,112
10'' No 10.00 2,130 21,300
8'' No 10.00 1,562 15,620
6'' No 20.00 1,278 25,560
4" No 40.00 887 35,480

22 Cast Iron specials 23/28b Kg


3" to 6" dia
8" to 12" dia 3709.17 84.70 314,166

23 Providing and fitting C.I. flanges


on pipes, including turning,
threading, facing and fitting, etc. 23/34 Kg
complete in all respect
a) 3" to 6" (75 to 150 mm) i/d Kg 1208 49.90 60,269
b) 8" to 12" (200 to 300 mm) i/d Kg 3139 44.30 139,059

24 Providing and installing PVC


Taper core BSS class B working 23/40
pressure.
4" No. 44 120.6 5,306
6" No. 90 166.45 14,981
8" No. 80 255.8 20,464
10" No. 18 314 5,652
12" No. 14 375.25 5,254

25 Providing and fixing Non return


valve with chamber as per
drawings and specifications No.
complete in all respect.

6" Ref Appendix I


No. 6 36,041.31 216,248
(RA 4 of 45)
8" Ref Appendix I
No. 8 42,111.54 336,892
(RA 3 of 45)

F16-6
APPENDIX F

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Based on MRS Ist Quarter 2009 Actual Alloted Tender Rates

Table F-16: Distribution System (Part - I)


MRS 1st Qtr.
Sr.
Descriptions 2009 Ref. Unit Qty. Rate Amount
No.
Ch/Item
10" Ref Appendix I
No. 1 49,764.49 49,764
(RA 2 of 45)
12" Ref Appendix I
No. 1 55,587.84 55,588
(RA 1 of 45)

26 Making connection for new


watersupply lines with the running
main, including excavation of
trench and refilling, complete, but Per
23/41
excluding cost of pipe and Connection
specials, etc.

Diameter of running main:


i) upto 4" i/d (100 mm) (i) ditto 50 643.5 32,175
ii) upto 6" i/d (150 mm) (i) ditto 30 643.5 19,305
iii) upto 8" i/d (200 mm) (ii) ditto 20 801.9 16,038
iv) upto 10" i/d (250 mm) (iii) ditto 5 1036.2 5,181
v) upto 12" i/d (300 mm) (iv) ditto 2 1432.2 2,864

27 Dead End 23/13


4" No. 200 71.75 14,350
6" No. 10 157.95 1,580
8" No. 5 309.85 1,549
10" No. 5 437.55 2,188

28 Providing and fixing, 6" (150 mm)


thick R.C.C. manhole cover with
3"x3"x¼" (75x75x6mm) angle iron
frame, 22" (550 mm) i/d as per 21/17 No. 78 2915.45 227,405
standard drawing STD/PD No. 7
of 1977, complete in all respects.

29 Recovery of Dismentling Material 100 Cft. 788.20 1,000.00 788,196

Total Cost Distribution System G-l (Zone-ll & V) 116,895,901

F16-7
APPENDIX I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Part - I)
Table I-1: Backup Calculations of Quantities

Item
Descriptions Qty Unit Length Width Height Total
No.
1.1 Dismentaling & Removing of
Road (Carpetted & Black
Topped)
Total Quantity as per statement Cft 197,049
100Cft 1,970.49

1.2 Dismentaling & Removing of


Road (PCC 1:2:4)
Total Quantity as per statement Cft 155,182
100Cft 1,551.82

1.3 Dismentaling & Removing of


Road (PCC 1:7:20) 80% of Item
No. 1.2
Cft 124,145
100Cft 1,241.45
1.3A Dismentaling of Flagged
Flooring without concrete
foundation
Total Quantity as per statement Sft 69,360
100 Sft 693.60
1.3B Dismentaling of RCC 1:2:4
Total Quantity as per statement Cft 9,073
100Cft 90.73

1.3 C Recovery of Road Dismentling


@40% of item 1.1

Total Quantity as per Length


Cft 78,820
Statement
100Cft 788.20
1.4 Excavation for water Supply Line
4" Dia 1 Cft 129420 2 3.71 960,296
6" Dia 1 Cft 47,363 2.5 3.92 464,157
8" Dia 1 Cft 92,451 2.5 4.08 943,000
10" Dia 1 Cft 19,612 3 4.25 250,053
12" Dia 1 Cft 6,536 3 4.42 86,667
Total Cft 2,704,174
1000Cft 2,704.17
1.4A Rehandling of earth @80% of Cft 2,163,339.49
item No. 1.4 1000Cft 2,163.34

1.4B Transportation of earth @15%


Cft 30,000.00
of item No. 1.4

1000Cft 30.00
1.5 Concrete 3000 Psi (See Table I-6)
Concrete in Bends 1 Cft 548.80
Concrete in Tees 1 Cft 1,945.41
Concrete in Crosses 1 Cft -
Concrete in Dead Ends 1 Cft -
Total Cft 2,494.21
2,494.21
Backup of F16- 1
APPENDIX I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Part - I)
Table I-1: Backup Calculations of Quantities

Item
Descriptions Qty Unit Length Width Height Total
No.
100Cft 24.94

Backup of F16- 2
APPENDIX I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Part - I)
Table I-1: Backup Calculations of Quantities

Item
Descriptions Qty Unit Length Width Height Total
No.
1.6 Restoration of Road
(Carpetted) @ 10% of item No.
1.1
Sft 19,705
100Sft 197.05
Laying of PCC 1:2:4 @ 25% of
1.7
item No. 1.2
Cft 38,795
100Cft 387.95
Laying of PCC 1:7:20 @ 25% of
1.8
item No. 1.3
Cft 31,036
100Cft 310.36
1.8-A Laying of PCC 1:4:8
Cft 500
100Cft 5.00

1.9 Restoration of flagged flooring Sft 17,339.88


100Sft 173.40

1.10 Restoration of RCC 1:2:4 Cft 2,268.28


100Cft 22.68
1.10 A Steel 6.75 lb/cft Kg 6,944.98
100 Kg 69.45
1.11 uPVC Pipes
a) 12" dia 1 Rft 6,536 6,536
b) 10" dia 1 Rft 19,612 19,612
c) 8" dia 1 Rft 92,451 92,451
d) 6" dia 1 Rft 47,363 47,363
e)4" dia 1 Rft 129,420 129,420

1.12 uPVC Fittings

450 Bend
6" 0 No. 0
8" 49 No. 49
10" 0 No. 0
12" 0 No. 0
90o Bend
4" 250 No. 250
6" 95 No. 95
8" 7 No. 7
10" 14 No. 14
12" 6 No. 6
Tees

Backup of F16- 3
APPENDIX I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Part - I)
Table I-1: Backup Calculations of Quantities

Item
Descriptions Qty Unit Length Width Height Total
No.
6"x6"x4" 0 No. 0
8"x8"x6" 27 No. 27

Backup of F16- 4
APPENDIX I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Part - I)
Table I-1: Backup Calculations of Quantities

Item
Descriptions Qty Unit Length Width Height Total
No.
8"x8"x4" 0 No. 0
10"x10"x8" 5 No. 5
10"x10"x6" 0 No. 0
10"x10"x4" 0 No. 0
12"x12"x10" 0 No. 0
12"x12"x8" 0 No. 0
12"x12"x6" 0 No. 0
Equal Tee
4" 0 No. 0
6" 123 No. 123
8" 96 No. 96
10" 17 No. 17
12" 15 No. 15
Reducer
6"x4" 173 No. 173
8"x4" 4 No. 4
8"x6" 92 No. 92
10"x6" 0 No. 0
10"x8" 17 No. 17
12x6" 0 No. 0
12x8" 8 No. 8
12x10" 4 No. 4

1.13 Sluice Valves


a) 12" dia 6 No. 6
b) 10" dia 6 No. 6
c) 8" dia 16 No. 16
d) 6" dia 15 No. 15
e) 4"dia 10 No. 10

1.14 Sandfilling in road crossings


Sandfilling in bed of pipe
a) for 6" & 8" dia 1 Cft 139,814 2.5 0.33 115,346.55
b) for 10" & 12" dia 1 Cft 26,148 3 0.33 25,887
Cft 141,233
100Cft 1,412.33
1.15 Fire Hydrants 2-1/2" dia. 4 No. 4

1.16 Indication Plates 10 No. 10

Backup of F16- 5
APPENDIX I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Part - I)
Table I-1: Backup Calculations of Quantities

Item
Descriptions Qty Unit Length Width Height Total
No.
1.17 Washouts 6 No. 6

Backup of F16- 6
APPENDIX I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Part - I)
Table I-1: Backup Calculations of Quantities

Item
Descriptions Qty Unit Length Width Height Total
No.

1.18 Providing and fixing Air valve


7 Nos. 7
2 -1/2" i/d BSS

1.19 P/F PVC Tapered core


12" dia 22 No. 22
10" dia 28 No. 28
8" dia 102 No. 102
6" dia 141 No. 141
4" dia 196 No. 196

1.20 Providing and fixing Gabault


Joint
12" dia 2 No. 2
10" dia 10 No. 10
8" dia 10 No. 10
6" dia 20 No. 20
4" dia 40 No. 40

1.21 C.I frame RCC manhole cover


78 No. 78

Wt. in
1.22 C.I specials No. Wt./specials Wt. in kg
lbs
Tee
8"x8"x3" 1 Ibs 113 113 51.27
8"x8"x6" 1 Ibs 123 123 55.81
8"x8"x8" 3 Ibs 141 423 191.92
10"x10"x6" 3 Ibs 190 570 258.62
10"x10"x10" 5 Ibs 226 1130 512.70
12"x12"x12" 3 Ibs 309 927 420.60
Bend 45
12" 7 Ibs 129 903 409.71

Bend 90
10" 18 lbs 146 2628 1192.38
8" 8 Ibs 91 728 330.31

Reducers
12''x10" 4 Ibs 114 456 206.90
10"x8" 2 Ibs 87 174 78.95
Kg Total Wt. 3709.17
Backup of F16- 7
APPENDIX I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Part - I)
Table I-1: Backup Calculations of Quantities

Item
Descriptions Qty Unit Length Width Height Total
No.
1.23 Providing and fitting C.I.
flanges on pipes, including
turning, threading, facing and
fitting, etc. complete in all
respect
3" 1 lbs 5.4 5.4 2.45
4" 196 lbs 7.1 1391.6 631.40
6" 115 lbs 11 1265 573.96
Total Wt. 1207.80
8" 157 lbs 15.3 2402.1 1089.88
10" 124 lbs 24.7 3062.8 1389.66
12" 51 lbs 28.5 1453.5 659.48
Kg Total Wt. 3139.02

1.24 Providing and installing PVC


Taper core BSS class B
working pressure.
3" No. 0.00
4" 44 No. 44.00
6" 90 No. 90.00
8" 80 No. 80.00
10" 18 No. 18.00
12" 14 No. 14.00

1.25 Providing and fixing Non


return valve with chamber as
per drawings and
specifications complete in all
respect.

6" 6 No. 6.00


8" 8 No. 8.00
10" 1 No. 1.00
12" 1 No. 1.00
1.26 Dead Ends
4" 200 No. 200
6" 10 No. 10
8" 5 No. 5
10" 5 No. 5

Backup of F16- 8
APPENDIX -I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


GROUP-I(ZONE-II & V)
Ditribution System (Part - I)
Table I-4: Detailed Calculations of PCC 3000 Psi for Thrust Blocks

PIPE SIZE TEE BLOCK DIMENSIONS TOTAL


UNIT QTY. Total
d C B D L QTY.
Number
inch feet feet feet feet feet cft cft
4.00 0.33 0.50 1.00 1.00 2.00 1.33 392.00 521.36
6 0.50 0.67 1.00 1.25 2.00 2.44 123 300.12
8 0.67 1.00 1.00 1.50 2.75 5.08 123 624.84
10 0.83 1.00 1.00 2.00 3.50 10.12 22 222.64
12 1.00 1.75 1.00 2.50 4.00 18.43 15 276.45
1,945.41

PIPE SIZE DEAD ENDS & LONGITUDAL SUPPORT TOTAL


UNIT QTY. Total
d C B D L QTY.
Number
inch feet feet feet feet feet cft cft
6 0.50 0.67 1.00 1.25 2.00 2.24 -
8 0.67 1.00 1.00 1.50 2.75 3.70 -
10 0.83 1.00 1.00 2.00 3.50 6.11 -
12 1.00 1.75 1.00 2.50 4.00 9.34 - -
-

PIPE SIZE BENDS TOTAL


UNIT QTY. Total
d C B D L QTY.
Number
inch feet feet feet feet feet cft cft
6 0.50 0.17 1.50 2.00 2.50 7.45 - -
8 0.67 0.50 1.50 2.25 3.00 11.20 49 548.80
10 0.83 0.67 2.25 2.25 4.00 15.56 - -
12 1.00 0.83 2.50 2.75 5.00 28.03 - -
548.80

PIPE SIZE CROSS BLOCK DIMENSIONS TOTAL


UNIT QTY. Total
d C B D L QTY.
Number
inch feet feet feet feet feet cft cft
6 0.50 0.67 1.00 1.25 2.00 2.44 -
8 0.67 1.00 1.00 1.50 2.75 5.08 -
10 0.83 1.00 1.00 2.00 3.50 10.12 -
12 1.00 1.75 1.00 2.50 4.00 18.43 -
-
TOTAL CONCRETE IN THRUST BLOCKS 2,494.21 Cft

Table I-4-1
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Detail of Specials (Part - II)

Length 45o Bend 90o Bend Tee Equal Tee Reducer Sluice Valve
Nullah
Zone Name of Line
Crossing

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d 6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4" 8"x8"x4" 8"x8"x6" 10"x10"x4"10"x10"x6"10"x10"x8" 12"x12"x8"12"x12"x10" 4" 6" 8" 10" 12" 6"x4" 8"x6" 10"x6"10"x8" 12"x6" 12"x8" 12"x10" 12" 10" 8" 6"

II 601-603 - - 1582 - - 1
503-508 - 1298 - - -

708-707 - - 3000 - -

631-632 - 2548 - - - 2
514-508 - 591 - - - 1 1 1 1
514-516 - 1482 - - - 2 1 1
603-604 - - 1450 - - 1 1 1 1 1
522-516 - 696 - - - 1 1 1
TW34-609 - 315 - - - 1
613-618 - 1068 - - - 1 1 1
618-628 - 1433 - - - 2 1 1 1
628-632 - 2361 - - - 1
629-621 - 1403 - - - 1 1 1 1
621-610 - 1713 - - - 2 1 2 1
627-606 - - 2769 - - 1 2
TW 34-604 - 934 - - - 1
611-612 - - 2155 - - 3 3
612-613 - - 992 - - 2 1 2 2
617-618 - - - 1700 - 4 5 5 1
708-713 - - 901 - - 1
704-707 - - 3331 - - 4 4 4
704-701 - - 549 - - 1 1 1
706-201 - - - 3000 - 2 3 2
621-620 - - 570 - - 1 1 1
620-606 - - 780 - - 1
606-627 - - 2769 - -
701-703 - 5009 - - - 2 3 2
503-504 - 2389 - - -
504-505 - 1267 - - -
505-506 - 1014 - - - 1
503-508 - 1602 - - - 2 1 1
V 607-608 - 2893 - - -
432-413 NC - - 1266 - - 2 2 2 2
413-410 - - 979 - - 2 1
410-411 - - 1175 - - 2 1
409-406 - - - 800 - 2 2

F16-1
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Detail of Specials (Part - II)

Length 45o Bend 90o Bend Tee Equal Tee Reducer Sluice Valve
Nullah
Zone Name of Line
Crossing

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d 6" 8" 10" 12" 4" 6" 8" 10" 12" 6"x6"x4" 8"x8"x4" 8"x8"x6" 10"x10"x4"10"x10"x6"10"x10"x8" 12"x12"x8"12"x12"x10" 4" 6" 8" 10" 12" 6"x4" 8"x6" 10"x6"10"x8" 12"x6" 12"x8" 12"x10" 12" 10" 8" 6"

Tw 1/433-424 - - 2168 - - 2 2
424-425 - - 715 - - 1 1 1
608-419 - 1727 - - - 1 1
412-413 - - - 1154 - 1
409-414 NC - - - 979 - 8 2 2
414-433 - - - 509 - 1
406-404 - - - 1205 - 3 1 2
404-TW-47 - - - 3340 - 8 1
402-TW47 - - - 500 - 1
606-607 - 423 - - - 2 2
5.401 - - - - 300
5.408 - - - - 238
5.409 - - - - 256
5.422 - - - - 285
5.423 - - - - 386
5.424 - - - - 512
5.425 - - - - 302
5.426 - - - - 345
5.427 - - - - 540
5.429 - - - - 77
5.430 - - - - 1514
5.431 - - - - 97
5.432 - - - - 136
5.433 - - - - 238
5.434 - - - - 70
5.435 - - - - 305
5.436 - - - - 145
5.437 - - - - 334
5.440 - - - - 213
5.441 - - - - 369
5.79 - - - - 212

5.442 - - - - 305

Grand total G-I 0 32166 27151 13187 7179 0 5 0 0 0 25 0 4 0 0 0 0 0 0 0 0 0 0 18 23 22 0 17 25 0 16 0 0 0 0 9 3 4 0

F16-2
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Dismantling Detail (Part - II)
Dismantlling
Length Width of Trench Road P.C.C R.C.C Solling
Zone No. Name of Line Length Depth Quantity Quantity Length Depth Quantity Length Depth Quantity Length Quantity

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d (ft) (ft) (ft) (Sft) (Cft) (ft) (ft) (Cft) (ft) (ft) (Cft) (ft) (Sft)

II 601-603 - - 1582 - - 2.5 1582 2 3955 7910 0 - - - - -

503-508 - 1298 - - - 3.0 0 - - - - -

708-707 - - 3000 - - 2.5 300 1 750 750 275 0.50 344 - - - 2000

631-632 - 2548 - - - 2.5 2548 0.8 6370 5096 - - - - - - - -

514-508 - 591 - - - 3.0 - - - - 1,298 0.50 1,947 - - - -

514-516 - 1482 - - - 3.0 0 0 - - - - - - -

603-604 - - 1450 - - 2.5 1450 2 3625 7250 0.60 0 - - - - -

522-516 - 696 - - - 3.0 - - - - - - - - - -

TW34-609 - 315 - - - 3.0 - - - 315 0.50 473 - - - - -

613-618 - 1068 - - - 3.0 - - - 500 0.50 750 - - - 400 1200

618-628 - 1433 - - - 3.0 - - - - - - - - - - -

628-632 - 2361 - - - 3.0 - - - - - - - - - - -

629-621 - 1403 - - - 3.0 0 0 - - - - - - - -

621-610 - 1713 - - - 3.0 0 0 800 0.50 1,200 - - - 200 600

627-606 - - 2769 - - 2.5 2769 1 6922.5 6923 0 - - - - -

TW 34-604 - 934 - - - 3.0 - - - - - - - - - - 934 2802

611-612 - - 2155 - - 2.5 2155 2 5388 10775 934 0.50 1,168 - - - - -

612-613 - - 992 - - 2.5 992 2 2480 4960 492 0.50 615 - - - - -

617-618 - - - 1700 - 2.5 - - - - 1,700 0.50 2,125 - - - - -

708-713 - - 901 - - 2.5 - - - - 0 - - - - -

704-707 - - 3331 - - 2.5 300 1 750 750 200 0.50 250 - - - 200 500

704-701 - - 549 - - 2.5 249 1 623 623 100 0.50 125 - - - 100 250

706-201 - - - 3000 - 2.5 500 1 1250 1250 600 0.50 750 - - - 0

621-620 - - 570 - - 2.5 - - - - - - - - - - - -

620-606 - - 780 - - 2.5 280 1 700 700 - - - - - - - -

606-627 - - 2769 - - 2.5 1269 1 3172.5 3173 - - - - - - - -

701-703 - 5009 - - - 3.0 1000 1 3000 3000 - - - - - - - -

503-504 - 2389 - - - 3.0 1000 1 3000 3000 - - - - - - - -

504-505 - 1267 - - - 3.0 267 1 801 801 - - - - - - - -

505-506 - 1014 - - - 3.0 200 1 600 600 - - - - - - - -

503-508 - 1602 - - - 3.0 400 1 1200 1200 - - - - - - 1202 3606

V 607-608 - 2893 - - - 3.0 1000 1 3000 3000 - - - - - - - -

432-413 NC - - 1266 - - 2.5 1266 1.5 3165 4748 120 0.50 150 - - - 100 250

413-410 - - 979 - - 2.5 1.5 0 0 - - - - - - 979 2448

410-411 - - 1175 - - 2.5 1,175 2 2937.5 5875 - - - 1175 0.75 2203 - -

F16-1
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Dismantling Detail (Part - II)
Dismantlling
Length Width of Trench Road P.C.C R.C.C Solling
Zone No. Name of Line Length Depth Quantity Quantity Length Depth Quantity Length Depth Quantity Length Quantity

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d (ft) (ft) (ft) (Sft) (Cft) (ft) (ft) (Cft) (ft) (ft) (Cft) (ft) (Sft)

409-406 - - - 800 - 2.5 2 0 0 - - - 1000 0.75 1875 800 2000

F16-2
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Back up Calculation)
Dismantling Detail (Part - II)
Dismantlling
Length Width of Trench Road P.C.C R.C.C Solling
Zone No. Name of Line Length Depth Quantity Quantity Length Depth Quantity Length Depth Quantity Length Quantity

12" i/d 10" i/d 8" i/d 6" i/d 4" i/d (ft) (ft) (ft) (Sft) (Cft) (ft) (ft) (Cft) (ft) (ft) (Cft) (ft) (Sft)

Tw 1/433-424 - - 2168 - - 2.5 1 0 0 200 0.50 250 - - - 2168 5420

424-425 - - 715 - - 2.5 100 1 250 250 - - - - - - 715 1787.5

608-419 - 1727 - - - 3.0 - - - - 1,727 0.5 2,591 - - - - -


412-413 - - - 1154 - 2.5 1154 1.5 2885 4328 - - - 1154 0.5 1443 - -
409-414 NC - - - 979 - 2.5 979 1.5 2448 3671 0 - - - - -

414-433 - - - 509 - 2.5 1.5 0 0 - - - - - - 509 1273

406-404 - - - 1205 - 2.5 2 0 0 - - - 0.5 0 1205 3013

404-TW-47 - - - 3340 - 2.5 2 0 0 - - - - - - 3340 8350

402-TW47 - - - 500 - 2.5 500 2 2500 2500 - - - - - - 500 1250

606-607 - 423 - - - 3.0 0 0 - - - - - - - -

5.401 - - - - 300 2.0 - - - - 300 0.33 198 - - - - -

5.408 - - - - 238 2.0 - - - - 238 0.33 157 - - - - -

5.409 - - - - 256 2.0 - - - - - - - - - - 256 512

5.422 - - - - 285 2.0 - - - - - - - - - - 285 570

5.423 - - - - 386 2.0 - - - - 386 0.33 255 - - - - -

5.424 - - - - 512 2.0 - - - - 512 0.33 338 - - - - -

5.425 - - - - 302 2.0 - - - - 302 0.33 199 - - - - -


5.426 - - - - 345 2.0 - - - - - - - - - - 345 690
5.427 - - - - 540 2.0 - - - - 540 0.33 356 - - - - -

5.429 - - - - 77 2.0 - - - - 77 0.33 51 - - - - -

5.430 - - - - 1514 2.0 - - - - 1,514 0.33 999 - -

5.431 - - - - 97 2.0 - - - - 97 0.33 64 - - - - -

5.432 - - - - 136 2.0 - - - - 136 0.33 90 - - - - -

5.433 - - - - 238 2.0 - - - - 238 0.33 157 - - - - -

5.434 - - - - 70 2.0 - - - - 70 0.33 46 - - - - -

5.435 - - - - 305 2.0 - - - - 305 0.33 201 - - - - -

5.436 - - - - 145 2.0 - - - - 145 0.33 96 - - - - -

5.437 - - - - 334 2.0 - - - - 334 0.33 220 - - - - -

5.440 - - - - 213 2.0 - - - - 213 0.33 141 - - - - -

5.441 - - - - 369 2.0 - - - - 369 0.33 244 - - - - -


5.79 - - - - 212 2.0 - - - - 212 0.33 140 - - - - -

5.442 - - - - 305 2.0 - - - - 305 0.33 201 - - - - -

Grand total G-I 0 32166 27151 13187 7179 23435 61771 83131 15554 16890 3329 5521 14238 38520

F16-3
APPENDIX F

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Work yet to be Alotted
Based on MRS Ist Bi - Annual 2016

Table F-16: Distribution System (Part -II)

Sr. MRS Ist Bi-Annual


Descriptions Unit Qty. Rate Amount
No. 2016 Ref. Ch/Item

1 Dismantling and removing of road


4/45 100 Cft. 831.31 950.40 790,077
metalling.

2 Dismantling Plain cement


4/19c 100 Cft. 168.90 5,227.20 882,874
concrete 1:2:4

3 Dismantling Plain cement


4/19d 100 Cft. 135.12 1,425.60 192,627
concrete 1:7:20

4 Dismantling of flagged flooring 4/29 100 Sft. 385.20 403.90 155,582

5 Dismantling of Reinforcement
4/20 100 Cft. 55.21 8,553.60 472,212
concrete 1:2:4

6 Excavation of trenches in all kinds


of soil, except cuttingrock, for
watersupply pipelines upto 5 ft.
(1.5 m) depthfrom ground level,
including trimming, dressing
sides, levelling the beds of 3/44 1000 Cft 869.41 3,569.30 3,103,199
trenches to correct grade cutting
pits for joints, etc. complete in all
respects.

7 Rehandling of earthwork:
Lead upto a single throw of Kassi,
phaorah or shovel and ramming 3/13a,3/24 (c ) 1000 Cft 695.53 1,900.80 1,322,066
earthwork (all types of soil) (80%
of item 4)

8 Providing, laying, cutting, jointing,


testing and disinfecting P.V.C
Pipe line of B.S.S with 'B'class
working pressure pipe,in
trenches, complete in all respect.

a) 10" dia 23/26 Rft. 32,166.00 727.10 23,387,899


b) 8" dia " Rft. 27,151.00 469.25 12,740,607
c) 6" dia " Rft. 13,187.00 305.20 4,024,672
d) 4" dia " Rft. 7,179.00 158.35 1,136,795

9 Providing and fixing follwing


uPVC specials of B.S.S Class 'B'
( such as bend, tee cross collar,
reducer, tail piece, flanged spigot,
cap, flanged socket, taper, angle NS
branch, plug etc.) with flanged
and flanged joints, complete in all
respect.

45 Bend
8" (Imported USA made) Ref Appendix II RA
No. 5 9,844.00 49,220
(5 of 24)

F16-1
APPENDIX F

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Work yet to be Alotted
Based on MRS Ist Bi - Annual 2016

Table F-16: Distribution System (Part -II)

Sr. MRS Ist Bi-Annual


Descriptions Unit Qty. Rate Amount
No. 2016 Ref. Ch/Item

F16-2
APPENDIX F

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Work yet to be Alotted
Based on MRS Ist Bi - Annual 2016

Table F-16: Distribution System (Part -II)

Sr. MRS Ist Bi-Annual


Descriptions Unit Qty. Rate Amount
No. 2016 Ref. Ch/Item

90 bend
4" 23/37 (i) b No. 20 368.75 7,375
6" 23/37 (i) d No. 25 896.75 22,419
10" (Imported USA made) " No. 4 36,750.00 147,000

Equal Tee
6" Tender Rates No. 18 1,881.65 33,870
8" (Imported USA made)
" No. 23 11,526.00 265,098

10" ( - do - ) " No. 22 44,928.00 988,416


Reducer
6"x 4" (Imported USA made) Ref Appendix II RA
No. 17 1,966.32 33,427
(11 of 24)
8"x6" ( - do - ) " No. 25 5,512.50 137,813
10"x8" ( - do - ) " No. 16 22,050.00 352,800

10 Restoration of metalled road,on


laid service line,including
compaction. (The specification
of restoration will match those of
existing roads)

i) Carpetted Road with 2" (38


mm) carpet and 10" (150mm)
depth of stone metal, for base 21/12-a 100Sft 83.13 7,147.35 594,159
and sub base.Quantity as per
statement.

11 Cement concrete plain including


placing,compacting, finishing and
curing complete (including
screening and washing of stone
aggregate)Quantity as per length
statement.

i) Ratio1:2:4 6/5(f) 100 Cft 42.22 18,886.55 797,390


ii) Ratio1:7:20 6/5(i) 100 Cft 33.78 14,400.95 486,464

12 Restoration of dry brick soling 21/10, 100Sft 385.20 2,960.60 1,140,423


13-B Restoration of R.C.C 1:2:4 6/6 (a-i-3), Cft 1,380.16 303.50 418,877

13 Sluice (gate) valve with chamber


as per drawings and
specifications complete in all
respect.

a) 10" dia Ref Appendix II


No. 9.00 61,328 551,949
(RA 14 of 24)
b) 8" dia Ref Appendix II
No. 3.00 53,852 161,555
(RA 15 of 24)

F16-3
APPENDIX F

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Work yet to be Alotted
Based on MRS Ist Bi - Annual 2016

Table F-16: Distribution System (Part -II)

Sr. MRS Ist Bi-Annual


Descriptions Unit Qty. Rate Amount
No. 2016 Ref. Ch/Item

c) 6" dia Ref Appendix II


No. 4.00 46,399 185,595
(RA 16 of 24)

F16-4
APPENDIX F

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Work yet to be Alotted
Based on MRS Ist Bi - Annual 2016

Table F-16: Distribution System (Part -II)

Sr. MRS Ist Bi-Annual


Descriptions Unit Qty. Rate Amount
No. 2016 Ref. Ch/Item

14 Supplying and filling sand under


floor; or plugging in wells. 7/30 100 Cft 651.23 1,338.00 871,348

15 Fire hydrant with chamber as per


drawing and specificatons Ref Appendix II
No. 3.00 57,863 173,588
complete in all respect. (RA 18 of 24)

16 Wash out with chamber as per


drawing and specificatons Ref Appendix II
No. 1.00 52,829 52,829
complete in all respect. (RA 19 of 24)

17 Air valve with chamber as per


drawing and specificatons Ref Appendix II
No. 3.00 40,281 120,842
complete in all respect. (RA 20 of 24)

18 Providing and fitting C.I. flanges


on pipes, including turning,
threading, facing and fitting, etc. 23/34 Kg
complete in all respect

a) 3" to 6" (75 to 150 mm) i/d Kg 150 106.95 16,013


b) 8" to 12" (200 to 300 mm) i/d Kg 488 95.85 46,768

19 Providing and installing PVC


Taper core BSS class B working 23/40 No.
pressure.
6" No. 16 209.15 3,346
8" No. 14 316.65 4,433
10" No. 20 379.8 7,596

20 Providing and fixing Non return


valve with chamber as per
drawings and specifications No.
complete in all respect.

6" Ref Appendix II


No. 4 46,398.86 185,595
(RA 4 of 24)
8" Ref Appendix II
No. 4 53,724.11 214,896
(RA 3 of 24)
10" Ref Appendix II
No. 1 61,731.36 61,731
(RA 2 of 24)

21 Providing and fixing, 6" (150 mm)


thick R.C.C. manhole cover with
3"x3"x¼" (75x75x6mm) angle iron
frame, 22" (550 mm) i/d as per 21/17 No. 25 3,821.05 95,526
standard drawing STD/PD No. 7
of 1977, complete in all respects.

22 Recovery of Dismentling Material 100 Cft. 332.52 1,000.00 332,523

Total Cost Distribution System G-l (Zone-ll & V) 56,436,975

F16-5
APPENDIX I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Part - II)
Table I-1: Backup Calculations of Quantities

Item
Descriptions Qty Unit Length Width Height Total
No.
1 DISTRIBUTION SYSTEM
1.1 Dismentaling & Removing of
Road (Carpetted & Black
Topped)
Total Quantity as per statement Cft 83,131
100Cft 831.31

1.2 Dismentaling & Removing of


Road (PCC 1:2:4)
Total Quantity as per statement Cft 16,890
100Cft 168.90

1.3 Dismentaling & Removing of


Road (PCC 1:7:20) 80% of Item
No. 1.2
Cft 13,512
100Cft 135.12
1.3A Dismentaling of Flagged
Flooring without concrete
foundation
Total Quantity as per statement Sft 38,520
100 Sft 385.20
1.3B Dismentaling of RCC 1:2:4
Total Quantity as per statement Cft 5,521
100Cft 55.21

1.3 C Recovery of Road Dismentling


@40% of item 1.1

Total Quantity as per Length


Cft 33,252
Statement
100Cft 332.52
1.4 Excavation for water Supply Line
4" Dia 1 Cft 7,179 2 3.7 53,125
6" Dia 1 Cft 13,187 2.5 3.92 129,233
8" Dia 1 Cft 27,151 2.5 4.08 276,940
10" Dia 1 Cft 32,166 3 4.25 410,117
12" Dia 1 Cft - 3 4.42 -
Total Cft 869,414
1000Cft 869.41
1.4A Rehandling of earth @80% of 1000Cft 695.53
item No. 1.4

1.5 Concrete 3000 Psi (See Table I-6)


Concrete in Bends 1 Cft -
Concrete in Tees 1 Cft 383.40
Concrete in Crosses 1 Cft -
Backup of F16-1
APPENDIX I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Part - II)
Table I-1: Backup Calculations of Quantities

Item
Descriptions Qty Unit Length Width Height Total
No.
Concrete in Dead Ends 1 Cft -
Total Cft 383.40

Backup of F16-2
APPENDIX I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Part - II)
Table I-1: Backup Calculations of Quantities

Item
Descriptions Qty Unit Length Width Height Total
No.
383.40
100Cft 3.83
1.6 Restoration of Road
(Carpetted) @10% of item No.
1.1
Sft 8,313
100Sft 83.13
Laying of PCC 1:2:4 @25% of
1.7
item No. 1.2
Cft 4,222
100Cft 42.22
Laying of PCC 1:7:20 @25% of
1.8
item No. 1.3
Cft 3,378
100Cft 33.78

1.9 Restoration of flagged flooring Sft 9,630.00


100Sft 96.30

1.10 Restoration of RCC 1:2:4 Cft 1,380.16


100Cft 13.80
1.10 A Steel 6.75 lb/cft Kg 4,225.73
100 Kg 42.26
1.11 uPVC Pipes
a) 12" dia 1 Rft - -
b) 10" dia 1 Rft 32,166 32,166
c) 8" dia 1 Rft 27,151 27,151
d) 6" dia 1 Rft 13,187 13,187
e) 4" dia 1 Rft 7,179 7,179

1.12 uPVC Fittings

450 Bend
8" 5 No. 5
10" 0 No. 0
90o Bend
4" 20 No. 20
6" 25 No. 25
8" 0 No. 0
10" 4 No. 4

Backup of F16-3
APPENDIX I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Part - II)
Table I-1: Backup Calculations of Quantities

Item
Descriptions Qty Unit Length Width Height Total
No.
Tees
6"x6"x4" 0 No. 0.00

Backup of F16-4
APPENDIX I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Part - II)
Table I-1: Backup Calculations of Quantities

Item
Descriptions Qty Unit Length Width Height Total
No.

8"x8"x6" 0 No. 0
8"x8"x4" 0 No. 0
10"x10"x8" 0 No. 0
10"x10"x6" 0 No. 0
10"x10"x4" 0 No. 0
Equal Tee
6" 18 No. 18
8" 23 No. 23
10" 22 No. 22
12" 0 No. 0
Reducer
6"x4" 17 No. 17
8"x6" 25 No. 25
10"x8" 16 No. 16

1.13 Sluice Valves


a) 10" dia 9 No. 9
b) 8" dia 3 No. 3
c) 6" dia 4 No. 4

1.14 Sandfilling in road crossings


Sandfilling in bed of pipe
a) for 6" & 8" dia 1 Cft 40,338 2.5 0.33 33,278.85
b) for 10" & 12" dia 1 Cft 32,166 3 0.33 31,844
65,123
100Cft 651.23
1.15 Fire Hydrants 2-1/2" dia. 3 No. 3

1.16 Indication Plates 3 No. 3

1.17 Washouts 1 No. 1

1.18 Providing and fixing Air valve


3 Nos. 3
2 -1/2" i/d BSS
1.19 C.I frame RCC manhole cover 25 No. 25.00

Backup of F16-5
APPENDIX I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Distribution System (Part - II)
Table I-1: Backup Calculations of Quantities

Item
Descriptions Qty Unit Length Width Height Total
No.

1.20
Providing and fitting C.I.
flanges on pipes, including
turning, threading, facing and
fitting, etc. complete in all
respect

6" 30 lbs 11 330 149.73


Total Wt. 149.73
8" 38 lbs 15.3 581.4 263.79
10" 20 lbs 24.7 494 224.14
Kg Total Wt. 487.93

Providing and installing PVC


1.21 Taper core BSS class B
working pressure.
6" 16 No. 16.00
8" 14 No. 14.00
10" 20 No. 20.00

1.22 Providing and fixing Non


return valve with chamber as
per drawings and
specifications complete in all
respect.
6" 4 No. 4.00
8" 4 No. 4.00
10" 1 No. 1.00

Backup of F16-6
APPENDIX -I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


GROUP-I(ZONE-II & V)
Ditribution System (Part - II)
Table I-4: Detailed Calculations of PCC 3000 Psi for Thrust Blocks

PIPE SIZE TEE BLOCK DIMENSIONS TOTAL


UNIT QTY. Total
d C B D L QTY.
Number
inch feet feet feet feet feet cft cft
6 0.50 0.67 1.00 1.25 2.00 2.44 18 43.92
8 0.67 1.00 1.00 1.50 2.75 5.08 23 116.84
10 0.83 1.00 1.00 2.00 3.50 10.12 22 222.64
12 1.00 1.75 1.00 2.50 4.00 18.43 - -
383.40

PIPE SIZE DEAD ENDS & LONGITUDAL SUPPORT TOTAL


UNIT QTY. Total
d C B D L QTY.
Number
inch feet feet feet feet feet cft cft
6 0.50 0.67 1.00 1.25 2.00 2.24 -
8 0.67 1.00 1.00 1.50 2.75 3.70 -
10 0.83 1.00 1.00 2.00 3.50 6.11 -
12 1.00 1.75 1.00 2.50 4.00 9.34 - -
-

PIPE SIZE BENDS TOTAL


UNIT QTY. Total
d C B D L QTY.
Number
inch feet feet feet feet feet cft cft
10 0.83 0.67 2.25 2.25 4.00 15.56 - -
-

PIPE SIZE CROSS BLOCK DIMENSIONS TOTAL


UNIT QTY. Total
d C B D L QTY.
Number
inch feet feet feet feet feet cft cft
6 0.50 0.67 1.00 1.25 2.00 2.44 -
8 0.67 1.00 1.00 1.50 2.75 5.08 -
10 0.83 1.00 1.00 2.00 3.50 10.12 -
12 1.00 1.75 1.00 2.50 4.00 18.43 -
-
TOTAL CONCRETE IN THRUST BLOCKS 383.40 Cft

Table I-4-2
Description
Group I Group II Group II
Providing and fixing follwing
uPVC specials of B.S.S Class 'B'
( such as bend, tee cross collar,
reducer, tail piece, flanged Total Total Total
spigot, cap, flanged socket, Part - I Part - II Part - I Part - II Part - I Part - II
taper, angle branch, plug etc.)
with flanged and flanged joints,
complete in all respect.

45 Bend
6"
36 38 39
36 19 57 39
8" (Imported USA made) 58 58 20 20 22 22
10" ( - do - ) 11 5 20 16
16 20 16
12" ( - do - ) 5 5 3
5 5 3

90 bend

4" 156 8 164 80 25 105 65 18 83


6" 78 9 87 17 15 32 41 9 50
8" (Imported USA made) 21 3 24 10 10 50 13 63
10" ( - do - ) 5 5 10 3 22
10 13 22
12" ( - do - ) 9 8 3
9 8 3

Tees 0 0 0
6"x6"x4" 59 6 65 40 28 68 109 29 138
8"x8"x4" 51 14 65 15 15 26 11 37
8"x8"x6" (Imported USA made) 42 10 52 16 5 21 43 5 48
10"x10"x4"
20 5 26 4
25 26 4
10"x10"x6" ( - do - ) 19 19 38 14 2 16 8 8
10"x10''x8" 21 7 28 10 10 3 3
12x12"x4" 0 10 10 0
12x12"x6" 4 4 6 6 2 2
12x12"x8" 5 5 4 4 1 1
12"x12"x10" 4 4 8 8 3 3

Equal Tee
4" 200 200 145 145 110 110
6" 94 6 100 20 13 33 71 10 81
8" (Imported USA made) 69 7 76 13 13 17 8 25
10" ( - do - ) 17 3 20 22 22 21 21
12" ( - do - ) 19 1 20 15 15 4 4
Reducer
6"x 4" 100 45 145 85 85 60 4 64
8"x6" (Imported USA made) 47 13 60 29 29 23 8 31
10"x6" ( - do - ) 11 11 22 22 10 10
10"x8" ( - do - ) 15 5 20 10 10 15 15
12"x6" ( - do - ) 3 3 0 2 2
12x8" ( - do - ) 24 24 10 10 2 2
12x10"( - do - ) 10 10 17 17 7 7

Sluice Valves

a) 12" dia 10 10 9 9 8 8
b) 10" dia 22 8 30 20 20 7 7
c) 8" dia 44 13 57 22 22 24 7 31
d) 6" dia 31 6 37 36 5 41 38 7 45
e) 4"dia 98 98 20 20 38 38
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Replacement of Existing Lines

Dismantlling
Length Width of Trench Road P.C.C R.C.C Solling
Zone No. Name of Line Length Depth Quantity Quantity Length Depth Quantity Length Depth Quantity Length Quantity

12" i/d 10" i/d 8" i/d 6" i/d (ft) (ft) (ft) (Sft) (Cft) (ft) (ft) (Cft) (ft) (ft) (Cft) (ft) (Sft)

II 508-507 - - - 1274 2.5 - - - - 1274 0.75 2,389 - - - 1274 3185

519-511 - - - 1147 2.5 - - - - 1147 0.67 1,912 - - - 1147 2867.5

512-520 170 - - - 3.0 170 2 510 1020 - - - - - - - -

520-519 484 - - - 3.0 484 2 1452 2904 - - - - - - - -

519-518 1143 - - - 3.0 1143 2 3429 6858 - - - - - - - -

518-517 2559 - - - 3.0 2559 2 7677 15354 - - - - - - - -

604-605 - - - 934 2.5 - - - - 934 0.67 1,557 - - - 934 2335

617-612 - - 492 2.5 - - - - 492 0.67 820 - - - - -

617-615 - - - 1152 2.5 - - - - 1152 0.50 1,440 - - - 1152 2880

615-610 - - - 817 2.5 - - - - 817 0.50 1,021 - - - 817 2042.5

616-619 - - - 933 2.5 - - - - 933 0.50 1,166 - - - - -

619-615 - - - 623 2.5 - - - - 623 0.50 779 - - - - -

100-TW 3 - - - 500 2.5 - - - - 500 0.50 625 - - - - -

624-630 - - 459 - 2.5 459 0.75 1147.5 860.63 459 0.50 574 - - - - -

712-710 - - - 860 2.5 - - - - 860 0.50 1,075 - - - - -

V 614-613 - - 798 - 2.5 798 1 1995 1995 - - - - - - 798 1995

613-611 - - 1075 - 2.5 1075 1 2687.5 2688 - - - - - - 1075 2687.5

611-602 - - - 1020 2.5 1020 1 2550 2550 1,020 0.50 1,275 - - - - -

611-612 - - - 1070 2.5 1070 1 2675 2675 1,070 0.50 1,338 - - - - -

425-430 - - - 1243 2.5 1243 1.5 3107.5 4661 - - - - - - - -

407-406 - - - 799 2.5 799 1 1997.5 1998 - - - - - - - -

403-404 - - - 2946 2.5 2946 1 7365 7365 - - - - - - - -

Grand Total G-I 4356 0 2824 15318 13766 36593 50928 11281 15970 0 0 7197 17993

F16-1
APPENDIX F

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Work yet to be Alotted
Based on MRS Ist Bi - annual 2015

Table F-16: Replacement of Existing Lines

Sr. MRS Ist Bi-annual


Descriptions Unit Qty. Rate Amount
No. 2015 Ref. Ch/Item

1 Dismantling and removing of road


4/45 100 Cft. 509.28 950.40 484,020
metalling.

2 Dismantling Plain cement


4/19c 100 Cft. 159.70 5,227.20 834,784
concrete 1:2:4

3 Dismantling Plain cement


4/19a 100 Cft. 159.70 2,613.60 417,392
concrete 1:7:20

4 Dismantling of flagged flooring 4/29 100 Sft. 179.93 403.90 72,672

5 Dismantling of Reinforcement
4/20 100 Cft. - 8,553.60 0
concrete 1:2:4

6
Excavation of trenches in all kinds
of soil, except cuttingrock, for
watersupply pipelines upto 5 ft.
(1.5 m) depthfrom ground level,
including trimming, dressing 3/44 1000 Cft 236.68 3,569.30 844,788
sides, levelling the beds of
trenches to correct grade cutting
pits for joints, etc. complete in all
respects.

7 Rehandling of earthwork:
Lead upto a single throw of Kassi,
phaorah or shovel and ramming 3/13a,3/24 (c ) 1000 Cft 189.35 1,901.80 360,097
earthwork (all types of soil) (80%
of item 4)

8 Transportation of earth all types


when the total distance, including
the lead covered in the item of
work, is more than
1000 ft. (300 m) 3/17b 1000 Cft 35.50 2,775.00 98,519
b) for every 330 ft. (100 m)
additional lead or part thereof,
beyond ¼ mile (400 m) upto one
mile. (1.6 Km.)

9
Providing, laying, cutting, jointing,
testing and disinfecting P.V.C
Pipe line of B.S.S with 'B'class
working pressure pipe,in
trenches, complete in all respect.

a) 12" dia 23/26 Rft. 4,356.00 1,011.60 4,406,530


b) 8" dia " Rft. 2,824.00 468.75 1,323,750
c) 6" dia " Rft. 15,318.00 304.85 4,669,692

F16-1
APPENDIX F

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Work yet to be Alotted
Based on MRS Ist Bi - annual 2015

Table F-16: Replacement of Existing Lines

Sr. MRS Ist Bi-annual


Descriptions Unit Qty. Rate Amount
No. 2015 Ref. Ch/Item

10 Providing and fixing follwing


uPVC specials of B.S.S Class 'B'
( such as bend, tee cross collar,
reducer, tail piece, flanged spigot,
NS
cap, flanged socket, taper, angle
branch, plug etc.) with flanged
and flanged joints, complete in all
respect.

90 bend
6" 23/37 (i) d No. 8 887.65 7,101
Ref Appendix II RA
8" (Imported USA made) No. 1 9,843.75 9,844
(6 of 24)
12" ( - do - ) " No. 8 56,437.50 451,500

Tees
6"x6"x4" 23/37 (i) d No. 2 2,108.45 4,217
Ref Appendix II RA
8"x8"x4" No. 1 12,468.75 12,469
(8 of 24)
8"x8"x6" (Imported USA made) " No. 2 18,375.00 36,750
12x12"x6" " No. 3 62,300.00 186,900
12x12"x8" " No. 3 76,092.50 228,278

Equal Tee
6" 23/38 (i) d No. 31 2,108.45 65,362
Ref Appendix II RA
8" (Imported USA made) No. 2 11,527.00 23,054
(10 of 24)
12" ( - do - ) " No. 13 56,438.00 733,694
Reducer
Ref Appendix II RA
6"x 4" (Imported USA made) No. 33 1,966.32 64,889
(11 of 24)
8"x6" ( - do - ) " No. 1 5,512.50 5,513
12"x6" ( - do - ) " No. 2 19,421.25 38,843
12x8" ( - do - ) " No. 16 19,983.00 319,728

11 Restoration of metalled road,on


laid service line,including
compaction. (The specification
of restoration will match those of
existing roads)

F16-2
APPENDIX F

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Work yet to be Alotted
Based on MRS Ist Bi - annual 2015

Table F-16: Replacement of Existing Lines

Sr. MRS Ist Bi-annual


Descriptions Unit Qty. Rate Amount
No. 2015 Ref. Ch/Item

i) Carpetted Road with 2" (38


mm) carpet and 10" (150mm)
depth of stone metal, for base 21/12-a 100Sft 407.42 8,101.40 3,300,672
and sub base.Quantity as per
statement.

12
Cement concrete plain including
placing,compacting, finishing and
curing complete (including
screening and washing of stone
aggregate)Quantity as per length
statement.

i) Ratio1:2:4 6/5(f) 100 Cft 127.76 20,275.20 2,590,360


ii) Ratio1:7:20 6/3(f) 100 Cft 103.80 8,013.70 831,822

13-A Restoration of dry brick soling 21/10, 100Sft 179.93 2,866.68 515,787
13-B Restoration of R.C.C 1:2:4 6/6 (a-i-3), 100Cft - 315.30 -

14 Sluice (gate) valve with chamber


as per drawings and
specifications complete in all
respect.

Ref Appendix II
a) 12" dia No. 7.00 67,555 472,883
(RA 13 of 24)
Ref Appendix II
b) 8" dia No. 1.00 53,852 53,852
(RA 15 of 24)
Ref Appendix II
c) 6" dia No. 10.00 46,399 463,989
(RA 16 of 24)

15 Supplying and filling sand under


7/30 100 Cft 192.80 1,278.00 246,393
floor; or plugging in wells.

16 Fire hydrant with chamber as per


Ref Appendix II
drawing and specificatons No. 2.00 57,863 115,726
(RA 18 of 24)
complete in all respect.

17 Wash out with chamber as per


Ref Appendix II
drawing and specificatons No. 3.00 52,829 158,488
(RA 19 of 24)
complete in all respect.

18 Air valve with chamber as per


Ref Appendix II
drawing and specificatons No. 4.00 40,281 161,123
(RA 20 of 24)
complete in all respect.

19 Providing and fitting C.I. flanges


on pipes, including turning,
23/34 Kg
threading, facing and fitting, etc.
complete in all respect
a) 3" to 6" (75 to 150 mm) i/d Kg 190 104.70 19,857
b) 8" to 12" (200 to 300 mm) i/d Kg 416 93.60 38,914

F16-3
APPENDIX F

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Work yet to be Alotted
Based on MRS Ist Bi - annual 2015

Table F-16: Replacement of Existing Lines

Sr. MRS Ist Bi-annual


Descriptions Unit Qty. Rate Amount
No. 2015 Ref. Ch/Item

20 Providing and installing PVC


Taper core BSS class B working 23/40 No.
pressure.
6" No. 38 204.85 7,784
8" No. 5 310.2 1,551
12" No. 34 446.95 15,196

21 Providing and fixing Non return


valve with chamber as per
No.
drawings and specifications
complete in all respect.
Ref Appendix II
6" No. 7 46,398.86 324,792
(RA 4 of 24)
Ref Appendix II
8" No. 1 53,724.11 53,724
(RA 3 of 24)
Ref Appendix II
12" No. 1 67,554.71 67,555
(RA 1 of 24)

Providing and fixing, 6" (150 mm)


thick R.C.C. manhole cover with
3"x3"x¼" (75x75x6mm) angle iron
22 21/17 No. 34 4,073.05 138,484
frame, 22" (550 mm) i/d as per
standard drawing STD/PD No. 7
of 1977, complete in all respects.

Total Cost Distribution System G-l (Zone-ll & V) 25,279,334

F16-4
APPENDIX I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Replacement of Existing Lines
Table I-1: Backup Calculations of Quantities

Item
Descriptions Qty Unit Length Width Height Total
No.
1 DISTRIBUTION SYSTEM
1.1 Dismentaling & Removing of
Road (Carpetted & Black
Topped)
Total Quantity as per statement Cft 50,928
100Cft 509.28

1.2 Dismentaling & Removing of


Road (PCC 1:2:4)
Total Quantity as per statement Cft 15,970
100Cft 159.70

1.3 Dismentaling & Removing of


Road (PCC 1:7:20)
Total Quantity as per Item No.1.2 Cft 15,970
100Cft 159.70
1.3A Dismentaling of Flagged
Flooring without concrete
foundation
Total Quantity as per statement Sft 17,993
100 Sft 179.93
1.3B Dismentaling of RCC 1:2:4
Total Quantity as per statement Cft -
100Cft -

1.4 Excavation for water Supply Line


6" Dia 1 Cft 15,318 2.5 3.92 150,116
8" Dia 1 Cft 2,824 2.5 4.08 28,805
10" Dia 1 Cft - 3 4.25 -
12" Dia 1 Cft 4,356 3 4.42 57,761
Total Cft 236,682
1000Cft 236.68
1.4A Rehandling of earth @80% of 1000Cft 189.35
item No. 1.4

1.4B Transportation of earth @15%


1000Cft 35.50
of item No. 1.4

1.5 Concrete 3000 Psi (See Table I-6)


Concrete in Bends 1 Cft 324.60
Concrete in Tees 1 Cft 345.51
Concrete in Crosses 1 Cft -
Concrete in Dead Ends 1 Cft -
Total Cft 670.11

Backup of F16-1
APPENDIX I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Replacement of Existing Lines
Table I-1: Backup Calculations of Quantities

Item
Descriptions Qty Unit Length Width Height Total
No.
670.11
100Cft 6.70
1.6 Restoration of Road
(Carpetted) @80% of item No.
1.1
Sft 40,742
100Sft 407.42
Laying of PCC 1:2:4 @80% of
1.7
item No. 1.2
Cft 12,776
100Cft 127.76
Laying of PCC 1:7:20 @65% of
1.8
item No. 1.3
Cft 10,380
100Cft 103.80

1.9 Restoration of flagged flooring Sft 17,992.50


100Sft 179.93

1.10 Restoration of RCC 1:2:4 Cft -


100Cft -
1.10 A Steel 6.75 lb/cft Kg -
100 Kg -
1.11 uPVC Pipes
a) 12" dia 1 Rft 4,356 4,356
b) 10" dia 1 Rft - -
c) 8" dia 1 Rft 2,824 2,824
a) 6" dia 1 Rft 15,318 15,318

1.12 uPVC Fittings

90o Bend
6" 8 No. 8
8" 1 No. 1
12" 8 No. 8

Tees
6"x6"x4" 2 No. 2

Backup of F16-2
APPENDIX I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Replacement of Existing Lines
Table I-1: Backup Calculations of Quantities

Item
Descriptions Qty Unit Length Width Height Total
No.

8"x8"x6" 2 No. 2
8"x8"x4" 1 No. 1
12"x12"x8" 3 No. 3
12"x12"x6" 3 No. 3
Equal Tee
6" 31 No. 31
8" 2 No. 2
12" 13 No. 13
Reducer
6"x4" 33 No. 33
8"x6" 1 No. 1
12x6" 2 No. 2
12x8" 16 No. 16

1.13 Sluice Valves


a) 12" dia 7 No. 7
b) 8" dia 1 No. 1
c) 6" dia 10 No. 10

1.14 Sandfilling in road crossings


Sandfilling in bed of pipe
a) for 6" & 8" dia 1 Cft 18,142 2.5 0.33 14,967.15
b) for 10" & 12" dia 1 Cft 4,356 3 0.33 4,312
19,280
100Cft 192.80
1.15 Fire Hydrants 2-1/2" dia. 2 No. 2

1.16 Indication Plates 5 No. 5

1.17 Washouts 3 No. 3

1.18 Providing and fixing Air valve


4 Nos. 4
2 -1/2" i/d BSS
1.19 C.I frame RCC manhole cover 34 No. 34.00

Backup of F16-3
APPENDIX I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate of Group-I (Zone-II & V)
Replacement of Existing Lines
Table I-1: Backup Calculations of Quantities

Item
Descriptions Qty Unit Length Width Height Total
No.

1.20 Providing and fitting C.I.


flanges on pipes, including
turning, threading, facing and
fitting, etc. complete in all
respect
6" 38 lbs 11 418 189.66
Total Wt. 189.66
8" 5 lbs 15.3 76.5 34.71
12" 34 lbs 24.7 839.8 381.03
Kg Total Wt. 415.74

Providing and installing PVC


1.21 Taper core BSS class B
working pressure.
6" 38 No. 38.00
8" 5 No. 5.00
12" 34 No. 34.00

1.22 Providing and fixing Non


return valve with chamber as
per drawings and
specifications complete in all
respect.
6" 7 No. 7.00
8" 1 No. 1.00
12" 1 No. 1.00

Backup of F16-4
APPENDIX -I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


GROUP-I(ZONE-II & V)
Replacement of Existing Lines
Table I-4: Detailed Calculations of PCC 3000 Psi for Thrust Blocks

PIPE SIZE TEE BLOCK DIMENSIONS TOTAL


UNIT QTY. Total
d C B D L QTY.
Number
inch feet feet feet feet feet cft cft
6 0.50 0.67 1.00 1.25 2.00 2.44 33 80.52
8 0.67 1.00 1.00 1.50 2.75 5.08 5 25.40
10 0.83 1.00 1.00 2.00 3.50 10.12 -
12 1.00 1.75 1.00 2.50 4.00 18.43 13 239.59
345.51

PIPE SIZE DEAD ENDS & LONGITUDAL SUPPORT TOTAL


UNIT QTY. Total
d C B D L QTY.
Number
inch feet feet feet feet feet cft cft
6 0.50 0.67 1.00 1.25 2.00 2.24 -
8 0.67 1.00 1.00 1.50 2.75 3.70 -
10 0.83 1.00 1.00 2.00 3.50 6.11 -
12 1.00 1.75 1.00 2.50 4.00 9.34 - -
-

PIPE SIZE BENDS TOTAL


UNIT QTY. Total
d C B D L QTY.
Number
inch feet feet feet feet feet cft cft
6 0.50 0.17 1.50 2.00 2.50 7.45 8 65.58
8 0.67 0.50 1.50 2.25 3.00 11.20 1 12.31
10 0.83 0.67 2.25 2.25 4.00 15.56 -
12 1.00 0.83 2.50 2.75 5.00 28.03 8 246.71
324.60

PIPE SIZE CROSS BLOCK DIMENSIONS TOTAL


UNIT QTY. Total
d C B D L QTY.
Number
inch feet feet feet feet feet cft cft
6 0.50 0.67 1.00 1.25 2.00 2.44 -
8 0.67 1.00 1.00 1.50 2.75 5.08 -
10 0.83 1.00 1.00 2.00 3.50 10.12 -
12 1.00 1.75 1.00 2.50 4.00 18.43 -
-
TOTAL CONCRETE IN THRUST BLOCKS 670.11 Cft

Table I-4-2
APPENDIX-J

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT


Revised Rough Cost Estimate
Work Executed under TMA (Gujrat)

Dismantlling
Length Width of Trench Road P.C.C R.C.C Solling
Sr # Length Depth Quantity Quantity Length Depth Quantity Length Depth Quantity Length Quantity

12" i/d 10" i/d 8" i/d 6" i/d (ft) (ft) (ft) (Sft) (Cft) (ft) (ft) (Cft) (ft) (ft) (Cft) (ft) (Sft)

1 - - - 1274 2.5 - - - - 1274 0.75 2,389 - - - 1274 3185

2 - - - 1152 2.5 - - - 1152 0.50 1,440 - - - 1152 2880

3 - - 120 2.5 120.0 2.0 300 600.00 0 0.50 0 - - - 0 0

4 - - 272 2.5 272.0 3.0 680 2040.00 0 0.50 0 - - - - -

5 - - 631 2.5 631.0 4.0 1577.5 6310.00 0 0.50 0 - - - - -

6 - - - 615 2.5 - - - - 615 0.50 769 - - - - -

7 - - 459 - 2.5 459 0.75 1147.5 860.63 459 0.50 574 - - - - -

8 - - - 860 2.5 - - - - 860 0.50 1,075 - - - - -

9 - - 258 - 2.5 258 1 645 645 - - - - - - 258 645

10 - - - 799 2.5 799 1 1997.5 1998 - - - - - - - -

Total 0 0 1740 4700 2539 6348 12453 4360 6246 0 0 2684 6710

F16-1
APPENDIX F

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate
Work yet to be Alotted
Based on MRS Ist Bi - annual 2015

Work Executed under TMA (Gujrat)

Sr. MRS Ist Bi-annual


Descriptions Unit Qty. Rate Amount
No. 2015 Ref. Ch/Item

1 Dismantling and removing of road


4/45 100 Cft. 124.53 950.40 118,353
metalling.

2 Dismantling Plain cement


4/19c 100 Cft. 62.46 5,227.20 326,491
concrete 1:2:4

3 Dismantling Plain cement


4/19a 100 Cft. 62.46 2,613.60 163,245
concrete 1:7:20

4 Dismantling of flagged flooring 4/29 100 Sft. 67.10 403.90 27,102

5 Dismantling of Reinforcement
4/20 100 Cft. - 8,553.60 0
concrete 1:2:4

6
Excavation of trenches in all kinds
of soil, except cuttingrock, for
watersupply pipelines upto 5 ft.
(1.5 m) depthfrom ground level,
including trimming, dressing 3/44 1000 Cft 63.81 3,569.30 227,750
sides, levelling the beds of
trenches to correct grade cutting
pits for joints, etc. complete in all
respects.

7 Rehandling of earthwork:
Lead upto a single throw of Kassi,
phaorah or shovel and ramming 3/13a,3/24 (c ) 1000 Cft 51.05 1,901.80 97,080
earthwork (all types of soil) (80%
of item 4)

8 Transportation of earth all types


when the total distance, including
the lead covered in the item of
work, is more than
1000 ft. (300 m) 3/17b 1000 Cft 9.57 2,775.00 26,560
b) for every 330 ft. (100 m)
additional lead or part thereof,
beyond ¼ mile (400 m) upto one
mile. (1.6 Km.)

9
Providing, laying, cutting, jointing,
testing and disinfecting P.V.C
Pipe line of B.S.S with 'B'class
working pressure pipe,in
trenches, complete in all respect.

a) 12" dia 23/26 Rft. - 1,011.60 -


b) 8" dia " Rft. 1,740.00 468.75 815,625
c) 6" dia " Rft. 4,700.00 304.85 1,432,795

F16-1
APPENDIX F

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate
Work yet to be Alotted
Based on MRS Ist Bi - annual 2015

Work Executed under TMA (Gujrat)

Sr. MRS Ist Bi-annual


Descriptions Unit Qty. Rate Amount
No. 2015 Ref. Ch/Item

10 Providing and fixing follwing


uPVC specials of B.S.S Class 'B'
( such as bend, tee cross collar,
reducer, tail piece, flanged spigot,
NS
cap, flanged socket, taper, angle
branch, plug etc.) with flanged
and flanged joints, complete in all
respect.

90 bend
6" 23/37 (i) d No. 8 887.65 7,101
Ref Appendix II RA
8" (Imported USA made) No. 5 9,843.75 49,219
(6 of 24)
12" ( - do - ) " No. 0 56,437.50 -

Tees
6"x6"x4" 23/37 (i) d No. 2 2,108.45 4,217
Ref Appendix II RA
8"x8"x4" No. 5 12,468.75 62,344
(8 of 24)
8"x8"x6" (Imported USA made) " No. 2 18,375.00 36,750
12x12"x6" " No. 0 62,300.00 -
12x12"x8" " No. 0 76,092.50 -

Equal Tee
6" 23/38 (i) d No. 31 2,108.45 65,362
Ref Appendix II RA
8" (Imported USA made) No. 2 11,527.00 23,054
(10 of 24)
12" ( - do - ) " No. 0 56,438.00 -
Reducer
Ref Appendix II RA
6"x 4" (Imported USA made) No. 33 1,966.32 64,889
(11 of 24)
8"x6" ( - do - ) " No. 5 5,512.50 27,563
12"x6" ( - do - ) " No. 0 19,421.25 -
12x8" ( - do - ) " No. 0 19,983.00 -

11 Restoration of metalled road,on


laid service line,including
compaction. (The specification
of restoration will match those of
existing roads)

F16-2
APPENDIX F

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate
Work yet to be Alotted
Based on MRS Ist Bi - annual 2015

Work Executed under TMA (Gujrat)

Sr. MRS Ist Bi-annual


Descriptions Unit Qty. Rate Amount
No. 2015 Ref. Ch/Item

i) Carpetted Road with 2" (38


mm) carpet and 10" (150mm)
depth of stone metal, for base 21/12-a 100Sft 99.63 8,101.40 807,142
and sub base.Quantity as per
statement.

12
Cement concrete plain including
placing,compacting, finishing and
curing complete (including
screening and washing of stone
aggregate)Quantity as per length
statement.

i) Ratio1:2:4 6/5(f) 100 Cft 49.97 20,275.20 1,013,152


ii) Ratio1:7:20 6/3(f) 100 Cft 40.60 8,013.70 325,356

13-A Restoration of dry brick soling 21/10, 100Sft 67.10 2,866.68 192,354
13-B Restoration of R.C.C 1:2:4 6/6 (a-i-3), 100Cft - 315.30 -

14 Sluice (gate) valve with chamber


as per drawings and
specifications complete in all
respect.

Ref Appendix II
a) 12" dia No. - 67,555 -
(RA 13 of 24)
Ref Appendix II
b) 8" dia No. 2.00 53,852 107,703
(RA 15 of 24)
Ref Appendix II
c) 6" dia No. 10.00 46,399 463,989
(RA 16 of 24)

15 Supplying and filling sand under


7/30 100 Cft 53.13 1,278.00 67,900
floor; or plugging in wells.

16 Fire hydrant with chamber as per


Ref Appendix II
drawing and specificatons No. 2.00 57,863 115,726
(RA 18 of 24)
complete in all respect.

17 Wash out with chamber as per


Ref Appendix II
drawing and specificatons No. 3.00 52,829 158,488
(RA 19 of 24)
complete in all respect.

18 Air valve with chamber as per


Ref Appendix II
drawing and specificatons No. 4.00 40,281 161,123
(RA 20 of 24)
complete in all respect.

19 Providing and fitting C.I. flanges


on pipes, including turning,
23/34 Kg
threading, facing and fitting, etc.
complete in all respect
a) 3" to 6" (75 to 150 mm) i/d Kg 190 104.70 19,857
b) 8" to 12" (200 to 300 mm) i/d Kg 69 93.60 6,498

F16-3
APPENDIX F

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate
Work yet to be Alotted
Based on MRS Ist Bi - annual 2015

Work Executed under TMA (Gujrat)

Sr. MRS Ist Bi-annual


Descriptions Unit Qty. Rate Amount
No. 2015 Ref. Ch/Item

20 Providing and installing PVC


Taper core BSS class B working 23/40 No.
pressure.
6" No. 38 204.85 7,784
8" No. 10 310.2 3,102
12" No. 0 446.95 -

21 Providing and fixing Non return


valve with chamber as per
No.
drawings and specifications
complete in all respect.
Ref Appendix II
6" No. 7 46,398.86 324,792
(RA 4 of 24)
Ref Appendix II
8" No. 5 53,724.11 268,621
(RA 3 of 24)
Ref Appendix II
12" No. 0 67,554.71 -
(RA 1 of 24)

Providing and fixing, 6" (150 mm)


thick R.C.C. manhole cover with
3"x3"x¼" (75x75x6mm) angle iron
22 21/17 No. 28 4,073.05 114,045
frame, 22" (550 mm) i/d as per
standard drawing STD/PD No. 7
of 1977, complete in all respects.

Total Cost Distribution System 7,733,131

F16-4
APPENDIX I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate
Work Executed under TMA (Gujrat)
Table I-1: Backup Calculations of Quantities

Item
Descriptions Qty Unit Length Width Height Total
No.
1 DISTRIBUTION SYSTEM
1.1 Dismentaling & Removing of
Road (Carpetted & Black
Topped)
Total Quantity as per statement Cft 12,453
100Cft 124.53

1.2 Dismentaling & Removing of


Road (PCC 1:2:4)
Total Quantity as per statement Cft 6,246
100Cft 62.46

1.3 Dismentaling & Removing of


Road (PCC 1:7:20)
Total Quantity as per Item No.1.2 Cft 6,246
100Cft 62.46
1.3A Dismentaling of Flagged
Flooring without concrete
foundation
Total Quantity as per statement Sft 6,710
100 Sft 67.10
1.3B Dismentaling of RCC 1:2:4
Total Quantity as per statement Cft -
100Cft -

1.4 Excavation for water Supply Line


6" Dia 1 Cft 4,700 2.5 3.92 46,060
8" Dia 1 Cft 1,740 2.5 4.08 17,748
10" Dia 1 Cft - 3 4.25 -
12" Dia 1 Cft - 3 4.42 -
Total Cft 63,808
1000Cft 63.81
1.4A Rehandling of earth @80% of 1000Cft 51.05
item No. 1.4

1.4B Transportation of earth @15%


1000Cft 9.57
of item No. 1.4

1.5 Concrete 3000 Psi (See Table I-6)


Concrete in Bends 1 Cft 127.16
Concrete in Tees 1 Cft 126.24
Concrete in Crosses 1 Cft -
Concrete in Dead Ends 1 Cft -
Total Cft 253.40

Backup of F16-1
APPENDIX I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate
Work Executed under TMA (Gujrat)
Table I-1: Backup Calculations of Quantities

Item
Descriptions Qty Unit Length Width Height Total
No.
253.40
100Cft 2.53
1.6 Restoration of Road
(Carpetted) @80% of item No.
1.1
Sft 9,963
100Sft 99.63
Laying of PCC 1:2:4 @80% of
1.7
item No. 1.2
Cft 4,997
100Cft 49.97
Laying of PCC 1:7:20 @65% of
1.8
item No. 1.3
Cft 4,060
100Cft 40.60

1.9 Restoration of flagged flooring Sft 6,710.00


100Sft 67.10

1.10 Restoration of RCC 1:2:4 Cft -


100Cft -
1.10 A Steel 6.75 lb/cft Kg -
100 Kg -
1.11 uPVC Pipes
a) 8" dia 1 Rft 1,740 1,740
b) 6" dia 1 Rft 4,700 4,700

1.12 uPVC Fittings

90o Bend
6" 8 No. 8
8" 5 No. 5

Tees
6"x6"x4" 2 No. 2

Backup of F16-2
APPENDIX I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate
Work Executed under TMA (Gujrat)
Table I-1: Backup Calculations of Quantities

Item
Descriptions Qty Unit Length Width Height Total
No.

8"x8"x6" 2 No. 2
8"x8"x4" 5 No. 5
Equal Tee
6" 31 No. 31
8" 2 No. 2
Reducer
6"x4" 33 No. 33
8"x6" 5 No. 5

1.13 Sluice Valves


a) 8" dia 2 No. 2
b) 6" dia 10 No. 10

1.14 Sandfilling in road crossings


Sandfilling in bed of pipe
a) for 6" & 8" dia 1 Cft 6,440 2.5 0.33 5,313.00
5,313
100Cft 53.13
1.15 Fire Hydrants 2-1/2" dia. 2 No. 2

1.16 Indication Plates 11 No. 11

1.17 Washouts 3 No. 3

1.18 Providing and fixing Air valve


4 Nos. 4
2 -1/2" i/d BSS
1.19 C.I frame RCC manhole cover 28 No. 28.00

Backup of F16-3
APPENDIX I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY


Revised Rough Cost Estimate
Work Executed under TMA (Gujrat)
Table I-1: Backup Calculations of Quantities

Item
Descriptions Qty Unit Length Width Height Total
No.

1.20 Providing and fitting C.I.


flanges on pipes, including
turning, threading, facing and
fitting, etc. complete in all
respect
6" 38 lbs 11 418 189.66
Total Wt. 189.66
8" 10 lbs 15.3 153 69.42
Kg Total Wt. 69.42

Providing and installing PVC


1.21 Taper core BSS class B
working pressure.
6" 38 No. 38.00
8" 10 No. 10.00

1.22 Providing and fixing Non


return valve with chamber as
per drawings and
specifications complete in all
respect.
6" 7 No. 7.00
8" 5 No. 5.00

Backup of F16-4
APPENDIX -I

CONSTRUCTION OF WATER SUPPLY SYSTEM, GUJRAT CITY

Work Executed under TMA (Gujrat)


Table I-4: Detailed Calculations of PCC 3000 Psi for Thrust Blocks

PIPE SIZE TEE BLOCK DIMENSIONS TOTAL


UNIT QTY. Total
d C B D L QTY.
Number
inch feet feet feet feet feet cft cft
6 0.50 0.67 1.00 1.25 2.00 2.44 33 80.52
8 0.67 1.00 1.00 1.50 2.75 5.08 9 45.72
10 0.83 1.00 1.00 2.00 3.50 - -
12 1.00 1.75 1.00 2.50 4.00 - - -
126.24

PIPE SIZE DEAD ENDS & LONGITUDAL SUPPORT TOTAL


UNIT QTY. Total
d C B D L QTY.
Number
inch feet feet feet feet feet cft cft
6 0.50 0.67 1.00 1.25 2.00 2.24 -
8 0.67 1.00 1.00 1.50 2.75 3.70 -
10 0.83 1.00 1.00 2.00 3.50 6.11 -
12 1.00 1.75 1.00 2.50 4.00 9.34 - -
-

PIPE SIZE BENDS TOTAL


UNIT QTY. Total
d C B D L QTY.
Number
inch feet feet feet feet feet cft cft
6 0.50 0.17 1.50 2.00 2.50 7.45 8 65.58
8 0.67 0.50 1.50 2.25 3.00 11.20 5 61.57
10 0.83 0.67 2.25 2.25 4.00 -
12 1.00 0.83 2.50 2.75 5.00 - -
127.16

PIPE SIZE CROSS BLOCK DIMENSIONS TOTAL


UNIT QTY. Total
d C B D L QTY.
Number
inch feet feet feet feet feet cft cft
6 0.50 0.67 1.00 1.25 2.00 2.44 -
8 0.67 1.00 1.00 1.50 2.75 5.08 -
10 0.83 1.00 1.00 2.00 3.50 10.12 -
12 1.00 1.75 1.00 2.50 4.00 18.43 -
-
TOTAL CONCRETE IN THRUST BLOCKS 253.40 Cft

Table I-4-2

You might also like