PERVEZ AHMAD KHAN Saudi Arab D/L : Validity 16-05-2019

16

H.No. 4/63, Jamalpur,


Jamalpu Distt. Aligarh, U.P, INDIA Passport No.:
No Z 2066252
pervez.pmp@gmail.com Validity : 24/06/2021
+966-556786222
556786222 (KSA) / +91-8307770786 Date of Birth : 09/07/1968

Job Objective Areas of Expertise


Expertis
Seeking position of Training and Placement Officer, Z.H. College of Engineering & Technology, A.M.U Aligarh.

Summary
A pragmatic confident Sr. MEP Manager
anager with a structured motivational approach. Extensive corporate experience in
handling multiple projects from conceptualization
nceptualization to the final handover. Excellent communication and prob
problem
solving skills, recognizing the requirements for success and driving out dependencies and risks for successful project
delivery.

Good exposure to all areas of Construction and Project Management in Ministry of Interior Projects e.g Police
Stations, Fire Brigade Stations, Training Centres, Stadium Clubs, Hospitals, Schools, UAE Armed Forces Projects and
High Rise Buildings, Residential, Commercial Towers, 5 Star Hotels and Infrastructure, Street Lightings etc.

 A strategic MEP Leader with experience in handling gamut of tasks right from planning, monitoring &
controlling phases of project lifecycle,
ifecycle, overall inter-discipline
discipline coordination, administration and resource
Mmbership for
planning etc.
 Extensive experience in Design & Supervision Management including its Control Procedures with respect to Project Management
cost, time runs and quality to ensure satisfactory
sat execution of project.
 Extensive experience in Man Power Planning, Material procurements, Site administration & trainings.

Recommend & forward CVs of engineers & inspectors to HR department for newly assigned projects
through our international links & friend circles.
circle Certification for
Conducting technical interviews for engineers & inspectors as per HR requests & advice technical Project Management
recommendations in accordance with project requirements.
Demonstrate technical presentations on site trainings & administration, project management & pr oject
control procedures, QA/QC procedures, Project activities & constraints, Accident prevention & safety
management, Project risks assesments, Project tools & machinery operation,
Demonstrate trainings on usage of technical softwares / Project planning
planni ng & scheduling software / Contract
management softwares. Certification for
Demonstrate training on drawing & material review procedures, Trainings on site inspections procedures Primavera P6
for installation & testing.
Demonstrate trainings on project mobilisation, executions & project finishing / handover procedures
requirements.
Arrange technical seminars meetings with suppliers & manufacturers for demonstrations of their products
to ensure that the proposed products meets the project’s need and in compliance with proje ct’s
specifications & standard and satisfactory with the contract’s terms & conditions.

 Maintaining soft copies of following documentations as our database from our History of projects for self Value Engineering
reference & for the use of newly hired engineers & inspectors.
ins

Catalogues of different products range used as MEP material in construction of buldings, towers &
infrastructure.
Library of codes & standards, UAE & Saudi Arab local authority regulations
Project’s specifications, BOQs, Tender Drawings, Shop Drawings & As built drawings from our History of
projects for self reference & for the use of newly hired engineers & inspectors.
Quality Control
Project Management Manuals, Project Control Procedures, Responsibility matrics charts, Quality Assurance
Manuals, HSE Manuals etc.
Project Management Templates, Project Mobilization & Project closeout checklists, Project execution &
control checklists, Project Programmes & Schedules with activity lists, sequencing & integration of works.
HSE Checklists & Accident prevention
prevent plans.
 Leading team of Electromechanical Engineers, Inspectors, Quantity Surveyors, Quality Control & HSE Engineers. Certification /
 Managed MEP projects interactions and transactions,
transactions MEP coordinations that take place between the parties, Appreciation Award in
before and after the signature
ture of the contract. Implement
I mplement good contract management policies practices. HSE Management

Academic Details
 Bachelor of Electrical Engineering from A.M.U Aligarh in India 1996
 Diploma in Electrical Engineering from A.M.U Aligarh in India 1988

Additional Qualification Appreciation Award


 Advanced Diploma in Project Management from Academic College of London in 2008 HSE Management

Trainings : Attended trainings from Zabeel Institute, UAE such as:


 Project Management
 Primavera P6
Membership
• Registered Member of Project Management
Manag Institute PMI-USA from 2008 to 1Jan-2014
2014
• Saudi Council of Engineers, Riyadh, Saudi Arabia
Highlights / Achievements: Educational
 Achieved strong decision-making
making skills
skill in MEP field and ability to prioritize, plan, execute efficiently & effectively. Qualifications

 Achieved MEP conflict resolutions skills


kills and focused on identifying the root causes of MEP problems.
 Achieved methodical approach to all tasks, MEP activities & its constraints, risk and quality procedures.
 Prepared Project Management Plan, Project Templates & Project Control Forms, Project control procedures.
 Prepared of Safety Manual including Checklists for Safety & Accident’s prevention plan.
 Achieved awareness of regulations e.g, DEWA, ADDC, Etisalat, Du, SEC, STC and SASO Standards procedures etc.
 Received HSE Appreciation Award for Project Monitoring & Control / Site Supervision of Zone -4 KAFD Project.

Computer Skills
 Well versed with MS Office (Word, Excel, PowerPoint), AutoCAD and Corel Video Studio and Internet Bachelor
achelor of
Applications. Electrical Engg.
Eng
 Primavera Contract Manager Version 13 and Aconex.
 Proficient in the use of Lighting Design Software AG132,
AG132 DIALUX 4.8, EAZYLUX.
 Conduct load flow, short circuit and fault level studies using ETAP
ET AP or SKM power system software.
 Perform power system studies (short circuit, coordination, motor starting, arc flash, harmonics) using SKM.
 Familiar with other softwares HAP 4.31, HAP E20, EDSA, CAPE, ASPEN Amtech, Hevacomp, Trace 7000 etc.

Primavera Contract Management (PCM) Skills


Skill
 Maintaining documentation control & issue logs for all incoming
inc oming , outgoing correspondences, material
submittals and its comments, drawing submittals, day to day instructions, variations / claims & value
engineering, Site measurements & interim payments, safety & risks. Diploma
iploma in
 Preparing, filtering & updating status for project correspondence, Programmed Schedules, Submittals Electrical Engg.
Eng
(Materials/Drawings),
/Drawings), Requests for Information, meeting minutes related Actions, Inbox, Alerts, and Issues etc.

Employment Details
01-04-2013 to Till date Freelancer MEP Project Management Consultant in India
(Responsibilities handled as Design Management & Construction, Project Management Consultant)
(Working
Working as freelancer for local residential buildings projects within Aligarh, I had also worked as Sr. MEP Manager
with Hill International Project Management (India) Ltd for two months for Design Management & Project
mobilization purpose @ Island City Centre ICC-ONE
ICC & ICC –TWO - Mumbai )

29-04-2009 to 05-03-2013 Assistant Resident Engineer – MEP Dar Al Riyadh, Saudi Arabia
(Responsibilities handled as Construction Supervision & Project Management Consultant) Advance
ance Diploma
 King Abdullah Financial District, Riyadh, Saudi Arabia _ PPA#10_ Value: SAR 1.5 Billion in Project
 King Abdullah Financial District, Riyadh, Saudi Arabia _ PPA#30_ Value: SAR 3.5 Billion Management
 Ministry of Interior Projects (Responsible to control 182 Sites distributed all over the Kingdom of Saudi Arabia).

04-08-2008 to 28-02-2009 Sr. Electrical Manager Kleindienst (Project Management), Dubai, UAE
(Responsibilities handled as Design Management & Construction, Project Management Client)
 European Business Centre (EBC) Value: AED 150 Million
 The Heart of Europe Value: AED 3.1 Billion
Registration @ Saudi
16-01-2008 to 02-08-2008 Senior Electrical Engineer ADP-II Designer & Planners, Dubai, UAE
Council of Engineers
(Responsibilities handled as Design Management & Construction Management Consultant)
 Tiara United Towers Project (Office Tower +Hotel Tower) Value: AED 163 Million

10-07-2007 to 15-01-2008 Senior Electrical Engineer IAN Banham


anham Associates, Dubai, UAE
(Responsibilities handled as Construction Supervision Consultant)
 The Views
iews of Emirates Hills B+G+24 Storey, Residential Tower _ EMAAR Properties Value: AED 220
 The Views of Emirates Hills B+G+P+23 Storey, Residential Tower _ EMAAR Properties Value: AED 220

03-09-2005 to 28-01-2007 Sr. MEP Engineer Concept Engineering Consultants, Abu Dhabi
(Responsibilities handled as Design Incharge & Construction Supervision Consultant)
 Schlumberger Learning Center at Al Shawamekh, Abu Dhabi Value: AED 75 Million
 3B+G+M+18
B+G+M+18 Floors Mr. Bakhit Mazroui Sons, Abu Dhabi Value: AED 35 Million
 3+G+M+3 office floors +15 Floors Mr. Ali Rushed
Ru Al Omairy Value: AED 41 Million
 Masafi Club Stadium _ M/s Devar Est.
Est Value: AED 9 Million
 B+G+2 floors Villa _Mr. Moh'd Bin Afsan Value: AED 9 Million
 Evangelical Church _ E.C.C Value: AED10 Million

10-10-2003 to 18-07-2005 Senior Electrical Engineer ALL Sultan Electrical Inst., Abu Dhabi, UAE
(Responsibilities handled as Contractor’s Engineer for developing shop drawings & site supervision)
 Project Handled: Many Villas & 5 Floor Buildings in Abu Dhabi

30-12-2000 to 20-09-2003 Senior Electrical Engineer Applied Electromech.,


., Abu Dhabi, UAE
(Responsibilities handled as Contractor’s Engineer for developing shop drawings & site supervision)
 MW-RG-113, MW-RG-112, MW-RG RG-130, MW-RG-234 Royal Guards, Abu Dhabi, UAE Value: AED 70 Million
 MW-AF-257,257, Facility 1, 2, 3, 4, 5, 6, 7, 9, 10, 11, 8a to 8m Mafraq Defence Camp, UAE Value: AED 45 Million
 Facility 1_ Noval College , Abu Dhabi, UAE Value: AED 5 Million

01-01-1997 to 19-12-2000 Senior Projects Engineer Information Technologies (India) Ltd., New Delhi
(Responsibilities
bilities handled as Contractor’s Engineer for developing shop drawings & site supervision) King Abdullah
 Project Handled: Computerised Combustion Control System
Syst @ Bokaro Steel Plant, (SAIL) Value: Rs. 550 Lakh Financial District
Project
05-10-1988 to 18-09-1992 Technical Assistant Electronic Systems Punjab Ltd., Chandigarh, India
 DCS Installation @ Vindhyachal Super Thermal Power Plant (VSTPP-NTPC), Dist.. Sidhi, M.P. Value: Rs. 750 Lakh
 DCS Installation @ Kota Thermal Power Plant (KTPS-RSEB),, Kota, Rajasthan. Value: Rs. 350 Lakh
 DCS Installation @ Parlee Super Thermal Power Station (PSTPS-MSEB),
MSEB), Parlee, Maharashtra Value: Rs. 150 Lakh
Core Competencies:
Extensive experience in developing and administer all MEP contracts from the tender process through to contract
closeout including variations andnd issue resolution for design, construction supervision and related project activities.
Feasibilty study, Project Management Planning, Project Control Procedures,
Pro cedures, Budgeti
Budgeting and Scheduling.
Study & implementations
tations of Contract Management, Contractual advice, Claim preparation, Claim responses and
defence, Dispute
pute adjudication & resolution, Change Controll & Risk Management, Hand-Over Management,
Maintenance Scheduler, Snags / Defects Management, Commissioning Management etc.
Prepare MEP Checklists for Concept Design Stage, Schematic Stage, DD Stage, GFC Stage Drawings .
Prepare checklists for MEP Project control, Quality Control & Safety/ Accidents Prevention Plans.
Prepare Quality metrics and set procedures for raising issues and handling problems.
Prepared Drawing templates, Assigned Numbering, Drafted Notes & assigned legends for all MEP Services.
Created WBS for MEP materials & drawings submittals,
submittals Schedules for procurement
procurement, Installations, work start &
completion milestones, time durations, resources, constraints, risks, HSE and related MEP services activities.
Review & approvals of MEP Design, Shop drawings, material submittals and Methods statement in accordance
with Contract documets, BOQ & Specifications and related addendums with respect to time & budget.
Prepared comparison of materials submittals, considering specifications
spec ifications & contractual requirements.
Discussed & negotiated with the supplier / manufacturers for profitable discounts, and finalized the deal
technically as well as commercially for getting more competitive prices.
Review & approvals of Quality Control Plan, HSE Plan, Site Mobilisation Drawings etc.
Site inspections for materials & workmanships and preparing weekly / monthly MEP Progress reports.
Checking quality before any activity or MEP work package is completed.
Review MEP services invoices & site measurements and recommend to management for approvals payments.
Control & Monitoring of managing MEP-Scope,
MEP Scope, Schedule and anticipating potential threats – Risk management.
Monitoring & controlling projects with respect to cost, time runs and quality to ensure satisfactory execution of
project; liaising with sub contractors and subordinates to get the things done within scheduled duration.
Monitored and oversee project progress, including personal responsibilities; provided guidance to MEP team
membersrs to ensure timely & effective MEP project execution considering Life safety code and LEED
requirements.

Role & Responsibilities Handled (Design Management & Construction Supervision)


Extensive experience in developing and administering all MEP contracts from the tender process to contract
closeout including variations and issue resolution for design, construction Supervision, Inspections, Testing &
Commissioning and other project related activities for residential, commercial buildings, Hospital, Stadium , five
star hotels, infrastructure projects.
Review, evaluate & verify & approve contractor's / vendor's pre-qualifications,
pre qualifications, Logistic Plans, methods
statements, shop drawings , materials submittals, MEP Coordination Plans, Contractor’s QA/QC & safety pla ns,
Construction Programme for Electrical, Telecommunication, Security Management, Public Address System, Fire
Alarm & Fire Fighting & Sprinklers System, Plumbing, Irrigation System, Landscaping, Water Treatment Plant,
HVAC Systems, Automatic Waste Control System (AWCS System from ENVAC), District Cooling System, Building
Management System, Swimming Pool & fountains etc in accordance with contract documents, specifications &
BOQ and related standards & recommended makes / suppliers. Produce reports and poli cies, perform
calculations relating to LEED certification, and communicate with project team members concerning
requirements.
Performed overall design management & construction management activities for all matters related to
Electrical, Low Current Systems,ems, e.g HV/LV Switchgears, Transformers, RMUs, Generators, UPS System,
Automatic Transfer Switches (ATS), Power Factor Improvement & Control (Capacitor Banks), MDB, SMDB,
MCCs & DB’s, Revenue Metering, Power & Lighting Distribution System, Emergency Lighting, Central Battery,
Logic Control Panels Lightings, Motion Control Lighting, Aircraft Warning Lights, Street Lighting, Swimming
Pools & fountains lighting, Facade Lighting, Fire Alarm, CCTV, IPTV, SMATV, MATV, Public Address, Access
Control Systems, s, Structured Cabling, Audio Visual, Wireless Access Points System, IP Telephone and Data
System, Master Clock System, Nurse Call System, RTU/SCADA System, DDCs, BMS System for control & monitor
of chilled water pumps, VFD AHU’s, FAHU’s ,CAV Boxes, VAV Boxes Box es , fan coil units, chillers, jet fans, parking
fresh and exhaust fans including various mechanical and electrical equipments, Integration with home
automation system, electronic security system, visitor management system + Video door phone + Integration,
Car Park Management System, Road Blockers, Gate Barriers, Automatic Sliding Doors, Vertical transportation,
Earthing & Lightning Protection System etc.
Prepared design criteria, protection philosophy & technical reports presentations,
resentations, specifications datasheets.
Prepared Concept Design Report, consisting of various calculations as well as schematics etc.
Prepare Project Mobilisation checklist, Review and approve site logistic plans.
Coordination for the design and construction and managing claims and disputes in an impartial manner.
Performed quantity take-off, technical & commercial matters during the tender stage and provided support to
estimations and design teams and evaluated tender documents including BOQ & specifications (Technical
specifications & Performance specifications)
specifications with a focus on value engineering.
Performeded power system studies, load flow analysis, short circuit, motor starting, arc flash, harmonics and fault
level studies using ETAP or SKM power system software .
Performed lighting lux level calculations using lighting design software AG132, DIALUX 4.8, EAZYLUX and made
circuiting arrangements of lighting and power points coordinating all the three phases.
Prepared site setting layouts / key plans showing Electricall Rooms, Single Line Diagram & Load Demand
Notification for Authorities Approval (ADDC & DEWA & SEC) & laisioning with local authorities to get project
approvals / Preliminary Authorities Clearances including equipments layouts and related schematic diag diagrams
for electrical & telecommunication systems, Load schedules, HV, MV & LV Equipment, cable routings, fire
alarm, emergency lighting, central battery system & air craft warning lights drawings etc. for towers.
Prepared drawings for electrical & low current systems including, layout drawings for transformer rooms,
electrical rooms, MDF & IDF rooms including cable trenches, cable trays & trunking routings with tabulated
cable tray schedules, power & lighting layout drawings etc.
Carried out engineering
neering calculations for demand load, equipment sizing (e.g. Transformers, Generators, Bus
bars and UPS, MDBs, SMDBs, DBs & related Circuit Breakers ACBs, MCCBs, MCB, ELCB, RCCB etc.) voltage drop,
& fault level, motor starting, neutral grounding resistors
resistor and system power factor improvement etc.
Performed the electrical design engineer’s task to calculate the Electrical Load Estimations e.g TCL, maximum Key Progress Photos
demand calculations, voltage drop calculations, capacitor banks calculations, diversity factor calculations, cable King Abdullah
cables & bus bar sizing calculations, cable tray/trunking & ladders selections etc. Financial District
Prepared calculations & study reports for lightning protections and grounding etc. Project
Performed selectivity study & calcualtions for protection devices e.g. motor starting analysis, CT ratio sizing, arc
flash study and relay settings, power factor improvement analysis & harmonics solutions, and related electrical
equipments & selections for recommended makes / brands in accordance with project requirements.
Prepared comparision data sheets for various makes related to Electrical & low current systems.
Prepared internal / external lighting layout drawings, lightning protection system & earthing system
considering the projects Specifications, Standards and local authority regulations.
Prepared lighting control, fire alarm & voice evacuation, BMS & controls, Telephone/Data, Central battery
Emergency lighting, MATV, security, structured cabling, earthing & Lightning protection systems drawings.
Prepared drawings for Telecom., Security Management and fire protection system for towers & buildings.
Prepared drawings related to interior fit-outs for five star hotels, commercial kitchens, gemanesium, swimming
pools & fountains etc.
Review & approve substation layouts, grounding layouts, electrical equipment layouts, MV/LV motor control
schematics, control panel layouts, cable and tray schedules etc.
Review & approve shop drawings for HT/LT Room & Transformer Layout, Lighting and emergency lighting
layout, Earthing & Lighting Protection Layout, Fire Detection Alarm system, CCTV & PA Systems Layout
Drawings, Containment/Cable Tray Routing & Equipment Layout etc.
Review & approve design for electrical & low current, fire detection and alarm elements arrangement layout
drawings (i.e. optical / ionization smoke detector, heat detector, siren, strobe light, manual call station etc.
Review, supervise and perform inspections for grounding layouts, electrical equipment layouts, motor control
schematics, control panel layouts, cable layouts, cable tray layouts, lighting layouts, general plant layouts.
Review shop drawings, supervise construction and perform inspections for protection, relay coordination and
relay settings for the power distribution system.
Read and extract electrical information from P& IDs Diagrams of the Mechanical System and prepare mechanical
equipment load list & implement the P&ID requirements into electrical requirements.
Performed witness tests for transformers, switchgears, control panels and generators etc and provides
comments for compliance to contract documents and specifications & standards.
Participated & assisted in technical discussions for all stages of designs i-e concept design stage, schematic
stage, detail drawings stage, GFC drawings stage etc.
MEP Coordination & Supervision for Access Control, CCTV, Nurse Call Systems, Digital Master Clock, Central
Battery & Central Battery & Emergency Lighting, LCP, Fire Alarm with HVAC and Public Address, HVAC ducts,
plumbing & drainage pipes, bus bar risers & cables trays & trunking routings, laying of underground PVC pipes
for cabling of Street Lighting Poles, Telephone & Data Lines, Power supply netwrk cabling etc.
Supervisions of construction for installations & testing of Indoor Cranes, Gate Barriers, Road Blockers, Sliding
doors automation consisting of Control Box, Photoelectric amplifier, Photo cell, motor unit, Push Buttons etc.
Physical inspections & testing of every installation to ensure safety and satisfactory performance for switchgear
panels, wirings on completion of electrical installations.
Physical inspections & testing for under voltage relays with Auto-reset timer for installations of air conditioning
units/ chiller plants / Air handling units, split units, Package Units, Fan Coil Units, Primary, Secondary & Chilled
water Pressurizing Pumps, Water Transfer , Filtration & Booster Pumps etc.
Physical inspection & testing for grounding controllers & surge protections to safeguard irrigation system.
Checking for ducts/openings to lift up the cables for upper floors.
Checking of switchgear panels submittals for enclosures & its structural parts and types of assemblies / IP
Protections / Bus Bars & circuit breakers ratings (ACB, MCCB, RCCB, ELCB, RCBO, MCB) shunt relays etc. & its
capacities, handles, selector switches and related indicating instruments control & measuring devices, signaling
& protective devices etc.
Inspection & testing of Transformers, HV Panels, MDBs, SMDBs, DBs, MCC Panels and FACP Panels etc.
Review & comment on DDC wiring diagram including sequence of operation for all MEP services equipment.
Comprehensive knowledge in Alerton Envision for BaCtalk (version 2.0, 2.5 and 3.0)
Experience in Honeywell Security Software ( WinPak, ProWatch, Netaxs, Maxpro VMS, and HFVMS)
Experience in Honeywell Security devices such as PRO2200 Controllers, PW5000, PW6000 Controllers, NetAXS
Control Unit, Maxpro NVR, Fusion IV DVR/NVR, HRDP, and Honeywell IP cameras (Box, Dome, PTZ).
Experience in Programmable Logic Controllers (PLC Mitsubishi, Pep Arab, Hitachi, Advanced PLC S7-300).
Extensive knowledge of BMS in ALERTON and Honeywell HVAC field devices such as Controllers, Actuators,
Sensors and Transmitter.
Prepare I/O summery for BMS & the sequence of operation (SOP) for equipments.
Testing loops and calibration of AHU, FCU, Chilled Water Pumps, VAV, fire alarm and Public Address system.
Review and approves O&M manual, ensuring the correctness & completeness of contractors As-Built drawing
submittals and review the adequacy and accuracy of punch lists and monitors final completion of work prior to
hand over of the project.
Overall testing of the building according to the NEC, IEC before installing / energizing the transformers.
Review shop drawings of Ventilation Rooms, Plant Room Layouts, Air Handling Unit Room Layouts & Air-
Distribution Arrangement, Ducting Layout Drawings/ Grills & Diffuser Layouts, Air Flow Diagrams, Lift Shaft &
Staircase Pressurization Systems etc.
Preparation of schematics, shaft & riser diagrams.
MEP Coordination for pre-fabrication and installation of HVAC duct, the connections between the ducts,
hangers and inserts, seismic supports, diffusers, VAV boxes, Fire smoke Dampers, duct and pipe insulation etc.
Selection of equipment including Chillers, Air Handling Units, Pumps, Ducts, Ventilation Fans, Smoke Extract
fans, Toilet Extract, Piping Sizing etc and Finalization of Ventilation & other Cutouts for construction purposes.
Review & approve stair pressurization calculations. In general I had used as per National building code of CANADA
 For Towers: 4.72 m³/s + 0.094 m³/s i-e 10,000 cfm + 200cfm for every door.
 For other stairs (Apart from typical floor like basement and above = 1000 cfm/floor.
 Smoke exhaust: 8 to 12 air changes/hour.
Review & approve Riser Layouts, horizontal piped water distribution Layout Drawings, Plumbing Services Layout
for all fixtures, Hot & Cold Water Distribution Layouts for all fixtures etc.
Perform drainage invert level calculation considering coordination with municipality keeping invert level for sump
pump more than the lift pit invert level.
Review of external MEP coordination drawings for underground plumbing lines, underground storm and sewer
pipes, all major waste and vent lines, electrical cables & conduits located in reference to the foundations,
considering miscellaneous structural metal supports and connection points to external building elements.
Review, identify and comment for interior fitouts for MEP services layout & coordination for Five Star Hotels. King Abdullah
MEP Coordination and installation for waste and vents piping including plumbing fixtures, cold and hot water Financial District
supply piping’s. Project
Selection of transfer pump required for basement floors and booster pumps for overhead reserved water tanks.
Review & approve shop drawings for Garden Hydrant, EffiluentEff luent Treatment, Sewage Treatment, Subsoil drainage,
Drainage System Layouts, Rain / Storm Water Distribution & harvesting System Layouts, External Sewage and
Hydrants etc.
Supervisions for laying & installations of Grease Traps, UPVC Plastic piping for water & drainage system, HDPE
pipes and its fittings for kitchen area, Pexal (Cross Linked Polyethylene) pipes and its fittings for heating & sanitary
systems, Butterfly valves, gate valves, ABS High Pressure Pipes and its fittings for water treatment Plant and
chilled
hilled water lines, Sanitary waste Traps and associated fittings, Pressure Reducing valves, pump control valves,
Roof Drain, Floor Drain, Cleanouts , steel grease interceptors, Loc-Ring
Loc Ring integral joint pipes for external drainage
system.
Review & approve shop op drawings layouts for fire fighting services consisting of Landing valves, fire hose reels, fire
man’s hose, Dry chemical powder etc.
Selection of fire pumps considering minimum pump capacity 500 GPM and maximum pump capacity 1500 GPM as
per NFPA 20 requirements.
Selection of Fire hose cabinets considering maximum coverage area 30 M pipe length.
Review & approve Plumbing & Fire Fighting & sprinkler system schematics, Shaft & Riser Diagrams. Perform
Calculations for Water Requirement, Underground & Overhead Overhe ad Tank Sizing, Plant Room Plumbing equipment
sizing & layouts etc.
MEP Coordination and installation for fire protection (sprinklers) mains and branches, drop pipes and verifying the
exact location of drops in the ceiling.
Coordination & Supervision for laying of underground ductiled Iron & PVC pipe Lines for fire Fighting / sprinklers,
chilled water Lines, drainage / water
ater Lines .
Selection of Light Hazard Sprinkler System for offices, residence apartments for coverage of 225 Sq feet.
Selection of Ordinary ry Hazard Sprinkler System Group-1
Group 1 required for Kitchen and Parking where one sprinkler
coverage is 130 Sq-feet and Group- 2 one sprinkler coverage is 100 Sq-feet.
Review & approve shop drawings and I/O list for BMS System. Verify the coordination & locat ions of Room
temperature sensors, Duct temperature sensors, Temperature sensor (Water), Duct humidity and temperature,
Room humidity and temperature sensor, Room humidity transmitter, Co2 Transmitter, Diff. Pressure Transmitter
(Air) etc for DDC Control System.
Checking the maintenance provisions during review of any MEP shop drawings.
Checked for coordination and clash resolutions for interfacing between Architectural, Structural & MEP services
during designing and pre-construction
construction phase.
Review of internal MEP coordination drawings considering architectural models like wall thickness and height,
hard ceilings and soffits, and suspended acoustical ceilings, casework with correct fixture locations etc.
Review of builders work & MEP coordination drawings drawin gs concentrating on ductwork and other systems
(i-ee underground and the above ceiling MEP coordination) located in reference to the structural elements like
slabs and steel beams and columns, brace frame connections and foundation elements like grade beams & spread
footings etc.
Performed site inspections for materials & workmanships and preparing weekly / monthly MEP Progress reports.
Performed MEP conflict resolutions focusing on identifying the root causes of MEP problems.
Kept everyone focused on completing the project to the agreed terms and conditions, specifications, Drawings,
times schedule and quality standards, MEP budget and approved MEP project management plan.
Facilitated coordination and clash resolutions for interface between Architectural, Structural & MEP services.
Verified the accuracy of material quantity take-off,
take off, material approval status, procurement and delivery status by
arranging procurement meetings.
Prepared meeting agendas, organized MEP meetings for Project
Proje ct kick off/site mobilization & Work Progress. Supervised 182 Sites
Determinations for what meetings, reports, and other activities will be used to control the project.
throughout the
Chair-up weekly MEP meetings for site progress, procurements,
procureme nts, change control & variation and value engineering
Kingdom of Saudi
meetings, technical meetings, QA/QC meetings, workshop meetings and monitoring of MEP work activity
programs to ensure that MEP contractors are in conformance of project target completion da tes and project Arabia as highlighted
specifications. on map
Site Supervision & coordinations for MEP Works & its Procedures, Checking & witnessing the pre pre-commissioning
and commissioning activities.

Role & Responsibilities Handled (Project


Project Management & Construction Supervision)
Good knowledge of Types of risk, force majeure, Managing risks, Risk transfer, Benchmarking, Managing the
relationship, Key factors for Management structures, Communication, Information flows, Communication levels,
Consistency in communications, Culture, Attitudes and behaviours, Trust, capability to ‘ do the job’ well, goodwill,
integrity, commitment to the relationship, commitment to the relationship, Handling problems, Escalation
procedures, Dispute Resolution, Contract maintenance etc. Photos of Ministry of
Good knowledge of establishing and managing communication frameworkframewo rk and ensuring that it is used effectively Interior Projects
for flows between client and contractor at all levels (peer-to-peer).
(peer
Selects, on-boards
boards and orients the site staff assigned to projects to clearly indentify the role of project
management in the project, including
includ ing specific roles and responsibilities for each project member; evaluated the
performance of site staff in coordination with their direct supervisors.
Performed Pre-bid project study & report generation for Renovation Projects.
Directed technical expertise to existing projects for expansion and re-routing
re routing of existing utilities.
Review contract for appropriate structures with representatives of client and contractor management for
reviewing and recommending for authorizing the change requests.
Review
iew requirements for service performance reports and management information before and during contract
negotiations, and confirmed during the transition period of the contract.
Review & administer procedures to reflect the specific circumstances of the contract
co ntract and the organization e.g.
contract maintenance and change control, charges and cost monitoring, ordering procedures, payment
procedures, budget procedures, resource management and planning, management reporting, asset management.
Review the specification
ation of the requirement, the contractual implications, the charges for the additional service,
and the delivery timescales.
Review specification of contract performance metrics and monitor contract performance and report at project
outcome level.
Preparation of Progress Charts & Construction Control checklists to measure, monitor & manage the Projects.
Hands on experience
Preparation of project operation MEP guidelines & MEP metrics to be used to measure quality.
in producing spot
Preparation of project
roject process MEP flow charts for communication plan, change management plan, quality
(QA/QC) plan, safety plan and transition & closure plan. lights on Project
Assistance in Contract Management, Negotiations, Change Control, Contract Claims & Variatons, Value Progress in
Engineering, Qualityy Management, Risk Management Procedures. Primavera P6 &
Assistance in creating WBS for MEP services activities and developing MEP Schedules. Forecasting resource with Primavera Contract
respect to project milestones and project schedules. Manager Ver-13
Ver
Phasing out the various work with detailed bar-chart chart for completion of job within stipulated time.
Providing assistance to planners for development of accurate construction documents and construction
scheduling / planning and monitoring the project using Primavera.
Created Work Breakdown Structure {WBS} Incorporating Major MEP Milestones, Master MEP Deliverables List,
MEP Task Planning & Scheduling, MEP Risk Planning etc.
Created project’s checklists, MEP Project work plan (including initiate & align documentation) & Tasks
assignments
ments (Team Mission/ Assignment i-e i e assigning roles & responsibilities to specific individuals on project
for risk identifications & risk management duties).
Created description of each MEP work package in WBS dictionary so that the work can be easily unde rstood by
those assigned, Sequencing MEP of coordination schedule to match the construction sequence of activities &
determining predecessors and successors related to MEP coordination with structural and architectural work.
Allowing contractor’s MEP teams ms to make rational course correction due to tracking of metrics which are
transparent and visible to everyone Plan do Check Act.
Review
iew and comment on metrics which were used to track progress during the coordination of MEP systems.
Discussed & interpretate technical logistics which were needed to setup for managing the MEP Coordination.
Review and comment on MEP coordination schedule by comparing estimated amount of hours to be spent by
each trade for installation of the systems.
Generating Project's reports
ports & advice on course of action to contractor’s RFIs for issues related to Electrical &
Low Current Systems variations & claims.
Updating of Project's Progress, Spot Lights & reports to Project Director clearly showing the Performance %
complete, Schedule ule % complete & Remaining duration etc.
Performed risk identifications, qualitative & quantitative risk analysis related to MEP work.
Measured Project performance against project performance measurements baselines related to MEP works.
Manage MEP projects interactions and transactions, Implement good contract management practices.
Prepare/issue EI’s(Engineers Instructions),
Instructions WIR’s(Work Inspection Reports), ), NCR’s(Non Conformance Report)
and approve its corrective actions.
Checked the completeness of drawings before starting construction, eliminating the subsequent request for
information (RFI) and delays.
Respond to technical queries, RFI (request for information) and correspondence from the client and contractor.
Reducing the RFIs and rework during construction by onsite immediate solutions.
Prepare/issue site observation notices (SONs) identifying quality deficiencies.
Performed multi-discipline
discipline problem resolution.
resolution On-site commissioning,
missioning, troubleshooting, testing, technical
investigation & assistance in auditing etc.
Keep track of types of changes during the contract period e.g. changes to performance metrics, changes to
service functionality, changes to service infrastructure, changes to workload.
Analyzed & performed MEP change requests (Approved or Rejected in coordination with the client.)
Implemented approved MEP changes, including corrective and preventive actions for any defects & constraints.
Monitoring & control the changes to services, procedures or contracts, as may have an effect on service
delivery, on performance, on costs. Maintained accurate field notes and performed accurate field computations
related to MEP works.
Prepared job status report, work progress report, material status report repor t for smooth execution of work.
Prepared time extension claims, reimbursement of prolongation cost, acceleration cost and for the losses
incurred due to various reasons, Also made investigations to find out grounds to raise claim s.
Checking & certifying sub-contractor’s
contractor’s valuation. Advising and setting of contractual disputes. Supervise and
evaluate site work measurement & workmanship.
Review MEP services invoices & site measurements and recommend to management for approvals.
Ensured that all invoices for completed portions of work are submitted in a timely manner for payment.
Interacting with the client and freezing the technical specifications, Design Drawings & BOQ.
Negotiate remedies with the contractor and Escalate contract problems as necessary.
Prepare reports for incidents, problems and issues promptly and accurately and monitor clients aspects of
service quality and escalate problems as necessary.
Prepare MEP Checklists for testing & commissioning, snag listing & final handover.
Site Supervision & coordinations for MEP Works & its Procedures, Checking & witnessing the pre pre-commissioning
and commissioning activities.
Verification and punch listing (snag removal) of all MEP scopes of work, including TAB (testing, a djusting and
balancing), building management system, fire protection and fire alarm system, lighting control system,
emergencypower system, CCTV and access control system, Metal Detector system , Public Address System,
electrically operated sliding gates, Gate Barrier and road blockers Plumbing, HVAC, Fire fighting, irrigation and
landscaping, Fountains and swimming pools, Lifts and elevators e.g., speed selection, Fire Fighter's
miscellaneous checks e.g. Car ventilation e. g Drive machine brake, Drive machine,
mac hine, gears and bearings, winding
drum machines, Belt or chain drive machine, motor generator, rope fastenings, governor, over speed switch,
blowers / rear vents, Hoist way smoke control e.g. sprinklers in hoist-way
hoist way and car safeties etc based on Elevator
safety code ASME A17.1 requirements, Elevator operational sequences, Motors and controller etc, Elevator
recall for firefighting services, Lubrication , operational checks, Elevators pit access & its levels, related
instrumentation work etc.
Overall supervision for MEP Test Plans and procedures for the projects ensuring verifications for coordinations
& accuracy between MEP Services considering LEED regulations for new construction.
Verify the accuracy of the contractor’s “As-Built”
“As drawings reflecting in details the asas-built conditions and
approve the As-Built Built drawings, contractor’s operations & maintenance manuals and other project
documentations.
Written procedures and implementation thereof for individual Site Handover Project Documentat ion.
Complete final performance reports & handoff project’s deliverables including all Test certificates, Guarantee
documents, As Built Drawings, Spares, operation & maintenance manuals, etc.
Hands on experience
Additional Skills (DCS, Process Automation & Instrumentation Control)
in MEP Coordination
Extensive experience in wireless communication and had supervised the installation & commissioning of DEC - Activities
ALPHA Computer
puter System and associated management informations over area network using Radio modems & producing
and Allen Bradely Programmable Logic Controllers PLCs. MEP Flow Charts
Handled the independent charge for the Computerised Combustion Control System project taken over by
Rautaruukki oyj Engg. Finland at Bokaro & Bhilai Steel Plants , India .The System was consisting of DEC
DEC-ALPHA
Computer System and associated management informations over area network. The System was built around
Allen Bradely PLC and its Panel views for collection of Data from coke oven batteries through field sensors,
transmitting and recieving data from DEC-ALPHA
DEC ALPHA Central Computer System through Radio Links System,
Infrared Pyrometers, Positioning Sensors, Coke Mass Analysers, Calorific Value Analysers
Analysers, Waste Gas Analysers,
CPMS software etc. The System gives to the operators real time informations of the status of the process in
such a fashion which supports them to make right decisions for actions and transfers the orders to the
basic automation system.

Seminars Attended

Switchgear Products for LV/MV : Schneider Electric, ABB, Eaton, GE, LG etc.
Fire Alarm system : Simplex , Cooper, Notifier, Gent, Essar,, Tyco
CCTV System : Honeywell, Bosch, Panasonic, Tyco
Access Control System : GE, Tyco
Public Address System : Toa, Panasonic
Master clock system : Simplex
Earthing & Lightning Protection System : Furse, A.N. Wallis
Air-Craft Lighting : Cooper Industries
Elevator : Mitsubishi Electric Saudi Ltd and Otis Company KAS Ltd.
Chillers and Air Handling Units : Carrier and Trane.
Chilled
d water pumps :
:Bell & Gossett.
Submersible pumps, water transfer pumps and booster pumps: Grundfos.
Water
ater treatment plant :
:Wetico.
Fire Fighting : NAFCO
Boilers and Calorifire : BABTAIN

Codes & Stanadards

Good working knowledge of Mechanical codes & stanadards:


 American Society of Heat Refrigeration Air Conditioning Engineers ASHRAE.
 Sheet Metal and Air Conditioning Contractors National Association SMACNA.
 American National Standards Institute ANSI.
 American Society of Mechanical Engineers (ASME).
 International and Uniform Plumbing Code.
 National Fire Protection Association (NFPA).
 NFPA 13 for Sprinkler system.
 NFPA 14 for Fire Hose Stand Pipe
 NFPA 17 for Dry Chemical Powder.
 NFPA 20 for Fire Pumps.
 NFPA 90A for Air Ventilation
entilation system e.g. Fire Damper, Kitchen Exhaust Ducts etc.
 Good knowledge of standards & codes, e.g. FIDIC, NEC, NEMA, NFPA, CSA/IEC, OESC, ANSI/IEEE etc.

Personal Details
Date of Birth : Date July 1968
Permanent Address : H.No. 4/63, Jamalpur, Distt. Aligarh, U.P, INDIA
Languages Known : English, Arabic, Hindi, Urdu.