This document provides an overview of the CE 306 Construction Planning and Management course. It discusses (1) the definition of project management, including planning, coordinating, and controlling a project to meet requirements on time, within budget, and to quality standards. It also (2) outlines the typical project lifecycle stages from inception to completion and (3) defines the roles of the project team and factors for project success. Finally, it (4) discusses the importance of project planning and scheduling.
This document provides an overview of the CE 306 Construction Planning and Management course. It discusses (1) the definition of project management, including planning, coordinating, and controlling a project to meet requirements on time, within budget, and to quality standards. It also (2) outlines the typical project lifecycle stages from inception to completion and (3) defines the roles of the project team and factors for project success. Finally, it (4) discusses the importance of project planning and scheduling.
This document provides an overview of the CE 306 Construction Planning and Management course. It discusses (1) the definition of project management, including planning, coordinating, and controlling a project to meet requirements on time, within budget, and to quality standards. It also (2) outlines the typical project lifecycle stages from inception to completion and (3) defines the roles of the project team and factors for project success. Finally, it (4) discusses the importance of project planning and scheduling.
• co-ordination and control of a project from inception to
completion,
• aimed at meeting a client’s requirements
• in order to produce a functionally and financially viable project
• that will be completed on time,
• within authorized cost and
• to the required quality standards.
CE-306 CPM Chander Prakash
Project life cycle Inception the stage where a client’s case for a building or a refurbishment is communicated to a professional team to develop the constraints.
Feasibility stage include investigation of alternatives, funding options, design
option appraisal, value enhancement, comparative estimates and life cycle cost
Strategy deals with how a project is carried out
and controlled, i.e. procurement route, the cost, the program, the control systems, the quality management and methodology for construction
Design and tendering appoints the
full design and construction team, full developing design scheme, detailed drawings, tendering/mobilization of resources for construction
CE-306 CPM Chander Prakash
Project life cycle Construction phase has emphasis on the control of time, quality and cost and the management of many other issues i.e. supply chain, health and safety planning, the environment and change.
Engineering commissioning comes at the latter end of construction.
Its outputs should include the efficient functioning of the building.
Completion is certified by the project manager for
the formal handover of the fabric and systems to the facilities team
Client’s occupation and Commission
full or sectional completion of the work.
CE-306 CPM Chander Prakash
Project team roles
CE-306 CPM Chander Prakash
Factors of success
CE-306 CPM Chander Prakash
Project planning The process of choosing the one method and order of work to be adopted for a project from all the various ways and sequences in which it could be done. It serves as a foundation for several functions i.e. cost estimating, scheduling, project control, quality control, safety management, etc.
CE-306 CPM Chander Prakash
Scheduling Scheduling is the determination of timing and sequence of operations in the project and their assembly/sequence to meet the completion time.
Project planning answers the questions What? How? Where? By
whom? and When (in general terms, the project’s start and end)? Scheduling deals with when on a detailed level.
Planning a family vacation Project Project schedule is itinerary
• Who will go on the trip? • Leave home in Thar on June 8 2021. • Which places do you want to visit? • Arrive in Manali on June 8, 2021. • What is the time frame • Manali to Atal Tunnel/back on 9 June • What is the total budget • Trek to Bhrigu lake on 11 June • What types of activities • Brigu to Rohtang Trek on 13 June • What means of transportation • Jogni fall, Dhungari, Raurich art • Other issues (accommodation, food, gellary etc on June 16-18 clothing etc.) • Return home to on June 19 CE-306 CPM Chander Prakash Why schedule projects? • Calculate the project completion date • Calculate the start or end of a specific activity • Coordinate among trades and subcontractors, adjust conflicts • Predict and calculate the cash flow • Improve work efficiency • Serve as an effective project control tool • Evaluate the effect of changes • Prove delay claims