Cont. Table 5.1 Updated Risk Register For Time.: Arab Academy For Science and Technology and Maritime Transport
Cont. Table 5.1 Updated Risk Register For Time.: Arab Academy For Science and Technology and Maritime Transport
Cont. Table 5.1 Updated Risk Register For Time.: Arab Academy For Science and Technology and Maritime Transport
95
ARAB ACADEMY FOR SCIENCE AND TECHNOLOGY AND MARITIME TRANSPORT
5.2.3.1 Introduction
The most effective risk factors obtained from the output of the qualitative risk
analysis process are analyzed using a Monte Carlo model. Using the schedule and
estimated costs of a case study in Egypt these risk factors are analyzed and
mitigations actions are added. The case study used is Cairo Festival City project, were
its time schedule and cost estimates was used in the analysis. Modeling technique is a
commonly used technique which includes both events oriented and project oriented
analysis approaches. In order to achieve an efficient analysis, Oracle primavera risk
analysis (Pert master tool) is used. It is most used by risk analysts in risk analysis field
and is full of key features and benefits. Key features include tracking risks, managing
project risks, studying impacts on risks and best responses towards different risk
factors.
Key features also includes, Integrating updated risk register with project schedule
and costs, comprehensive risk analysis graphics and reports, use of Monte Carlo
simulation to produce risk reports on probability and confidence levels, Analyze
project program sure track, good technique of determining contingency and
production of risk response plans as comprehensive technique of risk levels.
Primavera risk analysis risk will close projects to the risk register and risk templates
before using Monte Carlo simulation to analyze them. Reports are produced
including, risk histogram, tornado diagrams. These reports will enable the risk
analyzer to analyze risk drivers prior publishing risk resulting schedule.
Benefits will include, identifying common schedule pitfalls that may result in
misleading schedule or risk analysis results, integrate pre-developed risk registers and
define new risk register, address full life cycle risk management through advanced
Monte Carlo is based on cost and schedule analytics and report confidence levels with
regards to finish dates, costs, float, internal rate of return and net present value. The
program can provide a comprehensive means of reporting project confidence levels. It
is a proper technique for determining contingency and risk response plans. Primavera
risk analysis tool delivers objective view of required contingency and risk response
plans analysis. Pert-Master tool follow a systematic sequence of steps in order to
obtain an accurate reports reflecting risk events impact on both time and cost. These
steps include, complete schedule check, template quick risk, updating risk register and
risk analysis reports.
96