Hasil Pengukuran Stockpile

Jenis Stockpile Oktober November Desember Januari


Abu-batu 29.160 17.074 m3 5.192 m3
Biskos 55.176 1.367 m3 1.773 m3
2/3 + abu (Stok lama) 216 5.723 m3 5.260 m3
Split 1/2 - - 266 m3
Screening - 63 m3 424 m3
Abu Halus - 400 m3 579 m3
Makadam (Gudang
- - 685 m3
Batu)
Screening Lama 111.320 20.618 m3 20.618 m3