Permit To Work Inspection Checklist: Document Control. Description
Permit To Work Inspection Checklist: Document Control. Description
Document Control.
Description:
First Issue – March 2006
The Permit to Work Inspection Checklist has been developed as a helping aid during for the
Monitoring, Audit and Review process of the PTW System.
The PI, Asset Manager and/or HSE personnel must monitor work under Work Permit control on a
daily basis. This shall include spot checks of work-sites, Work Permits and supporting documents.
The main activities that must be carried out are:
As with any Management System, the PTW System must be reviewed by the System Custodian at
least once every 2 years following implementation of the PTW System to assess the PTW System’s
effectiveness. In doing his review the System Custodian must take into account, as a minimum, the
findings from any previous review, the findings from any audits which have been carried out in the
past 2 years and relevant local Laws (including recent changes or foreseeable future changes to such
Laws).
Audits and reviews may be carried out by the System Custodian more frequently and from time to
time if the System Custodian considers it necessary, for example, if any flaws are detected in the
PTW System that need to be addressed immediately, if indicated by incidents or routine monitoring.
Inspector: Inspector:
Description of Work
a) Have permit copies been properly distributed, and is the permit prominently displayed at the work
Yes / No
site?
b) Is the control room/office copy readily available? Yes / No
Scope:
a) Does the permit adequately describe the work location, the equipment to be worked on, the work
Yes / No
method and the tools and equipment to be used?
b) Do the work description and isolations clearly specify the limits of the work area and equipment to be
Yes / No
worked on?
If not, state deficiency:
Validity:
a) Does the permit clearly state the time and dates between which it is valid? Yes / No
b) Is permit revalidation being signed and dated by Permit Issuer? Yes / No
c) Are revalidations up to date? Yes / No
Hazards:
Health Hazards:
Environmental Hazards:
Precautions:
Gas Tests:
Isolation:
a) Has task been fully discussed with person carrying out the isolation? Yes / No
b) Has task been discussed with Permit Holder? Yes / No
c) If more than one Permit on equipment/system, have all appropriate cross-references been made and
Yes / No
all necessary personnel been made aware?
d) Where tasks may impinge on other responsible persons/areas, have affected persons signed to
acknowledge their awareness of the work?
Handover:
a) Was handover of permit done between Permit Issuers at shift change? Yes / No
b) How is this being documented?
Work Suspended/Completed:
Competence:
a) Have the signatories and others received classroom and practical training in the company's PTW
Yes / No
system?
b) Is the type and frequency of training in accordance with company policy? Yes / No
c) Have the signatories been assessed as competent? Check records.
d) Have the signatories been formally appointed? Check Records. Yes / No
e) Are the appointments still valid?
Signature