Sponsor Team Members A3 PROBLEM SOLVING SHEET


DATE: 24.04.13
D.Vijay Mahesh 1. Bala
Krishna 2. Ilayaraja Ref no: 02/04.13
3. Sridhar

Problem Description Cause Investigation 5 Why Investigation

RUPD bracket wrong orientation WHY?


WHAT - Item How Checked Result
Because: RUPD bracket wrong orientation
Part No.
A400 5200311 Vehicle - 9T 100 %
1 Verified
visual
inspection PDI WHY?
done by all report. Bracket subassembly done by
Because: wrong position.
Defect Class - Procedure defect 2 Nos parts.
How many - Verified
PDI report.
No WHY? Operator not awareness /
observation Negligence
Who Observed - Because:
23.04.13

Sketch
WHY? Error proofing not available in
the sub assembly fixture.
Because:

X PHOTOS

Direct Cause Root Cause

Error proofing not available. Error proofing not available in the sub
assembly fixture.
Containment Action
What Who When Status
Implementation Plan
1. Part segregated at customer. Bala 19.04.13 Completed What Who When Status
Total =82 nos,Ok = 80 nos & Not ok = 2no s. 2.
Part segregated at in house. 18.04.13
Total = 23 nos, Ok =23 nos & Not ok = 0 nos.
Bala Error proofing to be provided in the sub Mahesh 20.04.13 Comple
assembly fixture ted
Cause Analysis
After : X PHOTOS
Man Machine Environment

New Operator Less Space


Monitoring Effectiveness & Standardisation
Wrong Bad lighting
Operator not assembly Fool proof pins implemented in the sub assy fixtures.
awareness
bracket wrong
bracket wrong
orientation
Material mixup Ok & Sampling inspection only
Not ok done

Error proofing not Material defect.


available in the
welding fixture

Method Material
COMPANY NAME
DOC NO:
PROBLEM SOLVING SHEET (8D REPORT)
REV NO & DATE:

Part Name : Part No : Customer: Date:

1D. Team Formation


Sponser Team Leaders Team Members

2D. Problem Description


Before Photo
Nature of Defect

Defect Qty

Who Observed

Occurred Date

3D. Interim Containment Actions Target Date

4D. Root Cause Analysis

Man Machine / Tool / Fixture Method Why Why Analysis:

Why

Why

Why

Why

Material Measurement Environtment

5D. Corrective Actions Target Date

After Photo

6D. Effectiveness of Corrective Actions


12 Target Date
10
8
6 Dispatch Qty Accepted Qty Rejected Qty
4
2
0

7D. Identify & Implement Deployment Actions


Target Date

8D. Team & Individual Recognition


Thanks & Congratulation to team

Prepared By : Approved By: