BLOCK #1

O-Xylene Unloading and Storing


Area Classification:
 From Ortho-xylene tanker to O-xylene unloading pumps G-503 A/B
 From O-xylene unloading pumps G-503 A/B to T-503
 T-503 Nitrogen Breathing System (PSVS)

The main hazards of the unit:


 when o-xylene is released, personnel may be poisoned;
 in the event of a fire in the unit with the subsequent explosion of o-xylene, damage to pipelines,
equipment and structures is possible, poisoning, injury and thermal burns of personnel are possible.
 Maximum possible discharge: o-xylene kg
 MPC in the air of the working area:- o-xylene 50 mg / m3.
SCHEME FOR CONSTRUCTING THE SCENARIOS OF EMERGENCY AND DEVELOPMENT
INCIDENTS AND ACCIDENTS IN UNIT NO. 1

Material Wear or External Factors i.e.


Prerequisite Repair Errors Terrorist Act
Fatigue Weather, Nature

Depressurization, damage to the technical device, Ejection,


spillage, outflow of the medium from the technical device
Steam gas Phase

A.1

Incidents Formation of toxic


cloud on open area

Cloud Explosion
Alarms at Level <A>

Toxic Cloud Spread

A.1.2
A.1.2.2

A.1.2.1

Descriptions of action to localize and eliminate incidents and accidents in block no. 1
Position
Technical means (systems),
number, name Performers and measures (actions) to localize, eliminate the accident,
optimal methods of emergency Responsible
and alarm protect personnel and the procedure for their implementation
protection
code
A.1.1 over Technical means, systems: 1. - warn others, inform the shift engineer; turn on nearest emergency call First to see
flow of tank T - signaling light and sound on the point
– 503, Control room when the set level is 2. - stop taking o-xylene by stopping the pump for pumping o-xylene G-503 Oxidation operator
leakages on g- exceeded; A/B
503 A/B, - self containing breathing 3. - call the fire department by phone, plant HSE by phone. , if Shift engineer
suction line apparatus necessary, inform the first-aid team or call FIEDMC emergency or 1122
from tanker. Optimal methods of emergency service by phone. ;
protection - assess the situation, identify the number and location of people caught in
A.1.2. Bulk 1. Emergency stop unloading the accident, stop carrying out repair, construction and installation work;
leakage pumps. - set up a cordon around the accident area;
explosive and 2. Shutdown of the emergency - take measures to exclude the occurrence of a fire by the forces of the shift
toxic gas section of the pipeline, equipment. firefighting team, to save people.
mixture - put on the SCBA and close suction isolating valve of unloading pump and Oxidation operator
formation also tanker isolating valve at the o-xylene intake;
4. - disconnect power supply pump motors pos. G-503 A/B. Electrician on duty
A.1.2.1. Air 6. - deploy fire-extinguishing means; limit the filling area with sand to limit Shift firefighting
pollution. the filling area. team
Position
Technical means (systems),
number, name Performers and measures (actions) to localize, eliminate the accident,
optimal methods of emergency Responsible
and alarm protect personnel and the procedure for their implementation
protection
code
7. – organize meeting with FIEDMC team and locate them to the source. Boardman
8. – arrived FIEDMC firefighting team will take charge of the emergency
and shift firefighting team will coordinate with them. Firefighting teams
A.1.1. over Technical means, systems: 1. - warn others, inform the shift engineer; turn on nearest emergency call First to see
flow of tank T - signaling light and sound on the point
– 503, DCS when the set level is 2. - stop taking o-xylene by stopping the pump for pumping o-xylene G-503 Oxidation operator
leakages on g- exceeded; A/B.
503 A/B, - self containing breathing 3. - Reactor shut down. Boardman
suction line apparatus 4. - call the fire department by phone , plant HSE by phone. , Shift engineer
from tanker. Optimal methods of emergency if necessary, inform the first-aid team or call FIEDMC emergency or 1122
protection: service by phone. ;
A.1.2. Bulk 1. Emergency stop unloading - assess the situation, identify the number and location of people caught in
leakage pumps. the accident, stop carrying out repair, construction and installation work;
explosive and 2. Shutdown of the emergency - set up a cordon around the accident area;
toxic gas section of the pipeline, equipment. - take measures to exclude the occurrence of a fire by the forces of the shift
mixture firefighting team, to save people.
formation 5. put on the SCBA and close suction isolating valve of unloading pump Oxidation operator
and also tanker isolating valve at the o-xylene intake, if possible;
A.1.2. 2. 6. - disconnect power supply. pump motors pos. G-503 A/B, G-504 A/B Electrician on duty
Explosion, 7. - deploy fire extinguishing means, restrict the place of pouring with sand Shift firefighting
fire. to limit the filling area and begin to eliminate the fire source before the team
arrival FIEDMC firefighting team.
8. – organize meeting with FIEDMC team and locate them to the source. Boardman
9. – arrived FIEDMC firefighting team will take charge of the emergency Firefighting teams
and shift firefighting team will coordinate with them.