SCHEDULE OF QUANTITIES

ABSTRACT ESTIMATE FOR CONSTRUCTION OF RESIDENTIAL BUILDING


FOR Dr.PINAKINI. K .SHANKAR AT BANGALORE.

GROU ESTIMATED RATE AMOUNT


DESCRIPTION OF WORK UNITS
P QTY (in Rs) (in Rs)
CODE CIVIL WORKS
A EARTH WORK
A01 Earthwork Excavation. Cft 6,754.45 15.00 101,316.75
A02 Earth Filling using available earth. Cft 5,291.00 5.00 26,455.00
A03 Excess Earth carting away from the
site. Cft 2,024.00 15.00 30,360.00
A04 Earth Filling brought from outside Cft 10.00 -
A05 Earth Shifting over area Cft 2,400.00 10.00 24,000.00
182,131.75

B MASONRY WORKS
B01 Size Stone Masonary CM 1:6 Cft 720.00 180.00 129,600.00
B02 BBM 9" thk
Stilt floor Sft 1,873.53 200.00 374,706.00
Ground floor Sft 1,467.47 200.00 293,494.00
First floor Sft 1,490.93 200.00 298,186.00
Terrace floor Sft 817.88 200.00 163,576.00
B03 BBM 4.5" thk
Stilt floor Sft 486.13 120.00 58,335.60
Ground floor Sft 222.99 120.00 26,758.80
First floor Sft 197.88 120.00 23,745.60
1,368,402.00

C CONCRETE WORKS
C01 PCC 1:4:8
Below footing Cft 782.60 120.00 93,912.00
Below flooring Cft 962.17 120.00 115,460.40
C02 RCC Footing Concrete Cft 1,854.00 210.00 389,340.00
C03 RCC Plinth Beam Cft 288.70 300.00 86,610.00
C04 PCC 1:3:6 Sills
Stilt floor Cft 40.31 130.00 5,240.30
Ground floor Cft 8.54 130.00 1,110.20
First floor Cft 8.25 130.00 1,072.50
Terrace floor Cft 40.27 130.00 5,235.10
C05 RCC Column Concrete
Below Stilt floor Cft 69.75 330.00 23,017.50
Above Stilt floor Cft 165.38 330.00 54,575.40
Ground floor Cft 165.38 330.00 54,575.40
First floor Cft 165.38 330.00 54,575.40
Terrace Floor Cft 82.69 330.00 27,287.70

C06 RCC Lintel Concrete


Stilt floor Cft 27.28 300.00 8,184.00
Ground floor Cft 24.84 300.00 7,452.00
First floor Cft 29.06 300.00 8,718.00
Terrace Floor Cft 3.75 300.00 1,125.00
C07 RCC Chejja, loft concrete
Stilt floor Sft 76.00 245.00 18,620.00
Ground floor Sft 62.00 245.00 15,190.00
First floor Sft 88.00 245.00 21,560.00
Terrace Floor Sft 16.00 245.00 3,920.00
C08 RCC Beam Concrete
Stilt floor Cft 289.27 305.00 88,227.35
Ground floor Cft 347.58 305.00 106,011.90
First floor Cft 313.45 305.00 95,602.25
Terrace Floor Cft 73.41 305.00 22,390.05
C09 RCC Roof Slab concrete
Stilt floor Cft 785.84 305.00 239,681.20
Ground floor Cft 631.65 305.00 192,653.25
First floor Cft 497.06 305.00 151,603.30
Terrace floor Cft 82.50 305.00 25,162.50
C10 RCC Staircase Waist Slab
Stilt floor Cft 75.17 400.00 30,068.00
C11 RCC Staircase Folded type
Ground floor Cft 38.00 800.00 30,400.00
First floor Cft 38.00 800.00 30,400.00
2,008,980.70

D STEEL
D01 Steel Reinforcement including
fabrication (Basic cost=Rs.50000
Stilt/-)floor Kgs 8,000.00 68.00 544,000.00
Ground floor Kgs 5,750.00 68.00 391,000.00
First floor Kgs 5,050.00 68.00 343,400.00
Terrace floor Kgs 675.00 68.00 45,900.00
1,324,300.00

E DOORS AND WINDOWS


DOORS
E01 Teak Wood frame with OST Flush
shutter with teak wood panneling for
Ground floor Sft 28.00 2,420.00 67,760.00
E02 Main door.
Teak Wood frame withTeak wood
shutter for pooj Door - PD. Ground floor Sft 28.00 2,750.00 77,000.00
E03 Teak Wood frame with BST Flush
shutter for Room doors. Stilt floor Sft 42.00 1,800.00 75,600.00
Ground floor Sft 42.00 1,800.00 75,600.00
First floor Sft 59.50 1,800.00 107,100.00
E04 Teak Wood frame with Fully Glazed
Teak wood shutter including Glass for
Toilet doors
Stilt floor Sft 17.50 2,285.00 39,987.50
Ground floor Sft 35.00 2,285.00 79,975.00
First floor Sft 35.00 2,285.00 79,975.00
E05 Sal Wood frame with commercial
waterproof Flush shutter for Stilt
Servent
floor Sft 38.50 750.00 28,875.00
Room and
WINDOWS Servent toilet doors
E06 Teak wood frame with Teak wood
shutter for Windows Stilt floor Sft 94.50 2,100.00 198,450.00
Ground floor Sft 142.50 2,100.00 299,250.00
First floor Sft 181.50 2,100.00 381,150.00
E07 Sal Wood frame with Honne wood
shutter for Windows in Servent
Stiltroom
floor Sft 58.50 1,050.00 61,425.00
and Servent Toilet
1,572,147.50

F INTERIOR WORKS

F01 19 mm Century Commercial Ply, Inside


0.8mm Laminate Finish & Ground
Outside floor
Decorative Veneer of Rs 150/-Below
per sftloft
Sft 80.50 1,840.00 148,120.00
With Mellamine Finish , Fittings all are
Hetich, Handles are below 150Above
Rs andLoft Sft 34.50 950.00 32,775.00
Locks are Europa. First floor
Below loft Sft 196.35 1,840.00 361,284.00
Above Loft Sft 84.15 950.00 79,942.50

F02 Kitchen Cabinet


16 mm Century Water Proof Ply, Inside
0.8mm Laminate Finish & Outside 1
Stilt floor
mm Laminate with Alluminium edge
Below platform Sft 20.31 1,500.00 30,465.00
Profile Finish, Hinges all are Hetich
Above platform Sft 16.25 1,200.00 19,500.00
Above Loft Sft 24.38 1,000.00 24,380.00
Ground floor
Below platform Sft 63.13 2,200.00 138,886.00
Above platform Sft 50.50 1,600.00 80,800.00
Above Loft Sft 102.75 1,200.00 123,300.00
Tall unit Sft 21.00 1,600.00 33,600.00
F03 T.V.Cabinet
Ground floor Sft 70.00 1,500.00 105,000.00
F04 Crockery unit Sft 70.00 2,000.00 140,000.00
F05 Cot with back rest Each 3.00 75,000.00 225,000.00
F06 Study table Each 1.00 50,000.00 50,000.00
F07 Teak wood with Glass Stair case Railing Sft 303.00 1,200.00 363,600.00
1,956,652.50

G PLASTERING
G01 Outside Plastering
Stilt floor Sft 4,135.06 55.00 227,428.30
Ground floor Sft 2,345.50 55.00 129,002.50
First floor Sft 2,035.00 55.00 111,925.00
Terrace floor Sft 1,991.56 55.00 109,535.80
G02 Inside Wall Plastering
Stilt floor Sft 3,105.25 52.00 161,473.00
Ground floor Sft 3,242.40 52.00 168,604.80
First floor Sft 3,422.50 52.00 177,970.00
Terrace floor Sft 510.00 52.00 26,520.00
G03 Inside Ceiling Plastering
Stilt floor Sft 1,933.56 55.00 106,345.80
Ground floor Sft 1,572.21 55.00 86,471.55
First floor Sft 1,155.99 55.00 63,579.45
Terrace floor Sft 165.00 55.00 9,075.00
G04 Water proof plastering for toilets and
open area in terrace floor Ground floor Sft 145.75 60.00 8,745.00
First floor Sft 195.50 60.00 11,730.00
1,398,406.20

H FLOORING (without basic material cost)


H01 Italian marble for Flooring
Ground floor Sft 872.83 200.00 174,566.00
First floor Sft 446.57 200.00 89,314.00
H02 Italian marble for Skirting
Ground floor Rft 194.00 130.00 25,220.00
First floor Rft 158.33 130.00 20,582.90
H03 Wooden Flooring
Ground floor Sft 232.49 20.00 4,649.80
First floor Sft 423.27 20.00 8,465.40
H04 Wooden Skirting
Ground floor Rft 74.25 10.00 742.50
First floor Rft 148.25 10.00 1,482.50
H05 Wooden flooring Profile
Ground floor Rft 15.00 10.00 150.00
First floor Rft 25.00 10.00 250.00
H06 Cement flooring
Ground floor Sft 232.49 80.00 18,599.20
First floor Sft 423.27 80.00 33,861.60
H07 Vitrified tiles flooring
Stilt floor Sft 911.09 80.00 72,887.20
H08 Vitrified skirting
Stilt floor Rft 228.75 75.00 17,156.25
H09 Ceramic Tiles Flooring
Stilt floor Sft 139.83 80.00 11,186.40
Ground floor Sft 185.59 80.00 14,847.20
First floor Sft 101.00 80.00 8,080.00
H10 Ceramic Tiles Dadooing
Stilt floor Sft 453.50 90.00 40,815.00
Ground floor Sft 666.75 90.00 60,007.50
First floor Sft 385.50 90.00 34,695.00
H11 Italian Marble slab for Internal Stairs
Ground floor Sft 108.00 220.00 23,760.00
First floor Sft 108.00 220.00 23,760.00
H12 Italian Marble slab for Internal Stairs Skirting
Ground floor Rft 39.50 150.00 5,925.00
First floor Rft 39.50 150.00 5,925.00
H13 Granite slab for outside Stairs
Stilt floor St 161.86 140.00 22,660.40
H14 Granite slab for outside Stairs Skirting
Stilt floor Rft 50.13 110.00 5,514.30
H15 Granite Flooring
Ground floor Sft 276.08 110.00 30,368.80
First floor St 149.47 110.00 16,441.70
H16 Granite skirting
Ground floor Rft 104.89 110.00 11,537.90
First floor Rft 49.53 110.00 5,448.30
H17 Parking Tiles For flooring
Stilt floor Sft 959.16 80.00 76,732.80
H18 Parking Tiles for skirting
Stilt floor Rft 340.50 75.00 25,537.50
H19 Balcony tiles flooring
First floor Sft 153.75 80.00 12,300.00
H20 Balcony tiles skirting
First floor Rft 50.76 75.00 3,807.00
H21 20 mm granite slab for kitchen / Counters
Stilt floor Sft 21.00 100.00 2,100.00
Ground floor Sft 54.00 100.00 5,400.00
First floor Sft 24.00 100.00 2,400.00
H22 40 mm granite slab for Utility
Ground floor Sft 15.13 100.00 1,513.00
H23 20mm Granite Cladding @ Entrance Sft 300.00 150.00 45,000.00
H24 Door
Italian Marble Full nosing Rft 100.00 150.00 15,000.00
H25 Italian Marble Half nosing Rft 100.00 100.00 10,000.00
H26 Italian Marble Double nosing Rft 160.00 250.00 40,000.00
H27 20 mm Granite full nosing Rft 50.00 100.00 5,000.00
H28 20 mm Granite half nosing Rft 50.00 50.00 2,500.00
H29 20 mm Granite Double nosing Rft 150.00 150.00 22,500.00
H30 40 mm Granite full nosing Rft 30.00 100.00 3,000.00
H31 V-Groove in granite Rft 300.00 100.00 30,000.00
H32 Fixing Granite Cill for Bathroom door Each 6.00 150.00 900.00
H33 Clay Tiles for Terrace floor Sft 1,188.00 80.00 95,040.00
H34 Water proofing for Terraces Sft 1,188.00 85.00 100,980.00
1,288,610.15

I PAINTING WORKS
I01 Plastic Emulsion
Stilt floor Sft 5,038.81 26.00 131,009.06
Ground floor Sft 4,814.61 26.00 125,179.86
First floor Sft 4,578.49 26.00 119,040.74
Terrace floor Sft 675.00 26.00 17,550.00
I02 Exterior Emulsion (Apex)
Stilt floor Sft 4,135.06 24.00 99,241.44
Ground floor Sft 2,345.50 24.00 56,292.00
First floor Sft 2,035.00 24.00 48,840.00
Terrace floor Sft 1,991.56 24.00 47,797.44
I03 Enamel Paint
Stilt floor Sft 360.63 22.00 7,933.86
Ground floor Sft 178.13 22.00 3,918.75
First floor Sft 226.88 22.00 4,991.25
I04 Melamine Polish
Stilt floor Sft 266.83 90.00 24,014.25
Ground floor Sft 510.63 90.00 45,956.25
First floor Sft 463.13 90.00 41,681.25
773,446.15
J MISCELLANEOUS
J01 Sump Tank Ltrs 10,000.00 10.00 100,000.00
J02 Anti-termite treatment for Pesticides Sft 2,400.00 10.00 24,000.00
J03 Bath Floor Filling
Ground floor Cft 70.00 80.00 5,600.00
First floor Cft 138.00 80.00 11,040.00
J04 Stone Slab over Drains Sft 200.00 250.00 50,000.00
J05 Chicken Mesh Sft 200.00 180.00 36,000.00
J06 Grooves 1/2" Sft 600.00 20.00 12,000.00
J07 Cornice works - 1 step Sft 400.00 30.00 12,000.00
2 steps Sft 200.00 50.00 10,000.00
J08 Washing Stone Sft 10.00 350.00 3,500.00
J09 20 mm granite for Name board No 1.00 5,000.00 5,000.00
J10 Granite Cutting for Sink Each 3.00 600.00 1,800.00
J11 Granite Cutting for Hob Each 1.00 300.00 300.00
J12 Chimney Hole Each 2.00 1,000.00 2,000.00
J13 Gas Piping L.S 15,000.00
J14 Rain Water Harvesting Each 2.00 15,000.00 30,000.00
J15 Rough Stone Cladding @ Outside Wall Sft 550.00 400.00 220,000.00
(Inclusive of Material) 538,240.00

K M.S. / S.S. WORKS (without Basic material cost but including Painting)
K01 M.S. Gate Sft 130.00 60.00 7,800.00
K02 M.S. Staircase Railing Sft 71.06 50.00 3,553.00
K03 M.S. Covering Grill Sft 871.50 40.00 34,860.00
K04 M.S. Balcony Railing Sft 45.00 35.00 1,575.00
K05 M.S. T-angle Set 1.00 350.00 350.00
K06 M.S. Sky light covering Sft 355.00 100.00 35,500.00
K07 M.S. Ladder L.S 1.00 1,500.00 1,500.00
K08 M.S.Door Sft 42.00 60.00 2,520.00
K09 M.S.Grill Door Sft 21.00 80.00 1,680.00
K10 M.S.Frame for Structural Glazing Sft 325.00 50.00 16,250.00
105,588.00

L PLUMBING & SANITARY WORKS


L01 3/4" CPVC pipe (Cold & Hot Water ) Rft 650.00 110.00 71,500.00
L02 1" CPVC pipe Rft 500.00 110.00 55,000.00
L03 2" CPVC pipe Rft 40.00 225.00 9,000.00
L04 3/4" gate valve Nos 3.00 730.00 2,190.00
L05 1" gate value Nos 8.00 1,442.00 11,536.00
L06 2" gate valve Nos 1.00 1,854.00 1,854.00
L07 Ball valve for sump tank Each 1.00 835.00 835.00
L08 PVC over head tank Ltr 2,000.00 9.00 18,000.00
L09 3/4" Non-Return Valve for Solar Each 1.00 850.00 850.00
L10 PVC Pipes
a) 1 1/2" dia Rft 80.00 88.00 7,040.00
b) 2 1/2" dia Rft 270.00 160.00 43,200.00
c) 3" dia Rft 242.00
e) 4" dia (4kg/cm2) Rft 270.00 283.00 76,410.00
f) 5" dia (6kg/cm2) Rft 130.00 335.00 43,550.00
L11 PVC multi trap Each 14.00 900.00 12,600.00
L12 PVC P- trap Each 4.00 1,262.00 5,048.00
L13 Chambers 12"x12" Each 4.00 3,965.00 15,860.00
L14 Chambers 21"x21" Each 4.00 4,532.00 18,128.00
L15 Chambers 24"x24" Each 1.00 5,253.00 5,253.00
Fixtures (labour only)
L16 E.W.C with flushtank fixing Each 1,365.00 -
L17 Wall mounted Commode fixing Each 6.00 2,009.00 12,054.00
L18 Concealed Flush tank fixing Each 6.00 1,365.00 8,190.00
L19 Wash basin fixing Each 7.00 412.00 2,884.00
L20 Shower and shower arm fixing Each 6.00 283.00 1,698.00
L21 Angle cock & stop cock fixing Each 25.00 52.00 1,300.00
L22 Grating with frame fixing Each 16.00 62.00 992.00
L23 Wall mixer fixing Each 6.00 361.00 2,166.00
L24 2 IN 1 bib cock & Heaalth faucet fixing Each 6.00 124.00 744.00
L25 Sink Cock fixing Each 2.00 345.00 690.00
L26 Short body bib cock fixing Each 3.00 52.00 156.00
L27 Bootle Trap Fixing Each 6.00 82.00 492.00
L28 Single liver diverter Each 258.00 -
L29 Spout Each 36.00 -
L30 Waste pipe fixing Each 6.00 52.00 312.00
L31 Concealed stop cock Each 6.00 52.00 312.00
L32 Washing mechine tap Each 1.00 42.00 42.00
L33 Rain water filter fixing Each 1.00 7,983.00 7,983.00
L34 Sink fixing Each 3.00 258.00 774.00
438,643.00

M ELECTRICALWORKS (Anchor roma )


M01 Light point Each 90.00 649.00 58,410.00
M02 Spot Light point Each 10.00 805.00 8,050.00
M03 Fan point with Regulator Each 8.00 1,133.00 9,064.00
M04 Bell point Each 2.00 1,076.00 2,152.00
M05 Individual plug point Each 28.00 773.00 21,644.00
M06 Plug point Each 30.00 392.00 11,760.00
M07 Two way point Each 10.00 1,015.00 10,150.00
M08 30 amps DP socket heating point and 5 Each 10.00 1,000.00 10,000.00
M09 amps
15 amps switch withpoint
socket socket
for geezer & AC Each 15.00 541.00 8,115.00
M10 30 amps DP point for geezer control Each 15.00 654.00 9,810.00
M11 Lighting circuit Rft 600.00 50.00 30,000.00
M12 Heating circuit & Main Circuit Rft 700.00 72.00 50,400.00
M13 Telephone point Each 3.00 500.00 1,500.00
M14 Telephone circuit Rft 200.00 36.00 7,200.00
M15 Main circuit and lift 3 phase Rft 200.00 134.00 26,800.00
M16 Antana point Each 4.00 500.00 2,000.00
M17 Antana circuit Rft 170.00 36.00 6,120.00
M18 Pump point No. 1.00 1,076.00 1,076.00
M19 Pump Circuit Rft 100.00 72.00 7,200.00
M20 Main distribution board (24 way) Each 11,500.00 -
M21 control for mains board (12 way)
Main distribution Each 3.00 6,180.00 18,540.00
control for mains
Main distribution board (8 way) control Each 4,635.00 -
M22 for
Mainmains
Panel board L.S. 1.00 100,000.00
M23 Main grounding (8' 0" depth) Each 1.00 2,936.00 2,936.00
M24 Internal grounding ( 6' 0" depth ) Each 3.00 2,446.00 7,338.00
M25 Providing & fixing and laying 35 Sq mm Rft 90.00 150.00 13,500.00
M26 UGT.V.
CC cable with earth
Dummy work with
Conduits (1") pvc Rft 150.00 25.00 3,750.00
M27 pipe.(App)
Spot lights for interior works L.S 5,000.00
M29 Chandalear point
M32 Lift Pannel 1.00 15,000.00 15,000.00
M33 Lift light Wireing and 5amps plug point L.S 1.00 6,000.00 6,000.00
M34 G.I.Earth srtip 120.00 130.00 15,600.00
469,115.00
N MATERIALS TO BE SUPPLIED BY THE OWNER

FLOORING & CLADDING MATERIALS


1 Italian marble Sft 2,000.00 400.00 800,000.00
2 Vitrified tiles Sft 1,225.00 80.00 98,000.00
3 20 mm
20 mm Granite
Granite slabs
slabs for
for external
Flooring stair Sft 525.00 200.00 105,000.00
4 case Sft 200.00 200.00 40,000.00
5 20 mm Granite slabs for cladding Sft 310.00 200.00 62,000.00
6 20 mm granite slab for kitchen / Sft 150.00 200.00 30,000.00
7 Counters
40 mm Granite slabs for Utility Sft 25.00 200.00 5,000.00
8 Parking tiles Sft 1,200.00 150.00 180,000.00
9 Ceramic tiles- Floor Sft 450.00 80.00 36,000.00
10 Ceramic tiles- Dadoo Sft 1,600.00 100.00 160,000.00
11 Wooden Flooring Sft 700.00 150.00 105,000.00
12 Wooden Skirting Rft 225.00 100.00 22,500.00
13 Wooden profile Rft 50.00 110.00 5,500.00
14 Clay Tiles Sft 1,200.00 15.00 18,000.00

M.S. WORKS
1 M.S. Gate Sft 130.00 400.00 52,000.00
2 S.S Staircase Railing Sft 71.06 1,000.00 71,060.00
3 M.S. Covering Grill Sft 871.50 200.00 174,300.00
4 M.S. Balcony Railing Sft 45.00 180.00 8,100.00
5 M.S. T-angle Set 1.00 5,000.00 5,000.00
6 M.S. Sky light covering Sft 355.00 300.00 106,500.00
7 M.S. Ladder L.S 1.00 8,500.00 8,500.00
8 M.S.Door Sft 42.00 380.00 15,960.00
9 M.S.Grill Door Sft 21.00 300.00 6,300.00
10 M.S.Frame for Structural Glazing Sft 325.00 200.00 65,000.00

PLUMBING AND SANITORY WORKS


1 Wall mounted Commode Each 6.00 9,800.00 58,800.00
2 Concealed Flush tank Each 6.00 9,000.00 54,000.00
3 Wash basin Each 7.00 3,300.00 23,100.00
4 Shower and shower arm Each 6.00 2,750.00 16,500.00
5 Angle cock & stop cock (With Flange) Each 25.00 810.00 20,250.00
6 Grating with frame Each 16.00 140.00 2,240.00
7 Wall mixer Each 6.00 4,125.00 24,750.00
8 Connection pipes Each 24.00 145.00 3,480.00
9 Wastepipe & coupling Each 10.00 605.00 6,050.00
10 Pillar cock Each 7.00 2,000.00 14,000.00
11 Health faucet Each 6.00 1,210.00 7,260.00
12 2 IN 1 bib cock Each 6.00 2,065.00 12,390.00
13 Short body bib cock Each 10.00 935.00 9,350.00
14 Sink Cock Each 3.00 2,000.00 6,000.00
15 Single liver diverter Each 10,000.00 -
16 3/4" Extension Nipple Each 10.00 80.00 800.00
17 1" Extension Nipple Each 10.00 100.00 1,000.00
18 X- Nipple With Flange Each 100.00 -
19 Stainless steel Sink for kitchen
Stilt floor Each 1.00 6,000.00 6,000.00
Ground floor Each 2.00 15,000.00 30,000.00
GLASS WORKS
1 Shower partition Each 3.00 45,000.00 135,000.00
2 Design Glass for railings Sft 200.00 -
3 Laminated Glass for Sky light Sft 355.00 800.00
4 Structural Glazing Sft 325.00 300.00 97,500.00

KITCHEN ACCESSORIES ( Haffele Blum)


a) Tandom Box 30 Kg Nos 8.00 5,975.00 47,800.00
b) Tandom Box 65Kg with Gallery Nos 6.00 8,125.00 48,750.00
c) Spice Rack Nos 1.00 11,975.00 11,975.00
d) Dust bin holder Nos 1.00 2,875.00 2,875.00
e) Detergent holder Nos 1.00 950.00 950.00
f) Aventos Nos 4.00 14,725.00 58,900.00

2,879,440.00

COST SUMMARY

A EARTHWORK 182,131.75

B MASONARY WORK 1,368,402.00

C CONCRETE WORK 2,008,980.70

D STEEL 1,324,300.00

E DOORS AND WINDOWS 1,572,147.50

F INTERIOR WORKS 1,956,652.50

G PLASTERING 1,398,406.20

H FLOORING 1,288,610.15

I PAINTING WORKS 773,446.15

J MISCELLINIOUS WORKS 538,240.00

K M.S / S.S WORKS 105,588.00

L PLUMBING AND SANITARY WORKS 438,643.00

M ELECTRICAL WORKS 469,115.00


N MATERIALS SUPPLIED BY THE OWNER 2,879,440.00

O LIFT ( 5 Passanger) 1,100,000.00

Total Rs. 17,404,102.95


Note: Tax extra as applicable

S EXTRA WORKS
a) Sanction Plan Charges
b) BWSSB Prorata, Point & inspection
Charges
BESCOM( deposits
Approximately )
and office 150,000.00
c) expencess for Temparory
connection( Approximately)
BESCOM deposits and office 60,000.00
d) expencess for permanent
connection( Approximately) 100,000.00
e) Bore Well Pump 100,000.00
f) Solar Water Heater (200 ltr) 60,000.00
470,000.00
T FIXTURES & APPLIANCES (Including Labour)
a) 25 lts Geyser Nos 6.00 10,500.00 63,000.00
b) Ceiling Fans Nos 10.00 2,500.00 25,000.00
c) Tube Lights (LED) Nos 10.00 650.00 6,500.00
d) 40 W Light Nos 10.00 18.00 180.00
e) Calling Bell Nos 2.00 180.00 360.00
f) Bulkhead Fitting Nos 5.00 350.00 1,750.00
g) Electrical Chimney Nos 1.00 25,000.00 25,000.00
h) Hobb Nos 1.00 10,000.00 10,000.00
i) Towel Rod Nos 7.00 1,800.00 12,600.00
j) Towel Ring Nos 7.00 750.00 5,250.00
k) Soup Tray Nos 7.00 750.00 5,250.00
l) Mirror in Bathroom Nos 7.00 850.00 5,950.00
m) Corner Tray Nos 6.00 1,400.00 8,400.00
n) 1.0 H.P Water Pump & fittings Nos 1.00 12,000.00 12,000.00
o) Pelmet Rods Ls 1.00 60,000.00 60,000.00
241,240.00

Grand Total Rs. 18,115,342.95

AREA STATEMENT

Stilt floor = 1846.65 Sft


Ground floor = 1846.65 Sft
First floor = 1836.00 Sft
Terrace floor = 217.32 Sft
Total = 5746.62 Sft
397,854.00
40,789.00
1,667,000.00

512,720.00
295,970.00

232,500.00

171,250.00

200,000.00

100,000.00
2,000,000.00

300,000.00

300,000.00

2,900,000.00
     3 . PREAMBLE TO SCHEDULE OF QUANTITIES

While quoting we assume the following basic rates (landed cost at site including
all taxes and levies) The Rates quoted will be for all leads and lifts

1 CEMENT 50 KG BAG :Rs. 375.00 Bag Dalmia or any Equivalent brand


2 STEEL REINFORCEMENT TOR-40 :Rs. 50,000.00 M.T Sunvik or any Equivalent brand
3 TABLE MOULDED BRICKS :Rs. 8.00 Each
4 SOLID BLOCK 8" Thick :Rs. 48.00 Each
5 SOLID BLOCK 6" Thick :Rs. 35.00 Each
6 SOLID BLOCK 4" Thick :Rs. 30.00 Each
7 M.SAND :Rs. 40.00 Cft Bestow
8 SAND :Rs. 125.00 Cft
9 12 MM JELLY :Rs. 25.00 Cft
10 20 MM JELLY :Rs. 25.00 Cft
11 40 MM JELLY :Rs. 25.00 Cft
12 SIZE STONE :Rs. 13.00 Each
13 TEAK WOOD FRAME :Rs. 7,000.00 Cft Bharma Teak
14 TEAK WOOD PLANKS :Rs. 9,000.00 Cft Bharma Teak
15 WATER PROOF FLUSH DOOR 30mm thic:Rs. 130.00 Sft Kutti
16 OST FLUSH DOOR 30mm thick :Rs. 190.00 Sft Kutti
17 BST FLUSH DOOR 30mm thick :Rs. 230.00 Sft Kutti
18 PLY WOOD 19mm thick :Rs. 128.00 Sft Century or Euro or Equivalent
19 PLY WOOD 16mm thick :Rs. 118.00 Sft Century or Euro or Equivalent
20 PLY WOOD 12mm thick :Rs. 90.50 Sft Century or Euro or Equivalent
21 PLY WOOD 6mm thick :Rs. 68.00 Sft Century or Euro or Equivalent
22 VENEER :Rs. 160.00 Sft Century or Euro or Equivalent
23 LAMINATE 0.8mm thick FOR INSIDE :Rs. 600.00 Per Sheet Century or Euro or Equivalent
24 LAMINATE 1.2mm thick FOR OUT SIDE :Rs. 1,500.00 Per Sheet Century or Euro or Equivalent
any Equivalent brand
any Equivalent brand

r Euro or Equivalent
r Euro or Equivalent
r Euro or Equivalent
r Euro or Equivalent
r Euro or Equivalent
r Euro or Equivalent
r Euro or Equivalent
Dr.PINAKINI.K.SHANKAR RESIDENCE
MEASUREMENT SHEET OF R.A. BILL - 1

Length Breadth Height Quantity


Description Nos
Sl.no. ft ft ft +

A Earthwork
A01 Earthwork Excavation
A) For Footings
Earthwork Excavation @ Column Footing
F1 2.00 9.00 7.50 5.00 675.00
F2 7.00 7.50 7.00 5.00 1,837.50
F3 1.00 6.50 5.50 5.00 178.75
F4 1.00 8.50 7.00 5.00 297.50
F5 1.00 4.50 4.50 5.00 101.25
CF1 1.00 12.00 11.50 8.00 1,104.00
4,194.00 Cft
B) For S.S.M
North Side(40-10.5) 1.00 29.50 2.50 2.00 147.50
East Side(55-(7.5*2+6.5) 1.00 25.00 2.50 2.38 148.44
West Side(55-(7.5*4)) 1.00 30.00 2.50 2.50 187.50
South Side(40-(7+8.5)) 1.00 24.50 2.50 3.00 183.75
667.19 Cft
C)Below Plinth Beam
Horizontal
Grid 1A-1C 1.00 13.75 1.50 0.50 10.31
Grid 1C-1E 1.00 18.00 1.50 0.50 13.50
Grid 7A-7B 1.00 8.00 1.50 0.50 6.00
Grid 7B-7D 1.00 13.38 1.50 0.50 10.03
Grid 7D-7E 1.00 9.63 1.50 0.50 7.22
Grid 8A-8B' 1.00 10.38 1.50 0.50 7.78
Grid 8B'-8D 1.00 9.00 1.50 0.50 6.75
Vertical
Grid A1-A1' 1.00 9.08 1.50 0.50 6.81
Grid A1'-A4 1.00 9.17 1.50 0.50 6.88
Grid A4-A7 1.00 12.00 1.50 0.50 9.00
Grid A7-A8 1.00 14.25 1.50 0.50 10.69
Grid C1-C2 1.00 10.73 1.50 0.50 8.05
Grid C2-C6 1.00 15.50 1.50 0.50 11.63
Grid D7-D8' 1.00 17.25 1.50 0.50 12.94
Grid E1-E3 1.00 15.48 1.50 0.50 11.61
Grid E3-E5 1.00 8.25 1.50 0.50 6.19
Grid E5-E7 1.00 6.50 1.50 0.50 4.88
S.S.M Piller 2.00 2.00 2.00 0.50 4.00
154.26 Cft
5,015.44 Cft

Total earth work Excluding Sump 5,015.44


Sump 1.00 10.50 12.50 6.00 787.50
Total earth work Including Sump 5,802.94 Cft
A02 Earth Filling using available earth.
(A) Earth refilling Below G.L
Deduction
P.C.C Below footing 1.00 378.00
P.C.C Below SSM 1.00 229.63
Footing concrete 1.00 1,526.69
S.S.M 1.00 794.91
Columns 1.00 64.43
Lift well 1.00 6.50 7.00 6.25 284.38
3,278.04
Refilling Below G.L =Total Excavation Quantity -
(P.C.C+FootingConcrete+S.S.M+Columns+Lift
Well) =5015.44-3278.04 1,737.41 Cft
(B) Earth refilling above G.L 1.00 40.00 60.00 2.08 4,987.20
Deduction
Plinth Beam 1.00 244.07
P.C.C below plinth beam 1.00 76.25
P.C.C below Flooring 1.00 699.63
1,019.95
Earth refilling above G.L = Average Depth Of
Filling Above Ground Level Upto Plinth Top -(Plinth
Beam+P.C.C)=4987.20-1019.95 3,967.25 Cft

(C)Total Earth Filling(A+B) 5,704.66 Cft


A03 Excess Earth To Be Removed From Site
Total Earth Work - Total Earth Filling 98.28 Cft

B Masonry works
B01 Size Stone Masonry in CM 1:6
Compound wall
North Side
1st Course NW side 1.00 21.93 1.75 0.75 28.78
Next to sump 1.00 10.50 1.00 0.75 7.88
NE side 1.00 7.57 1.75 0.75 9.93
2nd Course NW side 1.00 21.93 1.75 0.75 28.78
Next to sump 1.00 10.50 1.00 0.75 7.88
NE side 1.00 7.57 1.75 0.75 9.93
3rd Course NW side 1.00 21.93 1.50 0.75 24.67
Next to sump 1.00 10.50 1.00 0.75 7.88
NE side 1.00 7.57 1.50 0.75 8.51
4th Course NW side 1.00 21.93 1.50 0.75 24.67
South Side
1st Course 1.00 40.00 1.75 0.75 52.50
2nd Course 1.00 40.00 1.75 0.75 52.50
3rd Course 1.00 40.00 1.50 0.75 45.00
4th Course 1.00 40.00 1.50 0.75 45.00
5th Course 1.00 40.00 1.50 0.75 45.00
East Side
1st course 1.00 7.50 2.00 0.75 11.25
2nd course 1.00 7.50 1.75 0.75 9.84
3rd Course(49+7.5) 1.00 56.50 1.75 0.75 74.16
4th Course(49+7.5) 1.00 56.50 1.50 0.75 63.56
West Side
1st Course 1.00 56.50 1.75 0.75 74.16
2nd Course 1.00 56.50 1.75 0.75 74.16
3rd Course 1.00 56.50 1.50 0.75 63.56
4th Course 1.00 56.50 1.50 0.75 63.56
SSM Piller Below Plinth Beam
1st Course 2.00 1.50 1.50 0.75 3.38
2nd Course 2.00 1.50 1.50 0.75 3.38
839.91 Cft

C Concrete works
C01 PCC 1:4:8
A) For Below Footings
At column footing
F1 2.00 9.00 7.50 0.50 67.50
F2 7.00 7.50 7.00 0.50 183.75
F3 1.00 6.50 5.50 0.50 17.88
F4 1.00 8.50 7.00 0.50 29.75
F5 1.00 4.50 4.50 0.50 10.13
CF1 1.00 12.00 11.50 0.50 69.00
378.00 Cft

Below S.S.M
North Side 1.00 29.50 2.50 0.50 36.88
Sump 1.00 10.50 1.00 0.50 5.25
South Side 1.00 40.00 2.50 0.50 50.00
East Side 1.00 55.00 2.50 0.50 68.75
West Side 1.00 55.00 2.50 0.50 68.75
229.63 Cft
Below Plinth Beam
Horizontal
Grid 1A-1C 1.00 13.75 1.50 0.25 5.16
Grid 1C-1E 1.00 18.00 1.50 0.25 6.75
Grid 7A-7B 1.00 8.00 1.50 0.25 3.00
Grid 7B-7D 1.00 13.38 1.50 0.25 5.02
Grid 7D-7E 1.00 9.63 1.50 0.25 3.61
Grid 8A-8D 1.00 20.88 1.50 0.25 7.83
Vertical
Grid A1-A4 1.00 19.75 1.50 0.25 7.41
Grid A4-A7 1.00 12.00 1.50 0.25 4.50
Grid A7-A8 1.00 14.25 1.50 0.25 5.34
Grid C1-C2 1.00 10.73 1.50 0.25 4.02
Grid C2-C6 1.00 15.50 1.50 0.25 5.81
Grid D7-D8' 1.00 17.25 1.50 0.25 6.47
Grid E1-E3 1.00 15.48 1.50 0.25 5.81
Grid E3-E5 1.00 8.25 1.50 0.25 3.09
Grid E5-E7 1.00 6.50 1.50 0.25 2.44
76.25 Cft
Total P.C.C Below Footings 683.88 Cft

B) Below Flooring
A1 1.00 13.75 28.50 0.50 195.94
A2 1.00 6.25 8.00 0.50 25.00
A3 1.00 22.13 15.00 0.50 165.94
A4 1.00 18.00 34.75 0.50 312.75
699.63 Cft

C02 Footing Concrete


At column footing
F1 2.00 9.00 7.50 2.25 303.75
F2 7.00 7.50 7.00 2.00 735.00
F3 1.00 6.50 5.50 1.75 62.56
F4 1.00 8.50 7.00 2.00 119.00
F5 1.00 4.50 4.50 1.50 30.38
CF1 1.00 12.00 11.50 2.00 276.00
1,526.69 Cft
C03 Retaining Wall
Lift North & South side(6.25+1.25) 2.00 6.50 0.75 7.50 73.13
Lift East & West side 2.00 5.50 0.75 7.50 61.88
135.00 Cft
C04 Column Concrete
Column upto plinth top
Grid A1 1.00 0.75 1.50 5.25 5.91
Grid C1 1.00 0.75 1.50 5.25 5.91
Grid E1 1.00 0.75 1.50 4.25 4.78
Grid C2 1.00 0.75 1.50 5.00 5.63
Grid E3 1.00 0.75 1.50 4.50 5.06
Grid A4 1.00 0.75 1.50 5.25 5.91
Grid E5 1.00 0.75 1.50 4.21 4.73
Grid A7 1.00 0.75 1.50 5.58 6.28
Grid D7 1.00 0.75 1.50 4.50 5.06
Grid E7 1.00 0.75 1.25 4.42 4.14
Grid A8 1.00 0.75 1.50 4.58 5.16
Grid D8 1.00 2.00 0.75 3.92 5.88
64.43 Cft
C05 RCC Plinth beam
Horizantal
Grid 1A-1C 1.00 13.75 0.75 1.25 12.89
Grid 1C-1E 1.00 18.00 0.75 1.25 16.88
Grid 7A-7B 1.00 8.00 0.75 1.25 7.50
Grid 7B-7D 1.00 13.38 0.75 1.25 12.54
Grid 7D-7E 1.00 9.63 0.75 1.25 9.02
Grid 8A-8B' 1.00 10.38 0.75 1.25 9.73
Grid 8B'-8D 1.00 9.00 0.75 1.25 8.44

Vertical
Grid A1-A1' 1.00 9.08 0.75 1.25 8.52
Grid A1'-A4 1.00 9.17 0.75 1.25 8.59
Grid A4-A7 1.00 12.00 0.75 1.25 11.25
Grid A7-A8 1.00 14.25 0.75 1.25 13.36
Grid C1-C2 1.00 10.73 0.75 1.25 10.06
Grid C2-C6 1.00 15.50 0.75 1.25 14.53
Grid D7-D8' 1.00 17.25 0.75 1.25 16.17
Grid E1-E3 1.00 15.48 0.75 1.25 14.52
Grid E3-E5 1.00 8.25 0.75 1.25 7.73
Grid E5-E7 1.00 6.50 0.75 1.25 6.09
187.82 Cft
Plinth Beam Above S.S.M
North Side 1.00 40.00 0.75 0.50 15.00
East Side(60-2.5) 1.00 57.50 0.75 0.50 21.56
West Side(60-2.5) 1.00 57.50 0.75 0.50 21.56
58.13 Cft

245.95 Cft

D01 Steel
Bill dt.04.12.19 3,695.00
Bill dt.27.12.19 998.00
Steel brought from Renuka murthy site 120.00
4,813.00 Kgs

J01 Sump tank 1.00 3.75 10.50 7.00 275.63


1.00 4.50 10.50 7.00 330.75
606.38
17,187.50 Ltr

Steel Brought From Renukamurthy Site

1 DIA OF BAR 8# 10#


2 TOTAL LENGTH OF BAR IN FEET 680.00 40.00
3 TOTAL LENGTH OF BAR IN METER 207.32 12.20
4 WEIGHT OF STEEL IN KG 81.89 7.56
-231.00
16#
60.00
18.29
28.90 118.35
1st and 2nd course
North Side 1.00 21.93 1.75 1.50 57.57
1.00 10.50 1.00 1.50 15.75
1.00 18.07 1.50 1.50 40.65
West Side 1.00 56.50 1.75 1.50 148.31
South Side 1.00 40.00 1.75 1.50 105.00

3rd and 4th c 1.00 21.93 1.50 1.50 49.34


West side 1.00 56.50 1.50 1.50 127.13
South side 1.00 40.00 1.50 1.50 90.00

2nd course 1.00 49.00 1.50 0.75 55.13


-
-
-
#REF!
Dr.PINAKINI.K.SHANKAR RESIDENCE
MEASUREMENT SHEET OF R.A. BILL - 2

Length Breadth Height Quantity


Sl.no. Description Nos
ft ft ft + -

A Earthwork
A01 Earthwork Excavation
B) S.S.M For Stair case landing
Landing 1.00 3.50 2.00 2.50 17.50
Landing 1 1.00 3.50 4.50 3.25 51.19
68.69 Cft

B Masonry works
B01 Size Stone Masonry in CM 1:6
Landing (3 course) 1.00 3.50 2.00 2.25 15.75
Landing 1 (4 course) 1.00 3.50 4.50 3.00 47.25
63.00 Cft
B02 BBM 9" thk WALL
Stilt floor
Horizontal Walls
Grid 1(13.75+18) 1.00 31.75 0.75 9.00 214.31
Grid 6(3.5+4) 1.00 7.50 0.75 9.00 50.63
Grid 7(8+13.375+9.625) 1.00 31.00 0.75 9.00 209.25

Vertical Walls
Grid A(19.75+12) 1.00 31.75 0.75 9.00 214.31
Grid B 1.00 4.75 0.75 9.00 32.06
Grid C(15.5+5.5) 1.00 21.00 0.75 9.00 141.75
Grid D 1.00 14.25 0.75 9.00 96.19
Grid E(15.5+8.25+6.75) 1.00 30.50 0.75 9.00 205.88

Deduction
ED 3.00 3.50 0.75 7.00 55.13
LD 1.00 3.00 0.75 7.00 15.75
D2 1.00 3.00 0.75 7.00 15.75
W3 4.00 5.00 0.75 4.50 67.50
W5 2.00 3.00 0.75 4.50 20.25
W6 1.00 2.00 0.75 4.50 6.75
KW 1.00 3.00 0.75 4.50 10.13
V1 2.00 3.00 0.75 2.00 9.00
Opening 1.00 3.25 0.75 7.00 17.06
1,164.38 217.31
947.06 Cft

BBM 4 ½ thk WALL


Stilt floor
Horizontal Walls
Grid 1' 1.00 10.38 9.00 93.38
Grid 2(13.75+12.375) 1.00 26.13 9.00 235.13
Grid 4' 1.00 18.00 9.00 162.00
Grid 6 1.00 4.38 9.00 39.38
Vertical Walls
Grid A' 1.00 4.63 9.00 41.63
Grid B' 1.00 3.13 9.00 28.13
Grid C' 1.00 11.00 9.00 99.00
Grid C" 1.00 12.00 9.00 108.00
Grid D' 1.00 6.13 9.00 55.13

Deduction
PD 1.00 4.00 7.00 28.00
D2 2.00 3.00 7.00 42.00
D4 2.00 2.50 7.00 35.00
861.75 105.00
756.75 Sft
C Concrete works
C01 PCC 1:4:8
Landing 1.00 3.50 2.00 0.42 2.92
Landing 1 1.00 3.50 4.50 0.42 6.56
9.48 Cft
C04 PCC 1:3:6 Sills
Stilt floor
W6 in Reception 1.00 4.00 0.75 0.25 0.75
W3 in Room -2 1.00 6.50 0.75 0.25 1.22
W5 in Clinic 1.00 5.50 0.75 0.25 1.03
W5 in Clinic 1.00 4.67 0.75 0.25 0.88
W3 in Living 1.00 6.50 0.75 0.25 1.22
W3 in Room -1 1.00 6.25 0.75 0.25 1.17
W3 in Dining 1.00 6.00 0.75 0.25 1.13
KW 1.00 4.00 0.75 0.25 0.75
8.14 Cft
C05 RCC Column Concrete
Grid A1 1.00 0.75 1.50 10.50 11.81
Grid C1 1.00 0.75 1.50 10.50 11.81
Grid E1 1.00 0.75 1.50 10.50 11.81
Grid C2 1.00 0.75 1.50 10.50 11.81
Grid E3 1.00 0.75 1.50 10.50 11.81
Grid A4 1.00 0.75 1.50 10.50 11.81
Grid E5 1.00 0.75 1.50 10.50 11.81
Grid B6 1.00 1.50 0.75 10.50 11.81
Grid C6 1.00 1.50 0.75 10.50 11.81
Grid A7 1.00 0.75 1.50 10.50 11.81
Grid B7 1.00 0.75 1.50 10.50 11.81
Grid D7 1.00 0.75 1.50 10.50 11.81
Grid E7 1.00 0.75 1.25 10.50 9.84
Grid A8 1.00 0.75 1.50 10.50 11.81
Grid D8 1.00 2.00 0.75 10.50 15.75
Grid D8' 1.00 0.75 0.75 10.50 5.91
185.06 Cft
C06 RCC Lintel Concrete
Stilt floor
W6 & ED in Reception 1.00 9.50 0.75 0.50 3.56
ED IN Lift 1.00 7.33 0.75 0.50 2.75
LD 1.00 5.50 0.75 0.50 2.06
W3 in Room -2 1.00 6.25 0.75 0.50 2.34
Passage Beyond Room 2 1.00 5.75 0.75 0.50 2.16
W5 in Clinic 2.00 5.00 0.75 0.50 3.75
W3 & ED in Living 1.00 12.83 0.75 0.50 4.81
W3 in Room -1 1.00 7.00 0.75 0.50 2.63
W3 & D2 in Dining 1.00 11.25 0.75 0.50 4.22
Kitchen South wall 1.00 10.38 0.38 0.50 1.95
kitchen East wall 1.00 3.13 0.38 0.50 0.59
Toilet South Wall 1.00 13.75 0.38 0.50 2.58
Toilet East Wall 1.00 4.63 0.38 0.50 0.87
Room 1 West wall 1.00 12.00 0.38 0.50 2.25
Room 1 South Wall 1.00 12.38 0.38 0.50 2.32
Living South Wall 1.00 18.00 0.38 0.50 3.38
Room 2 West Wall 1.00 11.00 0.38 0.50 2.06
Toilet 2 North Wall 1.00 4.38 0.38 0.50 0.82
Toilet 2 West Wall 1.00 6.13 0.38 0.50 1.15
46.24 Cft
C07 RCC Chajja Concrete
Stilt floor
W3 in Room-1 1.00 6.00 2.00 12.00
W3 & ED In Living 1.00 11.83 3.00 35.50
W5 in Clinic 2.00 4.00 2.00 16.00
V1 2.00 4.00 2.00 16.00
79.50 Sft
C08 RCC ROOF Beam Concrete
Stilt floor
Horizontal
Grid B0-E0 1.00 25.33 0.50 1.50 19.00
Grid A1-C1 1.00 13.75 0.75 1.50 15.47
Grid C1-E1 1.00 18.00 0.75 1.50 20.25
Grid C3-E3 1.00 18.00 0.75 1.50 20.25
Grid C5-E5 1.00 18.00 0.75 1.50 20.25
Grid A6-B6 1.00 8.00 0.50 1.50 6.00
Grid B6-E6 1.00 3.50 0.75 1.50 3.94
Grid B7-D7 1.00 13.38 0.75 1.50 15.05
Grid D7-E7 1.00 9.63 0.75 1.50 10.83
Grid A7'-B7' 1.00 8.00 0.50 1.50 6.00
Grid A8-D8 1.00 20.88 0.75 2.00 31.31

Vertical
Grid 1A-4A 1.00 19.75 0.75 2.00 29.63
Grid 4A-7A 1.00 12.00 0.75 1.50 13.50
Grid 7A-8A 1.00 14.25 0.75 1.50 16.03
Grid 6B-7B 1.00 4.75 0.75 1.50 5.34
Grid 7B-8B 1.00 15.00 0.75 1.50 16.88
Grid 0C-1C 1.00 4.50 0.75 1.50 5.06
Grid 1C-2C 1.00 10.75 0.75 1.50 12.09
Grid 2C-6C 1.00 15.50 0.75 1.50 17.44
Grid 6C-7C 1.00 5.50 0.75 1.50 6.19
Grid 7D-8D 1.00 14.25 0.75 1.50 16.03
Grid 0E-1E 1.00 4.50 0.75 1.50 5.06
Grid 1E-3E 1.00 15.50 0.75 1.50 17.44
Grid 3E-5E 1.00 8.25 0.75 1.50 9.28
Grid 5E-7E 1.00 6.75 0.75 1.50 7.59
Grid 7E-7E' 1.00 4.00 0.75 1.50 4.50
Grid 3D-5D 1.00 9.00 0.75 1.50 10.13
360.53 Cft
C09 RCC ROOF Slab Concrete
Stilt floor
S1 1.00 5.83 4.50 0.42 10.94
S2 1.00 18.00 4.50 0.42 33.70
S3 1.00 13.75 28.50 0.50 195.94
S4 1.00 18.00 17.00 0.50 153.00
S5 1.00 18.00 9.00 0.42 67.51
S6 1.00 18.00 7.25 0.42 54.38
S7 1.00 3.00 12.75 0.50 19.13
S8 1.00 8.00 14.25 0.50 57.00
S9 1.00 13.38 15.00 0.50 100.31
S10 1.00 5.63 4.00 0.50 11.25
S11 1.00 8.00 6.75 0.42 22.50
Extra Portion Left Side To S1 1.00 4.50 4.17 0.42 7.81
733.46 Cft
C09 RCC Staircase Waist slab Type
Stilt floor

Waist Slab 1.00 5.28 4.00 0.50 10.55


Steps 2.50 4.00 0.83 0.55 4.58
Foundation 1.00 4.00 1.00 1.07 4.27
19.40 Cft
C10 RCC Staircase Folded Type
Stilt floor

Landing 1 1.00 4.75 5.42 0.33 8.49


Landing 2 1.00 4.00 4.00 0.50 8.00
Threads 11.00 4.00 0.83 0.33 12.10
Risers 12.00 4.00 0.55 0.33 8.75
37.34 Cft
Dr.PINAKINI.K.SHANKAR RESIDENCE
MEASUREMENT SHEET OF R.A. BILL - 3

Length Breadth Height Quantity


Sl.no. Description Nos
ft ft ft +

B Masonry works

B02 BBM 9" thk WALL


Ground floor
Horizontal Walls
Grid 1(13.75+18) 1.00 31.75 0.75 10.00 238.13
Grid 2 1.00 2.00 0.75 5.00 7.50
Grid 2 1.00 2.00 0.75 5.00 7.50
Grid 3 1.00 9.75 0.75 2.50 18.28
Grid 5 1.00 6.00 0.75 10.00 45.00
Grid 5 1.00 3.75 0.75 2.50 7.03
Grid 6 1.00 3.50 0.75 9.00 23.63
Grid 7(13.375+4.375) 1.00 17.75 0.75 8.50 113.16
Grid 8 1.00 20.88 0.75 8.50 133.08
Vertical Walls -
Grid A 1.00 19.75 0.75 8.50 125.91
Grid A(12+14.25) 1.00 26.25 0.75 9.00 177.19
Grid B 1.00 4.75 0.75 9.00 32.06
Grid C(10.75+5.5) 1.00 16.25 0.75 9.00 109.69
Grid D 1.00 14.25 0.75 9.00 96.19
Grid D' 2.00 2.50 0.75 2.50 9.38
Grid D'' 1.00 7.25 0.75 10.00 54.38
Grid E(15.5+8.25) 1.00 23.75 0.75 9.00 160.31
Deduction
ED/W 1.00 5.00 0.75 7.00
D1 2.00 3.25 0.75 7.00
LD 1.00 3.00 0.75 7.00
W1 1.00 8.00 0.75 6.00
W2 1.00 6.00 0.75 6.00
W5 2.00 3.00 0.75 4.50
KW 1.00 3.00 0.75 4.50
V 1.00 5.00 0.75 2.00
V2 1.00 2.00 0.75 4.50
1,358.39
1,174.64

B03 BBM 4 ½ thk WALL


Ground floor
Horizontal Walls
Grid 0 1.00 25.33 5.00 126.67
Grid 6 1.00 8.00 9.00 72.00
Grid 6' 1.00 8.00 9.00 72.00
Grid 7' 1.00 6.63 9.00 59.63
Vertical Walls
Grid A' 1.00 9.00 9.00 81.00
Grid B 1.00 2.50 5.00 12.50
Grid E 1.00 4.63 5.00 23.13
Deduction
D3 2.00 2.75 7.00
446.92
408.42

C Concrete works
C04 PCC 1:3:6 Sills
Ground floor
W5 in Room 2.00 4.50 0.75 0.25 1.69
V in Toilet 1.00 6.50 0.75 0.25 1.22
V2 in Pwd Room 1.00 3.50 0.75 0.25 0.66
W2 in Dining 1.00 7.50 0.75 0.25 1.41
KW in Kitchen 1.00 4.50 0.75 0.25 0.84
W1 in Living 1.00 9.50 0.75 0.25 1.78
7.59

C05 RCC Column Concrete


Grid A1 1.00 1.50 0.75 10.50 11.81
Grid C1 1.00 1.50 0.75 10.50 11.81
Grid E1 1.00 1.50 0.75 10.50 11.81
Grid C2 1.00 1.50 0.75 10.50 11.81
Grid E3 1.00 1.50 0.75 10.50 11.81
Grid A4 1.00 1.50 0.75 10.50 11.81
Grid E5 1.00 1.50 0.75 10.50 11.81
Grid B6 1.00 1.50 0.75 10.50 11.81
Grid C6 1.00 1.50 0.75 10.50 11.81
Grid A7 1.00 1.50 0.75 10.50 11.81
Grid B7 1.00 1.50 0.75 10.50 11.81
Grid D7 1.00 1.50 0.75 10.50 11.81
Grid A8 1.00 1.50 0.75 10.50 11.81
Grid D8 1.00 2.00 0.75 10.50 15.75
169.31

C06 RCC Lintel Concrete


Ground floor
9" wall
W5 in room 1.00 16.88 0.75 0.50 6.33
D1 in room 1.00 5.00 0.75 0.50 1.88
D1 in Kitchen 1.00 5.25 0.75 0.50 1.97
Lift door 1.00 7.00 0.75 0.50 2.63
ED/W 1.00 6.75 0.75 0.50 2.53
W2 in dining 1.00 8.88 0.75 0.50 3.33
W1 in living 1.00 10.00 0.75 0.50 3.75

4.5" wall
Pwd room north wall 1.00 8.75 0.38 0.50 1.64
Pwd room south wall 1.00 8.75 0.38 0.50 1.64
Toilet east wall 1.00 9.38 0.38 0.50 1.76
Toilet south wall 1.00 7.00 0.38 0.50 1.31
28.76

C07 RCC Chajja Concrete


Ground floor
W5 in Room 1.00 15.00 0.75 11.25
W2 in Dining 1.00 7.00 2.00 14.00
W1 in Living 1.00 9.00 2.00 18.00
V in Toilet 1.00 5.50 2.00 11.00
V2 in Pwd room 1.00 3.00 2.00 6.00

60.25

C08 RCC ROOF Beam Concrete


Ground floor
Horizontal
Grid A0-C0 1 13.75 0.75 1.50 15.47
Grid C0-E0 1 18.00 0.75 1.50 20.25
Grid A4-C4 1 13.75 0.75 1.50 15.47
Grid A6-B6 1 8.00 0.75 1.50 9.00
Grid B6-C6 1 3.50 0.75 1.50 3.94
Grid B7-E7(13.375+9.625) 1 23.00 0.75 2.00 34.50
Grid A7'-B7' 1 8.00 0.50 1.50 6.00
Grid A8-E8(20.875+10.375) 1 31.25 0.75 2.00 46.88
Vertical
Grid A0-A4(2+19.75) 1 21.75 0.75 2.00 32.63
Grid A4-A7 1 12.00 0.75 1.50 13.50
Grid A7-A8 1 14.25 0.75 1.50 16.03
Grid B6-B7 1 4.75 0.75 1.50 5.34
Grid B7-B8 1 15.00 0.75 1.50 16.88
Grid C0-C2(2+10.75) 1 12.75 0.75 1.50 14.34
Grid C2-C6 1 15.50 0.75 1.50 17.44
Grid C6-C7 1 5.50 0.75 1.50 6.19
Grid D7-D8 1 15.00 0.75 1.50 16.88
Grid E0-E3(2+15.5) 1 17.50 0.75 1.50 19.69
Grid E3-E5 1 8.25 0.75 1.50 9.28
Grid E5-E8 1 23.00 0.75 2.00 34.50
354.19

C09 RCC ROOF Slab Concrete


Ground floor
S1 1.00 23.25 13.75 0.50 159.84
S2 1.00 18.00 15.00 0.54 146.25
S3 1.00 21.75 4.25 0.54 50.07
S4 1.00 7.75 3.25 0.54 13.64
S5 1.00 7.25 6.00 0.54 23.56
S6 1.00 12.25 8.00 0.50 49.00
S7 1.00 8.50 8.00 0.42 28.34
S8 1.00 15.00 13.38 0.50 100.31
S9 1.00 15.00 9.63 0.42 60.16
631.18
Quantity
-

26.25
34.13
15.75
36.00
27.00
20.25
10.13
7.50
6.75
183.75
Cft
38.50
38.50
Sft

Cft

Cft

Cft
Sft

Cft

Cft
Dr.PINAKINI.K.SHANKAR RESIDENCE
MEASUREMENT SHEET OF R.A. BILL - 4

Length Breadth Height Quantity


Sl.no. Description Nos
ft ft ft +

B Masonry works

B02 BBM 9" thk WALL


First Floor
Horizontal Walls
Grid 0 1.00 34.00 0.75 9.00 229.50
Grid 4 1.00 14.50 0.75 9.00 97.88
Grid 6(8+3.5) 1.00 11.50 0.75 9.00 77.63
Grid 7(13.375+10.375) 1.00 23.75 0.75 8.50 151.41
Grid 7 1.00 1.94 0.75 1.13 1.64
Grid 7' 1.00 6.81 0.75 1.13 5.75
Grid 8 1.00 20.88 0.75 8.50 133.08

Vertical Walls
Grid A(1.25+19.75) 1.00 21.00 0.75 8.50 133.88
Grid A(12+14.25) 1.00 26.25 0.75 9.00 177.19
GRID A' 1.00 5.63 0.75 1.13 4.75
Grid B 1.00 4.75 0.75 9.00 32.06
Grid C(1.25+10.75+8.25+5.5) 1.00 25.75 0.75 9.00 173.81
Grid D 1.00 14.25 0.75 9.00 96.19
Grid E(1.25+15.5+8.25+7.25) 1.00 32.25 0.75 9.00 217.69
Deduction
D1 3.00 3.25 0.75 7.00
W1 2.00 8.00 0.75 6.00
W4 1.00 3.00 0.75 6.00
W5 5.00 3.00 0.75 4.50
V 2.00 5.00 0.75 2.00
Buch work 2.00 0.67 0.75 6.00
1,532.43
1,324.11

BBM 4 ½" thk WALL


First Floor
Horizontal Walls
Grid 1' 1.00 6.38 10.00 63.75
Grid 7 1.00 1.75 9.00 15.75
Grid 7' 1.00 6.63 10.00 66.25

Vertical Walls
Grid A' 1.00 9.00 10.00 90.00
Grid A'' 1.00 6.00 10.00 60.00
Deduction
D3 2.00 2.75 7.00
295.75
257.25
C Concrete works
C04 PCC 1:3:6 Sills
First Floor
W5 in bedroom SW side 2.00 5.00 0.75 0.25 1.88
W5 in sun room north wall 1.00 5.00 0.75 0.25 0.94
V in A.toilet NW side 1.00 7.00 0.75 0.25 1.31
W1 in living north wall 1.00 10.00 0.75 0.25 1.88
W5 in bedroom NW side 2.00 5.00 0.75 0.25 1.88
V in A.toilet SW side 1.00 7.00 0.75 0.25 1.31
W1 in living east wall 1.00 10.00 0.75 0.25 1.88
W4 in open below east side 1.00 5.00 0.75 0.25 0.94
12.00

C05 RCC Column Concrete


Grid A1 1.00 1.50 0.75 10.50 11.81
Grid C1 1.00 1.50 0.75 10.50 11.81
Grid E1 1.00 1.50 0.75 10.50 11.81
Grid C2 1.00 1.50 0.75 10.50 11.81
Grid E3 1.00 1.50 0.75 10.50 11.81
Grid A4 1.00 1.50 0.75 10.50 11.81
Grid E5 1.00 1.50 0.75 10.50 11.81
Grid B6 1.00 1.50 0.75 10.50 11.81
Grid C6 1.00 1.50 0.75 10.50 11.81
Grid A7 1.00 1.50 0.75 10.50 11.81
Grid B7 1.00 1.50 0.75 10.50 11.81
Grid D7 1.00 1.50 0.75 10.50 11.81
Grid A8 1.00 1.50 0.75 10.50 11.81
Grid D8 1.00 2.00 0.75 10.50 15.75
169.31
C06 RCC Lintel Concrete
First floor
9" wall
W5 in bedroom south side 1.00 16.88 0.75 0.50 6.33
D1 & W5 in bedroom and
sunroom north wall 1.00 18.75 0.75 0.50 7.03
D1 in bedroom south side 1.00 5.00 0.75 0.50 1.88
W1 in living north wall 1.00 14.00 0.75 0.50 5.25
W5 in bedroom west wall 1.00 5.00 0.75 0.50 1.88
W5 in bedroom&Buch work in
NW side 1.00 13.13 0.75 0.50 4.92
LD 1.00 7.00 0.75 0.50 2.63
W1 in living east wall 1.00 11.25 0.75 0.50 4.22
W4 in open below east side 1.00 5.00 0.75 0.50 1.88

4 ½" wall
A.toilet NW side east wall 1.00 9.38 0.38 0.50 1.76
A.toilet NW side south wall 1.00 6.38 0.38 0.50 1.20
A.toilet SW side north wall 1.00 1.38 0.38 0.50 0.26
A.toilet SW side east wall 1.00 6.00 0.38 0.50 1.13
A.toilet SW side south wall 1.00 6.63 0.38 0.50 1.24
28.22

C07 RCC Chajja Concrete


First floor
W5 in bedroom SW side 1.00 15.00 0.75 11.25
W4 in open below east side 1.00 4.00 2.00 8.00
W1 in living east wall 2.00 9.00 2.00 36.00
W5 in bedroom NW side 2.00 4.00 2.00 16.00
V 2.00 6.00 2.00 24.00
95.25

C08 RCC ROOF Beam Concrete


First floor
Grid A8-E8(B1) 1.00 31.25 0.75 2.00 46.88
Grid A7-B7 (B2) 1.00 8.00 0.75 1.50 9.00
Grid B7-E7 (B3) 1.00 23.00 0.75 2.00 34.50
Grid A6-B6 (B4) 1.00 8.00 0.75 1.50 9.00
Grid B6-C6 (B5) 1.00 3.50 0.75 1.50 3.94
Grid B6-B7(B5) 1.00 4.75 0.75 1.50 5.34
Grid C6-C7(B5) 1.00 5.50 0.75 1.50 6.19
Grid A4-C4 (B6) 1.00 13.75 0.75 1.50 15.47
Grid A0-E0 (B6&B7) 1.00 31.75 0.75 1.50 35.72
Grid A4-A8 (B8&B9) 1.00 26.25 0.75 1.50 29.53
Grid A0-A4 (B10) 1.00 21.75 0.75 2.00 32.63
Grid C0-C6 (B12&B11) 1.00 31.75 0.75 1.50 35.72
Grid D7-D8 (B13) 1.00 14.25 0.75 1.50 16.03
Grid E0-E7 (B4 & B15) 1.00 33.00 0.75 1.50 37.13
Grid E7-E8 (B14) 1.00 15.75 0.75 2.00 23.63
340.69

C09 RCC ROOF Slab Concrete


First floor
S1 1.00 13.75 23.25 0.50 159.84
S2 1.00 18.00 36.75 0.54 358.31
S3 1.00 8.00 5.50 0.42 18.33
S4 1.00 22.13 15.00 0.50 165.94
S5 1.00 1.50 16.50 0.42 10.31
Deduction
CUTOUT 1.00 75.40 0.54
712.74
671.90
Quantity
-

51.19
72.00
13.50
50.63
15.00
6.00
208.32
Cft

38.50
38.50
Sft
Cft

Cft

Cft
Sft

40.84
40.84
Cft
Dr.PINAKINI.K.SHANKAR RESIDENCE
MEASUREMENT SHEET OF R.A. BILL - 5

Length Breadth Height Quantity


Sl.no. Description Nos
ft ft ft + -

A Earthwork
A01 Earthwork Excavation
S.S.M For Garden North wall Below 1.00 12.63 2.00 1.50 37.88
Below Columns -
Grid A9 1.00 2.00 2.00 2.00 8.00
Grid D9 1.00 2.00 2.00 2.00 8.00
Grid E'9 1.00 2.00 2.00 2.00 8.00
For East Compound Wall 1.00 35.00 1.50 1.00 52.50
114.38 Cft

B Masonry works
B01 Size Stone Masonry in CM 1:6
For Garden North wall Below 1.00 12.63 2.00 0.75 18.94 Cft

B02 BBM 9" thk WALL


Stilt floor
Horizontal Walls
Garden North Wall(1'6"+4'0") 1.00 5.50 0.75 8.50 35.06
Garden North Wall Above 1.00 12.63 0.75 1.00 9.47
Compound South Wall(2'3"+8'7.5") 1.00 10.88 0.75 7.50 61.17
Compound Brick Pillars 10.00 0.75 0.75 3.92 22.03
.
Vertical Walls
Garden East Wall 1.00 13.25 0.75 8.50 84.47
Infront of Name Board 1.00 2.25 0.75 8.25 13.92
Deduction
Name Board Opening 1.00 5.00 0.75 2.00 7.50
4' Opening 4.00 1.50 0.75 4.00 18.00
226.13 25.50
200.63 Cft

Ground Floor
Pooja Bottom Course(9'9"+2'6"+2'6"+4'1.5") 1.00 18.88 0.75 0.33 4.71
Utility Brick Pillars 3.00 0.38 0.75 4.25 3.59
8.30 Cft

First Floor
Sun room 1 course(15'0"+10'4.5") 1.00 25.38 0.75 0.33 6.28 Cft

Terrace Floor
Horizontal Walls
Grid 4 1.00 14.50 0.75 7.50 81.56
Grid 6(8'+3'6") 1.00 11.50 0.75 7.50 64.69
Grid 7(8'+5'9") 1.00 13.75 0.75 7.50 77.34
Vertical Walls
Grid A 1.00 12.00 0.75 7.50 67.50
Grid C(5'6"+6'6") 1.00 12.00 0.75 7.50 67.50
For Placing Channel 1.00 4.75 0.75 4.42 15.73
Step To Channel Wall 1.00 5.50 0.75 1.75 7.22
For Placing Controller 1.00 3.00 1.42 1.17 4.98

Parapet wall
Horizontal Walls
Grid 0 1.00 32.50 0.75 3.00 73.13
Grid 7 1.00 10.38 0.75 3.00 23.34
Grid 8 1.00 14.50 0.75 4.50 48.94
Grid 8(2 Course) 1.00 8.38 0.75 0.63 3.93

Vertical Walls
Grid A(2+19.75+12.75) 1.00 34.50 0.75 3.00 77.63
Grid A 1.00 1.50 0.75 4.50 5.06
Grid E(2+15.5+8.25+7.25) 1.00 33.00 0.75 3.00 74.25
Grid D(2 Course) 1.00 14.25 0.75 0.63 6.68
Deduction
D1 2.00 3.25 0.75 7.00 34.13
Buch Work 2.00 0.67 0.75 6.00 6.00
699.48 40.13
659.35 Cft
B03 BBM 4 ½" thk WALL
Stilt Floor
Horizontal wall
Garden North Wall (2'6"+2'5"+2'5") 1.00 7.33 2.50 18.33
Compound Wall(55'6"+36'3"+13'6") 1.00 105.25 3.92 412.23
Vertical wall
NW Toilets
Clinic Toilet East Wall 1.00 4.63 7.00 32.38
Gen Toilet East Wall 1.00 4.63 10.00 46.25
Kitchen Paltform
North Side 1.00 8.25 0.42 3.44
West Side 1.00 5.50 0.42 2.29
Wardrobe Paltform
NE Bedroom 1.00 12.00 0.42 5.00
SE Bedroom(4'4.5"+1'6") 1.00 5.88 0.42 2.45
Deduction
D4 1.00 2.50 7.00 17.50
522.37 17.50
504.87 Sft

Ground Floor
Pooja
Horizontal Walls
North Wall 1.00 9.38 2.00 18.75
South Wall 1.00 3.75 2.00 7.50
West Wall 2.00 2.50 2.00 10.00
Infront Of Pooja(4'6"+4'0"+4'6") 1.00 13.00 0.33 4.29
Platform For Powder Room Flush Tank 1.00 2.25 4.25 9.56
Platform For SW Toilet Flush Tank 1.00 6.25 4.00 25.00
Kitchen Paltform
North Side 1.00 3.50 0.42 1.46
West Side(6'7.5"+1'9") 1.00 8.38 0.42 3.49
80.05 Sft

First Floor
Platform For SW Toilet Flush Tank 1.00 6.25 4.00 25.00
NW Wardrobe Platform
North Side 1.00 5.63 0.42 2.34
East Side(7'3"+1'9") 1.00 9.00 0.42 3.75
31.09 Sft

Terrace Floor
For Elliptical Cutout 1.00 34.08 0.67 22.73
OHT Parapet wall
Horizontal Walls
Grid 4 1.00 12.00 2.50 30.00
Grid 7 1.00 14.50 2.50 36.25
wall near Cut out 2.00 6.75 0.63 8.44
Vertical Walls
Grid A 1.00 12.00 2.50 30.00
Grid C 1.00 13.88 2.50 34.69
wall near Cut out 2.00 1.00 0.63 1.25
163.36 Sft

C Concrete works
C01 PCC 1:4:8
Below Footing
Below S.S.M 1.00 13.38 2.00 0.50 13.38 Cft

C02 RCC Footing Concrete


Grid A9 1.00 2.00 2.00 1.50 6.00
Grid D9 1.00 2.00 2.00 1.50 6.00
Grid E9 1.00 2.00 2.00 1.50 6.00
18.00 Cft

C03 RCC Plinth beam


For Garden North wall Below 1.00 13.38 0.75 1.25 12.54 Cft

C04 PCC 1:3:6 Sills


Stilt floor
Infront of name board 1.00 2.25 0.75 0.25 0.42
Compound East wall Below 1.00 33.00 0.75 0.50 12.38
Alround The Compound Wall 1.00 45.09 0.25 11.27
Garden East Side Compound Wall Below 1.00 13.25 0.75 0.25 2.48
Garden North Wall(2'6"+2'6"+2'6") 1.00 7.50 0.75 0.25 1.41
Kitchen Platform(10'+5'3") 1.00 15.25 1.75 0.25 6.67
Wardrobe Plaforms
NE Bedroom 1.00 12.00 1.75 0.25 5.25
SE Bedroom 1.00 4.38 1.75 0.25 1.91
W6 in Reception 1.00 4.00 0.75 0.25 0.75
W5 in Clinic 1.00 5.50 0.75 0.25 1.03
W5 in Clinic 1.00 4.67 0.75 0.25 0.88
W3 in SE Room 1.00 6.50 0.75 0.25 1.22
W3 in Living 1.00 6.50 0.75 0.25 1.22
W3 in NE Room 1.00 6.25 0.75 0.25 1.17
W3 in Dining 1.00 6.00 0.75 0.25 1.13
49.19 Cft
Ground floor
W5 in Room 2.00 4.50 0.75 0.25 1.69
Top of The Utility Wall 1.00 14.39 0.25 3.60
Infront Of Pooja 1.00 45.25 0.25 11.31
Pooja
North Side 1.00 9.00 0.88 0.33 2.60
South Side 1.00 3.38 0.88 0.33 0.97
West Side 2.00 3.25 0.88 0.33 1.88
Kitchen Platforms(8'4.5"+1'9") 1.00 10.13 1.75 0.25 4.43
Toilet
PWD Room 1.00 8.00 5.00 0.25 10.00
SW Room 1.00 6.25 9.00 0.25 14.06
50.54 Cft
First floor
Sun room 1 course(15'0"+10'4.5") 1.00 25.38 0.75 0.25 4.76
Chinmay Wardrobe Platform(9'0"+5'7.5") 1.00 14.63 1.75 0.25 6.40
Chinmay Wardrobe Floor 1.00 7.38 9.48 0.25 17.47
Toilet
SW Room 1.00 86.84 0.25 21.71
NW Room 1.00 6.00 9.00 0.25 13.50
63.84 Cft
Terrace Floor
For Elliptical Cutout 1.00 34.08 0.38 0.25 3.20
Below Parapet wall
North side 1.00 32.50 0.75 0.50 12.19
East side 1.00 19.00 0.75 0.50 7.13
Above Parapet wall
North side 1.00 32.50 0.75 0.25 6.09
South side(6'4.5"+10'4.5") 1.00 16.75 0.75 0.25 3.14
4'6" Height Parapet wall
1st (15'3+1'6") 1.00 16.75 0.75 0.33 4.18
2nd (15'3"+5"+1'6"+5") 1.00 17.58 1.17 0.25 5.14
East side(2'0"+15'6"+8'3"+7'3"+14'3") 1.00 47.25 0.75 0.25 8.86
West side(2'0"+19'9"+12'9") 1.00 34.50 0.75 0.25 6.47
Channel Placing
West side 1.00 4.75 0.75 0.83 2.97
East side 1.00 3.67 0.75 1.17 3.21
Control Placing 1.00 3.00 1.58 0.25 1.19

OHT Parapet wall


Horizontal Walls
Grid 4 1.00 12.00 0.38 0.25 1.13
Grid 7 1.00 14.50 0.38 0.25 1.36
Vertical Walls
Grid A 1.00 12.00 0.38 0.25 1.13
Grid C 1.00 13.88 0.38 0.25 1.30
OHT Cut out(6'9"+1)*2 1.00 15.50 0.38 0.25 1.45
70.13 Cft

C05 RCC Column Concrete


Stilt Floor
Grid A9 1.00 1.50 0.75 9.00 10.13
Grid D9 1.00 1.25 0.75 9.00 8.44
Grid E9 1.00 1.50 0.75 9.00 10.13
28.69 Cft

Terrace Floor
Grid A4 1.00 1.50 0.75 9.00 10.13
Grid A7 1.00 1.50 0.75 9.00 10.13
Grid B6 1.00 1.50 0.75 9.00 10.13
Grid B7 1.00 1.50 0.75 9.00 10.13
Grid C6 1.00 1.50 0.75 9.00 10.13
Short height
Grid A1 1.00 1.50 0.75 3.25 3.66
Grid C1 1.00 1.50 0.75 3.25 3.66
Grid E1 1.00 1.50 0.75 3.25 3.66
Grid C2 1.00 1.50 0.75 3.25 3.66
Grid E3 1.00 1.50 0.75 3.25 3.66
Grid E5 1.00 1.50 0.75 3.25 3.66
Grid D7 1.00 1.50 0.75 3.25 3.66
Grid A8 1.00 1.50 0.75 4.92 5.53
Grid D8 1.00 2.00 0.75 0.63 0.94
OHT Room
Grid A4 1.00 1.50 0.75 2.75 3.09
Grid A7 1.00 1.50 0.75 2.75 3.09
88.88 Cft

C06 RCC Lintel Concrete


Stilt Floor
Garden east Wall 1.00 14.00 0.75 0.50 5.25
Garden North Wall 1.00 12.63 0.75 0.50 4.73
General Toilet D4 1.00 4.63 0.38 0.50 0.87
Clinic Toilet D4 1.00 4.63 0.75 0.50 1.73
12.59 Cft
Ground Floor
KW 1.00 5.00 0.75 0.50 1.88 Cft
First Floor
Sun Room West Wall 1.00 8.00 0.75 0.50 3.00 Cft

C07 RCC Chajja Concrete


Stilt Floor
Clinic Door D4 1.00 1.00 2.00 2.00 Sft
Terrace Floor
D1 2.00 4.75 3.00 28.50 Sft

C08 RCC ROOF Beam Concrete


Stilt Floor
South compound (2.25+20.875+12.625) 1.00 35.75 0.75 1.50 40.22 Cft

Terrace Floor
Grid A7-C7 (B1)(8'+5'9") 1.00 13.75 0.75 1.50 15.47
Grid A6-B6 (B2) 1.00 8.00 0.75 1.50 9.00
Grid B6-C6 (B3) 1.00 3.50 0.75 1.50 3.94
Grid B6-B7 (B3) 1.00 4.75 0.75 1.50 5.34
Grid A4-C4 (B4) 1.00 14.50 0.75 1.50 16.31
Grid A4-A7 (B5) 1.00 12.00 0.75 1.50 13.50
Grid C4-C7 (B6)(6'6"+5'6") 1.00 12.00 0.75 1.50 13.50
77.06 Cft

C09 RCC ROOF Slab Concrete


Stilt Floor
Clinic Toilet 1.00 5.13 4.63 0.50 11.85 Cft

Terrace Floor
S1 1.00 13.75 6.50 0.42 37.24
S2 1.00 8.00 5.50 0.42 18.33
S3 1.00 5.00 5.50 0.50 13.75
69.33 Cft

E DOORS AND WINDOWS


DOORS
E01 Teak Wood frame with OST Flush shutter with
teak wood panneling for Main door.
Ground floor
ED/W 1.00 5.00 7.00 35.00 Sft

E01 Teak Wood frame with BST Flush shutter for


Main door.
Stilt floor
ED 3.00 3.50 7.00 73.50 Sft

E02 Teak Wood frame withTeak wood shutter for


pooja Door - PD.
Stilt floor 1.00 4.00 7.00 28.00 Sft
Ground floor 1.00 4.00 7.00 28.00 Sft
E03 Teak Wood frame with BST Flush shutter for
Room doors.
Stilt floor 2.00 3.00 7.00 42.00 Sft
Ground floor 2.00 3.25 7.00 45.50 Sft
First floor 2.00 3.25 7.00 45.50 Sft

NT1 Teak Wood frame with OST Flush shutter for


Toilet, Utility & Terrace door.
Stilt floor 1.00 3.00 7.00 21.00 Sft
2.00 2.50 7.00 35.00
56.00

Terrace floor 1.00 3.25 7.00 22.75 Sft

E04 Teak Wood frame with Fully Glazed Teak


wood shutter including Glass for Toilet doors

Ground floor 2.00 2.75 7.00 38.50 Sft


First floor 2.00 2.75 7.00 38.50 Sft

WINDOWS
E06 Teak wood frame with Teak wood shutter for
Windows
Stilt floor
W3 4.00 5.00 4.50 90.00
W5 2.00 3.00 4.50 27.00
W6 1.00 2.00 4.50 9.00
KW 1.00 3.00 4.50 13.50
V1 1.00 3.00 2.00 6.00
145.50 Sft

Ground floor
W1 1.00 8.00 6.00 48.00
W2 1.00 6.00 6.00 36.00
W5 2.00 3.00 4.50 27.00
KW 1.00 3.00 4.50 13.50
V 1.00 5.00 2.00 10.00
V2 1.00 2.00 4.50 9.00
143.50 Sft

First Floor
W1 2.00 8.00 6.00 96.00
W4 1.00 3.00 6.00 18.00
W5 4.00 3.00 4.50 54.00
V 2.00 5.00 2.00 20.00
188.00 Sft

G PLASTERING
G01 Outside Plastering
Stilt floor
N,S,E & West Side 1.00 142.00 10.50 1,491.00
Parking East Wall 1.00 32.00 10.00 320.00
Column Grid A8(1'6"+9")*2 1.00 4.50 9.00 40.50
Compound Wall
N,E & West Side 1.00 294.08 4.17 1,225.45
Top 1.00 64.59 64.59
South Side
(3'9"+9")*2 1.00 9.00 7.50 67.50
(10'7.5"+9")*2 1.00 22.75 7.50 170.63
S Side Beam(1'6"+9")*2 1.00 40.00 4.50 180.00
Garden
E Side Wall(14'9"*2) 1.00 29.50 8.50 250.75
Lintel 1.00 14.75 1.75 25.81
North Wall 1.00 27.50 8.50 233.75
Lintel & Above 1.00 12.63 3.50 44.19
Chajjas
W3 in NE side 1.00 12.50 2.25 28.13
W3 & ED In Living 1.00 24.17 3.25 78.54
W5 in Clinic 2.00 8.50 2.25 38.25
V1 1.00 8.50 2.25 19.13
O 1.00 10.00 2.25 22.50
Deductions
Parking North Wall 1.00 32.50 0.50 16.25
South Compound Wall(3'9"+10'7.5"+9") 1.00 15.13 0.75 11.34
9" Junction 1.00 0.75 9.00 6.75
5.5" Junction 1.00 0.46 4.17 1.92
4.5" Junction 2.00 0.38 2.50 1.88
4" Junction 1.00 0.33 4.17 1.39
4,300.70 39.52
4,261.18 Sft

Ground floor
N,S,E & West side 1.00 172.00 10.50 1,806.00
Utility Wall 1.00 75.25 4.50 338.63
Top 1.00 14.39 14.39
Chajjas
W2 in Dining 1.00 14.50 2.25 32.63
W1 in Living 1.00 18.50 2.25 41.63
W5 In Bedroom Top & Bottom 4.00 15.00 1.00 60.00
W5 In Bedroom Sides 4.00 4.50 1.00 18.00
V in Toilet 1.00 12.50 2.25 28.13
V2 in Pwd room 1.00 6.50 2.25 14.63
Deductions
Entrance West Wall 1.00 34.13 0.50 17.06
4.5" Junction 2.00 0.38 4.50 3.38
2,354.02 20.44
2,333.58 Sft

First floor
All around 1.00 176.00 10.50 1,848.00
Railings Below(15'0"+8'4.5") 1.00 23.38 1.92 44.80
Sun room 1 course(15'0"+10'4.5") 1.00 25.38 1.92 48.63
Sunroom Top Portion
East Side
Top & Bottom(2'7"+2'3") 1.00 4.83 15.75 76.12
Sides(2'1"+2'3") 1.00 4.33 15.75 68.25
South Side
Top & Bottom(11.25"+11") 1.00 1.88 10.38 19.51
Sides(2'1"+2'3") 1.00 4.33 10.38 44.96
Pillars 7.00 1.00 8.00 56.00
Chajjas
W4 in open below east side 1.00 8.50 2.25 19.13
W1 in living east & North wall 2.00 18.50 2.25 83.25
W5 in bedroom NW side 2.00 8.50 2.25 38.25
V 2.00 12.50 2.25 56.25
W5 In Bedroom Top & Bottom 4.00 15.00 1.00 60.00
W5 In Bedroom Sides 4.00 4.50 1.00 18.00
2,481.15 Sft

Terrace floor
Level-1
All around 1.00 60.50 9.00 544.50
Parapet Wall
3'6" ht(106'7.5"+12'9") 1.00 119.38 7.75 925.16
4'6" ht(3'+15'3") 1.00 18.25 9.67 176.40
Sill Top & side (15'3"+5"+3'+5") 1.00 19.08 1.42 27.10
Sill Bottom 1.00 19.08 0.42 7.95
Elliptical Cutout 1.00 34.08 2.12 72.43
Level-2
All around 1.00 113.00 3.00 339.00
Cutout
Horizontal walls
Inside 2.00 6.00 1.08 13.00
Outside 2.00 6.75 0.58 7.87
Vertical walls
Inside 2.00 1.00 1.08 2.17
Outside 2.00 1.75 0.58 2.04
Chajjas
D1 2.00 10.00 3.25 65.00
2,182.62 Sft

G02 Inside Wall Plastering


Stilt floor
Living,Dining & Kitchen 1.00 120.50 10.00 1,205.00
Pooja(4'0"+4'7.5")*2 1.00 17.25 10.00 172.50
SE Room 1.00 49.25 10.00 492.50
SE Room Toilet(4+6'1.5")*2 1.00 20.25 10.00 202.50
NE Room(12'0"+12'0")*2 1.00 48.00 10.00 480.00
NW Toilet(4'7.5"+5'7.5"+5'7.5") 1.00 15.88 10.00 158.75
NW Toilet(West Wall) 1.00 4.63 7.50 34.69
Clinic 1.00 72.25 10.00 722.50
Clinic Toilet -
N & S Side 2.00 4.00 10.00 80.00
E Side 1.00 4.63 7.50 34.69
W Side 1.00 4.63 10.00 46.25
Lift(5'0"+5'6")*2 1.00 21.00 18.50 388.50
Passage Infront of Lift(4'0"+5'6")*2 1.00 19.00 10.00 190.00
Kitchen Platform 1.00 15.00 2.08 31.20
Wardrobe Platform
NE Room 1.00 12.00 2.08 24.96
SE Room 1.00 4.38 2.08 9.10

Deduction
ED 3.00 3.50 7.00 73.50
LD 1.00 3.00 7.00 21.00
D2 3.00 3.00 7.00 63.00
D4 3.00 2.50 7.00 52.50
W3 4.00 5.00 4.50 90.00
W5 2.00 3.00 4.50 27.00
W6 1.00 2.00 4.50 9.00
KW 1.00 3.00 4.50 13.50
V1 1.00 3.00 2.00 6.00
O 1.00 4.63 1.00 4.63
PD 1.00 4.00 7.00 28.00
4,273.14 388.13
3,885.01 Sft

Ground floor
Living,Dining & Kitchen 1.00 69.00 10.00 690.00
Column Grid C2 1.00 4.50 10.00 45.00
Pooja east Wall 1.00 13.75 10.50 144.38
Pooja South Wall 1.00 6.00 10.50 63.00
Pooja NW Wall 1.00 24.50 2.50 61.25
Sill 1.00 26.75 0.33 8.83
Pooja SW Wall 1.00 12.50 2.50 31.25
Sill 1.00 14.00 0.33 4.62
Staircase West Wall 1.00 6.50 10.50 68.25
Foyer & Staircase South wall 1.00 40.00 10.00 400.00
Lift(5'0"+5'6")*2 1.00 21.00 10.50 220.50
Pwd Room(8'0"+5'0")*2 1.00 26.00 10.00 260.00
SW Toilet(6'3"+9'0")*2 1.00 30.50 10.00 305.00
SW Room 1.00 76.75 10.00 767.50
Kitchen Platform(6'10.5"+1'9") 1.00 8.63 2.08 17.94
Platform For Powder Room Flush
Tank(2'3"+4.5"+4.5") 1.00 3.00 4.83 14.50
Platform For SW Toilet Flush Tank 1.00 6.25 4.58 28.65
Deduction
ED/W 1.00 5.00 7.00 35.00
D1 2.00 3.25 7.00 45.50
D3 2.00 2.75 7.00 38.50
LD 1.00 3.00 7.00 21.00
W1 1.00 8.00 6.00 48.00
W2 1.00 6.00 6.00 36.00
W5 2.00 3.00 4.50 27.00
KW 1.00 3.00 4.50 13.50
V 1.00 5.00 2.00 10.00
V2 1.00 2.00 4.50 9.00
3,130.66 283.50
2,847.16 Sft

First floor
Living,Staircase & Study 1.00 138.50 10.00 1,385.00
NW Bedroom 1.00 74.00 10.00 740.00
NW Room Toilet(9'0"+6'0")*2 1.00 30.00 10.00 300.00
Lift(5'0"+5'6")*2 1.00 21.00 10.50 220.50
SW Bedroom 1.00 74.25 10.00 742.50
SW Room Toilet 1.00 40.50 10.00 405.00
Chinmay Wardrobe Platforms(7'4.5"+7'3") 1.00 14.63 2.08 30.42
Platform For SW Toilet Flush Tank 1.00 6.25 4.58 28.65
Deduction
D1 2.00 3.25 7.00 45.50
D3 2.00 2.75 7.00 38.50
LD 1.00 3.00 7.00 21.00
W1 2.00 8.00 6.00 96.00
W4 1.00 3.00 6.00 18.00
W5 4.00 3.00 4.50 54.00
V 2.00 5.00 2.00 20.00
Buch work 2.00 0.67 6.00 8.00
Opening From Room 1.00 6.00 7.00 42.00
Opening From Study 1.00 7.63 7.00 53.38
3,852.07 396.38
3,455.69 Sft

Terrace Floor
Staircase Room(13'9"+6'6")*2 1.00 40.50 8.50 344.25
Wall For placing channel
West Side 1.00 4.75 11.25 53.44
East Side 2.00 3.67 1.17 8.59
Step To Inspect Channel 1.00 5.58 2.58 14.42
Platform For Controller 1.00 3.00 2.84 8.52
Machine Room 1.00 40.00 8.50 340.00
Deduction
D1 2.00 3.25 7.00 45.50
Buch work 2.00 0.67 6.00 8.00
769.22 53.50
715.71 Sft

G03 Inside Ceiling Plastering


Stilt floor
Living,Dining & Kitchen 1.00 387.63 387.63
Pooja 1.00 4.00 4.63 18.50
SE Room 1.00 121.44 121.44
SE Room Toilet 1.00 4.00 6.13 24.50
NE Room 1.00 12.00 12.00 144.00
General Toilet 1.00 10.00 4.63 46.25
Clinc Toilet 1.00 4.00 4.63 18.50
Clinic 1.00 271.72 271.72
Lift Passage 1.00 4.00 5.50 22.00
Below waist slab staircase
1st Waist slab 1.00 5.28 4.00 21.10
Landing 2 1.00 4.67 4.00 18.67

Folded staircase
Threads 11.00 4.00 0.83 36.65
Risers 12.00 4.00 0.54 26.00

Ceiling
S1 1.00 8.00 7.75 62.00
S2 1.00 8.00 6.75 54.00
S3 1.00 13.38 15.00 200.63
S4 1.00 9.63 4.00 38.50
S5 1.00 3.00 13.25 39.75
S6 1.00 31.70 31.70
S7 1.00 18.00 4.50 81.00
Sides(3'0"+12'9"+9'4.5") 1.00 25.13 0.50 12.56
Beams
Horizontal
Grid B0-E0 1.00 25.33 3.00 75.99
Grid C3-E3 1.00 18.00 2.75 49.50
Grid C5-E5(13'7.5"+4') 1.00 17.63 2.75 48.47
Grid A6-B6 1.00 8.00 1.00 8.00
Grid A7'-B7' 1.00 8.00 1.50 12.00
Grid A8-D8 1.00 20.88 4.25 88.72
Vertical
Grid C0-C1 1.00 4.50 2.75 12.38
Grid E0-E1 1.00 4.50 3.25 14.63
Grid C1-C2 1.00 10.75 2.75 29.56
Grid A7-A8 1.00 14.25 3.25 46.31
Grid B7-B8 1.00 15.00 2.75 41.25
Grid D3-D5 1.00 9.00 2.75 24.75
Grid D7-D7' 1.00 3.25 2.75 8.94
Grid E7-E7' 1.00 4.50 2.75 12.38
Deduction
Junctions 4.00 0.75 1.00 3.00
2,149.95 3.00
2,146.95 Sft

Ground floor
Foyer, Kitchen & Living 1.00 674.93 674.93
Sides(13'9"+18'6"+7'9") 1.00 40.00 0.50 20.00
Pwd Room 1.00 8.00 5.00 40.00
Toilet 1.00 6.25 9.00 56.25
Room 1.00 279.77 279.77
Ceiling
S1 1.00 9.63 15.00 144.38
S2 1.00 5.25 7.25 38.06
S3 1.00 13.75 1.25 17.19
S4 1.00 18.00 1.25 22.50
Beams
Horizontal
Grid A0-E0 1.00 33.25 3.25 108.06
Grid A4-C4 1.00 13.75 3.25 44.69
Grid D7'-E7 1.00 5.25 3.75 19.69
Grid D8-E8 1.00 10.38 4.25 44.09
Vertical
Grid A0-A1 1.00 2.00 4.25 8.50
Grid C0-C1 & E0-E1 2.00 1.25 3.75 9.38
Grid C1-C2 1.00 10.75 2.75 29.56
Grid C2-C4 1.00 8.25 2.75 22.69
Grid C4-C6 1.00 7.25 3.25 23.56
Grid E5-E7 1.00 7.25 3.25 23.56
Grid E7-E8 1.00 15.00 4.25 63.75
Deduction
Junctions 3.00 0.75 1.00 2.25
1,690.60 2.25
1,688.35 Sft

First floor
Living 1.00 18.00 36.75 661.50
NW Bedroom 1.00 259.92 259.92
NW Room Toilet 1.00 6.00 9.00 54.00
SW Bedroom 1.00 289.64 289.64
SW Toilet 1.00 86.84 86.84
Ceiling
S1 1.00 1.50 16.50 24.75
Beams
Horizontal
Grid A7-A7' 1.00 8.00 2.75 22.00
Deduction
Cutout 1.00 75.40 75.40
1,398.66 75.40
1,323.26 Sft

Terrace floor
Staircase Room 1.00 13.75 6.50 89.38
Machine Room 1.00 13.75 5.50 75.63
Beams
Horizontal
Grid B6-B7 1.00 4.75 2.75 13.06
Deduction
Cutout 1.00 1.50 6.00 9.00
178.06 9.00
169.06 Sft

G04 Water proof plastering for toilets


Ground floor
PWD Room 1.00 10.00 7.00 70.00
SW Room 1.00 8.25 11.00 90.75
160.75 Sft

First floor
NW Room 1.00 8.00 11.00 88.00
SW Room 1.00 10.00 14.25 142.50
230.50 Sft

H FLOORING (without basic material cost)


H01 Italian marble for Flooring
Ground floor
Foyer,Dining & Kitchen 1.00 567.50 567.50
Living 1.00 18.00 17.00 306.00
Between Kitcken Columns 1.00 10.75 0.83 8.95
Sheela Shankar Dress Area 1.00 6.71 6.88 46.12
Pooja Flooring 1.00 9.00 9.00 81.00
Deduction
Kitchen Cabinets(1'9"+8'4.5") 1.00 10.13 1.75 17.72
1,009.57 17.72
991.85 Sft

First floor
Family & Study 1.00 661.51 661.51
Pinakini Dress Area 1.00 6.71 8.63 57.86
Chinmay Dress Area 1.00 7.38 9.46 69.75
Deduction
Cut Out 1.00 221.66 221.66
Chinmay Wardrobe(9'0"+7'4.5") 1.00 16.38 1.75 28.66
789.12 250.32
538.80 Sft

H02 Italian marble for Skirting


Ground floor
Foyer,Dining & Kitchen 1.00 80.17 80.17
Infront of pooja 1.00 16.00 16.00
96.17 Rft

First floor
Family & Study 1.00 95.00 95.00
Chinmay Dress Area(5.7.5"+7.3"+1'9") 1.00 14.63 14.63
109.63 Rft

H06 Cement flooring


Ground floor
SW Room 1.00 15.50 15.00 232.50
Shelf Area 1.00 1.25 1.38 1.72
234.22 Sft
First floor
NW Room 1.00 13.00 13.88 180.38
SW Room 1.00 15.50 15.00 232.50
412.88 Sft
H07 Vitrified tiles flooring
Stilt floor
Living,Dining & Kitchen 1.00 387.63 387.63
NE Bedroom 1.00 12.00 12.00 144.00
SE Bedroom 1.00 121.44 121.44
Pooja Flooring 1.00 4.00 4.75 19.00
Clinic 1.00 271.72 271.72
Deduction
Kitchen Cabinets(7'0"+8'3") 1.00 15.25 1.75 26.69
NE Wardrobe 1.00 12.00 1.75 21.00
SE Wardrobe 1.00 4.38 1.75 7.66
943.79 55.34
888.44 Sft

Ground floor
Kitchen Cabinets
West side(8'4.5"+1'9") 1.00 10.13 1.75 17.72
East side 1.00 11.50 2.00 23.00
40.72 Sft

H08 Vitrified Tiles skirting


Stilt floor
Living,Dining & Kitchen 1.00 120.50 120.50
NE Bedroom 1.00 48.00 48.00
SE Bedroom 1.00 49.25 49.25
Clinic 1.00 72.25 72.25
290.00 Rft

H09 Ceramic Tiles Flooring


Stilt floor
Attached Toilet 1.00 4.00 6.13 24.50
General Toilet 1.00 4.63 5.63 26.02
Clinic Toilet 1.00 4.00 4.63 18.50
69.02 Sft

Ground floor
Powder Room 1.00 8.00 5.00 40.00
H10 Ceramic Tiles Dadooing
Stilt floor
Attached Toilet 1.00 20.25 7.00 141.75
General Toilet 1.00 20.50 7.00 143.50
Clinic Toilet 1.00 17.25 7.00 120.75
Deduction
Door 3.00 2.50 7.00 52.50
406.00 52.50
353.50 Sft

Ground floor
Powder Room (8'0"+5'0")*2 1.00 26.00 10.00 260.00
SW Room Toilet (6'3"+9'0")*2 1.00 30.50 10.00 305.00
Deduction
Door 2.00 2.75 7.00 38.50
V 1.00 5.00 2.00 10.00
V2 1.00 2.00 4.50 9.00
565.00 57.50
507.50 Sft

H23 20mm Granite Cladding @ Entrance Door


Cladding Infront Of Balcony(4'4.5"+8'0"+6'0") 1.00 18.38 8.50 156.19
Deduction
ED/W 1.00 5.00 7.00 35.00
156.19 35.00
121.19 Sft

H34 Water proofing for Terraces


Terrace floor
Level -1 1.00 1,336.21 1,336.21
Machine Room 1.00 8.00 5.50 44.00
Deduction
Columns 2.00 0.75 1.50 2.25
Elliptical Skylight 1.00 87.70 87.70
1,380.21 89.95
1,290.26 Sft

Level -2
O.H.T Room 1.00 13.75 12.75 175.31
Deduction
Skylight 1.00 6.75 1.75 11.81
175.31 11.81
163.50 Sft
1,453.76
J MISCELLANEOUS
J03 Bathroom Filling
Stilt floor
Kitchen Platfrorm
North Side 1.00 10.00 1.75 0.25 4.38
West Side 1.00 5.25 1.75 0.25 2.30
Wardrobe Platfrorm
NE Bedroom 1.00 12.00 1.75 0.25 5.25
SE Bedroom 1.00 4.38 1.75 0.25 1.91
13.84 Cft

Ground floor
PWD Toilet 1.00 8.00 5.00 0.75 30.00
SW Toilet 1.00 6.25 9.00 0.75 42.19
Infront of Pooja 1.00 42.00 0.33 13.86
Kitchen Platfrorm 1.00 9.63 1.75 0.25 4.21
90.26 Cft

First floor
SW Toilet 1.00 86.84 0.75 65.13
Chinmay Wardrobe Floor 1.00 7.38 9.00 0.50 33.19
Wardrobe Platfrorm 1.00 14.34 1.75 0.25 6.27
104.59 Cft

J05 Chicken Mesh


Stilt floor
Compound Wall 1.00 30.00 3.83 114.99 Sft
Ground floor
Windows 4" Thk Band
Bottom 2.00 15.00 1.00 30.00
Sides 4.00 4.50 1.00 18.00
48.00 Sft

First floor
Sun Room Portion
East Side
Bottom 1.00 2.25 15.75 35.44
Sides(2'1"+2'3") 1.00 4.33 15.75 68.25
pillars 7.00 1.00 8.00 56.00
159.69 Sft
322.68

J06 Grooves 1/2"


South Elevation
Horizontal Groove 2.00 8.38 16.75
Vertical Groove 1.00 2.58 2.58
19.33 Rft

J07 Cornice works -


1 step
Terrace Floor Parapet Wall 1.00 135.13 135.13
OHT Parapet Wall 1.00 56.50 56.50
Utility Wall 1.00 37.63 37.63
229.25 Rft

P DEMOLITION WORKS
P01 S.S.M
Stilt Floor
Below Columns 3 Course Removing
Grid A9 1.00 2.00 2.00 2.25 9.00
Grid D9 1.00 2.00 2.00 2.25 9.00
Grid E'9 1.00 2.00 2.00 2.25 9.00
27.00 Cft

P02 BBM 9" thk WALL


Stilt Floor
Toilet West Wall (Providing Door) 1.00 2.50 0.75 7.00 13.13 Cft

Ground Floor
Pooja Room North wall 1.00 9.75 0.75 2.50 18.28
Pooja Room West wall 2.00 2.50 0.75 2.50 9.38
Pooja Room South wall 1.00 4.13 0.75 7.00 21.66
Kitchen South wall 2.00 2.00 0.75 5.00 15.00
Kitchen East wall 1.00 10.75 0.75 9.00 72.56
SW Toilet shelf 1.00 1.00 0.75 2.00 1.50
138.38 Cft
First Floor
Sunroom West wall 1.00 6.00 0.75 8.00 36.00
Sunroom north wall 1.00 4.38 0.75 7.00 22.97
NW Toilet shelf 1.00 2.00 0.75 1.00 1.50
SW Toilet shelf 1.00 2.00 0.75 1.00 1.50
Deduction
W5 1.00 3.00 0.75 4.50 10.13
61.97 10.13
51.84 Cft

Terrace Floor
For Placing Channel 1.00 3.67 0.75 1.17 3.21 Cft

P03 BBM 4 ½" thk WALL


Stilt Floor
Toilet East Wall 1.00 4.63 10.00 46.25
Deduction
D4 1.00 2.50 7.00 17.50
46.25 17.50
28.75 Sft

P04 R.C.C Work Demolition


P04A PCC 1:3:6 Sills
Stilt floor
W6 in Reception 1.00 4.00 0.75 0.25 0.75
W5 in Clinic 1.00 5.50 0.75 0.25 1.03
W5 in Clinic 1.00 4.67 0.75 0.25 0.88
W3 in Room -2 1.00 6.50 0.75 0.25 1.22
W3 in Living 1.00 6.50 0.75 0.25 1.22
W3 in Room -1 1.00 6.25 0.75 0.25 1.17
W3 in Dining 1.00 6.00 0.75 0.25 1.13
7.39 Cft
Ground floor
W5 in Room 2.00 4.50 0.75 0.25 1.69 Cft

P04B RCC Lintel Concrete


Stilt Floor
Toilet 1.00 4.63 0.38 0.50 0.87 Cft

P04C RCC Chajja Concrete


Ground Floor 2.00 0.75 0.75 0.25 0.28 Cft

First Floor 2.00 0.75 0.75 0.25 0.28 Cft


H FLOORING (without basic material cost)
H06 Cement flooring
Stilt floor
Kitchen Platform(10'+5'3") 1.00 15.25 1.75 0.25
Wardrobe Plaforms
NE Bedroom 1.00 12.00 1.75 0.25
SE Bedroom 1.00 4.38 1.75 0.25

Ground floor
Kitchen Platforms(8'4.5"+1'9") 1.00 10.13 1.75 0.25

First floor
Chinmay Wardrobe Platform(9'0"+5'7.5") 1.00 14.63 1.75 0.25

J MISCELLANEOUS
J05 Chicken Mesh
Stilt floor
Compound Wall 1.00 30.00 3.83

Ground floor
Windows 4" Thk Band
Bottom 2.00 15.00 1.00
Sides 4.00 4.50 1.00

First floor
Sun Room Portion
East Side
Bottom 1.00 2.25 15.75
Sides(2'1"+2'3") 1.00 4.33 15.75
pillars 7.00 1.00 8.00
6.67

5.25
1.91
13.84

4.43

6.40

114.99 Sft

30.00
18.00
48.00 Sft

35.44
68.25
56.00
159.69 Sft
322.68
Dr. PINAKINI.K.SHANKAR RESIDENTIAL BUILDING
ABSTRACT OF R.A.BILL 1

GROUP ESTIMATED RATE R.A.BILL-1


CODE DESCRIPTION OF WORK UNITS
QTY (in Rs) QTY AMOUMT
CIVIL WORKS
A EARTH WORK
A01 Earthwork Excavation. Cft 6,754.45 15.00 5,015.44 75,231.60
A02 Earth Filling using available earth. Cft 5,291.00 5.00 5,704.66 28,523.30
A03 Excess Earth carting away from the site. Cft 2,024.00 15.00 98.28 1,474.20
B MASONRY WORKS
B01 Size Stone Masonary CM 1:6 Cft 720.00 180.00 839.91 151,183.80
C CONCRETE WORKS
C01 PCC 1:4:8
Below footing Cft 782.60 120.00 683.88 82,065.60
Below flooring Cft 962.17 120.00 699.63 83,955.60
C02 RCC Footing Concrete Cft 1,854.00 210.00 1,526.69 320,604.90
C03 RCC Plinth Beam Cft 288.70 300.00 245.95 73,785.00
C05 RCC Column Concrete
Below Stilt floor Cft 69.75 330.00 64.43 21,261.90
C12 RCC Retaining wall Cft 400.00 135.00 54,000.00
D STEEL
Steel Reinforcement including fabrication
D01 (Basic cost=Rs.50000 /-)
Stilt floor Kgs 8,000.00 68.00 4,813.00 327,284.00
J MISCELLANEOUS
J01 Sump Tank Ltrs 10,000.00 10.00 17,187.50 171,875.00
J02 Anti-termite treatment for Pesticides Sft 2,400.00 10.00 2,400.00 24,000.00
1,415,244.90

S EXTRA WORKS
c) BESCOM deposits and office expencess for
Temparory connection( Approximately) 62,000.00
e) Bore Well Pump 75,000.00
137,000.00

lll ESCALATION
Cement
Bill dt.04.12.19 (360.00-375.00= -15.00) Bags (15.00) 40.00 -600.00
Bill dt.13.12.19 (360.00-375.00 = -15.00) Bags (15.00) 50.00 -750.00
Bill dt.22.12.19 (360.00-375.00= -15.00) Bags (15.00) 75.00 -1,125.00
Bill dt.04.01.20 (335.00-375.00= -40.00) Bags (40.00) 100.00 -4,000.00

Steel
Bill dt.04.12.19 (43.01-50.00= -6.99) Kgs (6.99) 3,695.00 -25,828.05
Bill dt.27.12.19 (46.00-50.00 = -4.00) Kgs (4.00) 998.00 -3,992.00
-36,295.05

COST SUMMARY

l Tendered Works 1,415,244.90

ll Non Tendered Works

lll Escalation -36,295.05

IV Extra works 137,000.00

Value of R.A.Bil-1 1,515,949.85


Mobilization Advance Rs.10,00,000/-
Deduct 10% of Mobilization Advance 100,000.00
Advance paid till date 63,950.00
Balance payable 1,351,999.85
Dr. PINAKINI.K.SHANKAR RESIDENTIAL BUILDING
ABSTRACT OF R.A.BILL 2

GROUP ESTIMATED RATE AMOUNT (in R.A.BILL-1 R.A. BILL-2


DESCRIPTION OF WORK UNITS Previous Qty Total Qty Total Amount
CODE QTY (in Rs) Rs) QTY AMOUMT QTY AMOUNT
CIVIL WORKS
A EARTH WORK
A01 Earthwork Excavation. Cft 6,754.45 15.00 101,316.75 5,015.44 75,231.60 68.69 1,030.35 5,015.44 5,084.13 76,261.95
A02 Earth Filling using available earth. Cft 5,291.00 5.00 26,455.00 5,704.66 28,523.30 - 5,704.66 5,704.66 28,523.30
A03 Excess Earth carting away from the site. Cft 2,024.00 15.00 30,360.00 98.28 1,474.20 - 98.28 98.28 1,474.20
B MASONRY WORKS - - -
B01 Size Stone Masonary CM 1:6 Cft 720.00 180.00 129,600.00 839.91 151,183.80 63.00 11,340.00 839.91 902.91 162,523.80
B02 BBM 9" thk - - -
Stilt floor Sft 1,873.53 200.00 374,706.00 947.06 189,412.00 - 947.06 189,412.00
B03 BBM 4.5" thk - - - -
Stilt floor Sft 486.13 120.00 58,335.60 756.75 90,810.00 - 756.75 90,810.00
C CONCRETE WORKS - - -
C01 PCC 1:4:8 - - -
Below footing Cft 782.60 120.00 93,912.00 683.88 82,065.60 683.88 683.88 82,065.60
Below flooring Cft 962.17 120.00 115,460.40 699.63 83,955.60 699.63 699.63 83,955.60
Below Staircase Landing Cft 120.00 9.48 1,137.60 - 9.48 1,137.60
C02 RCC Footing Concrete Cft 1,854.00 210.00 389,340.00 1,526.69 320,604.90 1,526.69 1,526.69 320,604.90
C03 RCC Plinth Beam Cft 288.70 300.00 86,610.00 245.95 73,785.00 245.95 245.95 73,785.00
C04 PCC 1:3:6 Sills - - -
Stilt floor Cft 40.31 130.00 5,240.30 8.14 1,058.20 - 8.14 1,058.20
C05 RCC Column Concrete - - -
Below Stilt floor Cft 69.75 330.00 23,017.50 64.43 21,261.90 - 64.43 64.43 21,261.90
Above Stilt floor Cft 165.38 330.00 54,575.40 185.06 61,069.80 - 185.06 61,069.80
C06 RCC Lintel Concrete - - -
Stilt floor Cft 27.28 300.00 8,184.00 46.24 13,872.00 - 46.24 13,872.00
C07 RCC Chejja, loft concrete - - -
Stilt floor Sft 76.00 245.00 18,620.00 79.50 19,477.50 - 79.50 19,477.50
C08 RCC Beam Concrete - - -
Stilt floor Cft 289.27 305.00 88,227.35 360.53 109,961.65 - 360.53 109,961.65
C09 RCC Roof Slab concrete - - -
Stilt floor Cft 785.84 305.00 239,681.20 733.46 223,705.30 - 733.46 223,705.30
C10 RCC Staircase Waist Slab - - -
Stilt floor Cft 75.17 400.00 30,068.00 19.40 7,760.00 - 19.40 7,760.00
C11 RCC Staircase Folded type - - - -
Stilt floor Cft 800.00 37.34 29,872.00 - 37.34 29,872.00
C12 RCC Retaining wall Cft 400.00 135.00 54,000.00 - 135.00 135.00 54,000.00
- - - -
D STEEL - - -
Steel Reinforcement including fabrication
D01 (Basic cost=Rs.50000 /-) - - -
Stilt floor Kgs 8,000.00 68.00 544,000.00 4,813.00 327,284.00 4,000.00 272,000.00 4,813.00 8,813.00 599,284.00
Ground floor Kgs 5,750.00 68.00 391,000.00 1,825.00 124,100.00 - 1,825.00 124,100.00
J MISCELLANEOUS - - -
J01 Sump Tank Ltrs 10,000.00 10.00 100,000.00 17,187.50 171,875.00 - 17,187.50 17,187.50 171,875.00
J02 Anti-termite treatment for Pesticides Sft 2,400.00 10.00 24,000.00 2,400.00 24,000.00 - 2,400.00 2,400.00 24,000.00

S EXTRA WORKS -
c) BESCOM deposits and office expencess for
Temparory connection( Approximately) 60,000.00 62,000.00 - - -
e) Bore Well Pump 100,000.00 75,000.00 - - -
f) Solar Water Heater (200 ltr) 60,000.00 - - -
470,000.00 137,000.00 -

1,415,244.90 1,156,606.40 2,571,851.30

lll ESCALATION
Cement
Bill dt.04.12.19 (360.00-375.00= -15.00) Bags -15.00 40.00 -600.00 40.00 40.00 -600.00
Bill dt.13.12.19 (360.00-375.00 = -15.00) Bags -15.00 50.00 -750.00 50.00 50.00 -750.00
Bill dt.22.12.19 (360.00-375.00= -15.00) Bags -15.00 75.00 -1,125.00 75.00 75.00 -1,125.00
Bill dt.04.01.20 (335.00-375.00= -40.00) Bags -40.00 100.00 -4,000.00 100.00 100.00 -4,000.00
Bill dt.15.02.20 (360.00-375.00= -15.00) Bags -15.00 100.00 -1,500.00 100.00 -1,500.00
Bill dt.15.02.20 (360.00-375.00= -15.00) Bags -15.00 50.00 -750.00 50.00 -750.00

Steel
Bill dt.04.12.19 (43.01-50.00= -6.99) Kgs -6.99 3,695.00 -25,828.05 3,695.00 3,695.00 -25,828.05
Bill dt.27.12.19 (46.00-50.00 = -4.00) Kgs -4.00 998.00 -3,992.00 998.00 998.00 -3,992.00
Bill dt.21.01.20 (49.98-50.00 = -0.02) Kgs -0.02 470.00 -9.40 470.00 -9.40
Bill dt.13.02.20 (47.50-50.00 = -2.50) Kgs -2.50 5,355.00 -13,387.50 5,355.00 -13,387.50
10,518.00

-36,295.05 -15,646.90 -51,941.95

COST SUMMARY

l Tendered Works 1,415,244.90 1,156,606.40 2,571,851.30

ll Non Tendered Works

lll Escalation -36,295.05 -15,646.90 -51,941.95

IV Extra works 137,000.00 137,000.00

Value of R.A.Bill-2 1,515,949.85 1,140,959.50 2,656,909.35


Mobilization Advance Rs.10,00,000/-
Deduct 10% of Mobilization Advance 100,000.00 100,000.00 200,000.00
Advance paid till date 2,530,200.00
Balance payable 1,415,949.85 1,040,959.50 -73,290.65
Dr. PINAKINI.K.SHANKAR RESIDENT
ABSTRACT OF R.A.BIL

GROUP ESTIMATED RATE (in


DESCRIPTION OF WORK UNITS
CODE QTY Rs)
CIVIL WORKS
A EARTH WORK
A01 Earthwork Excavation. Cft 6,754.45 15.00
A02 Earth Filling using available earth. Cft 5,291.00 5.00

B MASONRY WORKS
B01 Size Stone Masonary CM 1:6 Cft 720.00 180.00
B02 BBM 9" thk
Stilt floor Sft 1,873.53 200.00
Ground floor Sft 1,467.47 200.00
B03 BBM 4.5" thk
Stilt floor Sft 486.13 120.00
Ground floor Sft 222.99 120.00

C CONCRETE WORKS
C01 PCC 1:4:8
Below footing Cft 782.60 120.00
Below flooring Cft 962.17 120.00
Below Staircase Landing Cft 120.00
C02 RCC Footing Concrete Cft 1,854.00 210.00
C03 RCC Plinth Beam Cft 288.70 300.00
C04 PCC 1:3:6 Sills
Stilt floor Cft 40.31 130.00
Ground floor Cft 8.54 130.00
C05 RCC Column Concrete
Below Stilt floor Cft 69.75 330.00
Above Stilt floor Cft 165.38 330.00
Ground floor Cft 165.38 330.00

C06 RCC Lintel Concrete


Stilt floor Cft 27.28 300.00
Ground floor Cft 24.84 300.00
C07 RCC Chejja, loft concrete
Stilt floor Sft 76.00 245.00
Ground floor Sft 62.00 245.00
C08 RCC Beam Concrete
Stilt floor Cft 289.27 305.00
Ground floor Cft 347.58 305.00
C09 RCC Roof Slab concrete
Stilt floor Cft 785.84 305.00
Ground floor Cft 631.65 305.00
C10 RCC Staircase Waist Slab
Stilt floor Cft 75.17 400.00
C11 RCC Staircase Folded type
Stilt floor Cft 800.00
C12 RCC Retaining wall Cft 400.00

D STEEL
Steel Reinforcement including fabrication
D01 (Basic cost=Rs.50000 /-)
Stilt floor Kgs 8,000.00 68.00
Ground floor Kgs 5,750.00 68.00

S EXTRA WORKS
a) Sanction Plan Charges
b) BWSSB Prorata, Point & inspection Charges
( Approximately )
c) BESCOM deposits and office expencess for
Temparory connection( Approximately)
d) BESCOM deposits and office expencess for
permanent connection( Approximately)
e) Bore Well Pump
f) Solar Water Heater (200 ltr)

lll ESCALATION
Cement
Bill dt.04.12.19 (360.00-375.00= -15.00) Bags -15.00
Bill dt.13.12.19 (360.00-375.00 = -15.00) Bags -15.00
Bill dt.22.12.19 (360.00-375.00= -15.00) Bags -15.00
Bill dt.04.01.20 (335.00-375.00= -40.00) Bags -40.00
Bill dt.15.02.20 (360.00-375.00= -15.00) Bags -15.00
Bill dt.15.02.20 (360.00-375.00= -15.00) Bags -15.00
Bill dt.17.03.20 (335.00-375.00= -40.00) Bags -40.00

Steel
Bill dt.04.12.19 (43.01-50.00= -6.99) Kgs -6.99
Bill dt.27.12.19 (46.00-50.00 = -4.00) Kgs -4.00
Bill dt.21.01.20 (49.98-50.00 = -0.02) Kgs -0.02
Bill dt.13.02.20 (47.50-50.00 = -2.50) Kgs -2.50
Bill dt.24.02.20 (48.00-50.00 = -2.00) Kgs -2.00
Bill dt.16.05.20 (49.206-50.00 = -0.79) Kgs -0.79

COST SUMMARY

l Tendered Works

ll Non Tendered Works

lll Escalation

IV Extra works

Value of R.A.Bill-3
Mobilization Advance Rs.10,00,000/-
Deduct 10% of Mobilization Advance
Advance paid till date
Balance payable
NI.K.SHANKAR RESIDENTIAL BUILDING
ABSTRACT OF R.A.BILL 3

AMOUNT (in R.A. BILL-3


Previous Qty Total Qty
Rs) QTY AMOUNT

101,316.75 5,084.13 5,084.13


26,455.00 5,704.66 5,704.66

129,600.00 902.91 902.91

374,706.00 947.06 947.06


293,494.00 1,174.64 234,928.00 1,174.64

58,335.60 756.75 756.75


26,758.80 408.42 49,010.40 408.42

93,912.00 683.88 683.88


115,460.40 699.63 699.63
9.48 9.48
389,340.00 1,526.69 1,526.69
86,610.00 245.95 245.95

5,240.30 8.14 8.14


1,110.20 7.59 986.70 7.59

23,017.50 64.43 64.43


54,575.40 185.06 185.06
54,575.40 169.31 55,872.30 169.31

8,184.00 46.24 46.24


7,452.00 28.76 8,628.00 28.76

18,620.00 79.50 79.50


15,190.00 60.25 14,761.25 60.25

88,227.35 360.53 360.53


106,011.90 354.19 108,027.95 354.19

239,681.20 733.46 733.46


192,653.25 631.18 192,509.90 631.18

30,068.00 19.40 19.40

37.34 37.34
135.00 135.00
544,000.00 8,813.00 8,813.00
391,000.00 5,411.00 367,948.00 1,825.00 7,236.00
1,032,672.50
- -

150,000.00

60,000.00

100,000.00
100,000.00
60,000.00
470,000.00 -

40.00 40.00
50.00 50.00
75.00 75.00
100.00 100.00
100.00 100.00
50.00 50.00
50.00 -2,000.00 - 50.00
- -
- -
3,695.00 3,695.00
998.00 998.00
470.00 470.00
5,355.00 5,355.00
181.00 -362.00 - 181.00
5,230.00 -4,131.70 - 5,230.00
15,929.00

-6,493.70

1,032,672.50

-6,493.70

1,026,178.80
100,000.00

926,178.80
Total Amount

76,261.95
28,523.30

162,523.80

189,412.00
234,928.00

90,810.00
49,010.40

82,065.60
83,955.60
1,137.60
320,604.90
73,785.00

1,058.20
986.70

21,261.90
61,069.80
55,872.30

13,872.00
8,628.00

19,477.50
14,761.25

109,961.65
108,027.95

223,705.30
192,509.90

7,760.00

29,872.00
54,000.00
599,284.00
492,048.00
3,604,523.80
-

-600.00
-750.00
-1,125.00
-4,000.00
-1,500.00
-750.00
-2,000.00
-
-
-25,828.05
-3,992.00
-9.40
-13,387.50
-362.00
-4,131.70

-58,435.65

3,604,523.80

-58,435.65

137,000.00

3,683,088.15
300,000.00
2,730,200.00
652,888.15
Dr. PINAKINI.K.SHANKAR RESIDENTIAL BUILDING
ABSTRACT OF R.A.BILL 4

GROUP ESTIMATED RATE (in AMOUNT (in R.A. BILL-4


DESCRIPTION OF WORK UNITS Previous Qty Total Qty Total Amount
CODE QTY Rs) Rs) QTY AMOUNT
CIVIL WORKS
B02 BBM 9" thk - - -
First floor Sft 1,490.93 200.00 298,186.00 1,324.11 264,822.00 - 1,324.11 264,822.00
B03 BBM 4.5" thk - - - -
First floor Sft 197.88 120.00 23,745.60 257.25 30,870.00 - 257.25 30,870.00
- - - -
C CONCRETE WORKS - - - -
C04 PCC 1:3:6 Sills - - - -
First floor Cft 8.25 130.00 1,072.50 12.00 1,560.00 - 12.00 1,560.00
C05 RCC Column Concrete - - - -
First floor Cft 165.38 330.00 54,575.40 169.31 55,872.30 - 169.31 55,872.30
- - - -
C06 RCC Lintel Concrete - - - -
First floor Cft 29.06 300.00 8,718.00 28.22 8,466.00 - 28.22 8,466.00
C07 RCC Chejja, loft concrete - - - -
First floor Sft 88.00 245.00 21,560.00 95.25 23,336.25 - 95.25 23,336.25
C08 RCC Beam Concrete - - - -
First floor Cft 313.45 305.00 95,602.25 340.69 103,910.45 - 340.69 103,910.45
C09 RCC Roof Slab concrete - - - -
First floor Cft 497.06 305.00 151,603.30 671.90 204,929.50 - 671.90 204,929.50
- - - -
D STEEL - - - -
Steel Reinforcement including fabrication
D01 (Basic cost=Rs.50000 /-) - - - -
First floor Kgs 5,050.00 68.00 343,400.00 5,580.00 379,440.00 - 5,580.00 379,440.00
68.00 288.00 19,584.00 - 288.00 19,584.00
68.00 100.00 6,800.00 100.00 6,800.00
- - - -
E DOORS AND WINDOWS - - - -
WOOD WORK ADVANCE 1,000,000.00 1.00 1,000,000.00 - 1.00 1,000,000.00
- - - -
M ELECTRICALWORKS (Anchor roma ) - - - -
ADVANCE 100,000.00 1.00 100,000.00 - 1.00 100,000.00
- - - -
2,199,590.50 5,804,114.30

lll ESCALATION
Cement
1 Bill dt.04.12.19 (360.00-375.00= -15.00) Bags -15.00 40.00 40.00 -600.00
2 Bill dt.13.12.19 (360.00-375.00 = -15.00) Bags -15.00 50.00 50.00 -750.00
3 Bill dt.22.12.19 (360.00-375.00= -15.00) Bags -15.00 75.00 75.00 -1,125.00
4 Bill dt.04.01.20 (335.00-375.00= -40.00) Bags -40.00 100.00 100.00 -4,000.00
5 Bill dt.15.02.20 (360.00-375.00= -15.00) Bags -15.00 100.00 100.00 -1,500.00
6 Bill dt.15.02.20 (360.00-375.00= -15.00) Bags -15.00 50.00 50.00 -750.00
7 Bill dt.17.03.20 (335.00-375.00= -40.00) Bags -40.00 50.00 50.00 -2,000.00
8 Bill dt.13.06.20 (400.00-375.00= 25.00) Bags 25.00 100.00 2,500.00 - 100.00 2,500.00
- -
- - -

Steel - - -
1 Bill dt.04.12.19 (43.01-50.00= -6.99) Kgs -6.99 3,695.00 3,695.00 -25,828.05
2 Bill dt.27.12.19 (46.00-50.00 = -4.00) Kgs -4.00 998.00 998.00 -3,992.00
3 Bill dt.21.01.20 (49.98-50.00 = -0.02) Kgs -0.02 470.00 470.00 -9.40
4 Bill dt.13.02.20 (47.50-50.00 = -2.50) Kgs -2.50 5,355.00 5,355.00 -13,387.50
5 Bill dt.24.02.20 (48.00-50.00 = -2.00) Kgs -2.00 181.00 181.00 -362.00
6 Bill dt.16.05.20 (49.20-50.00 = -0.79) Kgs -0.79 5,230.00 5,230.00 -4,131.70
7 Bill dt.01.07.20 (45.00-50.00 = -5.00) Kgs -5.00 288.00 -1,440.00 - 288.00 -1,440.00
8 Bill dt.18.07.20 (43.50-50.00) = -6.50) Kgs -6.50 5,580.00 -36,270.00 - 5,580.00 -36,270.00
Bill dt.25.07.20 (43.99-50.00) = -6.01) Kgs -6.01 100.00 -601.00 - 100.00 -601.00

-35,811.00 -94,246.65

COST SUMMARY

l Tendered Works 2,199,590.50 5,804,114.30

ll Non Tendered Works

lll Escalation -35,811.00 -94,246.65

IV Extra works -

Value of R.A.Bill-4 2,163,779.50 5,709,867.65


Mobilization Advance Rs.10,00,000/-
Deduct 10% of Mobilization Advance 100,000.00 400,000.00
Advance paid till date 4,200,400.00
Balance payable 2,063,779.50 1,109,467.65
Dr. PINAKINI.K.SHANKAR RESIDENTIAL BUILDING
ABSTRACT OF R.A.BILL 5

GROUP ESTIMATED R.A. BILL-5 PRE FINAL


CODE DESCRIPTION OF WORK UNITS ESTIMATED RATE AMOUNT QTY AMOUNT QTY
QTY (in Rs) (in Rs)
CIVIL WORKS
A EARTH WORK
A01 Earthwork Excavation. Cft 6,754.45 15.00 101,316.75 114.38 1,715.70
A02 Earth Filling using available earth. Cft 5,291.00 5.00 26,455.00 -
A03 Excess Earth carting away from the site. Cft 2,024.00 15.00 30,360.00 -
A04 Earth Filling brought from outside Cft 10.00 - -
A05 Earth Shifting over area Cft 2,400.00 10.00 24,000.00 -
182,131.75 1,715.70 107,975.15
-
B MASONRY WORKS -
B01 Size Stone Masonary CM 1:6 Cft 720.00 180.00 129,600.00 18.94 3,409.20
B02 BBM 9" thk -
Stilt floor Sft 1,873.53 200.00 374,706.00 200.63 40,126.00
Ground floor Sft 1,467.47 200.00 293,494.00 8.30 1,660.00
First floor Sft 1,490.93 200.00 298,186.00 6.28 1,256.00
Terrace floor Sft 817.88 200.00 163,576.00 659.35 131,870.00
B03 BBM 4.5" thk -
Stilt floor Sft 486.13 120.00 58,335.60 504.87 60,584.40
Ground floor Sft 222.99 120.00 26,758.80 80.05 9,606.00
First floor Sft 197.88 120.00 23,745.60 31.09 3,730.80
Terrace floor Sft 120.00 163.36 19,603.20
1,368,402.00 271,845.60 1,294,221.80
-
C CONCRETE WORKS -
C01 PCC 1:4:8 -
Below footing Cft 782.60 120.00 93,912.00 13.38 1,605.60
Below flooring Cft 962.17 120.00 115,460.40 -
Below Staircase Landing Cft 120.00 -
C02 RCC Footing Concrete Cft 1,854.00 210.00 389,340.00 18.00 3,780.00
C03 RCC Plinth Beam Cft 288.70 300.00 86,610.00 12.54 3,762.00
C04 PCC 1:3:6 Sills -
Stilt floor Cft 40.31 130.00 5,240.30 49.19 6,394.70
Ground floor Cft 8.54 130.00 1,110.20 50.54 6,570.20
First floor Cft 8.25 130.00 1,072.50 63.84 8,299.20
Terrace floor Cft 40.27 130.00 5,235.10 70.13 9,116.90
C05 RCC Column Concrete -
Below Stilt floor Cft 69.75 330.00 23,017.50 -
Above Stilt floor Cft 165.38 330.00 54,575.40 28.69 9,467.70
Ground floor Cft 165.38 330.00 54,575.40 -
First floor Cft 165.38 330.00 54,575.40 -
Terrace Floor Cft 82.69 330.00 27,287.70 88.88 29,330.40
-
C06 RCC Lintel Concrete -
Stilt floor Cft 27.28 300.00 8,184.00 12.59 3,777.00
Ground floor Cft 24.84 300.00 7,452.00 1.88 564.00
First floor Cft 29.06 300.00 8,718.00 3.00 900.00
Terrace Floor Cft 3.75 300.00 1,125.00 -
C07 RCC Chejja, loft concrete -
Stilt floor Sft 76.00 245.00 18,620.00 2.00 490.00
Ground floor Sft 62.00 245.00 15,190.00 -
First floor Sft 88.00 245.00 21,560.00 -
Terrace Floor Sft 16.00 245.00 3,920.00 28.50 6,982.50
C08 RCC Beam Concrete -
Stilt floor Cft 289.27 305.00 88,227.35 40.22 12,267.10
Ground floor Cft 347.58 305.00 106,011.90 -
First floor Cft 313.45 305.00 95,602.25 -
Terrace Floor Cft 73.41 305.00 22,390.05 77.06 23,503.30
C09 RCC Roof Slab concrete -
Stilt floor Cft 785.84 305.00 239,681.20 11.85 3,614.25
Ground floor Cft 631.65 305.00 192,653.25 -
First floor Cft 497.06 305.00 151,603.30 -
Terrace floor Cft 82.50 305.00 25,162.50 69.33 21,145.65
C10 RCC Staircase Waist Slab -
Stilt floor Cft 75.17 400.00 30,068.00 -
C11 RCC Staircase Folded type -
Stilt floor Cft 800.00 -
Ground floor Cft 38.00 800.00 30,400.00 -
First floor Cft 38.00 800.00 30,400.00 -
C12 RCC Retaining wall Cft 400.00 -
-
2,008,980.70 151,570.50 2,034,018.15
-
D STEEL -
Steel Reinforcement including fabrication
D01 (Basic cost=Rs.50000 /-) -
Stilt floor Kgs 8,000.00 68.00 544,000.00 -
Ground floor Kgs 5,750.00 68.00 391,000.00 -
First floor Kgs 5,050.00 68.00 343,400.00 -
68.00 -
68.00 -
68.00 -298.80 -20,318.40
Terrace floor Kgs 675.00 68.00 45,900.00 -
1,324,300.00 -20,318.40 1,476,837.60
-
E DOORS AND WINDOWS -
DOORS -
E01 Teak Wood frame with OST Flush shutter
with teak wood panneling for Main door. -
Stilt floor Sft 28.00 2,420.00 -
Ground floor Sft 28.00 2,420.00 67,760.00 35.00 84,700.00
E02 Teak Wood frame withTeak wood shutter for
pooja Door - PD. -
Stilt floor Sft 28.00 2,750.00 28.00 77,000.00
Ground floor Sft 28.00 2,750.00 77,000.00 28.00 77,000.00
E03 Teak Wood frame with BST Flush shutter for
Room doors. -
Stilt floor Main door Sft 2,100.00 73.50 154,350.00
Stilt floor Sft 42.00 1,800.00 75,600.00 42.00 75,600.00
Ground floor Sft 42.00 1,800.00 75,600.00 45.50 81,900.00
First floor Sft 59.50 1,800.00 107,100.00 45.50 81,900.00
-
NT1 Teak Wood frame with OST Flush shutter for
Toilet, Utility & Terrace door. -
Stilt floor Sft 1,750.00 56.00 98,000.00
Ground floor Sft 1,750.00 -
First floor Sft 1,750.00 -
Terrace Floor Sft 1,750.00 22.75 39,812.50
-
E04 Teak Wood frame with Fully Glazed Teak
wood shutter including Glass for Toilet doors
-
Stilt floor Sft 17.50 2,285.00 39,987.50 -
Ground floor Sft 35.00 2,285.00 79,975.00 38.50 87,972.50
First floor Sft 35.00 2,285.00 79,975.00 38.50 87,972.50
First floor Sliding door 2,500.00 42.00 105,000.00
E05 Sal Wood frame with commercial
waterproof Flush shutter for Servent Room
and Servent toilet doors -
Stilt floor Sft 38.50 750.00 28,875.00 17.50 13,125.00
WINDOWS -
E06 Teak wood frame with Teak wood shutter
for Windows -
Stilt floor Sft 94.50 2,100.00 198,450.00 145.50 305,550.00
Ground floor Sft 142.50 2,100.00 299,250.00 143.50 301,350.00
First floor Sft 181.50 2,100.00 381,150.00 188.00 394,800.00
E07 Sal Wood frame with Honne wood shutter
for Windows in Servent room and Servent
Toilet -
Stilt floor Sft 58.50 1,050.00 61,425.00 -
-
WOOD WORK ADVANCE 1,000,000.00 -1.00 -1,000,000.00
-
-
1,572,147.50 1,066,032.50 2,066,032.50
-
F INTERIOR WORKS -
-
F01 19 mm Century Commercial Ply, Inside
0.8mm Laminate Finish & Outside Decorative
Veneer of Rs 150/- per sft With Mellamine
Finish , Fittings all are Hetich, Handles are
below 150 Rs and Locks are Europa.
-
Ground floor -
Below loft Sft 80.50 1,840.00 148,120.00 -
Above Loft Sft 34.50 950.00 32,775.00 -
First floor -
Below loft Sft 196.35 1,840.00 361,284.00 -
Above Loft Sft 84.15 950.00 79,942.50 -
-
F02 Kitchen Cabinet -
16 mm Century Water Proof Ply, Inside
0.8mm Laminate Finish & Outside 1 mm
Laminate with Alluminium edge Profile Finish,
Hinges all are Hetich -
Stilt floor -
Below platform Sft 20.31 1,500.00 30,465.00 -
Above platform Sft 16.25 1,200.00 19,500.00 -
Above Loft Sft 24.38 1,000.00 24,380.00 -
Ground floor -
Below platform Sft 63.13 2,200.00 138,886.00 -
Above platform Sft 50.50 1,600.00 80,800.00 -
Above Loft Sft 102.75 1,200.00 123,300.00 -
Tall unit Sft 21.00 1,600.00 33,600.00 -
F03 T.V.Cabinet -
Ground floor Sft 70.00 1,500.00 105,000.00 -
F04 Crockery unit Sft 70.00 2,000.00 140,000.00 -
F05 Cot with back rest Each 3.00 75,000.00 225,000.00 -
F06 Study table Each 1.00 50,000.00 50,000.00 -
F07 Teak wood with Glass Stair case Railings Sft 303.00 1,200.00 363,600.00 -
Interior Work Advance 500,000.00 1.00 500,000.00
Pooja Work Advance 200,000.00 1.00 200,000.00
Stair Case & Railing Work Advance 500,000.00 1.00 500,000.00

1,956,652.50 1,200,000.00 1,200,000.00


-
G PLASTERING -
G01 Outside Plastering -
Stilt floor Sft 4,135.06 55.00 227,428.30 4,261.18 234,364.90
Ground floor Sft 2,345.50 55.00 129,002.50 2,333.58 128,346.90
First floor Sft 2,035.00 55.00 111,925.00 2,481.15 136,463.25
Terrace floor Sft 1,991.56 55.00 109,535.80 2,182.62 120,044.10
G02 Inside Wall Plastering 11,258.53 -
Stilt floor Sft 3,105.25 52.00 161,473.00 3,885.01 202,020.52
Ground floor Sft 3,242.40 52.00 168,604.80 2,847.16 148,052.32
First floor Sft 3,422.50 52.00 177,970.00 3,455.69 179,695.88
Terrace floor Sft 510.00 52.00 26,520.00 715.71 37,216.92
G03 Inside Ceiling Plastering -
Stilt floor Sft 1,933.56 55.00 106,345.80 2,146.95 118,082.25
Ground floor Sft 1,572.21 55.00 86,471.55 1,688.35 92,859.25
First floor Sft 1,155.99 55.00 63,579.45 1,323.26 72,779.30
Terrace floor Sft 165.00 55.00 9,075.00 169.06 9,298.30
G04 Water proof plastering for toilets -
Ground floor Sft 145.75 60.00 8,745.00 160.75 9,645.00
First floor Sft 195.50 60.00 11,730.00 230.50 13,830.00
1,398,406.20 1,502,698.89 1,502,698.89
-
H FLOORING (without basic material cost) -
H01 Italian marble for Flooring -
Ground floor Sft 872.83 200.00 174,566.00 991.85 198,370.00
First floor Sft 446.57 200.00 89,314.00 538.80 107,760.00
H02 Italian marble for Skirting - -
Ground floor Rft 194.00 130.00 25,220.00 96.17 12,502.10
First floor Rft 158.33 130.00 20,582.90 109.63 14,251.90
H03 Wooden Flooring - -
Ground floor Sft 232.49 20.00 4,649.80 -
First floor Sft 423.27 20.00 8,465.40 -
H04 Wooden Skirting - -
Ground floor Rft 74.25 10.00 742.50 -
First floor Rft 148.25 10.00 1,482.50 -
H05 Wooden flooring Profile - -
Ground floor Rft 15.00 10.00 150.00 -
First floor Rft 25.00 10.00 250.00 -
H06 Cement flooring - -
Ground floor Sft 232.49 80.00 18,599.20 234.22 18,737.60
First floor Sft 423.27 80.00 33,861.60 412.88 33,030.40
H07 Vitrified tiles flooring - -
Stilt floor Sft 911.09 80.00 72,887.20 888.44 71,075.20
Ground floor Sft 80.00 - 40.72 3,257.60
H08 Vitrified skirting - -
Stilt floor Rft 228.75 75.00 17,156.25 290.00 21,750.00
H09 Ceramic Tiles Flooring - -
Stilt floor Sft 139.83 80.00 11,186.40 69.02 5,521.60
Ground floor Sft 185.59 80.00 14,847.20 40.00 3,200.00
First floor Sft 101.00 80.00 8,080.00 -
H10 Ceramic Tiles Dadooing - -
Stilt floor Sft 453.50 90.00 40,815.00 353.50 31,815.00
Ground floor Sft 666.75 90.00 60,007.50 507.50 45,675.00
First floor Sft 385.50 90.00 34,695.00 -
H11 Italian Marble slab for Internal Stairs - -
Ground floor Sft 108.00 220.00 23,760.00 -
First floor Sft 108.00 220.00 23,760.00 -
H12 Italian Marble slab for Internal Stairs Skirting - -
Ground floor Rft 39.50 150.00 5,925.00 -
First floor Rft 39.50 150.00 5,925.00 -
H13 Granite slab for outside Stairs - -
Stilt floor St 161.86 140.00 22,660.40 -
H14 Granite slab for outside Stairs Skirting - -
Stilt floor Rft 50.13 110.00 5,514.30 -
H15 Granite Flooring - -
Ground floor Sft 276.08 110.00 30,368.80 -
First floor St 149.47 110.00 16,441.70 -
H16 Granite skirting - -
Ground floor Rft 104.89 110.00 11,537.90 -
First floor Rft 49.53 110.00 5,448.30 -
H17 Parking Tiles For flooring - -
Stilt floor Sft 959.16 80.00 76,732.80 -
H18 Parking Tiles for skirting - -
Stilt floor Rft 340.50 75.00 25,537.50 -
H19 Balcony tiles flooring - -
First floor Sft 153.75 80.00 12,300.00 -
H20 Balcony tiles skirting - -
First floor Rft 50.76 75.00 3,807.00 -
H21 20 mm granite slab for kitchen / Counters - -
Stilt floor Sft 21.00 100.00 2,100.00 -
Ground floor Sft 54.00 100.00 5,400.00 -
First floor Sft 24.00 100.00 2,400.00 -
H22 40 mm granite slab for Utility - -
Ground floor Sft 15.13 100.00 1,513.00 -
H23 20mm Granite Cladding @ Entrance Door Sft 300.00 150.00 45,000.00 121.19 18,178.50
H24 Italian Marble Full nosing Rft 100.00 150.00 15,000.00 -
H25 Italian Marble Half nosing - -
Ground floor Rft 100.00 100.00 10,000.00 -
First floor Rft 100.00 - -
H26 Italian Marble Double nosing Rft 160.00 250.00 40,000.00 -
H27 20 mm Granite full nosing Rft 50.00 100.00 5,000.00 -
H28 20 mm Granite half nosing Rft 50.00 50.00 2,500.00 -
H29 20 mm Granite Double nosing Rft 150.00 150.00 22,500.00 -
H30 40 mm Granite full nosing Rft 30.00 100.00 3,000.00 -
H31 V-Groove in granite Rft 300.00 100.00 30,000.00 -
H32 Fixing Granite Cill for Bathroom door Each 6.00 150.00 900.00 -
H33 Clay Tiles for Terrace floor Sft 1,188.00 80.00 95,040.00 -
H34 Water proofing for Terraces Sft 1,188.00 85.00 100,980.00 1,453.76 123,569.60
1,288,610.15 708,694.50 708,694.50
-
I PAINTING WORKS -
I01 Plastic Emulsion -
Stilt floor Sft 5,038.81 26.00 131,009.06 -
Ground floor Sft 4,814.61 26.00 125,179.86 -
First floor Sft 4,578.49 26.00 119,040.74 -
Terrace floor Sft 675.00 26.00 17,550.00 -
I02 Exterior Emulsion (Apex) 15,106.91 11,258.53 -
Stilt floor Sft 4,135.06 24.00 99,241.44 -
Ground floor Sft 2,345.50 24.00 56,292.00 -
First floor Sft 2,035.00 24.00 48,840.00 -
Terrace floor Sft 1,991.56 24.00 47,797.44 -
I03 Enamel Paint -
Stilt floor Sft 360.63 22.00 7,933.86 -
Ground floor Sft 178.13 22.00 3,918.75 -
First floor Sft 226.88 22.00 4,991.25 -
I04 Melamine Polish -
Stilt floor Sft 266.83 90.00 24,014.25 -
Ground floor Sft 510.63 90.00 45,956.25 -
First floor Sft 463.13 90.00 41,681.25 -
Advance 200,000.00 1.00 200,000.00

773,446.15 200,000.00 200,000.00


J MISCELLANEOUS -
J01 Sump Tank Ltrs 10,000.00 10.00 100,000.00 -
J02 Anti-termite treatment for Pesticides Sft 2,400.00 10.00 24,000.00 -
J03 Bath Floor Filling -
Stilt floor Cft 80.00 - 13.84 1,107.20
Ground floor Cft 70.00 80.00 5,600.00 90.26 7,220.80
First floor Cft 138.00 80.00 11,040.00 104.59 8,367.20
J04 Stone Slab over Drains Sft 200.00 250.00 50,000.00 -
J05 Chicken Mesh Sft 200.00 180.00 36,000.00 322.68 58,082.40
J06 Grooves 1/2" Sft 600.00 20.00 12,000.00 19.33 386.60
J07 Cornice works - 1 step Sft 400.00 30.00 12,000.00 229.25 6,877.50
2 steps Sft 200.00 50.00 10,000.00 -
J08 Washing Stone Sft 10.00 350.00 3,500.00 -
J09 20 mm granite for Name board No 1.00 5,000.00 5,000.00 -
J10 Granite Cutting for Sink Each 3.00 600.00 1,800.00 -
J11 Granite Cutting for Hob Each 1.00 300.00 300.00 -
J12 Chimney Hole Each 2.00 1,000.00 2,000.00 -
J13 Gas Piping L.S 15,000.00 -
J14 Rain Water Harvesting Each 2.00 15,000.00 30,000.00 -
J15 Rough Stone Cladding @ Outside Wall
(Inclusive of Material) Sft 550.00 400.00 220,000.00 -
538,240.00 82,041.70 277,916.70
-
-
K M.S. / S.S. WORKS (without Basic material cost but including Painting) -
K01 M.S. Gate Sft 130.00 60.00 7,800.00 -
K02 M.S. Staircase Railing Sft 71.06 50.00 3,553.00 -
K03 M.S. Covering Grill Sft 871.50 40.00 34,860.00 -
K04 M.S. Balcony Railing Sft 45.00 35.00 1,575.00 -
K05 M.S. T-angle Set 1.00 350.00 350.00 -
K06 M.S. Sky light covering Sft 355.00 100.00 35,500.00 -
K07 M.S. Ladder L.S 1.00 1,500.00 1,500.00 -
K08 M.S.Door Sft 42.00 60.00 2,520.00 -
K09 M.S.Grill Door Sft 21.00 80.00 1,680.00 -
K10 M.S.Frame for Structural Glazing Sft 325.00 50.00 16,250.00 -

105,588.00 - -
-
-
-
L PLUMBING & SANITARY WORKS -
L01 3/4" CPVC pipe (Cold & Hot Water ) Rft 650.00 110.00 71,500.00 -
L02 1" CPVC pipe Rft 500.00 110.00 55,000.00 -
L03 2" CPVC pipe Rft 40.00 225.00 9,000.00 -
L04 3/4" gate valve Nos 3.00 730.00 2,190.00 -
L05 1" gate value Nos 8.00 1,442.00 11,536.00 -
L06 2" gate valve Nos 1.00 1,854.00 1,854.00 -
L07 Ball valve for sump tank Each 1.00 835.00 835.00 -
L08 PVC over head tank Ltr 2,000.00 9.00 18,000.00 -
L09 3/4" Non-Return Valve for Solar Each 1.00 850.00 850.00 -
L10 PVC Pipes -
a) 1 1/2" dia Rft 80.00 88.00 7,040.00 -
b) 2 1/2" dia Rft 270.00 160.00 43,200.00 -
c) 3" dia Rft 242.00 -
e) 4" dia (4kg/cm2) Rft 270.00 283.00 76,410.00 -
f) 5" dia (6kg/cm2) Rft 130.00 335.00 43,550.00 -
L11 PVC multi trap Each 14.00 900.00 12,600.00 -
L12 PVC P- trap Each 4.00 1,262.00 5,048.00 -
L13 Chambers 12"x12" Each 4.00 3,965.00 15,860.00 -
L14 Chambers 21"x21" Each 4.00 4,532.00 18,128.00 -
L15 Chambers 24"x24" Each 1.00 5,253.00 5,253.00 -
Fixtures (labour only) -
L16 E.W.C with flushtank fixing Each 1,365.00 - -
L17 Wall mounted Commode fixing Each 6.00 2,009.00 12,054.00 -
L18 Concealed Flush tank fixing Each 6.00 1,365.00 8,190.00 -
L19 Wash basin fixing Each 7.00 412.00 2,884.00 -
L20 Shower and shower arm fixing Each 6.00 283.00 1,698.00 -
L21 Angle cock & stop cock fixing Each 25.00 52.00 1,300.00 -
L22 Grating with frame fixing Each 16.00 62.00 992.00 -
L23 Wall mixer fixing Each 6.00 361.00 2,166.00 -
L24 2 IN 1 bib cock & Heaalth faucet fixing Each 6.00 124.00 744.00 -
L25 Sink Cock fixing Each 2.00 345.00 690.00 -
L26 Short body bib cock fixing Each 3.00 52.00 156.00 -
L27 Bootle Trap Fixing Each 6.00 82.00 492.00 -
L28 Single liver diverter Each 258.00 - -
L29 Spout Each 36.00 - -
L30 Waste pipe fixing Each 6.00 52.00 312.00 -
L31 Concealed stop cock Each 6.00 52.00 312.00 -
L32 Washing mechine tap Each 1.00 42.00 42.00 -
L33 Rain water filter fixing Each 1.00 7,983.00 7,983.00 -
L34 Sink fixing Each 3.00 258.00 774.00 -
Advance 450,000.00 1.00 450,000.00
438,643.00 450,000.00 450,000.00
-

-
M ELECTRICALWORKS (Anchor roma ) -
M01 Light point Each 90.00 649.00 58,410.00 -
M02 Spot Light point Each 10.00 805.00 8,050.00 -
M03 Fan point with Regulator Each 8.00 1,133.00 9,064.00 -
M04 Bell point Each 2.00 1,076.00 2,152.00 -
M05 Individual plug point Each 28.00 773.00 21,644.00 -
M06 Plug point Each 30.00 392.00 11,760.00 -
M07 Two way point Each 10.00 1,015.00 10,150.00 -
M08 30 amps DP socket heating point and 5
amps switch with socket Each 10.00 1,000.00 10,000.00 -
M09 15 amps socket point for geezer & AC Each 15.00 541.00 8,115.00 -
M10 30 amps DP point for geezer control Each 15.00 654.00 9,810.00 -
M11 Lighting circuit Rft 600.00 50.00 30,000.00 -
M12 Heating circuit & Main Circuit Rft 700.00 72.00 50,400.00 -
M13 Telephone point Each 3.00 500.00 1,500.00 -
M14 Telephone circuit Rft 200.00 36.00 7,200.00 -
M15 Main circuit and lift 3 phase Rft 200.00 134.00 26,800.00 -
M16 Antana point Each 4.00 500.00 2,000.00 -
M17 Antana circuit Rft 170.00 36.00 6,120.00 -
M18 Pump point No. 1.00 1,076.00 1,076.00 -
M19 Pump Circuit Rft 100.00 72.00 7,200.00 -
M20 Main distribution board (24 way) control for
mains Each 11,500.00 - -
M21 Main distribution board (12 way) control for
mains Each 3.00 6,180.00 18,540.00 -
Main distribution board (8 way) control for
mains Each 4,635.00 - -
M22 Main Panel board L.S. 1.00 100,000.00 -
M23 Main grounding (8' 0" depth) Each 1.00 2,936.00 2,936.00 -
M24 Internal grounding ( 6' 0" depth ) Each 3.00 2,446.00 7,338.00 -
M25 Providing & fixing and laying 35 Sq mm UG
cable with earth work with pvc pipe.(App)
Rft 90.00 150.00 13,500.00 -
M26 CC T.V. Dummy Conduits (1") Rft 150.00 25.00 3,750.00 -
M27 Spot lights for interior works L.S 5,000.00 -
M29 Chandalear point -
M32 Lift Pannel 1.00 15,000.00 15,000.00 -
M33 Lift light Wireing and 5amps plug point L.S 1.00 6,000.00 6,000.00 -
M34 G.I.Earth srtip 120.00 130.00 15,600.00 -
-
Advance 100,000.00 -
Advance 150,000.00 1.00 150,000.00
469,115.00 150,000.00 250,000.00
-
N MATERIALS TO BE SUPPLIED BY THE OWNER -
-
FLOORING & CLADDING MATERIALS -
1 Italian marble Sft 2,000.00 400.00 800,000.00 -
2 Vitrified tiles Sft 1,225.00 80.00 98,000.00 -
3 20 mm Granite slabs for Flooring Sft 525.00 200.00 105,000.00 -
4 20 mm Granite slabs for external stair case Sft 200.00 200.00 40,000.00 -
5 20 mm Granite slabs for cladding Sft 310.00 200.00 62,000.00 -
6 20 mm granite slab for kitchen / Counters Sft 150.00 200.00 30,000.00 -
7 40 mm Granite slabs for Utility Sft 25.00 200.00 5,000.00 -
8 Parking tiles Sft 1,200.00 150.00 180,000.00 -
9 Ceramic tiles- Floor Sft 450.00 80.00 36,000.00 -
10 Ceramic tiles- Dadoo Sft 1,600.00 100.00 160,000.00 -
11 Wooden Flooring Sft 700.00 150.00 105,000.00 -
12 Wooden Skirting Rft 225.00 100.00 22,500.00 -
13 Wooden profile Rft 50.00 110.00 5,500.00 -
14 Clay Tiles Sft 1,200.00 15.00 18,000.00 -
-
M.S. WORKS -
1 M.S. Gate Sft 130.00 400.00 52,000.00 -
2 S.S Staircase Railing Sft 71.06 1,000.00 71,060.00 -
3 M.S. Covering Grill Sft 871.50 200.00 174,300.00 -
4 M.S. Balcony Railing Sft 45.00 180.00 8,100.00 -
5 M.S. T-angle Set 1.00 5,000.00 5,000.00 -
6 M.S. Sky light covering Sft 355.00 300.00 106,500.00 -
7 M.S. Ladder L.S 1.00 8,500.00 8,500.00 -
8 M.S.Door Sft 42.00 380.00 15,960.00 -
9 M.S.Grill Door Sft 21.00 300.00 6,300.00 -
10 M.S.Frame for Structural Glazing Sft 325.00 200.00 65,000.00 -
Advance 300,000.00 1.00 300,000.00
-

-
PLUMBING AND SANITORY WORKS -
1 Wall mounted Commode Each 6.00 9,800.00 58,800.00 -
2 Concealed Flush tank Each 6.00 9,000.00 54,000.00 -
3 Wash basin Each 7.00 3,300.00 23,100.00 -
4 Shower and shower arm Each 6.00 2,750.00 16,500.00 -
5 Angle cock & stop cock (With Flange) Each 25.00 810.00 20,250.00 -
6 Grating with frame Each 16.00 140.00 2,240.00 -
7 Wall mixer Each 6.00 4,125.00 24,750.00 -
8 Connection pipes Each 24.00 145.00 3,480.00 -
9 Wastepipe & coupling Each 10.00 605.00 6,050.00 -
10 Pillar cock Each 7.00 2,000.00 14,000.00 -
11 Health faucet Each 6.00 1,210.00 7,260.00 -
12 2 IN 1 bib cock Each 6.00 2,065.00 12,390.00 -
13 Short body bib cock Each 10.00 935.00 9,350.00 -
14 Sink Cock Each 3.00 2,000.00 6,000.00 -
15 Single liver diverter Each 10,000.00 - -
16 3/4" Extension Nipple Each 10.00 80.00 800.00 -
17 1" Extension Nipple Each 10.00 100.00 1,000.00 -
18 X- Nipple With Flange Each 100.00 - -
19 Stainless steel Sink for kitchen -
Stilt floor Each 1.00 6,000.00 6,000.00 -
Ground floor Each 2.00 15,000.00 30,000.00 -
GLASS WORKS -
1 Shower partition Each 3.00 45,000.00 135,000.00 -
2 Design Glass for railings Sft 200.00 - -
3 Laminated Glass for Sky light Sft 355.00 800.00 284,000.00 -
4 Structural Glazing Sft 325.00 300.00 97,500.00 -
-
KITCHEN ACCESSORIES ( Haffele Blum) -
a) Tandom Box 30 Kg Nos 8.00 5,975.00 47,800.00 -
b) Tandom Box 65Kg with Gallery Nos 6.00 8,125.00 48,750.00 -
c) Spice Rack Nos 1.00 11,975.00 11,975.00 -
d) Dust bin holder Nos 1.00 2,875.00 2,875.00 -
e) Detergent holder Nos 1.00 950.00 950.00 -
f) Aventos Nos 4.00 14,725.00 58,900.00 -
-
1 H.M.G Bill -1 1.00 1,800,000.00
2 H.M.G Bill -2 1.00 115,000.00
3 H.M.G Bill -3 1.00 307,400.00
4 Chabria & Sons Bill-1 1.00 200,000.00
5 Chabria & Sons Bill-2 1.00 370,000.00
6 S.S. Ceramics Bill-1 1.00 84,000.00
7 S.S. Ceramics Bill-2 1.00 4,500.00
8 Nitko Bill -1 1.00 55,000.00
9 Nitko Bill -2 1.00 144,000.00
10 Muniraj Stones 1.00 192,066.00
11 Wood & Moulding 1.00 100,000.00

3,163,440.00 3,671,966.00 3,671,966.00

O LIFT ( 5 Passanger) LS 1,100,000.00


Advance 300,000.00 1.00 300,000.00
Advance 290,000.00 1.00 290,000.00
1,100,000.00 590,000.00 590,000.00

P DEMOLITION WORKS -
P01 SSM
Stilt floor Cft 70.00 27.00 1,890.00
P02 BBM 9" thk -
Stilt floor Cft 70.00 13.13 919.10
Ground floor Cft 70.00 138.38 9,686.60
First floor Cft 70.00 51.84 3,628.80
Terrace floor Cft -
P03 BBM 4.5" thk -
Stilt floor Sft 50.00 28.75 1,437.50
Ground floor Sft 50.00 -
First floor Sft 50.00 -
Terrace floor Sft 50.00 -
-
P04 R.C.C Work Demolition -
P04A PCC 1:3:6 Sills
Stilt floor Cft 120.00 7.39 886.80
Ground floor Cft 120.00 1.69 202.80
First floor Cft 120.00 -
Terrace floor Cft 120.00 -
-
P04B RCC Lintel Concrete
Stilt floor Cft 150.00 0.87 130.50
Ground floor Cft 150.00 -
First floor Cft 150.00 -
Terrace floor Cft 150.00 -
P04C RCC Chajja Concrete
Ground floor Cft 150.00 0.28 42.00
First floor Cft 150.00 0.28 42.00
- 18,866.10 18,866.10

Q ESCALATION
Cement
1 Bill dt.04.12.19 (360.00-375.00= -15.00) Bags -15.00 -
2 Bill dt.13.12.19 (360.00-375.00 = -15.00) Bags -15.00 -
3 Bill dt.22.12.19 (360.00-375.00= -15.00) Bags -15.00 -
4 Bill dt.04.01.20 (335.00-375.00= -40.00) Bags -40.00 -
5 Bill dt.15.02.20 (360.00-375.00= -15.00) Bags -15.00 -
6 Bill dt.15.02.20 (360.00-375.00= -15.00) Bags -15.00 -
7 Bill dt.17.03.20 (335.00-375.00= -40.00) Bags -40.00 -
8 Bill dt.13.06.20 (400.00-375.00= 25.00) Bags 25.00 -
9 Bill dt.18.08.20 (400.00-375.00= 25.00) Bags 25.00 50.00 1,250.00
10 Bill dt.24.08.20 (400.00-375.00= 25.00) Bags 25.00 25.00 625.00
11 Bill dt.14.09.20 (390.00-375.00= 15.00) Bags 15.00 50.00 750.00
12 Bill dt.02.10.20 (400.00-375.00= 25.00) Bags 25.00 50.00 1,250.00
13 Bill dt.02.10.20 (400.00-375.00= 25.00) Bags 25.00 50.00 1,250.00
14 Bill dt.15.10.20 (400.00-375.00= 25.00) Bags 25.00 50.00 1,250.00
15 Bill dt.24.10.20 (400.00-375.00= 25.00) Bags 25.00 50.00 1,250.00
16 Bill dt.08.11.20 (400.02-375.00= 25.00) Bags 25.00 50.00 1,250.00
17 Bill dt.16.11.20 (400.00-375.00= 25.00) Bags 25.00 100.00 2,500.00
18 Bill dt.29.12.20 (390.00-375.00= 15.00) Bags 15.00 50.00 750.00
19 Bill dt.03.01.21 (400.00-375.00= 25.00) Bags 25.00 50.00 1,250.00
20 Bill dt.10.02.21 (390.00-375.00= 15.00) Bags 15.00 50.00 750.00
21 Bill dt.03.03.21 (400.00-375.00= 25.00) Bags 25.00 50.00 1,250.00

Steel
1 Bill dt.04.12.19 (43.01-50.00= -6.99) Kgs -6.99 -
2 Bill dt.27.12.19 (46.00-50.00 = -4.00) Kgs -4.00 -
3 Bill dt.21.01.20 (49.98-50.00 = -0.02) Kgs -0.02 -
4 Bill dt.13.02.20 (47.50-50.00 = -2.50) Kgs -2.50 -
5 Bill dt.24.02.20 (48.00-50.00 = -2.00) Kgs -2.00 -
6 Bill dt.16.05.20 (49.20-50.00 = -0.79) Kgs -0.79 -
7 Bill dt.01.07.20 (45.00-50.00 = -5.00) Kgs -5.00 -
8 Bill dt.18.07.20 (43.50-50.00) = -6.50) Kgs -6.50 -
9 Bill dt.25.07.20 (43.99-50.00) = -6.01) Kgs -6.01 -

15,375.00 -78,871.65

S EXTRA WORKS
a) Sanction Plan Charges
b) BWSSB Prorata, Point & inspection Charges
( Approximately ) 150,000.00
c) BESCOM deposits and office expencess for
Temparory connection( Approximately) 60,000.00
d) BESCOM deposits and office expencess for
permanent connection( Approximately) 100,000.00
e) Bore Well Pump 100,000.00
f) Solar Water Heater (200 ltr) 60,000.00
NT1 Security Systems
Advance 50,000.00 1.00 50,000.00
NT2 A.C System
Advance 350,000.00 1.00 350,000.00
Advance 100,000.00 1.00 100,000.00

470,000.00 500,000.00 637,000.00

T FIXTURES & APPLIANCES (Including Labour)


a) 25 lts Geyser Nos 6.00 10,500.00 63,000.00
b) Ceiling Fans Nos 10.00 2,500.00 25,000.00
c) Tube Lights (LED) Nos 10.00 650.00 6,500.00
d) 40 W Light Nos 10.00 18.00 180.00
e) Calling Bell Nos 2.00 180.00 360.00
f) Bulkhead Fitting Nos 5.00 350.00 1,750.00
g) Electrical Chimney Nos 1.00 25,000.00 25,000.00
h) Hobb Nos 1.00 10,000.00 10,000.00
i) Towel Rod Nos 7.00 1,800.00 12,600.00
j) Towel Ring Nos 7.00 750.00 5,250.00
k) Soup Tray Nos 7.00 750.00 5,250.00
l) Mirror in Bathroom Nos 7.00 850.00 5,950.00
m) Corner Tray Nos 6.00 1,400.00 8,400.00
n) 1.0 H.P Water Pump & fittings Nos 1.00 12,000.00 12,000.00
o) Pelmet Rods Ls 1.00 60,000.00 60,000.00
241,240.00 -
COST SUMMARY

A EARTHWORK 182,131.75 1,715.70

B MASONARY WORK 1,368,402.00 271,845.60

C CONCRETE WORK 2,008,980.70 151,570.50

D STEEL 1,324,300.00 -20,318.40

E DOORS AND WINDOWS 1,572,147.50 1,066,032.50

F INTERIOR WORKS 1,956,652.50 1,200,000.00

G PLASTERING 1,398,406.20 1,502,698.89

H FLOORING 1,288,610.15 708,694.50

I PAINTING WORKS 773,446.15 200,000.00

J MISCELLINIOUS WORKS 538,240.00 82,041.70

K M.S / S.S WORKS 105,588.00 -

L PLUMBING AND SANITARY WORKS 438,643.00 450,000.00

M ELECTRICAL WORKS 469,115.00 150,000.00

N MATERIALS SUPPLIED BY THE OWNER 3,163,440.00 3,671,966.00

O LIFT ( 5 Passanger) 1,100,000.00 590,000.00

P DEMOLITION WORKS 18,866.10

Q ESCALATION 15,375.00
S EXTRA WORKS 470,000.00 500,000.00

T FIXTURES & APPLIANCES 241,240.00 -

Total Rs. 18,399,342.95 10,560,488.09 16,407,355.74


Note: Tax extra as applicable

Advance paid till date

Balance payable
RE FINAL
Previous Qty Total Qty Total Amount
AMOUNT

5,084.13 5,198.51 77,977.65


5,704.66 5,704.66 28,523.30
98.28 98.28 1,474.20
- - -
- - -
107,975.15
- - -
- - -
902.91 921.85 165,933.00
- - -
947.06 1,147.69 229,538.00
1,174.64 1,182.94 236,588.00
1,324.11 1,330.39 266,078.00
- 659.35 131,870.00
- - -
756.75 1,261.62 151,394.40
408.42 488.47 58,616.40
257.25 288.34 34,600.80
- 163.36 19,603.20
1,294,221.80
- - -
- - -
- - -
683.88 697.26 83,671.20
699.63 699.63 83,955.60
9.48 9.48 1,137.60
1,526.69 1,544.69 324,384.90
245.95 258.49 77,547.00
- - -
8.14 57.33 7,452.90
7.59 58.13 7,556.90
12.00 75.84 9,859.20
- 70.13 9,116.90
- - -
64.43 64.43 21,261.90
185.06 213.75 70,537.50
169.31 169.31 55,872.30
169.31 169.31 55,872.30
- 88.88 29,330.40
- - -
- - -
46.24 58.83 17,649.00
28.76 30.64 9,192.00
28.22 31.22 9,366.00
- - -
- - -
79.50 81.50 19,967.50
60.25 60.25 14,761.25
95.25 95.25 23,336.25
- 28.50 6,982.50
- - -
360.53 400.75 122,228.75
354.19 354.19 108,027.95
340.69 340.69 103,910.45
- 77.06 23,503.30
- - -
733.46 745.31 227,319.55
631.18 631.18 192,509.90
671.90 671.90 204,929.50
- 69.33 21,145.65
- - -
19.40 19.40 7,760.00
- - -
37.34 37.34 29,872.00
- - -
- - -
135.00 135.00 54,000.00
- - -
2,034,018.15
- - -
- - -

- - -
8,813.00 8,813.00 599,284.00
7,236.00 7,236.00 492,048.00
5,580.00 5,580.00 379,440.00
288.00 288.00 19,584.00
100.00 100.00 6,800.00
- -298.80 -20,318.40
- - -
1,476,837.60
- - -
- - -
- - -

- - -
- - -
- 35.00 84,700.00

- - -
- 28.00 77,000.00
- 28.00 77,000.00

- - -
- 73.50 154,350.00
- 42.00 75,600.00
- 45.50 81,900.00
- 45.50 81,900.00
- - -

- - -
- 56.00 98,000.00
- - -
- - -
- 22.75 39,812.50
- - -

- - -
- - -
- 38.50 87,972.50
- 38.50 87,972.50
- 42.00 105,000.00
- - -
- - -
- 17.50 13,125.00
- - -

- - -
- 145.50 305,550.00
- 143.50 301,350.00
- 188.00 394,800.00

- - -
- - -
- - -
1.00 - -
- - -
- - -
2,066,032.50
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- 1.00 500,000.00
- 1.00 200,000.00
- 1.00 500,000.00

1,200,000.00
- - -
- - -
- - -
- 4,261.18 234,364.90
- 2,333.58 128,346.90
- 2,481.15 136,463.25
- 2,182.62 120,044.10
- 11,258.53 -
- 3,885.01 202,020.52
- 2,847.16 148,052.32
- 3,455.69 179,695.88
- 715.71 37,216.92
- - -
- 2,146.95 118,082.25
- 1,688.35 92,859.25
- 1,323.26 72,779.30
- 169.06 9,298.30
- - -
- 160.75 9,645.00
- 230.50 13,830.00
1,502,698.89
- - -
- - -
- - -
- 991.85 198,370.00
- 538.80 107,760.00
- - -
- 96.17 12,502.10
- 109.63 14,251.90
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- 234.22 18,737.60
- 412.88 33,030.40
- - -
- 888.44 71,075.20
- 40.72 3,257.60
- - -
- 290.00 21,750.00
- - -
- 69.02 5,521.60
- 40.00 3,200.00
- - -
- - -
- 353.50 31,815.00
- 507.50 45,675.00
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- 121.19 18,178.50
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- 1,453.76 123,569.60
708,694.50
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- 11,258.53 -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- 1.00 200,000.00
- - -
200,000.00
- - -
17,187.50 17,187.50 171,875.00
2,400.00 2,400.00 24,000.00
- - -
- 13.84 1,107.20
- 90.26 7,220.80
- 104.59 8,367.20
- - -
- 322.68 58,082.40
- 19.33 386.60
- 229.25 6,877.50
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -
- - 277,916.70
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
-
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- 1.00 450,000.00
- - 450,000.00
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -

- - -

- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
1.00 1.00 100,000.00
- 1.00 150,000.00
- - 250,000.00
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- 1.00 300,000.00
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- 1.00 1,800,000.00
- 1.00 115,000.00
- 1.00 307,400.00
- 1.00 200,000.00
- 1.00 370,000.00
- 1.00 84,000.00
- 1.00 4,500.00
- 1.00 55,000.00
- 1.00 144,000.00
- 1.00 192,066.00
- 1.00 100,000.00

- - -
3,671,966.00

- 1.00 300,000.00
- 1.00 290,000.00
590,000.00

- - -
- - -
- 27.00 1,890.00
- - -
- 13.13 919.10
- 138.38 9,686.60
- 51.84 3,628.80
- - -
- - -
- 28.75 1,437.50
- - -
- - -
- - -
- - -
- - -
- - -
- 7.39 886.80
- 1.69 202.80
- - -
- - -
- - -
- - -
- 0.87 130.50
- - -
- - -
- - -
- - -
- 0.28 42.00
- 0.28 42.00
18,866.10

40.00 40.00 -600.00


50.00 50.00 -750.00
75.00 75.00 -1,125.00
100.00 100.00 -4,000.00
100.00 100.00 -1,500.00
50.00 50.00 -750.00
50.00 50.00 -2,000.00
100.00 100.00 2,500.00
- 50.00 1,250.00
- 25.00 625.00
- 50.00 750.00
- 50.00 1,250.00
- 50.00 1,250.00
- 50.00 1,250.00
- 50.00 1,250.00
- 50.00 1,250.00
- 100.00 2,500.00
- 50.00 750.00
- 50.00 1,250.00
- 50.00 750.00
- 50.00 1,250.00

3,695.00 3,695.00 -25,828.05


998.00 998.00 -3,992.00
470.00 470.00 -9.40
5,355.00 5,355.00 -13,387.50
181.00 181.00 -362.00
5,230.00 5,230.00 -4,131.70
288.00 288.00 -1,440.00
5,580.00 5,580.00 -36,270.00
100.00 100.00 -601.00

-78,871.65

62,000.00

75,000.00
- 1.00 50,000.00

- 1.00 350,000.00
- 1.00 100,000.00

637,000.00

107,975.15

1,294,221.80

2,034,018.15

1,476,837.60

2,066,032.50

1,200,000.00

1,502,698.89

708,694.50

200,000.00

277,916.70

450,000.00

250,000.00

3,671,966.00
s
590,000.00

18,866.10

-78,871.65
637,000.00

16,407,355.74

15,547,855.00

859,500.74
Dr.PINAKINI.K.SHANKAR RESIDENCE
MEASUREMENT SHEET OF PRE FINAL BILL

Length Breadth Height Quantity


Sl.no. Description Nos
ft ft ft + -
CIVIL WORKS
A EARTH WORK
A01 Earthwork Excavation.
For Flagging Concete 1.00

A02 Earth Filling using available earth.


For Flagging Concete 1.00

B MASONRY WORKS
B02 BBM 9" thk
Stilt floor
Lift Well Platform 1 1.00 0.75 0.75 1.25 0.70 Cft

Terrace floor
For Placing AC controller 1.00 5.00 4.00 0.42 8.33
For Placing Lift controller 1.00 1.83 1.42 1.17 3.04
11.37 Cft
C CONCRETE WORKS
C01 PCC 1:4:8
Below flooring
Flagging Concrete Alround 1.00 429.60 0.33 143.06 Cft

C04 PCC 1:3:6 Sills


Stilt floor
Clinic
Portion 1 1.00 9.75 1.50 0.25 3.66
Portion 2 (13'6"+4'0") 1.00 17.50 1.50 0.25 6.56
Lift Well 1.00 5.00 5.50 0.50 13.75
Lift Well Platform 1 1.00 0.75 0.75 0.25 0.14
Lift Well Platform 2 1.00 1.50 1.50 2.50 5.63
29.73 Cft

Terrace floor
For Placing AC controller 1.00 5.00 4.00 0.25 5.00
For Placing Lift controller 1.00 1.83 1.42 0.25 0.65
5.65 Cft

E DOORS AND WINDOWS


DOORS
ENT1 Sliding Door 1.00 6.00 7.00 42.00 Sft

F INTERIOR WORKS
F01 Wardrobes `
19 mm Century Commercial Ply, Inside 0.8mm
Laminate Finish & Outside Decorative Veneer of
Rs 150/- per sft With Mellamine Finish , Fittings all
are Hetich, Handles are below 150 Rs and Locks
are Europa.
Stilt floor
Below loft
NE Bedroom 1.00 12.00 7.00 84.00
SE Bedroom 1.00 4.38 7.00 30.63
114.63
Above Loft
NE Bedroom 1.00 12.00 3.00 36.00
SE Bedroom 1.00 4.38 3.00 13.13
49.13
Ground Floor
SW Bedroom(4'10.5"+6'4") 1.00 11.21 10.00 112.08

First floor
NW Bedroom(7'4.5"+7'0") 1.00 7.38 9.50 70.06
SW Bedroom(6'4"+6'4") 1.00 12.66 10.00 126.60
196.66

F02 Kitchen Cabinet


16 mm Century Water Proof Ply, Inside 0.8mm
Laminate Finish & Outside 1 mm Laminate with
Alluminium edge Profile Finish, Hinges all are
Hetich
Stilt floor
Below platform(10'0"+5'0") 1.00 15.00 2.50 37.50 Sft
Above platform 1.00 7.00 2.00 14.00 Sft
Above Loft

Ground floor
Below platform
North Side(8'6"+1'4.5") 1.00 9.88 2.50 24.69
East Side 1.00 11.75 2.50 29.38
54.06 Sft
Above platform
North Side 1.00 3.38 2.00 6.75 Sft

Above Loft
West Side 1.00 13.00 3.00 39.00 Sft

Tall unit 1.00 3.00 7.00 21.00


OTG 1.00 2.00 7.00 14.00
35.00 Sft

F02NT1 Column panelling


South Side(1'6"+9")*2 1.00 4.50 10.00 45.00
North Side(9"+9"+9") 1.00 2.25 10.00 22.50
67.50 Sft
F02NT2 False ceiling
Beam 1.00 10.75 6.75 72.56 Sft

F02NT3 Ribs & Bands


Ribs 4.00 3.00 12.00 Rft

F03 T.V.Cabinet
Ground floor

F04 Crockery unit


East Side 1.00 3.00 4.00 12.00
1.00 2.00 7.00 14.00
West Side 1.00 5.00 4.00 20.00
46.00 Sft
F05 Cot with back rest
2.00 Nos
F06 Study table

F07 Internal Staircase Railing in Teak Wood With


Glass 1.00 100.00 3.00 300.00 Sft

FNT1 Internal Balcony Railing in Teak Wood With


Glass

FNT2 Staircase Steps

FNT3 Pooja Work

FNT4 Pooja Platform & Frame Work

FNT5 Pooja Wall Work (Brick Pattern)

FNT6 Glass Floor 1.00 7.75 4.00 31.00 Sft

FNT7 Lift Panelling


Stilt floor
Lift Wall(1'3"+1'3") 1.00 2.50 7.00 17.50
Jambs(9"+9") 1.00 1.50 7.00 10.50
Lintel 1.00 5.50 1.00 5.50
33.50

Ground floor
Lift Wall(1'3"+2'0") 1.00 2.50 7.00 17.50
Jambs(9"+9") 1.00 1.50 7.00 10.50
Lintel 1.00 6.25 1.00 6.25
34.25

First floor
Lift Wall(1'3"+2'0") 1.00 2.50 7.00 17.50
Jambs(9"+9") 1.00 1.50 7.00 10.50
Lintel 1.00 6.25 1.00 6.25
34.25

102.00 Sft

FNT8 T.V. Wall Panelling 1.00 3.00 7.00 21.00

G PLASTERING
G01 Outside Plastering
Stilt Floor
Garden North Wall 1.00 4.00 7.00 28.00 Sft

Ground Floor
Elevation Wall (15'3"+3'0") 1.00 18.25 10.50 191.63 Sft

First Floor
Elevation Wall (15'3"+3'0") 1.00 18.25 10.50 191.63 Sft

Terrace Floor
Elevation Wall (15'3"+3'0") 1.00 18.25 4.83 88.20 Sft

G02 Inside Wall Plastering


Stilt floor
Platform -1(9"+9"+9") 1.00 2.25 1.50 3.38
Platform -2(1'6"+1'6")*2 1.00 6.00 2.50 15.00
18.38 Sft

Terrace floor
For Placing AC controller 1.00 5.00 4.00 20.00
Sides 1.00 9.00 0.67 6.00
For Placing controller(1'10"+1'5") 1.00 3.25 1.42 4.60
30.61 Sft

G03 Inside Ceiling Plastering


First floor
Grid E7-E8 1.00 15.00 5.50 82.50
Grid C4-C6 1.00 6.50 3.25 21.13
103.63 Sft
H FLOORING
H01 Italian marble for Flooring
Stilt floor
Passage Infront Of lift 1.00 4.00 5.50 22.00 Sft

H02 Italian marble for Skirting


Stilt floor
Passage Infront Of lift 1.00 17.50 17.50 Rft

Ground Floor
Living(18'0"+17'0")*2 1.00 70.00 70.00 Rft

H02NT Italian marble for Dadooing


Ground Floor
Pooja Short Wall Cladding(9'0"+2'6"+2'6"+3'0") 1.00 17.00 2.50 42.50
Pooja South Wall Cladding 1.00 5.25 7.00 36.75
Pooja East Short Wall Cladding 1.00 7.50 1.00 7.50
86.75 Sft

H03 Wooden Flooring


Ground floor
SW Room 1.00 234.22 234.22 Sft

First floor
NW Room 1.00 13.75 13.88 190.78
SW Room 1.00 15.50 15.00 232.50
423.28 Sft

H04 Wooden Skirting


Ground floor
SW Room 1.00 53.38 53.38 Rft

First floor
NW Room 1.00 55.25 55.25
SW Room 1.00 43.13 43.13
151.75 Rft

H05 Wooden flooring Profile


Ground floor
SW Room 1.00 10.13 10.13 Rft

First floor
NW Room 1.00 3.25 3.25
SW Room 1.00 17.88 17.88
31.25 Rft

H09 Ceramic Tiles Flooring


Ground Floor
Utility Wall 1.00 118.27 118.27 Sft

Terrace floor 1.00 1,336.21 1,336.21


Deductions
Elliptical Cutout 1.00 87.70 87.70
Columns 2.00 0.75 1.50 2.25
1,336.21 89.95
1,246.26 Sft

H10 Ceramic Tiles Dadooing


Stilt Floor
Kitchen Wall 1.00 19.00 2.00 38.00 Sft

Ground Floor
Utility Wall 1.00 63.75 4.67 63.75
Deductions
D1 1.00 3.25 3.25
63.75 3.25
60.50 Sft

H13 Granite slab for outside Stairs


Stilt floor
Threads 16.00 1.00 4.08 65.33
Risers 18.00 0.58 4.08 42.60
Landing 1 1.00 4.50 4.83 21.75
Landing 2 1.00 4.08 4.67 19.06
Landing 3 1.00 130.19 130.19
278.92 Sft

H14 Granite slab for outside Stairs Skirting


Stilt floor
Threads 16.00 1.00 16.00
Risers 18.00 0.50 9.00
Landing 2 1.00 8.67 8.67
Landing 3 1.00 23.25 23.25
56.92 Sft

H15 Granite Flooring


Ground floor
SW Toilet 1.00 6.25 9.00 56.25 Sft

First Floor
NW Toilet 1.00 6.00 9.00 54.00
SW Toilet 1.00 86.85 86.85
140.85 Sft

H15NT Granite Dadooing


First Floor
NW Toilet (6'0"+9'0")*2 1.00 30.00 9.00 270.00
SW Toilet 1.00 40.50 9.00 364.50
Deductions
D3 2.00 2.75 7.00 5.50
V 2.00 5.00 2.00 10.00
634.50 15.50
619.00 Sft

H17 Parking Tiles For flooring


Stilt floor
Parking & Utility Flooring 1.00 2,122.39 2,122.39
Deductions
Column 1.00 0.75 1.50 1.13
Built Up Area 1.00 1,233.06 1,233.06
2,122.39 1,234.19
888.21 Sft

H18 Parking Tiles for skirting


Stilt floor
Parking & Utility 1.00 206.00 206.00
Column 1.00 4.50 4.50
Built Up Area 1.00 142.00 142.00
352.50 Rft

H19 Sunroom Flooring


First Floor 1.00 10.38 15.00 155.63 Sft

H20 Sunroom Skirting


First Floor(10'4.5"+15'0")*2 1.00 50.75 50.75 Rft

H25 Italian Marble Half nosing


Stilt floor
Infront Of Lift(9"+1'3"+4'0"+5'6"+9"+1'3") 1.00 13.25 13.25 Rft

Ground floor
Foyer, Staircase & Dining 1.00 51.50 51.50
Living(18'0"+17'0") 1.00 35.00 35.00
86.50 Rft

First floor
Family 1.00 57.75 57.75
Lift,Passage & study(2'0"+1'3"+4'4.5"+2'+7'3') 1.00 16.88 16.88
74.63 Rft

H31 V Groove In Granite


First floor
NW Toilet 4.00 30.00 120.00
SW Toilet 4.00 40.50 162.00
Deductions
Door 6.00 2.75 16.50
282.00 16.50
265.50 Rft

H31NT V Groove In Marble


Ground floor
Pooja South Wall 1.00 5.25 5.25 Rft

H32 Fixing Granite Sill for Bathroom door


Stilt floor
Toilet doors 2.00 2.50 5.00 Rft

Ground floor
Toilet doors 2.00 2.75 5.50 Rft

First floor
Toilet doors 2.00 2.75 5.50 Rft

16.00

H33 Clay Tiles for Terrace floor

H35 20 mm Granite Patti


Ground floor
Balcony Wall Cladding
Horizontal(4'0"+4'4.5"+2'7"+3"+5'11") 2.00 17.13 34.25
Vertical 1.00 9.00 9.00
Main Door 1.00 19.00 19.00
Powder Room Flush Tank Top 1.00 2.25 2.25
SW Room Toilet Flush Tank Top 1.00 6.25 6.25
Shelf (2'0"+1'0")*2 1.00 6.00 6.00
Toilet Door Patti (2'9"+7'0"+7'0") 2.00 16.75 33.50
110.25 Rft

First floor
SW room Toilet Flush Tank Top 1.00 6.25 6.25
Shelf (2'0"+1'0")*2 2.00 6.00 12.00
Toilet Door Patti (2'9"+7'0")*2 2.00 19.50 39.00
Windows Patti (5'0"+2'0")*2 2.00 14.00 28.00
85.25 Rft

H36 20 mm Granite Edge Pollishing


Ground floor
Balcony Wall Cladding
Horizontal(4'0"+4'4.5"+2'7"+3"+5'11") 4.00 17.13 68.50
Vertical 2.00 9.00 18.00
Main Door(5'0"+7'0"+5'0") 2.00 19.00 38.00
Powder Room Flush Tank Top 2.00 2.25 4.50
SW Room Toilet Flush Tank Top 2.00 6.25 12.50
Shelf (2'0"+1'0")*2 2.00 6.00 12.00
Toilet Door Patti (2'9"+7'0"+7'0") 4.00 16.75 67.00
220.50 Rft

First floor
SW room Toilet Flush Tank Top 1.00 6.25 6.25
Shelf (2'0"+1'0")*2 2.00 6.00 12.00
Toilet Door Patti (2'9"+7'0")*2 2.00 19.50 39.00
Windows Patti (5'0"+2'0")*2 2.00 14.00 28.00
85.25 Rft

H37 40 mm Granite Patti


Ground floor
Pooja
SE Side
Horizontal(3'8"+3'1") 2.00 6.75 13.50
vertical 1.00 2.17 2.17
NW Side
Horizontal(3'0"+9'10") 2.00 12.83 25.67
vertical 1.00 2.17 2.17

Step To Living(18'0"+17'0") 1.00 35.00 35.00


78.50 Rft

First floor
NW Dress Room 1.00 7.38 7.38
Cut Out 1.00 50.00 50.00
57.38 Rft

H38 40 mm Granite Edge Polishing


Ground floor
Pooja
SE Side
Horizontal(3'8"+3'1") 10.00 6.75 67.50
vertical 5.00 2.17 10.84
NW Side
Horizontal(3'0"+9'10") 10.00 12.83 128.33
vertical 5.00 2.17 10.84

Step To Living(18'0"+17'0") 3.00 35.00 105.00


322.50 Rft

First floor
NW Dress Room 3.00 7.38 22.13
Cut Out 3.00 50.00 150.00
172.13 Rft

H39NT ONYEX
Ground floor
Pooja 1.00 8.00 4.00 32.00 Sft

I PAINTING WORKS
I01 Plastic Emulsion
Stilt floor
Walls(3885.01+18.38) 1.00 3,903.39 3,903.39
Ceiling 1.00 2,146.95 2,146.95
6,050.34 Sft
Ground floor
Walls 1.00 2,847.16 2,847.16
Ceiling 1.00 1,688.35 1,688.35
4,535.51 Sft
First floor
Walls 1.00 3,455.69 3,455.69
Ceiling 1.00 1,323.26 1,323.26
4,778.95 Sft
Terrace floor
Walls(715.71+4.60) 1.00 720.31 720.31
Ceiling 1.00 169.06 169.06
889.37 Sft

I02 Exterior Emulsion (Apex)


Stilt floor 1.00 4,261.18 4,261.18
Ground floor 1.00 2,333.58 2,333.58
First floor 1.00 2,481.15 2,481.15
Terrace floor 1.00 2,182.62 2,182.62 Sft

I03 Enamel Paint


Stilt floor
For wood works
W3 4.00 5.00 4.50 90.00
W5 2.00 3.00 4.50 27.00
W6 1.00 2.00 4.50 9.00
KW 1.00 3.00 4.50 13.50
V1 1.00 3.00 2.00 6.00
145.50 Sft
Ground floor
For wood works
W1 1.00 8.00 6.00 48.00
W2 1.00 6.00 6.00 36.00
W5 2.00 3.00 4.50 27.00
KW 1.00 3.00 4.50 13.50
V 1.00 5.00 2.00 10.00
V2 1.00 2.00 4.50 9.00
143.50 Sft
First floor
For wood works
W1 2.00 8.00 6.00 96.00
W4 1.00 3.00 6.00 18.00
W5 4.00 3.00 4.50 54.00
V 2.00 5.00 2.00 20.00
188.00 Sft

I04 Melamine Polish


Wood Works
Stilt floor
For Doors
ED 3.00 3.50 7.00 73.50
PD 1.00 4.00 7.00 28.00
D2 3.00 3.00 7.00 63.00
D4 2.00 2.50 7.00 35.00
199.50
Factor 2.50 498.75
For Windows
W3 4.00 5.00 4.50 90.00
W5 2.00 3.00 4.50 27.00
W6 1.00 2.00 4.50 9.00
KW 1.00 3.00 4.50 13.50
V1 1.00 3.00 2.00 6.00
145.50
Factor 1.50 218.25
Total 717.00

Ground floor
For Doors
ED/W 1.00 5.00 7.00 35.00
PD 1.00 4.00 7.00 28.00
D1 2.00 3.25 7.00 45.50
D3 2.00 2.75 7.00 38.50
147.00
Factor 2.50 367.50

For Windows
W1 1.00 8.00 6.00 48.00
W2 1.00 6.00 6.00 36.00
W5 2.00 3.00 4.50 27.00
KW 1.00 3.00 4.50 13.50
V 1.00 5.00 2.00 10.00
V2 1.00 2.00 4.50 9.00
143.50
Factor 1.50 215.25
Total 582.75
First floor
For Doors
D1 2.00 3.25 7.00 45.50
D3 2.00 2.75 7.00 38.50
84.00
Factor 2.50 210.00

For Windows
W1 2.00 8.00 6.00 96.00
W4 1.00 3.00 6.00 18.00
W5 4.00 3.00 4.50 54.00
V 2.00 5.00 2.00 20.00
188.00
Factor 1.50 282.00
Total 492.00
Terrace floor
For Doors
D1 1.00 3.25 7.00 22.75
Factor 2.50 56.88

J MISCELLANEOUS
J04 Stone Slab over Drains 1.00 40.00 5.00 200.00

J06 Grooves 1/2" 32.00 18.25 584.00


Grooves 3/4"
Deductions
W5 14.00 7.83 109.66
584.00 109.66
474.34

J08 Washing Stone 1.00 5.00 2.00 10.00

J09 20 mm granite for Name board 1.00 5.00 2.00 10.00

J10 Granite Cutting for Sink

J11 Granite Cutting for Hob

J12 Chimney Hole 2.00 2.00 Nos

J13 Gas Piping

K M.S. / S.S. WORKS (without Basic material cost but including Painting)
K01 M.S. Gate
Stilt floor
Parking Gate 1.00 20.88 7.50 156.56
Small Gate 1.00 4.00 7.50 30.00
186.56 Sft
K02 S.S. Staircase Railing 1.00
Stilt floor
External Staircase(5'4"+12'0"+9'4.5"+12'9"+3') 1.00 42.46 3.00 127.37 Sft

K03 M.S. Covering Grill


Stilt floor
- Sft
K04 M.S. Balcony Railing
Terrace Floor
Railing Above Sunroom (8'4.5"+15'0') 1.00 23.38 3.00 70.13 Sft

K05 M.S. T-angle 1.00 1.00 No

K06 M.S. Sky light covering


Elliptical skylight 1.00 80.80 80.80
Sun Room Skylight 1.00 9.67 15.04 145.40
226.20 Sft

K07 M.S. Ladder

K08 M.S.Door 1.00 3.25 7.00 22.75 Sft

K09 M.S.Grill Door

K10 M.S.Frame for Structural Glazing

Pargola To Cover The Balcony Near Entrance


KNT1 Door 38.25
1.00 12.75 3.00 Sft

KNT2 Utility Covering


Top 1.00 25.54 3.00 76.63
Side 1.00 25.54 4.50 114.93
191.56 Sft

KNT3 M.S. Internal Staircase 1.00 1.00 No

KNT4 M.S. Staircase In Terrace Floor 1.00 1.00 No

KNT5 M.S. Frame For Glass Floor 1.00 7.75 4.00 31.00 Sft

KNT6 Louvers For Clinic Toilet 1.00 5.00 1.00 5.00 Sft

KNT7 Windows Patti


Windows 4" Thk Band
Bottom 2.00 15.00 1.00 30.00
Sides 4.00 4.50 1.00 18.00
48.00 Sft

KNT8 Sunroom Mesh


First floor
Sun Room Portion
East Side
Bottom 1.00 2.25 15.75 35.44
Sides(2'1"+2'3") 1.00 4.33 15.75 68.25
pillars 7.00 1.00 8.00 56.00
159.69 Sft

KNT9 Compound Mesh


Stilt floor
Compound Wall 1.00 30.00 3.83 114.99 Sft

KNT10 M.S. Sunroom Covering Grill


First Floor(9'7.5"+15'0") 1.00 24.63 9.50 233.94 Sft

L PLUMBING & SANITARY WORKS


L01 3/4" CPVC pipe (Cold & Hot Water ) Rft
L02 1" CPVC pipe Rft
L03 2" CPVC pipe Rft
L04 3/4" gate valve Nos
L05 1" gate value Nos
L06 2" gate valve Nos
L07 Ball valve for sump tank Each
L08 PVC over head tank Ltr
L09 3/4" Non-Return Valve for Solar Each
L10 PVC Pipes
a) 1 1/2" dia Rft
b) 2 1/2" dia Rft
c) 3" dia Rft
e) 4" dia (4kg/cm2) Rft
f) 5" dia (6kg/cm2) Rft
L11 PVC multi trap Each
L12 PVC P- trap Each
L13 Chambers 12"x12" Each
L14 Chambers 21"x21" Each
L15 Chambers 24"x24" Each
Fixtures (labour only)
L16 E.W.C with flushtank fixing Each
L17 Wall mounted Commode fixing Each
L18 Concealed Flush tank fixing Each
L19 Wash basin fixing Each
L20 Shower and shower arm fixing Each
L21 Angle cock & stop cock fixing Each
L22 Grating with frame fixing Each
L23 Wall mixer fixing Each
L24 2 IN 1 bib cock & Heaalth faucet fixing Each
L25 Sink Cock fixing Each
L26 Short body bib cock fixing Each
L27 Bootle Trap Fixing Each
L28 Single liver diverter Each
L29 Spout Each
L30 Waste pipe fixing Each
L31 Concealed stop cock Each
L32 Washing mechine tap Each
L33 Rain water filter fixing Each
L34 Sink fixing Each

M ELECTRICALWORKS (Anchor roma )


M01 Light point Each
M02 Spot Light point Each
M03 Fan point with Regulator Each
M04 Bell point Each
M05 Individual plug point Each
M06 Plug point Each
M07 Two way point Each
M08 30 amps DP socket heating point and 5 amps
switch with socket Each
M09 15 amps socket point for geezer & AC Each
M10 30 amps DP point for geezer control Each
M11 Lighting circuit Rft
M12 Heating circuit & Main Circuit Rft
M13 Telephone point Each
M14 Telephone circuit Rft
M15 Main circuit and lift 3 phase Rft
M16 Antana point Each
M17 Antana circuit Rft
M18 Pump point No.
M19 Pump Circuit Rft
M20 Main distribution board (24 way) control for mains
Each
M21 Main distribution board (12 way) control for mains
Each
Main distribution board (8 way) control for mains
Each
M22 Main Panel board L.S.
M23 Main grounding (8' 0" depth) Each
M24 Internal grounding ( 6' 0" depth ) Each
M25 Providing & fixing and laying 35 Sq mm UG
cable with earth work with pvc pipe.(App) Rft
M26 CC T.V. Dummy Conduits (1") Rft
M27 Spot lights for interior works L.S
M29 Chandalear point
M32 Lift Pannel
M33 Lift light Wireing and 5amps plug point L.S
M34 G.I.Earth srtip

N MATERIALS TO BE SUPPLIED BY THE OWNER

GLASS WORKS
1 Shower partition 4.00 4.00 Nos
2 Design Glass for railings
3 Laminated Glass for Sky light
Elliptical Skylight 1.00 105.60 105.60
Sun room Skylight 1.00 163.94 163.94
Staircase Skylight 1.00 7.25 2.25 16.31
4 Structural Glazing
5 Laminated Glass
Glass Floor 1.00 7.75 4.00 31.00
Infront Of pooja 1.00 4.00 4.00 16.00
Entrance Door pargola Top 1.00 12.75 3.50 44.63
Utility Top 1.00 25.58 3.50 89.51
Parking Pargola 1.00 23.63 3.50 82.69
16,254.17

11,258.53
3.00
1.00
Dr. PINAKINI.K.SHANKAR
ABSTRACT OF P

GROUP ESTIMATED
CODE DESCRIPTION OF WORK UNITS ESTIMATED RATE AMOUNT
QTY (in Rs) (in Rs)
CIVIL WORKS
A EARTH WORK
A01 Earthwork Excavation. Cft 6,754.45 15.00 101,316.75
A02 Earth Filling using available earth. Cft 5,291.00 5.00 26,455.00
A03 Excess Earth carting away from the site.
Cft 2,024.00 15.00 30,360.00
A04 Earth Filling brought from outside Cft 10.00 -
A05 Earth Shifting over area Cft 2,400.00 10.00 24,000.00
182,131.75

B MASONRY WORKS
B01 Size Stone Masonary CM 1:6 Cft 720.00 180.00 129,600.00
B02 BBM 9" thk
Stilt floor Sft 1,873.53 200.00 374,706.00
Ground floor Sft 1,467.47 200.00 293,494.00
First floor Sft 1,490.93 200.00 298,186.00
Terrace floor Sft 817.88 200.00 163,576.00
B03 BBM 4.5" thk
Stilt floor Sft 486.13 120.00 58,335.60
Ground floor Sft 222.99 120.00 26,758.80
First floor Sft 197.88 120.00 23,745.60
Terrace floor Sft 120.00
1,368,402.00

C CONCRETE WORKS
C01 PCC 1:4:8
Below footing Cft 782.60 120.00 93,912.00
Below flooring Cft 962.17 120.00 115,460.40
Below Staircase Landing Cft 120.00
C02 RCC Footing Concrete Cft 1,854.00 210.00 389,340.00
C03 RCC Plinth Beam Cft 288.70 300.00 86,610.00
C04 PCC 1:3:6 Sills
Stilt floor Cft 40.31 130.00 5,240.30
Ground floor Cft 8.54 130.00 1,110.20
First floor Cft 8.25 130.00 1,072.50
Terrace floor Cft 40.27 130.00 5,235.10
C05 RCC Column Concrete
Below Stilt floor Cft 69.75 330.00 23,017.50
Above Stilt floor Cft 165.38 330.00 54,575.40
Ground floor Cft 165.38 330.00 54,575.40
First floor Cft 165.38 330.00 54,575.40
Terrace Floor Cft 82.69 330.00 27,287.70

C06 RCC Lintel Concrete


Stilt floor Cft 27.28 300.00 8,184.00
Ground floor Cft 24.84 300.00 7,452.00
First floor Cft 29.06 300.00 8,718.00
Terrace Floor Cft 3.75 300.00 1,125.00
C07 RCC Chejja, loft concrete
Stilt floor Sft 76.00 245.00 18,620.00
Ground floor Sft 62.00 245.00 15,190.00
First floor Sft 88.00 245.00 21,560.00
Terrace Floor Sft 16.00 245.00 3,920.00
C08 RCC Beam Concrete
Stilt floor Cft 289.27 305.00 88,227.35
Ground floor Cft 347.58 305.00 106,011.90
First floor Cft 313.45 305.00 95,602.25
Terrace Floor Cft 73.41 305.00 22,390.05
C09 RCC Roof Slab concrete
Stilt floor Cft 785.84 305.00 239,681.20
Ground floor Cft 631.65 305.00 192,653.25
First floor Cft 497.06 305.00 151,603.30
Terrace floor Cft 82.50 305.00 25,162.50
C10 RCC Staircase Waist Slab
Stilt floor Cft 75.17 400.00 30,068.00
C11 RCC Staircase Folded type
Stilt floor Cft 800.00
Ground floor Cft 38.00 800.00 30,400.00
First floor Cft 38.00 800.00 30,400.00
C12 RCC Retaining wall Cft 400.00

2,008,980.70

D STEEL
Steel Reinforcement including fabrication
D01 (Basic cost=Rs.50000 /-)
Stilt floor Kgs 8,000.00 68.00 544,000.00
Ground floor Kgs 5,750.00 68.00 391,000.00
First floor Kgs 5,050.00 68.00 343,400.00
68.00
68.00
68.00
Terrace floor Kgs 675.00 68.00 45,900.00
1,324,300.00

E DOORS AND WINDOWS


DOORS
E01 Teak Wood frame with OST Flush shutter
with teak wood panneling for Main door.

Stilt floor Sft 28.00 2,420.00


Ground floor Sft 28.00 2,420.00 67,760.00
E02 Teak Wood frame withTeak wood shutter
for pooja Door - PD.
Stilt floor Sft 28.00 2,750.00
Ground floor Sft 28.00 2,750.00 77,000.00
E03 Teak Wood frame with BST Flush shutter
for Room doors.
Stilt floor Main door Sft 2,100.00
Stilt floor Sft 42.00 1,800.00 75,600.00
Ground floor Sft 42.00 1,800.00 75,600.00
First floor Sft 59.50 1,800.00 107,100.00

NT1 Teak Wood frame with OST Flush shutter


for Toilet, Utility & Terrace door.
Stilt floor Sft 1,750.00
Ground floor Sft 1,750.00
First floor Sft 1,750.00
Terrace Floor Sft 1,750.00

E04 Teak Wood frame with Fully Glazed Teak


wood shutter including Glass for Toilet
doors
Stilt floor Sft 17.50 2,285.00 39,987.50
Ground floor Sft 35.00 2,285.00 79,975.00
First floor Sft 35.00 2,285.00 79,975.00
First floor Sliding door 2,500.00

E05 Sal Wood frame with commercial


waterproof Flush shutter for Servent Room
and Servent toilet doors
Stilt floor Sft 38.50 750.00 28,875.00
WINDOWS
E06 Teak wood frame with Teak wood shutter
for Windows
Stilt floor Sft 94.50 2,100.00 198,450.00
Ground floor Sft 142.50 2,100.00 299,250.00
First floor Sft 181.50 2,100.00 381,150.00
E07 Sal Wood frame with Honne wood shutter
for Windows in Servent room and Servent
Toilet
Stilt floor Sft 58.50 1,050.00 61,425.00

ENT1 Sliding Door


First floor Sft 3,000.00

WOOD WORK ADVANCE 1,000,000.00

1,572,147.50

F INTERIOR WORKS

F01 Wardrobes
19 mm Century Commercial Ply, Inside
0.8mm Laminate Finish & Outside
Decorative Veneer of Rs 150/- per sft With
Mellamine Finish , Fittings all are Hetich,
Handles are below 150 Rs and Locks are
Europa.
Stilt floor
Below loft Sft 1,500.00 -
Above Loft Sft 900.00 -
Ground floor
Below loft Sft 80.50 1,840.00 148,120.00
1,400.00
Above Loft Sft 34.50 950.00 32,775.00
Glass Door 1,000.00

First floor
Below loft Sft 196.35 1,840.00 361,284.00
1,400.00
Above Loft Sft 84.15 950.00 79,942.50
Glass Door 1,000.00

F02 Kitchen Cabinet


16 mm Century Water Proof Ply, Inside
0.8mm Laminate Finish & Outside 1 mm
Laminate with Alluminium edge Profile
Finish, Hinges all are Hetich
Stilt floor
Below platform Sft 20.31 1,500.00 30,465.00
2,100.00
Above platform Sft 16.25 1,200.00 19,500.00
1,300.00
Above Loft Sft 24.38 1,000.00 24,380.00

Ground floor
Below platform Sft 63.13 2,200.00 138,886.00
2,600.00
Above platform Sft 50.50 1,600.00 80,800.00
1,670.00
Above Loft Sft 102.75 1,200.00 123,300.00
Tall unit Sft 21.00 1,600.00 33,600.00
1,750.00
F02NT1 Column panelling Sft 900.00
F02NT2 False ceiling Sft 1,000.00
F02NT3 Ribs Rft 900.00
F03 T.V.Cabinet
Stilt floor Sft 7,000.00
Ground floor Sft 70.00 1,500.00 105,000.00
F04 Crockery unit Sft 70.00 2,000.00 140,000.00
F05 Cot with back rest Each 3.00 75,000.00 225,000.00
F06 Study table Each 1.00 50,000.00 50,000.00
F07 Internal Staircase Railing in Teak Wood
With Glass Sft 303.00 1,200.00 363,600.00
FNT2 Staircase Steps 700,000.00
FNT3 Pooja Work 300,000.00
FNT4 Pooja Platform And Frame Works 1,800.00
FNT5 Pooja Wall Work (Brick Pattern)
FNT6 Glass Floor 1,250.00
FNT7 Lift Panelling 900.00
FNT8 T.V. Wall Panelling 900.00
Interior Work Advance 500,000.00
Pooja Work Advance 200,000.00
Stair Case & Railing Work Advance 500,000.00

1,956,652.50

G PLASTERING
G01 Outside Plastering
Stilt floor Sft 4,135.06 55.00 227,428.30
Ground floor Sft 2,345.50 55.00 129,002.50
First floor Sft 2,035.00 55.00 111,925.00
Terrace floor Sft 1,991.56 55.00 109,535.80
G02 Inside Wall Plastering
Stilt floor Sft 3,105.25 52.00 161,473.00
Ground floor Sft 3,242.40 52.00 168,604.80
First floor Sft 3,422.50 52.00 177,970.00
Terrace floor Sft 510.00 52.00 26,520.00
G03 Inside Ceiling Plastering
Stilt floor Sft 1,933.56 55.00 106,345.80
Ground floor Sft 1,572.21 55.00 86,471.55
First floor Sft 1,155.99 55.00 63,579.45
Terrace floor Sft 165.00 55.00 9,075.00
G04 Water proof plastering for toilets
Ground floor Sft 145.75 60.00 8,745.00
First floor Sft 195.50 60.00 11,730.00
1,398,406.20

H FLOORING (without basic material cost)


H01 Italian marble for Flooring
Stilt Floor Sft 200.00
Ground floor Sft 872.83 200.00 174,566.00
First floor Sft 446.57 200.00 89,314.00
H02 Italian marble for Skirting
Stilt Floor Rft 130.00
Ground floor Rft 194.00 130.00 25,220.00
First floor Rft 158.33 130.00 20,582.90

H02NT Italian marble for Dadooing


Ground floor Sft 250.00

H03 Wooden Flooring


Ground floor Sft 232.49 20.00 4,649.80
First floor Sft 423.27 20.00 8,465.40
H04 Wooden Skirting
Ground floor Rft 74.25 10.00 742.50
First floor Rft 148.25 10.00 1,482.50
H05 Wooden flooring Profile
Ground floor Rft 15.00 10.00 150.00
First floor Rft 25.00 10.00 250.00
H06 Cement flooring
Ground floor Sft 232.49 80.00 18,599.20
First floor Sft 423.27 80.00 33,861.60
H07 Vitrified tiles flooring
Stilt floor Sft 911.09 80.00 72,887.20
Ground floor Sft 80.00
H08 Vitrified skirting
Stilt floor Rft 228.75 75.00 17,156.25
H09 Ceramic Tiles Flooring
Stilt floor Sft 139.83 80.00 11,186.40
Ground floor Sft 185.59 80.00 14,847.20
First floor Sft 101.00 80.00 8,080.00
H10 Ceramic Tiles Dadooing
Stilt floor Sft 453.50 90.00 40,815.00
Ground floor Sft 666.75 90.00 60,007.50
First floor Sft 385.50 90.00 34,695.00
H11 Italian Marble slab for Internal Stairs
Ground floor Sft 108.00 220.00 23,760.00
First floor Sft 108.00 220.00 23,760.00
H12 Italian Marble slab for Internal Stairs Skirting
Ground floor Rft 39.50 150.00 5,925.00
First floor Rft 39.50 150.00 5,925.00
H13 Granite slab for outside Stairs
Stilt floor St 161.86 140.00 22,660.40
H14 Granite slab for outside Stairs Skirting
Stilt floor Rft 50.13 110.00 5,514.30
H15 Granite Flooring
Ground floor Sft 276.08 110.00 30,368.80
First floor St 149.47 110.00 16,441.70
H15NT Granite Dadooing
First floor St 150.00

H16 Granite skirting


Ground floor Rft 104.89 110.00 11,537.90
First floor Rft 49.53 110.00 5,448.30
H17 Parking Tiles For flooring
Stilt floor Sft 959.16 80.00 76,732.80
H18 Parking Tiles for skirting
Stilt floor Rft 340.50 75.00 25,537.50
H19 Balcony tiles flooring
First floor Sft 153.75 80.00 12,300.00
H20 Balcony tiles skirting
First floor Rft 50.76 75.00 3,807.00
H21 20 mm granite slab for kitchen / Counters
Stilt floor Sft 21.00 100.00 2,100.00
Ground floor Sft 54.00 100.00 5,400.00
First floor Sft 24.00 100.00 2,400.00
H22 40 mm granite slab for Utility
Ground floor Sft 15.13 100.00 1,513.00
H23 20mm Granite Cladding @ Entrance Door
Sft 300.00 150.00 45,000.00
H24 Italian Marble Full nosing Rft 100.00 150.00 15,000.00
H25 Italian Marble Half nosing
Stilt floor Rft 100.00
Ground floor Rft 100.00 100.00 10,000.00
First floor Rft 100.00 -
H26 Italian Marble Double nosing Rft 160.00 250.00 40,000.00
H27 20 mm Granite full nosing Rft 50.00 100.00 5,000.00
H28 20 mm Granite half nosing Rft 50.00 50.00 2,500.00
H29 20 mm Granite Double nosing Rft 150.00 150.00 22,500.00
H30 40 mm Granite full nosing Rft 30.00 100.00 3,000.00
H31 V-Groove in granite Rft 300.00 100.00 30,000.00
H31NT V-Groove in Marble Rft 50.00
H32 Fixing Granite Sill for Bathroom door Each 6.00 150.00 900.00
H33 Clay Tiles for Terrace floor Sft 1,188.00 80.00 95,040.00
H34 Water proofing for Terraces Sft 1,188.00 85.00 100,980.00
H35NT 20 mm Granite Patti
Ground floor Rft 50.00
First floor Rft 50.00
H36NT 20 mm Granite Edge Pollishing
Ground floor Rft 50.00
First floor Rft 50.00
H37NT 40 mm Granite Patti
Ground floor Rft 100.00
First floor Rft 100.00
H38NT 40 mm Granite Edge Polishing
Ground floor Rft 100.00
First floor Rft 100.00
H39NT ONYEX 500.00
1,288,610.15

I PAINTING WORKS
I01 Plastic Emulsion
Stilt floor Sft 5,038.81 26.00 131,009.06
Ground floor Sft 4,814.61 26.00 125,179.86
First floor Sft 4,578.49 26.00 119,040.74
Terrace floor Sft 675.00 26.00 17,550.00
I02 Exterior Emulsion (Apex)
Stilt floor Sft 4,135.06 24.00 99,241.44
Ground floor Sft 2,345.50 24.00 56,292.00
First floor Sft 2,035.00 24.00 48,840.00
Terrace floor Sft 1,991.56 24.00 47,797.44
I03 Enamel Paint
Stilt floor Sft 360.63 22.00 7,933.86
Ground floor Sft 178.13 22.00 3,918.75
First floor Sft 226.88 22.00 4,991.25
I04 Melamine Polish
Stilt floor Sft 266.83 90.00 24,014.25
Ground floor Sft 510.63 90.00 45,956.25
First floor Sft 463.13 90.00 41,681.25
Terrace floor Sft 90.00
Advance 200,000.00

773,446.15
J MISCELLANEOUS
J01 Sump Tank Ltrs 10,000.00 10.00 100,000.00
J02 Anti-termite treatment for Pesticides Sft 2,400.00 10.00 24,000.00
J03 Bath Floor Filling
Stilt floor Cft 80.00 -
Ground floor Cft 70.00 80.00 5,600.00
First floor Cft 138.00 80.00 11,040.00
J04 Stone Slab over Drains Sft 200.00 250.00 50,000.00
J05 Chicken Mesh Sft 200.00 180.00 36,000.00
J06 Grooves 3/4" Sft 600.00 20.00 12,000.00
J07 Cornice works - 1 step Sft 400.00 30.00 12,000.00
2 steps Sft 200.00 50.00 10,000.00
J08 Washing Stone Sft 10.00 350.00 3,500.00
J09 20 mm granite for Name board No 1.00 5,000.00 5,000.00
J10 Granite Cutting for Sink Each 3.00 600.00 1,800.00
J11 Granite Cutting for Hob Each 1.00 300.00 300.00
J12 Chimney Hole Each 2.00 1,000.00 2,000.00
J13 Gas Piping L.S 15,000.00 15,000.00
J14 Rain Water Harvesting Each 2.00 15,000.00 30,000.00
J15 Rough Stone Cladding @ Outside Wall
(Inclusive of Material) Sft 550.00 400.00 220,000.00
538,240.00

K M.S. / S.S. WORKS (without Basic material cost but including Painting)
K01 M.S. Gate Sft 130.00 60.00 7,800.00
K02 S.S. Staircase Railing Sft 71.06 50.00 3,553.00
K03 M.S. Covering Grill Sft 871.50 40.00 34,860.00
K04 M.S. Balcony Railing Sft 45.00 35.00 1,575.00
K05 M.S. T-angle Set 1.00 350.00 350.00
K06 M.S. Sky light covering Sft 355.00 100.00 35,500.00
K07 M.S. Ladder L.S 1.00 1,500.00 1,500.00
K08 M.S.Door Sft 42.00 60.00 2,520.00
K09 M.S.Grill Door Sft 21.00 80.00 1,680.00
K10 M.S.Frame for Structural Glazing Sft 325.00 50.00 16,250.00
KNT1 Pargola To Cover The Balcony Near
Entrance Door Sft 60.00
KNT2 Utility Covering Sft 60.00
KNT3 M.S. Staircase For Internal Staircase No 5,000.00
KNT4 M.S. Staircase In Terrace Floor No 5,000.00
KNT5 M.S. Frame For Glass Floor Sft 60.00
KNT6 Louvers For Clinic Toilet Sft 60.00
KNT7 Windows Patti Sft 30.00
KNT8 Sunroom Mesh Sft 30.00
KNT9 Compound Mesh Sft 30.00
KNT10 Sunroom Covering grill Sft
105,588.00

L PLUMBING & SANITARY WORKS


L01 3/4" CPVC pipe (Cold & Hot Water ) Rft 650.00 110.00 71,500.00
L02 1" CPVC pipe Rft 500.00 110.00 55,000.00
L03 2" CPVC pipe Rft 40.00 225.00 9,000.00
L04 3/4" gate valve Nos 3.00 730.00 2,190.00
L05 1" gate value Nos 8.00 1,442.00 11,536.00
L06 2" gate valve Nos 1.00 1,854.00 1,854.00
L07 Ball valve for sump tank Each 1.00 835.00 835.00
L08 PVC over head tank Ltr 2,000.00 9.00 18,000.00
L09 3/4" Non-Return Valve for Solar Each 1.00 850.00 850.00
L10 PVC Pipes
a) 1 1/2" dia Rft 80.00 88.00 7,040.00
b) 2 1/2" dia Rft 270.00 160.00 43,200.00
c) 3" dia Rft 242.00
e) 4" dia (4kg/cm2) Rft 270.00 283.00 76,410.00
f) 5" dia (6kg/cm2) Rft 130.00 335.00 43,550.00
L11 PVC multi trap Each 14.00 900.00 12,600.00
L12 PVC P- trap Each 4.00 1,262.00 5,048.00
L13 Chambers 12"x12" Each 4.00 3,965.00 15,860.00
L14 Chambers 21"x21" Each 4.00 4,532.00 18,128.00
L15 Chambers 24"x24" Each 1.00 5,253.00 5,253.00
Fixtures (labour only)
L16 E.W.C with flushtank fixing Each 1,365.00 -
L17 Wall mounted Commode fixing Each 6.00 2,009.00 12,054.00
L18 Concealed Flush tank fixing Each 6.00 1,365.00 8,190.00
L19 Wash basin fixing Each 7.00 412.00 2,884.00
L20 Shower and shower arm fixing Each 6.00 283.00 1,698.00
L21 Angle cock & stop cock fixing Each 25.00 52.00 1,300.00
L22 Grating with frame fixing Each 16.00 62.00 992.00
L23 Wall mixer fixing Each 6.00 361.00 2,166.00
L24 2 IN 1 bib cock & Heaalth faucet fixing Each 6.00 124.00 744.00
L25 Sink Cock fixing Each 2.00 345.00 690.00
L26 Short body bib cock fixing Each 3.00 52.00 156.00
L27 Bootle Trap Fixing Each 6.00 82.00 492.00
L28 Single liver diverter Each 258.00 -
L29 Spout Each 36.00 -
L30 Waste pipe fixing Each 6.00 52.00 312.00
L31 Concealed stop cock Each 6.00 52.00 312.00
L32 Washing mechine tap Each 1.00 42.00 42.00
L33 Rain water filter fixing Each 1.00 7,983.00 7,983.00
L34 Sink fixing Each 3.00 258.00 774.00
Advance 450,000.00
Advance 150,000.00
438,643.00

M ELECTRICALWORKS (Anchor roma )


M01 Light point Each 90.00 649.00 58,410.00
M02 Spot Light point Each 10.00 805.00 8,050.00
M03 Fan point with Regulator Each 8.00 1,133.00 9,064.00
M04 Bell point Each 2.00 1,076.00 2,152.00
M05 Individual plug point Each 28.00 773.00 21,644.00
M06 Plug point Each 30.00 392.00 11,760.00
M07 Two way point Each 10.00 1,015.00 10,150.00
M08 30 amps DP socket heating point and 5
amps switch with socket Each 10.00 1,000.00 10,000.00
M09 15 amps socket point for geezer & AC Each 15.00 541.00 8,115.00
M10 30 amps DP point for geezer control Each 15.00 654.00 9,810.00
M11 Lighting circuit Rft 600.00 50.00 30,000.00
M12 Heating circuit & Main Circuit Rft 700.00 72.00 50,400.00
M13 Telephone point Each 3.00 500.00 1,500.00
M14 Telephone circuit Rft 200.00 36.00 7,200.00
M15 Main circuit and lift 3 phase Rft 200.00 134.00 26,800.00
M16 Antana point Each 4.00 500.00 2,000.00
M17 Antana circuit Rft 170.00 36.00 6,120.00
M18 Pump point No. 1.00 1,076.00 1,076.00
M19 Pump Circuit Rft 100.00 72.00 7,200.00
M20 Main distribution board (24 way) control for
mains Each 11,500.00 -
M21 Main distribution board (12 way) control for
mains Each 3.00 6,180.00 18,540.00
Main distribution board (8 way) control for
mains Each 4,635.00 -
M22 Main Panel board L.S. 1.00 100,000.00
M23 Main grounding (8' 0" depth) Each 1.00 2,936.00 2,936.00
M24 Internal grounding ( 6' 0" depth ) Each 3.00 2,446.00 7,338.00
M25 Providing & fixing and laying 35 Sq mm
UG cable with earth work with pvc pipe.
(App) Rft 90.00 150.00 13,500.00
M26 CC T.V. Dummy Conduits (1") Rft 150.00 25.00 3,750.00
M27 Spot lights for interior works L.S 5,000.00
M29 Chandalear point
M32 Lift Pannel 1.00 15,000.00 15,000.00
M33 Lift light Wireing and 5amps plug point L.S 1.00 6,000.00 6,000.00
M34 G.I.Earth srtip 120.00 130.00 15,600.00

Advance 100,000.00
Advance 150,000.00
Advance 450,000.00
469,115.00

N MATERIALS TO BE SUPPLIED BY THE OWNER

FLOORING & CLADDING MATERIALS


1 Italian marble Sft 2,000.00 400.00 800,000.00
2 Vitrified tiles Sft 1,225.00 80.00 98,000.00
3 20 mm Granite slabs for Flooring Sft 525.00 200.00 105,000.00
4 20 mm Granite slabs for external stair
case Sft 200.00 200.00 40,000.00
5 20 mm Granite slabs for cladding Sft 310.00 200.00 62,000.00
6 20 mm granite slab for kitchen / Counters Sft 150.00 200.00 30,000.00
7 40 mm Granite slabs for Utility Sft 25.00 200.00 5,000.00
8 Parking tiles Sft 1,200.00 150.00 180,000.00
9 Ceramic tiles- Floor Sft 450.00 80.00 36,000.00
10 Ceramic tiles- Dadoo Sft 1,600.00 100.00 160,000.00
11 Wooden Flooring Sft 700.00 150.00 105,000.00
12 Wooden Skirting Rft 225.00 100.00 22,500.00
13 Wooden profile Rft 50.00 110.00 5,500.00
14 Clay Tiles Sft 1,200.00 15.00 18,000.00
H.M.G Bill -1 1,800,000.00
H.M.G Bill -2 115,000.00
H.M.G Bill -3 307,400.00
H.M.G Bill -4 112,935.59
S.S. Ceramics Bill-1 84,000.00
S.S. Ceramics Bill-2 4,500.00
Nitko Bill -1 55,000.00
Nitko Bill -2 144,000.00
Muniraj Stones 192,066.00
Nitko Bill -3 7,300.00
Ghala Stone 48,965.00
Wood & Moulding 100,000.00
Wood & Moulding BALANCE 300,000.00
1,667,000.00

M.S. WORKS
1 M.S. Gate Sft 130.00 400.00 52,000.00
2 S.S Staircase Railing Sft 71.06 1,000.00 71,060.00
3 M.S. Covering Grill Sft 871.50 200.00 174,300.00
4 M.S. Balcony Railing Sft 45.00 180.00 8,100.00
5 M.S. T-angle Set 1.00 5,000.00 5,000.00
6 M.S. Sky light covering Sft 355.00 300.00 106,500.00
7 M.S. Ladder L.S 1.00 8,500.00 8,500.00
8 M.S.Door Sft 42.00 380.00 15,960.00
9 M.S.Grill Door Sft 21.00 300.00 6,300.00
10 M.S.Frame for Structural Glazing Sft 325.00 200.00 65,000.00
KNT1 Pargola To Cover The Balcony Near
Entrance Door Sft
KNT2 Utility Covering Sft
KNT3 M.S. Internal Staircase No
KNT4 M.S. Staircase In Terrace Floor No
KNT5 M.S. Frame For Glass Floor Sft
KNT6 Louvers For Clinic Toilet Sft
KNT7 Windows Patti Sft
KNT8 Sunroom Mesh Sft
KNT9 Compound Mesh Sft
KNT10 Sunroom Covering grill Sft
Advance 300,000.00
Advance 400,000.00
512,720.00

PLUMBING AND SANITORY WORKS


1 Wall mounted Commode Each 6.00 9,800.00 58,800.00
2 Concealed Flush tank Each 6.00 9,000.00 54,000.00
3 Wash basin Each 7.00 3,300.00 23,100.00
4 Shower and shower arm Each 6.00 2,750.00 16,500.00
5 Angle cock & stop cock (With Flange) Each 25.00 810.00 20,250.00
6 Grating with frame Each 16.00 140.00 2,240.00
7 Wall mixer Each 6.00 4,125.00 24,750.00
8 Connection pipes Each 24.00 145.00 3,480.00
9 Wastepipe & coupling Each 10.00 605.00 6,050.00
10 Pillar cock Each 7.00 2,000.00 14,000.00
11 Health faucet Each 6.00 1,210.00 7,260.00
12 2 IN 1 bib cock Each 6.00 2,065.00 12,390.00
13 Short body bib cock Each 10.00 935.00 9,350.00
14 Sink Cock Each 3.00 2,000.00 6,000.00
15 Single liver diverter Each 10,000.00 -
16 3/4" Extension Nipple Each 10.00 80.00 800.00
17 1" Extension Nipple Each 10.00 100.00 1,000.00
18 X- Nipple With Flange Each 100.00 -
19 Stainless steel Sink for kitchen
Stilt floor Each 1.00 6,000.00 6,000.00
Ground floor Each 2.00 15,000.00 30,000.00
Chabria & Sons Bill-1 200,000.00
Chabria & Sons Bill-2 370,000.00
Chabria & Sons Bill-3 13,452.00
Chabria & Sons Bill-4 87,140.00
Chabria & Sons Bill-5 6,732.00
Chabria & Sons Bill-6 6,426.00
295,970.00

GLASS WORKS
1 Shower partition Each 3.00 45,000.00 135,000.00
2 Design Glass for railings Sft 200.00 -
3 Laminated Glass for Sky light Sft 355.00 800.00 284,000.00
Elliptical Skylight Sft 1,000.00
Sun room Skylight Sft 800.00
Staircase Skylight Sft 800.00
4 Structural Glazing Sft 325.00 300.00 97,500.00
3 Laminated Glass
Glass Floor Sft
Infront of Pooja Sft 600.00
Entrance Door pargola Sft 600.00
Utility Top Sft 600.00
Parking Pargola Sft 600.00
UPVC WINDOWS Sft 500.00
516,500.00

KITCHEN ACCESSORIES ( Haffele Blum)


a) Tandom Box 30 Kg Nos 8.00 5,975.00 47,800.00
b) Tandom Box 65Kg with Gallery Nos 6.00 8,125.00 48,750.00
c) Spice Rack Nos 1.00 11,975.00 11,975.00
d) Dust bin holder Nos 1.00 2,875.00 2,875.00
e) Detergent holder Nos 1.00 950.00 950.00
f) Aventos Nos 4.00 14,725.00 58,900.00

171,250.00

3,163,440.00

O LIFT ( 5 Passanger) LS 1,100,000.00


Advance 300,000.00
Advance 290,000.00
Final payment 285,000.00
Scaffolding, Masonry and Supervision 100,000.00
1,100,000.00

P DEMOLITION WORKS
P01 SSM
Stilt floor Cft 70.00
P02 BBM 9" thk
Stilt floor Cft 70.00
Ground floor Cft 70.00
First floor Cft 70.00
Terrace floor Cft
P03 BBM 4.5" thk
Stilt floor Sft 50.00
Ground floor Sft 50.00
First floor Sft 50.00
Terrace floor Sft 50.00

P04 R.C.C Work Demolition


P04A PCC 1:3:6 Sills
Stilt floor Cft 120.00
Ground floor Cft 120.00
First floor Cft 120.00
Terrace floor Cft 120.00

P04B RCC Lintel Concrete


Stilt floor Cft 150.00
Ground floor Cft 150.00
First floor Cft 150.00
Terrace floor Cft 150.00
P04C RCC Chajja Concrete
Ground floor Cft 150.00
First floor Cft 150.00
-

Q ESCALATION
Cement
1 Bill dt.04.12.19 (360.00-375.00= -15.00) Bags -15.00
2 Bill dt.13.12.19 (360.00-375.00 = -15.00) Bags -15.00
3 Bill dt.22.12.19 (360.00-375.00= -15.00) Bags -15.00
4 Bill dt.04.01.20 (335.00-375.00= -40.00) Bags -40.00
5 Bill dt.15.02.20 (360.00-375.00= -15.00) Bags -15.00
6 Bill dt.15.02.20 (360.00-375.00= -15.00) Bags -15.00
7 Bill dt.17.03.20 (335.00-375.00= -40.00) Bags -40.00
8 Bill dt.13.06.20 (400.00-375.00= 25.00) Bags 25.00
9 Bill dt.18.08.20 (400.00-375.00= 25.00) Bags 25.00
10 Bill dt.24.08.20 (400.00-375.00= 25.00) Bags 25.00
11 Bill dt.14.09.20 (390.00-375.00= 15.00) Bags 15.00
12 Bill dt.02.10.20 (400.00-375.00= 25.00) Bags 25.00
13 Bill dt.02.10.20 (400.00-375.00= 25.00) Bags 25.00
14 Bill dt.15.10.20 (400.00-375.00= 25.00) Bags 25.00
15 Bill dt.24.10.20 (400.00-375.00= 25.00) Bags 25.00
16 Bill dt.08.11.20 (400.02-375.00= 25.00) Bags 25.00
17 Bill dt.16.11.20 (400.00-375.00= 25.00) Bags 25.00
18 Bill dt.29.12.20 (390.00-375.00= 15.00) Bags 15.00
19 Bill dt.03.01.21 (400.00-375.00= 25.00) Bags 25.00
20 Bill dt.10.02.21 (390.00-375.00= 15.00) Bags 15.00
21 Bill dt.03.03.21 (400.00-375.00= 25.00) Bags 25.00
22 Bill dt.14.03.21 (400.00-375.00= 25.00) Bags 25.00
23 Bill dt.26.03.21 (400.00-375.00= 25.00) Bags 25.00

Steel
1 Bill dt.04.12.19 (43.01-50.00= -6.99) Kgs -6.99
2 Bill dt.27.12.19 (46.00-50.00 = -4.00) Kgs -4.00
3 Bill dt.21.01.20 (49.98-50.00 = -0.02) Kgs -0.02
4 Bill dt.13.02.20 (47.50-50.00 = -2.50) Kgs -2.50
5 Bill dt.24.02.20 (48.00-50.00 = -2.00) Kgs -2.00
6 Bill dt.16.05.20 (49.20-50.00 = -0.79) Kgs -0.79
7 Bill dt.01.07.20 (45.00-50.00 = -5.00) Kgs -5.00
8 Bill dt.18.07.20 (43.50-50.00) = -6.50) Kgs -6.50
9 Bill dt.25.07.20 (43.99-50.00) = -6.01) Kgs -6.01

S EXTRA WORKS
a) Sanction Plan Charges
b) BWSSB Prorata, Point & inspection
Charges ( Approximately ) 1.00 150,000.00 150,000.00
c)
BESCOM deposits and office expencess
for Temparory connection( Approximately) 1.00 60,000.00 60,000.00
62,000.00
d) BESCOM deposits and office expencess
for permanent connection( Approximately) 1.00 100,000.00 100,000.00
200,000.00
e) Bore Well Pump 100,000.00
75,000.00
f) Solar Water Heater (200 ltr) 60,000.00
NT1 Security Systems
Advance 50,000.00
Final payment 5,000.00
Wiring & Supervision 5,000.00

NT2 A.C System


Advance 350,000.00
Advance 100,000.00
Final payment 169,546.00
Scafolding, Masonry and Supervision 50,000.00

NT3 Solar water heater, Heat Pump, Pressure


pump and Softner 300,000.00

470,000.00

T FIXTURES & APPLIANCES (Including Labour)


a) 25 lts Geyser Nos 6.00 10,500.00 63,000.00
b) Ceiling Fans Nos 10.00 2,500.00 25,000.00
c) Tube Lights (LED) Nos 10.00 650.00 6,500.00
d) 40 W Light Nos 10.00 18.00 180.00
e) Calling Bell Nos 2.00 180.00 360.00
f) Bulkhead Fitting Nos 5.00 350.00 1,750.00
g) Electrical Chimney Nos 1.00 25,000.00 25,000.00
15,000.00
h) Hobb Nos 1.00 10,000.00 10,000.00
i) Towel Rod Nos 7.00 1,800.00 12,600.00
j) Towel Ring Nos 7.00 750.00 5,250.00
k) Soup Tray Nos 7.00 750.00 5,250.00
l) Mirror in Bathroom Nos 7.00 850.00 5,950.00
m) Corner Tray Nos 6.00 1,400.00 8,400.00
n) 1.0 H.P Water Pump & fittings Nos 1.00 12,000.00 12,000.00
o) Pelmet Rods Ls 1.00 60,000.00 60,000.00
Khaff 78,980.00
Euro Hardware World 369,000.00

241,240.00

COST SU

Group
code Description of works Estimated Amount

A EARTHWORK 182,131.75

B MASONARY WORK 1,368,402.00

C CONCRETE WORK 2,008,980.70

D STEEL 1,324,300.00

E DOORS AND WINDOWS 1,572,147.50

F INTERIOR WORKS 1,956,652.50

G PLASTERING 1,398,406.20

H FLOORING 1,288,610.15

I PAINTING WORKS 773,446.15

J MISCELLINIOUS WORKS 538,240.00

K M.S / S.S WORKS 105,588.00


L PLUMBING AND SANITARY WORKS 438,643.00

M ELECTRICAL WORKS 469,115.00

N MATERIALS SUPPLIED BY THE OWNER 3,163,440.00

O LIFT ( 5 Passanger) 1,100,000.00

P DEMOLITION WORKS

Q ESCALATION

S EXTRA WORKS 470,000.00

T FIXTURES & APPLIANCES 241,240.00

Total Rs. 18,399,342.95


Note: Tax extra as applicable

Advance paid till date

Balance payable
ANKAR RESIDENTIAL BUILDING
ACT OF PRE FINAL BILL

PRE FINAL
Previous Qty Total Qty
QTY AMOUNT

- 5,198.51 5,198.51
- 5,704.66 5,704.66

- 98.28 98.28
- - -
- - -
- 107,975.15
- - -
- - -
- 921.85 921.85
- - -
0.70 140.00 1,147.69 1,148.39
- 1,182.94 1,182.94
- 1,330.39 1,330.39
11.37 2,274.00 659.35 670.72
- - -
- 1,261.62 1,261.62
- 488.47 488.47
- 288.34 288.34
- 163.36 163.36
2,414.00 1,296,635.80
- - -
- - -
- - -
- 697.26 697.26
143.06 17,167.20 699.63 842.69
- 9.48 9.48
- 1,544.69 1,544.69
- 258.49 258.49
- - -
29.73 3,864.90 57.33 87.06
- 58.13 58.13
- 75.84 75.84
5.65 734.50 70.13 75.78
- - -
- 64.43 64.43
- 213.75 213.75
- 169.31 169.31
- 169.31 169.31
- 88.88 88.88
- - -
- - -
- 58.83 58.83
- 30.64 30.64
- 31.22 31.22
- - -
- - -
- 81.50 81.50
- 60.25 60.25
- 95.25 95.25
- 28.50 28.50
- - -
- 400.75 400.75
- 354.19 354.19
- 340.69 340.69
- 77.06 77.06
- - -
- 745.31 745.31
- 631.18 631.18
- 671.90 671.90
- 69.33 69.33
- - -
- 19.40 19.40
- - -
- 37.34 37.34
- - -
- - -
- 135.00 135.00
- - -
21,766.60 2,055,784.75
- - -
- - -

- - -
- 8,813.00 8,813.00
- 7,236.00 7,236.00
- 5,580.00 5,580.00
- 288.00 288.00
- 100.00 100.00
- -298.80 -298.80
- - -
- 1,476,837.60
- - -
- - -
- - -

- - -
- - -
- 35.00 35.00

- - -
- 28.00 28.00
- 28.00 28.00

- - -
- 73.50 73.50
- 42.00 42.00
- 45.50 45.50
- 45.50 45.50
- - -

- - -
- 56.00 56.00
- - -
- - -
- 22.75 22.75
- - -

- - -
- - -
- 38.50 38.50
- 38.50 38.50
- 42.00 42.00
- - -

- - -
- 17.50 17.50
- - -

- - -
- 145.50 145.50
- 143.50 143.50
- 188.00 188.00

- - -
- - -
- - -
- - -
42.00 126,000.00 - 42.00
- - -
- - -
- - -
- - -
126,000.00 2,192,032.50
- - -
- - -
- - -
- - -

- - -
- - -
114.63 171,945.00 - 114.63
49.13 44,217.00 - 49.13
- - -
- - -
112.08 156,912.00 - 112.08
- - -
49.00 49,000.00 - 49.00
- -
- - -
- - -
196.66 275,324.00 - 196.66
- - -
112.00 112,000.00 - 112.00

- - -

- - -
- - -
- - -
37.50 78,750.00 - 37.50
- - -
14.00 18,200.00 - 14.00
- - -
- - -
- - -
- - -
54.06 140,556.00 - 54.06
- - -
6.75 11,272.50 - 6.75
39.00 46,800.00 - 39.00

35.00 61,250.00 - 35.00


67.50 60,750.00 - 67.50
72.56 72,560.00 - 72.56
12.00 10,800.00 - 12.00
- - -
1.00 7,000.00 - 1.00
- - -
46.00 92,000.00 - 46.00
2.00 150,000.00 - 2.00
- - -

300.00 360,000.00 - 300.00


1.00 700,000.00 - 1.00
1.00 300,000.00 - 1.00
44.00 79,200.00 - 44.00
- - -
31.00 38,750.00 - 31.00
102.00 91,800.00 - 102.00
21.00 18,900.00 - 21.00
-1.00 -500,000.00 1.00 -
-1.00 -200,000.00 1.00 -
-1.00 -500,000.00 1.00 -
- - -
1,947,986.50 3,147,986.50
- - -
- - -
- - -
28.00 1,540.00 4,261.18 4,289.18
191.63 10,539.65 2,333.58 2,525.21
191.63 10,539.65 2,481.15 2,672.78
88.63 4,874.65 2,182.62 2,271.25
- - -
18.38 955.76 3,885.01 3,903.39
- 2,847.16 2,847.16
- 3,455.69 3,455.69
30.61 1,591.72 715.71 746.32
- - -
- 2,146.95 2,146.95
- 1,688.35 1,688.35
103.63 5,699.65 1,323.26 1,426.89
- 169.06 169.06
- - -
- 160.75 160.75
- 230.50 230.50
35,741.08 1,538,439.97
- - -
- - -
- - -
22.00 4,400.00 - 22.00
- 991.85 991.85
- 538.80 538.80
- - -
17.50 2,275.00 - 17.50
70.00 9,100.00 96.17 166.17
- 109.63 109.63
- - -
- - -
86.75 21,687.50 - 86.75
- - -
- - -
234.22 4,684.40 - 234.22
423.28 8,465.60 - 423.28
- - -
53.38 533.80 - 53.38
157.75 1,577.50 - 157.75
- - -
10.13 101.30 - 10.13
31.25 312.50 - 31.25
- - -
- 234.22 234.22
- 412.88 412.88
- - -
- 888.44 888.44
- 40.72 40.72
- - -
- 290.00 290.00
- - -
- 69.02 69.02
118.27 9,461.60 40.00 158.27
1,246.26 99,700.80 - 1,246.26
- - -
38.00 3,420.00 353.50 391.50
60.50 5,445.00 507.50 568.00
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
278.92 39,048.80 - 278.92
- - -
56.92 6,261.20 - 56.92
- - -
56.25 6,187.50 - 56.25
140.85 15,493.50 - 140.85
- - -
619.00 92,850.00 - 619.00
- - -
- - -
- - -
- - -
- - -
888.21 71,056.80 - 888.21
- - -
325.20 24,390.00 - 325.20
- - -
155.63 12,450.40 - 155.63
- - -
50.75 3,806.25 - 50.75
- - -
- - -
- - -
- - -
- - -
- - -

- 121.19 121.19
- - -
- - -
13.25 1,325.00 - 13.25
86.50 8,650.00 - 86.50
74.63 7,463.00 - 74.63
- - -
- - -
- - -
- - -
- - -
265.50 26,550.00 - 265.50
5.25 262.50 - 5.25
6.00 900.00 - 6.00
- - -
- 1,453.76 1,453.76
- - -
110.25 5,512.50 - 110.25
85.25 4,262.50 - 85.25
- - -
220.50 11,025.00 - 220.50
85.25 4,262.50 - 85.25
- - -
78.50 7,850.00 - 78.50
57.38 5,738.00 - 57.38
- - -
322.50 32,250.00 - 322.50
172.13 17,213.00 - 172.13
32.00 16,000.00 - 32.00
571,573.45 1,280,267.95
- - -
- - -
- - -
6,050.34 157,308.84 - 6,050.34
4,535.51 117,923.26 - 4,535.51
4,778.95 124,252.70 - 4,778.95
889.37 23,123.62 - 889.37
- - -
4,261.18 102,268.32 - 4,261.18
2,333.58 56,005.92 - 2,333.58
2,481.15 59,547.60 - 2,481.15
2,182.62 52,382.88 - 2,182.62
- - -
145.50 3,201.00 - 145.50
143.50 3,157.00 - 143.50
188.00 4,136.00 - 188.00
- - -
717.00 64,530.00 - 717.00
582.75 52,447.50 - 582.75
492.00 44,280.00 - 492.00
56.88 5,119.20 - 56.88
-1.00 -200,000.00 1.00 -
- - -
669,683.84 869,683.84
- - -
- 17,187.50 17,187.50
- 2,400.00 2,400.00
- - -
- 13.84 13.84
- 90.26 90.26
- 104.59 104.59
200.00 50,000.00 - 200.00
- 322.68 322.68
474.34 9,486.80 19.33 493.67
- 229.25 229.25
- - -
10.00 3,500.00 - 10.00
1.00 5,000.00 - 1.00
3.00 1,800.00 - 3.00
1.00 300.00 - 1.00
2.00 2,000.00 - 2.00
1.00 15,000.00 - 1.00
1.00 15,000.00 - 1.00
- - -
102,086.80 380,003.50 - -
- - -
- - -
- - -
186.56 11,193.60 - 186.56
127.37 6,368.50 - 127.37
900.00 36,000.00 - 900.00
70.13 2,454.55 - 70.13
1.00 350.00 - 1.00
226.20 22,620.00 - 226.20
- - -
22.75 1,365.00 - 22.75
21.00 1,680.00 - 21.00
- - -

38.25 2,295.00 - 38.25


191.56 11,493.60 - 191.56
1.00 5,000.00 - 1.00
1.00 5,000.00 - 1.00
31.00 1,860.00 - 31.00
5.00 300.00 - 5.00
48.00 1,440.00 - 48.00
159.69 4,790.70 - 159.69
114.99 3,449.70 - 114.99
233.94 - - 233.94
117,660.65 117,660.65
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- 1.00 1.00
1.00 150,000.00 - 1.00
150,000.00 600,000.00 - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -

- - -

- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- 1.00 1.00
- 1.00 1.00
1.00 450,000.00 - 1.00
450,000.00 700,000.00
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- 1.00 1.00
- 1.00 1.00
- 1.00 1.00
1.00 112,935.59 - 1.00
- 1.00 1.00
- 1.00 1.00
- 1.00 1.00
- 1.00 1.00
- 1.00 1.00
1.00 7,300.00 - 1.00
1.00 48,965.00 - 1.00
- 1.00 1.00
1.00 300,000.00 - 1.00
469,200.59 3,271,166.59

- - -
186.56 74,624.00 - 186.56
127.37 127,370.00 - 127.37
900.00 180,000.00 - 900.00
70.13 12,623.40 - 70.13
1.00 5,000.00 - 1.00
226.20 67,860.00 - 226.20
- - -
22.75 8,645.00 - 22.75
21.00 6,300.00 - 21.00
- - -

38.25 - - 38.25
191.56 - - 191.56
1.00 - - 1.00
1.00 - - 1.00
31.00 - - 31.00
5.00 - - 5.00
48.00 - - 48.00
159.69 - - 159.69
114.99 - - 114.99
233.94 - - 233.94
- 1.00 1.00
1.00 400,000.00 - 1.00
882,422.40 1,182,422.40
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- 1.00 1.00
- 1.00 1.00
1.00 13,452.00 - 1.00
1.00 87,140.00 - 1.00
1.00 6,732.00 - 1.00
1.00 6,426.00 - 1.00
113,750.00 683,750.00

- - -
4.00 180,000.00 - 4.00
- - -
- - -
105.60 105,600.00 - 105.60
165.00 132,000.00 - 165.00
16.31 13,048.00 - 16.31
- - -
- - -
- - -
16.00 9,600.00 - 16.00
44.63 26,775.00 - 44.63
89.51 53,707.50 - 89.51
82.69 49,612.50 - 82.69
212.50 106,250.00 - 212.50
676,593.00 676,593.00

- - -
- - -
8.00 47,800.00 - 8.00
6.00 48,750.00 - 6.00
1.00 11,975.00 - 1.00
1.00 2,875.00 - 1.00
1.00 950.00 - 1.00
4.00 58,900.00 - 4.00
- - -

171,250.00 171,250.00

- - -
2,313,215.99 5,985,181.99

- 1.00 1.00
- 1.00 1.00
1.00 285,000.00 - 1.00
1.00 100,000.00 - 1.00
385,000.00 975,000.00

- - -
- - -
- 27.00 27.00
- - -
- 13.13 13.13
- 138.38 138.38
- 51.84 51.84
- - -
- - -
- 28.75 28.75
- - -
- - -
- - -
- - -
- - -
- - -
- 7.39 7.39
- 1.69 1.69
- - -
- - -
- - -
- - -
- 0.87 0.87
- - -
- - -
- - -
- - -
- 0.28 0.28
- 0.28 0.28
- 18,866.10

- 40.00 40.00
- 50.00 50.00
- 75.00 75.00
- 100.00 100.00
- 100.00 100.00
- 50.00 50.00
- 50.00 50.00
- 100.00 100.00
- 50.00 50.00
- 25.00 25.00
- 50.00 50.00
- 50.00 50.00
- 50.00 50.00
- 50.00 50.00
- 50.00 50.00
- 50.00 50.00
- 100.00 100.00
- 50.00 50.00
- 50.00 50.00
- 50.00 50.00
- 50.00 50.00
50.00 1,250.00 - 50.00
50.00 1,250.00 - 50.00
- - -
- - -
- 3,695.00 3,695.00
- 998.00 998.00
- 470.00 470.00
- 5,355.00 5,355.00
- 181.00 181.00
- 5,230.00 5,230.00
- 288.00 288.00
- 5,580.00 5,580.00
- 100.00 100.00
- - -
2,500.00 -76,371.65

1.00 150,000.00 - 1.00

- - -
1.00 1.00

- - -
1.00 200,000.00 - 1.00
- - -
1.00 1.00
- - -
- - -
- 1.00 1.00
1.00 5,000.00 - 1.00
1.00 5,000.00 - 1.00
- -
- - -
- 1.00 1.00
- 1.00 1.00
1.00 169,546.00 - 1.00
1.00 50,000.00 - 1.00
- -
- -

1.00 300,000.00 - 1.00


- - -
- - -
879,546.00 1,516,546.00

-
10.00 25,000.00 - 10.00
12.00 7,800.00 - 12.00
10.00 180.00 - 10.00
2.00 360.00 - 2.00
5.00 1,750.00 - 5.00
- - -
1.00 15,000.00 - 1.00
- - -
6.00 10,800.00 - 6.00
6.00 4,500.00 - 6.00
6.00 4,500.00 - 6.00
3.00 2,550.00 - 3.00
3.00 4,200.00 - 3.00
2.00 24,000.00 - 2.00
- - -
1.00 78,980.00 - 1.00
1.00 369,000.00 - 1.00

548,620.00 548,620.00

COST SUMMARY
-

- 107,975.15
-
2,414.00 1,296,635.80
-
21,766.60 2,055,784.75
-
- 1,476,837.60
-
126,000.00 2,192,032.50
-
1,947,986.50 3,147,986.50
-
35,741.08 1,538,439.97
-
571,573.45 1,280,267.95
-
669,683.84 869,683.84
-
102,086.80 380,003.50
-
117,660.65 117,660.65
-
150,000.00 600,000.00
-
450,000.00 700,000.00
-
2,313,215.99 5,985,181.99
-
385,000.00 975,000.00
-
- 18,866.10
-
2,500.00 -76,371.65
-
879,546.00 1,516,546.00
-
548,620.00 548,620.00

8,323,794.91
Total Amount

77,977.65
28,523.30

1,474.20
-
-
107,975.15
-
-
165,933.00
-
229,678.00
236,588.00
266,078.00
134,144.00
-
151,394.40
58,616.40
34,600.80
19,603.20
1,296,635.80
-
-
-
83,671.20
101,122.80
1,137.60
324,384.90
77,547.00
-
11,317.80
7,556.90
9,859.20
9,851.40
-
21,261.90
70,537.50
55,872.30
55,872.30
29,330.40
-
-
17,649.00
9,192.00
9,366.00
-
-
19,967.50
14,761.25
23,336.25
6,982.50
-
122,228.75
108,027.95
103,910.45
23,503.30
-
227,319.55
192,509.90
204,929.50
21,145.65
-
7,760.00
-
29,872.00
-
-
54,000.00
-
2,055,784.75
-
-

-
599,284.00
492,048.00
379,440.00
19,584.00
6,800.00
-20,318.40
-
1,476,837.60
-
-
-

-
-
84,700.00

-
77,000.00
77,000.00

-
154,350.00
75,600.00
81,900.00
81,900.00
-

-
98,000.00
-
-
39,812.50
-

-
-
87,972.50
87,972.50
105,000.00
-

-
13,125.00
-

-
305,550.00
301,350.00
394,800.00

-
-
-
-
126,000.00
-
-
-
-
2,192,032.50
-
-
-
-

-
-
171,945.00
44,217.00
-
-
156,912.00
-
49,000.00
-
-
-
275,324.00
-
112,000.00

-
-
-
78,750.00
-
18,200.00
-
-
-
-
140,556.00
-
11,272.50
46,800.00

61,250.00
60,750.00
72,560.00
10,800.00
-
7,000.00
-
92,000.00
150,000.00
-

360,000.00
700,000.00
300,000.00
79,200.00
-
38,750.00
91,800.00
18,900.00
-
-
-
-
3,147,986.50
-
-
-
235,904.90
138,886.55
147,002.90
124,918.75
-
202,976.28
148,052.32
179,695.88
38,808.64
-
118,082.25
92,859.25
78,478.95
9,298.30
-
9,645.00
13,830.00
1,538,439.97
-
-
-
4,400.00
198,370.00
107,760.00
-
2,275.00
21,602.10
14,251.90
-
-
21,687.50
-
-
4,684.40
8,465.60
-
533.80
1,577.50
-
101.30
312.50
-
18,737.60
33,030.40
-
71,075.20
3,257.60
-
21,750.00
-
5,521.60
12,661.60
99,700.80
-
35,235.00
51,120.00
-
-
-
-
-
-
-
-
39,048.80
-
6,261.20
-
6,187.50
15,493.50
-
92,850.00
-
-
-
-
-
71,056.80
-
24,390.00
-
12,450.40
-
3,806.25
-
-
-
-
-
-

18,178.50
-
-
1,325.00
8,650.00
7,463.00
-
-
-
-
-
26,550.00
262.50
900.00
-
123,569.60
-
5,512.50
4,262.50
-
11,025.00
4,262.50
-
7,850.00
5,738.00
-
32,250.00
17,213.00
16,000.00
1,280,267.95
-
-
-
157,308.84
117,923.26
124,252.70
23,123.62
-
102,268.32 16,254.17 16,254.17 26.00
56,005.92
59,547.60 11,258.53 11,258.53 24.00
52,382.88
-
3,201.00
3,157.00
4,136.00
-
64,530.00
52,447.50
44,280.00
5,119.20
-
-
869,683.84
-
171,875.00
24,000.00
-
1,107.20
7,220.80
8,367.20
50,000.00
58,082.40
9,873.40
6,877.50
-
3,500.00
5,000.00
1,800.00
300.00
2,000.00
15,000.00
15,000.00
-
380,003.50
-
-
-
11,193.60
6,368.50
36,000.00
2,454.55
350.00
22,620.00
-
1,365.00
1,680.00
-

2,295.00
11,493.60
5,000.00
5,000.00
1,860.00
300.00
1,440.00
4,790.70
3,449.70
-
117,660.65
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
450,000.00
150,000.00
600,000.00
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-

-
-
-
-
-
-
-
-
100,000.00
150,000.00
450,000.00
700,000.00
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
1,800,000.00
115,000.00
307,400.00
112,935.59
84,000.00
4,500.00
55,000.00
144,000.00
192,066.00
7,300.00
48,965.00
100,000.00
300,000.00
3,271,166.59

-
74,624.00
127,370.00
180,000.00
12,623.40
5,000.00
67,860.00
-
8,645.00
6,300.00
-

-
-
-
-
-
-
-
-
-
-
300,000.00
400,000.00
882,422.40
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
200,000.00
370,000.00
13,452.00
87,140.00
6,732.00
6,426.00
683,750.00

-
180,000.00
-
-
105,600.00
132,000.00
13,048.00
-
-
-
9,600.00
26,775.00
53,707.50
49,612.50
106,250.00
676,593.00

-
-
47,800.00
48,750.00
11,975.00
2,875.00
950.00
58,900.00
-

171,250.00

-
5,685,181.99

300,000.00
290,000.00
285,000.00
100,000.00
975,000.00

-
-
1,890.00
-
919.10
9,686.60
3,628.80
-
-
1,437.50
-
-
-
-
-
-
886.80
202.80
-
-
-
-
130.50
-
-
-
-
42.00
42.00
18,866.10

-600.00
-750.00
-1,125.00
-4,000.00
-1,500.00
-750.00
-2,000.00
2,500.00
1,250.00
625.00
750.00
1,250.00
1,250.00
1,250.00
1,250.00
1,250.00
2,500.00
750.00
1,250.00
750.00
1,250.00
1,250.00
1,250.00
-
-
-25,828.05
-3,992.00
-9.40
-13,387.50
-362.00
-4,131.70
-1,440.00
-36,270.00
-601.00
-
-76,371.65

150,000.00

-
62,000.00

-
200,000.00
-
75,000.00
-
-
50,000.00
5,000.00
5,000.00
-
-
350,000.00
100,000.00
169,546.00
50,000.00
-
-

300,000.00
-
-
1,516,546.00

25,000.00
7,800.00
180.00
360.00
1,750.00
-
15,000.00
-
10,800.00
4,500.00
4,500.00
2,550.00
4,200.00
24,000.00
-
78,980.00
369,000.00

548,620.00

Total Bill Amount Difference

107,975.15 74,156.60
-
1,296,635.80 71,766.20
-
2,055,784.75 -46,804.05
-
1,476,837.60 -152,537.60
-
2,192,032.50 -619,885.00
-
3,147,986.50 -1,191,334.00
-
1,538,439.97 -140,033.77
-
1,280,267.95 8,342.20
-
869,683.84 -96,237.69
-
380,003.50 158,236.50
-
117,660.65 -12,072.65
-
600,000.00 -161,357.00
-
700,000.00 -230,885.00
-
5,685,181.99 -2,521,741.99
-
975,000.00 125,000.00
-
18,866.10 -18,866.10
-
-76,371.65 76,371.65
-
1,516,546.00 -1,046,546.00
-
548,620.00 -307,380.00

24,431,150.65 -6,031,807.70

22,112,856.83

2,318,293.82
422,608.42

270,204.72
Dr.PINAKINI.K.SHANKAR RESIDENCE
MEASUREMENT SHEET OF Final Bill

Length Breadth Height Quantity


Sl.no. Description Nos
ft ft ft + -
CIVIL WORKS
A EARTH WORK
A02 Earth Filling using available earth.
For Flagging Concete
North Side 1.00 131.73 1.00 131.73
West Side 1.00 148.16 1.00 148.16
279.89 Cft

B MASONRY WORKS
B02 BBM 9" thk
Stilt floor
Lift Well Platform 1 1.00 0.75 0.75 1.25 0.70
Parking West Wall 1.00 2.67 0.75 9.00 18.00
18.71 Cft

Terrace floor
For Placing AC controller 1.00 5.00 4.00 0.42 8.33
For Placing Lift controller 1.00 1.83 1.42 1.17 3.04
11.37 Cft

B04 BBM 4.5" thk


Garden West Side Stairs below 1.00 13.63 0.75 10.22
Garden South Side Stairs below 1.00 4.17 0.75 3.13
13.34 Sft

C CONCRETE WORKS
C01 PCC 1:4:8
Below flooring
Flagging Concrete Alround 1.00 429.60 0.33 143.06 Cft

C04 PCC 1:3:6 Sills


Stilt floor
Clinic
Portion 1 1.00 9.75 1.50 0.25 3.66
Portion 2 (13'6"+4'0") 1.00 17.50 1.50 0.25 6.56
Lift
Lift Well Flooring 1.00 5.00 5.50 0.50 13.75
Lift Well Platform 1 1.00 0.75 0.75 0.25 0.14
Lift Well Platform 2 1.00 1.50 1.50 2.50 5.63
Gas Platform 1.00 5.00 1.75 0.33 2.89
Infront of Gate 1.00 22.88 3.00 0.50 34.31
Levelling Drain stone 2.00 40.00 0.50 0.50 20.00
Ramp Concrete 1.00 22.88 3.50 0.50 40.03
Garden West Side Stairs below 1.00 13.63 3.75 0.75 38.32
Garden South Side Stairs below 1.00 4.17 3.75 0.75 11.72
177.01 Cft

Terrace floor
For Placing AC controller 1.00 5.00 4.00 0.25 5.00
For Placing Lift controller 1.00 1.83 1.42 0.25 0.65
Support for Breakfast marble 1.00 0.83 0.83 2.50 1.73
Platform for roof pipe over the floor 1.00 0.75 0.75 0.83 0.47
Pressure pump platform 1.00 1.00 1.00 0.33 0.33
Support for Shade To Pressure Pump 1.00 0.75 0.75 0.25 0.14
Support For Pipes @ Oht 6.00 0.75 0.75 0.33 1.12
9.45 Cft

E DOORS AND WINDOWS


DOORS
Second floor
ENT1 Sliding Door 1.00 6.00 7.00 42.00 Sft
ENT2 Pelmet Box For Sliding Door 1.00 12.00 1.00 12.00 Sft
ENT3 UPVC windows
Sun room
East Side 1.00 15.00 8.00 120.00
North Side 1.00 10.00 8.00 80.00
200.00 Sft

Utility
North Side 1.00 33.75 4.50 151.88 Sft
351.88

F INTERIOR WORKS
F01 Wardrobes `
19 mm Century Commercial Ply, Inside 0.8mm
Laminate Finish & Outside Decorative Veneer of Rs
150/- per sft With Mellamine Finish , Fittings all are
Hetich, Handles are below 150 Rs and Locks are
Europa.
Stilt floor
Below loft
NE Bedroom 1.00 12.00 7.00 84.00
SE Bedroom 1.00 4.25 7.00 29.75
113.75
Above Loft
NE Bedroom 1.00 12.00 2.25 27.00
SE Bedroom 1.00 4.25 1.75 7.44
34.44

Beam Cover
SE Bedroom 1.00 4.25 3.00 12.75

Ground Floor
SW Bedroom
South Side 1.00 6.25 8.50 53.13
West Side 1.00 5.00 8.50 42.50
Dress Table 1.00 4.50 9.50 42.75
Sliding Door 1.00 6.75 9.50 64.13
202.50

Beam Cover with MDF 1.00 6.75 1.50 10.13

First floor
SW Bedroom
North & South Side 2.00 6.25 8.25 103.13
Dress Table 1.00 4.75 8.25 39.19
Sliding Door 1.00 8.50 9.75 82.88
NW Bedroom
North Side 1.00 7.25 8.00 58.00
East Side 1.00 7.25 8.00 58.00
Dress Table 1.00 3.00 7.00 21.00
Sliding Door 1.00 7.25 9.25 67.06
429.25

F02 Kitchen Cabinet


16 mm Century Water Proof Ply, Inside 0.8mm
Laminate Finish & Outside 1 mm Laminate with
Alluminium edge Profile Finish, Hinges all are Hetich

Stilt floor
Below platform(7'9'+6'9") 1.00 14.50 2.75 39.88 Sft
Above platform 1.00 6.75 2.00 13.50 Sft

Ground floor
Below platform
North West Side 1.00 9.50 2.75 26.13
East Side 1.00 11.75 2.75 32.31
58.44 Sft
Above platform
West Side 1.00 4.25 3.25 13.81 Sft
Above Loft
West Side 1.00 13.00 2.75 35.75 Sft

Tall unit 1.00 3.00 7.00 21.00


OTG 1.00 2.00 7.00 14.00
35.00 Sft

Beyond Fridge 1.00 3.38 7.00 23.63 Sft

F03 T.V.Cabinet
Ground floor 1.00 - Sft

F04 Crockery unit


West Side 1.00 3.00 4.00 12.00
1.00 2.00 7.00 14.00
East Side 1.00 5.00 4.00 20.00
46.00 Sft

F05 Cot with back rest


Nos
F06 Study table

F07 Internal Staircase Railing in Teak Wood With


Glass
Cutout Railing 3.00 14.00 3.50 147.00
Staircase Railing 1.00 6.00 3.25 19.50
1.00 7.00 3.25 22.75
1.00 13.00 3.25 42.25
1.00 6.25 3.25 20.31
1.00 6.00 3.25 19.50
1.00 14.00 3.25 45.50
1.00 3.00 2.00 6.00
322.81 Sft

FNT1 Column panelling


South Column
North & South 2.00 1.00 8.00 16.00
East 1.00 1.75 8.00 14.00
West 1.00 1.75 3.75 6.56

North Column
South & East 1.00 1.92 8.00 15.33
West Side 1.00 0.75 3.75 2.81
Breakfast Down side 1.00 10.50 4.75 49.88
104.58 Sft
FNT2 Staircase Steps Sft

FNT3 Pooja Work Sft

FNT4 Pooja Platform & Frame Work


Side 2.00 3.00 1.25 7.50
Middle 1.00 3.00 1.83 5.50
Onyx frame 1.00 8.58 5.50 47.21
60.21 Sft

FNT5 Pooja Wall Work (Brick Pattern) 1.00 18.50 2.33 43.16 Sft

FNT6 Glass Floor 1.00 7.50 4.50 33.75 Sft

FNT7 Lift Panelling


Stilt floor
Lift Wall 2.00 1.42 6.42 18.18
Jambs 2.00 1.00 6.42 12.83
Lintel 1.00 2.58 1.00 2.58
Top 1.00 5.42 1.42 7.67
41.27

Ground floor
Lift Wall
Left 1.00 1.50 6.42 9.63
Right 1.00 2.42 6.42 15.51
Jambs 2.00 1.00 6.42 12.83
Lintel 1.00 2.58 1.00 2.58
Top 1.00 6.42 1.50 9.63
50.17

First floor
Left 1.00 1.50 6.42 9.63
Right 1.00 2.42 6.42 15.51
Jambs 2.00 1.00 6.42 12.83
Lintel 1.00 2.58 1.00 2.58
Top 1.00 6.42 1.50 9.63
50.17

141.62

FNT8 T.V. Wall Panelling 1.00 3.00 5.00 15.00 Sft

FNT9 Grid False ceiling


First floor
NW Toilet 1.00 9.00 6.00 54.00
SW Toilet 1.00 8.00 5.88 47.00
1.00 6.25 6.00 37.50
Deduction
Beam 1.00 6.25 0.75 4.69
138.50 4.69
133.81 Sft

FNT10 Wooden False ceiling in Kitchen


Beam Cover 1.00 13.00 3.00 39.00 Sft

FNT11 Ribs
Ribs 4.00 4.00 16.00 Rft

G PLASTERING
G01 Outside Plastering
Stilt Floor
Parking West Wall (2.667+0.75)*2 1.00 6.83 9.00 61.51 Sft

Ground Floor
Elevation Wall (15'3"+3'0") 1.00 18.25 10.50 191.63 Sft

First Floor
Elevation Wall (15'3"+3'0") 1.00 18.25 10.50 191.63 Sft

Terrace Floor
Elevation Wall (15'3"+3'0") 1.00 18.25 4.83 88.20 Sft

G02 Inside Wall Plastering


Stilt floor
Ramp Concrete 1.00 22.88 3.50 80.06
Lift Flooring 1.00 5.00 5.50 27.50
Lift Platform -1(9"+9"+9") 1.00 2.25 1.50 3.38
Top 1.00 0.75 0.75 0.56
Lift Platform -2(1'6"+1'6")*2 1.00 6.00 2.50 15.00
Top 1.00 1.50 1.50 2.25
Gas Platform
Top 1.00 5.00 1.75 8.75
Sides(5+1.75+1.75) 1.00 8.50 0.33 2.81
140.31 Sft

Terrace floor
For Placing AC controller 1.00 5.00 4.00 20.00
Sides 1.00 9.00 0.67 6.00
For Placing Lift controller(1'10"+1'5") 1.00 3.25 1.42 4.60
(Rework) Short Column-1(10"+10")*2 1.00 3.33 2.50 8.33
Top 1.00 0.83 0.83 0.69
Platform for roof pipe over the floor(9"+9"+9") 1.00 2.25 0.83 1.87
Top 1.00 0.75 0.75 0.56
Pressure pump platform(1'0"+1'0")*2 1.00 4.00 0.33 1.32
Top 1.00 1.00 1.00 1.00
Support for Shade To Pressure Pump(0.75+0.75)*2 1.00 3.00 0.25 0.75
Top 1.00 0.75 0.75 0.56
Support For Pipes @ Oht(9"+6")*2 6.00 6.25 0.33 12.38
Top 6.00 0.75 0.50 2.25
60.31 Sft

G03 Inside Ceiling Plastering


First floor
Beams
( Rework Sunroom East Beam Grid) E7-E8 1.00 15.00 5.50 82.50
(Stair case Top Beam Grid) C4-C6 1.00 6.50 3.25 21.13
103.63 Sft
H FLOORING
H01 Italian marble for Flooring
Stilt floor
Passage Infront Of lift 1.00 4.00 5.50 22.00
Lift Sill 1.00 3.00 0.75 2.25
24.25 Sft

Ground floor
Lift Sill 1.00 3.00 0.75 2.25 Sft

First floor
B/w Study & Sunroom 1.00 7.63 0.75 5.72
Lift Sill 1.00 3.00 0.75 2.25
Demolished(Sun room Sliding door Sill) 1.00 6.00 0.75 4.50
12.47 Sft

H02 Italian marble for Skirting


Stilt floor
Passage Infront Of lift 1.00 17.50 17.50 Rft

Ground Floor
Living(18'0"+17'0")*2 1.00 70.00 70.00
Kitchen
North side(2'0"+2'0"+2'0") 1.00 6.00 6.00
South side(5'+1'3"+5') & (3'+1'3"+5') 1.00 20.50 20.50
East side 1.00 11.75 11.75
108.25 Rft

First Floor
Chinmay Dress area west side(6"+4'1.5") 1.00 4.63 4.63 Rft

H02NT Italian marble for Dadooing


Ground Floor
Pooja Short Wall Cladding(9'0"+2'6"+2'6"+3'0") 1.00 17.00 2.50 42.50
Pooja South Wall Cladding 1.00 5.68 7.00 39.73
Pooja East Short Wall Cladding 1.00 8.25 1.00 8.25
90.48 Sft

H02NT2 Italian marble for Platforms


Ground Floor
Pooja Platforms
Sides Platform 2.00 3.00 2.00 12.00
Middle Platform 1.00 3.00 2.00 6.00
18.00 Sft

H03 Wooden Flooring


Ground floor
SW Room 1.00 234.22 234.22 Sft

First floor
NW Room 1.00 13.75 13.88 190.78
SW Room 1.00 15.50 15.00 232.50
423.28 Sft

H04 Wooden Skirting


Ground floor
SW Room 1.00 53.38 53.38 Rft

First floor
NW Room 1.00 55.25 55.25
SW Room 1.00 43.13 43.13
151.75 Rft

H05 Wooden flooring Profile


Ground floor
SW Room 1.00 10.13 10.13 Rft

First floor
NW Room 1.00 3.25 3.25
SW Room 1.00 17.88 17.88
31.25 Rft

H09 Ceramic Tiles Flooring


Ground Floor
Utility Wall 1.00 118.27 118.27 Sft

Terrace floor 1.00 1,336.21 1,336.21


Deductions
Elliptical Cutout 1.00 87.70 87.70
Columns 2.00 0.75 1.50 2.25
1,336.21 89.95
1,246.26 Sft

H10 Ceramic Tiles Dadooing


Stilt Floor
Kitchen Wall 1.00 19.00 2.00 38.00
Utility wall NW Corner
North side 1.00 5.25 3.17 16.63
West side(4'11"+4.5"+4.5") 1.00 5.67 3.42 19.36
South side 1.00 3.25 3.17 10.30
84.29 Sft

Ground Floor
Utility Wall 1.00 63.75 4.67 63.75
Utility Wall Top 1.00 14.39 14.39
Deductions
D1 1.00 3.25 4.67 15.18
78.14 15.18
62.96 Sft

H13 Granite slab for outside Stairs


Stilt floor
Threads 16.00 1.00 4.08 65.33
Risers 18.00 0.58 4.08 42.60
Landing 1 1.00 4.50 4.83 21.75
Landing 2 1.00 4.08 4.67 19.06
Landing 3 1.00 130.19 130.19
278.92 Sft

H14 Granite slab for outside Stairs Skirting


Stilt floor
Threads 16.00 1.00 16.00
Risers 18.00 0.50 9.00
Landing 1 1.00 1.00 1.00
Landing 2 1.00 8.67 8.67
34.67 Sft

H15 Granite Flooring


Ground floor
SW Toilet 1.00 6.25 9.00 56.25 Sft

First Floor
NW Toilet 1.00 6.00 9.00 54.00
SW Toilet 1.00 86.85 86.85
140.85 Sft

H15NT Granite Dadooing


Ground Floor
Kitchen 1.00 77.54 77.54
Below Sink(2'0"+3'0"+2'0") 1.00 7.00 2.50 17.50
95.04 Sft

First Floor
NW Toilet (6'0"+9'0")*2 1.00 30.00 9.00 270.00
SW Toilet 1.00 40.50 9.00 364.50
Deductions
D3 2.00 2.75 7.00 5.50
V 2.00 5.00 2.00 10.00
KW 1.00 3.00 4.50 3.00
634.50 18.50
616.00 Sft

H16 Granite Skirting


First Floor
Sunroom (14'9"+2'0"+10'0"+4'6"+4'6") 1.00 35.75 35.75
Sunroom Platforms -
South side 1.00 14.75 14.75
East side 1.00 10.00 10.00
60.50 Sft

H17 Parking Tiles For flooring


Stilt floor
Garden West & South side (13'7.5"+4'2") 1.00 17.79 4.00 71.17
Sides (9'7.5"+4'2") 1.00 13.79 1.00 13.79
Parking & Utility Flooring 1.00 2,122.39 2,122.39
Deductions
Column 1.00 0.75 1.50 1.13
Built Up Area 1.00 1,233.06 1,233.06
2,207.35 1,234.19
973.17 Sft

H18 Parking Tiles for skirting


Column(0.75+1.5)*2 2.00 4.50 9.00
Parking north & west wall 1.00 40.88 40.88
Parking east wall 1.00 16.50 16.50
66.38 Rft

H19 Sunroom Flooring


First Floor 1.00 10.00 14.75 147.50 Sft

H20 Sunroom Skirting

H21 20 mm granite slab for kitchen / Counters


Stilt floor
Kitchen(10'0"+5'0") 1.00 15.00 2.00 30.00
Pooja Platform
Top 1.00 4.00 1.50 6.00
Support 3.00 1.50 0.50 2.25
38.25 Sft

Ground floor
Kitchen Platform
North & West(6'6"+3'4.5") 1.00 9.88 2.25 22.22
East 1.00 11.75 2.00 23.50
Brekfast table top 1.00 10.75 1.25 13.44
Brekfast table sides 1.00 11.75 1.25 14.69
South 2.00 5.00 1.25 12.50
86.34 Sft

First floor
Sun room Door Sill 1.00 6.00 0.75 4.50 Sft

H22NT 30 mm granite slab for Utility


Ground floor
Top 1.00 10.00 10.00
Middle 1.00 5.00 5.00
Support 3.00 2.50 7.50
22.50 Sft

H22NT1 30 mm granite edge polishing


Ground floor
Top 2.00 10.00 20.00
Middle 2.00 5.00 10.00
Support 6.00 2.50 15.00
45.00 Sft

H25 Italian Marble Half nosing


Stilt floor
Infront Of Lift(9"+1'3"+4'0"+5'6"+6"+9"+1'3") 1.00 13.75 13.75 Rft

Ground floor
Foyer, Staircase & Dining(51'6"+9"+9"+3'4.5"-(3'3"+3'0")) 1.00 50.13 50.13
Living(18'0"+17'0") 1.00 35.00 35.00
85.13 Rft

First floor
Family 1.00 57.75 57.75
Lift,Passage &
study(2'0"+9"+1'3"+9"+4'4.5"+2'+7'3"+9") 1.00 19.13 19.13
Chinmay Dress area west side(6"+4'1.5") 1.00 4.63 4.63
81.50 Rft

H28 20mm Granite Half Nosing


Stilt Floor
Threads 16.00 1.00 16.00
Risers 18.00 0.50 9.00
Landing 1 1.00 1.00 1.00
Landing 2 1.00 8.67 8.67
34.67
First Floor Sun room
Sunroom West side(2'0"+4'6"+4'6") 1.00 11.00 11.00
45.67 Rft
H31 V Groove In Granite
Ground floor
Kitchen(2'0"+6'9"+3'0"+1'6"+2'0") 1.00 15.25 15.25
Below Sink(2'0"+3'0"+2'0") 3.00 7.00 21.00
36.25 Rft

First floor
NW Toilet 4.00 30.00 120.00
SW Toilet 4.00 40.50 162.00
Deductions
Door 6.00 2.75 16.50
282.00 16.50
265.50 Rft

H31NT V Groove In Marble 301.75


Ground floor
Pooja South Wall 1.00 5.68 5.68 Rft

H32 Fixing Granite Sill for Bathroom door


Ground floor
Toilet doors 2.00 2.75 5.50
First floor
Toilet doors 2.00 2.75 5.50
11.00 Rft

H33 Clay Tiles for Terrace floor

H35 20 mm Granite Patti


Stilt floor
Stair case
Threads 16.00 4.00 64.00
Landing 1 1.00 4.50 4.50
Landing 2 1.00 4.67 4.67
Landing 3 (13'4.5"+12'9"+3'0") 1.00 29.13 29.13
Kitchen Platform Top(10'0"+7'0") 1.00 17.00 17.00
Step at NW Corner For Washing 1.00 4.50 4.50
External Toilet Door Patti(2'6"+2'6") 1.00 5.00 5.00
Infront of garden north wall(4'0"+2'0") 1.00 6.00 6.00
134.79 Rft

Ground floor
Balcony Wall Cladding
Horizontal(4'0"+4'4.5"+2'7"+3"+5'11") 2.00 17.13 34.25
Vertical 1.00 9.00 9.00
Main Door 1.00 19.00 19.00
Powder Room Flush Tank Top 1.00 2.25 2.25
SW Room Toilet Flush Tank Top 1.00 6.25 6.25
Shelf (2'0"+1'0")*2 1.00 6.00 6.00
Toilet Door Patti (2'9"+7'0"+7'0") 2.00 16.75 33.50
Utility Door(3'3"+7'0"+7'0") 1.00 17.25 17.25
127.50 Rft

First floor
SW room Toilet Flush Tank Top 1.00 6.25 6.25
Shelf (2'0"+1'0")*2 2.00 6.00 12.00
Toilet Door Patti (2'9"+7'0")*2 2.00 19.50 39.00
Windows Patti (5'0"+2'0")*2 2.00 14.00 28.00
Sunroom Platforms
South side 1.00 14.75 14.75
East side 1.00 10.00 10.00
110.00 Rft

H36 20 mm Granite Edge Pollishing


Stilt floor
Stair case
Threads 32.00 4.83 154.66
Landing 2 2.00 5.50 11.00
Landing 3 (13'4.5"+12'9"+3'0") 2.00 29.13 58.25
Kitchen Platform Top(10'0"+7'0") 1.00 17.00 17.00
Step at NW Corner For Washing 1.00 4.50 4.50
External Toilet Door Patti(2'6"+2'6") 2.00 5.00 10.00
31.50 Rft

Ground floor
Balcony Wall Cladding
Horizontal(4'0"+4'4.5"+2'7"+3"+5'11") 4.00 17.13 68.50
Vertical 2.00 9.00 18.00
Main Door(5'0"+7'0"+5'0") 2.00 19.00 38.00
Powder Room Flush Tank Top 2.00 2.25 4.50
SW Room Toilet Flush Tank Top 2.00 6.25 12.50
Shelf (2'0"+1'0")*2 2.00 6.00 12.00
Toilet Door Patti (2'9"+7'0"+7'0") 4.00 16.75 67.00
Utility Door(3'3"+7'0"+7'0") 4.00 17.25 69.00
220.50 Rft

First floor
SW room Toilet Flush Tank Top 1.00 6.25 6.25
Shelf (2'0"+1'0")*2 2.00 6.00 12.00
Toilet Door Patti (2'9"+7'0")*2 2.00 19.50 39.00
Windows Patti (5'0"+2'0")*2 2.00 14.00 28.00
85.25 Rft

H37 20 mm Marble Patti


Ground floor
Pooja wall Platforms
SE Side
Horizontal(3'8"+3'1") 2.00 6.75 13.50
vertical 1.00 2.17 2.17
NW Side
Horizontal(3'0"+9'10") 2.00 12.83 25.67
vertical 1.00 2.17 2.17
Pooja Platfoms
Sides 2.00 3.00 6.00
Middle(3'0"+1'6"+1'6") 1.00 6.00 6.00
Step To Living(18'0"+17'0") 1.00 35.00 35.00
Kitchen
North & west platform(6'6"+3'4.5") 1.00 9.88 9.88
East side 1.00 11.75 11.75
Break fast table West side 1.00 11.75 11.75
Break fast table east side 1.00 11.75 11.75
Crockery unit(5'0"+1'3"+5'0") 2.00 11.25 22.50
158.13 Rft
First floor
NW Dress Room 1.00 7.38 7.38
Cut Out 1.00 50.00 50.00
57.38 Rft

H38 20 mm Marble Edge Polishing


Ground floor
Pooja
S&E Side
Horizontal(3'8"+3'1") 4.00 6.75 27.00
vertical 4.00 2.17 8.67
NW Side
Horizontal(3'0"+9'10") 4.00 12.83 51.33
vertical 4.00 2.17 8.67
Pooja Platfoms
Sides 2.00 3.00 6.00
Middle(3'0"+2'0"+2'0") 2.00 7.00 14.00
Step To Living(18'0"+17'0") 2.00 35.00 70.00
Kitchen
North & west platform(6'6"+3'4.5") 2.00 9.88 19.75
East side 2.00 11.75 23.50
Break fast table West side 2.00 11.75 23.50
Break fast table east side 2.00 11.75 23.50
Crockery unit(5'0"+1'3"+5'0") 4.00 11.25 45.00
320.92 Rft

First floor
NW Dress Room 2.00 7.38 14.75
Cut Out 2.00 50.00 100.00
114.75 Rft

H39NT ONYEX
Ground floor
Pooja 1.00 8.00 4.00 32.00
Sheela Shankar room 1.00 6.00 2.00 12.00
44.00 Sft

H40NT White marble for Breakfast platform


Terrace floor
Breakfast table 1.00 5.00 2.50 12.50 Sft

H41NT Garden North Wall Dadooing


Stilt Floor
North wall 1.00 4.00 8.00 32.00 Sft

I PAINTING WORKS
I01 Plastic Emulsion
Stilt floor
Walls(3885.01+(140.31-(80.06-27'6")) 1.00 3,937.57 3,937.57
Ceiling 1.00 2,146.95 2,146.95
6,084.52 Sft
Ground floor
Walls 1.00 2,847.16 2,847.16
Ceiling 1.00 1,688.35 1,688.35
4,535.51 Sft
First floor
Walls 1.00 3,455.69 3,455.69
Ceiling 1.00 1,323.26 1,323.26
4,778.95 Sft
Terrace floor
Walls(715.71+60.31) 1.00 776.02 776.02
Ceiling 1.00 169.06 169.06
945.08 Sft

I02 Exterior Emulsion (Apex)


Stilt floor (4261.18+61.51) 1.00 4,322.69 4,322.69
Ground floor 1.00 2,333.58 2,333.58
First floor 1.00 2,481.15 2,481.15
Terrace floor 1.00 2,182.62 2,182.62 Sft

I03 Enamel Paint


Stilt floor
For wood works FACTOR
Utility Door 1.00 3.00 1.00 7.00 21.00
W3 4.00 5.00 1.00 4.50 90.00
W5 2.00 3.00 1.00 4.50 27.00
W6 1.00 2.00 1.00 4.50 9.00
KW 1.00 3.00 1.00 4.50 13.50
V1 1.00 3.00 1.00 2.00 6.00
145.50 Sft
Ground floor
For wood works
W1 1.00 8.00 1.00 6.00 48.00
W2 1.00 6.00 1.00 6.00 36.00
W5 2.00 3.00 1.00 4.50 27.00
KW 1.00 3.00 1.00 4.50 13.50
V 1.00 5.00 1.00 2.00 10.00
V2 1.00 2.00 1.00 4.50 9.00
143.50 Sft
First floor
For wood works
W1 2.00 8.00 1.00 6.00 96.00
W4 1.00 3.00 1.00 6.00 18.00
W5 4.00 3.00 1.00 4.50 54.00
V 2.00 5.00 1.00 2.00 20.00
188.00 Sft

Terrace Floor
For wood works
D1 1.00 3.25 1.00 7.00 22.75 Sft

I04 Melamine Polish


Wood Works
Stilt floor
For Doors
ED 3.00 3.50 2.50 7.00 183.75
PD 1.00 4.00 2.50 7.00 70.00
D2 2.00 3.00 2.50 7.00 105.00
D2 1.00 3.00 1.50 7.00 31.50
D4 2.00 2.50 2.50 7.00 87.50
477.75

For Windows
W3 4.00 5.00 1.50 4.50 135.00
W5 2.00 3.00 1.50 4.50 40.50
W6 1.00 2.00 1.50 4.50 13.50
KW 1.00 3.00 1.50 4.50 20.25
V1 1.00 3.00 1.50 2.00 9.00
218.25
Total 696.00

Ground floor
For Doors
ED/W 1.00 5.00 2.50 7.00 87.50
PD 1.00 4.00 2.50 7.00 70.00
D1 2.00 3.25 2.50 7.00 113.75
D3 2.00 2.75 2.50 7.00 96.25
367.50

For Windows
W1 1.00 8.00 1.50 6.00 72.00
W2 1.00 6.00 1.50 6.00 54.00
W5 2.00 3.00 1.50 4.50 40.50
KW 1.00 3.00 1.50 4.50 20.25
V 1.00 5.00 1.50 2.00 15.00
V2 1.00 2.00 1.50 4.50 13.50
215.25
Total 582.75
First floor
For Doors
D1 2.00 3.25 2.50 7.00 113.75
D3 2.00 2.75 2.50 7.00 96.25
Sunroom Door 1.00 6.00 2.50 7.00 105.00
210.00

For Windows
W1 2.00 8.00 1.50 6.00 144.00
W4 1.00 3.00 1.50 6.00 27.00
W5 4.00 3.00 1.50 4.50 81.00
V 2.00 5.00 1.50 2.00 30.00
282.00
Total 492.00
Terrace floor
For Doors
D1 1.00 3.25 1.50 7.00 34.13

I05NT Elevation wall texture


Ground Floor
Elevation Wall (15'3"+3'0") 1.00 18.25 10.50 191.63 Sft
First Floor
Elevation Wall (15'3"+3'0") 1.00 18.25 10.50 191.63 Sft

Terrace Floor
Elevation Wall (15'3"+3'0") 1.00 18.25 4.83 88.20 Sft
471.45
I06NT Inside Wall Texture
Stair case south wall (10'6"+10'6"+9'0") 1.00 14.50 30.00 435.00 Sft

J MISCELLANEOUS
J04 Stone Slab over Drains 1.00 40.00 5.00 200.00 Sft

J06 Grooves 1/2"


Grooves 3/4" 32.00 18.25 584.00
Deductions
W5 14.00 7.83 109.66
584.00 109.66
474.34 Rft

J08 Washing Stone 1.00 5.00 2.00 10.00 Sft

J09 20 mm granite for Name board -

J10 Granite Cutting for Sink 2.00 2.00 Nos

J11 Granite Cutting for Hob 1.00

J12 Chimney Hole 2.00 2.00 Nos

J13 Gas Piping

J14 Granite Cutting for Wash basin Counter 3.00 3.00 Nos

K M.S. / S.S. WORKS (without Basic material cost but including Painting)
K01 M.S. Gate
Stilt floor
Parking Gate 1.00 20.88 7.50 156.56
Small Gate 1.00 4.00 7.50 30.00
186.56 Sft
K02 S.S. Staircase Railing
Stilt floor
External Staircase(5'4"+12'0"+9'4.5"+12'9"+3') 1.00 42.46 3.00 127.37 Sft

K03 M.S. Covering Grill


Stilt floor
Top (40'0"+59'3") 1.00 99.25 5.00 496.25
Side-1(5'0"+40'0"+59'3") 1.00 104.25 4.50 469.13
Side-2 2.00 3.00 3.00 18.00
983.38 Sft
K04 M.S. Balcony Railing
Terrace Floor
East Side 1.00 15.00 3.00 45.00
South Side 1.00 8.38 3.00 25.13
70.13 Sft

K05 M.S. T-angle 1.00 1.00 No

K06 M.S. Sky light covering


Sun room 1.00 10.00 15.25 152.50
Elliptical 1.00 8.75 12.75 111.56
Staircase Top 1.00 6.75 1.75 11.81
275.88 Sft

K07 M.S. Ladder

K08 M.S.Door 2.00 3.25 7.00 45.50 Sft

K09 M.S.Grill Door 2.00 2.50 7.00 35.00 Sft

K10 M.S.Frame for Structural Glazing

KNT1 Pargola To Cover The Balcony Near Entrance Door


Top 1.00 12.75 3.00 38.25
Sides 1.00 12.75 9.00 114.75
153.00 Sft

KNT2 Utility Covering


Ground Floor
Sides 1.00 25.50 4.58 116.88
North side Top 1.00 25.50 2.67 68.00
East side 1.00 4.67 5.00 23.33
West side 1.00 4.50 3.00 13.50
NW Corner 1.00 2.00 2.00 4.00
225.71 Sft

KNT3 M.S. Internal Staircase 1.00 1.00 No

KNT4 M.S. Staircase In Terrace Floor 1.00 1.00 No

KNT5 M.S. Frame For Glass Floor


First Floor 1.00 7.33 4.42 32.39 Sft

KNT6 Louvers For Clinic Toilet


Stilt Floor 1.00 3.58 1.00 3.58 Sft

KNT7 Windows Patti


North Side
Horizontal 2.00 13.50 0.75 20.25
Vertical 4.00 4.50 0.75 13.50
33.75 Sft

KNT8 Sunroom Mesh


First floor
East Side 1.00 16.00 1.50 24.00
South Side 1.00 16.00 1.25 20.00
Pillars 3.00 10.00 0.75 22.50
Pillars 2.00 9.00 0.75 13.50
80.00

KNT9 Compound Mesh


Stilt floor
East side 1.00 29.00 3.75 108.75 Sft

KNT10 M.S. Sunroom Covering Grill


South side 1.00 10.92 9.50 103.71
East side 1.00 14.92 9.50 141.71
245.42 Sft

KNT11 Sump Cover 3.00 3.00 Nos


KNT12 Cylinder Fence
Stilt floor 1.00 5.25 2.92 15.31 Sft

KNT13 Storage For Generator


Stilt floor 1.00 14.43 14.43 Sft

KNT14 Shade for Pressure Pump


Terrace floor
West side 1.00 4.00 5.25 21.00
Top 1.00 4.50 6.08 27.37
East side 1.00 7.25 6.00 43.50
91.87 Sft

KNT15 Support to Breakfast Platform


Terrace floor

KNT16 Flower Pot Stand


Terrace floor 6.00 Nos

L PLUMBING & SANITARY WORKS


L01 3/4" CPVC pipe (Cold & Hot Water ) 1,051.00 Rft
L02 1" CPVC pipe 725.00 Rft
1.5" CPVC Pipe 115.00
L03 2" CPVC pipe Rft
L04 3/4" gate valve 2.00 Nos
L05 1" gate value 14.00 Nos
1.5" gate value 2.00
L06 2" gate valve Nos
L07 Ball valve for sump tank Each
L08 PVC over head tank 2.00 2,000.00 4,000.00 Ltr
L09 3/4" Non-Return Valve for Solar Each
L10 PVC Pipes
a) 1 1/2" dia 73.00 Rft
1 1/4" dia 20.00
b) 2 1/2" dia 362.00 Rft
c) 3" dia Rft
e) 4" dia (4kg/cm2) 341.00 Rft
f) 5" dia (6kg/cm2) Rft
f) 6" dia (6kg/cm2) 101.00
L11 PVC multi trap Each
PVC Floor Trap 18.00 Each
L12 PVC P- trap 10.00 Each
L13 Chambers 12"x12" 2.00 Each
Chambers 15"x15" 1.00 Each
Chambers 18"x18" 3.00 Each
L14 Chambers 21"x21" Each
L15 Chambers 24"x24" 7.00 Each
Fixtures (labour only)
L16 E.W.C with flushtank fixing 3.00 Each
L17 Wall mounted Commode fixing 4.00 Each
L18 Concealed Flush tank fixing 3.00 Each
L19 Wash basin fixing Each
L20 Shower and shower arm fixing Each
L21 Angle cock & stop cock fixing 6.00 Each
L22 Grating with frame fixing Each
L23 Wall mixer fixing Each
L24 2 IN 1 bib cock & Heaalth faucet fixing Each
L25 Sink Cock fixing Each
L26 Short body bib cock fixing Each
L27 Bootle Trap Fixing Each
L28 Single liver diverter Each
Rain Shower Diverter Fixing with overhead shower 1.00
Concealed Body Shower 2.00
L29 Spout Each
L30 Waste pipe fixing Each
L31 Concealed stop cock Each
L32 Washing mechine tap Each
L33 Rain water filter fixing Each
L34 Sink fixing Each

M ELECTRICALWORKS (Anchor roma )


M01 Light point Each
M02 Spot Light point Each
M03 Fan point with Regulator Each
M04 Bell point Each
M05 Individual plug point Each
M06 Plug point Each
M07 Two way point Each
M08 30 amps DP socket heating point and 5 amps switch
with socket Each
M09 15 amps socket point for geezer & AC Each
M10 30 amps DP point for geezer control Each
M11 Lighting circuit Rft
M12 Heating circuit & Main Circuit Rft
M13 Telephone point Each
M14 Telephone circuit Rft
M15 Main circuit and lift 3 phase Rft
M16 Antana point Each
M17 Antana circuit Rft
M18 Pump point No.
M19 Pump Circuit Rft
M20 Main distribution board (24 way) control for mains Each
M21 Main distribution board (12 way) control for mains Each
Main distribution board (8 way) control for mains Each
M22 Main Panel board L.S.
M23 Main grounding (8' 0" depth) Each
M24 Internal grounding ( 6' 0" depth ) Each
M25 Providing & fixing and laying 35 Sq mm UG cable
with earth work with pvc pipe.(App) Rft
M26 CC T.V. Dummy Conduits (1") Rft
M27 Spot lights for interior works L.S
M29 Chandalear point
M32 Lift Pannel
M33 Lift light Wireing and 5amps plug point L.S
M34 G.I.Earth srtip

N MATERIALS TO BE SUPPLIED BY THE OWNER

GLASS WORKS
1 Shower partition 3.00 3.00 Nos
2 Design Glass for railings
3 Laminated Glass for Sky light
Elliptical Skylight 1.00 101.60 101.60 Sft
Sun room Skylight 1.00 16.33 10.50 171.47 Sft
Staircase Skylight 1.00 7.58 2.42 18.33 Sft
4 Structural Glazing
5 Laminated Glass
Glass Floor 1.00 7.33 4.67 34.22 Sft
Infront Of pooja 1.00 4.00 4.00 16.00 Sft
Entrance Door pargola Top 1.00 14.08 3.50 49.29 Sft
Utility Top 1.00 25.58 3.00 76.73 Sft
Parking Pargola 1.00 24.13 3.50 84.44 Sft
Utility NW Top 1.00 2.25 2.50 5.63 Sft
Garden East wall 4.00 1.50 4.00 24.00 Sft
Glass For sliding Gate 10.00 4.83 1.50 72.50 Sft
Glass For small Gate 1.00 3.00 1.25 3.75 Sft
Buch Glass 4.00 0.67 6.00 16.01 Sft
Glass Blocks 9.00 9.00 Nos

P DEMOLITION WORKS
P04 R.C.C Work Demolition
P04D R.C.C Column Concrete
Terrace floor
Short Column 2.00 0.75 1.50 0.50 1.13 Cft
H FLOORING
ITALIAN MARBLE
H01 Italian marble for Flooring
Stilt floor
Passage Infront Of lift 1.00 4.00 5.50
Lift Sill 1.00 3.00 0.75

Ground floor
Lift Sill 1.00 3.00 0.75
Foyer,Dining & Kitchen 1.00 567.50
Living 1.00 18.00 17.00
Between Kitcken Columns 1.00 10.75 0.83
Sheela Shankar Dress Area 1.00 6.71 6.88
Pooja Flooring 1.00 9.00 9.00
Deduction
Kitchen Cabinets(1'9"+8'4.5") 1.00 10.13 1.75

First floor
Family & Study 1.00 18.00 36.75
Pinakini Dress Area 1.00 6.71 8.63
Chinmay Dress Area 1.00 7.38 9.46
B/w Study & Sunroom 1.00 7.63 0.75
Lift Sill 1.00 3.00 0.75
Demolished(Sun room Sliding door Sill) 1.00 6.00 0.75
Deduction
Cut Out 1.00 221.66
Chinmay Wardrobe(9'0"+7'4.5") 1.00 16.38 1.75

H02 Italian marble for Skirting


Stilt floor
Passage Infront Of lift 1.00 17.50

Ground Floor
Living(18'0"+17'0")*2 1.00 70.00
Foyer,Dining & Kitchen 1.00 80.17
Kitchen
North side(2'0"+2'0"+2'0") 1.00 6.00
South side(5'+1'3"+5') & (3'+1'3"+5') 1.00 20.50
East side 1.00 11.75
Infront of pooja 1.00 16.00
First floor
Family & Study 1.00 95.00
Chinmay Dress Area(5.7.5"+7.3"+1'9") 1.00 14.63
Chinmay Dress area west side(6"+4'1.5") 1.00 4.63

H02NT Italian marble for Dadooing


Ground Floor
Pooja Short Wall Cladding(9'0"+2'6"+2'6"+3'0") 1.00 17.00
Pooja South Wall Cladding 1.00 5.68
Pooja East Short Wall Cladding 1.00 8.25

H02NT2 Italian marble for Platforms


Ground Floor
Pooja Platforms
Sides Platform 2.00 3.00 2.00
Middle Platform 1.00 3.00 2.00

H25 Italian Marble Half nosing


Stilt floor
Infront Of Lift(9"+1'3"+4'0"+5'6"+9"+6"+1'3") 1.00 13.75

Ground floor
Foyer, Staircase & Dining(51'6"+9"+9"+3'4.5"-(3'3"+3'0")) 1.00 50.13
Living(18'0"+17'0") 1.00 35.00

First floor
Family 1.00 57.75
Lift,Passage &
study(2'0"+9"+1'3"+9"+4'4.5"+2'+7'3"+9") 1.00 19.13
Chinmay Dress area west side(6"+4'1.5") 1.00 4.63

H31NT V Groove In Marble


Ground floor
Pooja South Wall 1.00 5.68

H37 20 mm Marble Patti


Ground floor
Pooja wall Platforms
SE Side
Horizontal(3'8"+3'1") 1.00 6.75
vertical 1.00 2.17
NW Side
Horizontal(3'0"+9'10") 1.00 12.83
vertical 1.00 2.17
Pooja Platfoms
Sides 2.00 3.00
Middle(3'0"+1'6"+1'6") 1.00 6.00
Step To Living(18'0"+17'0") 1.00 35.00
Kitchen
North & west platform(6'6"+3'4.5") 1.00 9.88
East side 1.00 11.75
Break fast table West side 1.00 11.75
Break fast table east side 1.00 11.75
Crockery unit(5'0"+1'3"+5'0") 2.00 11.25

First floor
NW Dress Room 1.00 7.38
Cut Out 1.00 50.00

H38 20 mm Marble Edge Polishing


Ground floor
Pooja
S&E Side
Horizontal(3'8"+3'1") 4.00 6.75
vertical 4.00 2.17
NW Side
Horizontal(3'0"+9'10") 4.00 12.83
vertical 4.00 2.17
Pooja Platfoms
Sides 2.00 3.00
Middle(3'0"+2'0"+2'0") 2.00 7.00
Step To Living(18'0"+17'0") 2.00 35.00
Kitchen
North & west platform(6'6"+3'4.5") 2.00 9.88
East side 2.00 11.75
Break fast table West side 2.00 11.75
Break fast table east side 2.00 11.75
Crockery unit(5'0"+1'3"+5'0") 4.00 11.25

First floor
NW Dress Room 2.00 7.38
Cut Out 2.00 50.00

H40NT White marble for Breakfast platform


Terrace floor
Breakfast table 1.00 5.00 2.50
GRANITE
H15 Granite Flooring
Ground floor
SW Toilet 1.00 6.25 9.00

First Floor
NW Toilet 1.00 6.00 9.00
SW Toilet 1.00 86.85

H16 Granite Skirting


First Floor
Sunroom (14'9"+2'0"+10'0"+4'6"+4'6") 1.00 35.75
Sunroom Platforms
South side 1.00 14.75
East side 1.00 10.00

H15NT Granite Dadooing


Ground Floor
Kitchen 1.00 77.54
Below Sink(2'0"+3'0"+2'0") 1.00 7.00

First Floor
NW Toilet (6'0"+9'0")*2 1.00 30.00
SW Toilet 1.00 40.50
Deductions
D3 2.00 2.75
V 2.00 5.00
KW 1.00 3.00

H23 20mm Granite Cladding @ Entrance Door


Cladding Infront Of Balcony(4'4.5"+8'0"+6'0") 1.00 18.38
Deduction
ED/W 1.00 5.00

H13 Granite slab for outside Stairs


Stilt floor
Threads 16.00 1.00 4.08
Risers 18.00 0.58 4.08
Landing 1 1.00 4.50 4.83
Landing 2 1.00 4.08 4.67
Landing 3 1.00 130.19
H14 Granite slab for outside Stairs Skirting
Stilt floor
Threads 16.00 1.00
Risers 18.00 0.50
Landing 1 1.00 1.00
Landing 2 1.00 8.67

H35 20 mm Granite Patti


Stilt floor
Stair case
Threads 16.00 4.00
Landing 1 1.00 4.50
Landing 2 1.00 4.67
Landing 3 (13'4.5"+12'9"+3'0") 1.00 29.13
Kitchen Platform Top(10'0"+7'0") 1.00 17.00
Step at NW Corner For Washing 1.00 4.50
External Toilet Door Patti(2'6"+2'6") 1.00 5.00
Infront of garden north wall(4'0"+2'0") 1.00 6.00

Ground floor
Balcony Wall Cladding
Horizontal(4'0"+4'4.5"+2'7"+3"+5'11") 2.00 17.13
Vertical 1.00 9.00
Main Door 1.00 19.00
Powder Room Flush Tank Top 1.00 2.25
SW Room Toilet Flush Tank Top 1.00 6.25
Shelf (2'0"+1'0")*2 1.00 6.00
Toilet Door Patti (2'9"+7'0"+7'0") 2.00 16.75
Utility Door(3'3"+7'0"+7'0") 1.00 17.25

First floor
SW room Toilet Flush Tank Top 1.00 6.25
Shelf (2'0"+1'0")*2 2.00 6.00
Toilet Door Patti (2'9"+7'0")*2 2.00 19.50
Windows Patti (5'0"+2'0")*2 2.00 14.00
Sunroom Platforms
South side 1.00 14.75
East side 1.00 10.00

H21 20 mm granite slab for kitchen / Counters


Stilt floor
Kitchen(10'0"+5'0") 1.00 15.00 2.00
Pooja Platform
Top 1.00 4.00 1.50
Support 3.00 1.50 0.50

Ground floor
Kitchen Platform
North & West(6'6"+3'4.5") 1.00 9.88 2.25
East 1.00 11.75 2.00
Brekfast table top 1.00 10.75 1.25
Brekfast table sides 1.00 11.75
South 2.00 5.00 1.25

First floor
Sun room Door Sill 1.00 6.00 0.75

H22NT 30 mm granite slab for Utility


Ground floor
Top 1.00 10.00
Middle 1.00 5.00
Support 3.00 2.50

H36 20 mm Granite Edge Pollishing


Stilt floor
Stair case
Threads 32.00 4.83
Landing 2 2.00 5.50
Landing 3 (13'4.5"+12'9"+3'0") 2.00 29.13
Kitchen Platform Top(10'0"+7'0") 1.00 17.00
Step at NW Corner For Washing 1.00 4.50
External Toilet Door Patti(2'6"+2'6") 2.00 5.00

Ground floor
Balcony Wall Cladding
Horizontal(4'0"+4'4.5"+2'7"+3"+5'11") 4.00 17.13
Vertical 2.00 9.00
Main Door(5'0"+7'0"+5'0") 2.00 19.00
Powder Room Flush Tank Top 2.00 2.25
SW Room Toilet Flush Tank Top 2.00 6.25
Shelf (2'0"+1'0")*2 2.00 6.00
Toilet Door Patti (2'9"+7'0"+7'0") 4.00 16.75
Utility Door(3'3"+7'0"+7'0") 4.00 17.25

First floor
SW room Toilet Flush Tank Top 1.00 6.25
Shelf (2'0"+1'0")*2 2.00 6.00
Toilet Door Patti (2'9"+7'0")*2 2.00 19.50
Windows Patti (5'0"+2'0")*2 2.00 14.00

H28 20mm Granite Half Nosing


Stilt Floor
Threads 16.00 1.00
Risers 18.00 0.50
Landing 1 1.00 1.00
Landing 2 1.00 8.67

First Floor Sun room


Sunroom West side(2'0"+4'6"+4'6") 1.00 11.00

H22NT1 30 mm granite edge polishing


Ground floor
Top 2.00 10.00
Middle 2.00 5.00
Support 6.00 2.50

H31 V Groove In Granite


Ground floor
Kitchen(2'0"+6'9"+3'0"+1'6"+2'0") 1.00 15.25
Below Sink(2'0"+3'0"+2'0") 3.00 7.00

First floor
NW Toilet 4.00 30.00
SW Toilet 4.00 40.50
Deductions
Door 6.00 2.75

H32 Fixing Granite Sill for Bathroom door


Ground floor
Toilet doors 2.00 2.75
First floor
Toilet doors 2.00 2.75

TILES
H07 Vitrified tiles flooring
Stilt floor
Living,Dining & Kitchen 1.00 387.63
NE Bedroom 1.00 12.00 12.00
SE Bedroom 1.00 121.44
Pooja Flooring 1.00 4.00 4.75
Clinic 1.00 271.72
Deduction
Kitchen Cabinets(7'0"+8'3") 1.00 15.25 1.75
NE Wardrobe 1.00 12.00 1.75
SE Wardrobe 1.00 4.38 1.75

Ground floor
Kitchen Cabinets
West side(8'4.5"+1'9") 1.00 10.13 1.75
East side 1.00 11.50 2.00

H08 Vitrified Tiles skirting


Stilt floor
Living,Dining & Kitchen 1.00 120.50
NE Bedroom 1.00 48.00
SE Bedroom 1.00 49.25
Clinic 1.00 72.25

H09 Ceramic Tiles Flooring


Stilt floor
Attached Toilet 1.00 4.00 6.13
General Toilet 1.00 4.63 5.63
Clinic Toilet 1.00 4.00 4.63

Ground floor
Utility Wall 1.00 118.27
Powder Room 1.00 8.00 5.00

Terrace floor 1.00 1,336.21


Deductions
Elliptical Cutout 1.00 87.70
Columns 2.00 0.75 1.50

H10 Ceramic Tiles Dadooing


Stilt floor
Attached Toilet 1.00 20.25
General Toilet 1.00 20.50
Clinic Toilet 1.00 17.25
Kitchen Wall 1.00 19.00
Utility wall NW Corner
North side 1.00 5.25
West side(4'11"+4.5"+4.5") 1.00 5.67
South side 1.00 3.25
Deduction
Door 3.00 2.50

Ground floor
Powder Room (8'0"+5'0")*2 1.00 26.00
SW Room Toilet (6'3"+9'0")*2 1.00 30.50
Utility Wall 1.00 63.75
Utility Wall Top 1.00 14.39
Deductions
D1 1.00 3.25
Toilet Door 2.00 2.75
V 1.00 5.00
V2 1.00 2.00

H17 Parking Tiles For flooring


Stilt floor
Garden West & South side (13'7.5"+4'2") 1.00 17.79 4.00
Sides (9'7.5"+4'2") 1.00 13.79
Parking & Utility Flooring 1.00 2,122.39
Deductions
Column 1.00 0.75 1.50
Built Up Area 1.00 1,233.06

H18 Parking Tiles for skirting


Column(0.75+1.5)*2 2.00 4.50
Parking north & west wall 1.00 40.88
Parking east wall 1.00 16.50

H41NT Garden North Wall Dadooing


Stilt Floor
North wall 1.00 4.00 8.00

H19 Sunroom Flooring


First Floor 1.00 10.00 14.75

H39NT ONYEX
Ground floor
Pooja 1.00 8.00 4.00
Sheela Shankar room 1.00 6.00 2.00

WOODEN & CEMENT FLOORING


H03 Wooden Flooring
Ground floor
SW Room 1.00 234.22

First floor
NW Room 1.00 13.75 13.88
SW Room 1.00 15.50 15.00

H04 Wooden Skirting


Ground floor
SW Room 1.00 53.38

First floor
NW Room 1.00 55.25
SW Room 1.00 43.13

H05 Wooden flooring Profile


Ground floor
SW Room 1.00 10.13

First floor
NW Room 1.00 3.25
SW Room 1.00 17.88

H06 Cement flooring


Ground floor
SW Room 1.00 15.50 15.00
Shelf Area 1.00 1.25 1.38

First floor
NW Room 1.00 13.00 13.88
SW Room 1.00 15.50 15.00
22.00
2.25
24.25 Sft

2.25
567.50
306.00
8.95
46.12
81.00

17.72
1,011.82 17.72
994.10 Sft

661.50
57.86
69.75
5.72
2.25
4.50

221.66
28.66
801.58 250.32
551.26 Sft

17.50 Rft

70.00
80.17

6.00
20.50
11.75
16.00
204.42 Rft
95.00
14.63
4.63
114.25 Rft

2.50 42.50
7.00 39.73
1.00 8.25
90.48 Sft

12.00
6.00
18.00 Sft

13.75 Rft

50.13
35.00
85.13 Rft

57.75

19.13
4.63
81.50 Rft

5.68 Rft

6.75
2.17
12.83
2.17

6.00
6.00
35.00

9.88
11.75
11.75
11.75
22.50
138.54 Rft

7.38
50.00
57.38 Rft

27.00
8.67

51.33
8.67

6.00
14.00
70.00

19.75
23.50
23.50
23.50
45.00
320.92 Rft

14.75
100.00
114.75 Rft

12.50 Sft
56.25 Sft

54.00
86.85
140.85 Sft

35.75
-
14.75
10.00
60.50 Sft

77.54
2.50 17.50
95.04 Sft

9.00 270.00
9.00 364.50

7.00 5.50
2.00 10.00
4.50 3.00
634.50 18.50
616.00 Sft

8.50 156.19

7.00 35.00
156.19 35.00
121.19 Sft

65.33
42.60
21.75
19.06
130.19
278.92 Sft

16.00
9.00
1.00
8.67
34.67 Sft

64.00
4.50
4.67
29.13
17.00
4.50
5.00
6.00
134.79 Rft

34.25
9.00
19.00
2.25
6.25
6.00
33.50
17.25
127.50 Rft

6.25
12.00
39.00
28.00

14.75
10.00
110.00 Rft

30.00
6.00
2.25
38.25 Sft

22.22
23.50
13.44
1.25 14.69
12.50
86.34 Sft

4.50 Sft

10.00
5.00
7.50
22.50 Sft

154.66
11.00
58.25
17.00
4.50
10.00
31.50 Rft

68.50
18.00
38.00
4.50
12.50
12.00
67.00
69.00
220.50 Rft

6.25
12.00
39.00
28.00
85.25 Rft

16.00
9.00
1.00
8.67
34.67

11.00
45.67 Rft

20.00
10.00
15.00
45.00 Sft

15.25
21.00
36.25

120.00
162.00

16.50
282.00 16.50
265.50
301.75 Rft

5.50

5.50
11.00 Rft
387.63
144.00
121.44
19.00
271.72

26.69
21.00
7.66
943.79 55.34
888.44 Sft

17.72
23.00
40.72 Sft

120.50
48.00
49.25
72.25
290.00 Rft

24.50
26.02
18.50
69.02 Sft

118.27
40.00
158.27 Sft

1,336.21

87.70
2.25
1,336.21 89.95
1,246.26 Sft
7.00 141.75
7.00 143.50
7.00 120.75
2.00 38.00

3.17 16.63
3.42 19.36
3.17 10.30

7.00 52.50
490.29 52.50
437.79 Sft

10.00 260.00
10.00 305.00
4.67 63.75
14.39

4.67 15.18
7.00 38.50
2.00 10.00
4.50 9.00
643.14 72.68
570.46 Sft

71.17
1.00 13.79
2,122.39

1.13
1,233.06
2,207.35 1,234.19
973.17 Sft

9.00
40.88
16.50
66.38 Rft

32.00 Sft
147.50 Sft

32.00
12.00
44.00 Sft

234.22 Sft

190.78
232.50
423.28 Sft

53.38 Rft

55.25
43.13
151.75 Rft

10.13 Rft

3.25
17.88
31.25 Rft

232.50
1.72
234.22 Sft

180.38
232.50
412.88 Sft
Dr. PINAKINI.K.S
ABST

GROUP ESTIMATED R.A.BILL-1 R.A. BILL-2


CODE DESCRIPTION OF WORK UNITS ESTIMATED RATE AMOUNT QTY AMOUNT
QTY (in Rs) (in Rs) QTY AMOUMT
CIVIL WORKS
A EARTH WORK
A01 Earthwork Excavation. Cft 6,754.45 15.00 101,316.75 5,015.44 75,231.60 68.69 1,030.35
A02 Earth Filling using available earth. Cft 5,291.00 5.00 26,455.00 5,704.66 28,523.30 -
A03 Excess Earth carting away from the site.
Cft 2,024.00 15.00 30,360.00 98.28 1,474.20 -
A04 Earth Filling brought from outside Cft 10.00 - - -
A05 Earth Shifting over area Cft 2,400.00 10.00 24,000.00 - -
182,131.75 105,229.10 1,030.35
-
B MASONRY WORKS
B01 Size Stone Masonary CM 1:6 Cft 720.00 180.00 129,600.00 839.91 151,183.80 63.00 11,340.00
B02 BBM 9" thk
Stilt floor Sft 1,873.53 200.00 374,706.00 947.06 189,412.00
Ground floor Sft 1,467.47 200.00 293,494.00 -
First floor Sft 1,490.93 200.00 298,186.00 -
Terrace floor Sft 817.88 200.00 163,576.00 -
B03 BBM 4.5" thk -
Stilt floor Sft 486.13 120.00 58,335.60 756.75 90,810.00
Ground floor Sft 222.99 120.00 26,758.80 -
First floor Sft 197.88 120.00 23,745.60 -
Terrace floor Sft 120.00
1,368,402.00 151,183.80 291,562.00

C CONCRETE WORKS
C01 PCC 1:4:8
Below footing Cft 782.60 120.00 93,912.00 683.88 82,065.60
Below flooring Cft 962.17 120.00 115,460.40 699.63 83,955.60
Below Staircase Landing Cft 120.00 9.48 1,137.60
C02 RCC Footing Concrete Cft 1,854.00 210.00 389,340.00 1,526.69 320,604.90
C03 RCC Plinth Beam Cft 288.70 300.00 86,610.00 245.95 73,785.00
C04 PCC 1:3:6 Sills
Stilt floor Cft 40.31 130.00 5,240.30 8.14 1,058.20
Ground floor Cft 8.54 130.00 1,110.20 -
First floor Cft 8.25 130.00 1,072.50 -
Terrace floor Cft 40.27 130.00 5,235.10 -
C05 RCC Column Concrete
Below Stilt floor Cft 69.75 330.00 23,017.50 64.43 21,261.90 -
Above Stilt floor Cft 165.38 330.00 54,575.40 185.06 61,069.80
Ground floor Cft 165.38 330.00 54,575.40 -
First floor Cft 165.38 330.00 54,575.40 -
Terrace Floor Cft 82.69 330.00 27,287.70 -
C06 RCC Lintel Concrete
Stilt floor Cft 27.28 300.00 8,184.00 46.24 13,872.00
Ground floor Cft 24.84 300.00 7,452.00 -
First floor Cft 29.06 300.00 8,718.00 -
Terrace Floor Cft 3.75 300.00 1,125.00 -
C07 RCC Chejja, loft concrete
Stilt floor Sft 76.00 245.00 18,620.00 79.50 19,477.50
Ground floor Sft 62.00 245.00 15,190.00 -
First floor Sft 88.00 245.00 21,560.00 -
Terrace Floor Sft 16.00 245.00 3,920.00 -
C08 RCC Beam Concrete
Stilt floor Cft 289.27 305.00 88,227.35 360.53 109,961.65
Ground floor Cft 347.58 305.00 106,011.90 -
First floor Cft 313.45 305.00 95,602.25 -
Terrace Floor Cft 73.41 305.00 22,390.05 -
C09 RCC Roof Slab concrete
Stilt floor Cft 785.84 305.00 239,681.20 733.46 223,705.30
Ground floor Cft 631.65 305.00 192,653.25 -
First floor Cft 497.06 305.00 151,603.30 -
Terrace floor Cft 82.50 305.00 25,162.50 -
C10 RCC Staircase Waist Slab
Stilt floor Cft 75.17 400.00 30,068.00 19.40 7,760.00
C11 RCC Staircase Folded type -
Stilt floor Cft 800.00 37.34 29,872.00
Ground floor Cft 38.00 800.00 30,400.00 -
First floor Cft 38.00 800.00 30,400.00 -
C12 RCC Retaining wall Cft 400.00 135.00 54,000.00 -
-
2,008,980.70 635,673.00 467,914.05
-
D STEEL
Steel Reinforcement including fabrication
D01 (Basic cost=Rs.50000 /-)
Stilt floor Kgs 8,000.00 68.00 544,000.00 4,813.00 327,284.00 4,000.00 272,000.00
Ground floor Kgs 5,750.00 68.00 391,000.00 1,825.00 124,100.00
First floor Kgs 5,050.00 68.00 343,400.00 -
68.00
68.00
68.00
Terrace floor Kgs 675.00 68.00 45,900.00 -
1,324,300.00 327,284.00 396,100.00
-
E DOORS AND WINDOWS -
DOORS -
E01 Teak Wood frame with OST Flush shutter
with teak wood panneling for Main door.
-
Stilt floor Sft 28.00 2,420.00
Ground floor Sft 28.00 2,420.00 67,760.00 -
E02 Teak Wood frame withTeak wood shutter
for pooja Door - PD. -
Stilt floor Sft 28.00 2,750.00
Ground floor Sft 28.00 2,750.00 77,000.00 -
E03 Teak Wood frame with BST Flush shutter
for Room doors. -
Stilt floor Main door Sft 2,100.00
Stilt floor Sft 42.00 1,800.00 75,600.00 -
Ground floor Sft 42.00 1,800.00 75,600.00 -
First floor Sft 59.50 1,800.00 107,100.00 -
NT1 Teak Wood frame with OST Flush shutter
for Toilet, Utility & Terrace door.
Stilt floor Sft 1,750.00
Ground floor Sft 1,750.00
First floor Sft 1,750.00
Terrace Floor Sft 1,750.00
E04 Teak Wood frame with Fully Glazed Teak
wood shutter including Glass for Toilet
doors -
Stilt floor Sft 17.50 2,285.00 39,987.50 -
Ground floor Sft 35.00 2,285.00 79,975.00 -
First floor Sft 35.00 2,285.00 79,975.00 -
First floor Sliding door 2,500.00 -
E05 Sal Wood frame with commercial
waterproof Flush shutter for Servent Room
and Servent toilet doors -
Stilt floor Sft 38.50 750.00 28,875.00 -

WINDOWS -
E06 Teak wood frame with Teak wood shutter
for Windows -
Stilt floor Sft 94.50 2,100.00 198,450.00 -
Ground floor Sft 142.50 2,100.00 299,250.00 -
First floor Sft 181.50 2,100.00 381,150.00 -
E07 Sal Wood frame with Honne wood shutter
for Windows in Servent room and Servent
Toilet -
Stilt floor Sft 58.50 1,050.00 61,425.00 -
ENT1 Sliding Door
First floor Sft 3,000.00
ENT2 Pelmet Box For Sliding door Rft 2,000.00
ENT3 UPVC windows Sft 500.00
WOOD WORK ADVANCE 1,000,000.00
1,572,147.50 - -
-
F INTERIOR WORKS -
F01 Wardrobes
19 mm Century Commercial Ply, Inside
0.8mm Laminate Finish & Outside
Decorative Veneer of Rs 150/- per sft With
Mellamine Finish , Fittings all are Hetich,
Handles are below 150 Rs and Locks are
Europa.
-
Stilt floor
Below loft Sft 1,500.00 -
Above Loft Sft 900.00 -
Beam cover Sft 900.00 -
Ground floor -
Below loft Sft 80.50 1,840.00 148,120.00 -
1,400.00
Above Loft Sft 34.50 950.00 32,775.00 -
1,000.00
MDF Beam cover Sft 1,000.00

First floor -
Below loft Sft 196.35 1,840.00 361,284.00 -
1,400.00
Above Loft Sft 84.15 950.00 79,942.50 -
1,000.00 -

F02 Kitchen Cabinet -


16 mm Century Water Proof Ply, Inside
0.8mm Laminate Finish & Outside 1 mm
Laminate with Alluminium edge Profile
Finish, Hinges all are Hetich -
Stilt floor -
Below platform Sft 20.31 1,500.00 30,465.00 -
2,100.00
Above platform Sft 16.25 1,200.00 19,500.00 -
1,300.00
Above Loft Sft 24.38 1,000.00 24,380.00 -
Ground floor -
Below platform Sft 63.13 2,200.00 138,886.00 -
2,600.00
Above platform Sft 50.50 1,600.00 80,800.00 -
1,670.00
Above Loft Sft 102.75 1,200.00 123,300.00 -
Tall unit Sft 21.00 1,600.00 33,600.00 -
1,750.00
Beyond Fridge Sft
F03 T.V.Cabinet -
Stilt floor Sft 7,000.00
Ground floor Sft 70.00 1,500.00 105,000.00 -
F04 Crockery unit Sft 70.00 2,000.00 140,000.00 -
F05 Cot with back rest Each 3.00 75,000.00 225,000.00 -
F06 Study table Each 1.00 50,000.00 50,000.00 -
F07 Internal Staircase Railing in Teak Wood
With Glass Sft 303.00 1,200.00 363,600.00 -
FNT1 Column panelling Sft 900.00 -
FNT2 Staircase Steps Sft 700,000.00
FNT3 Pooja Work Sft 300,000.00
FNT4 Pooja Platform And Frame Works Sft 1,800.00
FNT5 Pooja Wall Work (Brick Pattern) Sft 500.00
FNT6 Glass Floor Sft 1,250.00
FNT7 Lift Panelling Sft 900.00
FNT8 T.V. Wall Panelling Sft 900.00
FNT9 Grid False ceiling Sft 200.00
FNT10 Wooden False ceiling Sft 1,000.00 -
FNT11 Ribs Rft 900.00 -
Interior Work Advance 500,000.00
Pooja Work Advance 200,000.00
Stair Case & Railing Work Advance 500,000.00
1,956,652.50 - -
-
G PLASTERING -
G01 Outside Plastering -
Stilt floor Sft 4,135.06 55.00 227,428.30 -
Ground floor Sft 2,345.50 55.00 129,002.50 -
First floor Sft 2,035.00 55.00 111,925.00 -
Terrace floor Sft 1,991.56 55.00 109,535.80 -
G02 Inside Wall Plastering -
Stilt floor Sft 3,105.25 52.00 161,473.00 -
Ground floor Sft 3,242.40 52.00 168,604.80 -
First floor Sft 3,422.50 52.00 177,970.00 -
Terrace floor Sft 510.00 52.00 26,520.00 -
G03 Inside Ceiling Plastering -
Stilt floor Sft 1,933.56 55.00 106,345.80 -
Ground floor Sft 1,572.21 55.00 86,471.55 -
First floor Sft 1,155.99 55.00 63,579.45 -
Terrace floor Sft 165.00 55.00 9,075.00 -
G04 Water proof plastering for toilets -
Ground floor Sft 145.75 60.00 8,745.00 -
First floor Sft 195.50 60.00 11,730.00 -
1,398,406.20 - -
-
H FLOORING (without basic material cost) -
H01 Italian marble for Flooring -
Stilt Floor Sft 200.00
Ground floor Sft 872.83 200.00 174,566.00 -
First floor Sft 446.57 200.00 89,314.00 -
H02 Italian marble for Skirting -
Stilt Floor Rft 130.00
Ground floor Rft 194.00 130.00 25,220.00 -
First floor Rft 158.33 130.00 20,582.90 -
H02NT Italian marble for Dadooing
Ground floor Sft 250.00
H02NT1 Italian marble for Plaforms
Ground floor Sft
H03 Wooden Flooring -
Ground floor Sft 232.49 20.00 4,649.80 -
First floor Sft 423.27 20.00 8,465.40 -
H04 Wooden Skirting -
Ground floor Rft 74.25 10.00 742.50 -
First floor Rft 148.25 10.00 1,482.50 -
H05 Wooden flooring Profile -
Ground floor Rft 15.00 10.00 150.00 -
First floor Rft 25.00 10.00 250.00 -
H06 Cement flooring -
Ground floor Sft 232.49 80.00 18,599.20 -
First floor Sft 423.27 80.00 33,861.60 -
H07 Vitrified tiles flooring -
Stilt floor Sft 911.09 80.00 72,887.20 -
Ground floor Sft 80.00
H08 Vitrified skirting -
Stilt floor Rft 228.75 75.00 17,156.25 -
H09 Ceramic Tiles Flooring -
Stilt floor Sft 139.83 80.00 11,186.40 -
Ground floor Sft 185.59 80.00 14,847.20 -
First floor Sft 101.00 80.00 8,080.00 -
H10 Ceramic Tiles Dadooing -
Stilt floor Sft 453.50 90.00 40,815.00 -
Ground floor Sft 666.75 90.00 60,007.50 -
First floor Sft 385.50 90.00 34,695.00 -
H11 Italian Marble slab for Internal Stairs -
Ground floor Sft 108.00 220.00 23,760.00 -
First floor Sft 108.00 220.00 23,760.00 -
H12 Italian Marble slab for Internal Stairs Skirting -
Ground floor Rft 39.50 150.00 5,925.00 -
First floor Rft 39.50 150.00 5,925.00 -
H13 Granite slab for outside Stairs -
Stilt floor St 161.86 140.00 22,660.40 -
H14 Granite slab for outside Stairs Skirting -
Stilt floor Rft 50.13 110.00 5,514.30 -
H15 Granite Flooring -
Ground floor Sft 276.08 110.00 30,368.80 -
First floor St 149.47 110.00 16,441.70 -
H15NT Granite Dadooing
Stilt floor St 150.00
First floor St 150.00

H16 Granite skirting -


Ground floor Rft 104.89 110.00 11,537.90 -
First floor Rft 49.53 110.00 5,448.30 -
H17 Parking Tiles For flooring -
Stilt floor Sft 959.16 80.00 76,732.80 -
H18 Parking Tiles for skirting -
Stilt floor Rft 340.50 75.00 25,537.50 -
H19 Sunroom tiles flooring -
First floor Sft 153.75 80.00 12,300.00 -
H20 Sunroom tiles skirting -
First floor Rft 50.76 75.00 3,807.00 -
H21 20 mm granite slab for kitchen / Counters -
Stilt floor Sft 21.00 100.00 2,100.00 -
Ground floor Sft 54.00 100.00 5,400.00 -
First floor Sft 24.00 100.00 2,400.00 -
H22 40 mm granite slab for Utility -
Ground floor Sft 15.13 100.00 1,513.00 -
H22NT 30 mm granite slab for Utility -
Ground floor Sft 100.00 -
H22NT1 30 mm granite Edge Polishing
Ground floor Rft 50.00
H23 20mm Granite Cladding @ Entrance Door
Sft 300.00 150.00 45,000.00 -
H24 Italian Marble Full nosing Rft 100.00 150.00 15,000.00 -
H25 Italian Marble Half nosing -
Stilt floor Rft 100.00
Ground floor Rft 100.00 100.00 10,000.00
First floor Rft 100.00 -
H26 Italian Marble Double nosing Rft 160.00 250.00 40,000.00 -
H27 20 mm Granite full nosing Rft 50.00 100.00 5,000.00 -
H28 20 mm Granite half nosing Rft 50.00 50.00 2,500.00 -
H29 20 mm Granite Double nosing Rft 150.00 150.00 22,500.00 -
H30 40 mm Granite full nosing Rft 30.00 100.00 3,000.00 -
H31 V-Groove in granite Rft 300.00 100.00 30,000.00 -
H31NT V-Groove in Marble Rft 50.00 -
H32 Fixing Granite Sill for Bathroom door Each 6.00 150.00 900.00 -
H33 Clay Tiles for Terrace floor Sft 1,188.00 80.00 95,040.00 -
H34 Water proofing for Terraces Sft 1,188.00 85.00 100,980.00 -
H35NT 20 mm Granite Patti
Stilt floor Rft 50.00
Ground floor Rft 50.00
First floor Rft 50.00
H36NT 20 mm Granite Edge Pollishing
Stilt floor Rft 50.00
Ground floor Rft 50.00
First floor Rft 50.00
H37NT 20 mm Marble Patti
Ground floor Rft 100.00
First floor Rft 100.00
H38NT 20 mm Marble Edge Polishing
Ground floor Rft 100.00
First floor Rft 100.00
H39NT ONYEX 500.00
H40NT White marble for Breakfast platform Sft
H41NT Garden North Wall Dadooing Sft
1,288,610.15 - -
-
I PAINTING WORKS -
I01 Plastic Emulsion -
Stilt floor Sft 5,038.81 26.00 131,009.06 -
Ground floor Sft 4,814.61 26.00 125,179.86 -
First floor Sft 4,578.49 26.00 119,040.74 -
Terrace floor Sft 675.00 26.00 17,550.00 -
I02 Exterior Emulsion (Apex) -
Stilt floor Sft 4,135.06 24.00 99,241.44 -
Ground floor Sft 2,345.50 24.00 56,292.00 -
First floor Sft 2,035.00 24.00 48,840.00 -
Terrace floor Sft 1,991.56 24.00 47,797.44 -
I03 Enamel Paint -
Stilt floor Sft 360.63 22.00 7,933.86 -
Ground floor Sft 178.13 22.00 3,918.75 -
First floor Sft 226.88 22.00 4,991.25 -
Terrace floor Sft 22.00
I04 Melamine Polish -
Stilt floor Sft 266.83 90.00 24,014.25 -
Ground floor Sft 510.63 90.00 45,956.25 -
First floor Sft 463.13 90.00 41,681.25 -
Terrace floor Sft 90.00
I05NT Elevation wall texture Sft 50.00
I06NT Inside Wall Texture Sft 60.00
Advance 200,000.00 -
773,446.15 - -
J MISCELLANEOUS -
J01 Sump Tank Ltrs 10,000.00 10.00 100,000.00 17,187.50 171,875.00 -
J02 Anti-termite treatment for Pesticides Sft 2,400.00 10.00 24,000.00 2,400.00 24,000.00 -
J03 Bath Floor Filling
Stilt floor Cft 80.00 -
Ground floor Cft 70.00 80.00 5,600.00
First floor Cft 138.00 80.00 11,040.00
J04 Stone Slab over Drains Sft 200.00 250.00 50,000.00
150.00
J05 Chicken Mesh Sft 200.00 180.00 36,000.00
J06 Grooves 3/4" Sft 600.00 20.00 12,000.00
J07 Cornice works - 1 step Sft 400.00 30.00 12,000.00
2 steps Sft 200.00 50.00 10,000.00
J08 Washing Stone Sft 10.00 350.00 3,500.00
J09 20 mm granite for Name board No 1.00 5,000.00 5,000.00
J10 Granite Cutting for Sink Each 3.00 600.00 1,800.00
J11 Granite Cutting for Hob Each 1.00 300.00 300.00
J12 Chimney Hole Each 2.00 1,000.00 2,000.00
J13 Gas Piping L.S 15,000.00 15,000.00
J14 Rain Water Harvesting Each 2.00 15,000.00 30,000.00
J15 Rough Stone Cladding @ Outside Wall
(Inclusive of Material) Sft 550.00 400.00 220,000.00
J16 Granite Cutting for Washbasin Counter Each
538,240.00 195,875.00 -

K M.S. / S.S. WORKS (without Basic material cost but including Painting)
K01 M.S. Gate Sft 130.00 60.00 7,800.00
K02 S.S. Staircase Railing Sft 71.06 50.00 3,553.00
K03 M.S. Covering Grill Sft 871.50 40.00 34,860.00
K04 M.S. Balcony Railing Sft 45.00 35.00 1,575.00
K05 M.S. T-angle Set 1.00 350.00 350.00
K06 M.S. Sky light covering Sft 355.00 100.00 35,500.00
K07 M.S. Ladder L.S 1.00 1,500.00 1,500.00
K08 M.S.Door Sft 42.00 60.00 2,520.00
K09 M.S.Grill Door Sft 21.00 80.00 1,680.00
K10 M.S.Frame for Structural Glazing Sft 325.00 50.00 16,250.00
KNT1 Pargola To Cover The Balcony Near
Entrance Door Sft 60.00
KNT2 Utility Covering Sft 60.00
KNT3 M.S. Staircase For Internal Staircase No 5,000.00
KNT4 M.S. Staircase In Terrace Floor No 5,000.00
KNT5 M.S. Frame For Glass Floor Sft 60.00
KNT6 Louvers For Clinic Toilet Sft 60.00
KNT7 Windows Patti Sft 30.00
KNT8 Sunroom Mesh Sft 30.00
KNT9 Compound Mesh Sft 30.00
KNT10 Sunroom Covering grill Sft 60.00
KNT11 Sump Cover No 60.00
KNT12 Cylinder Fence Sft 60.00
KNT13 Storage for generator Sft 60.00
KNT14 Shade for pressure pump Sft 60.00
KNT15 Support for Breakfast platform Sft 500.00
KNT16 Flower pot stand Sft 6,000.00
105,588.00 - -

L PLUMBING & SANITARY WORKS


L01 3/4" CPVC pipe (Cold & Hot Water ) Rft 650.00 110.00 71,500.00
L02 1" CPVC pipe Rft 500.00 110.00 55,000.00
L03 2" CPVC pipe Rft 40.00 225.00 9,000.00
L04 3/4" gate valve Nos 3.00 730.00 2,190.00
L05 1" gate value Nos 8.00 1,442.00 11,536.00
L06 2" gate valve Nos 1.00 1,854.00 1,854.00
L07 Ball valve for sump tank Each 1.00 835.00 835.00
L08 PVC over head tank Ltr 2,000.00 9.00 18,000.00
L09 3/4" Non-Return Valve for Solar Each 1.00 850.00 850.00
L10 PVC Pipes
a) 1 1/2" dia Rft 80.00 88.00 7,040.00
b) 2 1/2" dia Rft 270.00 160.00 43,200.00
c) 3" dia Rft 242.00
e) 4" dia (4kg/cm2) Rft 270.00 283.00 76,410.00
f) 5" dia (6kg/cm2) Rft 130.00 335.00 43,550.00
L11 PVC multi trap Each 14.00 900.00 12,600.00
L12 PVC P- trap Each 4.00 1,262.00 5,048.00
L13 Chambers 12"x12" Each 4.00 3,965.00 15,860.00
L14 Chambers 21"x21" Each 4.00 4,532.00 18,128.00
L15 Chambers 24"x24" Each 1.00 5,253.00 5,253.00
Fixtures (labour only)
L16 E.W.C with flushtank fixing Each 1,365.00 -
L17 Wall mounted Commode fixing Each 6.00 2,009.00 12,054.00
L18 Concealed Flush tank fixing Each 6.00 1,365.00 8,190.00
L19 Wash basin fixing Each 7.00 412.00 2,884.00
L20 Shower and shower arm fixing Each 6.00 283.00 1,698.00
L21 Angle cock & stop cock fixing Each 25.00 52.00 1,300.00
L22 Grating with frame fixing Each 16.00 62.00 992.00
L23 Wall mixer fixing Each 6.00 361.00 2,166.00
L24 2 IN 1 bib cock & Heaalth faucet fixing Each 6.00 124.00 744.00
L25 Sink Cock fixing Each 2.00 345.00 690.00
L26 Short body bib cock fixing Each 3.00 52.00 156.00
L27 Bootle Trap Fixing Each 6.00 82.00 492.00
L28 Single liver diverter Each 258.00 -
L29 Spout Each 36.00 -
L30 Waste pipe fixing Each 6.00 52.00 312.00
L31 Concealed stop cock Each 6.00 52.00 312.00
L32 Washing mechine tap Each 1.00 42.00 42.00
L33 Rain water filter fixing Each 1.00 7,983.00 7,983.00
L34 Sink fixing Each 3.00 258.00 774.00
Advance 450,000.00
Advance 150,000.00
438,643.00 - -

M ELECTRICALWORKS (Anchor roma )


M01 Light point Each 90.00 649.00 58,410.00
M02 Spot Light point Each 10.00 805.00 8,050.00
M03 Fan point with Regulator Each 8.00 1,133.00 9,064.00
M04 Bell point Each 2.00 1,076.00 2,152.00
M05 Individual plug point Each 28.00 773.00 21,644.00
M06 Plug point Each 30.00 392.00 11,760.00
M07 Two way point Each 10.00 1,015.00 10,150.00
M08 30 amps DP socket heating point and 5
amps switch with socket Each 10.00 1,000.00 10,000.00
M09 15 amps socket point for geezer & AC Each 15.00 541.00 8,115.00
M10 30 amps DP point for geezer control Each 15.00 654.00 9,810.00
M11 Lighting circuit Rft 600.00 50.00 30,000.00
M12 Heating circuit & Main Circuit Rft 700.00 72.00 50,400.00
M13 Telephone point Each 3.00 500.00 1,500.00
M14 Telephone circuit Rft 200.00 36.00 7,200.00
M15 Main circuit and lift 3 phase Rft 200.00 134.00 26,800.00
M16 Antana point Each 4.00 500.00 2,000.00
M17 Antana circuit Rft 170.00 36.00 6,120.00
M18 Pump point No. 1.00 1,076.00 1,076.00
M19 Pump Circuit Rft 100.00 72.00 7,200.00
M20 Main distribution board (24 way) control for
mains Each 11,500.00 -
M21 Main distribution board (12 way) control for
mains Each 3.00 6,180.00 18,540.00
Main distribution board (8 way) control for
mains Each 4,635.00 -
M22 Main Panel board L.S. 1.00 100,000.00
M23 Main grounding (8' 0" depth) Each 1.00 2,936.00 2,936.00
M24 Internal grounding ( 6' 0" depth ) Each 3.00 2,446.00 7,338.00
M25 Providing & fixing and laying 35 Sq mm
UG cable with earth work with pvc pipe.
(App) Rft 90.00 150.00 13,500.00
M26 CC T.V. Dummy Conduits (1") Rft 150.00 25.00 3,750.00
M27 Spot lights for interior works L.S 5,000.00
M29 Chandalear point
M32 Lift Pannel 1.00 15,000.00 15,000.00
M33 Lift light Wireing and 5amps plug point L.S 1.00 6,000.00 6,000.00
M34 G.I.Earth srtip 120.00 130.00 15,600.00
Advance 100,000.00
Advance 150,000.00
Advance 450,000.00
469,115.00 - -

N MATERIALS TO BE SUPPLIED BY THE OWNER

FLOORING & CLADDING MATERIALS


1 Italian marble Sft 2,000.00 400.00 800,000.00
2 Vitrified tiles Sft 1,225.00 80.00 98,000.00
3 20 mm Granite slabs for Flooring Sft 525.00 200.00 105,000.00
4 20 mm Granite slabs for external stair
case Sft 200.00 200.00 40,000.00
5 20 mm Granite slabs for cladding Sft 310.00 200.00 62,000.00
6 20 mm granite slab for kitchen / Counters Sft 150.00 200.00 30,000.00
7 40 mm Granite slabs for Utility Sft 25.00 200.00 5,000.00
8 Parking tiles Sft 1,200.00 150.00 180,000.00
9 Ceramic tiles- Floor Sft 450.00 80.00 36,000.00
10 Ceramic tiles- Dadoo Sft 1,600.00 100.00 160,000.00
11 Wooden Flooring Sft 700.00 150.00 105,000.00
12 Wooden Skirting Rft 225.00 100.00 22,500.00
13 Wooden profile Rft 50.00 110.00 5,500.00
14 Clay Tiles Sft 1,200.00 15.00 18,000.00
H.M.G Bill -1 1,800,000.00
H.M.G Bill -2 115,000.00
H.M.G Bill -3 307,400.00
H.M.G Bill -4 112,935.59
S.S. Ceramics Bill-1 84,000.00
S.S. Ceramics Bill-2 4,500.00
Nitko Bill -1 55,000.00
Nitko Bill -2 144,000.00
Muniraj Stones 192,066.00
Nitko Bill -3 7,300.00
Ghala Stone 48,965.00
Wood & Moulding 100,000.00
Wood & Moulding 293,100.00
1,667,000.00

M.S. WORKS
1 M.S. Gate Sft 130.00 400.00 52,000.00
2 S.S Staircase Railing Sft 71.06 1,000.00 71,060.00
3 M.S. Covering Grill Sft 871.50 200.00 174,300.00
4 M.S. Balcony Railing Sft 45.00 180.00 8,100.00
5 M.S. T-angle Set 1.00 5,000.00 5,000.00
6 M.S. Sky light covering Sft 355.00 300.00 106,500.00
7 M.S. Ladder L.S 1.00 8,500.00 8,500.00
8 M.S.Door Sft 42.00 380.00 15,960.00
9 M.S.Grill Door Sft 21.00 300.00 6,300.00
10 M.S.Frame for Structural Glazing Sft 325.00 200.00 65,000.00
KNT1 Pargola To Cover The Balcony Near
Entrance Door Sft
KNT2 Utility Covering Sft
KNT3 M.S. Internal Staircase No
KNT4 M.S. Staircase In Terrace Floor No
KNT5 M.S. Frame For Glass Floor Sft
KNT6 Louvers For Clinic Toilet Sft
KNT7 Windows Patti Sft
KNT8 Sunroom Mesh Sft
KNT9 Compound Mesh Sft
KNT10 Sunroom Covering grill Sft
KNT11 Sump Cover Nos
KNT12 Cylinder Fence Sft
KNT13 Storage For UPS Sft
KNT14 Shade for Pressure Pump Sft
KNT15 Support to Breakfast Platform Sft
KNT16 Flower Pot Stand Sft
S.S Staircase Railing Rft 80,000.00
Bill dt.22/04/2021 132,953.00
Bill dt.22/04/2021 331,249.00
300,000.00
512,720.00

PLUMBING AND SANITORY WORKS


1 Wall mounted Commode Each 6.00 9,800.00 58,800.00
2 Concealed Flush tank Each 6.00 9,000.00 54,000.00
3 Wash basin Each 7.00 3,300.00 23,100.00
4 Shower and shower arm Each 6.00 2,750.00 16,500.00
5 Angle cock & stop cock (With Flange) Each 25.00 810.00 20,250.00
6 Grating with frame Each 16.00 140.00 2,240.00
7 Wall mixer Each 6.00 4,125.00 24,750.00
8 Connection pipes Each 24.00 145.00 3,480.00
9 Wastepipe & coupling Each 10.00 605.00 6,050.00
10 Pillar cock Each 7.00 2,000.00 14,000.00
11 Health faucet Each 6.00 1,210.00 7,260.00
12 2 IN 1 bib cock Each 6.00 2,065.00 12,390.00
13 Short body bib cock Each 10.00 935.00 9,350.00
14 Sink Cock Each 3.00 2,000.00 6,000.00
15 Single liver diverter Each 10,000.00 -
16 3/4" Extension Nipple Each 10.00 80.00 800.00
17 1" Extension Nipple Each 10.00 100.00 1,000.00
18 X- Nipple With Flange Each 100.00 -
19 Stainless steel Sink for kitchen
Stilt floor Each 1.00 6,000.00 6,000.00
Ground floor Each 2.00 15,000.00 30,000.00
Chabria & Sons Bill-1 200,000.00
Chabria & Sons Bill-2 370,000.00
Chabria & Sons Bill-3 13,452.00
Chabria & Sons Bill-4 87,140.00
Chabria & Sons Bill-5 6,732.00
Dhanalakshmi Hardware 100,000.00
295,970.00

GLASS WORKS
1 Shower partition Each 3.00 45,000.00 135,000.00
3.00 30,000.00
2 Design Glass for railings Sft 200.00 -
3 Laminated Glass for Sky light Sft 355.00 800.00 284,000.00
Elliptical Skylight Sft 900.00
Sun room Skylight Sft 800.00
Staircase Skylight Sft 800.00
4 Structural Glazing Sft 325.00 300.00 97,500.00
3 Laminated Glass
Glass Floor Sft 400.00
Infront of Pooja Sft 300.00
Entrance Door pargola Sft 300.00
Parking Pargola Sft 300.00
Utility Top Sft 300.00
Utility NW Top Sft 300.00
Garden East wall Sft 200.00
Glass For sliding Gate Sft 300.00
Glass For small Gate Sft 600.00
Buch Glass Sft 1,500.00
Glass Blocks Nos 400.00
516,500.00
KITCHEN ACCESSORIES ( Haffele Blum)
a) Tandom Box 30 Kg Nos 8.00 5,975.00 47,800.00
b) Tandom Box 65Kg with Gallery Nos 6.00 8,125.00 48,750.00
c) Spice Rack Nos 1.00 11,975.00 11,975.00
d) Dust bin holder Nos 1.00 2,875.00 2,875.00
e) Detergent holder Nos 1.00 950.00 950.00
f) Aventos Nos 4.00 14,725.00 58,900.00
Euro hardware world 344,010.00
171,250.00

3,163,440.00

O LIFT ( 5 Passanger) LS 1,100,000.00


Advance 300,000.00
Advance 290,000.00
Advance 250,000.00
Final payment 125,000.00
Scaffolding, Masonry and Supervision 100,000.00
1,100,000.00 - -

P DEMOLITION WORKS
P01 SSM
Stilt floor Cft 70.00
P02 BBM 9" thk
Stilt floor Cft 70.00
Ground floor Cft 70.00
First floor Cft 70.00
Terrace floor Cft
P03 BBM 4.5" thk
Stilt floor Sft 50.00
Ground floor Sft 50.00
First floor Sft 50.00
Terrace floor Sft 50.00
P04 R.C.C Work Demolition
P04A PCC 1:3:6 Sills
Stilt floor Cft 120.00
Ground floor Cft 120.00
First floor Cft 120.00
Terrace floor Cft 120.00
P04B RCC Lintel Concrete
Stilt floor Cft 150.00
Ground floor Cft 150.00
First floor Cft 150.00
Terrace floor Cft 150.00
P04C RCC Chajja Concrete
Ground floor Cft 150.00
First floor Cft 150.00
P04D R.C.C Column Concrete
Terrace floor Cft 150.00
- - -
Q ESCALATION
Cement
1 Bill dt.04.12.19 (360.00-375.00= -15.00) Bags -15.00 40.00 -600.00
2 Bill dt.13.12.19 (360.00-375.00 = -15.00) Bags -15.00 50.00 -750.00
3 Bill dt.22.12.19 (360.00-375.00= -15.00) Bags -15.00 75.00 -1,125.00
4 Bill dt.04.01.20 (335.00-375.00= -40.00) Bags -40.00 100.00 -4,000.00
5 Bill dt.15.02.20 (360.00-375.00= -15.00) Bags -15.00 100.00 -1,500.00
6 Bill dt.15.02.20 (360.00-375.00= -15.00) Bags -15.00 50.00 -750.00
7 Bill dt.17.03.20 (335.00-375.00= -40.00) Bags -40.00
8 Bill dt.13.06.20 (400.00-375.00= 25.00) Bags 25.00
9 Bill dt.18.08.20 (400.00-375.00= 25.00) Bags 25.00
10 Bill dt.24.08.20 (400.00-375.00= 25.00) Bags 25.00
11 Bill dt.14.09.20 (390.00-375.00= 15.00) Bags 15.00
12 Bill dt.02.10.20 (400.00-375.00= 25.00) Bags 25.00
13 Bill dt.02.10.20 (400.00-375.00= 25.00) Bags 25.00
14 Bill dt.15.10.20 (400.00-375.00= 25.00) Bags 25.00
15 Bill dt.24.10.20 (400.00-375.00= 25.00) Bags 25.00
16 Bill dt.08.11.20 (400.02-375.00= 25.00) Bags 25.00
17 Bill dt.16.11.20 (400.00-375.00= 25.00) Bags 25.00
18 Bill dt.29.12.20 (390.00-375.00= 15.00) Bags 15.00
19 Bill dt.03.01.21 (400.00-375.00= 25.00) Bags 25.00
20 Bill dt.10.02.21 (390.00-375.00= 15.00) Bags 15.00
21 Bill dt.03.03.21 (400.00-375.00= 25.00) Bags 25.00
22 Bill dt.14.03.21 (400.00-375.00= 25.00) Bags 25.00
23 Bill dt.26.03.21 (400.00-375.00= 25.00) Bags 25.00

Steel
1 Bill dt.04.12.19 (43.01-50.00= -6.99) Kgs -6.99 3,695.00 -25,828.05
2 Bill dt.27.12.19 (46.00-50.00 = -4.00) Kgs -4.00 998.00 -3,992.00
3 Bill dt.21.01.20 (49.98-50.00 = -0.02) Kgs -0.02 470.00 -9.40
4 Bill dt.13.02.20 (47.50-50.00 = -2.50) Kgs -2.50 5,355.00 -13,387.50
5 Bill dt.24.02.20 (48.00-50.00 = -2.00) Kgs -2.00
6 Bill dt.16.05.20 (49.20-50.00 = -0.79) Kgs -0.79
7 Bill dt.01.07.20 (45.00-50.00 = -5.00) Kgs -5.00
8 Bill dt.18.07.20 (43.50-50.00) = -6.50) Kgs -6.50
9 Bill dt.25.07.20 (43.99-50.00) = -6.01) Kgs -6.01
-36,295.05 -15,646.90

S EXTRA WORKS
a) Sanction Plan Charges
b) BWSSB Prorata, Point & inspection
Charges ( Approximately ) 1.00 150,000.00 150,000.00
c)
BESCOM deposits and office expencess
for Temparory connection( Approximately) 1.00 60,000.00 60,000.00
62,000.00 1.00 62,000.00
d) BESCOM deposits and office expencess
for permanent connection( Approximately) 1.00 100,000.00 100,000.00
175,000.00
e) Bore Well Pump 100,000.00
75,000.00 1.00 75,000.00
f) Solar Water Heater (200 ltr) 60,000.00
NT1 Security Systems
Advance 50,000.00
Final payment 5,000.00
Wiring & Supervision 55,000.00
NT2 A.C System
Advance 350,000.00
Advance 100,000.00
Final payment 169,546.00
Scafolding, Masonry and Supervision 50,000.00
NT3 Solar water heater, Heat Pump, Pressure
pump and Softener 300,000.00
470,000.00 137,000.00 -
T FIXTURES & APPLIANCES (Including Labour)
a) 25 lts Geyser Nos 6.00 10,500.00 63,000.00
b) Ceiling Fans Nos 10.00 2,500.00 25,000.00
c) Tube Lights (LED) Nos 10.00 650.00 6,500.00
d) 40 W Light Nos 10.00 18.00 180.00
e) Calling Bell Nos 2.00 180.00 360.00
f) Bulkhead Fitting Nos 5.00 350.00 1,750.00
g) Electrical Chimney Nos 1.00 25,000.00 25,000.00
15,000.00
h) Hobb Nos 1.00 10,000.00 10,000.00
i) Towel Rod Nos 7.00 1,800.00 12,600.00
j) Towel Ring Nos 7.00 750.00 5,250.00
k) Soup Tray Nos 7.00 750.00 5,250.00
l) Mirror in Bathroom Nos 7.00 850.00 5,950.00
m) Corner Tray Nos 6.00 1,400.00 8,400.00
n) 1.0 H.P Water Pump & fittings Nos 1.00 12,000.00 12,000.00
o) Pelmet Rods Ls 1.00 60,000.00 60,000.00
Khaff 78,980.00
Euro Hardware World 369,000.00
241,240.00 - -

COST SUMMARY
A EARTHWORK 182,131.75 105,229.10 1,030.35

B MASONARY WORK 1,368,402.00 151,183.80 291,562.00

C CONCRETE WORK 2,008,980.70 635,673.00 467,914.05

D STEEL 1,324,300.00 327,284.00 396,100.00

E DOORS AND WINDOWS 1,572,147.50 - -

F INTERIOR WORKS 1,956,652.50 - -

G PLASTERING 1,398,406.20 - -

H FLOORING 1,288,610.15 - -

I PAINTING WORKS 773,446.15 - -

J MISCELLINIOUS WORKS 538,240.00 195,875.00 -

K M.S / S.S WORKS 105,588.00 - -

L PLUMBING AND SANITARY WORKS 438,643.00 - -

M ELECTRICAL WORKS 469,115.00 - -

N MATERIALS SUPPLIED BY THE OWNER 3,163,440.00 - -

O LIFT ( 5 Passanger) 1,100,000.00 - -

P DEMOLITION WORKS - -

Q ESCALATION -36,295.05 -15,646.90

S EXTRA WORKS 470,000.00 137,000.00 -

T FIXTURES & APPLIANCES 241,240.00 - -

Total Rs. 18,399,342.95 1,515,949.85 1,140,959.50


Note: Tax extra as applicable

Advance paid till date

Balance payable
AKINI.K.SHANKAR RESIDENTIAL BUILDING
ABSTRACT OF PRE FINAL BILL

R.A. BILL-3 R.A. BILL-4 R.A. BILL-5 PRE FINAL


Previous Qty
QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT

114.38 1,715.70 - 5,198.51


- 279.89 1,399.45 5,704.66

- - 98.28
- - -
- - -
- - 1,715.70 1,399.45
- - -
- - -
18.94 3,409.20 - 921.85
- - -
200.63 40,126.00 18.71 3,742.00 1,147.69
1,174.64 234,928.00 8.30 1,660.00 - 1,182.94
1,324.11 264,822.00 6.28 1,256.00 - 1,330.39
- 659.35 131,870.00 11.37 2,274.00 659.35
- - - -
- 504.87 60,584.40 13.34 1,600.80 1,261.62
408.42 49,010.40 - 80.05 9,606.00 - 488.47
257.25 30,870.00 31.09 3,730.80 - 288.34
163.36 19,603.20 - 163.36
283,938.40 295,692.00 271,845.60 7,616.80
- - - -
- - - -
- - - -
- 13.38 1,605.60 - 697.26
- - 143.06 17,167.20 699.63
- - - 9.48
- 18.00 3,780.00 - 1,544.69
- 12.54 3,762.00 - 258.49
- - - -
- 49.19 6,394.70 177.01 23,011.30 57.33
7.59 986.70 - 50.54 6,570.20 - 58.13
12.00 1,560.00 63.84 8,299.20 - 75.84
- 70.13 9,116.90 9.45 1,228.50 70.13
- - - -
- - - 64.43
- 28.69 9,467.70 - 213.75
169.31 55,872.30 - - - 169.31
169.31 55,872.30 - - 169.31
- 88.88 29,330.40 - 88.88
- - - -
- 12.59 3,777.00 - 58.83
28.76 8,628.00 - 1.88 564.00 - 30.64
28.22 8,466.00 3.00 900.00 - 31.22
- - - -
- - - -
- 2.00 490.00 - 81.50
60.25 14,761.25 - - - 60.25
95.25 23,336.25 - - 95.25
- 28.50 6,982.50 - 28.50
- - - -
- 40.22 12,267.10 - 400.75
354.19 108,027.95 - - - 354.19
340.69 103,910.45 - - 340.69
- 77.06 23,503.30 - 77.06
- - - -
- 11.85 3,614.25 - 745.31
631.18 192,509.90 - - - 631.18
671.90 204,929.50 - - 671.90
- 69.33 21,145.65 - 69.33
- - - -
- - - 19.40
- - - -
- - - 37.34
- - - -
- - - -
- - - 135.00
- - - -
380,786.10 398,074.50 151,570.50 41,407.00
- - - -
- - - -

- - - -
- - - 8,813.00
5,411.00 367,948.00 - - - 7,236.00
5,580.00 379,440.00 - - 5,580.00
288.00 19,584.00 - - 288.00
100.00 6,800.00 - - 100.00
-298.80 -20,318.40 - -298.80
- - - -
367,948.00 405,824.00 -20,318.40 -
- - - -
- - - -
- - - -

- - - -
- - -
- 35.00 84,700.00 - 35.00

- - - -
28.00 77,000.00 - 28.00
- 28.00 77,000.00 - 28.00

- - - -
73.50 154,350.00 - 73.50
- 42.00 75,600.00 - 42.00
- 45.50 81,900.00 - 45.50
- 45.50 81,900.00 - 45.50

- - -
56.00 98,000.00 - 56.00
- - -
- - -
22.75 39,812.50 - 22.75

- - - -
- - - -
- 38.50 87,972.50 - 38.50
- 38.50 87,972.50 - 38.50
- 42.00 105,000.00 - 42.00

- - - -
- 17.50 13,125.00 - 17.50

- - - -

- - - -
- 145.50 305,550.00 - 145.50
- 143.50 301,350.00 - 143.50
- 188.00 394,800.00 - 188.00

- - - -
- - - -
- -
42.00 126,000.00 -
12.00 24,000.00 -
351.88 175,940.00 -
1.00 1,000,000.00 -1.00 -1,000,000.00 - -
1,000,000.00 1,066,032.50 325,940.00
- - - -
- - - -
- -

- - - -
- -
113.75 170,625.00 -
34.44 30,996.00 -
12.75 11,475.00 -
- - - -
- - - -
202.50 283,500.00 -
- - - -
- -
10.13 10,130.00 -
-
- - - -
- - - -
429.25 600,950.00 -
- - - -
- - - -

- - - -

- - - -
- - - -
- - - -
39.88 83,748.00 -
- - - -
13.50 17,550.00 -
- - - -
- -
- - - -
- - - -
58.44 151,944.00 -
- - - -
13.81 23,062.70 -
- - 35.75 42,900.00 -
- -
35.00 61,250.00 -
23.63 - -
- - - -
- -
- - - -
- - 46.00 92,000.00 -
- - - -
- - - -

- - 322.81 387,372.00 -
- - 104.58 94,122.00 -
1.00 700,000.00 -
1.00 300,000.00 -
60.21 108,378.00 -
43.16 21,580.00 -
33.75 42,187.50 -
141.62 127,458.00 -
15.00 13,500.00 -
133.81 26,762.00 -
- - 39.00 39,000.00 -
- - 16.00 14,400.00 -
1.00 500,000.00 -1.00 -500,000.00 1.00
1.00 200,000.00 -1.00 -200,000.00 1.00
1.00 500,000.00 -1.00 -500,000.00 1.00
- - 1,200,000.00 2,254,890.20
- - - -
- - - -
- - - -
- 4,261.18 234,364.90 61.51 3,383.05 4,261.18
- 2,333.58 128,346.90 191.63 10,539.65 2,333.58
- 2,481.15 136,463.25 191.63 10,539.65 2,481.15
- 2,182.62 120,044.10 88.20 4,851.00 2,182.62
- - - -
- 3,885.01 202,020.52 140.31 7,296.12 3,885.01
- 2,847.16 148,052.32 - 2,847.16
- 3,455.69 179,695.88 - 3,455.69
- 715.71 37,216.92 60.31 3,136.12 715.71
- - - -
- 2,146.95 118,082.25 - 2,146.95
- 1,688.35 92,859.25 - 1,688.35
- 1,323.26 72,779.30 103.63 5,699.65 1,323.26
- 169.06 9,298.30 - 169.06
- - - -
- 160.75 9,645.00 - 160.75
- 230.50 13,830.00 - 230.50
- - 1,502,698.89 45,445.24
- - - -
- - - -
- - - -
24.25 4,850.00 -
- 991.85 198,370.00 2.25 450.00 991.85
- 538.80 107,760.00 12.47 2,494.00 538.80
- - - -
17.50 2,275.00 -
- 96.17 12,502.10 108.25 14,072.50 96.17
- 109.63 14,251.90 4.63 601.90 109.63
- -
90.48 22,620.00 -

18.00 - -
- - - -
- - 234.22 4,684.40 -
- - 423.28 8,465.60 -
- - - -
- - 53.38 533.80 -
- - 157.75 1,577.50 -
- - - -
- - 10.13 101.30 -
- - 31.25 312.50 -
- - - -
- 234.22 18,737.60 - 234.22
- 412.88 33,030.40 - 412.88
- - - -
- 888.44 71,075.20 - 888.44
40.72 3,257.60 - 40.72
- - - -
- 290.00 21,750.00 - 290.00
- - - -
- 69.02 5,521.60 - 69.02
- 40.00 3,200.00 118.27 9,461.60 40.00
- - 1,246.26 99,700.80 -
- - - -
- 353.50 31,815.00 84.29 7,586.10 353.50
- 507.50 45,675.00 62.96 5,666.40 507.50
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - 278.92 39,048.80 -
- - - -
- - 34.67 3,813.70 -
- - - -
- - 56.25 6,187.50 -
- - 140.85 15,493.50 -
- -
95.04 14,256.00 -
616.00 92,400.00 -
- -
- - - -
- - - -
- - 60.50 6,655.00 -
- - - -
- - 973.17 77,853.60 -
- - - -
- - 66.38 4,978.50 -
- - - -
- - 147.50 11,800.00 -
- - - -
- - - -
- - - -
- - 38.25 3,825.00 -
- - 86.34 8,634.00 -
- - 4.50 450.00 -
- - - -
- - - -
- - - -
- - 22.50 2,250.00 -
- -
45.00 2,250.00 -

- 121.19 18,178.50 - 121.19


- - - -
- - - -
13.75 1,375.00 -
- 85.13 8,513.00 -
- 81.50 8,150.00 -
- - - -
- - - -
- - 45.67 2,283.50 -
- - - -
- - - -
- - 301.75 30,175.00 -
- - 5.68 284.00 -
- - 4.00 600.00 -
- - - -
- 1,453.76 123,569.60 - 1,453.76
- -
134.79 6,739.50 -
127.50 6,375.00 -
110.00 5,500.00 -
- -
31.50 1,575.00 -
220.50 11,025.00 -
85.25 4,262.50 -
- -
158.13 15,813.00 -
57.38 5,738.00 -
- -
320.92 32,092.00 -
114.75 11,475.00 -
44.00 22,000.00 -
12.50 - -
40.00 - -
- - 708,694.50 622,474.50
- - - -
- - - -
- - - -
- - 6,084.52 158,197.52 -
- - 4,535.51 117,923.26 -
- - 4,778.95 124,252.70 -
- - 945.08 24,572.08 -
- - - -
- - 4,322.69 103,744.56 -
- - 2,333.58 56,005.92 -
- - 2,481.15 59,547.60 -
- - 2,182.62 52,382.88 -
- - - -
- - 145.50 3,201.00 -
- - 143.50 3,157.00 -
- - 188.00 4,136.00 -
22.75 500.50 -
- - - -
- - 696.00 62,640.00 -
- - 582.75 52,447.50 -
- - 492.00 44,280.00 -
34.13 3,071.70 -
471.46 23,573.00 -
435.00 26,100.00 -
- 1.00 200,000.00 -1.00 -200,000.00 1.00
- - 200,000.00 719,733.22
- - - -
- - - 17,187.50
- - - 2,400.00
- - - -
13.84 1,107.20 - 13.84
- 90.26 7,220.80 - 90.26
- 104.59 8,367.20 - 104.59
- - - -
- - 200.00 30,000.00 -
- 322.68 58,082.40 - 322.68
- 19.33 386.60 474.34 9,486.80 19.33
- 229.25 6,877.50 - 229.25
- - - -
- - 10.00 3,500.00 -
- - - -
- - 3.00 1,800.00 -
- - 1.00 300.00 -
- - 2.00 2,000.00 -
- - 2.00 30,000.00 -
- - 1.00 15,000.00 -

- - - -
- -
- - 82,041.70 92,086.80 -
- - - -
- - - -
- - 186.56 11,193.60 -
- - 135.00 6,750.00 -
- - 983.38 39,335.20 -
- - 70.13 2,454.55 -
- - 1.00 350.00 -
- - 275.88 27,588.00 -
- - - -
- - 45.50 2,730.00 -
- - 35.00 2,800.00 -
- - - -

- - 153.00 9,180.00 -
- - 225.71 13,542.60 -
- - 1.00 5,000.00 -
- - 1.00 5,000.00 -
- - 32.39 1,943.40 -
- - 3.58 214.80 -
- - 33.75 1,012.50 -
- - 80.00 2,400.00 -
- - 108.75 3,262.50 -
- - 245.42 14,725.20 -
- - 3.00 180.00 -
- - 15.31 918.60 -
- - 14.43 865.80 -
- - 91.87 5,512.20 -
- - 1.00 500.00 -
- - 1.00 6,000.00 -
- - - 163,458.95
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
1.00 450,000.00 - 1.00
1.00 150,000.00 -
- - 450,000.00 150,000.00 -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -

- - - -

- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
1.00 100,000.00 - - 1.00
1.00 150,000.00 - 1.00
1.00 450,000.00 -
- 100,000.00 150,000.00 450,000.00
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
1.00 1,800,000.00 - 1.00
1.00 115,000.00 - 1.00
1.00 307,400.00 - 1.00
1.00 112,935.59 -
1.00 84,000.00 - 1.00
1.00 4,500.00 - 1.00
1.00 55,000.00 - 1.00
1.00 144,000.00 - 1.00
1.00 192,066.00 - 1.00
1.00 7,300.00 -
1.00 48,965.00 -
1.00 100,000.00 - 1.00
1.00 293,100.00 -
2,801,966.00 462,300.59

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- -
- -
- -
- -
- -
- -
1.00 80,000.00 -
1.00 132,953.00 -
1.00 331,249.00 -
1.00 300,000.00 -
- 844,202.00
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
1.00 200,000.00 - 1.00
1.00 370,000.00 - 1.00
- 1.00 13,452.00 -
- 1.00 87,140.00 -
- 1.00 6,732.00 -
- 1.00 100,000.00 -
570,000.00 207,324.00

- - - -
- - 3.00 135,000.00 -

- - - -
- - - -
101.60 91,440.00 -
171.47 137,176.00 -
18.33 14,664.00 -
- - - -
- -
- -
34.22 10,266.00 -
16.00 4,800.00 -
49.29 14,787.00 -
84.44 25,332.00 -
5.63 1,689.00 -
24.00 4,800.00 -
72.50 21,750.00 -
3.75 2,250.00 -
16.01 24,015.00 -
9.00 3,600.00 -
491,569.00
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - 1.00 344,010.00 -
344,010.00

3,371,966.00 2,349,405.59

1.00 300,000.00 - 1.00


1.00 290,000.00 - 1.00
1.00 250,000.00 -
1.00 125,000.00 -
1.00 100,000.00 -
- - 590,000.00 475,000.00

- - -
- -
27.00 1,890.00 - 27.00
- - -
13.13 919.10 - 13.13
138.38 9,686.60 - 138.38
51.84 3,628.80 - 51.84
- - -
- - -
28.75 1,437.50 - 28.75
- - -
- - -
- - -
- - -
- -
7.39 886.80 - 7.39
1.69 202.80 - 1.69
- - -
- - -
- -
0.87 130.50 - 0.87
- - -
- - -
- - -
- -
0.28 42.00 - 0.28
0.28 42.00 - 0.28
- -
1.13 169.50 -
- - 18,866.10 -
- - 40.00
- - 50.00
- - 75.00
- - 100.00
- - 100.00
- - 50.00
50.00 -2,000.00 - - 50.00
100.00 2,500.00 - - 100.00
50.00 1,250.00 - 50.00
25.00 625.00 - 25.00
50.00 750.00 - 50.00
50.00 1,250.00 - 50.00
50.00 1,250.00 - 50.00
50.00 1,250.00 - 50.00
50.00 1,250.00 - 50.00
50.00 1,250.00 - 50.00
100.00 2,500.00 - 100.00
50.00 750.00 - 50.00
50.00 1,250.00 - 50.00
50.00 750.00 - 50.00
50.00 1,250.00 - 50.00
50.00 1,250.00 -
50.00 1,250.00 -
- -
- -
- - 3,695.00
- - 998.00
- - 470.00
- - 5,355.00
181.00 -362.00 - - 181.00
5,230.00 -4,131.70 - - 5,230.00
288.00 -1,440.00 - - 288.00
5,580.00 -36,270.00 - - 5,580.00
100.00 -601.00 - - 100.00
-6,493.70 -35,811.00 15,375.00 2,500.00

1.00 150,000.00 -

- -
1.00

- -
1.00 175,000.00 -
- -
1.00
- -
- -
1.00 50,000.00 - 1.00
1.00 5,000.00 -
1.00 55,000.00 -
- -
1.00 350,000.00 - 1.00
1.00 100,000.00 - 1.00
1.00 169,546.00 -
1.00 50,000.00 -

1.00 300,000.00 -
- - 500,000.00 904,546.00
-
- -
12.00 7,800.00 -
10.00 180.00 -
2.00 360.00 -
5.00 1,750.00 -
- -
- -
- -
6.00 10,800.00 -
6.00 4,500.00 -
6.00 4,500.00 -
3.00 2,550.00 -
3.00 4,200.00 -
2.00 24,000.00 -
1.00 60,000.00 -
1.00 78,980.00 -
1.00 369,000.00 -
- - - 568,620.00
- - 1,715.70 1,399.45
-
283,938.40 295,692.00 271,845.60 7,616.80
-
380,786.10 398,074.50 151,570.50 41,407.00
-
367,948.00 405,824.00 -20,318.40 -
-
- 1,000,000.00 1,066,032.50 325,940.00

- - 1,200,000.00 2,254,890.20

- - 1,502,698.89 45,445.24

- - 708,694.50 622,474.50

- - 200,000.00 719,733.22

- - 82,041.70 92,086.80

- - - 163,458.95

- - 450,000.00 150,000.00

- 100,000.00 150,000.00 450,000.00

- - 3,371,966.00 2,349,405.59

- - 590,000.00 475,000.00

- - 18,866.10 -

-6,493.70 -35,811.00 15,375.00 2,500.00

- - 500,000.00 904,546.00

- - - 568,620.00

1,026,178.80 2,163,779.50 10,260,488.09 9,174,523.75


Total Qty Total Amount

5,198.51 77,977.65
5,984.55 29,922.75

98.28 1,474.20
- -
- -
109,374.60
- -
- -
921.85 165,933.00
- -
1,166.40 233,280.00
1,182.94 236,588.00
1,330.39 266,078.00
670.72 134,144.00
- -
1,274.96 152,995.20
488.47 58,616.40
288.34 34,600.80
163.36 19,603.20
1,301,838.60
- -
- -
- -
697.26 83,671.20
842.69 101,122.80
9.48 1,137.60
1,544.69 324,384.90
258.49 77,547.00
- -
234.34 30,464.20
58.13 7,556.90
75.84 9,859.20
79.58 10,345.40
- -
64.43 21,261.90
213.75 70,537.50
169.31 55,872.30
169.31 55,872.30
88.88 29,330.40
- -
58.83 17,649.00
30.64 9,192.00
31.22 9,366.00
- -
- -
81.50 19,967.50
60.25 14,761.25
95.25 23,336.25
28.50 6,982.50
- -
400.75 122,228.75
354.19 108,027.95
340.69 103,910.45
77.06 23,503.30
- -
745.31 227,319.55
631.18 192,509.90
671.90 204,929.50
69.33 21,145.65
- -
19.40 7,760.00
- -
37.34 29,872.00
- -
- -
135.00 54,000.00
- -
2,075,425.15
- -
- -

- -
8,813.00 599,284.00
7,236.00 492,048.00
5,580.00 379,440.00
288.00 19,584.00
100.00 6,800.00
-298.80 -20,318.40
- -
1,476,837.60
- -
- -
- -

- -
- -
35.00 84,700.00

- -
28.00 77,000.00
28.00 77,000.00

- -
73.50 154,350.00
42.00 75,600.00
45.50 81,900.00
45.50 81,900.00

- -
56.00 98,000.00
- -
- -
22.75 39,812.50

- -
- -
38.50 87,972.50
38.50 87,972.50
42.00 105,000.00

- -
17.50 13,125.00

- -

- -
145.50 305,550.00
143.50 301,350.00
188.00 394,800.00

- -
- -
- -
42.00 126,000.00
12.00 24,000.00
351.88 175,940.00
- -
2,391,972.50
- -
- -
- -

- -
- -
113.75 170,625.00
34.44 30,996.00
12.75 11,475.00
- -
- -
202.50 283,500.00
- -
- -
10.13 10,130.00
- -
- -
- -
429.25 600,950.00
- -
- -

- -

- -
- -
- -
39.88 83,748.00
- -
13.50 17,550.00
- -
- -
- -
- -
58.44 151,944.00
- -
13.81 23,062.70
35.75 42,900.00

35.00 61,250.00
23.63 -
- -
- -
- -
46.00 92,000.00
- -
- -

322.81 387,372.00
104.58 94,122.00
1.00 700,000.00
1.00 300,000.00
60.21 108,378.00
43.16 21,580.00
33.75 42,187.50
141.62 127,458.00
15.00 13,500.00
133.81 26,762.00
39.00 39,000.00
16.00 14,400.00
- -
- -
- -
3,454,890.20
- -
- -
- -
4,322.69 237,747.95
2,525.21 138,886.55
2,672.78 147,002.90
2,270.82 124,895.10
- -
4,025.32 209,316.64
2,847.16 148,052.32
3,455.69 179,695.88
776.02 40,353.04
- -
2,146.95 118,082.25
1,688.35 92,859.25
1,426.89 78,478.95
169.06 9,298.30
- -
160.75 9,645.00
230.50 13,830.00
1,548,144.13
- -
- -
- -
24.25 4,850.00
994.10 198,820.00
551.27 110,254.00
- -
17.50 2,275.00
204.42 26,574.60
114.26 14,853.80
- -
90.48 22,620.00

18.00 -
- -
234.22 4,684.40
423.28 8,465.60
- -
53.38 533.80
157.75 1,577.50
- -
10.13 101.30
31.25 312.50
- -
234.22 18,737.60
412.88 33,030.40
- -
888.44 71,075.20
40.72 3,257.60
- -
290.00 21,750.00
- -
69.02 5,521.60
158.27 12,661.60
1,246.26 99,700.80
- -
437.79 39,401.10
570.46 51,341.40
- -
- -
- -
- -
- -
- -
- -
- -
278.92 39,048.80
- -
34.67 3,813.70
- -
56.25 6,187.50
140.85 15,493.50
- -
95.04 14,256.00
616.00 92,400.00
- -
- -
- -
60.50 6,655.00
- -
973.17 77,853.60
- -
66.38 4,978.50
- -
147.50 11,800.00
- -
- -
- -
38.25 3,825.00
86.34 8,634.00
4.50 450.00
- -
- -
- -
22.50 2,250.00
- -
45.00 2,250.00

121.19 18,178.50
- -
- -
13.75 1,375.00
85.13 8,513.00
81.50 8,150.00
- -
- -
45.67 2,283.50
- -
- -
301.75 30,175.00
5.68 284.00
4.00 600.00
- -
1,453.76 123,569.60
- -
134.79 6,739.50
127.50 6,375.00
110.00 5,500.00
- -
31.50 1,575.00
220.50 11,025.00
85.25 4,262.50
- -
158.13 15,813.00
57.38 5,738.00
- -
320.92 32,092.00
114.75 11,475.00
44.00 22,000.00
12.50 -
40.00 -
13,507.87 1,331,169.00
- -
- -
- -
6,084.52 158,197.52
4,535.51 117,923.26
4,778.95 124,252.70
945.08 24,572.08
- -
4,322.69 103,744.56 16,254.17 16,254.17 26.00 422,608.42
2,333.58 56,005.92
2,481.15 59,547.60 11,258.53 11,258.53 24.00 270,204.72
2,182.62 52,382.88
- -
145.50 3,201.00
143.50 3,157.00
188.00 4,136.00
22.75 500.50
- -
696.00 62,640.00
582.75 52,447.50
492.00 44,280.00
34.13 3,071.70
471.46 23,573.00
435.00 26,100.00
- -
919,733.22
- -
17,187.50 171,875.00
2,400.00 24,000.00
- -
13.84 1,107.20
90.26 7,220.80
104.59 8,367.20
- -
200.00 30,000.00
322.68 58,082.40
493.67 9,873.40
229.25 6,877.50
- -
10.00 3,500.00
- -
3.00 1,800.00
1.00 300.00
2.00 2,000.00
2.00 30,000.00
1.00 15,000.00

- -
- -
- 370,003.50
- -
- -
186.56 11,193.60
135.00 6,750.00
983.38 39,335.20
70.13 2,454.55
1.00 350.00
275.88 27,588.00
- -
45.50 2,730.00
35.00 2,800.00
- -

153.00 9,180.00
225.71 13,542.60
1.00 5,000.00
1.00 5,000.00
32.39 1,943.40
3.58 214.80
33.75 1,012.50
80.00 2,400.00
108.75 3,262.50
245.42 14,725.20
3.00 180.00
15.31 918.60
14.43 865.80
91.87 5,512.20
1.00 500.00
1.00 6,000.00
163,458.95
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
1.00 450,000.00
1.00 150,000.00
- 600,000.00
- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

- -

- -

- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
1.00 100,000.00
1.00 150,000.00
1.00 450,000.00
700,000.00
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
1.00 1,800,000.00
1.00 115,000.00
1.00 307,400.00
1.00 112,935.59
1.00 84,000.00
1.00 4,500.00
1.00 55,000.00
1.00 144,000.00
1.00 192,066.00
1.00 7,300.00
1.00 48,965.00
1.00 100,000.00
1.00 293,100.00
3,264,266.59

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
1.00 80,000.00
1.00 132,953.00
1.00 331,249.00
1.00 300,000.00
844,202.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
1.00 200,000.00
1.00 370,000.00
1.00 13,452.00
1.00 87,140.00
1.00 6,732.00
1.00 100,000.00
777,324.00

- -
-
3.00 90,000.00
- -
- -
101.60 91,440.00
171.47 137,176.00
18.33 14,664.00
- -
- -
34.22 13,688.00
16.00 4,800.00
49.29 14,787.00
84.44 25,332.00
5.63 1,689.00
76.73 23,019.00
24.00 4,800.00
72.50 21,750.00
3.75 2,250.00
16.01 24,015.00
9.00 3,600.00
473,010.00
- -
- -
- -
- -
- -
- -
- -
1.00 344,010.00
344,010.00

5,702,812.59

1.00 300,000.00
1.00 290,000.00
1.00 250,000.00
1.00 125,000.00
1.00 100,000.00
1,065,000.00

- -
- -
27.00 1,890.00
- -
13.13 919.10
138.38 9,686.60
51.84 3,628.80
- -
- -
28.75 1,437.50
- -
- -
- -
- -
- -
7.39 886.80
1.69 202.80
- -
- -
- -
0.87 130.50
- -
- -
- -
- -
0.28 42.00
0.28 42.00
- -
1.13 169.50
18,866.10
40.00 -600.00
50.00 -750.00
75.00 -1,125.00
100.00 -4,000.00
100.00 -1,500.00
50.00 -750.00
50.00 -2,000.00
100.00 2,500.00
50.00 1,250.00
25.00 625.00
50.00 750.00
50.00 1,250.00
50.00 1,250.00
50.00 1,250.00
50.00 1,250.00
50.00 1,250.00
100.00 2,500.00
50.00 750.00
50.00 1,250.00
50.00 750.00
50.00 1,250.00
50.00 1,250.00
50.00 1,250.00
- -
- -
3,695.00 -25,828.05
998.00 -3,992.00
470.00 -9.40
5,355.00 -13,387.50
181.00 -362.00
5,230.00 -4,131.70
288.00 -1,440.00
5,580.00 -36,270.00
100.00 -601.00
-76,371.65

1.00 150,000.00

- -
1.00 62,000.00

- -
1.00 175,000.00
- -
1.00 75,000.00
- -
- -
1.00 50,000.00
1.00 5,000.00
1.00 55,000.00
- -
1.00 350,000.00
1.00 100,000.00
1.00 169,546.00
1.00 50,000.00

1.00 300,000.00
1,541,546.00
- -
12.00 7,800.00
10.00 180.00
2.00 360.00
5.00 1,750.00
- -
- -
- -
6.00 10,800.00
6.00 4,500.00
6.00 4,500.00
3.00 2,550.00
3.00 4,200.00
2.00 24,000.00
1.00 60,000.00
1.00 78,980.00
1.00 369,000.00
568,620.00
109,374.60 72,757.15
-
1,301,838.60 66,563.40
-
2,075,425.15 -66,444.45
-
1,476,837.60 -152,537.60
-
2,391,972.50 -819,825.00
-
3,454,890.20 -1,498,237.70
-
1,548,144.13 -149,737.93
-
1,331,169.00 -42,558.85
-
919,733.22 -146,287.07
-
370,003.50 168,236.50
-
163,458.95 -57,870.95
-
600,000.00 -161,357.00
-
700,000.00 -230,885.00
-
5,702,812.59 -2,539,372.59
-
1,065,000.00 35,000.00
-
18,866.10 -18,866.10
-
-76,371.65 76,371.65
-
1,541,546.00 -1,071,546.00
-
568,620.00 -327,380.00

25,263,320.49 -6,863,977.54

22,412,856.83

2,850,463.66
Dr.PINAKINI.K.SHANKAR PAYMENT DETAILS

Date Cheque No. Amount Remarks

Advance
07.11.2019 39 100,000.00 Poovaiah
07.11.2019 40 100,000.00 Poovaiah
07.11.2019 41 100,000.00 S.V.G Eng works
07.11.2019 42 100,000.00 R.M.C
07.11.2019 43 100,000.00 R.M.C
07.11.2019 500,000.00 Cash
30.09.2019 25,000.00 Advance
27.11.2019 38,950.00 Bescom Temp deposit
11.01.2020 500,000.00 Cash
11.01.2020 77 500,000.00 Rakshith
11.01.2020 79 50,000.00 Poovaiah
11.01.2020 80 50,000.00 Poovaiah
11.01.2020 81 200,000.00 Vijayalakshmi
09.02.2020 1,000,000.00 Cash
22.02.2020 82 166,250.00 R.M.C
14.05.2020 100,000.00 Poovaiah
14.05.2020 100,000.00 Self cheque
26.05.2020 49 139,200.00 RMC
26.05.2020 50 100,000.00 Nanda kumar
26.05.2020 51 300,000.00 Bildo_Craft
26.05.2020 52 531,000.00 Shankar enterprises
26.05.2020 53 400,000.00 Rakshith
28.07.2020 57 144,000.00 Self cheque (RMC)
28.07.2020 58 200,000.00 Bildo_Craft
28.07.2020 59 256,000.00 Self cheque
28.07.2020 76 500,000.00 Rakshith
09.09.2020 73 200,000.00 Self cheque
07.10.2020 75 200,000.00 Self cheque
21.10.2020 78 200,000.00 Self cheque
17.11.2020 85 700,000.00 Vijayalakshmi
17.11.2020 79 300,000.00 Self cheque
17.11.2020 21 100,000.00 Plastering
17.11.2020 22 150,000.00 Kumar UPVC Windows
02.12.2020 86 200,000.00 Cheque
02.12.2020 150,000.00 Cash
30.12.2020 105 500,000.00 Self Cheque
15.01.2021 86 300,000.00 Anaga Elevators
15.01.2021 87 50,000.00 Nakshatra Technologies
15.01.2021 88 50,000.00 Shyam Dhani Painter
15.01.2021 89 200,000.00 Rakshith
10.02.2021 200,000.00 Cash
10.02.2021 94 300,000.00 Cheque
06.03.2021 93 200,000.00 Self cheque
06.03.2021 96 300,000.00 Rakshith
06.03.2021 97 290,000.00 Anaga Elevators
06.03.2021 98 195,000.00 Shankar enterprises
10.03.2021 106 67,000.00 Maya Bandar Doors Ltd
10.03.2021 108 300,000.00 Euro Veneers World
10.03.2021 109 350,000.00 Air Design System
10.03.2021 500,000.00 Cash
21.03.2021 16,000.00 Refund From HMG
29.03.2021 95 200,000.00 Dhanalaxmi
29.03.2021 96 100,000.00 Paramesh N
29.03.2021 98 200,000.00 Rakshith
29.03.2021 250,000.00 Cash
17.04.2021 518 25,000.00 Cheque
17.04.2021 520 100,000.00 Cheque
17.04.2021 522 50,000.00 Cheque
17.04.2021 523 25,000.00 Cheque
21.04.2021 525 100,000.00 Cheque
27.04.2021 200,000.00 Vijayalakshmi
27.04.2021 200,000.00 Nanda kumar
27.04.2021 200,000.00 Rakshith
18.05.2021 529 100,000.00 Cheque
18.05.2021 530 100,000.00 Cheque
18.05.2021 100,000.00 Online Transfer Nandakumar
18.05.2021 100,000.00 Online Transfer Rakshith
26.05.2021 531 50,000.00 Selvam
26.05.2021 533 50,000.00 Shyam
26.05.2021 534 50,000.00 Selvam
01.06.2021 386 50,000.00
02.06.2021 387 200,000.00 Euro World
02.06.2021 388 50,000.00
02.06.2021 389 25,000.00 Selvaraj
02.06.2021 390 25,000.00 Santhosh
14.06.2021 100 340,000.00
14.06.2021 101 100,000.00
14.06.2021 102 100,000.00
14.06.2021 103 100,000.00
28.06.2021 104 100,000.00
28.06.2021 106 300,000.00
28.06.2021 107 100,000.00
28.06.2021 108 200,000.00 Renerga Power Systems pvt ltd
09.07.2021 110 250,000.00 Anaga Elevators
09.07.2021 111 100,000.00
09.07.2021 112 100,000.00
09.07.2021 113 50,000.00
09.07.2021 114 50,000.00
09.07.2021 115 50,000.00
09.07.2021 116 25,000.00
09.07.2021 117 25,000.00
10.07.2021 65,676.00 BESCOM DD
02.08.2021 118 148,562.00 Shankar Enterprises
12.08.2021 119 100,000.00
13.08.2021 120 200,000.00
13.08.2021 121 200,000.00
19.08.2021 122 98,884.00 BWSSB DD (Self)
29.09.2021 125 150,000.00 Mana Upvc Windows & Doors ltd
11.10.2021 126 300,000.00 Self
18,121,522.00

MATERIALS SUPPLIED BY THE OWNER


26.09.2020 200,000.00 Chabria & Sons
11.12.2020 1,800,000.00 HMG
19.12.2020 370,000.00 Chabria & Sons
19.12.2020 84,000.00 Cash to SS ceramics
19.12.2020 23 55,000.00 Cash (self cheque ) Nitko
21.12.2020 92 115,000.00 HMG
06.03.2021 144,000.00 (Net bank payment) Nitko
12.03.2021 92 65,555.00 Muniraj Stones
4,500.00 SS ceramics
15.03.2021 307,400.00 HMG
17.03.2021 100,000.00 Wood & Moulding
18.03.2021 7,300.00 (Net bank payment) Nitko
4 48,965.00 Ghala Stone
6 78,980.00 Khaff
13,452.00 Chabria & Sons
05.04.2021 87,140.24 Chabria & Sons
6,732.00 Chabria & Sons
369,000.00 Euro Hardware World
112,935.59 HMG
29.03.2021 28,275.00 AM Enterprises
13.09.2021 123 293,100.00 Wood and moulding
4,291,334.83

TOTAL 22,412,856.83
532 Bounced Cheque