Familiar Situation in Pump Hydraulics
Naphtha Splitter Product Pump
NPSHA, m 2.5
Next few slides on
Assumed Pump C/L elevation, m 1 making best guess to
Assumed Column elevation, m 4.8 avoid rework when
vendor data is received
Required Pump NPSHR, m 1.5
Vendor A 2.1
NPSHA - NPSHR < 1 m
Vendor B 2.3 None of the Pumps
suitable
Vendor C 2.9
2
Rework → Increase column elevation
Consequences of Incorrect First Guess
Skid/Module dimensions
are going to change with
lot of rework to Piping /
Civil / Static teams
5
Can Process Engineer Determine Pump NPSHR?
◎ Answer is NO
○ Only pump vendor has dimensional details for definitive
NPSHR determination
○ It can only be determined by Test and to some extent by
CFD
9
Henshaw Method
Henshaw article “NPSHA –
how much is enough”,
◎ Henshaw modified Lobanoff / Hydrocarbon Processing,
Vlaming formula October 2004, 75-76
○ Where U1 is inlet peripheral velocity
in ft/s 𝑁𝑠𝑠 = 2520 × 𝑈10.375
◎ Inlet peripheral velocity can be 𝐷𝑒 ∙ 𝑁
estimated from approximations (De 𝑈1 =
229
formula not from Henshaw article) 1
𝑄 3
◎ De is impeller eye diameter in inch, 𝐷𝑒 = 183.46 ×
𝑁
Q is flowrate in m3/s and N is
impeller rpm
4
◎ NPSHR estimated from Suction 𝑁𝑃𝑆𝐻𝑅 =
𝑟𝑝𝑚 ∙ 𝑄 3
10
Performance of Methods for OH2 Pumps
Data for about 180 pumps
Yedidiah method
recommended;
Conservative most of
the times
Yedidiah method
Recommended;
Conservative most of
the times