Professional Documents
Culture Documents
WP02 WP02 Attachment D Short Haul Routes V1
WP02 WP02 Attachment D Short Haul Routes V1
1. INCHOEN –TOKYO
2. TAIPEI-INCHOEN
3. MANILA-TOKYO
4. HO CHI MINH-MANILA
5. HONG KONG –TAIPEI
6. BANGKOK-HONG KONG
7. COLOMBO-BANGKOK
8. BANGKOK-KUALA LUMPUR
9. KUALA LUMPUR-SINGAPORE
10. SINGAPORE-JAKARTA
11. DHAKA-CHENNAI
12. MUMBAI-KUNMING
ROUTE 1 /SEOUL-TOKYO
GAP ANALYSIS
Route 2: TAIPEI-SEOUL
FIR RCTP RKRR
FROM/TO Departure Airport TAIPEI Destination Airport INCHOEN
ATM SERVICE ARR/APP ARR/APP/AMAN/DMAN/SMR/CDO
CAPABILITY
ARR/APP
CDM/CDO/AMAN/D
MAN/SMR/AAR/CC
O/PBN PROC with
vertical guidance
CONCEPT OF RNAV5/RNAV2 based on direct surveillance/VHF and planned RNAV1/RNP2
OPERATIONS
NA VIGATION EN- RNAV
ROUTE
COMMUNICATIONS VHF VHF
SURVEILLANCE RADAR RADAR
Radar/MLAT/ADS-
C/ADS-B
WEEKLY 93
MOVEMENTS
GAP ANALYSIS
ROUTE 3: MANILA-TOKYO
GAP ANALYSIS
Route 4: HO CHI MINH CITY-MANILA
GAP ANALYSIS
Route 5: HONG KONG- TAIPEI
GAP ANALAYSIS
ROUTE 6: BANGKOK-HONGKONG
FIR VTBB VDPP VLVT VVVV ZJSA VHHK
FROM/TO Departure Airport Destination
BANGKOK Airport
HONG KONG
ATM SERVICE ARR/APP ARR/APP
CAPABILITY CDM/CDO/AMAN/D CDM/CDO/AM
ARR/APP MAN/SMR/AAR/PB AN/DMAN/SM
CDM/CDO/AMAN/D N PROC with vertical R/AAR/PBNPR
MAN/SMR/AAR/CC guidance OC with
O/PBN PROC with vertical
vertical guidance guidance
CONCEPT OF RNAV5/RNAV2 based on direct surveillance/VHF and planned RNAV1/RNP2
OPERATIONS
NAVIGATION RNAV RNAV RNAV RNAV RNAV RNAV
ENROUTE
COMMUNICATIONS VHF/AIDC VHF/AIDC VHF/AIDC VHF/AIDC VHF/AIDC VHF/AIDC
SURVEILLANCE RADAR RADAR RADAR RADAR RADAR RADAR
Radar/MLAT/ADS-
C/ADS-B
ATM SERVICE RADAR/VHF RADAR/VHF RADAR/VHF RADAR/VHF RADAR/VHF RADAR/VHF
ENROUTE En-route: 10 min. En-route: 10 min. En-route: 10 min. En-route: 10 En-route: 10 En-route: 10
longitudinal longitudinal longitudinal min. min. min.
separation separation separation longitudinal longitudinal longitudinal
-30NM under radar -30NM under radar -30NM under separation separation separation
radar -30NM under -30NM under -30NM under
radar radar radar
WEEKLY 264
MOVEMENTS
GAP ANALYSIS
Route 7: COLOMBO-BANGKOK
GAP ANALYSIS
Route 8: BANGKOK-KUALA LUMPUR
GAP ANALYSIS
Route 9: KUALA LUMPUR- SINGAPORE
GAP ANALYSIS
ROUTE 10: SINGAPORE -JAKARTA
GAP ANALYSIS
Route 11: DHAKA -CHENNAI
GAP ANALYSIS
ROUTE 12: MUMBAI- KUNMING
FIR VABF VECF VGFR VVYF ZPKF
FROM/TO Departure Airport Destination Airport
MUMBAI KUNMING
ATM SERVICE ARR/APP ARR/APP
CAPABILITY
ARR/APP
CDM/CDO/AMAN/D
MAN/SMR/AAR/CCO/
PBNPROC with
vertical guidance
CONCEPT OF
OPERATIONS
NAVIGATION Non-RNAV NON-RNAV NON-RNAV NON-RNAV NON-RNAV
ENROUTE
COMMUNICATIONS VHF/HF VHF/HF VHF/HF VHF/HF/CPDLC VHF
SURVEILLANCE ADS-C/RADAR ADS-C/RADAR ADS-C/RADAR RADAR
Radar/MLAT/ADS-
c/ADS-B
GAP ANALYSIS