EQUIPMENT REPAIR

DOCUMENTATION

ABAN PEARL PTE LTD IDS-4A


Rig: Aban Pearl

Date Received : 19th March 08

Date Out : 12th August 08

‰ Equipment :
1) TDS-4H Top Drive Assembly
– 1 Unit (Ref ID: DSW5619)

Your PO# WO/SYD/AP/029

Service Data book


DSW/5619 WO#20241

5 November 2008

© Copyright National Oilwell Varco Pte Ltd 2008

National Oilwell Varco Pte Ltd Phone: +065-6861-2027


9 Tuas Avenue 5 Fax: +065-6861-0796
Singapore 639335 E-mail: ernest.hui@nov.com
Co. Reg. No. 197700997Z

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241
DATA BOOK INDEX

Section 1 - Quotation & Scope of Work

Section 2 - Repair BoM

Section 3 - Photos

Section 4 - MPI Reports

Section 5 - Service Reports

Section 6 - Test Reports

Section 7 - Purchase Order

Section 8 - Delivery Order

Section 9 - Certificates

Section 10 - Tax Invoice

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241
SECTION 1

Quotation & Scope of


Work

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241
Varco International Private Limited
9 Tuas Avenue 5
Singapore 639335
PHONE NUMBER: +65 6 861 1566 Doc. GQAAD1001
FAX NUMBER: +65 6 861 0796 Issue 1, Rev 4
www.nov.com

To: Aban Pearl Private Limited Date: 24-Jun-2008


Customer Ref.: AP/SYD/012
Quote No.: QTE-DSW-00703-1
Attention: Jayaraj / Ramesh / Sanu Y. Das NOV Job No.: DSW 5619 WO 20241
Rig Name: Aban Pearl
From: Sing Hun Wei Destination: Singapore
Quote Currency: US Dollars

Repair Quotation for TDS 4H Top Drive Assembly

Section 1 Labour $ 54,700.00

Section 2 Miscellaneous Item $ 9,800.00

Section 3 Parts (Please see Sales Quote 1056864 Revision 1 attached) $ 156,568.72

Section 4 Other Services / Machine Charge $ 44,950.00

Re-assembly, Testing / Factory Acceptance Test and Delivery of


Section 5 (Inclusive)
Equipment

Section 6 Databooks and Required Documentation (Inclusive)

Subtotal $ 266,018.72

Taxes (Not Applicable)

Estimated Repair Delivery * 6 to 8 weeks

* Subject to Spares Delivery 22 to 24 weeks

Kindly issue Purchase Order to Varco International Private Limited


Varco International Private Limited
9 Tuas Avenue 5
Singapore 639335
Doc. GQAAD1001
FAX NUMBER: +65 6 861 0796 Issue 1, Rev 4
www.nov.com

Date: 24-Jun-2008
Quote No.: QTE-DSW-00703-1
NOV Job No.: DSW 5619 WO 20241

Repair Quotation for TDS 4H Top Drive Assembly

This quotation covers our product repairs to our standard specifications. Non-standard product requirements, third-
party specification and / or regulatory agency requirements, which are not incorporated within our standard
specification, if required, may result in increased costs.

Quotation Notes:
Quote validity is 45 days from date of this quotation.
Payment Terms: Net 30 Days from invoice date.
This quotation is based on NOV Drilling Equipment Standard Terms and Conditions of Sale enclosed.

General Note(s):
Top Drive was sent to National Oilwell Varco without accessories like Link Tilt, Torque Arrestors, Solid Body, S-Pipe
and etcetra.

We appreciate this opportunity to be of service to your company and hope this quotation meets with your approval
and acceptance. If you require additional information please do not hesitate to contact the undersigned.

Submitted Respectfully,

Sing Hun Wei.

National Oilwell Varco

Quotation Prepared by:


Name: S. K. Zaman
Title: Operations Support
Phone: +65 6 868 2041
Email: Kamarulzaman.Salim@nov.com
Subject : Repair Quotation for TDS 4H Top Drive Assembly

Unit Price Total Price


Item: Qty: Description: US$ US$
1 1 Lot Labour Charges:
To disassemble, repair and reassemble TDS 4H Top Drive Assembly
using listed materials. As modification and repair / rebuild
costs can vary depending on the condition of the original
equipment itself, actual charges will be based on actual shop
hours accumulated and current shop rates at NOV Service
Center doing work.
Total Workshop Labour Charges for TDS 4H Top Drive Assembly $ 54,700.00

Total Labour Charges: $ 54,700.00

2 Miscellaneous Charges:
1 Lot Including gasket, nuts, bolts, hoses, fittings and expendable
Items, includes cleaning, water blast, MPI inspections, prime
and paint to NOV specifications. Excludes worn or damaged parts
that need replacement. Databook and consumables.
Note: Parts quoted in sales quote on are not charged here.

Total Miscellaneous Charges: $ 9,800.00

3 Outside Services / Machine Charges:


3a Motor
1 ea DC motor GE 752 for service. $ 12,200.00
1 ea Repair of 20 HP 460V Blower Motor $ 780.00
1 ea Repair of 2 HP 460V Oil Pump Motor $ 780.00

3b Alignment Cylinder Components (Duplex Cylinder)


2 ea Machine New Piston Rods $ 480.00 $ 960.00
2 ea Machine New Barrels $ 340.00 $ 680.00
1 ea Machine New Blind End Clevis $ 850.00 $ 850.00

3c Gearcase / Mainshaft Housing


1 ea Mainshaft MPI inspection, Flexible Rattling, ID Gauging, UT Inspection
Check Wash out area and Connections Inspection $ 3,680.00
1 ea Dressing up and phosphating of mainshaft $ 720.00
1 ea Repair of bearing ID bore on Upper Gearcase $ 6,500.00
1 ea Replace both worn Trunion Pins on Quill Shaft Hse $ 3,800.00

3d Rotating Head Assembly


1 ea Rechrome of Rotating Flange and repair of worn area on the underside $ 4,200.00
1 ea Repair worn area on Cam and Machine to Specification. $ 2,200.00
1 ea Repair worn area on OD of Swivel Block and Machine to Specification. $ 2,400.00

3e Others
1ea To repair crack on Dolly weldment and repair of pin hole on Lug $ 5,200.00

Total Outside Services / Machine Charges: $ 44,950.00

4 Summary
4.1 Labour Charges: $ 54,700.00
4.2 Miscellaneous Charges: $ 9,800.00
4.3 Outside Services / Machine Charges: $ 44,950.00
4.4 Spare Parts for Overhaul Job (Please see attached Sales Quote 1056864 Revision) $ 156,568.72

Total Charges: US $ 266,018.72


This Quotation Does Not include any Repair, Parts for Field Upgrades
and Installation.

Note:
1 Terms below are in addition to Incoterms 1st Feb 2008.

2 Transportation of equipment to and from NOV will be the responsibility of


the owner as will the supply of necessary cranage outside our facility.

3 Prices quoted / indicated are excluding handling, packing and freight


unless otherwise stated.

4 Total Price, Ex-Works, Singapore.

5 This quote does not include any replacement parts, remedial repairs or
machining that may be required unless otherwise specifically mentioned.

6 The provision of service engineers to supervise the installation and


commissioning is not included in this quote unless otherwise specified.
Scope of Work

Equipment Description: TDS-4H Top Drive


I
S/N Work Description
1.0 RECEIVING AND INSPECTION
1.1 Unload from transport
1.2 Check receiving forms and take pictures
1.3 Wash TDS
1.4 Check for unauthorized modifications
1.5 Check for Product Bulletins/Upgrade kits needed or wanted
1.6 Check for equipment history (from client and internally)
1.7 Remove TDS from dolly (as required)
2.0 MOTOR
2.1 Remove motor
2.2 Remove pinion and brake hub
2.3 MPI pinion for cracks
2.4 Inspect motor shaft for surface corrosion and pitting
2.5 Ship to repair shop for service/overhaul
2.6 Test heater function
2.7 Fit pinion and hub
3.1b TRANSMISSION (TDS-4H MODELS ONLY)
3.2b Strip down gearbox and quill housing
3.3b Visual and MPI inspection of bull gear, housing and bonnet
3.4b Strip down quill shaft and inspect bearings
3.5b Visual and MPI inspection of quill housing and shaft (see MAINSHAFT section)
3.6b Strip down Hi and Low gear assemblies
3.7b Visually inspect and MPI Hi and Low gear assemblies
3.8b Strip down and inspect Geneva mechanism
3.9b MPI bull gear hub
3.10b Thoroughly clean and re-assemble all parts and subassemblies with new bearings and seals
3.11b Rotate gear assemblies and function Geneva mechanism
3.12b MODIFICATIONS TO BE CARRIED OUT (AS REQUIRED)
3.12b.1 Inspect diameter of quill housing trunion pins
3.12b.2 Check for correct protrusion of trunion tins
3.12b.3 Inspect condition of quill housing dowel and bolt holes
3.12b.4 Carry out repairs if required
4.0 COOLING SYSTEM (SCOPE DEPENDENT ON SYSTEM TYPE)
4.1 Remove ducting and heat exchangers (as required)
4.2 Clean and inspect ducting, replace as required
4.3 Inspect and pressure test heat exchangers (if fitted)
4.4 Inspect blower and spark arrestor (if fitted)
4.5 Ship blower motor to repair shop for service/overhaul
4.6 Assemble blower subassembly and function test
5.0 BRAKE ASSEMBLY (SCOPE DEPENDENT ON SYSTEM TYPE)
5.1 Disassemble all brake parts (bag, drum, pads -OR- calipers and disc)
5.2 Inspect air bag, brake drum and pads -OR- Inspect all components and MPI disc
5.3 Clean, re-assemble, and test brake
6.0 HYDRAULIC PRESSURE FILTER
6.1 Inspect and replace filter as required
6.2 Record findings from inspection
7.0 LUBRICATION SYSTEM
7.1 Visual inspection of motor-pump
7.2 Ship motor to repair shop for service/overhaul

Inspection & Workscope Page 1 of 4


7.3 Check relevant service bulletins and implement as directed by client
7.4 Inspect and replace fittings, as required
7.5 Inspect all fittings and pipework for integrity and wash out lubrication system
7.6 Thoroughly clean and bench test motor-pump assembly
8.0 MOTOR DOLLY FRAME
8.1 Disassemble rollers, brackets, hoses and fittings
8.2 Grit blast frame and MPI
8.3 Grit blast roller brackets and MPI
8.4 Visually and dimensionally inspect rollers and brackets
8.5 Visually and dimensionally inspect all connection points and holes
8.6 Visually and dimensionally inspect trunion blocks and caps
8.7 Visually inspect frame for straightness
8.8 Visually inspect motor lug
8.9 Inspect all padeyes
8.10 Inspect all hoses and fittings, replace as required
8.11 Check Service Bulletin No. 80
8.12 Check if fabrication requires upgrade
8.13 Carry out repairs as required
8.14 Reassemble rollers, brackets and frame
8.15 Load test pad eyes
8.16 Repaint
9.0 COUNTER BALANCE SYSTEM
9.1 Grit blast and MPI chains, clevises, pins and pear links
9.2 Inspect and recharge accumulator bottles
9.3 Check all hoses and fittings, replace as required
9.4 Remove manifold
9.5 Disassemble manifold
9.6 Inspect all parts, replace as required
9.7 Pressure test counterbalance relief valve
9.8 Overhaul cylinders, pressure test and recharge
9.9 Re-assemble manifold
10.0 ROTATING HEAD (7 AND 10 PORT MODELS)
10.1 Complete strip down
10.2 Inspect rotating head for damage
10.3 Strip and visually inspect
10.4 Check bores of clevises for wear
10.5 Machine counter-bore at all bolt holes, if required
10.6 Grit blast and MPI clevis mountings
10.7 Inspect actuating cylinder and indexing mechanism
10.8 Carry out repairs if required
10.9 Overhaul and pressure test auto-return cylinder
10.10 Rebuild installing new seals
10.11 Test in accordance with Varco specification
11.0 ELECTRICAL COMPONENTS
11.1 Inspect AC junction box
11.2 Inspect DC junction boxes
11.3 Inspect I.S. junction box
11.4 Check water detectors
11.5 Check motor heaters
11.6 Check resistance of solenoids
11.7 Check pressure and temperature switches
12.0 SOLENOID MANIFOLD ASSEMBLY
12.1 Overhaul or change out TDS air solenoids
12.2 If 5-gang manifold installed, recommend upgrade to 6-gang manifold
12.3 Carry out full seal change on all solenoids

Inspection & Workscope Page 2 of 4


12.4 Thoroughly clean solenoid manifold block
12.5 Carry out working function test
14.0 GUARD
14.1 Visual inspection
14.2 Carry out repairs if required
14.3 Repaint
15.0 'S' PIPE
15.1 Grit blast and full visual inspection
15.2 Full MPI and UT inspections
15.3 Repaint
17.0 OIL COOLING SYSTEM
17.1 Inspect oil cooling system components
17.2 Bench test oil cooling assembly
18.0 SAFETY VALVE ACTUATOR (SCOPE CAN VARY BETWEEN PH MODELS)
18.1 Strip down assembly
18.2 MPI actuator shell
18.3 Inspect roller assembly(ies)
18.4 Inspect crank assembly(ies)
18.5 Re-assemble
19.0 LANDING COLLAR AND RETAINER
19.1 Customer Suppply New Component due to the Upgrade
20.0 ALIGNMENT CYLINDER
20.1 Inspect and pressure test cylinder
20.2 Grit blast and MPI clevises
20.3 Inspect/replace all hydraulic fittings, as required
20.4 Reassemble
21.0 SOLID BODY ELEVATOR
21.1 Customer Supply New Component due to the Upgrade
22.0 SOLID BODY ELEVATOR PLATE
22.1 Offer upgraded style plate if obsolete
22.2 Grit blast, visual inspection and MPI
22.3 Repaint
23.0 LINK TILT (SCOPE DEPENDENT ON TYPE)
23.1 Customer supply new Component due to the Upgrade
24.0 TORQUE ARRESTORS
24.1 Grit blast and MPI all load bearing parts
24.2 Strip and visually inspect
24.3 Carry out repairs as required
24.4 Re-assemble
24.5 Repaint
25.0 MAINSHAFT
25.1 Customer supply new Component due to the Upgrade from 650t unot to 750 unit mainshaft
26.0 SWIVEL LINK ARMS (4H MODELS ONLY)
26.1 Grit blast, visually inspect, and MPI
26.2 Repaint
27.0 TOP DRIVE COMPLETION
27.1 Rebuild in accordance with Varco specification
27.2 Refit electrical components, hydraulic components, and all hoses
27.3 Working Pressure test of hydraulics
27.4 Touch up paint
27.5 Review for 'Dropped Objects' (Model specific)
27.6 If test stand is available - Rig up and test TDS
27.7 Record results
27.8 Check that work and documentation is completed

Inspection & Workscope Page 3 of 4


28.0 CERTIFICATION AND INVENTORY CHECKS
28.1 Verify equipment inventory against receipt check list
28.2 Complete configuration update sheet
28.3 Final inspection and release
28.4 Prepare TDS for shipment and load onto transport
28.5 Document transmittal of updated drawings
29.0 DATA PACKAGE
29.1 Workscope review by Varco QA Representative
29.2 Workscope review by Customer
29.3 Position of Customer Representative
29.4 Preparation and delivery of Databook
NOTES:
Grit blasting will be used - not shot or bead blasting. Shot and bead blasting can cover surface
1
defects that MPI would otherwise normally detect.
All fasteners, washers, and lockwire will be replaced during a shop overhaul unless otherwise
2
instructed by customer (supporting documentation required).
All MPI inspections for load bearing components will be completed utilizing the "wet fluorescent"
3
method (Reference PB TDS-03-25). Non-load bearing components can be MPI-inspected dry or
When using this information for a budgetary quotation, columns A and B ONLY should be included
4
in the Standard Quotation form. The sheet is designed to help calculate labor costs on a standard

Inspection & Workscope Page 4 of 4


SECTION 2

Repair BoM

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 1 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

B009 130 SRP S995


ABAN PEARL PTE LTD ABAN VIII JACKUP RIG
8, SHENTON WAY,
Invoice To

Ship To
#32-03
SINGAPORE 068811

Cust Contact SANU


Customer eMail sanu@aban.com Date Printed 06/25/2008
Ultimate Dest SINGAPORE Quote Date 06/25/2008
Currency UNITED STATES DOLLAR Freight Terms Quote Exp Date 08/08/2008
Quoted by Kamarulzaman Salim Payment Terms NET 30 DAYS
Ref/Rig Name Aban Pearl Shipping Terms EX-WORKS
Branch SINGAPORE DISTRIBUTION CENTER Carrier LOCAL DELIVERY

Details
Ext Net Delivery
Line Item Description UM Qty Ord Unit Price Net Price Price (wks)
Repair Quotation for Top Drive System 4H Top Drive Assembly

NOV Job Reference Number: DSW 5619 WO 20241


NOV Quote Reference Number: QTE-DSW-00703-1
__________________________________________________________________________________________________
001 88599 EA 2.000 $1,111.00 $999.90 $1,999.80 1
BEARING,ROLLER,SPHERICAL,TDS-4
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 19.318182 KG Total Weight: 38.636364 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
002 88600 EA 2.000 $3,051.40 $2,746.26 $5,492.52 1
BEARING,ROLLER,CYLINDRICAL,5.12X7.87
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 10.454545 KG Total Weight: 20.90909 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
003 88595 EA 1.000 $30,228.00 $27,205.20 $27,205.20 22
TDS-4 HI CMPD GEAR 30/27
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: 118.181818 KG Total Weight: 118.181818 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 11/23/2008
__________________________________________________________________________________________________
004 88604 EA 2.000 $16.61 $14.95 $29.90 5
WASHER,LOCK,BEARING,W28
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 2 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .227273 KG Total Weight: .454546 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/27/2008
__________________________________________________________________________________________________
005 97997 EA 2.000 $80.08 $72.07 $144.14 8
RING,RETAINING,INTERNAL
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: .022727 KG Total Weight: .045454 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 08/22/2008
__________________________________________________________________________________________________
006 97998 EA 2.000 $52.69 $47.42 $94.84 8
RING,RETAINING,8.000BORE
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: .25 KG Total Weight: .5 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 08/17/2008
__________________________________________________________________________________________________
007 88603 EA 2.000 $12.76 $11.48 $22.97 4
WASHER,LOCK,BEARING,W26
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .227273 KG Total Weight: .454546 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/20/2008
__________________________________________________________________________________________________
008 88602 EA 2.000 $113.30 $101.97 $203.94 5
NUT,LOCK,BEARING,AN28
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: 1.736364 KG Total Weight: 3.472728 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/27/2008
__________________________________________________________________________________________________
009 88601 EA 2.000 $61.38 $55.24 $110.48 8
NUT,LOCK,BEARING,AN26
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: 1.545455 KG Total Weight: 3.09091 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 08/22/2008
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 3 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
__________________________________________________________________________________________________
Line Item Description UM Qty Ord Price Net Price Price (wks)
010 6581 EA 4.000 $3.64 $3.09 $12.38 1
Relief Fitting Alemite
Replaces 53250-1
Stocking Line: MTS
Line Discount: 15.00%
Del# Quantity Required Date Promise Date
0001 4.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
011 74004 EA 1.000 $36.08 $30.67 $30.67 1
Gauge, Sight, Oil 6600/6800 Kelly
Spinners & TDS-3 Top Drive
Replaces 72923
Stocking Line: MTS
Line Discount: 15.00%
Unit Weight: 1 KG Total Weight: 1 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
012 75980 EA 1.000 $19.36 $17.42 $17.42 1
TDS-3 GASKET BEARING COV
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .090909 KG Total Weight: .090909 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
013 76041 EA 1.000 $348.70 $313.83 $313.83 1
SEAL,BEARING-COVER,TDS-3
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .822727 KG Total Weight: .822727 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
014 76044 EA 1.000 $10,355.40 $9,319.86 $9,319.86 1
BEARING,RADIAL-ROLLER,TDS-3
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 45.604545 KG Total Weight: 45.604545 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
015 76045 EA 1.000 $2,876.50 $2,588.85 $2,588.85 8
BEARING,SPHERICAL-ROLLER,TDS-3
Stocking Line: MTS
Line Discount: 10.00%
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 4 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
Unit Weight: 58.181818 KG Total Weight: 58.181818 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 08/22/2008
__________________________________________________________________________________________________
016 76534 EA 1.000 $1,156.10 $1,040.49 $1,040.49 1
TDS-3 SLEEVE WEAR QUILL
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .25 KG Total Weight: .25 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
017 78641 EA 1.000 $3,774.10 $3,396.69 $3,396.69 1
SLEEVE,WEAR (MAIN SHAFT)
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 5.454545 KG Total Weight: 5.454545 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
018 78634 EA 1.000 $95.15 $85.64 $85.64 1
LOCKPLATE,TDS-3,LOCKNUT
Stocking Line: MTSS
Line Discount: 10.00%
Unit Weight: .086364 KG Total Weight: .086364 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
019 78642 EA 1.000 $509.30 $458.37 $458.37 8
SEAL,MAIN-SHAFT-HOUSING
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 1.363636 KG Total Weight: 1.363636 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 08/22/2008
__________________________________________________________________________________________________
020 78648 EA 1.000 $171.60 $154.44 $154.44 1
SEAL, MAIN-SHAFT
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .909091 KG Total Weight: .909091 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
021 30125034 EA 8.000 $2.99 $2.69 $21.55 8
WASHER,TAB LOCK,1/2"(Replaces 80077)
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 5 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .004545 KG Total Weight: .03636 KG
Del# Quantity Required Date Promise Date
0001 8.0000 06/24/2008 08/22/2008
__________________________________________________________________________________________________
022 80074 EA 12.000 $4.38 $3.94 $47.29 1
WASHER,LOCK,TAB
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .004545 KG Total Weight: .05454 KG
Del# Quantity Required Date Promise Date
0001 12.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
023 87251 EA 2.000 $8.63 $7.76 $15.53 1
TDS-3 GASKET FILTER SCRN
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .027273 KG Total Weight: .054546 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
024 88588 EA 1.000 $119.90 $107.91 $107.91 1
GASKET,GEAR,CASE {SET OF 4 PCS}
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .022727 KG Total Weight: .022727 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
025 88589 EA 1.000 $3,862.10 $3,475.89 $3,475.89 1
TDS-4 HOUSING SEAL
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 9.090909 KG Total Weight: 9.090909 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
026 88859 EA 1.000 $1.38 $1.24 $1.24 1
GASKET,GEAR,CASING
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .004545 KG Total Weight: .004545 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 6 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
__________________________________________________________________________________________________
Line Item Description UM Qty Ord Price Net Price Price (wks)
027 88953 EA 1.000 $30.14 $27.13 $27.13 1
SEAL,CUP,2-1/2,NITRILE
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .004545 KG Total Weight: .004545 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
028 90133 EA 1.000 $11.55 $10.40 $10.40 1
O-RING,32.19DIAX.275
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .122727 KG Total Weight: .122727 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
029 90283 EA 1.000 $3,136.10 $2,822.49 $2,822.49 2
SLEEVE,WEAR,BULL GEAR,500T,TDS4
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: 3.863636 KG Total Weight: 3.863636 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/10/2008
__________________________________________________________________________________________________
030 90284 EA 1.000 $507.10 $456.39 $456.39 2
SEAL,LIP,MAIN-SHAFT(4-500)
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: 1.172727 KG Total Weight: 1.172727 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/10/2008
__________________________________________________________________________________________________
031 50012-28-C5D EA 12.000 $5.38 $4.84 $58.10 1
SCREW, CAP HEX HEAD DRILLED
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .236364 KG Total Weight: 2.836368 KG
Del# Quantity Required Date Promise Date
0001 12.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
032 50020-24-C5D EA 2.000 $43.34 $39.01 $78.01 1
SCREW, CAP-HEX HD DRILLED, TDS
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .677273 KG Total Weight: 1.354546 KG
Del# Quantity Required Date Promise Date
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 7 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
033 50020-29-C5D EA 7.000 $30.14 $27.13 $189.88 1
SCREW, CAP-HEX HD DRILLED, TDS
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .768182 KG Total Weight: 5.377274 KG
Del# Quantity Required Date Promise Date
0001 7.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
034 50020-33-C5D EA 9.000 $47.30 $42.57 $383.13 1
SCREW, CAP-HEX HD
Stocking Line: MTO
Line Discount: 10.00%
Del# Quantity Required Date Promise Date
0001 9.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
035 50912-C EA 38.000 $ .24 $ .22 $8.28 1
Spring Lockwasher 3/4
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .018182 KG Total Weight: .690916 KG
Del# Quantity Required Date Promise Date
0001 38.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
036 51216-24 EA 4.000 $8.17 $7.36 $29.42 1
PIN,DOWEL
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .298182 KG Total Weight: 1.192728 KG
Del# Quantity Required Date Promise Date
0001 4.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
037 51300-238-B EA 2.000 $ .76 $ .68 $1.37 1
O-RING, PHM-1
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .004545 KG Total Weight: .00909 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
038 51300-456-B EA 2.000 $10.41 $9.36 $18.73 1
O-RING TDS
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .05 KG Total Weight: .1 KG
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 8 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
039 51300-276-B EA 1.000 $3.88 $3.49 $3.49 1
O-RING
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .009091 KG Total Weight: .009091 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
040 51300-234-B EA 2.000 $ .79 $ .71 $1.42 1
O ring
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .003636 KG Total Weight: .007272 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
041 51300-232-B EA 2.000 $1.25 $1.12 $2.24 1
O-Ring
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .003636 KG Total Weight: .007272 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
042 51300-217-B EA 2.000 $ .51 $ .45 $ .91 1
O Ring
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: .009091 KG Total Weight: .018182 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
043 51300-142-B EA 1.000 $ .51 $ .46 $ .46 1
O-RING
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .009091 KG Total Weight: .009091 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
044 51300-274-B EA 1.000 $4.86 $4.37 $4.37 1
O-RING
Stocking Line: MTO
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 9 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
Line Discount: 10.00%
Unit Weight: .009091 KG Total Weight: .009091 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
045 51300-460-B EA 1.000 $13.09 $11.78 $11.78 1
O-Ring, 16x15.5x.25,70 Duro
replaces 910660-460
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .059091 KG Total Weight: .059091 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
046 51300-215-B EA 2.000 $ .88 $ .79 $1.58 1
VBJ O-Ring
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: .001818 KG Total Weight: .003636 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
047 51108-C EA 20.000 $ .36 $ .33 $6.53 1
Lockwasher, Heavy
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .004545 KG Total Weight: .0909 KG
Del# Quantity Required Date Promise Date
0001 20.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
048 50920-C EA 9.000 $ .90 $ .81 $7.31 1
Lockwasher
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .063636 KG Total Weight: .572724 KG
Del# Quantity Required Date Promise Date
0001 9.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
049 50512-C EA 10.000 $2.53 $2.28 $22.77 8
BJ Slotted Hex Nut 3/4 Replaces
50512-C-H
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .004545 KG Total Weight: .04545 KG
Del# Quantity Required Date Promise Date
0001 10.0000 06/24/2008 08/22/2008
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 10 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
__________________________________________________________________________________________________
050 50524-C EA 2.000 $11.99 $10.79 $21.58 1
NUT, HEX-SLTD, (UNC-2B)
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .372727 KG Total Weight: .745454 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
051 88333 EA 1.000 $3.67 $3.30 $3.30 1
TDS ROT HEAD "O" RING
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: .036364 KG Total Weight: .036364 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
052 88606 EA 2.000 $521.40 $469.26 $938.52 1
BUSHING,LOWER
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .881818 KG Total Weight: 1.763636 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
053 88605 EA 2.000 $149.11 $134.19 $268.39 1
BUSHING,UPPER
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .540909 KG Total Weight: 1.081818 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
054 53250-4 EA 2.000 $2.59 $2.33 $4.65 1
TDS QUIL SHAFT RELIEF VLV
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .004545 KG Total Weight: .00909 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
055 78910-2 EA 2.000 $55.22 $49.70 $99.40 1
RTV,162 WHITE 10.3 OZ, C/W MSDS
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .390909 KG Total Weight: .781818 KG
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 11 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
056 89053-V EA 2.000 $815.10 $733.59 $1,467.18 8
TDS-4 LIP SEAL VITON
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 1.818182 KG Total Weight: 3.636364 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 08/22/2008
__________________________________________________________________________________________________
057 75663 EA 1.000 $170.50 $153.45 $153.45 1
VALVE,EXHAUST,QUICK
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .909091 KG Total Weight: .909091 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
058 73302 EA 1.000 $3,902.80 $3,512.52 $3,512.52 1
BRAKE,AIR (P)
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 68.331818 KG Total Weight: 68.331818 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
059 78627 EA 2.000 $710.60 $639.54 $1,279.08 1
PIN,TRUNNION
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: 8.181818 KG Total Weight: 16.363636 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
060 88614 EA 1.000 $521.40 $469.26 $469.26 1
SCREEN,SUCTION-CAP,TDS-4,OIL-FILTER
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: .118182 KG Total Weight: .118182 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
061 88862 EA 1.000 $141.35 $127.22 $127.22 1
BUSHING,SLEEVE,2.25X2.50X.38
Stocking Line: MTO
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 12 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
Line Discount: 10.00%
Unit Weight: .059091 KG Total Weight: .059091 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
062 88950 EA 2.000 $8.88 $7.99 $15.98 1
SPRING,PLUNGER,1/4-20
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: .009091 KG Total Weight: .018182 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
063 88956 EA 2.000 $2.51 $2.26 $4.52 1
GASKET,GEAR-CHANGER
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .013636 KG Total Weight: .027272 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
064 89196 EA 1.000 $13.09 $11.78 $11.78 1
SPRING,COMPRESSION,0.6OD
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: .009091 KG Total Weight: .009091 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
065 89062 EA 1.000 $844.80 $760.32 $760.32 1
CLUTCH
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: .490909 KG Total Weight: .490909 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
066 89071 EA 1.000 $304.70 $274.23 $274.23 1
BUSHING,FLANGED,1.62X1.75X.75LG
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: .081818 KG Total Weight: .081818 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
067 89072 EA 1.000 $255.75 $230.18 $230.18 1
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 13 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
BUSHING,SHAFT,GENEVA
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: .504545 KG Total Weight: .504545 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
068 89244 EA 1.000 $198.00 $178.20 $178.20 1
BUSHING,SLEEVE,1.73X1.86X.5LG
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .027273 KG Total Weight: .027273 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
069 88948 EA 1.000 $717.20 $645.48 $645.48 9
HOUSING,GEAR-CHANGER
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: 1.863636 KG Total Weight: 1.863636 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 08/29/2008
__________________________________________________________________________________________________
070 78626 EA 2.000 $5,736.50 $5,162.85 $10,325.70 8
TDS-3 M/F TRUNNION CAP
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: 13.113636 KG Total Weight: 26.227272 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 08/17/2008
__________________________________________________________________________________________________
071 71827 EA 1.000 $70.95 $63.86 $63.86 1
Cam Follower, IR2000/2100
BOP Hanger Assembly
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 1.068182 KG Total Weight: 1.068182 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
072 75975 EA 2.000 $377.30 $339.57 $679.14 1
SEAL,LOWER-GEAR-BOX,TDS-3
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 1.818182 KG Total Weight: 3.636364 KG
Del# Quantity Required Date Promise Date
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 14 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
073 79850 EA 1.000 $103.95 $93.56 $93.56 1
SPRING,COMPRESSION.ROT.P.H.TDS*SCD*
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .1 KG Total Weight: .1 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
074 79851 EA 1.000 $137.50 $123.75 $123.75 6
RING,RETAINING.ROTAT.P.H.TDS*SCD*
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .454545 KG Total Weight: .454545 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 08/03/2008
__________________________________________________________________________________________________
075 79853 EA 1.000 $1,464.10 $1,317.69 $1,317.69 1
BALL BEARING ROTAT.P.H. TDS
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 3.590909 KG Total Weight: 3.590909 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
076 79854 EA 1.000 $1,689.60 $1,520.64 $1,520.64 1
BALL-BEARING,11"IDX13"OD,ROT.PH.TDS
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 4 KG Total Weight: 4 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
077 79893 EA 1.000 $1,874.40 $1,686.96 $1,686.96 2
RETAINER RING, TDS
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: 3.772727 KG Total Weight: 3.772727 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/10/2008
__________________________________________________________________________________________________
078 79943 EA 2.000 $7.23 $6.50 $13.01 1
BUSHING,SLEEVE,FLANGED,1.0X1.25X1.25
Stocking Line: MTS
Line Discount: 10.00%
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 15 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
Unit Weight: .068182 KG Total Weight: .136364 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
079 79945 EA 1.000 $4.07 $3.66 $3.66 1
BUSHING,CYLINDRICAL,TDS*SCD*
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .063636 KG Total Weight: .063636 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
080 82049 EA 2.000 $134.20 $120.78 $241.56 2
TDS3 PIN CAM CYL-ROT HEAD
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: .222727 KG Total Weight: .445454 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/10/2008
__________________________________________________________________________________________________
081 84816 EA 1.000 $11.44 $10.30 $10.30 1
TDS ROTATING HEAD GASKET
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .018182 KG Total Weight: .018182 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
082 86930 EA 8.000 $171.60 $154.44 $1,235.52 1
GLYD-RING,ROTARY,10" (ROT.P.H.TDS)
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .090909 KG Total Weight: .727272 KG
Del# Quantity Required Date Promise Date
0001 8.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
083 108894-L25 EA 1.000 $54.01 $48.61 $48.61 1
SEAL,LIP,PISTON (Same as 16701-3,87018-2)
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .090909 KG Total Weight: .090909 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
084 50508-C EA 2.000 $ .96 $ .86 $1.72 1
Slotted Hex Nut 1/2
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 16 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .013636 KG Total Weight: .027272 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
085 51433-12-S EA 2.000 $ .40 $ .36 $ .71 1
COTTER PIN, TDS
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: .004545 KG Total Weight: .00909 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
086 51604-16-C EA 1.000 $ .88 $ .79 $ .79 1
Roll Pin
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .004545 KG Total Weight: .004545 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
087 52804-2-G EA 1.000 $2.77 $2.49 $2.49 1
BUSHING, REDUCING, TDS
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .009091 KG Total Weight: .009091 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
088 53002-08-S EA 2.000 $8.40 $7.56 $15.11 4
Plug, Pipe,--Square Head, 1/2 NPT
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .036364 KG Total Weight: .072728 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/20/2008
__________________________________________________________________________________________________
089 53002-12-C EA 2.000 $6.25 $5.63 $11.25 4
PLUG, PIPE-SQ HD
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .077273 KG Total Weight: .154546 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/21/2008
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 17 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
__________________________________________________________________________________________________
Line Item Description UM Qty Ord Price Net Price Price (wks)
090 55912-6-6 EA 1.000 $37.62 $33.86 $33.86 1
VALVED COUPLER, QD
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .254545 KG Total Weight: .254545 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
091 55912-8-8 EA 1.000 $46.42 $41.78 $41.78 2
VLVD COUPLR, QD SNAPTITE
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: .440909 KG Total Weight: .440909 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/10/2008
__________________________________________________________________________________________________
092 55913-6-6 EA 1.000 $19.58 $17.62 $17.62 2
VALVED NIPPLE, QD (AEROQUIP ONLY)
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: .104545 KG Total Weight: .104545 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/10/2008
__________________________________________________________________________________________________
093 55913-8-8 EA 2.000 $21.89 $19.70 $39.40 9
VLVD NIPPLE, QD (USE AEROQUIP)
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: .172727 KG Total Weight: .345454 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 08/25/2008
__________________________________________________________________________________________________
094 56501-12-12-S EA 3.000 $15.40 $13.09 $39.27 2
MALE CONNECTOR,3/4 MP-3/4 JIC
Stocking Line: MTO
Line Discount: 15.00%
Unit Weight: .136364 KG Total Weight: .409092 KG
Del# Quantity Required Date Promise Date
0001 3.0000 06/24/2008 07/10/2008
__________________________________________________________________________________________________
095 56501-12-8-C EA 3.000 $50.16 $45.14 $135.43 2
CONN,EXT PIPE/37 DEG
Stocking Line: MTO
Line Discount: 10.00%
Del# Quantity Required Date Promise Date
0001 3.0000 06/24/2008 07/10/2008
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 18 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
__________________________________________________________________________________________________
096 56507-6-6-S EA 2.000 $13.75 $12.38 $24.75 2
TEE, BRANCH 37/37/EXT PIPE
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: .090909 KG Total Weight: .181818 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/10/2008
__________________________________________________________________________________________________
097 56533-8-8-S EA 2.000 $21.89 $19.70 $39.40 1
Tee, external Pipe
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: .15 KG Total Weight: .3 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
098 56700-8-6-S EA 2.000 $4.50 $4.05 $8.10 1
Reducing Bushing 1/2 x 3/8
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .045455 KG Total Weight: .09091 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
099 56709-8-8-S EA 2.000 $27.61 $24.85 $49.70 2
ELBOW, STREET 45
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: .209091 KG Total Weight: .418182 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/10/2008
__________________________________________________________________________________________________
100 79333-1 EA 1.000 $134.20 $120.78 $120.78 1
KIT,SEAL,ROD/GLAND,PHM3I
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: .145455 KG Total Weight: .145455 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
101 79895-1 EA 1.000 $830.50 $747.45 $747.45 1
ROD,LOCKING, TDS
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .509091 KG Total Weight: .509091 KG
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 19 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
102 79896-1 EA 1.000 $77.66 $69.89 $69.89 1
HANDLE,LOCKING, TDS
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 2.968182 KG Total Weight: 2.968182 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
103 80366 EA 1.000 $1,760.00 $1,584.00 $1,584.00 3
TDS-ROT HEAD CYLINDR ASSY
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: 11.818182 KG Total Weight: 11.818182 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/13/2008
__________________________________________________________________________________________________
104 79898 EA 1.000 $5,328.40 $4,795.56 $4,795.56 10
ARM,ROLLER ROTATE HEAD
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: 13.477273 KG Total Weight: 13.477273 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 09/02/2008
__________________________________________________________________________________________________
105 86203 EA 6.000 $113.30 $101.97 $611.82 1
REPAIR-PACK,VALVE (SINGLE SOLENOID)TDS
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .909091 KG Total Weight: 5.454546 KG
Del# Quantity Required Date Promise Date
0001 6.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
106 10743+50 EA 2.000 $31.90 $27.12 $54.23 10
MUFFLER CONTROL VALVE 1/2
Stocking Line: MTS
Line Discount: 15.00%
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 09/03/2008
__________________________________________________________________________________________________
107 83542 EA 1.000 $310.20 $279.18 $279.18 1
REGULATOR,PRESSURE
Stocking Line: MTS
Line Discount: 10.00%
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 20 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
Unit Weight: 1.136364 KG Total Weight: 1.136364 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
108 87235 EA 1.000 $589.60 $530.64 $530.64 1
TDS IBOP CTL CIRCUIT KIT
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 1.709091 KG Total Weight: 1.709091 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
109 88083 EA 1.000 $40.04 $36.04 $36.04 1
VALVE,QUICK,EXHAUST,.75NPT
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .363636 KG Total Weight: .363636 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
110 85986-U16-1 EA 6.000 $171.60 $154.44 $926.64 1
TDS SPARE SOLENOID UL
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .454545 KG Total Weight: 2.72727 KG
Del# Quantity Required Date Promise Date
0001 6.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
111 87204 EA 1.000 $77.66 $69.89 $69.89 1
VALVE,SHUTTLE
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .454545 KG Total Weight: .454545 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
112 87541 EA 1.000 $913.00 $821.70 $821.70 1
SWTCH,CONTROL,PRESSURE
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 4.545455 KG Total Weight: 4.545455 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
113 76842 EA 1.000 $1,075.80 $968.22 $968.22 1
SWITCH,PRESSURE-DIFFERENTIAL
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 21 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 3.477273 KG Total Weight: 3.477273 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
114 76841 EA 1.000 $902.00 $811.80 $811.80 1
TDS-3 SWITCH PRESSURE EEX
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 3.181818 KG Total Weight: 3.181818 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
115 79388 EA 1.000 $1,001.00 $900.90 $900.90 1
SWITCH,PRESSURE,IBOP
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 2.159091 KG Total Weight: 2.159091 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
116 84665 EA 2.000 $1,138.50 $1,024.65 $2,049.30 1
SWITCH,TEMP
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 2.386364 KG Total Weight: 4.772728 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
117 76743 EA 1.000 $900.90 $810.81 $810.81 1
MAGNETIC-PICKUP,E/P,TDS-3
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .795455 KG Total Weight: .795455 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
118 92119-2 EA 2.000 $622.60 $560.34 $1,120.68 1
TP BARRIER
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .090909 KG Total Weight: .181818 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 22 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
__________________________________________________________________________________________________
Line Item Description UM Qty Ord Price Net Price Price (wks)
119 84882 EA 2.000 $273.90 $246.51 $493.02 1
SENSOR,PROXIMITY
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .090909 KG Total Weight: .181818 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
120 99176 EA 2.000 $578.60 $520.74 $1,041.48 1
ISOLATOR,SAFETY,SINGLE-CHANNEL
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .109091 KG Total Weight: .218182 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
121 93939 EA 2.000 $288.20 $259.38 $518.76 1
SENSOR,PROXIMITY
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .090909 KG Total Weight: .181818 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
122 98943 EA 1.000 $2,154.90 $1,939.41 $1,939.41 1
J-BOX,MODIFIED
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: 7.272727 KG Total Weight: 7.272727 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
123 88621 EA 1.000 $1,442.10 $1,297.89 $1,297.89 1
SLEEVE,PINION
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 7.954545 KG Total Weight: 7.954545 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
124 79832 EA 1.000 $1,639.00 $1,475.10 $1,475.10 1
ARMATURE BEARING UPPER GE
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 15.909091 KG Total Weight: 15.909091 KG
Del# Quantity Required Date Promise Date
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 23 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
125 79833 EA 1.000 $1,689.60 $1,520.64 $1,520.64 1
ARMATURE BEARING LOWER GE
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 27.272727 KG Total Weight: 27.272727 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
126 56625-300-01 FT 24.000 $47.41 $42.67 $1,024.06 1
CABLE,SHPBD MLTCR IEC92-3 *See Text*
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 2.634 FT Total Weight: 63.216 FT
Del# Quantity Required Date Promise Date
0001 24.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
127 16812 EA 1.000 $19.91 $17.92 $17.92 1
ORIFICE,.25
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .077273 KG Total Weight: .077273 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
128 76419 EA 1.000 $63.91 $57.52 $57.52 1
VALVE,NEEDLE
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .136364 KG Total Weight: .136364 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
129 76790 EA 1.000 $482.90 $434.61 $434.61 1
VALVE,CONTROL,DIRECTIONAL
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 1.55 KG Total Weight: 1.55 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
130 77615 EA 1.000 $163.90 $147.51 $147.51 1
VALVE,CARTRIDGE,PRESSURE-REDUCING
Stocking Line: MTS
Line Discount: 10.00%
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 24 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
Unit Weight: .681818 KG Total Weight: .681818 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
131 77616 EA 1.000 $90.09 $81.08 $81.08 1
VALVE,CARTRIDGE,PILOT/CHECK
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 1.136364 KG Total Weight: 1.136364 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
132 80630 EA 1.000 $206.80 $186.12 $186.12 1
GAUGE PRESSURE, C/W CERT
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .454545 KG Total Weight: .454545 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
133 87605 EA 3.000 $224.40 $201.96 $605.88 1
KIT,SEAL,REPAIR-PACK,ACCUMULATOR
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .004545 KG Total Weight: .013635 KG
Del# Quantity Required Date Promise Date
0001 3.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
134 109270-CAD EA 1.000 $48.95 $44.06 $44.06 8
TDS LINE BODY
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .3 KG Total Weight: .3 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 08/22/2008
__________________________________________________________________________________________________
135 50103-10-B EA 4.000 $2.05 $1.84 $7.36 1
SCREW, CAP-SOC HD
Stocking Line: MTS
Line Discount: 10.00%
Del# Quantity Required Date Promise Date
0001 4.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
136 51103-C EA 4.000 $ .51 $ .45 $1.82 1
Hi Coll Spring Lockwasher
Stocking Line: MTS
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 25 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
Line Discount: 10.00%
Unit Weight: .001818 KG Total Weight: .007272 KG
Del# Quantity Required Date Promise Date
0001 4.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
137 56501-8-12-S EA 2.000 $5.66 $5.09 $10.18 1
Connector
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .118182 KG Total Weight: .236364 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
138 56506-12-12-S EA 1.000 $10.96 $9.86 $9.86 1
90 Degrees Male Elbow
3/4 MP - 3/4 JIC
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .208 KG Total Weight: .208 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
139 56506-2-4-S EA 1.000 $4.98 $4.48 $4.48 1
Varco BJ Elbow, 90' Ext. Pipe 37'
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .018182 KG Total Weight: .018182 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
140 56506-8-12-S EA 1.000 $16.06 $14.45 $14.45 1
ELBOW, 90DEG EXT PIPE/37
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .195455 KG Total Weight: .195455 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
141 56507-8-8-S EA 1.000 $19.36 $17.42 $17.42 1
TEE, BRANCH 37/37/EXT PIPE
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .15 KG Total Weight: .15 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 26 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
__________________________________________________________________________________________________
Line Item Description UM Qty Ord Price Net Price Price (wks)
142 56705-4-4-S EA 1.000 $7.33 $6.60 $6.60 1
90 Degrees Elbow
3/4 x 3/4
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .072727 KG Total Weight: .072727 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
143 56710-12-8-C EA 1.000 $61.82 $55.64 $55.64 1
REDUCER PIPE-INT/EXT
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .181818 KG Total Weight: .181818 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
144 80387-5 EA 2.000 $776.60 $698.94 $1,397.88 1
REBUILD KIT (INCLUDES 1 EA -1,-2, & -3)
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 63.636364 KG Total Weight: 127.272728 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
145 94522-21N EA 1.000 $127.60 $114.84 $114.84 1
CARTRIDGE,VALVE,PHM3I
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .322727 KG Total Weight: .322727 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
146 56512-8-12-S EA 2.000 $29.04 $26.14 $52.27 1
ELBOW, XLONG 90-EXT PIPE37
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .327273 KG Total Weight: .654546 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
147 30171395 EA 2.000 $414.70 $373.23 $746.46 2
PIN. CLEVIS, ROD END, C'BAL CYL.
Stocking Line: MTO
Line Discount: 10.00%
Del# Quantity Required Date Promise Date
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 27 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
0001 2.0000 06/24/2008 07/11/2008
__________________________________________________________________________________________________
148 30171396 EA 2.000 $449.90 $404.91 $809.82 2
PIN, CLEVIS, C'BAL CYL.
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: 1.818182 KG Total Weight: 3.636364 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/11/2008
__________________________________________________________________________________________________
149 50516-C EA 4.000 $1.68 $1.51 $6.06 1
Slotted Hex Nut
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .109091 KG Total Weight: .436364 KG
Del# Quantity Required Date Promise Date
0001 4.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
150 76419 EA 1.000 $63.91 $57.52 $57.52 1
VALVE,NEEDLE
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .136364 KG Total Weight: .136364 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
151 77615 EA 1.000 $163.90 $147.51 $147.51 1
VALVE,CARTRIDGE,PRESSURE-REDUCING
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .681818 KG Total Weight: .681818 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
152 77616 EA 1.000 $90.09 $81.08 $81.08 1
VALVE,CARTRIDGE,PILOT/CHECK
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 1.136364 KG Total Weight: 1.136364 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
153 50006-24-C5 EA 4.000 $ .38 $ .34 $1.35 1
SCREW, CAP-HEX HD (UNC)
Stocking Line: MTS
Line Discount: 10.00%
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 28 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
Unit Weight: .045455 KG Total Weight: .18182 KG
Del# Quantity Required Date Promise Date
0001 4.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
154 51404-14 EA 2.000 $ .38 $ .34 $ .68 1
Cotter Pin 1/4 x 1-3/4
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .009091 KG Total Weight: .018182 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
155 51806-C EA 4.000 $1.71 $1.53 $6.14 1
Flexloc nut 3/8
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .009091 KG Total Weight: .036364 KG
Del# Quantity Required Date Promise Date
0001 4.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
156 55320-C EA 1.000 $3.50 $3.15 $3.15 1
Varco Nut, Hex-Jam (UNF-2B)
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .154545 KG Total Weight: .154545 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
157 56501-8-8-S EA 1.000 $3.28 $2.95 $2.95 8
Male Connector 1/2 MP - 1/2 JIC
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .077273 KG Total Weight: .077273 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 08/22/2008
__________________________________________________________________________________________________
158 56502-8-8-S EA 1.000 $8.02 $7.22 $7.22 1
45 Elbow
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .081818 KG Total Weight: .081818 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
159 56507-8-8-S EA 1.000 $19.36 $17.42 $17.42 1
TEE, BRANCH 37/37/EXT PIPE
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 29 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .15 KG Total Weight: .15 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
160 56700-8-4-S EA 1.000 $3.67 $3.30 $3.30 8
REDUCER, PIPE-EXT/INT
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .059091 KG Total Weight: .059091 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 08/22/2008
__________________________________________________________________________________________________
161 56702-8-8-S EA 1.000 $11.55 $10.40 $10.40 1
Elbow, 90 Deg-Ext Pipe
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .127273 KG Total Weight: .127273 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
162 56703-8-8-S EA 1.000 $3.67 $3.30 $3.30 8
Varco BJ Nipple
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .063636 KG Total Weight: .063636 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 08/22/2008
__________________________________________________________________________________________________
163 56705-4-4-S EA 1.000 $7.33 $6.60 $6.60 1
90 Degrees Elbow
3/4 x 3/4
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .072727 KG Total Weight: .072727 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
164 14783 EA 1.000 $334.40 $284.24 $284.24 1
GAUGE PRESSURE, 0-3000PSI
Stocking Line: MTS
Line Discount: 15.00%
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 30 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
__________________________________________________________________________________________________
Line Item Description UM Qty Ord Price Net Price Price (wks)
165 15208 EA 2.000 $82.94 $74.65 $149.29 1
VALVE, CONTROL FLOW
Stocking Line: MTS
Line Discount: 10.00%
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
166 71131 EA 1.000 $140.80 $126.72 $126.72 1
Seal Kit, Gland/Rod, IR-2000/2100
Lift Cylinder, 76341, TDS-3 Pipe
Handler Lift Cylinder
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .25 KG Total Weight: .25 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
167 85197 EA 1.000 $52.69 $47.42 $47.42 1
WASHER,LOCK,TAB
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .036364 KG Total Weight: .036364 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
168 85205 EA 1.000 $163.90 $147.51 $147.51 1
TUBE,ASSY
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .163636 KG Total Weight: .163636 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
169 85678 EA 1.000 $854.70 $769.23 $769.23 1
SEAL-KIT,DUPLEX-CYLINDER,TDS
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .454545 KG Total Weight: .454545 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
170 30171685-1 EA 1.000 $391.60 $352.44 $352.44 1
PIN, ALIGNMENT, CYLINDER
Stocking Line: MTO
Line Discount: 10.00%
Del# Quantity Required Date Promise Date
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 31 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
171 30171685-2 EA 1.000 $391.60 $352.44 $352.44 1
PIN, ALIGNMENT, CYLINDER
Stocking Line: MTO
Line Discount: 10.00%
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
172 30111013 EA 1.000 $732.60 $659.34 $659.34 1
ASSY,FILTER,60-MICRON,OIL
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 5.681818 KG Total Weight: 5.681818 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
173 98147 EA 1.000 $1,051.60 $946.44 $946.44 1
TDS ROTARY OIL PUMP
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 5.454545 KG Total Weight: 5.454545 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
174 98141-1 EA 1.000 $111.10 $99.99 $99.99 10
TDS-4 OIL COOL HE FAN UL
Stocking Line: MTS4
Line Discount: 10.00%
Unit Weight: .709091 KG Total Weight: .709091 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 08/31/2008
__________________________________________________________________________________________________
175 109411 EA 1.000 $4,288.90 $3,860.01 $3,860.01 1
EXCHANGER,HEAT
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 63.636364 KG Total Weight: 63.636364 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
176 84821 EA 1.000 $1,839.20 $1,655.28 $1,655.28 1
IMPELLER,BLOWER
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 13.181818 KG Total Weight: 13.181818 KG
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 32 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
177 7887 EA 1.000 $ .99 $ .89 $ .89 1
Lynch Pin Clip
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .045455 KG Total Weight: .045455 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
178 50516-C EA 6.000 $1.68 $1.52 $9.09 1
Slotted Hex Nut
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .109091 KG Total Weight: .654546 KG
Del# Quantity Required Date Promise Date
0001 6.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
179 53201 EA 30.000 $1.39 $1.18 $35.34 1
Fitting , Grease , 12PTF, Alemite
replaces 901261-1
Stocking Line: MTS
Line Discount: 15.00%
Unit Weight: .009091 KG Total Weight: .27273 KG
Del# Quantity Required Date Promise Date
0001 30.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
180 80230-1 EA 20.000 $697.40 $627.66 $12,553.20 1
TDS-4 CAM FOLLOWER
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 9.272727 KG Total Weight: 185.45454 KG
Del# Quantity Required Date Promise Date
0001 20.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
181 82747 EA 1.000 $1,351.90 $1,216.71 $1,216.71 1
FILTER,PRESSURE
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: 5.009091 KG Total Weight: 5.009091 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
182 82777+30 EA 1.000 $278.30 $250.47 $250.47 6
VALVE,CHECK,.75NPT
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 33 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
Stocking Line: MTO
Line Discount: 10.00%
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 08/03/2008
__________________________________________________________________________________________________
183 51403-12-S EA 4.000 $ .61 $ .54 $2.18 STOCK
Cotter Pin 3/16x1.1/2
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .004545 KG Total Weight: .01818 KG
Del# Quantity Required Date Promise Date
0001 4.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
184 77159-2 EA 4.000 $50.16 $45.14 $180.58 1
TDS SCREW DR 50016-34-C5
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .522727 KG Total Weight: 2.090908 KG
Del# Quantity Required Date Promise Date
0001 4.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
185 81628+30 EA 2.000 $3.93 $3.53 $7.07 4

Stocking Line: MTO


Line Discount: 10.00%
Unit Weight: .072727 KG Total Weight: .145454 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/20/2008
__________________________________________________________________________________________________
186 80569+30 EA 4.000 $30.14 $27.13 $108.50 4
NUT,HEX,JAM,2.0-12UN
Stocking Line: MTS
Line Discount: 10.00%
Del# Quantity Required Date Promise Date
0001 4.0000 06/24/2008 07/25/2008
__________________________________________________________________________________________________
187 79516-2 EA 1.000 $1,568.60 $1,411.74 $1,411.74 1
TDS HINGE PIN
Stocking Line: MTO
Line Discount: 10.00%
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
188 73719 EA 1.000 $507.10 $456.39 $456.39 1
BEARING,ROLLER-THRUST,TDS-DOLLY
Stocking Line: MTO
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 34 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
Line Discount: 10.00%
Unit Weight: .890909 KG Total Weight: .890909 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
189 79862-2 EA 8.000 $100.54 $90.49 $723.89 1
TDS BUSHING 1.28"
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: .409091 KG Total Weight: 3.272728 KG
Del# Quantity Required Date Promise Date
0001 8.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
190 35556984 EA 2.000 $368.50 $331.65 $663.30 11
PIN,MOTOR FRAME,TDS
Stocking Line: MTO
Line Discount: 10.00%
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 09/07/2008
__________________________________________________________________________________________________
191 86176 EA 2.000 $1,098.90 $989.01 $1,978.02 1
BOLT,ASSY,SWING
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: 4.545455 KG Total Weight: 9.09091 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
192 79037 EA 1.000 $133.10 $119.79 $119.79 2
RUBBER,S-PIPE,TDS*SCD*
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: 2.463636 KG Total Weight: 2.463636 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 07/10/2008
__________________________________________________________________________________________________
193 50012-32-C5D EA 4.000 $5.89 $5.30 $21.19 1
SCREW, CAP-HEX HD DRILLED, JDC
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .263636 KG Total Weight: 1.054544 KG
Del# Quantity Required Date Promise Date
0001 4.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
194 50912-C EA 4.000 $ .24 $ .22 $ .87 1
Spring Lockwasher 3/4
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 35 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .018182 KG Total Weight: .072728 KG
Del# Quantity Required Date Promise Date
0001 4.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
195 50016-20-C5D EA 10.000 $5.29 $4.76 $47.62 1
SCREW, CAP-HEX HD DRILLED
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .345455 KG Total Weight: 3.45455 KG
Del# Quantity Required Date Promise Date
0001 10.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
196 50916-C EA 10.000 $ .96 $ .86 $8.61 1
Spring Lockwasher 1
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .036364 KG Total Weight: .36364 KG
Del# Quantity Required Date Promise Date
0001 10.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
197 56512-8-12-S EA 2.000 $29.04 $26.14 $52.27 1
ELBOW, XLONG 90-EXT PIPE37
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .327273 KG Total Weight: .654546 KG
Del# Quantity Required Date Promise Date
0001 2.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
198 74109-1 EA 16.000 $71.28 $64.15 $1,026.43 1
TDS-3 PIN SPIROL 2.5 LG
Stocking Line: MTS
Line Discount: 10.00%
Unit Weight: .090909 KG Total Weight: 1.454544 KG
Del# Quantity Required Date Promise Date
0001 16.0000 06/24/2008 07/05/2008
__________________________________________________________________________________________________
199 82674-CE EA 1.000 $5,790.40 $5,211.36 $5,211.36 11
ACCUMULATOR,PISTON 4.0 BORE
Stocking Line: MTO
Line Discount: 10.00%
Del# Quantity Required Date Promise Date
0001 1.0000 06/24/2008 09/13/2008
__________________________________________________________________________________________________
200 \56625-14-04 EA 24.000 $9.00 $9.00 $216.00 1
CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 36 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
Space Heater Cable
Del# Quantity Required Date Promise Date
0001 24.0000 06/25/2008 06/25/2008
__________________________________________________________________________________________________
201 \56625-06-03 EA 15.000 $12.00 $12.00 $180.00 1
Shunt Cable
Del# Quantity Required Date Promise Date
0001 15.0000 06/25/2008 06/25/2008
__________________________________________________________________________________________________
202 56705-8-8-S EA 1.000 $11.00 $9.90 $9.90 3
ELBOW, STREET 90 DEG
Stocking Line: MTO
Line Discount: 10.00%
Unit Weight: .163636 KG Total Weight: .163636 KG
Del# Quantity Required Date Promise Date
0001 1.0000 06/25/2008 07/13/2008

Sub-Total $156,568.72

Total Sales Quote Acknowledgement 1056864 Rev 1: $156,568.72

__________________________________________________________________________________________________
TERMS AND CONDITIONS
This quotation is subject to NOV's Terms & Conditions.
A copy of it is available upon request.
All deliveries are quoted Ex Works Singapore and are valid for 45 days
Items quoted are subjected to prior sales. Minimum sales order is
US$ 25.00 per order. Cancellation of confirmed sales order is subject
to a re-stocking charges of 20% of the sales order.
All local shipment (S'pore) without export document (Bill of Lading or
export document) is subjected to Goods and Service Tax.
Foreign vessels POs or DOs must be accompanied by signatory and vessel
stamp for tax exemption. Withholding tax will be borne by the buyer.
This quotation does not include GST. Please be advise that the FOB and
boxing charges cannot be pro-rated by you. Upon request we can inform
you with the FOB and boxing charges for part of this quotation.
Please note the following definition :
MTS :Make to stock, Standard stock items
INS : Critical item, Parts intended for rig down and urgent situation
MTO: Make to order, non stock ; special order ; non-returnable
Prices are subjected to change without prior notice
All POs are to be issued to Varco International Pte Ltd

Thank you for your enquiry ! We appreciate your business !


CO. 150 VARCO INTERNATIONAL PTE LTD
NO.9 TUAS AVENUE 5 Quote 1056864
SINGAPORE 639335
SINGAPORE Rev 1
ATTN: SERVICE & REPAIR DEPT
TEL: (65) 6861 1566 Cust RFQ QTE-DSW-00703-1
FAX: (65) 6861 0796
Cust Num 11102
Page 37 of 37

Sales Quote Acknowledgement Please reference this Quote Number on all correspondence.

Details Cont.
Unit Ext Net Delivery
Line Item Description UM Qty Ord Price Net Price Price (wks)
__________________________________________________________________________________________________
End of Sales Quote Acknowledgement 1056864 Rev 1:
SECTION 3

Photos

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241
Components of TDS-4H Top Drive Assembly
Initial Stage

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 1 of 9


Components of TDS-4H Top Drive Assembly
Initial Stage

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 2 of 9


Components of TDS-4H Top Drive Assembly
Initial Stage

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 3 of 9


Components of TDS-4H Top Drive Assembly
Initial Stage

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 4 of 9


Components of TDS-4H Top Drive Assembly
Initial Stage

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 5 of 9


Components of TDS-4H Top Drive Assembly
Initial Stage

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 6 of 9


Components of TDS-4H Top Drive Assembly
Initial Stage

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 7 of 9


Components of TDS-4H Top Drive Assembly
Initial Stage

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 8 of 9


Components of TDS-4H Top Drive Assembly
Initial Stage

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 9 of 9


Components of TDS-4H Top Drive Assembly
Assembly / Testing Stage

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 1 of 4


Components of TDS-4H Top Drive Assembly
Assembly / Testing Stage

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 2 of 4


Components of TDS-4H Top Drive Assembly
Assembly / Testing Stage

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 3 of 4


Components of TDS-4H Top Drive Assembly
Assembly / Testing Stage

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 4 of 4


SECTION 4

MPI Reports

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241
REPORT NUMBER : MT 038/5/08
DATE OF INSPECTION : 7/5/2008
PAGE PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : QUILL SHAFT PART NUMBER : N.A
TUBO.W.O.NO: 34557 VARCO.W.O.NO: NA SERIAL NUMBER: N.A
ACCEPTANCE CRITERIA : AS PER API RP 8B PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: 2003111
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

MAGNETIC PARTICLE INSPECTION (WET METHOD) WAS PERFORMED ON ALL AREAS OF THE ABOVE
MENTIONED ITEMS, UTILIZING 220V AC YOKE, AND FLUORESCENT PARTICLE SOLUTIONS.

RESULTS :
NO VISIBLE CRACK INDICATIONS WAS FOUND ON ITEM AT TIME OF INSPECTION.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE: 7/5/2008

Print & Sign

038 DSW 5619 Quill Shaft.xls


REPORT NUMBER : MT 038/5/08
DATE OF INSPECTION : 7/5/2008
PAGE : PAGE 2 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : QUILL SHAFT SERIAL NUMBER : N.A

COMMENTS ON VIEW SHOWN ABOVE :


NO VISIBLE CRACK INDICATIONS WAS FOUND ON ITEM AT TIME OF INSPECTION.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE : 7/5/2008

Print & Sign


REPORT NUMBER : MT 037/5/08
DATE OF INSPECTION : 7/5/2008
PAGE PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : ACCUMULATOR PART NUMBER : N.A
TUBO.W.O.NO: 34557 VARCO.W.O.NO: NA SERIAL NUMBER: N.A
ACCEPTANCE CRITERIA : AS PER API RP 8B PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: 2003111
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

MAGNETIC PARTICLE INSPECTION (WET METHOD) WAS PERFORMED ON ALL AREAS OF THE ABOVE
MENTIONED ITEMS, UTILIZING 220V AC YOKE, AND FLUORESCENT PARTICLE SOLUTIONS.

RESULTS :
NO VISIBLE CRACK INDICATIONS WAS FOUND ON ITEM AT TIME OF INSPECTION.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE: 7/5/2008

Print & Sign

037 DSW 5619 Accumulator.xls


REPORT NUMBER : MT 037/5/08
DATE OF INSPECTION : 7/5/2008
PAGE : PAGE 2 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : ACCUMULATOR SERIAL NUMBER : N.A

COMMENTS ON VIEW SHOWN ABOVE :


NO VISIBLE CRACK INDICATIONS WAS FOUND ON ITEM AT TIME OF INSPECTION.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE : 7/5/2008

Print & Sign


REPORT NUMBER : MT 036/5/08
DATE OF INSPECTION : 7/5/2008
PAGE PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 SET OF 3 PCS
ITEM INSPECTED : BRACKET ROLLER ARMS ASSEMBLY PART NUMBER : N.A
TUBO.W.O.NO: 34557 VARCO.W.O.NO: NA SERIAL NUMBER: N.A
ACCEPTANCE CRITERIA : AS PER API RP 8B PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: 2003111
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

MAGNETIC PARTICLE INSPECTION (WET METHOD) WAS PERFORMED ON ALL AREAS OF THE ABOVE
MENTIONED ITEMS, UTILIZING 220V AC YOKE, AND FLUORESCENT PARTICLE SOLUTIONS.

RESULTS :
NO VISIBLE CRACK INDICATIONS WERE FOUND ON ALL ITEMS AT TIME OF INSPECTION.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE: 7/5/2008

Print & Sign

036 DSW 5619 Bracket Roller Arm Assy.xls


REPORT NUMBER : MT 036/5/08
DATE OF INSPECTION : 7/5/2008
PAGE : PAGE 2 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : QUANTITY :
NATIONAL OILWELL VARCO WORKSHOP 1 SET OF 3 PCS
ITEM INSPECTED : BRACKET ROLLER ARMS ASSEMBLY SERIAL NUMBER : N.A

COMMENTS ON VIEW SHOWN ABOVE :


NO VISIBLE CRACK INDICATIONS WERE FOUND ON ITEMS AT TIME OF INSPECTION.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE : 7/5/2008

Print & Sign


REPORT NUMBER : MT 035/5/08
DATE OF INSPECTION : 7/5/2008
PAGE PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 SET OF 2 PCS
ITEM INSPECTED : TRUNNION BLOCKS PART NUMBER : N.A
TUBO.W.O.NO: 34557 VARCO.W.O.NO: NA SERIAL NUMBER: N.A
ACCEPTANCE CRITERIA : AS PER API RP 8B PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: 2003111
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

MAGNETIC PARTICLE INSPECTION (WET METHOD) WAS PERFORMED ON ALL AREAS OF THE ABOVE
MENTIONED ITEMS, UTILIZING 220V AC YOKE, AND FLUORESCENT PARTICLE SOLUTIONS.

RESULTS :
NO VISIBLE CRACK INDICATIONS WERE FOUND ON BOTH ITEMS AT TIME OF INSPECTION.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE: 7/5/2008

Print & Sign

035 DSW 5619 Trunnion Blocks.xls


REPORT NUMBER : MT 035/5/08
DATE OF INSPECTION : 7/5/2008
PAGE : PAGE 2 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 SET OF 2 PCS
ITEM INSPECTED : TRUNNION BLOCKS SERIAL NUMBER : N.A

COMMENTS ON VIEW SHOWN ABOVE :


NO VISIBLE CRACK INDICATIONS WERE FOUND ON BOTH ITEMS AT TIME OF INSPECTION.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE : 7/5/2008

Print & Sign


REPORT NUMBER : MT 034/5/08
DATE OF INSPECTION : 7/5/2008
PAGE PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : S-PIPE BRACKET PART NUMBER : N.A
TUBO.W.O.NO: 34557 VARCO.W.O.NO: NA SERIAL NUMBER: N.A
ACCEPTANCE CRITERIA : AS PER API RP 8B PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: 2003111
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

MAGNETIC PARTICLE INSPECTION (WET METHOD) WAS PERFORMED ON ALL AREAS OF THE ABOVE
MENTIONED ITEMS, UTILIZING 220V AC YOKE, AND FLUORESCENT PARTICLE SOLUTIONS.

RESULTS :
NO VISIBLE CRACK INDICATIONS WAS FOUND ON ITEM AT TIME OF INSPECTION.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE: 7/5/2008

Print & Sign

034 DSW 5619 S-Pipe Bracket.xls


REPORT NUMBER : MT 034/5/08
DATE OF INSPECTION : 7/5/2008
PAGE : PAGE 2 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : S-PIPE BRACKET SERIAL NUMBER : N.A

COMMENTS ON VIEW SHOWN ABOVE :


NO VISIBLE CRACK INDICATIONS WAS FOUND ON ITEM AT TIME OF INSPECTION.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE : 7/5/2008

Print & Sign


REPORT NUMBER : MT 033/5/08
DATE OF INSPECTION : 7/5/2008
PAGE PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : MOTOR ALIGNMENT CYCLINDER PART NUMBER : N.A
TUBO.W.O.NO: 34557 VARCO.W.O.NO: NA SERIAL NUMBER: N.A
ACCEPTANCE CRITERIA : AS PER API RP 8B PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: 2003111
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

MAGNETIC PARTICLE INSPECTION (WET METHOD) WAS PERFORMED ON ALL AREAS OF THE ABOVE
MENTIONED ITEMS, UTILIZING 220V AC YOKE, AND FLUORESCENT PARTICLE SOLUTIONS.

RESULTS :
BLIND END BLOCK FOUND CRACKS.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)


AS PER N.O.V'S RECOMMENDATIONS.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE: 7/5/2008

Print & Sign

033 DSW 5619 Motor Alignment Cyclinder.xls


REPORT NUMBER : MT 033/5/08
DATE OF INSPECTION : 7/5/2008
PAGE : PAGE 2 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : QUANTITY :
NATIONAL OILWELL VARCO WORKSHOP 1 PC
ITEM INSPECTED : MOTOR ALIGNMENT CYCLINDER SERIAL NUMBER : N.A

COMMENTS ON VIEW SHOWN ABOVE :


BLIND END BLOCK FOUND CRACKS.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE : 7/5/2008

Print & Sign


REPORT NUMBER : MT 032/5/08
DATE OF INSPECTION : 7/5/2008
PAGE PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : CAM PART NUMBER : N.A
TUBO.W.O.NO: 34557 VARCO.W.O.NO: NA SERIAL NUMBER: N.A
ACCEPTANCE CRITERIA : AS PER API RP 8B PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: 2003111
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

MAGNETIC PARTICLE INSPECTION (WET METHOD) WAS PERFORMED ON ALL AREAS OF THE ABOVE
MENTIONED ITEMS, UTILIZING 220V AC YOKE, AND FLUORESCENT PARTICLE SOLUTIONS.

RESULTS :
MPI CHECKED - OK. CAM FOUND SEVERELY WORN.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)


AS PER N.O.V'S RECOMMENDATIONS.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE: 7/5/2008

Print & Sign

032 DSW 5619 Cam.xls


REPORT NUMBER : MT 032/5/08
DATE OF INSPECTION : 7/5/2008
PAGE : PAGE 2 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : CAM SERIAL NUMBER : N.A

CONDITIONS OF WEAR ON CAM


COMMENTS ON VIEW SHOWN ABOVE :
MPI CHECKED - OK. CAM FOUND SEVERELY WORN.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE : 7/5/2008

Print & Sign


REPORT NUMBER : MT 031/5/08
DATE OF INSPECTION : 7/5/2008
PAGE PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : AUTO-RETURN CYCLINDER PART NUMBER : N.A
TUBO.W.O.NO: 34557 VARCO.W.O.NO: NA SERIAL NUMBER: N.A
ACCEPTANCE CRITERIA : AS PER API RP 8B PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: 2003111
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

MAGNETIC PARTICLE INSPECTION (WET METHOD) WAS PERFORMED ON ALL AREAS OF THE ABOVE
MENTIONED ITEMS, UTILIZING 220V AC YOKE, AND FLUORESCENT PARTICLE SOLUTIONS.

RESULTS :
SCATTERED CRACKS FOUND ON ROD END AND BLIND END BLOCKS.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)


AS PER N.O.V'S RECOMMENDATIONS.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE: 7/5/2008

Print & Sign

031 DSW 5619 Auto-Return Cyclinder.xls


REPORT NUMBER : MT 031/5/08
DATE OF INSPECTION : 7/5/2008
PAGE : PAGE 2 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : AUTO-RETURN CYCLINDER SERIAL NUMBER : N.A

COMMENTS ON VIEW SHOWN ABOVE :


SCATTERED CRACKS FOUND ON ROD END AND BLIND END BLOCKS.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE : 7/5/2008

Print & Sign


REPORT NUMBER : MT 030/5/08
DATE OF INSPECTION : 7/5/2008
PAGE PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : RETRACT DOLLY PART NUMBER : N.A
TUBO.W.O.NO: 34557 VARCO.W.O.NO: NA SERIAL NUMBER: N.A
ACCEPTANCE CRITERIA : AS PER API RP 8B PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: 2003111
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

MAGNETIC PARTICLE INSPECTION (WET METHOD) WAS PERFORMED ON ALL WELDMENTS OF THE ABOVE
MENTIONED ITEMS, UTILIZING 220V AC YOKE, AND BLACK/WHITE CONTRAST MEDIUMS.

RESULTS :
2 CRACKS WERE FOUND ON WELDMENTS AT TIME OF INSPECTION.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)


AS PER N.O.V'S RECOMMENDATIONS.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE: 7/5/2008

Print & Sign

030 DSW 5619 Retract Dolly.xls


REPORT NUMBER : MT 030/5/08
DATE OF INSPECTION : 7/5/2008
PAGE : PAGE 2 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : RETRACT DOLLY SERIAL NUMBER : N.A

NO.1 CRACK

NO.2 CRACK
COMMENTS ON VIEW SHOWN ABOVE :
TOTAL 2 CRACKS FOUND AT TIME OF INSPECTION.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE : 7/5/2008

Print & Sign


REPORT NUMBER : MT 020/7/08
DATE OF INSPECTION : 8/7/2008
PAGE PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : PINION GEAR ( AFTER ASSEMBLY) PART NUMBER : N.A
TUBO.W.O.NO: 34796 VARCO.W.O.NO: NA SERIAL NUMBER: N.A
ACCEPTANCE CRITERIA : AS PER API RP 8B PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: 2003111
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

MAGNETIC PARTICLE INSPECTION (WET METHOD) WAS PERFORMED ON ALL AREAS OF THE ABOVE
MENTIONED ITEMS, UTILIZING 220V AC YOKE, AND FLUORESCENT PARTICLE SOLUTIONS.

RESULTS :
NO VISIBLE CRACK INDICATIONS WAS FOUND ON ITEM AT TIME OF INSPECTION.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE: 8/7/2008

Print & Sign

020 DSW 5619 Pinion Gear-After Assembly.xls


REPORT NUMBER : MT 020/7/08
DATE OF INSPECTION : 8/7/2008
PAGE : PAGE 2 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : QUANTITY :
NATIONAL OILWELL VARCO WORKSHOP 1 PC
ITEM INSPECTED : PINION GEAR (AFTER ASSEMBLY) PART NUMBER : N.A

COMMENTS ON VIEW SHOWN ABOVE :


NO VISIBLE CRACK INDICATIONS WAS FOUND ON ITEM AT TIME OF INSPECTION.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE : 8/7/2008

Print & Sign


REPORT NUMBER : MT 013/5/08
DATE OF INSPECTION : 3/5/2008
PAGE PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : PINION GEAR BEFORE ASSEMBLY PART NUMBER : N.A
TUBO.W.O.NO: 34557 VARCO.W.O.NO: NA SERIAL NUMBER: N.A
ACCEPTANCE CRITERIA : AS PER API RP 8B PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: 2003111
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

MAGNETIC PARTICLE INSPECTION (WET METHOD) WAS PERFORMED ON ALL AREAS OF THE ABOVE
MENTIONED ITEMS, UTILIZING 220V AC YOKE, AND FLUORESCENT PARTICLE SOLUTIONS.

RESULTS :
NO VISIBLE CRACK INDICATIONS WAS FOUND ON ITEM AT TIME OF INSPECTION.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE: 3/5/2008

Print & Sign

013 DSW 5619 Pinion Gear Before Assy.xls


REPORT NUMBER : MT 013/5/08
DATE OF INSPECTION : 3/5/2008
PAGE : PAGE 2 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : QUANTITY :
NATIONAL OILWELL VARCO WORKSHOP 1 PC
ITEM INSPECTED : PINION GEAR BEFORE ASSEMBLY SERIAL NUMBER : N.A

COMMENTS ON VIEW SHOWN ABOVE :


NO VISIBLE CRACK INDICATIONS WAS FOUND ON ITEM AT TIME OF INSPECTION.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE : 3/5/2008

Print & Sign


REPORT NUMBER : MT 012/6/08
DATE OF INSPECTION : 3/6/2008
PAGE PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : QUILL SHAFT HOUSING PART NUMBER : N.A
TUBO.W.O.NO: 34757 VARCO.W.O.NO: NA SERIAL NUMBER: N.A
ACCEPTANCE CRITERIA : AS PER API RP 8B PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: 2003111
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

MAGNETIC PARTICLE INSPECTION (WET METHOD) WAS PERFORMED ON ALL AREAS OF THE ABOVE
MENTIONED ITEMS, UTILIZING 220V AC YOKE, AND FLUORESCENT PARTICLE SOLUTIONS.

RESULTS :
NO VISIBLE CRACK INDICATIONS WAS FOUND ON ITEM AT TIME OF INSPECTION.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE: 3/6/2008

Print & Sign

012 DSW 5619 Quill Shaft Housing.xls


REPORT NUMBER : MT 012/6/08
DATE OF INSPECTION : 3/6/2008
PAGE : PAGE 2 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : QUILL SHAFT HOUSING SERIAL NUMBER : N.A

COMMENTS ON VIEW SHOWN ABOVE :


NO VISIBLE CRACK INDICATIONS WAS FOUND ON ITEM AT TIME OF INSPECTION.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE : 3/6/2008

Print & Sign


REPORT NUMBER : MT 011/6/08
DATE OF INSPECTION : 3/6/2008
PAGE PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : UPPER GEAR CASE PART NUMBER : N.A
TUBO.W.O.NO: 34757 VARCO.W.O.NO: NA SERIAL NUMBER: N.A
ACCEPTANCE CRITERIA : AS PER API RP 8B PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: 2003111
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

MAGNETIC PARTICLE INSPECTION (WET METHOD) WAS PERFORMED ON ALL AREAS OF THE ABOVE
MENTIONED ITEMS, UTILIZING 220V AC YOKE, AND FLUORESCENT PARTICLE SOLUTIONS.

RESULTS :
NO VISIBLE CRACK INDICATIONS WAS FOUND ON ITEM AT TIME OF INSPECTION.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE: 3/6/2008

Print & Sign

011 DSW 5619 Upper Gear Case.xls


REPORT NUMBER : MT 011/6/08
DATE OF INSPECTION : 3/6/2008
PAGE : PAGE 2 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : UPPER GEAR CASE SERIAL NUMBER : N.A

COMMENTS ON VIEW SHOWN ABOVE :


NO VISIBLE CRACK INDICATIONS WAS FOUND ON ITEM AT TIME OF INSPECTION.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE : 3/6/2008

Print & Sign


REPORT NUMBER : MT 010/6/08
DATE OF INSPECTION : 3/6/2008
PAGE PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : FLANGE ROTATING HEAD PART NUMBER : N.A
TUBO.W.O.NO: 34757 VARCO.W.O.NO: NA SERIAL NUMBER: N.A
ACCEPTANCE CRITERIA : AS PER API RP 8B PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: 2003111
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

MAGNETIC PARTICLE INSPECTION (WET METHOD) WAS PERFORMED ON ALL AREAS OF THE ABOVE
MENTIONED ITEMS, UTILIZING 220V AC YOKE, AND FLUORESCENT PARTICLE SOLUTIONS.

RESULTS :
NO VISIBLE CRACK INDICATIONS WAS FOUND ON ITEM AT TIME OF INSPECTION.
FLAKING FOUND ON PLATED AREAS.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)


AS PER N.O.V'S RECOMMENDATIONS.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE: 3/6/2008

Print & Sign

010 DSW 5619 Flange Rotating Head.xls


REPORT NUMBER : MT 010/6/08
DATE OF INSPECTION : 3/6/2008
PAGE : PAGE 2 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : FLANGE ROTATING HEAD SERIAL NUMBER : N.A

6 AREAS FOUND FLAKING

COMMENTS ON VIEW SHOWN ABOVE :


NO VISIBLE CRACK INDICATIONS WAS FOUND ON ITEM AT TIME OF INSPECTION.
FLAKING FOUND ON PLATED AREAS.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE : 3/6/2008

Print & Sign


REPORT NUMBER : MT 009/6/08
DATE OF INSPECTION : 3/6/2008
PAGE PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 SET OF 2 PCS
ITEM INSPECTED : LINKS PART NUMBER : N.A
TUBO.W.O.NO: 34757 VARCO.W.O.NO: NA SERIAL NUMBER: N.A
ACCEPTANCE CRITERIA : AS PER API RP 8B PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: 2003111
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

MAGNETIC PARTICLE INSPECTION (WET METHOD) WAS PERFORMED ON ALL AREAS OF THE ABOVE
MENTIONED ITEMS, UTILIZING 220V AC YOKE, AND FLUORESCENT PARTICLE SOLUTIONS.

RESULTS :
NO VISIBLE CRACK INDICATIONS WERE FOUND ON BOTH ITEMS AT TIME OF INSPECTION.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE: 3/6/2008

Print & Sign

009 DSW 5619 Links.xls


REPORT NUMBER : MT 009/6/08
DATE OF INSPECTION : 3/6/2008
PAGE : PAGE 2 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 SET OF 2 PCS
ITEM INSPECTED : LINKS SERIAL NUMBER : N.A

COMMENTS ON VIEW SHOWN ABOVE :


NO VISIBLE CRACK INDICATIONS WERE FOUND ON BOTH ITEMS AT TIME OF INSPECTION.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE : 3/6/2008

Print & Sign


REPORT NUMBER : MT 008/6/08
DATE OF INSPECTION : 2/6/2008
PAGE PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : LOWER GEAR CASE PART NUMBER : N.A
TUBO.W.O.NO: 34757 VARCO.W.O.NO: NA SERIAL NUMBER: N.A
ACCEPTANCE CRITERIA : AS PER API RP 8B PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: 2003111
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

MAGNETIC PARTICLE INSPECTION (WET METHOD) WAS PERFORMED ON ALL AREAS OF THE ABOVE
MENTIONED ITEMS, UTILIZING 220V AC YOKE, AND FLUORESCENT PARTICLE SOLUTIONS.

RESULTS :
NO VISIBLE CRACK INDICATIONS WAS FOUND ON ITEM AT TIME OF INSPECTION.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE: 2/6/2008

Print & Sign

008 DSW 5619 Lower Gear Case.xls


REPORT NUMBER : MT 008/6/08
DATE OF INSPECTION : 2/6/2008
PAGE : PAGE 2 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : LOWER GEAR CASE SERIAL NUMBER : N.A

COMMENTS ON VIEW SHOWN ABOVE :


NO VISIBLE CRACK INDICATIONS WAS FOUND ON ITEM AT TIME OF INSPECTION.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE : 2/6/2008

Print & Sign


REPORT NUMBER : MT 007/6/08
DATE OF INSPECTION : 2/6/2008
PAGE PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : SWIVEL ROTATING HEAD PART NUMBER : N.A
TUBO.W.O.NO: 34757 VARCO.W.O.NO: NA SERIAL NUMBER: N.A
ACCEPTANCE CRITERIA : AS PER API RP 8B PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: 2003111
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

MAGNETIC PARTICLE INSPECTION (WET METHOD) WAS PERFORMED ON ALL AREAS OF THE ABOVE
MENTIONED ITEMS, UTILIZING 220V AC YOKE, AND FLUORESCENT PARTICLE SOLUTIONS.

RESULTS :
NO VISIBLE CRACK INDICATIONS WAS FOUND ON ITEM AT TIME OF INSPECTION.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE: 2/6/2008

Print & Sign

007 DSW 5619 Swivel Rotating Head.xls


REPORT NUMBER : MT 007/6/08
DATE OF INSPECTION : 2/6/2008
PAGE : PAGE 2 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : SWIVEL ROTATING HEAD SERIAL NUMBER : N.A

COMMENTS ON VIEW SHOWN ABOVE :


NO VISIBLE CRACK INDICATIONS WAS FOUND ON ITEM AT TIME OF INSPECTION.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE : 2/6/2008

Print & Sign


REPORT NUMBER : MT 006/6/08
DATE OF INSPECTION : 2/6/2008
PAGE PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : UPPER BEARING RETAINER PART NUMBER : N.A
TUBO.W.O.NO: 34757 VARCO.W.O.NO: NA SERIAL NUMBER: N.A
ACCEPTANCE CRITERIA : AS PER API RP 8B PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: 2003111
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

MAGNETIC PARTICLE INSPECTION (WET METHOD) WAS PERFORMED ON ALL AREAS OF THE ABOVE
MENTIONED ITEMS, UTILIZING 220V AC YOKE, AND FLUORESCENT PARTICLE SOLUTIONS.

RESULTS :
NO VISIBLE CRACK INDICATIONS WAS FOUND ON ITEM AT TIME OF INSPECTION.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE: 2/6/2008

Print & Sign

006 DSW 5619 Upper Bearing Retainer.xls


REPORT NUMBER : MT 006/6/08
DATE OF INSPECTION : 2/6/2008
PAGE : PAGE 2 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : UPPER BEARING RETAINER SERIAL NUMBER : N.A

COMMENTS ON VIEW SHOWN ABOVE :


NO VISIBLE CRACK INDICATIONS WAS FOUND ON ITEM AT TIME OF INSPECTION.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE : 2/6/2008

Print & Sign


REPORT NUMBER : MT 005/5/08
DATE OF INSPECTION : 2/5/2008
PAGE PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 2 PCS
ITEM INSPECTED : COMPOUND SHAFTS ( LOW & HIGH ) PART NUMBER : N.A
TUBO.W.O.NO: 34557 VARCO.W.O.NO: NA SERIAL NUMBER: N.A
ACCEPTANCE CRITERIA : AS PER API RP 8B PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: 2003111
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

MAGNETIC PARTICLE INSPECTION (WET METHOD) WAS PERFORMED ON ALL AREAS OF THE ABOVE
MENTIONED ITEMS, UTILIZING 220V AC YOKE, AND FLUORESCENT PARTICLE SOLUTIONS.

RESULTS :
NO VISIBLE CRACK INDICATION WAS FOUND AT TIME OF INSPECTION.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)


AS PER NOV'S RECOMMENDATIONS.

TPI STAMP & SIGN : INSPECTED BY : JAI SANKAR. DATE: 2/5/2008

Print & Sign

005DSW 5619.COM SHAFTS.xls


REPORT NUMBER : MT 005/5/08
DATE OF INSPECTION : 2/5/2008
PAGE : PAGE 2OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 2PCS
ITEM INSPECTED : COMPOUND SHAFTS (LOW& HIGH ) SERIAL NUMBER : N.A

COMMENTS ON VIEW SHOWN ABOVE :

TPI STAMP & SIGN : INSPECTED BY : JAI SANKAR DATE : 2/5/2008

Print & Sign


REPORT NUMBER : MT 005/6/08
DATE OF INSPECTION : 2/6/2008
PAGE PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : MOUNTING PLATE J-BOX MANIFOLD PART NUMBER : N.A
TUBO.W.O.NO: 34757 VARCO.W.O.NO: NA SERIAL NUMBER: N.A
ACCEPTANCE CRITERIA : AS PER API RP 8B PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: 2003111
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

MAGNETIC PARTICLE INSPECTION (WET METHOD) WAS PERFORMED ON ALL WELDMENTS OF THE ABOVE
MENTIONED ITEMS, UTILIZING 220V AC YOKE, AND FLUORESCENT PARTICLE SOLUTIONS.

RESULTS :
NO VISIBLE CRACK INDICATIONS WERE FOUND ON ALL WELDMENTS AT TIME OF INSPECTION.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE: 2/6/2008

Print & Sign

005 DSW 5619 Mounting Plate J-Box Manifold.xls


REPORT NUMBER : MT 005/6/08
DATE OF INSPECTION : 2/6/2008
PAGE : PAGE 2 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : QUANTITY :
NATIONAL OILWELL VARCO WORKSHOP 1 PC
ITEM INSPECTED : MOUNTING PLATE J-BOX MANIFOLD SERIAL NUMBER : N.A

COMMENTS ON VIEW SHOWN ABOVE :


NO VISIBLE CRACK INDICATIONS WERE FOUND ON ALL WELDMENTS AT TIME OF INSPECTION.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE : 2/6/2008

Print & Sign


REPORT NUMBER : MT 004/5/08
DATE OF INSPECTION : 2/5/2008
PAGE PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : BULLGEAR PART NUMBER : N.A
TUBO.W.O.NO: 34557 VARCO.W.O.NO: NA SERIAL NUMBER: N.A
ACCEPTANCE CRITERIA : AS PER API RP 8B PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: 2003111
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

MAGNETIC PARTICLE INSPECTION (WET METHOD) WAS PERFORMED ON ALL AREAS OF THE ABOVE
MENTIONED ITEMS, UTILIZING 220V AC YOKE, AND FLUORESCENT PARTICLE SOLUTIONS.

RESULTS :
NO VISIBLE CRACK INDICATION WAS FOUND AT TIME OF INSPECTION.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)


AS PER NOV'S RECOMMENDATIONS.

TPI STAMP & SIGN : INSPECTED BY : JAI SANKAR. DATE: 2/5/2008

Print & Sign

004DSW 5619BULLGEAR.xls
REPORT NUMBER : MT 004/5/08
DATE OF INSPECTION : 2/5/2008
PAGE : PAGE 2OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1PC
ITEM INSPECTED : BULLGEAR SERIAL NUMBER : N.A

COMMENTS ON VIEW SHOWN ABOVE :

TPI STAMP & SIGN : INSPECTED BY : JAI SANKAR DATE : 2/5/2008

Print & Sign


REPORT NUMBER : MT 003/5/08
DATE OF INSPECTION : 2/5/2008
PAGE PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : COMPOUND GEAR (LOW ) PART NUMBER : N.A
TUBO.W.O.NO: 34557 VARCO.W.O.NO: NA SERIAL NUMBER: N.A
ACCEPTANCE CRITERIA : AS PER API RP 8B PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: 2003111
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

MAGNETIC PARTICLE INSPECTION (WET METHOD) WAS PERFORMED ON ALL AREAS OF THE ABOVE
MENTIONED ITEMS, UTILIZING 220V AC YOKE, AND FLUORESCENT PARTICLE SOLUTIONS.

RESULTS :
NO VISIBLE CRACK INDICATION WAS FOUND AT TIME OF INSPECTION.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)


AS PER NOV'S RECOMMENDATIONS.

TPI STAMP & SIGN : INSPECTED BY : JAI SANKAR. DATE: 2/5/2008

Print & Sign

003DSW 5619.L GEAR.xls


REPORT NUMBER : MT 003/5/08
DATE OF INSPECTION : 2/5/2008
PAGE : PAGE 2OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1PC
ITEM INSPECTED : COMPOUND GEAR ( LOW ) SERIAL NUMBER : N.A

COMMENTS ON VIEW SHOWN ABOVE :

TPI STAMP & SIGN : INSPECTED BY : JAI SANKAR DATE : 2/5/2008

Print & Sign


REPORT NUMBER : MT 002/5/08
DATE OF INSPECTION : 2/5/2008
PAGE PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : COMPOUND GEAR ( HIGH ) PART NUMBER : N.A
TUBO.W.O.NO: 34557 VARCO.W.O.NO: NA SERIAL NUMBER: N.A
ACCEPTANCE CRITERIA : AS PER API RP 8B PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: 2003111
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

MAGNETIC PARTICLE INSPECTION (WET METHOD) WAS PERFORMED ON ALL AREAS OF THE ABOVE
MENTIONED ITEMS, UTILIZING 220V AC YOKE, AND FLUORESCENT PARTICLE SOLUTIONS.

RESULTS :
CRACK WAS FOUND GEAR INNER AREAS.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)


AS PER NOV'S RECOMMENDATIONS.

TPI STAMP & SIGN : INSPECTED BY : JAI SANKAR. DATE: 2/5/2008

Print & Sign

002DSW 5619.H GEAR.xls


REPORT NUMBER : MT 002/5/08
DATE OF INSPECTION : 2/5/2008
PAGE : PAGE 2OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1PC
ITEM INSPECTED : COMPOUND GEAR( HIGH) SERIAL NUMBER : N.A

CRACKS ON COMPOUND GEAR

COMMENTS ON VIEW SHOWN ABOVE :

TPI STAMP & SIGN : INSPECTED BY : JAI SANKAR DATE : 2/5/2008

Print & Sign


REPORT NUMBER : MT 039/5/08
DATE OF INSPECTION : 7/5/2008
PAGE : PAGE 1 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER P.O. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : MAIN SHAFT PART NO : 90281
TUBO.W.O.NO: 34557 S/NO : BD 77 V
ACCEPTANCE CRITERIA : AS PER API RP 7G PROCEDURE NO.: SOP 2000 Rev.0

MATERIAL : STEEL STAGE OF EXAMINATION :


TEMPERATURE : AMBIENT INITIAL INTERMEDIATE FINAL
SURFACE PREPARATION : GRINDING BUFFING BLASTED OTHERS
MAGNETIZATION UNIT : 220V DC COIL SERIAL NO.: NEW TECH COIL - 07190214
MAGNETIZATION CABLE WRAP MAGNETIZING CURRENT : 4.8 AMPS.
TECHNIQUE : COIL NUMBER OF COIL TURNS : 1800 TURNS
CENTRAL CONDUCTOR † AC † DC
PERMANENT MAGNET LIFTING CAPACITY : 10 LBS.
YOKE POLE SPACING : 3 TO 6 INCH.
AC DC
TESTING MEDIUM : DRY WET FLUORESCENT
TYPE : MAGNAGLO 14A COLOR : GREEN APPLICATION : SPRAY
CONTRAST MEDIUM : TYPE : MAGNAGLO WCP-2 COLOR : WHITE DRYING TIME : NA
BLACK LIGHT UNIT : SPECTROLINE 1400 μW/cm² @ 15" SERIAL NO.: 1451323
WET PARTICLE CONCENTRATION : 0.1 - 0.4 % MAGNETIC FIELD INDICATION TYPE : CASTROL STRIP
REMARKS / COMMENTS :

1) PRE-CLEANING PRIOR TO INSPECTION

2) VISUAL THREAD INSPECTION, WALL THICKNESS MEASUREMENT, DIMENSIONAL CHECKS AND


FULL LENGTH FLUORESCENT MAGNETIC PARTICLE INSPECTION.

3) WALL THICKNESS MEASUREMENT ON 10 SECTIONS ON MAINSHAFT INCLUDING 7 5/8 AND


6 5/8 PIN STRESS RELIEVE GROOVE.

RESULTS :
NO REJECTABLE DEFECTS WAS FOUND ON ITEM AS PER API RP7G AND VARCO'S SPECIFICATION
AT TIME OF INSPECTION. CENTER SPLINE FOUND SLIGHT WORN.

(REFER TO ATTACHED PHOTOGRAPHS)

RECOMMENDATIONS : (if any)


AS PER N.OV'S RECOMMENDATIONS

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE: 7/5/2008

Print & Sign

039 DSW 5619 Mainshaft.xls


REPORT NUMBER : MT 039/5/08
DATE OF INSPECTION : 7/5/2008
PAGE : PAGE 2 OF 2
MAGNETIC PARTICLE INSPECTION REPORT
CUSTOMER : NATIONAL OILWELL VARCO CUSTOMER JOB. NUMBER : DSW 5619
LOCATION : NATIONAL OILWELL VARCO WORKSHOP QUANTITY : 1 PC
ITEM INSPECTED : MAIN SHAFT S/NO : BD 77 V

I.D BORE AFTER RATTLING

BOTH 7 5/8 AND 6 5/8 REG PIN CONNECTION V.T.I CHECKED - OK

CENTER SPLINE FOUND SLIGHT WORN


COMMENTS ON VIEW SHOWN ABOVE :
NO REJECTABLE DEFECTS WAS FOUND ON MAINSHAFT AS PER VARCO'S SPECIFICATION AND
API RP7G AT TIME OF INSPECTION.

TPI STAMP & SIGN : INSPECTED BY : JONATHAN DATE : 7/5/2008

Print & Sign


SUMMARY OF TOOL INSPECTION
The Results of Tool inspection Reported By the Company To the Customer Represent Good Faith Opinions only
And Are not to be Considered Warranties Or Guarantees Of Quality,Classification,Or Usability Of Tool Inspected

Customer: NATIONAL OILWELL VARCO Date : 7/5/2008


Well/ Rig: NOT APPLICABLE RPT.No # MT 039/5/08
Location: NATONAL OILWELL VARCO WORKSHOP JOB.No # DSW 5619

Quantity Need
SUMMARY OK Reject Remarks
Inspected Repair

Type Of Inspection:
VISUAL THREAD INSPECTION, DIMENSIONAL CHECK AS PER API RP7G

1 LENGTH MAIN SHAFT


S/NO : BD77V, PART NO : 90281
PREMIUM 7 5/8 REG PIN (LH) x 6 5/8 REG (RH) PIN CONNECTION X

COMMENTS : INSPECTION REPORT ATTACHED

Serviced by : JONATHAN

F005- (Summary) Rev 2001-10-31


F003 (BHA)
Rev 2003-01-02

BHA & Subs Equipment Inspection Report


Customer NATIONAL OILWELL VARCO WO DSW 5619 Well - Date 7/5/2008 Inspector JONATHAN Tubo RPT.No: MT 039/5/08

Insp.
Size 9 23/32"" ID 3 1/16" Connections 7 5/8REG (LH) PIN x 6 5/8REG (RH) PIN BSR Range to Type
API RP7G Other MAINSHAFT

Center Pad (HWDP),


Elevator & Slip Groove
Pin Connection Box Connection

Boreback Length
Stress Relief Length

Hardband Condition
Elevator Recess (DC)

Boreback Diam.
Slip Recess (DC)

Bevel Diameter
Stress Relief OD

BSR (DC only)

BSR (DC only)

Box Condition
Bevel Diameter
Thd/Seal Cond

Thd/Seal Cond
Thread Length

Pin Condition
Thread Type

Thread Type

Qc Diameter
Tool Description

Tong Space

Tong Space
Neck Length

Seal Width
Qc Depth
Reface

Reface
Length
S/NO :

Lead
OD

OD

OD
ID
REMARKS

BD 77V M.S 10.81 - - - 7 5/8REG 9 23/32" 3 3/32" - OK - - - - OK - - - OK - - - - - - - - - - - - - - AS MENTIONED

6 5/8REG 7 3/4" 3 1/16" - OK - - - - OK - - - OK - - - - - - - - - - - - - -

Tool Description: DC: Drill Collar, HW: Heavy Wate, XO: X-Over, BS: Bit Sub, LS: Lifting Sub: KC: Kelly Cock, SE: Side Entry Sub Ok: Operative

PT:pitted threads, PS:pitted seal GS:galled seal, GT:galled threads, DS:damage seal, DT: damage thread, CK:crack, RB: rebevel, BB: Belled Box OPERATIVE 2 Total Refaced OPERATIVE P: Req. Pin

ES
S
PIN

OX
W:washout, PSRG: pitted stress relieve groove, F&C:face and chase FIELD REPR. Pin Box FIELD REPR. B: Req. Box

LB
AL

PAINT BANDS WHITE:OK, RED:scrap BLUE:Shop Rpr. GREEN: Field Rpr. SHOP REPR SHOP REPR C: Req. Cen. Pad

TA
TOT

TO
SCRAP SCRAP G: Req. Grooves

Comments CENTER SPLINE FOUND SLIGHT WORN.


UT WALL THICKNESS REPORT

DATE 7/5/2008

CUSTOMER NATIONAL OILWELL VARCO

TUBO RPT. NO UT 039/5/08

LOCATION NATIONAL OILWELL VARCO WORKSHOP

DESCRIPTION MAIN SHAFT

S.NO/ P.NO/JOB NO: BD 77V / 90281 / DSW 5619

D B

Spot 1 2 3 4 5 6 7 8 9 10 LOAD COLLAR LOAD COLLAR

A 2.320 2.260 2.247 2.237 3.345 3.356 3.342 3.375 3.428 3.387 1.786 1.773
B 2.287 2.285 2.214 2.280 3.348 3.377 3.514 3.492 3.512 3.394 1.828 1.756
C 2.356 2.228 2.276 2.247 3.322 3.375 3.462 3.489 3.496 3.416 1.800 1.768
D 2.315 2.379 2.236 2.221 3.122 3.349 3.396 3.289 3.510 3.391 1.768 1.792
7 5/8 PIN SRG (UPPER) 6 5/8 PIN SRG (LOWER)
1.712 1.128
1.718 1.139
1.714 1.137
1.699 1.137

Note: Wall Thickness Taken Approx 7-10" Apart


Total: 56 Wall Thickness Locations JONATHAN
All Dimensions Are In Inches. TUBOSCOPE INSPECTOR
SECTION 5

Service Reports

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241
INITIAL
01 PC

Initial-1 Report

DSW/5619 WO#20241
National Oilwell Varco Pte Ltd
C

A; Inner mating face 
was found badly worn.

B; Chrome peeled off dent were found on stem.
C; Badly worn off area.

Page 1 of 14
9, Tuas Avenue 5
Service Reports

NATIONAL OILWELL VARCO PTE LTD INSP BY : SUN TUN F-INSP BY : N/A JOB NO : 2806063
ITEM : FLANGE ROTATING HEAD PREP BY : KYAW NAING DWG NO 06063-01
VESSEL N/A CHK BY : KYAW NAING CHECK BY : N/A DATE : 06-06-2008
Components of TDS-4H Top Drive Assembly – 1 Unit

REQ-01061 (P/N.79395)(DSW-5619-20241)

Singapore 639335
A
Initial-2 Report

DSW/5619 WO#20241
National Oilwell Varco Pte Ltd
B; 01 in no chrome hole 
about 10mm on the stem.

Page 2 of 14
9, Tuas Avenue 5
A; 03 in no chrome hole about 2mm on the stem.
Service Reports

NATIONAL OILWELL VARCO PTE LTD INSP BY : SUN TUN F-INSP BY : N/A JOB NO : 2806063
ITEM : FLANGE ROTATING HEAD PREP BY : KYAW NAING DWG NO 06063-02
VESSEL N/A CHK BY : KYAW NAING CHECK BY : N/A DATE : 27-06-2008
Components of TDS-4H Top Drive Assembly – 1 Unit

REQ-01061 (P/N.79395)(DSW-5619-20241)

Singapore 639335
Final Report

DSW/5619 WO#20241
National Oilwell Varco Pte Ltd
FINAL
( 01 pc )

8.5"
7.5"

Page 3 of 14
9, Tuas Avenue 5
Service Reports

FINAL INSPECTION

Ø9.998"
Ø10.998"
1) Repaired the swivel flange by grinding to sound metal and built-up by manual welding.
2) Pre-grind & removed the existing chrome from the stem swivel O.DØ9.997" , Ø10.997" . Ø7.85"
3) Built-up hard chrome on the pre-ground area.
4) Final grind the swivel stem O.D to ok size as per drawing.
5) Grind & removed the excessive weldment , grind to profile , cleaned & packed.
6) Dye penetrant checked, no significant of defect was found.
NATIONAL OILWELL VARCO PTE LTD INSP BY : SUN TUN F-INSP BY : SUN TUN JOB NO : 2806063
ITEM : FLANGE ROTATING HEAD PREP BY : KYAW NAING DWG NO 06063-03
VESSEL N/A CHK BY : KYAW NAING CHECK BY : KYAW NAING DATE : 13-07-2008
Components of TDS-4H Top Drive Assembly – 1 Unit

REQ-01061 (P/N.79395)(DSW-5619-20241)

Singapore 639335
Service Reports
Components of TDS-4H Top Drive Assembly – 1 Unit

MPI Report
REPORT NO : 06063-03
NATIONAL OILWELL VARCO PTE LTD
VESSEL : n/a
PART NO : (P/N.79395)(DSW-5619-20241)
ITEM : FLANGE ROTATING HEAD
LEG NO / JOB NO : 2806063

MAGNETIC PARTICLE INSPECTION REPORT


Date of Inspection : 14-06-2008 Item Inspected : FINAL welding area.
Part no :
Material : Before Repair After Repair

Welding Process : As welded Rough Machine Final Machine


Surface Preparation : Machining Wire Bush Power grind Others
MAGNETIZATION UNIT : MOBILE UNIT Y6 ELETROMAGNETIC YOKE Serial No. 926459
Magnetization Yoke Lifting Capacity : 10Lbs
Technique Pole Spacing : 3"- 6"
Testing Medium Dry Wet Fluorescent
Particle Type Colour : Black / Greenish Application : Spray

Inspected by: AUNG KYAW NAING (LEVEL II) FINAL INSPECTION:


Cert No. : M/AA-0941 1) MPI ,no significant defect was found.

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 4 of 14


Service Reports
Components of TDS-4H Top Drive Assembly – 1 Unit

Dye Penetrant
REPORT NO : 06063-05
NATIONAL OILWELL VARCO PTE LTD
ITEM : FLANGE ROTATING HEAD
Part NO : (P/N.79395)(DSW-5619-20241)
JOB NO : 2806063
DATE : 13-07-2008

DYE PENETRANT INSPECTION REPORT


Date of Inspection : 04-07-2008 Location Inspected : CHROMING surfaces

Material : Before Repair After repair

Welding Process : As welded Rough Machine Final Grinding.


Surface Preparation : Machining Wire Bush Power Grind Others
MATERIAL USED : CHROME
BATCH NO. TIME. APPLICATION.
a) Penetrant : Magnaflux SKL-SP1 08A10K Penetrant time : 10-20 mins Spraying
b) Remover : Magnaflux SKC-S 06A09K Drying time : 5 mins Wiping surfaces with solvent damped cloth
c) Developer : Magnaflux SKD-S2 08B20K Developing time : 10 to 15 mins Spraying
Method of Test
a) The areas to be tested were first cleaned with remover
b) Dye Penetrant was then sprayed on the areas to be tested. After about ten minutes, the excess Penetrant was then wiped with
dry cloth and the remaining Penetrant was then removed with the remover and the Developer was applied. The area under
testing was then examined.

FINAL INSPECTION
1) Dye penetrant performed,
no unacceptable indications were observed,
at the time of inspection.

INSPECTED BY : AUNG KYAW NAING (LEVEL II)


Cert No. : M/AA-0944

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 5 of 14


Initial Report

DSW/5619 WO#20241
National Oilwell Varco Pte Ltd
A; Bearing seating I/D was found dent.

INITIAL
01 PC
A

Page 6 of 14
9, Tuas Avenue 5
Service Reports

NATIONAL OILWELL VARCO PTE LTD INSP BY : SUN TUN F-INSP BY : N/A JOB NO : 2806064
ITEM : UPPER GEARCASE PREP BY : KYAW NAING DWG NO 06064-01
VESSEL N/A CHK BY : KYAW NAING CHECK BY : N/A DATE : 06-06-2008
Components of TDS-4H Top Drive Assembly – 1 Unit

REQ-01061 (P/N.88881)(DSW-5619-20241)

Singapore 639335
FINAL FINAL‐A Ø18.997"
01 PC

Final Report
A

DSW/5619 WO#20241
National Oilwell Varco Pte Ltd
After repairing the dent area.

FINAL‐B

After retap one thread hole.

Page 7 of 14
9, Tuas Avenue 5
FINAL INSPECTION B
1) Rough machine 1/8" per side of 
Service Reports

    I/D Ø18.997" for weld preperation.
2) Build up rough out area & dent area by welding.
3) Final machine the weldment to size 
     as per dimension.
4) Grind the weldment to profile & retap the
    stud holes.
5) MPI, no significant defect was found.
NATIONAL OILWELL VARCO PTE LTD INSP BY : SUN TUN F-INSP BY : CHE YU JOB NO : 2806064
ITEM : UPPER GEARCASE PREP BY : KYAW NAING DWG NO 06064-02
VESSEL N/A CHK BY : KYAW NAING CHECK BY : KYAW NAING DATE : 26-06-2008
Components of TDS-4H Top Drive Assembly – 1 Unit

REQ-01061 (P/N.88881)(DSW-5619-20241)

Singapore 639335
Service Reports
Components of TDS-4H Top Drive Assembly – 1 Unit

MPI Report
REPORT NO : 06064-03
NATIONAL OILWELL VARCO PTE LTD
VESSEL : n/a

ITEM : UPPER GEARCASE (P/N.88881)(DSW-5619-20241)


LEG NO / JOB NO : 2806064

MAGNETIC PARTICLE INSPECTION REPORT


Date of Inspection : 18-06-2008 Item Inspected : FINAL welding area.
Part no :
Material : Before Repair After Repair

Welding Process : As welded Rough Machine Final Machine


Surface Preparation : Machining Wire Bush Power grind Others
MAGNETIZATION UNIT : MOBILE UNIT Y6 ELETROMAGNETIC YOKE Serial No. 926459
Magnetization Yoke Lifting Capacity : 10Lbs
Technique Pole Spacing : 3"- 6"
Testing Medium Dry Wet Fluorescent
Particle Type Colour : Black / Greenish Application : Spray

FINAL INSPECTION:
1) MPI ,no significant defect was found.

Inspected by: AUNG KYAW NAING (LEVEL II)


Cert No. : M/AA-0941

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 8 of 14


B; Cam I/D was found badly worn. Initial Report

DSW/5619 WO#20241
National Oilwell Varco Pte Ltd
INITIAL
01 PC

Page 9 of 14
9, Tuas Avenue 5
Service Reports

A; Cam outer profile was found badly worn.

NATIONAL OILWELL VARCO PTE LTD INSP BY : SUN TUN F-INSP BY : N/A JOB NO : 2806065
ITEM : CAM(P/N.79892)(DSW-5619-20241) PREP BY : KYAW NAING DWG NO 06065-01
VESSEL N/A CHK BY : KYAW NAING CHECK BY : N/A DATE : 06-06-2008
Components of TDS-4H Top Drive Assembly – 1 Unit

REQ-01061

Singapore 639335
FINAL
01 PC

24 x R.626 Final Report

DSW/5619 WO#20241
12.83"

National Oilwell Varco Pte Ltd


31"
4.0
Ø1
7.81"
0.49"x24pl

Page 10 of 14
1.5"

9, Tuas Avenue 5
FINAL INSPECTION
Service Reports

1) Rough out 1/16" per side of the cam


I.D Ø14.031" for weld preparation.
2) Built-up the pre-machined area by manual welding.
3) Final machined the weldment by turning to size
as per drawing.
4) Grind the excessive weldment.
5) M P I i ifi t fd f t f d

NATIONAL OILWELL VARCO PTE LTD INSP BY : SUN TUN F-INSP BY : SUN TUN JOB NO : 2806065
ITEM : CAM(P/N.79892)(DSW-5619-20241) PREP BY : KYAW NAING DWG NO 06065-02
VESSEL N/A CHK BY : KYAW NAING CHECK BY : KYAW NAING DATE : 13-07-2008
Components of TDS-4H Top Drive Assembly – 1 Unit

REQ-01061 (DSW-5628-20316)

Singapore 639335
Service Reports
Components of TDS-4H Top Drive Assembly – 1 Unit

MPI Report
REPORT NO : 06065-03
NATIONAL OILWELL VARCO PTE LTD
VESSEL : N/A

ITEM : CAM(P/N.79892)(DSW-5619-20241)
LEG NO / JOB NO : 2806065

MAGNETIC PARTICLE INSPECTION REPORT


Date of Inspection : 11-07-2008 Item Inspected : CAM ROTATING HEAD
Part no :
Material : Before Repair After Repair

Welding Process : As welded Rough Machine Final Machine


Surface Preparation : Machining Wire Bush Power grind Others
MAGNETIZATION UNIT : MOBILE UNIT Y6 ELETROMAGNETIC YOKE Serial No. 926459
Magnetization Yoke Lifting Capacity : 10Lbs
Technique Pole Spacing : 3"- 6"
Testing Medium Dry Wet Fluorescent
Particle Type Colour : Black / Greenish Application : Spray

FINAL INSPECTION:
1) M.P.I , no significant defect was found.

Inspected by: AUNG KYAW NAING (LEVEL II)


Cert No. : M/AA-0941

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 11 of 14


INITIAL
B ( 01 pc )
A

Initial Report

DSW/5619 WO#20241
National Oilwell Varco Pte Ltd
C
B; 01 in no crack about 5".

C; 01 in no cpper bush was found.

Page 12 of 14
9, Tuas Avenue 5
Service Reports

A; 01 in no crack about 9".

NATIONAL OILWELL VARCO PTE LTD INSP BY : CHE YU F-INSP BY : N/A JOB NO : 2806105


ITEM : TDS DOLLY WELDMENT PREP BY : KYAW NAING DWG NO 06105-01
VESSEL N/A CHK BY : KYAW NAING CHECK BY : N/A DATE : 11-06-2008
(DSW-5619-20241)
Components of TDS-4H Top Drive Assembly – 1 Unit

REQ-01085

Singapore 639335
After repairing lifting lug hole.
Final Report

DSW/5619 WO#20241
National Oilwell Varco Pte Ltd
After repairing crack area.

FINAL INSPECTION
1) Repaired the cracks area by welding.
2) Repaired the worn lifting lug by welding & machining.
After repairing cracks area.
3) Gring the excess weldment & splatter.
4) MPI, no significant defect was found. 

FINAL
01 PC

Page 13 of 14
9, Tuas Avenue 5
Service Reports

NATIONAL OILWELL VARCO PTE LTD INSP BY : CHE YU F-INSP BY : CHE YU JOB NO : 2806105


ITEM : TDS DOLLY WELDMENT PREP BY : KYAW NAING DWG NO 06105-02
VESSEL N/A CHK BY : KYAW NAING CHECK BY : KYAW NAING DATE : 06-07-2008
(DSW-5619-20241)
Components of TDS-4H Top Drive Assembly – 1 Unit

REQ-01085

Singapore 639335
Service Reports
Components of TDS-4H Top Drive Assembly – 1 Unit

MPI Report
REPORT NO : 06105-03
NATIONAL OILWELL VARCO PTE LTD
VESSEL : n/a

ITEM : TDS DOLLY WELDMENT (DSW-5619-20241)


LEG NO / JOB NO : 2806105

MAGNETIC PARTICLE INSPECTION REPORT


Date of Inspection : 23-06-2008 Item Inspected : FINAL welding area.
Part no :
Material : Before Repair After Repair

Welding Process : As welded Rough Machine Final Machine


Surface Preparation : Machining Wire Bush Power grind Others
MAGNETIZATION UNIT : MOBILE UNIT Y6 ELETROMAGNETIC YOKE Serial No. 926459
Magnetization Yoke Lifting Capacity : 10Lbs
Technique Pole Spacing : 3"- 6"
Testing Medium Dry Wet Fluorescent
Particle Type Colour : Black / Greenish Application : Spray

FINAL INSPECTION:
1) MPI ,no significant defect was found.

Inspected by: AUNG KYAW NAING (LEVEL II)


Cert No. : M/AA-0941

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 14 of 14


National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 1 of 4


National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 2 of 4


National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 3 of 4


National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 4 of 4


SERVICE REPORT

HANSEN AC MOTOR
OVERHAUL

DATE : MAY 2008


JOB No. : J08/257/02

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 1 of 8


CONTENTS

A. TECHNICAL DATA / SPECIFICATIONS

B. SERVICE JOB SCOPE

C. ELECTRICAL TEST RESULTS

D. MECHANICAL TEST RESULTS

E. INSTRUMENTS USED

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 2 of 8


SERVICE REPORT

Job Number : J08/257/02


Client : NOV TUAS FACILITY
Equipment Description : HANSEN AC MOTOR
Customer Job No : DSW – 5619 – 20241
Report No. : R08 / 109
Date Received : 30 APRIL 08
Date Completed : 14 MAY 08

A. Technical data / Specifications

Rated HP : 1.5 HP
Rated Voltage : 440 - 460 V
Rated Current : 3.5 amps
Frequency : 60 Hz
Speed : 1700 rpm
Phase/Windings :3
Type : AE90LH
Bearing Drive End : 6205 2Z/C3
Bearing Non Drive End : 6205 2Z/C3

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 3 of 8


B. Service Job Scope

• Dismantle AC motor for inspection.


• Stator - Carry out chemical and steam cleaning.
- Carry out dip varnishing and oven baking.
• Rotor - Carry out chemical and steam cleaning.
- Apply one layer of varnish and oven baking.
• Carry out Megger, Hi-pot and Surge test of motor stator winding.
• Carry out No-load test on complete motor assembly.
• Motor body - Carry out sand blasting to remove old paint.
- Carry out chemical and steam cleaning on all parts.
- Apply epoxy primer and finishing paint on complete motor assembly.

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 4 of 8


C. Electrical Test Results

Stator Megger test (500 volts)

Before Overhaul After Overhaul

25 M Ohm 550 M Ohm

Surge test

Voltage Turns Quality

1000 95 % 95 %

Hi-Pot test

Voltage Mega Ohm

1000 999 MΩ

No-Load test

Amperes
Volts Speed
R Y B

455 volts 3.0 amps 3.0 amps 3.1 amps 1496.0 rpm

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 5 of 8


D. MECHANICAL TEST RESULTS

DE NDE

1. ARMATURE SHAFT BEARING JOURNAL CLEARANCE CHECK

ACTUAL VALUE TOP / BOTTOM LEFT / RIGHT REMARKS

DE 25.00 25.01 25.01 WITHIN TOLERANCE

NDE 25.00 25.01 25.01 WITHIN TOLERANCE

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 6 of 8


DE NDE

2. BEARING HOUSING CLEARANCE CHECK

DRIVE END (1) (2) DIFFERENCE


Measurement ACTUAL MEASURED BETWEEN
REMARKS
(mm) VALUE VALUE 1 AND 2
TOP TO BOTTOM 52.00 52.04 0.04 WITHIN TOLERANCE

LEFT TO RIGHT 52.00 52.04 0.04 WITHIN TOLERANCE

NON-DRIVE END (1) (2) DIFFERENCE


Measurement ACTUAL MEASURED BETWEEN
REMARKS
(mm) VALUE VALUE 1 AND 2
TOP TO BOTTOM 52.00 52.02 0.02 WITHIN TOLERANCE

LEFT TO RIGHT 52.00 52.02 0.02 WITHIN TOLERANCE

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 7 of 8


E. INSTRUMENTS USED

Cal. Date/
Instrument Make/ Model Serial No. Measure
Due Date
Insulation
Megger Kaise/ SK-3003 23007 07Dec06
Resistance

26Dec07/
Voltmeter Tektronix/ TEK DMM247 CE-1173-07 26Dec08 Voltage

Clamp 21Feb08/
Multi AC/DC/ Model 270 1000687 Current
Meter 21Feb09

Tachometer Line Seiki/ TM-4000 2084-59 ------------- RPM

Micro meter 25Mar08/ Bearing Journal


Mitutoyo/ (25-50mm) 007849
Caliper 25Mar09 clearance

Micro stick 25Mar08/ Bearing housing


Mitutoyo/ (100-400mm) CD-1201-08
Caliper 25Mar09 clearance

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241 Page 8 of 8


SECTION 6

Test Reports

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241
THIS DOCUMENT CONTAINS PROPRIETARY
REVISION~
INfORMATION. AND SUCH INFORMATION
MAY NOT BE DISCLOSED TO OTHERS FOR URI DESCRIPTION PREPARED CHECKED APVD
ANY PURPOSE. NOR USED FOR MANUFAC·
TURING PURPOSES WITHOUT WRITTEN DEV RELEASE L. ~t9~~t?u I.BINMORE J. PEL€CHICI
PERMISSION fROM VARCO
D. Campbell CMB JES

~
INTERNATIONAL. INC. SEE DCN
SEE DCN

CUSTOMER r r J - / .... ". "', " -r , .~~;;-

RIG NAME A~,,) PEtar2.L

PART NUMBER 19b90


SERIAL NUMBER RH b \~U \ 29

ASSEMBLY LOAD RATING SOO TONS

TEST TECHNICIAN NAME tc...· f'l\Q Ii ~ STAMP ~, ~


3RD PARTY WITNESS AGENCY ...---, f\Jf\

3RO PARTY WITNESS NAME ---, t-.j ~ STAMP - 1\11.. ~

3RD PARTY WITNESS SIGNATURE .---. IV ),


TEST DATE t b - ~t> L - 08
~ ND.' .MNJ Sbf9

REV STATUS
OFDOCUMENT loevl A I B I c I 0 I ElF I G I H I J I K I LIM I Nip I aI R I SiT I u I v IW I x I Y I Z IAA
PREPARED: DATE

~[RQ3@~IJ~
LAURA RONDOU
I I I CHECKED:
I. BINMORE
DRILLING SYSTEMS
TDS-5 ~~gtJgR:
TITLE: ROTATING HEAD ASSEMBLY
TD8-4 GROUP
1------........,--T;..;;0'-'8"-_3-""1 MANAGER: J. PELECH IC

PLANNING:
NEXT ASSY PRODUCT

MARKETING:

APPLICATION SHEET OF 4
Cover 1-92
REVISIONS

AI DESCRIPTION
I PREPARED 1 ~CKED I ~

TEST SPECIFICATION FOR ROTATING HEAD ASSEMBLY

1.0 Desired Equipment

Asset No'/Cal. Due Date

-Torque wrench - 0 - 175 ft- lbs


3000 psi pressure gauges, ideally with 2-1/2" faces
~.38~~J;tM
ss.: :.:Y 6 /;;). ~
"'Torque Multiplier - (10 X 1 ratio) Not Required
Hydraulic pump with capability of 2500 psi or greater Not Required

2.0 Procedure

2.1 Mount rotating head firmly on a sturdy base or on motor housing assembly.

2.2 Connect pressure line to port "Hi n (on flange and a pressure gauge) to
correspondig port "H1" on swivel block. After bleeding line, pressurize port "H1"
to 2000 psi and isolate circuit from pump. Hold pressure for 3 minutes.

2.3 Repeat above procedure for each of the ports "H2, 51, and 52· (Pressure drop
should not be more than 150 psi).

2.4 Similarly hydraulically pressurize ports "A1, A2 and A3" individually to 2000 psi.
Hold pressure for 3 minutes.

2.5 Relieve pressure in all lines. Measure friction torque between swivel block and
flange.

Maximum friction torque 400 ft-Ib to 500 Ton rating, 520 ft-lb for 650 Ton rating.

2.6 Pressurize the "H1" port to 2500 psi and measure friction torque. Maximum
friction torque 600 ft-Ib for a 500 Ton rating, 780 ft-Ib for a 650 Ton rating.

2.7 Rotate swivel head 1 complete turn with port H1 pressurized to 2000 psi to as­
sure free rotation with constant friction torque.

2.8 Check "Cam Plate" for free rotation.

TITLE AI DOCUMENT NO.

WClllf@@@BJ~ ROTATING HEAD TS 00172


__'_41'."'-_ £]5.'_ ASSEMBLY HYDRO­
I
SCI\LJ:
ii'
• •}iJI!!1m.1Yt.1~3~C.- STATIC PRESSURE TEST SH~ 2 OF 4
REVISIONS
A DESCRIPTIOIl PRePARED a£Cl(ED APW

PORT FUNCTION

"H1 n • Pressure (Hydraulic)

"H2" - Return (Hydraulic)

"A1" - IBOP Open (Air)

n /J.2" - IBOP Close (Air)


"A3" • Link Tilt (Air)
"S1"· Spare
"S2" - Spare

DATA SHEET

2.0 Rotating Head

STEP NO. TEST INSPECTION VERIFICATION REQUIREMEr-.JTS

2.2 Pressure Port "H1" ':2ct:oo ps- r Held 3 minutes


Ll P < 150 psi

2.3a Pressure Port "H2" 12000 PSt Held 3 minutes


P < 150 psi
Ll

2.3b Pressure Port n S1n 2000,pSI Held 3 minutes


Ll P
< 150 psi

2.3c Pressure Port "52" 2000 {D5;I Held 3 minutes


< 150 psi
Ll P

2.4a Pressure Port •A1n 2000 PSI Held 3 minutes


P < 150 psi
Ll

2.4b Pressure Port"A2" Qooors:s Held 3 minutes


Ll P < 150 psi

2.4c Pressure Port "A3" Qooo Pf.J Held 3 minutes


Ll P
< 150 psi

Witness Initials
SIZE
TITLE

~~~BJTM A
ROTATING HEAD TS 00172
ASSEMBLY HYDRO­ SCAlf
DRILLING SYSTEMS STATIC PRESSURE TEST S~T 3 OF 4
REVISIONS
A DESCRIPTION PIle PARED ctlECKED M'VD

2.5 Rotational Friction ft-Ibs 400 ft-Ibs (500 Ton)


(no pressure) 520 ft-Ibs (650 Ton)

2.6 Rotational Friction ft-Ibs 600 ft-Ibs (500 Ton)


(2500 psi) 780 ft-Ibs (650 Ton)

2.7 Friction Rotation V Rotates OK

2.8 Cam Plate Movement v Free Rotation

WllMU Iniliaia _

SIZE
TITLE
\YlG)[P@@qpBJTM ROTATING HEAD A TS 00172
ASSEMBLY HYDRO­ SCALE
DRILLING SYSTEMS STATIC PRESSURE TEST SHeET 4 OF 4

~

THIS DOCUMENT CONTAINS PROPRIETARY REVISION


NFORMATION, AND SUCH INFORMATiON MAY
NOT BE DISCLOSED TO OTHERS FOR ANY LTR DESCRIPTION DATE PREPARED CHECKED APVD
PURPOSE NOR USED fOR MANUFACTURING
PURPOSES WITHOUT WRITIEN PERMISSION - INITIAL RELEASE JES RLM JES
FROM VARCO INTERNATIONAL, INC.
C SEE DeN 6/1/99 LAR ~H-f~ ~ I/.If~

..
Customer K~C- ..J)Jru7~

Rig A-~ ~L
SIN E E. 9Atwo 8b ABS

~ !vU:J>fj., lJa : -:f52 U~ 2

Shop Order .lJ~ ~/~

Inspector Technician Name ~. N\DK~N Stamp ~-~


3RD Party Witness Agency N"?4·
3RD Party Witness Name N-A . Stamp N-IT.

3RD Party Witness Signature N-A·

Test Date ~8· ~- 0-8

~.5TArus I I I 1 I T1 I I I I I I I I I I 1 I 1 1
1 I I
OF$tlEETS I 1 I2 13 14 5 r6 I 7 I 8 1 9 110111 112 13114115116117118 19120121122123124125126127
PREPARED DATE

CHECKED
J. Snyder 4/13/93
Wffi[f@)@@
R. Murray 4/13/93 • •lill •• I~ S-w..ii9~E:.
R. Murray 4/13/93 TTTLE
TDS Pinion/Brake Hub/GE Motor
4/13/93 Installation

NExT ASSV.
-
PRODUCT
J. Snyder
sA I DOCUMeNT NO. ASPOOOO6

SCALE
APPLICATION
SENIOR
MANAGER I SHEeT 1JF 6
"

Item Pinion Installation Instructions Verified Date


1. Visually inspect the surface of the motor shaft taper.

Remove high spots with a whet stone. Polish


0'0
complete taper by hand with 320 or finer emery
rx,'
cloth usinq an orbital motion. \'0=-. ~
~
2. Visually inspect the pinion bore. Remove high spots

with a whet stone. Polish complete taper by hand


~i)j
:f
l"f\L-. ~~
with 320 or finer emery cloth using an orbital motion.
3. Clean and dry the shaft and pinion tapers with
~Qt>
Kimwipes and Acetone, repeating until no oil residue \8"
remains. YY\L 00..
4. Cover shaft taper with a thin film of Dikem Hi Spot &l\O~
#107. ~\
I'XV....
5. Firmly install the pinion on to the shaft by hand. rx.\o'C
11\C­ ~
6. Mark reference lines on the pinion and shaft to ~o'O
ensure identical angular orientation each time. ffil.L o.J..\..<:?>
7. Remove pinion taking care to avoid disturbing the ~\O~
Dikem. me... ou..\'O
8. There must be a minimum of 85% surface contact
between the pinion and shaft. Dress the shaft
and/or pinion with emery cloth. Repeat steps 3 to 7
as many times a necessary until there is at least
85% surface contact between the pinion and motor ,\Q'>I
10
shaft. tf\C...­ 0:'
9. Clean & dry shaft and pinion Kimwipes and Acetone \o""..\~
until no residue remains. me... ~
1O, Firmly install pinion on the shaft by hand, ensuring f?\\oq\6t
that the reference marks line up. rflC­
11. Measure and record the distance or depth between

the end of the motor shaft and the face of the pinion
~'Jrr:.
(see Figure 1). I, ~o"c
Q.q\Q f'f\L- t)'\
First recorded measurement:
12. Subtract .073" from the above measurement and

record results.

Calculated measurement: N-A~ I'I-~

Assembly Note:
Total time between removal of pinion from oven, to completion of installation
should not exceed 3 minutes. Cooling of the pinion effects its final position on
the shaft. An appropriate fixture must be used to provide a stop to locate pinion
at the final position.

13. Set up appropriate fixture to the calculated dO


measurement. N\L­ 0'\\'0"1"\
14. Remove pinion from shaft. Clean and dry pinion !JI\O£
and shaft with Kimwipes and Acetone. w...... 6't~

Assembly Procedure No. ASP00006 Page 2 of 6


Reve
Item Instruction Verified Date
15. Coat pinion taper with Nalco, using a Scott #150
towel. N4r·
16. Heat pinion in oven at 380°F for 3 hours. mill­ 1>1/oHr.e
17. 30 minutes before pinion is ready to be removed
from oven, coat shaft with Nalco, using a Scott #150
!'file-­ 01101118
towel.
18. After heating the pinion for 3 hours, remove from
oven and install appropriate fixture that has been
set up in Step 13. Place the pinion on the motor
shaft and ensure that the reference marks line up.
Slide pinion in to place and hold there for 1 minute. 1'f\C.­ D1-~~IDB
19. Allow assembly to cool to normal room temperature. fl!\e..c 01\'01- ~
20. Record the final pinion position by determining the
measurement or depth from the end of the motor
shaft to the face of the pinion.
Second recorded measurement: Q. ' g (2.9 tnt.­ ~9jtl1-rCf
21. Record the pinion to shaft advancement.
First recorded measurement: Q.·ql<'2­
Second recorded measurement: <2.-. @ '29 subtract

Pinion advancement: 0, 083"

f'N.­ cYdlOf~r
22. The required position is .085 ± .005" advancement.
If the final position is not correct, remove the pinion
from the shaft and start over.
~N~ ­ -
Installation Completed by: _----"tcL..:....·~IY\....:..o.:........:..t-l.!..../.\:....t-J~ _

Verified By: Wf,-


16
p'
.. J-..i'CJ.H-"",,[iJrL'j..1

Assembly Procedure No. ASP00006 Page 3 of 6


RevC
Item Brake Hub Installation Instructions Verified Date
1. Visually inspect the surface of the motor shaft taper.

2.
Remove high spots with a whet stone. Polish
complete taper by hand with 320 or finer emery
cloth using an orbital motion.
Visually inspect the brake hub bore. Remove high
1
spots with a whet stone. Polish complete taper by
hand with 320 or finer emery cloth using an orbital
motion. L
I
3. Clean and dry the shaft and brake hub tapers with
Kimwipes and Acetone, repeating until no oil residue
remains.
4. Cover shaft taper with a thin film of Dikem Hi Spot
#107. I
5. Firmly install the brake hub on to the shaft by hand.
/1
6. Mark reference lines on the brake hub and shaft to
ensure identical anQular orientation each time. I
7. Remove brake hub taking care to avoid disturbing
the Dikem. I
8. There must be a minimum of 85% surface contact
between the brake hub and shaft. Dress the shaft
and/or brake hub with emery cloth. Repeat steps 3

1
~
to 7 as many times a necessary until there is at least

85% surface contact between the brake hub and

motor shaft.
I
9. Clean & dry shaft and brake hub with Kimwipes and
Acetone until no residue remains. I
10.

11.
Firmly install brake hub on the shaft by hand,

ensuring that the reference marks line up.

Measure and record the distance or depth between

12.
the end of the motor shaft and the face of the brake

hub (see Figure 1).

First recorded measurement:


Subtract .073" from the above measurement and

record results.

II
Calculated measurement:

Assembly Note:
Total time between removal of brake hub from oven, to completion of installation
should not exceed 3 minutes. Cooling of the brake hub eHects its final position
on the shaft. An appropriate fixture must be used to provide a stop to locate
brake hub at the final position.

13. Set up appropriate fixture to the calculated


measurement. ,,,t><; V
14. Remove brake hub from shaft. Clean and dry brake .~.l-
hub and shaft with Kimwipes and Acetone.
Assembly Procedure No. ASP00006 Page 4 of 6
RevC
"

Item Brake Hub Installation Instructions Verified Date


15. Heat brake hub in oven at 380 to 400°F for 3 hours.
~
16. After heating the brake hub for 3 hours, remove

/
from oven and install appropriate fixture that has
been set up in Step 13. Place the brake hub on the
motor shaft and ensure that the reference marks line
up. Slide brake hub in to place and hold there for 1
minute.
17. Allow assembly to cool to normal room temperature.
/
18. Record the final brake hub position by determining
the measurement or depth from the end of the
J
motor shaft to the face of the brake hub. ~
Second recorded measurement I
19. Record the brake hub to shaft advancement.

20.
First recorded measurement:
Second recorded measurement:
Subtract brake hub advancement
The required position is .085 ± .005" advancement.
/
If the final position is not correct, remove the brake
hub from the shaft and start over. 1/

Assembly Procedure No. ASP00006 Page 5 of 6


RevC
~
-

, Pinion or Brake Hub

l Fixture
with stop,
See Step 13

Motor Shaft
,'" ./
r" h
ure this .

Figure 1

Assembly Procedure No. ASP00006 Page 6 of 6


RevC
THIS DOCUMENT CONTAINS REVISIONS
PROPRIETARY INFORMATION. AHD
SUCH INFORMATION WAY NOT BE lTR OESCRIPllON I DATE APVD
DISCLOSED TO OTHERS FOR AHY
PURPOSE NOR USED FOR INITIAL RELEASE
MANJFACTURIHG PURPOSES
wiTHOlJT WRrrreH PERMISSION
fROMI VAilCO INTERNAllONAL, INC.
,.,

PIN Assy 9E2o o 0


Shop Order 'D-> VS,1 '=:>"0 I 7;~fi>,"

Verified Complete %'<VL.£'V (t>~tK


Date

WGJ~~BJTM
DRILLING SYSTEMS

GROUP
MGR
~~~~ TDS-4 HIGH GEAR
ASSEMBLY PROCEDUR~ I
SIZE
I I I Pl.ANNlNG
NEXT ASSY. PROOUCT
SCALE
A ASP 00010
MARKETING
APPLICATION SHEET 10F 2
INITIAL DATE
1. Thoroughly wash oil passages in High gear compound shaft. ~(Jth

Record Shaft SIN (if supplied): ~ Nl>r- r<\C.-­ \<J\fJ3


2. Record manufacturer's name, serial no, and PIN from smaller shaft
bearing (if any). oro
I\l riLF~ 2bw-2>~ ;p\
Name: 1'1 !'(\'C P-I\) Serial No: PIN: RghDo ~ \9\1
3. Measure 00 of smaller high gear compound shaft: S·ll~
Measure 10 of smaller high gear bearing: ,5'- \\B
~<o
tl\l-­ ,p\@
Bearing/shaft clearance: O,000
4. Install smaller bearing onto upper end of high gear compound shaft.
It should be a "slip-fit", (Verify snap ring side of bearing is facing
:f
closest end of shaft). Secure with 130 mm locknut and lockwasher.
Torque to 200 ft-Ibs + 10 ft-Ibs. Bend over lockwasher. IYlV ,#
5. Thoroughly wash High" compound gear and check bearing surfaces
(j(()
for burrs. ':()\.
__ t-JI\-­ Iw..­ -9'{)
Record gear SIN (if supplied):
6. Record manufacturers name, serial number and PIN from larger

spherical roller bearing (if any).

~oYJ
!
Name: SIC-t- Serial No: N~ PIN: 8-8- ~ '1 ') rok
7. Measure 00 of larger high gear bearing: q',Bb~
Measure bore in high gear for larger bearing: 9· &61_ ~f(;
Bearinglgear interference: - C). 00"1­ fY\.L.­ ~~
8. Heat compound gear to 250 +/- 20 deg F and install larger beuring. tQ
'!2
Verify bearing is fully seated and install retaining ring. ~\o
\()
Y\f\L:
9. Measure 00 of high gear smaller bearing: 7'F/:{'Z;
Measure bore for high gear smaller bearing: ~'?J
:/·8?fc '}...Q'd
BearinQ/Qear interference: - D·OQQ.. 'MJ.­ \()

10. Measure 00 of larger high gear compound shaft 5·~1?


Measure 10 of larger high gear bearing: S;. S'l Z ~o0
\,fy.,i:P
Bearing shaft clearance: It) - Do-n Me..­
11. Heat compound gear and bearing to 250 +1- 20 deg F and install
shaft and bearing assembly into gear/bearing assembly. Verify '10
bearing is fully seated and secure with 140mm lock nut and ~\o
lockwasher. Torque to 200 ft-Ibs + 10 ft-Ibs. Bend over lockwasher. rY'u \'"
12. Install spacers and snap ring in both sides of gear. Then install flow :f?~
reducing plug into bearing surface at upper end of shafts. ':t?VJ
!'Ci-­ I~

(yJ~
13. Install pipe plugs (socket type) in motor end of shafts,

lff".V ~
14. Install roll pins in splines on shaft. Verify pin does not protrude
above tops of splines. ~'0

15. When fully assembled, pour gear oil (EP-4) liberally into bearings on
rNr L
both ends of both shafts. Circulate oil by rotating gears several !F\<fb
times. Cover unit to keep it clean. mu 'f!~

Assembly Procedure, ASP 00010 Page 2012


Initial Release
ntiS DOCUMENT CONTAINS REVISIONS
PROPRIETARY INFORMATlON, AND
SUCH INFORMATlON MAY NOT BE Lffi DESCRIPTION I DATE
DISCLOSED TO OTHERS FOR ANY
PURPOSE NOR USED FOR INITIAL RELEASE ~
MANUFACTURING PURPOSES WITHOUT
WRITTEN PERMISSION FROM VARCO
INTERNATIONAL, INC.

P/NAssy 91999
Shop Order 1) 8 vJ S bl9

Verified Complete ';;Z~Y (~~


Signature Date
I!'UTATUI

OI'lHEm

W!D~~IJ ..
DRILliNG SYSTEMS

TDS-4 LOW GEAR


GROUP ASSEMBLY PROCEDURE
MGR
SIZE
I I I Pl.ANIilNG ASP 00011
NEXT A.S$V. PRODUCT
SCALE
A
MAAKEnNG
APPUCATION 5HEET 10F 2
INITIAL DATE
1. Thoroughly wash oil passages in Low-gear compound shaft.
~o'f;
(}do
Record shaft SIN (if supplied)~ NI\ ­ (Y\.C-­
2. Record manufacturer's name, serial no and PIN from smaller shaft

bearing (if any).

\oq;;
~ '::\~
Name: T\ N\c.p.l\) Serial No: l\lNC.f= 56 2~P/N: 8SSDO 'Y'k [\.0

3. Measure 00 of smaller low gear compound shaft: S' 'lB


Measure lOaf smaller low gear bearing: :;-. \ \9
\9~
~~
Bearinglshaft clearance: n,ao'S f'f\L...­
4. Install smaller bearing onto lower end of low gear compound
shaft, it should be a "slip fit" (verify snap ring side of bearing is
\(p
facing closest end of shaft). Secure with 130mm locknut and
~Q
lockwasher. Torque to 200 ft.lb. Bend over lockwasher. ~
5. Thoroughly wash Low-gear and check bearing surfaces for burrs.
Record gear SIN.
\o'b
w\Q'¢
Gear SIN (if supplied): ---iJft­ ft\L­
6. Record manufacturer's name, serial no" and PIN from larger
spherical roller bearing (if any).
':{!'O
Serial No: Q.~~rz S PIN: 88599 - ~~
Name: Skf roc \.'

7. Measure 00 of larger low gear bearing: q. ~4lJ-


~o~
Measure bore in low gear for larger bearing: q. Rt,..2
8.
Bearing/gear interference: - o· flo2
Heat compound gear to 250 +1- 20 deg F and install larger
Mr L
(jo\o<o
bearing. Verify bearing is fully seated and install retaining ring, !'f\k \Q~
9. Measure OD of low gear smaller bearing: 1·&1:3 \o'rJ
Measure bore for low gear smaller bearing: 1· <3 '15 ~o'Q
Bearing/gear interference: - o. 00'2,. ~ ~
10. Measure 00 of larger low gear compound shaft: S:SJ 2 \,()0
Measure 10 of larger low gear bearing: S·5"IZ,
Bearing shaft clearance: Q·ooo ~ w'f'o
11. Heat compound gear and bearing to 250 +/- 20 deg F and install

shaft and bearing assembly into gearlbearing assembly. Verify


~o(()
bearing is fully seated and secure with 140mm locknut and lock ~o'()
washer. Torque to 200 ft-lbs + 10 ft-Ibs. Bend over lock washer. /Y\t2­ \9
12. Install spacers and snap ring in both sides of gear. Then install
flow reducing plug into bearing surface at upper end of shafts. ~'Q
lo
IDG ~
13. Install pipe plugs (socket type) in motor end of shafts.
da\ot:f.
fYV-­ 'J:>'\
14. Install roll pins in splines on shaft. Verify pin does not protrude
above tops of splines. "J>fb
\\0'0
!Y\L-­ \0
15. When fully assembled, pour gear oil (EP~4) liberally into bearings 0
on both ends of both shafts. Circulate oil by rotating gears several ~Q'<>\P
times. Cover unit to keep it clean. ~ ,,~

Assembly Procedure, ASP 00011 Page 2 of 2


Initial Release
THIS DOCUMENT CONTAINS
REVISIONS
PROPRIElARV INFORMATION, AND L1l'l DESCRIPTION I DATE PREPAflEO I CHECI<EO APVD
SUCH INFORMATION MAYNOT BE
DISCLOSED TO OTHERS FOR ANY INITIAL RELEASE
PlIRPOSE NOR USEO FOR
MANUFACl1JRIHG PURPOSES WITHOUT A See DeN
WRIITE:N PERMISSION FROM VAACO
INTERNATIONAL, INC.

Configuration "TD s 4- H ( 6501D"J

SIN /\.1 '. so. •


Shop Order D £ \I"'-l S619

PIN B8584=
Customer Name A 'B A.t-J

Rig Name A6AN PEARL

Verified Complete \[~~l'o/ J8"/tfJ.l;tff


Signature Date
uvnAM
~1I£fl'$

PRe'AAEO

~~~B.J,.
Cr-IB
I [ I CHECKED
DRILLING SYSTEMS
PROJECT
I I tENGR JPSJ 9/93 ITITLE
TDS-4H MOTOR HOUSING
GROUP ASSEMBLY PROCEDURE
MGR
SIZE
I I I PLANNING
HEXT ASS.". PROOUCT A
5CALE
ASP 00009
MARKETING
APPLICATION 5HEET loF 7
ASSEMBLY NOTES

A. Cleaning of Bearings
Wipe bearing clean. Do not clean in solvent tan k.

B. Chilling of Bearings
Should be chilled in a cooler, temperature should not go below 40°F. Do not use
nitrogen at anytime to chill bearing.

C. Heating of Bearings
Bearing are to be heated in oven to a maximum of 250°F,

D. Bearing Fits
Bearing to housing and bearing to shaft fits should be checked and recorded before
chilling or heating by Assembly personnel.

E. Torque Values
All fasteners should be torqued to specification with a calibrated torque wrench. Refer
to the assembly drawings or APS for correct values. If not called out, refer to DS 00008.

Assembly Procedure, ASP 00009 Page 2 of 7


Revision A
MAINBOOY/MOTOR INITIAL DATE
1. Install brake adapter plate and secure with bolts, lock washers.
Torque to 500 FT-LBS and safety wire. Verify bolt heads on this ~?t~
end of motor are sealed. Apply silicone to bolts as necessary.
\'{'l/ t/7
2. Install c9mmutator end grease lines between bearing cap and \of.
brake ad~pter plate. Prefill the grease lines with 'Cyprina' RA
bearing grease. Install grease line breather caps. ~ &0""
3. Install brake drum, spacer and pick-up ring onto brake hub. Use
indicator to check runout at 4 positions and record. Should be
{)­~
0.010" or less. Torque safety wire fasteners.

RUNOUT: 1. ~...poo 2. - V-DO \ 3. o· ODo 4. D ·000 ~ ~


4. Install brake unit and secure with lock washers and bolts. Torque ~"r\~
and safety wire. Then clean brake cover and install. \Y\.l-­ ~O\
5. Wash and clean main shaft housing.
~\or:o
tN--: hY
6. Install grease seal and wearlbearing sleeve in upper end of main
housing. l'Mc­
~\~
7. Measure 00 of upper bearing bearing: Ib·...5:sb
~
Measure lD of main shaft housing: lb·;:> 54"
\'()L-­
'lR~
fl,~
Bearing/housing interference: 00· C 0 Q...."
8. Chill the upper bearing to -40°F ± 1QOF and install in the main '.:f2~<RJ
shaft housing. IT<=­ rv'>7
9. Clean the foot pad mating surfaces on both the motor and the
main shaft housing. ttL \\\o?,\Ot
10. Install the main shaft housing onto the motor using the locating
dowel" pins for alignment. Install bolts (after coating with anti-
seize), flat washers and castle nuts. Torque to 1500 FT-LBS.
Safety wire upper bolts, drill lower bolts and install cotter pins.
t{i... \~o'1\~
11. Wash upper gear case and thoroughly clean all holes. Y?~~
mL­ 0\
12. Install oil spray nozzles and related fittings in upper gear case.
Tack weld plumbing in place. !t\L. O\\r:f'.~
14. Install bronze bushings, O-Rings and alignment pins for
compound shafts into upper gear case. Verify oil hole in bushing
is in upper position. Verify bushing I.p. is 3.001 +.001 in. and
-.002 ~Qro
\tit.. CJ?-~
ream to size if necessary.
15. Install the pinion seal and O-Rings in seal plate. Verify correct
seal lip orientation. w.... \O'{)~
16. Install O-Ring in upper gear case. Use contact cement to secure
in groove. Attach upper gear case onto main shaft housing/motor
using dowel pins for alignment. Install bolts and lock washers and ~.;jb
torque. Safety wire all fasteners. \YJ­ ~
17. Measure 00 of the lower bearing: tC1, • co~
\~
Measure ID of gear case bearing bore: \lO·tjQ'1
o. D03," ~'\~
Bearing/housing interference: 1J'N-­ 0"
18. Chill the lower bearing outer race -40°F ± 10°F and install in the
upper gear case. Insure that the bearing is fully seated against ~KO
the bottom of the gear case, with no gaps in between. ~ ~\
Assembly Procedure, ASP 00009 Page 3 of 7
Revision A
MAINBODY/MOTOR INITIAL DATE
19. Measure OD of quill shaft: 112.604=
Measure ID of bearing inner race: \'2 . .soo ~
Bearing/shaft interference: Do • t"loA­ ttJ.-­ '{l­~
20. Heat lower bearing inner race with pre-heated bearing heater to K)~
250°F + 20°F for one hour and install onto quill shaft. tN- \'}~
21. Install vent and grease fitting onto side of quill shaft. (p\.~
'\t'.Q.-­ '\..~
22. Heat and install the seal wear ring to 250°F E ± E 20°F and install )..~\'I!t
onto the quill shaft. ,w..­ ~
23. Install the 'quill shaft/bull gear' assembly into the 'main shaft/motor
housing assembly' inspect for correct fit and positioning. XJf':
\N.- o,,'q~

24. Install quill shaft retaining nut and secure with lock tab. Attach
bolts to lock tab and tighten. Safety wire all ,:\fJ'Q\~
fasteners. ~ <}'-\

25. Pack upper qUill shaft bearing with EP type grease. ,:\f:>"o\~
~ ~
26. Install and verify correct seal orientation within the housing upper
lv\v't
bearing retainer cap. Partially fill bearing retainer with EP type
fv,\\9
grease. W-,:
27. Install bearing retainer and gasket onto main shaft housing with hf\do\~
screws, lock washers and lock tabs. Torque to 55 FT~LBS 'f'M--­

Assembly Procedure, ASP 00009 Page 4 of 7


Revision A
GEARBOX INITIAL DATE
28. Install O-Rings into groove on I.D. of upper gear case bushings
and lubricate them with grease. \'(\Q/ ~~\ffb
29. Install shaft/gear assemblies into upper housing bushings. (Be
careful not to damage O-Rings).

Shaft to bearing clearance: o 'OOl~ High Gear


9,'0
\~\~
Shaft to bearing clearance: 0·00'2. l:ow Gear f'M­
30. Install dowel pins and shifter-Shaft bushing into gear sUb~plate.
Drill edges near bolt holes(for safety wiring attaching bolts). Install
sUb-plate on upper gear case. Secure with bolts, lockwashers " ':O~
~ ~\)\'O
and safety wire.
31. Install compound shaft spacers. Verify clearance on 0.0. of
spacer to 1.0. of Sub-plate bores.

Shaft to spacer clearance: D-OO\ High Gear \~~


Shaft to spacer clearance: o· OD L> Low Gear ~ o/Y
32. Install Geneva drive shaft through bushing in sub plate from upper ~\\)ro
side. ~ ~
33. Install key in Geneva drive shaft and install Geneva drive cap on 'f/2.\"iJ'1 \~
shaft. f'ft..­
34. Use print to orient shafts, driver and Geneva for assembly.
Secure driver assembly with screws, lockwashers and small (p'1!?r\<$O
safety wire. f'N-..-'
35. Install test fixture and crank assembly (without spring). '(JofI(fl
MU 0\.1,
36. Clean bull gear. Check gear teeth for nicks and burrs. '1}'O..<fO
l'N/ ~
37. Secure the bull gear with bolts and ~ock washers. Torque bolts ~~ort
and lockwire. t'f\&
38. Measure bull gear Run Out in four places. Maximum runout is
.006 TIR. ':f(()
Face: 1:0·000 2: -0 .00 \ 3: - o· 00 L 4: o·oo~ rp

39.
TIR: 1:0 · 0 0 0 2: - 0 co<z.­ 3: -0 -00 l4: Q . 00 ,
Measure 00 of hub for wear sleeve: \I. Db 3­
rNz ~'"
Measure ID of bull gear hub wear sleeve: J\. (9~9
~0
Ilt~
Hub/sleeve interference: - 0·00 B ('(IL.­ ev
40. Heat bull gear hub wear sleeve to 250 +/- 20 deg F and install on ~o~
bull gear. Insure that the wear sleeve sets completely on hub. f'N....= ~

Assembly Procedure, ASP 00009 Page 5 of 7


Revision A
41. Check and record pinion to compound gear back lash (4 places
90° apart). Backlash should be .010 to .040.

Low Gear High Gear


1.J2..:.J2l 4 1. O-Q':l-~

2·-'2..:.Qllf 2. 0' D8>o

3.Q.:.Q.\ l{ 3. ~ 'O'2-~
~\{f.
4. 0·01 c;:­ 4. () . o2.OJ f'l'\C..Q-­ ~
o\f!
42. Check and record bull gear to compound gear back lash (4 places
90° apart). Backlash should be .010 to .045.

Low Gear High Gear


1.~) 1. O'o~o

2.0 . 08> 1 2. o· O.2-~

3. 0 . o~"'O 3. 0'°24 ~Gt:


~'>J\
4.~% 4. o ·o~o
mv \()
43. Remove test fixture and crank assembly. -:,\<R:;
ffiL-= ~
44. Thoroughly wash lower gear case.
f'{\L-­ 1--q~~
45. Chill dowel pins to -40 +/- 10 deg F and install in the lower gear
case. f't'.k \\'(l}\~
46. Install shaft bushings in lower gear case. Verify bushing 1.0. is
3.001 +.001 in.
-.002
and ream to size as necessary

Shaft to bearing clearance: 0-00\ High Gear ~


Shaft to bearing clearance: 0- 0 015 Low Gear fl\Q.­ £'
47. Instal/lower gear case and gasket onto upper gear case with bolts
and lock washers. Torque and safety wire. \'<\C­ \'0.or\r;R.
48. Freeze gear changer shaft and press onto gear, press bushing
than screw plunger springs and roll pins.

Interference: - N~ ..­ - ,l\.l ~


49. Install seal onto torque limiter housing, put clutch onto housing
then match gear changer onto clutch.
'!
Check clutch settinQ: ft-lbs ~ 'J'~
50. Install O-ring onto gear changer housing than put torque limiter ~
adapter assembly into housing. Install this assembly onto lower ~~
gear case. ~ ~
51. Install gaskets and lock plate onto lower gearcase then install
thrust washers and spring onto gear shifter then shifter assembly \~
onto lower qearcase. W\L-­ ~,\'O'"'l

Assembly Procedure, ASP 00009 Paga 6 of 7


Revision A
52. I Set shifter to "High" gear then install indicator gears, timing them
by matching drill points. ft\L---' 1"\2?r~
53. I Install drive indicator housing and spacer using test indicator.
N'\L--­ 1\'\\()1'\~
I Install oil lube system.
I\P\~~
54.
role
55. I Install oil level sight gauge in lower gearcase.
t'f\L 1\~\'0""~
56. I Verify seals are installed in rotating head, pack area between
seals 100% with Cyprina RA or equivalent, then install rotating
head.
\d?:
'Q'\
Record SIN (if supplied): RHe, 1'2 LJ I f2 9 'ff\C...._ I~
57 I Install cover plates over motor openings (for test only)
L
58. I Mount motor housing assembly in test fixture on cart and turn
lL
.,
upright.
59. I Install test stand drive shaft.
/
60. I Rig up for motor test

I Motor test per TS


61.

I Rig down from motor test.


'
l
62.
/
63. I Remove from test cart.
v
-~

COMPLETE-*~APERWOR~~:: ;, ~~Q
Leadman (/~-./'
/ ...-
.
Stamp iP"
ll,ooO_\
'-\ ...
I..J'::""" .~,

·'<.:·l

Assembly Procedure, ASP 00009 Page 7 of 7


Revision A
Customer: ABAN PEARL PTE LTD Test Report No. :

Job No. : Test Pressure :


_~PS Vjj~§12LYV Oft]02_4J _ _lOOOJ2si _
P.O. No. : Duration: 30 mins
_._--_._-----------_.

Pressure Test Medium Test Recorder Serial No. : 0103334

~ - Hydraulic Oil Calibration Due : 29 !UN 2009

c=J - Fresh Water Test Gauge Serial No. : NOY-Ol

c=J - Air Calibration Due : 13 MAR 2009

Technician : VINCENT Date ofTest : 01 AUG 2008

Test Started at : hrs Test Stopped at : hrs.

Pressure Chart Signed : SINGHW Test Accepted ~ Test Rejected c:==:J

Item's Description :
1. AUTO RETURN CYLINDER ASSEMBLY QTY: OlEA
PIN: 80366
2. MOTOR ALIGNMENT CYLINDER ASSEMBLY QTY: OlEA
PIN: 30172237

Remarks:
PRESSURE CHART ENCLOSED

PRESSURE TEST WAS PERFORMED AT CYLINDER ROD AND BLIND END


AND WAS FOUND TO BE ACCEPTABLE IN ACCORDANCE TO THE
APPLICABLE ACCEPTANCE CRITERIA

For NOY: For Client: Cel1ifying Authority:

~'~~
<~
~~~
t) F;
.'
;:;' ~ ;P'
' f } - 1f­
'.t;
NA N.A.

o '1yt~O\.),

Issue A I Rev. - (Oct 2005) FORM No. - WIF Y-02AI



--
Customer: Aban Pearl Pte Ltd Test Report No. :

Job No. : Test Pressure :


DSW~?_2.19"--:WO# 202~1 300012_si_ _
P.O. No. : Duration: 30 mins

Pressure Test Medium Test Recorder Serial No. : 0103334

d - Hydraulic Oil Calibration Due: 20 JUN 2008

r-l - Fresh Water Test Gauge Serial No. : NOV-OI

c=J - Air Calibration Due: 13 MAR 2009

Technician : MARAN Date of Test : 12 JUN 2008

Test Started at : hrs Test Stopped at : hrs.

Pressure Chart Signed : SING HW Test Accepted 9 Test Rejected c=J

Item's Description :

1. MOTOR ALIGNMENT ACCUMULATOR QTY: OlEA


PIN: 84601-3

Remarks:
PRESSURE CHART ENCLOSED

PRESSURE TEST WAS PERFORMED AT FLUID END


AND WAS FOUND TO BE ACCEPTABLE IN ACCORDANCE TO THE
APPLICABLE ACCEPTANCE CRITERIA

For Client:
Certifying Authority:

0w

~ '0
,; ~<p ~
..,.,)$ f-
A ~~

';
N.A. N.A.

tl t 0 {. ~ o<V

Issue AI Rev. - (Oct 2005) FORM No. - WIF_ V-02A 1


Customer: Aban Pearl Pte Ltd Test Report No. :

Job No. : DSW/S619, ~9~)0241_ _ Test Pressure : 3000psi


P.o. No. : Duration: 30 mins

Pressure Test Medium Test Recorder Serial No. : 0103334

c;6 - Hydraulic Oil CaJibration Due : 20 JUN 2008

r-l - Fresh Water Test Gauge Serial No. : NOY-01

~ - Air Calibration Due : 13 MAR 2009

Technician : SAMKOH Date of Test : 25 .TUN 2008

Test Started at : hrs Test Stopped at : hrs.


/

Pressure Chart Signed : SINGHW Test Accepted cz::::J Test Rejected ~

Item's Description :
1. COUNTERBALANCE ACCUMULATOR QTY: 02EA
PIN: 82674

Remarks:
PRESSURE CHART ENCLOSED

PRESSURE TEST WAS PERFORMED AT FLUID END


AND WAS FOUND TO BE ACCEPTABLE IN ACCORDANCE TO THE
APPLICABLE ACCEPTANCE CRITERIA

For~W<" o~ For Client: Certifying Authority :

W~(o li:tj
l/)

)lo-N'OI

UlOl.l~r
~
NA. N.A.

----------------------------------------------- ---
Issue A I Rev. - (Oct 2005) FORM No. - WJF Y-02Al
1 HR. -----.­
30 M.
..
·w Ot
- - - - - - - . I:LL
I..VVJ::..... VARC
TDS FUNCTION TEST / BENCH TEST

Customer
Rig
Date of Test
TDS Model
Serial Number
Configuration Number

Item # I Description I Result/Remarks I Verification


1 BLOWER SYSTEM
1.1 Blower Configuration
1(€1'A~~ &~W&7"'{
1.2 Motor Specification
NA
1.3 Motor AMPS (Running)
NA­
1.4 Impeller Rotation
AlA
1.5 Differential pressure switch signal
Nit

2 OIL PUMP & MOTOR


2.1 Motor Specification I:/t.. ,.~ KV'}J
., ~lT' uts ~-~~o
NAn.' I roo
H.:z "

k?:'~
I
2.2 Motor AMPS (Running)
'""(' c2~h1'r
2.3 Gear Pump Type (3S/2S)
2s:.

2.4 Pump operating pressure (PSI)


l--LA

2.5 Heat Exchanger Fan rotation (if any)


IJA
2.6 Oil pressure switch signal
N'A­

-...._'"

Varco International Pte Ltd 9, Tuas Avenue 5 Singapore 639335

Page 1 of 3
Item # Description FtesulU1{ennarks Verification

3 ROTATING HEAD / PIPE HANDLER FUNCTION


3.1 Torque Wrench switch

3.2 Link Tilt (Specify Type/ Model)


(),~

3.3 mop Open/Close


OK
3,4' . Pressure drop to 30 PSI at open position
after time delay c-tz
3.5 mop pressure switch activate when

close
OK
3.6 Torque Wrench (Specify TypelModel)
N~

3.7 Check for leakage when pressurized


rA/JA

4 HYDRAULIC SYSTEM
4.1 Check for leaks on cylinder and fitting

connections

4.2 Counterbalance Manifold Valves (PRV .­

&NV)
4.3 Accumulator Nitrogen Pre-charge

pressure (PSI)

4.4 Motor alignment cylinder manifold

valves (PRV & NV)

Varco International Pte Ltd 9, Tuas Avenue 5 Singapore 639335

Page 2 of 3
.

Item # Descriotion Result/Remarks Verification

5 TRANSMISSION (a2 DRILLING POSITION


5.1 Check for transmission oil leakage @
• Gear case Gasket NA­
• Suction Strainer plate gasket
(for H Model only) N6
• Bull gear seals (Lower Gear
case/Rotating Head) ~.D

Customer representative:

(Name & Signature)


Date:

Varco International Pte Ltd 9, Tuas Avenue 5 Singapore 639335

Page 3 of 3
SECTION 7

Purchase Order

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241
\

®
a ean e LT.,

WORKORDER

To,
VARCO INTERNATIONAL-PTE LTD P.O. No. : WQ/SYD/APJ029
9, TUAS AVENUES Date : 26/06/2008
SINGAPORE - 63.9335 Q~n. Ref.·: QTE-S~W-00710-1, QTE-DSW·00703-1,
Q,TE-DSW-00700-1. QTE-SHW-D0372-1
DalEt ; 24(0612008 & 2710612008
Phone: 065 - 6861 1566 M.R. No.:
Fa)( 065 - 6861 17~6 DatEt
FOR: Aban pearl
Dear Sil1il,
• _.J - ...
a •••• -"~~ '"'._ __ ,...,.... .....­ .... - ._ .. _..-.....
~ M •• _ . , . __ •

Unit Ra1e Valu.e


SI No. pescrip1iol') Oty Units
USD US!;;)
1 b'lsasse.mbly & Inspection of Upper and Lower Female 1 Lot 3,400.00 3,400.00
R~ceptacl~s a~ per belQw
Upper Female & Lower Female Receptacle
a. To bla.st clean receptacle with hlgn pressure water jet
b. To perform iJjsual and dimentioni:l1 inspection
c. To perform MPI and hardness check
d. To record' and supmit report
2 RepC1lr of TDS'AI-j Top Drive Assembly including spares as 1 Lot 266,018.72 -ltl6,fl1lUa­
per your Annexure - A enclosed

3 Complete overhaul of Shafter 80,000 Ibs Ris!3r T!3nsioner 1 Lot 777,655.78 777,655.78
Assembly - 6 Wnits as per Annexure - 8 enclosed
(Including. Spcires)
4 Cotnpl~te Qvefhaul of Shaffer 16,000 lbs Guide!ine 1 Lot 496,~30.89 496,;330.89
Tensioner Assembly - 6 Units as per Annexure - C
enclosed (InclVding Spares)
rOTAI. U~D i ,54-3,4Q5.39
Completion Time :Top Driye 1st Aug. 2008, Riser Tensloner" a-Weeks & Guide Line Tensioner - 5th september 2008.

Consignee: Aban Pearl p'te Ltd.,


Terms of p~yment: 30 Days
Your bill for the above may pl~ase be sent to Aban Pearl Pte Ltd., 32-03, No.8, Shenton Way, Singapore - 068811,

Yours Faithfully

For ABAN PEARL PTE LTD.

~~ =t;1l1~T;''''''''
This order is valid only of deliv81Y is made wilhin lhe period mentioned. Please quote our order number and date in your deJivelJ' challan and
invoice. Acceptance of all supplies are SUbject to inspection by ow Quality Control G)epartment. Any item rejecled by oOr QC Departmenl Will
have lo be taken baclo; and replaced by acceptance quality immediately. Guarantee 1Waranlee Certificate must be submitted along With the
supply. All disputes 10 Chennai jurisdiction.

Page 1 of 1

Reyis!ered & Corporate miiee :.# 32·Q3, No.8, Shflt~n 'Nay, Sii:y"per8· 058811

Co RegeL Nil. 2f1J71B564~ Tel: +%·65DOI300 (iJ 9 r ax : +f35·6l8,~55'~O

ANNE;XURE· A TO 'N,(J}#WOfSYD/AP/029' DATEO.~6106f2008


mmm
SI No. Description Qt'y I Units IlJnitUSPB'!Je I Value
l,JSD
I
Repair Qf TD~ 4H Top Drive Assembly
1 ILabour Charg'es:
To disassemb.I~, 'repair and reassemble TDS 4H Top Drive
Assembly usi~@l' listed materials. As modificatiOn and re'pair I
rebuild G9sf~ ~can vary dependirig on the condition of the
orig [i'la I equip'fiT1ent itSelf, actu~1 charges will be bas'ed Qn
actual shop ~O.ulS accumulate'd and currenl .shop rates at
NOV SerVice ¢€fflter doing work.
Total Workshpp Labour 'Charges for TDS 4H Top D,rivel 1 lot 54,700.00 54,700.00
As~embly

2 IMiscellanec:>u$. Charges:
Iflcluding ~ras~et, nuts, bolts, hoses, fittin'gs and expendable
Itenis, ili'GiUde§ cleaning, wat~r blast, MPlirispecticms, prime
aQd paint to NOV specificati0ns. Excluq,es worn or dam?ged
pQrts that nee~ rep,lacement r;:>atab0ok and cons.umables.

Note~ Pl1rts qUQted in sales qL!ote on are nQt charged here.


Total Mlscella~'e9Us Ch?rges: I 1 lot 9,800.00 9.800.00
3 IOuts~de Servtces.f Machine Charges:
313 Motor
DC m0tor GE :752 for service. 1 1 each 12,200.00 12,200.00
R~pair of 20 rip 460V Blowe-r Motor 1 each reO.OQ 780.00
Rep:air of 2 HP: 460V Oii Pump Motpr 1 eaeh laQ.Oo 780.00
3b IAlignment Cy,lindiH Components (Duplex C9Jinder)
Mashin-e New'Pislon RodS

Machine' New 'Barrels
I 2
2
each 480.00 960.00
each 340.00 680.00
Machin~ New :Slir:ld End Clevis 1 each 850.00 850.00
36 IG'ear.oas.e I ~:~i:nshaft Housing
Mainshafl MP! in:sp.ecti0f1, Flexible Rattling, ID Gauging, Ut
InspeCtion
Ch'$ek Wash !Dut·a(e~ Clhd Conne\:\ions lnsp'.ectiofl 1 ea..~h 3,680.00 3;680.00
Pressing LiP anQ phosphating of mainshaft 1 each 720.00 720.00
Repqir of bear:ing· ib bore on Upper Gearcase 1 each 6,500.00 6,500.00
Replace both worn Trunien Pin's 0n Quill Shaft Hse 1 each 3,800.00 3,800.00
3d IRptafing HEla!:l Assembly
Rec;hFGme of ~o.tating Flange and repair of wom area on thel 1 each 4,200.00 4.20000
undersl~e
Repair worn area on Cam and Machine to Specification. I 1 each 2,200.00 2,200.00
Repair worn ~fe'a on OD of Swivel Block and Machine to 1 each 2,400.00 2,400.00
Specification.
Others
To repqir crack on Dolly w~lamenl and repair of pin hole ani 1 each 5,200.00 5,200.00
Lug
4 !Spare Parts for Repair Job as per your Sales Quote 10568641 1 Lot 156,568.72 156,568.72
Revision 1 (202 line items)

TOTAL usn 266,01.8.72

ANNt:XURE - B TO Wp # WO/SYD/APJ02·9 DATED 26/0612008


ram
81 No. Description Qty I Unrts I Ull!tR~te I
USD
Value
u~n
I
For CompletE'! Overhal,Jl of Shaffer BO,OOOlbs Riser
Tensioner As$el1lbly ·6 units

1 10& 1 Charges:.
To disassembl~ BOK Riser TensiQneJ Assembly., waterblast
to remove paint and clean all parts to bare metal, f0IIowed by
performing of Visual and dimensional inspectit>n, MPI and
OPt on all· part~.
To record and ~uQmit r€port.
Total 0 & I Chgrges are (Quoted)

2 Labour Charg~s:
To repair, se~jce, pressure test cylinders I reservoirs and
re?!ssemble 8(:jK Ri~r Tensioner Asserntily using listed
materials, As rDodlficqlipn and repair /" rebUild costs can vary
dependihg on lhe condition of the original eql.!ipment itSelf,
actual charge:s Will be based on a~tual shop hours
ac.cumulated <ind curtent shoj) rates at NOV Service Center
doing wo~k.
Total Labour $harges: I 6 Each 15;500.00 93,000.00

3 Miscellaneous Charges:
IAci~dlng gask~~ nuts, polts, hoses, fitlings arid expendable
Items, ihclud~s c1ear)ing, prime and paint to NOV
speciffcation. ~xGludes worn or d.amageQ parts that need
replacement Oatabook and c0rls.umables
Note: Parts quo(ed·in sales· quote are not charged here.
Total Mi~ceH~nE'!ol,JsCharges: ! 1 Lot 18,500.00 18,500.00

4 Outside.Seiitiees I Machine Charges:


Repair and reb,Wild of Cylinder Barrei as per draWing \ 6 Each 23,600.00 141.600.00
Repair and ret>;uild of Piston Ro·d as per drawing 6 Each 22,700.00 136,200.00
Renew both end Flange of Accumulator by welding as per 1 Each 9,000.00 9,000.00
draWing
Renew Flange.·Clf.Air-Oil Reservoir by welding as per drawing I 2 Each 4.500.00 9,000.00

Weld repair Head, Blind End


Repair Rod End Sheave Bracket
2
4
I Each
Each
1,700.00
3.800.00
3,400.00
15,200.00

5 ISpare for COn'lplete Overhaul jOb as per your sales Quotel 1 Lot I 351,755.78 351,755.78
1056834 Revi~Jon 1 ($4 line. items)

TOTAL U.$D 777,655.78


ANNEXURE - C TO WO # WOlSYDlAPl029 DATED 26106/2008
.. .,
F.imm
Vnit ~te Value
SI No. Description Qty Units.
. "
USb U$D

For Complete Overhaul cjf Shaffer 1B,OOOI~s Guidelhie


Tensloner A.ssembly - 6 units

1 Labour Charges:
To rep~ir, setVice, pressure test cylinders/reServoirs and
rea$semble 19K Guideline Tensioner Assembly .using listed
n1C!terials. Ai, modification and repair/rebuild costs can vary
depelldtng o~ ihe condition or-the origina! etjuipment itself,
Clctual 9harges
. I
will he based em actu"al shop hours
accumulate.Wand current shop rates at NQV Service Center
doing work.
Total Works~op Labour Charges 6 Each 6,60Q.00 39,600.00

2 Miscellaneous Charges:
ificludlng gas:;Ket, nuts, bolts, hoses, fittings and expendable
Items, includ~s cleaning, prime and paint to NOV
s~ecificatiqh.i Excludes worn or damaged I'grts that ne~d
repiaGement5 Databook and consumables
Total Miscellaneous Charges: 1 Lot 16,400.0D 16,400.00

3 Outsj~e'Serldcesl Machine Charges:


3a Repair ~nd r~JJlJlld of Cylinder B~rrel as per d'rawing 6 Each 18,400.00 110,400.00
30 Repair anQ' r~b_u.ild of" Piston Rod as per drawing 6 Each 12,800.00 ' 76,800.0{)
3c Repair Roa End Sheave Bra"cl<et 0 Each 4,200.00 25,200.00

4 Spares for C~mplete Overhaul job as per your Sates Quote 1 Lot 227,930.89 227,93D.a9
1056S81 Re~ - 1 (37 linEl items)

TOtAL \.ISO 49&,33{).8~

SECTION 8

Delivery Order

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241
NATIOt>.lAL OILWELL VARCO PTE LTD

R'j<,_SOLUTIONS GROUP
Delivery Order
9, T ....AS AVENUE 5

SINGAPORE 639335

TEL: MAIN (65) 6861 1566


Delivery Order No: DLO-00884
FAX: (65) 6861 0796

Job No: IDSW-5619-20241 Rig Name: ABAN PEARL Date: 12 August, 2008

Purchase Q,rder No's Sold To: I Ship To:

AP/SYD/Ol2 ABAN LOYD· 11102

WO/SYD/AP/029
Contact: Contact:

Phone Number: Phone Number:

Fax Number: Fax Number:

Emai IAddress: Emai IAddress:

Address: Address:

P~_. Detail
Item "]Model J Part 'Numbe;:-ro;scriP;i~n Qty Package Unit Pac'kage No
.­ -­
l
-
N.A I TDS-4H TOP DRIVE ASSY. t UNIT
I -2 N.A MAIN SHAFT<: ., __ ~ --'-)
i-
EACH

Package Detail

Comments:
RETURN AFTER REPAIR

RECEIVED THE ABOVE IN GOOD ORDER

~\q-
COMPAN~. \-\\~~ n J
rA%\Q({ 1-"'1&c;ttt\.{; r
CUSTOMER'S SIGNATURE AND STAMP

Issue 1 Rev. - (Ocl. 2006)

C}? \t.Wv ~ ~f,\ d/,


SECTION 9

Certificates

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241
National Oilwell Varco Pte Ltd
9, Tuas Avenue 5
.W1fI;w.VARCO
Singapore 639335
Tel: (65) 6861-1566
Fax: (65) 6861-0796
Co. Reg. No. 197700997Z

Reference No. : Yom PO # WO/SYD/AP/029


Om Job # DSW/5619 WO#20241

5 November 2008

ABAN PEARL PTE LTD


RIG: ABAN PEARL

Dear Sir,

CERTIFICATE OF CONFORMANCE
This is to certifY that the following equipment listed below was/were Serviced, Repaired, Inspected
and Tested in accordance with the National Oilwell Varco Specifications and the Customer
Requirements.

NATIONAL OILWELL VARCO offers a six-month conditional and limited warranty on all parts
replaced from the date of completion of repair.

Country of Service / Repair: SINGAPORE

No. illY Description


1 TDS-4H TOP DRIVE ASSEMBLY
REF ID: DSW5619

M
Sing Hun Wei K.B. Tan

Workshop Supervisor QHSE Manager

SECTION 10

Tax Invoice

National Oilwell Varco Pte Ltd 9, Tuas Avenue 5 Singapore 639335

DSW/5619 WO#20241

...• •••
'.
:. - TAX INVOICE
REG No. 1977009972
GST No. M9-0009S20-L
DEBIT MEMO / INVOICE 7007898
DEBIT MEMO DATE 09/29/2008
PAGE 1

Bill to: Remit to:


11102 B009 NATIONAL OILWELL VARCO PTE LTD PO # WO/SYD/AP/029
ABAN PEARL PTE LTD HONG KONG & SHANGHAI BANK CORP LTD Pmt terms NET 30 DAYS
USD A/C # 260-372727-178 Currency ($,
8, SHENTON WAY, SWIFT # HSBCSGSG UNITED STATES DOLLAR
#32-03 Del terms EX-WORKS
SINGAPORE 068811 Contact SATISH
Sales Rep Jeanette Tan

COmment: REPAIR OF TDS4S TOP DRIVE ASSY.


OUR JOB NO: DSW/5619, WO# 20241 - RIG : ABAN PEARL

Document number Line Tx Item number Rev UM Date Quantity Net price Extension
Customer PO # Description Packlist H

6889 DSWM EA 09/24/08 1.0000 156,568.7200 156,568.72


DSW:5619 DRILLING SYSTEM WORKSHOP MATERIAL
6889 3 DSWL EA 09/24/08 1.0000 54,700.0000 54,700.00
DSW:5619 DRILLING SYSTEM WORKSHOP LABOR
6889 4 DSWO EA 09/24/08 1.0000 54,750.0000 54,750.00
DSW: 5619 DRILLING SYSTEM WORKSHOP OTHER

* ITEMS SUBTOTAL 266,018.72

DISCOUNT AMOUNT

* CHARGES SUBTOTAL .00

TOTAL **DEBIT** AMOUNT 266,018.72