Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

The Formwork Experts.

Capability in
bridge‑building
How you get there makes all the difference. www.doka.com
The advantages are
there for the taking
The facts decide.

Doka is firmly committed to building its formwork-technology lead. This is why it keeps on developing
measures to boost construction efficiency, and energetically putting these into practice. Firstly in formwork
systems, and secondly in the technical services to go with them. A Doka formwork solution is always a
package that gives our customers tangible benefit and added value. We have a client-orientated mindset and
'build bridges' to the goals that our customers have.

As a pathbreaking formwork manufacturer, we take an all-encompassing view of the construction sequence.


Formwork planning and formwork statical calculations are just as much a part of our spectrum of services
as are formwork pre-assembly and the subsequent return procedures for rented formwork. Only a seamless,
end-to-end formwork concept will deliver the best results. The mere fact of dealing with just one partner for
all the formwork ensures that the interfaces are well co-ordinated and work together smoothly.

Bridge-building makes particularly exacting demands in terms of construction-engineering and statical


knowledge, quality and precision. Our experience as a formwork partner stands on firm pillars.
The bridge from
knowledge to experience
Our capabilities have a wide span.

We focus on the formwork-engineering challenges right from the design phase. Even at this early stage, we
start contributing our knowledge to enable the works to be carried out swiftly, efficiently and economically.
We bring much more to the table as well: the solution, in terms of the right formwork system.

Pylons and piers

Our extensive planning expertise and high-performing crane-climbed and automatic climbing formwork
systems can handle great variability in the design of piers and pylons, of no matter what geometry, height
and dimensioning.

Shoring towers

Cost-effective planning and on-time delivery of materials-optimised shoring scaffolds for transferring high
loads from bridge superstructures safely and economically.

Cantilevering

Outstanding cost-efficiency and rapid equipment availability, made possible by Doka's rentable all-in-one
system. Also, high certainty regarding the planning and execution, thanks to thorough project support from
Doka, taking in everything from detailed planning to co-ordination with the superstructure designer to on-site
support by the Competence Centre for Cantilever Construction.

Composite bridges

Cost-effective solutions for widely differing bridge geometries are achieved by using a rentable, variable, all-in-
one system, and by the comprehensive project support provided by the Composite Bridge Competence Centre.

Launching-girder equipment

Project-specific planning and pre-assembly of high-performing formwork systems, and our long-standing col-
laboration with leading suppliers of launching-girder equipment, mean smooth, efficient construction progress.

Incremental launching

Project-specific planning and pre-assembly of variable formwork systems for casting-yard construction, with
practical formwork closing/opening logic for time- and cost-optimised workflows.

Arched bridges

Extensive planning services, and rentable formwork solutions that can be specifically tailored to the statical situ-
ation of each superstructure, for optimised load transfers and for ensuring that the project progresses to plan.

4 | Capability in bridge-building
Closer to the goal, a stage at a time
With Doka, active project support is a 'given'.

The aim of all Doka's preliminary services is to achieve greater efficiency by providing transparently costed and optimised formwork concepts. The sooner the Doka technicians start inputting their knowledge and experience into the project, the more efficiently it can then be carried out.
With our active project support, we fulfil this aim in each successive stage of a project. As early as in the Project Development Stage, our know- In each of its stages. And by staying with the project all the way until it is successfully completed, Doka builds long-term partnerships with its
how and expertise give our customers the basis on which to take well-founded decisions. customers.

Bid invitation by Order awarded to Order awarded


project owner construction firm to Doka

Project Development Stage Bidding Stage Project Mgmt. Planning Stage Concrete Construction Stage Project Close-out Stage Success of project

The stage in which decisions are The stage in which the overall frame- The stage in which the forming The stage in which the formwork- The stage in which the forming With our project-specific formwork
taken based on professional advice work is defined: operations are organised for greater engineering resources are optimally assignment is satisfactorily closed out solutions and a range of service
and consulting: efficiency with the aid of optimised deployed with assistance from experi- with professional support and a high offerings that are geared to the needs
selecting the optimum construction formwork concepts: enced Doka Formwork Experts: degree of transparency: of the project, we put our customers'
detailed analysis of the initial methods and formwork solution project-success on a firm footing and
situation specifying the commissioning co-ordinating with superstructure formwork dismantling build long-term partnerships.
determining the commissioning
identifying the risks applying to quantities designer return of rented formwork
quantities
planning, execution and costs co-ordinating lead-times and shop drawings incl. statical
bid planning, incl. bills of materials return delivery
selecting the construction method handover deadlines calculations
binding bid prices for rental and cleaning and rehabilitation
logistics concept ready-to-Use Service
purchase jointly handled close-out
transport logistics

field service (Doka Formwork


Instructor, formwork pre-assembly, ...)
myDoka –
online formwork controlling

Ongoing advice and support from a dedicated contact person


Engineering
myDoka
Field service

6 | Capability in bridge-building Capability in bridge-building | 7


Flexibility as a system
Complex structures. Complete solutions.

Doka's range of formwork-technology offerings is among the largest and most versatile on the market. This has a lot to do with the modularly
designed systems. And this, in turn, is based on decades-long experience of many different construction assignments in many different countries,
across the entire architectural spectrum. What all the various Doka systems have in common is superior safety standards coupled with the very
greatest efficiency and ease of handling.

Automatic climbing formwork SKE plus Cantilever forming traveller (CFT)

Aids construction of technically demanding bridge pylons with its great Smooth, safe construction progress is facilitated by this rentable
adaptability to widely varying layouts and inclinations. all-in-one system comprising both the supporting structure and the
formwork, with integrated working platforms and ladderways.

Load-bearing tower Staxo 100 Bridge edge beam formwork

Safe shoring of high loads and excellent adaptability to different Great variability and efficiency for widely differing project require-
layouts, made possible by high load-bearing capacity and variable ments, achieved by a broad product line ranging from a simple single
inter-frame spacing. bracket all the way up to overslung or underslung bridge-edge forming
wagons.

DokaShore shoring system Large-area formwork Top 50 for launching-girder equipment

Safe, economical shoring of high loads (e.g. from pre-cast concrete Excellent cost-efficiency, as the system adapts easily to complex
members) is made possible by this rentable modular system with a cross-sections and different loads.
load-bearing capacity of up to 430 kN per strut.

Composite forming carriage Large-area formwork Top 50 for incremental launching

High adaptability to different bridge geometries, and controlled con- A versatile modular system that adapts economically to many very
struction workflow thanks to a modular system concept consisting of different types of casting yard.
rentable standard components, enabling a weekly casting cycle.

8 | Capability in bridge-building Capability in bridge-building | 9


The world is getting Mississippi River Bridge R1 Selenec - Beladice
motorway

Bridges open up
Location: St. Louis, USA

smaller all the time
Height: 120 m Location: Beladice, Slovakia
Length: 960 m

new paths Behind every structure is a network.


Real-life results are what counts.
The closer-meshed a net, the more effective it is. Doka's network, with over 160 worldwide sales and logistics locations, is no exception. If you
want a local presence, you need local locations. Wherever our customers are, that's where you'll find our formwork-technology capability at work,
We don't go in for superlatives. Even though we do like to point out the exceptional and that's where our formwork systems are rapidly available.
dimensions of our references, and in so doing, the achievements of our formwork
technicians. The quality of our work lies in how it is rated by our customers, and in
their satisfaction.

Froschgrundsee Viaduct Auenbach valley crossing

Location: Coburg, Germany Location: Auenbach, Austria


Length: 798 m Length: 687 m

Tverlandsbrua Slip-road for Warsaw


Bridge, A2 motorway
Location: Vikan, Norway
Length: 670 m Location: Warsaw, Poland
Length: 268 m

Important notice: Always observe all relevant safety regulations (e.g. as issued by construction-industry employee safety organisations) applying to the use of our products in the You will find more references at
country in which you are operating. In addition, the User Information booklets (Instructions for Assembly and Use), which contain information on standard system set-up and on compli- www.doka.com/bridge-projects
ant utilisation of Doka formwork systems, must also be observed. The illustrations in this brochure show the situation during formwork assembly and are therefore incomplete from the
safety aspect. It could be dangerous to combine our formwork equipment with other manufacturers’. If you intend to combine different systems, please contact Doka for advice first.

12 | Capability in bridge-building Capability in bridge-building | 13


Art. no. 931109402 // 03/2013 en-GB

Doka GmbH | Josef Umdasch Platz 1 | 3300 Amstetten | Austria | T +43 7472 605-0 | F +43 7472 64430 | info@doka.com | www.doka.com

You might also like