Coal Yard Calculation
Coal Yard Calculation
1. The coal handling system based on 24 hours per day 7 days a week.
2. The Capacity Factor is 0,8
= 7992 m3
= 5328 m3
= 13320 m3
BASIC INFO:
Capacity Factor 80 %
Coal consumption (100% MCR) 7.4 T/H = 28.75553 m
Coal density 0.8 T/m3
Dead storage 45 days
Life storage 30 days = 3.622235 m
Stockpile Dimension
Stockpile volume 13320 m3 294.7708 m3
Quantity of stockpile 1
Space between stockpile 0m
Width of stockpile (b) 36 m 12986.33 m3
Angle of stokcpile (a) 38 deg.
Requirement height of stockpile 2.83 m a = 28.75553 m
b = 36 m
Minimum Coal Yard dimension h = 2.83 m
Width of coal yard (W)
W = b + space between 36 m
Conveyor inclination 80 m Based on Conveyor Vendor 141.7272 m
ST/RE parking area 44 m Vendor Data
Boom Length 32 m Vendor Data
Length of coal yard
224.97164 m Cone volume (A area)
r=c
Total area 3.622235 m
8098.9791 m2 t=h
0.8098979 Ha 2.83 m
SUMMARY
SCOPE OF SUPPLY
One Stock Pile Operating Data
Material : Coal (Bulk) Unit
Density : 0.80 ton/m3
Stockpile
Dimension : L1 141.73 m
LSP 148.97 m
a 28.76 m
b (widh of stockpile) 36.00 m
c 3.62 m
h (height of stockpile) 2.83 m
Coal Shed
Dimension : L2 56.33 m
Lcs (length of coal shed) 59.95 m
Coal Yard
Dimension : Ltot (length of coal yard) 224.97 m
W (width of coal yard) 36.00 m