Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12

KEY PLAN
MIA UNDERPASS

A A

02 02
UPSTAND NOTES:
NOTES:
COLUMN 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS
STATED OTHERWISE. ALL DIMENSIONS TO BE VERIFIED ON SITE AND
500X500
B APPROVED BY THE ENGINEER. B
2. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH RELEVANT
ARCHITECTURAL, MECHANICAL AND ELECTRICAL DRAWINGS AND ALL
EXPANSION JOINT RELEVANT SECTIONS OF THE SPECIFICATIONS.

3. MASS CONCRETE/SCREED SLOPES SHALL BE COORDINATED WITH MECHANICAL


DRAWINGS.
UPSTAND
4. GROUND WATER TABLE SHALL BE MAINTAINED AT LEAST 500mm BELOW
FORMATION LEVEL TILL THE CONCRETE STRUCTURES OF THE ATTENUATION
TANK IS FULLY CONSTRUCTED.
℄MIA UNDERPASS 5. PILES DESIGN WAS PERFORMED CONSIDERING THE LOADING EITHER FORM
THE CAR PARK OR THE WATER TREATMENT SYSTEM, SEPARATELY AND NOT
COMBINED.

6. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH DRAWINGS NO.


CDCBP-P2A-PIL-ST-1010 AND 1011.

7. THE GEOTECHNICAL DATA USED IN THE DESIGN EXTRACTED FROM REPORT


CDCBP-P086-CP02A-JEC-RP-0003-01 AND IT ITS AMENDMENTS DATED 14-10-2020.
C LEGENDS: C
T.O.F =TOP OF FOOTING
B.O.F =BOTTOM OF FOOTING
B.O.P =BOTTOM OF PILE
COLUMN
500X500 2000 INDICATES SLAB THICKNESS

GENERAL NOTES:
* ALL DIMENSIONS ARE IN MILLIMETERS.
* ALL LEVELS ARE IN METERS (m) .
* BARS CAN BE BUNDLED INLAPPING LOCATIONS TO AVOID CONJESTION
-THE CONCRETE COVER FOR BOTTOM RFT 100 MM
EXPANSION JOINT -THE CONCRETE COVER FOR SIDES 75 MM AND TOP RFT 50 MM
-THE CONCRETE COVER FOR COLUMNS ARE 50 MM
* BARS REINFORCEMENT NAMES : 22 T25-20-150 (T1)
NO. OF BARS
BAR DIA
BAR MARK
D SPACING
D
MIA UNDERPASS LOWER LEVEL PLAN (CITY SIDE ENTRANCE) - PHASE 1 BAR POSITION

(PART 2) AND PHASE 2 CAST IN SITU STRUCTURE IFC REFERENCE


01 CDCBP-P2A-PIL-ST-3001 (D02)
- ROOF SLAB BOTTOM REINF. DETAILS * REFER MEP DRAWINGS FOR PIPE SLEEVE/OPENING CDCBP-P2A-PIL-ST-3200(D03)
SCALE 1:75 AND DUCT LOCATIONS AND LEVELS CDCBP-P2A-PIL-ST-3210 (D02)
CDCBP-P2A-PIL-ST-3211 (D02)
CDCBP-P2A-PIL-ST-3220(D03)
CDCBP-P2A-PIL-ST-3230 (D02)

ALL REVISIONS ARE REVISED AS PER THE LATEST


REVISION D03 OF STRUCTURAL IFC DRAWINGS
E REV. E
DATE DESCRIPTION APPR.
NO.

Public Works Authority


02 P.O.Box 22188
02
Tel. : (0974) 44950000
Fax. : (0974) 44950999
www.ashghal.gov.qa Qatar Deserves The Best

PROJECT AFFAIRS
GENERAL ENGINEERING CONSULTANT

F
F
EXPANSION JOINT

CONTRACTOR

℄MIA UNDERPASS

PROJECT

CENTRAL DOHA & CORNICHE


BEAUTIFICATION PROJECT
PACKAGE 2A
G G
PROJECT CODE PA 2019 C 113 G

TITLE

STRUCTURE MIA UNDERPASS


CITY SIDE ENTRANCE
WALL,ROOF SLAB & UPSTAND REINF.
PHASE-1 (PART-2) SHEET 03 OF 04
DESIGNED STATUS
I. MAKKEYAH DETAILED DESIGN

H CHECKED M. AHMED APPROVAL Z. EL-BALBISI H

MIA UNDERPASS LOWER LEVEL PLAN (CITY SIDE ENTRANCE) - PHASE 1 DATE SEPTEMBER 2021 SCALE
1:100
(PART 2) AND PHASE 2 CAST IN SITU 01 DWG. NO. REV. NO.
- ROOF SLAB TOP REINF. DETAILS
SCALE 1:75
CDCBP-P086-CP02A-JEC-SD-STR-1045
02
1 2 3 4 5 6 7 8 9 10 11 12

You might also like