1. Define Production scheduling profile – PP consultant will be defining in PP Configuration
2. Assign Production scheduling profile in Material master of the material in Workscheduling view Also maintain the designated prod storage location
3. Maintain Production Supply area
Transaction = PK05
Enter any supply area name
Enter prod storage location which was defined in material master 4. Assign this PSA in work center (CR02)
5. Create Storage bin for storage type 100 (production st type)
6. Create Control cycle for PSA and material Enter material Enter PSA In second screen Maintain staging indicator = 1 Maintain storage type = 100 Maintain Storage bin = PROD
Configuration Check in process order for scheduling profile Select 1 – TR and TO creation on Release