WM-PP Staging

Master data

1. Define Production scheduling profile – PP consultant will be defining in PP Configuration


2. Assign Production scheduling profile in Material master of the material in Workscheduling
view
Also maintain the designated prod storage location

3. Maintain Production Supply area


Transaction = PK05

Enter any supply area name


Enter prod storage location which was defined in material master
4. Assign this PSA in work center (CR02)

5. Create Storage bin for storage type 100 (production st type)


6. Create Control cycle for PSA and material
Enter material
Enter PSA
In second screen
Maintain staging indicator = 1
Maintain storage type = 100
Maintain Storage bin = PROD

Configuration
Check in process order for scheduling profile
Select 1 – TR and TO creation on Release