Contents
Preface
Preface
According to years of rich project experience and in-depth work in Ethiopia, we, TEAMS
Engineering(Beijing) Co., Ltd. have well cognized and fully understood the industrial development
and existing technology status of Ethiopia, therefore, we put forward this Ethiopia lost foam
casting plant project planning which contains the implement plan and initial quotation at the same
time.
recently. Product of this plant has good market prospects, while at the same time, with
Production scale is suitable for the Ethiopia economies scale while it keeps the
As the widely adopted and matured advanced technology and equipment, it can meet the
equipment;
Combining with Ethiopia's current technical level and personnel technical skill, we choose
the most suitable transfer technology and strengthen technical training during the project
cooperation, so that to greatly enhance the technical level in Ethiopia and its independent
production capacity.
Based on our years of experience in international projects and our high technical level of
project management team, we put forward this feasibility study report and provide the
After careful study and analysis, we put forward this 5000t/annual lost foam casting plant
The technology and production line are suitable for producing other products
Lost foam casting is a process of combining the model of foam cluster which has the similar
size of the casting parts together, and then coating with fire resistant paint before dry it. It was
buried into dry quartz sand to modeling according to continuous vibrating by casting under the
negative pressure. With the gasification of the foam model, metal liquid occupies the foam model
position, after cooling and solidification, it forms the model. Lost foam casting is one of the most
Lost foam casting process meets with the general modern foundry trend. Compared with
High precision: lost foam casting is a new almost no residual high precision modeling
technology. Without modulo, parting surface, sand core, so that the casting parts do not
have edges, burrs and pattern draft. It reduces the size error caused by a combination of
the cores. Surface roughness can drop down to Ra3.2 to 12.5μm. Casting accuracy can
Flexible casting: It provides sufficient freedom for model design. We can cast a high
No traditional core sand: as there is no traditional core sand casting process and
equipment, it largely reduces the quantities of waste caused by core making. It will avoid
uneven casting parts wall caused by the inaccurate size and position of the sand ;
Clean: no chemical binder; the foam is harmless to the environment in low temperature;
more than 95% sand recycling rate; reduce dust, smoke and noise pollution; greatly
improved the working environment of the foundry workers and reduced labor intensity;
Reduce investment and production costs: reduce the weight of the casting blank; low
down machining allowance to 1.5mm to 2mm, greatly reduce the cost of machining;
Simplified plant design: fixed asset investment can be reduced by 30-40%; area and the
10-20%.
1. Plant construction proposal overview
1.5.1 Steel structured main workshop. One is 24 meters and another is 21 meters, including
melting, modeling, shaping, cleaning and other main production departments. Lost foam casting
technical characteristics needed to be considered when planning the plant layout. It must meet the
requirements of production, maintenance, transportation and fire protection. Placing different
green plants to different places of the plant to reduce dust, noise and other pollutes, as well as
decorating the room at the same time.
1.5.2 Office facilities includes office buildings, staff canteen and other basic facilities
1.5.3 Public facilities include water supply, power supply, gas & oil supply and others. Power
sub-stations set in the vicinity of the melt shop to provide the power for the whole plant.
1.5.4 Built a big stock yard for the characteristics of the lost foam casting
1.5.5 Separate staff and logistic flow ways, use weighbridge to manage in and out logistic in
warehouse.
预发→成型→白模烘干→粘接组合→涂刷→一次涂刷烘干→涂 刷→二次涂刷烘干→涂刷→三次涂刷烘干与储
三涂烘干、储存 三涂烘干、储存 三涂烘干、储存
模型方向 model direction 三涂烘干、储存 二涂烘干 二
131415 16
1 3 4 5 6 7 8 9 10 11121718 19 20 22 23 21 24 25
17 14 1 2 5 6 7 8 9 14 10 11 12 22 23
Twice drying Assembly runner Paint compensation Drying Conveying to the modeling line
Pouring
Cooling
Sand shakeout
Pig iron, scrap steel, waste casting are stored in daily consumption warehouse; after surface
cleaning at the cleaning drum of daily consumption warehouse, pouring cup will be stored in
the daily consumption warehouse.
1 sets of 2Ton medium frequency induction furnace (double furnace body, dual power supply)
and 1 sets of 1ton medium frequency induction electric furnace (double furnace body, double
power supply), according to the high temperature, we get the high quality iron liquid;
According to the ingredients, the iron will be conveyed to the weighing by the microcomputer
iron distribution scale and then been put into the feeding container and moved to the furnace
by electric flat car in front.
Use crane to lift the feeding container in front of the furnace and then pour the materials to
the medium frequency induction furnace. Turn on the electric furnace to melt;
The iron liquid comes from the medium frequency induction furnace will be transport to
pouring area in the casting ladle by crane. Crane Bridge mounted with electronic hook weigh
which can accurately weigh the quantity of the iron liquid casting ladle.
In quick analysis lab, using the vacuum direct reading spectrometer to control and adjust the
chemical composition of the liquid iron rapidly, to ensure the quality of molten iron;
Configure the crushing mill, casting ladle, baking facilities,
The melting process flow diagram:
Pig iron Steel Chip block Return scrap
scra
p
Feeding device
Alloy
Electric flat car
casting parts has no sand core. Compare to traditional casting, it has no process of burr so
that grinding workload reduced correspondingly.
Shakeout sand after casting will be transported to municipal castings stacking area in
barrels with a forklift.
In the ground casting stacking area, use hydraulic casting machine to removal pouring cup.
Use continuous sling shot blasting cleaning machine to clean it up.
In the manual cleaning bench with portable grinders and other tools to clean up the
remaining part of riser and local sand part.
Second time for cleaning.
All casting part needs anti-rust treatment. After the treatment, the casting parts shall be
hung on the suspension chain.
The cleaning process flow chart
Production capability: output of the gearbox house 5000T annually, weight 72kg, then the
annual output is 5000 x 1000 / 72=69445 piece;
Annual work time 2400 hours; hours production 69445/2032=34 piece, included 5%
waste, then 35.7 pieces / hour;
Casting production per hour: 5000 t / 254 days/ 8 hours =2.46t, as 5% of scrap and 10%
pouring cup, required hot metal amount 246 * 1.15=2.83t each hour; One set of 2T
medium frequency induction furnace and one set of 1ton of intermediate frequency
induction furnace can meet production needs. Use 2 sets of electric furnaces is intended
to produce different other parts at same time;
According to the size of the casting part, sand box size is 1400 * 1100 * 900mm, each box
placed 4 pieces of castings, It produce 40 pieces every hour which can meet the
requirements of the production capability.
Sand quantity per hour: 1.4 x 1.1 x 0.9 x 10 (box) =13.86 m³. According to a pearl sand
vibration compaction density: ρ=2.0tons / m³. Sand needs to be treated are 27.72 (tons)
every hour. Sand handling system will be 30t/h processing capacity;
Cooling sand processing capacity: 30 tons/hour, sand temperature after treatment is
≤50℃;
The sand supporting closed cooling tower, cooling water circulation: 100m³/h
According to the number of sand box and casting weight, negative pressure system
suction quantity: 35m³/min;
Foam beads consumption: annual production of 5000000kg castings parts, each kilogram
of foam beads can produce s 300kg casting parts, total of bead amount of a years is : 5
000000÷300 = 16667 ( kg ) , amount of beads every hours is: 16667÷2032÷0.8 =
10.2(kg)
Pre-expander: 25kg/h electric steam pre-expanding machine (EPS) can meet the
requirements of production;
Molding machine: 1000mm * 1200mm selection and 1200mm * 1500mm molding
machine, each mold can produce one model. Productivity ~15 piece/h. Annual modulus
is 69445 x 1.05 x 2=145835 piece, take 15% waste into account, the actual annual model
pieces is: 145835 x 1.15=167710 piece. Number of molding machine is
167710÷2302÷15=5.5 sets. Say, 6 sets.
Electric pre-foaming
machine(EPS)
Model:ROYF-I
Capacity: 25~30kg/h,
using power 5KW
simultaneously in actual
operation
2
No. Equipment Image example
4
No. Equipment Image example
Sandbox
ROSX-Ⅲ Size:
1400x1100X900
7
No. Equipment Image example
Model:ROLT-Ⅰ-9.5
Capacity:≥30t/h
Hopper running speed:
1.4m/s; Power: 5.5KW
Hopper width:250mm
11
20 / 36
7. Configuration table for equipment
ROJB-Ⅰ
6 coating blender (01) 100kg/(barrel) 1 1.5 1.5
with control box
Sub-total 33.8
steam pipe
2.4m³/min,
air compressor(screw) 1 15 15
0.7MPa
air compression & storage 3m³,0.7MPa
2 1 0 0
surge tank
3 cooling pipe
Sub-total 22.5
1 11
drying room and steam pipe
Sub-total 100.1
The equipments and facilitiesof black area and sand processing equipment
water cooling & sand ROLS-Ⅱ 2500X2274X model sand collection and
3 1 0 0
shakeout machine 1000 transportation; water cooling
sieving,transportation, removing
ROSF-Ⅲ 4000X1300X dust, wind cooling(10 mesh sieving
5 screening conveyor 1 5.15 5.15
1200 plate)
Configuration table for equipment
Power(u Power-k
No. Name Model Specification Quantity
nit)KW W Brief introduction
6 slag lifting machine ROTZ-Ⅰ 1 0.5 0.5 slags and iron beans are lifted out of
ground
ROLT-Ⅰ 1100X460X7
7 chain bucket type elevator -7.5 1 5.5 5.5
500 automatic alarm for breakdown
RORS-Ⅱ 1350X720X7
8 powder screening assembly 1 0 0 screen sand and soot particle
20
ROLT-Ⅰ 1100X460X9
10 chain bucket type elevator -9.5 1 5.5 5.5
500 automatic alarm for breakdown
ROLT-Ⅰ 1100X460X9
12 chain bucket type elevator -9.0 1 5.5 5.5
000 automatic alarm for breakdown
ROPD-Ⅰ Central
belt widthB=650, three-roller V type
13 belt conveyor distance 1 5.5 5.5
(03) conveying material by belt
L=21500
ROPD-Ⅰ Central
belt widthB=650, three-roller V type
14 belt conveyor distance 1 4 4
(01) conveying material by belt
L=8700
ROSX-Ⅲ 1400X1100X
19 47 0 0
sandbox 900 with walking wheel
ROFY-35
22 negative pressure 35m3/min 2 55 110 2BE253 pump head
A
assembling unit
Configuration table for equipment
Power(u Power-k
No. Name Model Specification Quantity
nit)KW W Brief introduction
ROCC-96
24 bag type dust remover 41472m3/h 1 55 55 match 1m³ air storage tank
-6
ROZK-Ⅰ 600X400X20
30 1 0 0
vibrating table control 0 bottom sand
cabinet
ROZK-Ⅱ 600X400X20
2 0 0 FM
0
negative pressure ROFK-Ⅰ
32 assembling units control (01) 1
since lotus-root reduction voltage start
cabinet
37 1 15 15
water-bath dust remover
39 Sub-total 268.36
ROFT-Ⅰ
-2 diameter φ200 2 0.1
surroudin
g sand shakeout surrounding blocking
blocking
5 centrifuga 100m³/h,32m 1 15 15
cooling water pump l pump
3.2m³/min,
air compressor 0.7MPa 1 18.5 18.5
screw type
6 1m³ 1
air storage tank
Sub-total 39.2
2 2 5
cutting grinding machine
3 3T 1 0
forklift
4 1piece 57.5
spray paint line
Sub-total 142.5
Melting workshop
4 1T 2
cast iron ladle adjustable
5 1
spectrum analyzer five elements
6 Round cleaning roller Q118 1 7.5 7.5
7 crushing mill C258A 1 7.5 7.5
Gn=6t,S=143
8 Electric flat car KPD-6-1
5mm
1 2.8 2.8
9 Baking device 1
Sub-total 2029.2
Gn=3t,S=19.5
Electric single girder crane ,H=10m, level 2 7.9 15.8
A6
Sub-total 68.6
3 Design Design
4 Engineering design
Engineering design
5 Non-standard production line & equipment Non-standard production line & equipment
9 No.1 Patch
No.1 Patch
10 No.2 Patch No.2 Patch
12
13 Manufacture Manufacture
17 Purchase for utilities system equipment & materials Purchase for utilities system equipment & materials
18
19 Shiping Shiping
23
( By METEC )
24
Plant area & civil works Plant area & civil works ( By METEC )
25 Plant Engineering Plant Engineering
26 Civil Works
Civil Works
27
28 Site jobs of United Engineering (Beijing) Site jobs of United Engineering (Beijing)
Total 2,826,287.55
Subtotal 101,256.68
29 / 36
Quotation for 5000t/a lost foam casting plant
Total price
No. Name Model Specification Quantity
(USD)
steam pipe
2.4m³/min, 1
air compressor(screw)
0.7MPa
cooling pipe
3
water supply tank without tower 3.0m³,0.5MPa 1
Sub-total 85,322.66
1 11 53,966.58
drying room and steam pipe
Sub-total 81,077.87
The equipments and facilitiesof black area and sand processing equipment
6 ROTZ-Ⅰ 1 1,215.85
slag lifting machine
31 / 36
Quotation for 5000t/a lost foam casting plant
Total price
No. Name Model Specification Quantity
(USD)
39 Sub-total 659,714.83
ladder
guardrail
cover plate
chute
3 steel structure 13,864.93
maintenance
platform
surrouding
blocking
3.2m³/min, 1
air compressor screw type 8,425.61
0.7MPa
Sub-total 85,642.62
Quotation for 5000t/a lost foam casting plant
Total price
No. Name Model Specification Quantity
(USD)
3 forklift 3T 1 10,665.33
4 spray paint line 1piece 119,451.72
Sub-total 180,457.42
Melting workshop
Total 1,784,331.48
" Complete sets of equipment, production line installation and commissioning, trial production and technical
training
Quotation for 5000t/a lost foam casting plant
Total price
No. Name Model Specification Quantity
(USD)
thermodetector(one)+temperatur
13 15,358.08
e measuring probe(600)