Descriiption Input Value

AM notified by operator of blower siezed. AM contacts FC for recommendation. AM has third party dig sand out of
blower FC recommends we order new blower Third party spends 10 hours trying to free up blower no luck calls FC
replacement blower ordered through Badger parts dist. PO amount adjusted and approval matrix for increased spend.

To do

Log in as Maint. Manager

Home screen opens

To do

FC advises the blower be replaced with a reman blower. FC opens WO and assigns a PO. FC Orders blower from Badger
Parts Dept.
To do

Top left corner click on the ?Navigator?

Navigator window opens

To do

Under ?Supply Chain Excecution? section ? Click ?Maintenance Management?

Maintenance Management screen opens

To do

Next to ?Maintenance Organization? confirm you are in the organization desired. If Necessary click change organization
(CA_MNT for Canada, US_MNT for U.S.)
Select Organization window opens

To do

Click Drop down arrow

Drop down window populated

To do

select desired bussines unit (CA_MNT for Canada, US_MNT for U.S.)

In organization field desired BU populated

To do

Click ok

Select Organization window dissapears and proper BU is selected

To do

10
Click on the ?task? button on right hand side of page

Task window opens

To do

11

under work management Click ?Manage Maintenance Work Orders?

Maintenance Work Order screen opens

To do

12

click + to create a new work order

Create Maintenance Work Order window opens

To do

13

Enter asset number (unit number) in asset field

asset number in asset field

To do

14

Click on drop down arrow in work definition field.

Drop down window populated

To do

15

Scroll to desired work definition and click on it (corrective - vac system)

desired work definition selected

To do

16

Click on drop down arrow in type field.

Drop down window populated

To do

17

Scroll to desired type and click on it (corrective)

desired type selected

To do

18

At bottom of screen click on save and edit

edit work order screen populated and W.O. number populated

To do

19

Enter Description of work being performed in description field (replace blower)


Description in description field

To do

20

top right of screen select save

Confirmation will populate on top left under edit work order

To do

21

click on operations tab next to general information

operations tab opens

To do

22

click on items in desired operation tab

edit operation items pop up window populates

To do

23

click + to add a line item

line item populates

To do

24

click on the search icon

search menu populates

To do

25

in description field type in part desired (blower 145 robocchi)

Description in description field

To do

26

click search

multiple parts populated

To do

27

select desired part (blower)

part highlighted

To do

28

select ok

search window minimizes part populates in line item field

To do
29

select ok

part number populates under items

To do

30

call parts dept have them add desired part to ticket and ship

To do

31

click save

Confirmation will populate on top left under edit work order

To do

32

click back to general information window

in general information window

To do

33

In status field select drop down arrow

Drop down window populated

To do

34

select released in drop down window

status switched to released

To do

35

Click save and Close


Under Maintenance Work Orders Confirmation will appear, Under Confirmation Work order and WO number was
updated should appear
To do

36

Log in as Maint. Manager

Home screen opens

To do

37

Top left corner click on the ?Navigator?

Navigator window opens

To do

38

Under ?Procurement? section ? Click Purchase Orders


Overview Screen should appear

To do

39

Click on the ?task? button on right hand side of page

Task window opens

To do

40

Under Requisitions click Process Requisitions

Process Requisistions screen appears

To do

41

In the ?Requisitioning BU? field click on drop down arrow

Drop down window populated

To do

42

Select apprioriate BU (US BU or CA BU)

Proper Bu selected

To do

43

Under Buyer field clear field

buyer field blank

To do

44

Click Search

all applied requisitions found

To do

45

click desired requisition line

desired requisition highlighted

To do

46

click add to document builder

Add to Document Builder screen populated

To do

47

In supplier field start typing in desired supplier name

supplier name will populate

To do
48

click on full supplier name

supplier name and info will be selected

To do

49

Click OK

Document builder will populate on right side of screen

To do

50

scroll to bottom

at bottom

To do

51

click create

information window will poplate with PO number

To do

52

Click ok

information window dissapears

To do

53

Scroll to bottom

at bottom

To do

54

Under quantity (NOT PRICE) enter the dollar amount you want the purchase order to amount to

ordered amount will change to desired amount

To do

55

Scroll to top of page

at top of page

To do

56

click save

confirmation will populate

To do

57
click on view pdf

pdf will populate

To do

58

open pdf

pdf open

To do

59

save pdf to your desktop

pdf saved to your desktop

To do

60

open email

email opened

To do

61

create new email

email page populated

To do

62

put AM's email address in to field

AM's email in to field

To do

63

Click attach file

attach file box populated

To do

64

selected desired attachment

desired attachment selected

To do

65

click ok

PO pdf attached to email

To do

66

Subject field type in under number

subject is unit number


To do

67

type in unit number, work definition, po number in body of email

info in body of email

To do

68

click send

email sent

To do

69

go back to oracle

in oracle

To do

70

click submit on purchase order

pop up bubble should appear confirming your po was created

To do

71

AM submits P.O. to third party shop

third party performs repairs

To do

72

AM confirms repairs are completed

repairs confirmed and unit picked up

To do

73

AM Logs into oracle

Oracle home screen appears

To do

74

Click on Navigator

Navigator screen popsuph

To do

75

Under Procurment click on My Reciepts

Receive Items screen should pop

To do

76
Clear out Name in requester Box

Requester box is empty

To do

77

click on Items due pull dow arrow

pull down screen opens

To do

78

On pull down select Any Time

Item Due Box Populates with Any Time

To do

79

Sellect Requisitioning B U pull down arrow

Pop udown window should populate with options

To do

80

Click on appropriate BU

Requisitioning BU should populate in the Box

To do

81

Click in Purchase Order Box and enter P O &#

Purchase order Box now contains PO and #

To do

82

Click on Pull Down arrow next to Purchase order Box

Pop up bubble should appear

To do

83

Select Search

Search and select : Purchase Order window should appear

To do

84

hit the search button

PO should populate below

To do

85

Highlight PO
PO should Highlight

To do

86

Click Select Button

Should populate on Receive Items Screen

To do

87

Highlite PO by clicking in Box

PO box should highlite

To do

88

Click Receive Button

Create reciept screen should pop

To do

89

Click in Quantity Box and enter the price on invoice

Quantity Box should populate with Number

To do

90

Scroll requisition line all the way to the right

Should see Attachments

To do

91

Select Plus symbol under attachments

Attachment search window should appear

To do

92

Click on the choose File Box and attach scanned copy of invoice

Under title Document should be displaid

To do

93

Click OK

Goes back to Create Reciept screen with attachment column filled

To do

94

Click Submitt Button at top right


Popup bubble should appear indicating that the transaction quanitity must be equal to or less than quantity created by
FC
To do
95

Select OK

AM notifies FC that he was unable to receive and complete due to the final price exceeding original P.O. amount

To do

96

FC creates change order to adjust P.O. amount

To do

97

Log in as Maint. Manager

Home screen opens

To do

98

Top left corner click on the ?Navigator?

Navigator window opens

To do

99

Under ?Procurement? section ? Click Purchase Orders

Overview Screen should appear

To do

100

Click on the ?task? button on right hand side of page

Task window opens

To do

101

under orders click manage orders

Manage Order page should populate

To do

102

remove buyer from buyer field

buyer field blank

To do

103

in order field type in po number

po number populated in orde field

To do

104

click search button


po found

To do

105

Highlight PO

po highlighted

To do

106

click on the edit pencil

edit change order page populated

To do

107

type in reason for change order in description box (labor exceeded estimated time)

desription written

To do

108

scroll down

at bottom of page

To do

109

in quanity field change quanity to desired amount (10,300)

quanity changed

To do

110

Scroll to top of page

at top of page

To do

111

click save

change order saved

To do

112

click submitt Button at top right

comfirmation pop up will populate

To do

113

AM Logs into oracle

Oracle home screen appears

To do
114

Click on Navigator

Navigator screen popsuph

To do

115

Under Procurment click on My Reciepts

Receive Items screen should pop

To do

116

Clear out Name in requester Box

Requester box is empty

To do

117

click on Items due pull dow arrow

pull down screen opens

To do

118

On pull down select Any Time

Item Due Box Populates with Any Time

To do

119

Sellect Requisitioning B U pull down arrow

Pop udown window should populate with options

To do

120

Click on appropriate BU

Requisitioning BU should populate in the Box

To do

121

Click in Purchase Order Box and enter P O &#

Purchase order Box now contains PO and #

To do

122

Click on Pull Down arrow next to Purchase order Box

Pop up bubble should appear

To do

123
Select Search

Search and select : Purchase Order window should appear

To do

124

hit the search button

PO should populate below

To do

125

Highlight PO

PO should Highlight

To do

126

Click Select Button

Should populate on Receive Items Screen

To do

127

Highlite PO by clicking in Box

PO box should highlite

To do

128

Click Receive Button

Create reciept screen should pop

To do

129

Click in Quantity Box and enter the price on invoice

Quantity Box should populate with Number

To do

130

Scroll requisition line all the way to the right

Should see Attachments

To do

131

Select Plus symbol under attachments

Attachment search window should appear

To do

132

Click on the choose File Box and attach scanned copy of invoice

Under title Document should be displaid


To do

133

Click OK

Goes back to Create Reciept screen with attachment column filled

To do

134

Click Submitt Button at top right

confirmation pop up will populate

To do

135

Select OK

takes you back to received items screen and am is done

To do

136

Log in as Maint. Manager

Maintenance Management screen opens

To do

137

Click on Navigation Screen

Navigation Screen should open

To do

138

Click on Maintenance Management under supply Chain

Maintenance Management screen opens

To do

139

Click on number next to Ready in the Operations box.

Maintenance Dispatch List screen should appear.

To do

140

High light WO number in the line.

Edit WO page opens

To do

141

Click additional information

Boxes will appear

To do

142
Select Completed on time pull down arrow if applicable

Yes or No can be chosen

To do

143

Chose appropriate Yes or no (yes)

Box with populate with coshen yes or no

To do

144

Chose appropriate Yes or no for incident related box if applicable (no)

Box with populate with coshen yes or no

To do

145

scroll to top of page and select Save

Comfirmation bubble appears that changes were saved

To do

146

Select operations Tab highlight Job description 10 line

Job description 10 will highlight

To do

147

Click on arrow on the far right

Click on the Supplier Operations Detail

To do

148

Review supplier operations window opens

Review Quantity Ordered matches Quantity Received

To do

149

In the Receiving Details window click on the receipt number.

Receipt Window opens

To do

150

Scroll to the right to review attachments.

Review attachments.

To do

151

Click Done
Maintenance Management screen opens

To do

152

Click on number next to Ready in the Operations box.

Maintenance Dispatch List screen should appear.

To do

153

Select Arrow next to Work Order number.

Complete options appear.

To do

154

Select Quick Complete

Confirmation that WO has changed from Ready to Complete


Descriiption

AM notified by operator of blower siezed. AM contacts


FC for recommendation. AM has third party dig sand
out of blower FC recommends we order new blower
1 Third party spends 10 hours trying to free up blower no
luck calls FC replacement blower ordered through
Badger parts dist. PO amount adjusted and approval
matrix for increased spend.

2 Log in as Maint. Manager


Home screen opens
FC advises the blower be replaced with a reman blower.
3 FC opens WO and assigns a PO. FC Orders blower from
Badger Parts Dept.
4 Top left corner click on the ?Navigator?
Navigator window opens
Under ?Supply Chain Excecution? section ? Click ?
5
Maintenance Management?
Maintenance Management screen opens
Next to ?Maintenance Organization? confirm you are in
6 the organization desired. If Necessary click change
organization (CA_MNT for Canada, US_MNT for U.S.)
Select Organization window opens
7 Click Drop down arrow
Drop down window populated
select desired bussines unit (CA_MNT for Canada,
8
US_MNT for U.S.)
In organization field desired BU populated
9 Click ok
Select Organization window dissapears and proper BU is
selected
10 Click on the ?task? button on right hand side of page
Task window opens
under work management Click ?Manage Maintenance
11
Work Orders?
Maintenance Work Order screen opens
12 click + to create a new work order
Create Maintenance Work Order window opens
13 Enter asset number (unit number) in asset field
asset number in asset field
14 Click on drop down arrow in work definition field.
Drop down window populated
Scroll to desired work definition and click on it
15
(corrective - vac system)
desired work definition selected
16 Click on drop down arrow in type field.
Drop down window populated
17 Scroll to desired type and click on it (corrective)
desired type selected
18 At bottom of screen click on save and edit
edit work order screen populated and W.O. number
populated
Enter Description of work being performed in
19
description field (replace blower)
Description in description field
20 top right of screen select save
Confirmation will populate on top left under edit work
order
21 click on operations tab next to general information
operations tab opens
22 click on items in desired operation tab
edit operation items pop up window populates
23 click + to add a line item
line item populates
24 click on the search icon
search menu populates
in description field type in part desired (blower 145
25
robocchi)
Description in description field
26 click search
multiple parts populated
27 select desired part (blower)
part highlighted
28 select ok
search window minimizes part populates in line item
field
29 select ok
part number populates under items
call parts dept have them add desired part to ticket and
30
ship
31 click save
Confirmation will populate on top left under edit work
order
32 click back to general information window
in general information window
33 In status field select drop down arrow
Drop down window populated
34 select released in drop down window
status switched to released
35 Click save and Close
Under Maintenance Work Orders Confirmation will
appear, Under Confirmation Work order and WO
number was updated should appear
36 Log in as Maint. Manager
Home screen opens
37 Top left corner click on the ?Navigator?
Navigator window opens
38 Under ?Procurement? section ? Click Purchase Orders
Overview Screen should appear
39 Click on the ?task? button on right hand side of page
Task window opens
40 Under Requisitions click Process Requisitions
Process Requisistions screen appears
In the ?Requisitioning BU? field click on drop down
41
arrow
Drop down window populated
42 Select apprioriate BU (US BU or CA BU)
Proper Bu selected
43 Under Buyer field clear field
buyer field blank
44 Click Search
all applied requisitions found
45 click desired requisition line

desired requisition highlighted

46 click add cument builder


Add cument Builder screen populated
47 In supplier field start typing in desired supplier name
supplier name will populate
48 click on full supplier name
supplier name and info will be selected
49 Click OK

Document builder will populate on right side of screen

50 scroll to bottom
at bottom
51 click create
information window will poplate with PO number
52 Click ok
information window dissapears
53 Scroll to bottom
at bottom
Under quantity (NOT PRICE) enter the dollar amount
54
you want the purchase order to amount to
ordered amount will change to desired amount
55 Scroll to top of page
at top of page
56 click save
confirmation will populate
57 click on view pdf
pdf will populate
58 open pdf
pdf open
59 save pdf to your desktop
pdf saved to your desktop
60 open email
email opened
61 create new email
email page populated
62 put AM's email address in to field
AM's email in to field
63 Click attach file
attach file box populated
64 selected desired attachment
desired attachment selected
65 click ok
PO pdf attached to email
66 Subject field type in under number
subject is unit number
type in unit number, work definition, po number in
67
body of email
info in body of email
68 click send
email sent
69 go back to oracle
in oracle
70 click submit on purchase order
pop up bubble should appear confirming your po was
71
created
AM submits P.O. to third party shop
third party performs repairs
72 AM confirms repairs are completed
repairs confirmed and unit picked up
73 AM Logs into oracle
Oracle home screen appears
74 Click on Navigator
Navigator screen popsuph
75 Under Procurment click on My Reciepts
Receive Items screen should pop
76 Clear out Name in requester Box
Requester box is empty
77 click on Items due pull dow arrow
pull down screen opens
78 On pull down select Any Time
Item Due Box Populates with Any Time
79 Sellect Requisitioning B U pull down arrow
Pop udown window should populate with options
80 Click on appropriate BU
Requisitioning BU should populate in the Box
81 Click in Purchase Order Box and enter P O &#
Purchase order Box now contains PO and #
82 Click on Pull Down arrow next to Purchase order Box
Pop up bubble should appear
83 Select Search
Search and select : Purchase Order window should
appear
84 hit the search button
PO should populate below
85 Highlight PO
PO should Highlight
86 Click Select Button
Should populate on Receive Items Screen
87 Highlite PO by clicking in Box
PO box should highlite
88 Click Receive Button
Create reciept screen should pop
89 Click in Quantity Box and enter the price on invoice
Quantity Box should populate with Number
90 Scroll requisition line all the way to the right
Should see Attachments
91 Select Plus symbol under attachments
Attachment search window should appear
92
Click on the choose File Box and attach scanned copy of
invoice
Under title Document should be displaid

93 Click OK
Goes back to Create Reciept screen with attachment
column filled
94 Click Submitt Button at top right
Popup bubble should appear indicating that the
transaction quanitity must be equal to or less than
quantity created by FC

95 Select OK
AM notifies FC that he was unable to receive and
complete due to the final price exceeding original P.O.
amount
96 FC creates change order to adjust P.O. amount
97 Log in as Maint. Manager
Home screen opens
98 Top left corner click on the ?Navigator?

Navigator window opens


99 Under ?Procurement? section ? Click Purchase Orders
Overview Screen should appear
100 Click on the ?task? button on right hand side of page
Task window opens
101 under orders click manage orders
Manage Order page should populate
102 remove buyer from buyer field
buyer field blank
103 in order field type in po number
po number populated in orde field
104 click search button
po found
105 Highlight PO
po highlighted
106 click on the edit pencil
edit change order page populated
107
type in reason for change order in description box
(labor exceeded estimated time)
desription written
108 scroll down
at bottom of page
109
in quanity field change quanity to desired amount
(10,300)
quanity changed
110 Scroll to top of page
at top of page
111 click save
change order saved
112 click submitt Button at top right
comfirmation pop up will populate
113 AM Logs into oracle
Oracle home screen appears
115 Click on Navigator
Navigator screen popsuph
116 Under Procurment click on My Reciepts
Receive Items screen should pop
117 Clear out Name in requester Box
Requester box is empty
118 click on Items due pull dow arrow
pull down screen opens
119 On pull down select Any Time
Item Due Box Populates with Any Time
120 Sellect Requisitioning B U pull down arrow
Pop udown window should populate with options
121 Click on appropriate BU
Requisitioning BU should populate in the Box
122 Click in Purchase Order Box and enter P O &#
Purchase order Box now contains PO and #
123 Click on Pull Down arrow next to Purchase order Box
Pop up bubble should appear
124 Select Search
Search and select : Purchase Order window should
appear
125 hit the search button
PO should populate below
126 Highlight PO
PO should Highlight
127 Click Select Button
Should populate on Receive Items Screen
128 Highlite PO by clicking in Box
PO box should highlite
129 Click Receive Button

Create reciept screen should pop


130 Click in Quantity Box and enter the price on invoice
Quantity Box should populate with Number
131 Scroll requisition line all the way to the right
Should see Attachments
132 Select Plus symbol under attachments
Attachment search window should appear
133
Click on the choose File Box and attach scanned copy of
invoice
Under title Document should be displaid
Click OK
134
Goes back to Create Reciept screen with attachment
column filled
135 Click Submitt Button at top right
confirmation pop up will populate
136 Select OK

takes you back to received items screen and am is done

137 Log in as Maint. Manager


Maintenance Management screen opens
138 Click on Navigation Screen
Navigation Screen should open
139 Click on Maintenance Management under supply Chain

Maintenance Management screen opens


140 Click on number next to Ready in the Operations box.
Maintenance Dispatch List screen should appear.
141 High light WO number in the line.
Edit WO page opens
142 Click additional information
Boxes will appear

143 Select Completed on time pull down arrow if applicable

Yes or No can be chosen


144 Chose appropriate Yes or no (yes)
Box with populate with coshen yes or no
145
Chose appropriate Yes or no for incident related box if
applicable (no)
Box with populate with coshen yes or no
146 scroll to top of page and select Save

Comfirmation bubble appears that changes were saved

147 Select operations Tab highlight Job description 10 line

Job description 10 will highlight

148 Click on arrow on the far right


Click on the Supplier Operations Detail
149 Review supplier operations window opens
Review Quantity Ordered matches Quantity Received
150
In the Receiving Details window click on the receipt
number.
Receipt Window opens
151 Scroll to the right to review attachments.
Review attachments.
152 Click Done
Maintenance Management screen opens
153 Click on number next to Ready in the Operations box.
Maintenance Dispatch List screen should appear.
154 Select Arrow next to Work Order number.
Complete options appear.
155 Select Quick Complete
Confirmation that WO has changed from Ready to
Complete
Input Value

VLewis@badgerinc.com

US_MNT
US_MNT
DONE

Done

1064

WO20050857 - 1064

CORRECTIVE - VAC SYSTEM

done

corrective

WO10022564

Replace blower

DONE
10 , 20 operations

Done
AIR DIG

Done

blower 145 robocchi

done

AIR DIG

done

AIR DIG

done
done

done

done

released

OK

DONE
WO20050859-10

WO20050859

OK

US BU

US BU

VLewis@badgerinc.com

RQ20060184

Outside Processing Purchase Order


A&K MACHINE & FAB SHOP INC

1-JACKSONVILLE

PO20044780

OK

PO20044780
done
ok

I USD
Done

done

Done

done

done

done

ok
ok

ok

ok

ok
ok

ok
ok
ok

PO20044780
ok

ok

ok

ok

You created the following receipt numbers: 41032.

ok

ok

ok
US BU

US BU

PO20044780
OK

OK
OK

You created the following receipt numbers: 41032.


OK

OK

OK

OK

1 USD
PO20044780

OK

OK

OK

OK

OK
OK

OK
OK

OK

You created the following receipt numbers: 41032.

OK

OK

You created the following receipt numbers: 41032.

PO10025368
OK

I USD

OSP

OK

You created the following receipt numbers: 41032.


WO20050859-10

WO20050859-10

DONE

DONE

DONE

OK

DONE

DONE

OK

WO20050859-10
OK

OK

DONE