Professional Documents
Culture Documents
Department of Education Cordillera Administrative Region Schools Division of Apayao
Department of Education Cordillera Administrative Region Schools Division of Apayao
Department of Education
Cordillera Administrative Region
Schools Division of Apayao
Instruction:Conduct an ocular inspection of the school physical facilities listed below, then provide the needed information to
facilitate the improvement to be done on these certified facilities. (If needed, you may use separate forms for each classroom
and facilities)
CONDITION REMARKS NATURE OF MATERIAL RESOURCES MANPOWER
FACILITIES (Check one) IMPROVEMENT NEEDED NEEDED
If NEEDED: ( Indicate kind and quantity) (Indicate quantity
Satisfac- Unsatis- unsatisfactory (ex. Repair, and Nature of
tory factory
, describe the repainting, labor and services
problem replacement needed)
etc.)
ROOFS/GUTTERS
School garden
Gulayan sa / Robust weeds Weeding/Cultiv Bolo 50+ Gardeners
Paaralan/ ating Shovel
Tahanan Plants
Robust weeds Weeding Bolo 20+ Gardeners
YES-O park Landscaping Shovel
planting Plants
ECOLOGICAL / Robust Waste Shovel 55 laborers
PARK weeds/trees Removal/Disp Bolos
osing, Sacks
Weeding, Woods
Landscaping 1 kl Common nails 4”
Developing an 1 kl common nail 23 “
eco park 1 kilo common nail 2“
hammer
Plant Boxes Robust Weeding Bolo 20+ Gardeners
weeds/trees Landscaping Shovel
WINDOWS
/ Change Changing of 16 pcs carpenter
Jalousies broken
jalousies
Principals / Not safe Installing of 4 window grills welder
office window grills
windows
DOORS
/ Destroyed Repairing of 4 padlocks 1 carpenter
Door knobs door knobs doorknobs
School Grounds
/ Flooded Area Construction of 150 bags cement 50 mason
School
concrete 6 loads gravel and sand volunteers
Pavement
pavement
/ Rogh and Construction of 30 bags cement 10 mason
muddy path pathway 1 load gravel and sand volunteers
Pathway beside
principals
office-down
School Fence/ wall
/ Carabao can Constructing Reuse GI Sheets for Carpenters
Temporary
enter and temporary constructing temporary fence
Fence
destroy plants fence
ELECTRICITY
/ No Installing of Male plugs Electrician
Administrati
electrification electricity Female plugs
ve office 10 m wire
/ Not Checking the Electrician
3 JHS rooms functioning connections
electricity
LABORATORY EQUIPMENT