NEW YORK METROPOLITAN TRANSPORTATION COUNCIL

ADOPTED ON SEPTEMBER 5, 2019

FEDERAL FISCAL YEARS 2020-2024


TRANSPORTATION
IMPROVEMENT PROGRAM
i
Disclaimer
The preparation of this report has been financed through the U.S. Department of Transportation’s
Federal Transit Administration and Federal Highway Administration. This document is
disseminated under the sponsorship of the New York Metropolitan Transportation Council
(NYMTC) in the interest of information exchange. The contents of this report reflect the views
of the authors who are responsible for the facts and accuracy of the data presented herein. The
contents do not necessarily reflect the official views or policies of the Federal Transit
Administration, Federal Highway Administration or the State of New York. This report does not
constitute a standard, specification or regulation. This report was funded through project
PTCS19D00, in NYMTC’s State Fiscal Year 2019-2020 Unified Planning Work Program.

Title VI Notice to the Public


NYMTC is committed to compliance with Title VI of the Civil Rights Act of 1964, the Civil
Rights Restoration Act of 1987, and all related rules and statutes. NYMTC assures that no person
or group(s) of persons shall, on the grounds of race, color, age, disability, national origin, gender,
or income status, be excluded from participation in, be denied the benefits of, or be otherwise
subjected to discrimination under any and all programs, services, or activities administered by
NYMTC, whether those programs and activities are federally funded or not. It is also the policy
of NYMTC to ensure that all of its programs, polices, and other activities do not have
disproportionate adverse effects on minority and low-income populations. Additionally,
NYMTC will provide meaningful access to services for persons with Limited English
Proficiency.

ii
iii
Contents
Section I. Preface....................................................................................................................... 1
Section II. Acronyms .................................................................................................................. 2
Section III. NYMTC and its Planning Area................................................................................. 3
Membership ................................................................................................................................ 4
Planning Area.............................................................................................................................. 4
Section IV. Developing the TIP ................................................................................................... 5
Documentation ............................................................................................................................ 5
Building the TIP .......................................................................................................................... 5
Required TIP Content ................................................................................................................. 6
Highway Safety Improvement Program (HSIP) and Safety Performance Management ............ 7
Transit Asset Management (TAM) ........................................................................................... 10
Infrastructure – Pavement and Bridge ...................................................................................... 18
Transportation System Performance ......................................................................................... 21
CMAQ Performance Plan ......................................................................................................... 21
Other System PM Targets ......................................................................................................... 23
Section V. Financing the FFYs 2020-2024 TIP ....................................................................... 36
Fiscal Constraint ....................................................................................................................... 36
Operations and Maintenance..................................................................................................... 37
Additional Funding Strategies .................................................................................................. 37
Year of Expenditure .................................................................................................................. 38
Planning Factors........................................................................................................................ 40
Figures....................................................................................................................................... 41
Section VI. Project Listings ....................................................................................................... 50
New York City .......................................................................................................................... 51
Long Island ............................................................................................................................. 131
Lower Hudson Valley ............................................................................................................. 216
Section VII. Appendices ........................................................................................................ 308
Appendix A ............................................................................................................................. A-1
Appendix B ............................................................................................................................. B-1
Appendix C ............................................................................................................................. C-1
Appendix D ............................................................................................................................. D-1

iv
v
Section I. Preface

The New York Metropolitan Transportation Council (NYMTC) is a regional council of


governments, which is the Metropolitan Planning Organization (MPO) for New York City,
Long Island and the lower Hudson Valley. The MPO, as mandated under 23 CFR 450.310,
requires a designation for each urbanized area with a population of more than 50,000
individuals, as determined by the U.S. Bureau of the Census.

One of NYMTC’s responsibilities is the development and adoption of a five-year Transportation


Improvement Program (TIP), which confers federal funding eligibility for listed transportation
improvement projects. NYMTC’s proposed TIP for FFYs 2020-2024 has been built within the
context of the current federal funding authorization act, which is the Fixing America’s Surface
Transportation (FAST) Act. The proposed TIP meets the relevant requirements of this
legislation and related federal planning regulations; specifically, 23 CFR Part 450.326 and 23
CFR Part 450.328. A draft Transportation Conformity Determination accompanies the proposed
TIP as required by 40 CFR Part 93 for air quality non-attainment and maintenance areas under
the Clean Air Act Amendments of 1990.

The proposed FFYs 2020-2024 TIP is a program of projects identified for federal funding under
Title 23 and Title 49 U.S.C. Chapter 53 and, after adoption by the New York Metropolitan
Transportation Council (NYMTC), will be submitted for full inclusion in the Statewide
Transportation Improvement Program (STIP) compiled by New York State.

1
Section II. Acronyms

AIS Accident Inventory Reporting System


FAST Act Fixing America's Surface Transportation Act
FARS Fatality Analysis Reporting System
FFY Federal Fiscal Year
FHWA Federal Highway Administration
FTA Federal Transit Authority
HSIP Highway Safety Improvement Program
LIRR Long Island Rail Road
LRTP Long Range Transportation Plan
MAP-21 Moving Ahead for Progress in the 21st Century Act
MNR Metro-North Railroad
MPO Metropolitan Planning Organization
MTA Metropolitan Transportation Council
NYCDOT New York City Department of Transportation
NYCEDC New York City Economic Development Corporation
NYMTC New York Metropolitan Transportation Council
NYS New York State
NYSDEC New York State Department of Environmental Conservation
NYSDOT New York State Department of Transportation
OCTC Orange County Transportation Council
PDCTC Poughkeepsie-Dutchess County Transportation Council
PFAC Program, Finance and Administration Committee
PM Performance Measures
Plan 2045 Plan 2045; Maintaining the Vision for a Sustainable Future
PONA Poughkeepsie Ozone Non-Attainment Area
RTP Regional Transportation Plan
SIP State Implementation Plan
SHSP New York State Strategic Highway Safety Plan
TAM Transit Asset Management
TCCs Transportation Coordinating Committees
TIP Transportation Improvement Program
USDOT United States Department of Transportation
USEPA United States Environmental Protection Agency
VMT Vehicle Miles Traveled
YOE Year of Expenditure

2
Section III. NYMTC and its Planning Area

NYMTC is a regional council of governments, which is the Metropolitan Planning Organization


(MPO) for New York City, Long Island and the lower Hudson Valley as designated by the
Governor of the State of New York and certified by the federal government. NYMTC provides
its region with a collaborative planning forum in which to address transportation-related issues
from a regional perspective, and to plan for and make decisions on the use of federal
transportation funds. As a requirement for the receipt of federal transportation funding, MPOs in
each urbanized region of the country must maintain a continuing, cooperative and
comprehensive transportation planning process, considering all modes in a coordinated manner
through the following mandated planning products:

• A long-range Regional Transportation Plan (minimum 20 years – the “Plan”)


• A medium-range Transportation Improvement Program (minimum 4-year
program – the “TIP”)
• An annual Unified Planning Work Program (one year – the “UPWP”)
• A Congestion Management Process (CMP), since NYMTC’s planning area is
designated as transportation managements areas, or TMA;
• A Transportation Conformity Determination, containing a regional emissions
analysis, since NYMTC’s planning area includes all or part of several air quality
nonattainment or maintenance areas under the Clean Air Act Amendments of
1990, and
• A periodically updated Public Involvement Plan.
Figure 1 - The Regional Transportation Planning Process

PROJECT PLANNING
REGIONAL
AND
TRANSPORTATION
IMPLEMENTATION
PLAN (defines long-
(implements
range needs)
improvements)

CONGESTION
MANAGEMENT UNIFIED PLANNING
PROCESS AND WORK PROGRAM
REGIONAL AND MEMBERS’
EMISSIONS PLANNING (defines
ANALYSIS the improvements)
(analyzes impacts)
TRANSPORTATIO
N IMPROVEMENT
PROGRAM
(defines
schedule and
funding)

3
Membership
NYMTC is a regional council comprised of nine voting and seven advisory members. Voting
members include the county executives of Nassau and Suffolk counties on Long Island and
Putnam, Rockland and Westchester counties in the lower Hudson Valley; the Commissioner of
New York City’s Department of Transportation and the Directors of its Department of City
Planning; the Commissioner of the New York State Department of Transportation and the chief
executive officer of the Metropolitan Transportation Authority.

Advisory members include the chief executive officers of the Port Authority of New York and
New Jersey, New Jersey Transit, and the North Jersey Transportation Planning Authority; and
the regional or division directors of the New York State Department of Environmental
Conservation, the Federal Highway Administration, the Federal Transit Administration and the
United States Environmental Protection Agency.

Planning Area
To conform with the requirements of 23 CFR 450.312, which governs metropolitan planning
area boundaries, NYMTC’s planning area includes the five boroughs of New York City plus the
five suburban counties on Long Island and in the lower Hudson Valley. The planning area
includes 2,440 square miles and a 2017 population of 12.72 million, approximately 65 percent of
New York State’s population and 4 percent of the population of the nation.

This planning area also encompasses an extensive transportation system, comprised of 28,820
centerline miles of roads, streets and highways, several commercial airports and maritime
facilities for both passengers and freight, 1,389 track miles of commuter rail and 689 track miles
of rail rapid transit, and a multitude of bus transit, paratransit, intercity and intracity bus routes
and transfer stations. On an average weekday in 2016, this system accommodates over 676,000
commuter rail passengers, 3.5 million bus riders, 9.6 million rail rapid transit passengers,
122,400 ferries riders, millions of drivers and passengers on the region’s roads.
Figure 2 - NYMTC's Planning Area

4
Section IV. Developing the TIP

Documentation
The TIP documents NYMTC’s medium-range transportation improvement projects that are
eligible for federal funding and/or require federal permits or other actions. Project types include
bridges and roadway rehabilitation or construction; transit equipment and facilities; bikeway,
greenway, and walkway rehabilitation or construction; roadway and transit safety improvements;
roadway signalization improvements; and demand management programs and services.
The proposed FFYs 2020-2024 TIP is derived from and consistent with Plan 2045, NYMTC’s
current long-range plan which covers FFYs 2018-2045. Plan 2045’s strategic framework is built
around eight goals shared by NYMTC’s members and related desired outcomes. The eight
shared goals of Plan 2045 are:

• Enhance the regional environment


• Improve the regional economy
• Improve the regional quality of life
• Provide a convenient and flexible transportation system within the region
• Enhance the safety and security of the transportation system
• Improve the resiliency of the regional transportation system
• Build the case for obtaining resources to implement regional investments
• Preserve the existing transportation system

Building the TIP


The FFYs 2020-2024 TIP has been cooperatively built by NYMTC’s members within the federal
funding targets supplied by the New York State Department of Transportation based on their
sub-allocation within the state of funding distributed to states nationally by formula from federal
appropriations. NYMTC’s members collaborated to define and select projects for inclusion in
the proposed TIP based on their individual capital plans and consider regional needs when they
come together as NYMTC.
23 CFR 450.326 (b) requires that NYMTC provide all interested parties with a reasonable
opportunity to comment on the proposed TIP and provide at least one formal public meeting
during the TIP development process. In addition, NYMTC must publish or otherwise make
readily available the TIP for public review, including (to the maximum extent practicable) in
electronically accessible formats and means.

In response to these requirements, NYMTC released a proposed TIP as part of a formal public
review period to seek public commentary. The public review period was advertised through
NYMTC’s regional distribution list, social media sites and website. During the public review
period, NYMTC held public review meetings in New York City, on Long Island and in the lower

5
Hudson Valley. These meetings will be made available to remote participation through a
concurrent webinar.

Native American Tribal Governments


As of October 1, 2010, the Shinnecock Indian Nation was federally recognized as an Indian
tribal government. NYMTC became aware of this status through the Federal Register / Vol. 75,
No. 207 / Wednesday, October 27, 2010. NYMTC’s Executive Director sent a letter on February
16, 2011 extending an invitation to the tribal government to participate in the regional planning
process. NYMTC staff has continued to notify the tribal government of planning process
activities to include the development of the TIP and RTP. The Shinnecock Nation is on
NYMTC’s distribution list.

Required TIP Content


23 CFR 450.326 identifies the required content of the TIP. The following sections describe
selected requirements and how they are met in NYMTC’s FFYs 2020-2024 TIP.
23 CFR 450.326 (d)

The TIP shall include, to the maximum extent practicable, a description of the anticipated effect
of the TIP toward achieving the performance targets identified in the metropolitan transportation
plan, linking investment priorities to those performance targets.

NYMTC has established and is using a performance-based approach to transportation decision-


making to support national goals for transportation performance as detailed in 23
U.S.C. 150(b) and the general purposes described in 49 U.S.C. 5301(c); specifically, to establish
standards for the state of good repair of public transportation infrastructure and vehicles. The
national performance goals include:
• Safety – To achieve a significant reduction in traffic fatalities and serious injuries
on all public roads.
• Infrastructure Condition – To maintain the highway infrastructure asset system in
a state of good repair.
• Congestion Reduction – To achieve a significant reduction in congestion on the
National Highway System.
• System Reliability – To improve the efficiency of the surface transportation
system.
• Freight Movement and Economic Vitality – To improve the national freight
network, strengthen the ability of rural communities to access national and
international trade markets, and support regional economic development.
• Environmental Sustainability – To enhance the performance of the transportation
system while protecting and enhancing the natural environment.
• Reduced Project Delivery Delays – To reduce project costs, promote jobs and the
economy, and expedite the movement of people and goods by accelerating project
completion.

6
As part of these requirements, the anticipated effects of the transportation improvement program
toward achieving statewide performance targets established under the national performance goals
are described below.

Highway Safety Improvement Program (HSIP) and Safety


Performance Management
On March 15, 2016, FHWA published the final rule for HSIP and Safety Performance
Management (Safety PM) Measures in the Federal Register with an effective date of April 14,
2016. The requirement was for targets to be set for the following performance measures:
• Number of fatalities;
• Fatality rate per 100 million vehicle miles traveled (VMT);
• Number of serious injuries;
• Serious injury rate per 100 million VMT; and
• Number of non-motorized fatalities and serious injuries.
The 2017 New York Strategic Highway Safety Plan (SHSP) intends to reduce “the number of
fatalities and serious injuries resulting from motor vehicle crashes on public roads in New York
State.” The SHSP guides NYSDOT, the MPOs, and other safety partners in addressing safety
and defines a framework for implementation activities to be carried out across New York State.
The NYSDOT Highway Safety Improvement Program (HSIP) annual report documents the
statewide performance targets.
On January 18, 2018, through Resolution #458, NYMTC’s Program, Finance and Administration
Committee (PFAC) resolved to support the NYSDOT statewide 2018 targets for the above-
mentioned Safety performance measures, which are based on five-year rolling averages per 23
CFR § 490.207(b):

7
Table 1 - Statewide Safety Performance Baseline and Targets

Number of Fatalities Number of Serious Number of


Fatalities per 100 Serious Injuries Nonmotorized
Million Injuries per 100 Fatalities and
VMT Million Serious
VMT Injuries

Statewide 1,143 0.89 11,547 8.99 2,872


Baseline

Statewide 1,086 0.87 10,854 8.54 2,843


Targets

Safety is a critical component of NYMTC’s shared strategic vision. One of the eight shared goals
of NYMTC’s members in Plan 2045 is to enhance the safety and security of the transportation
system. This goal is described in the plan as follows:

NYMTC’s members will work to reduce the rate and severity of transportation-related crashes in
the region and make the transportation system safer for all users. Members will also strive to
increase the security of the transportation system, and support emergency management response
and recovery efforts.

The desired outcomes identified for this shared strategic goal include the following:

NYMTC will continue to work in a collaborative fashion to achieve these outcomes:

• Reduced rate of annual injuries and fatalities on the region’s transportation


systems;
• Promulgation of advanced safety and security measures throughout the region;
• Enhanced coordination, data, and information sharing among members and
other stakeholders; and
• Promotion of safety and security improvements in all aspects of transportation
planning and implementation.

Given their strategic positioning within NYMTC’s planning process, safety considerations
permeate all aspects of NYMTC’s program building and implementation; from project selection
to project design/equipment specification and to the funding of safety-related programs. This TIP
includes projects programmed with HSIP funds and other fund sources that are expected to
materially benefit the safety of the traveling public on roadways throughout the metropolitan
planning area and to support the achievement of New York State’s safety performance targets.

8
Projects selected for HSIP funding are reviewed and approved by the NYSDOT traffic and safety
engineers in each sub regional portion of NYMTC’s planning area. Projects chosen as part of
statewide HSIP solicitations support safety-specific projects that direct safety funds where they
are most needed by targeting locations, corridors, or areas demonstrating an advantageous
benefit-cost ratio to reduce fatal and severe injury crashes. Funding has been awarded based on
an evaluation of project proposals to maximize investment in the most cost-effective safety
projects. Successful proposals are consistent with the strategies and emphasis areas identified in
the NYMTC Plan and the SHSP.

Anticipated Effects of the FFYs 2020-24 TIP

The TIP programs $188 million in HSIP funds for projects throughout the NYMTC planning
area. Safety is a critical component of NYMTC’s mission, and the projects on the TIP are
consistent with the need to address safety. Safety is a primary consideration in the selection of
projects to be included in the TIP. NYMTC anticipates that the implementation of this TIP will
contribute to progress made in addressing the safety performance targets established by the State.
Highlights of NYMTC members’ projects and programs follow:
Nassau County: Will improve safety with the Countywide resurfacing program and various
bridge projects, both in the TIP and County Program.
NYCDOT: New York City Mayor de Blasio has made safety a key priority through the Vision
Zero initiative launched in 2014. NYCDOT has worked hard to use every tool available to drive
down injuries and fatalities on New York City streets. NYCDOT utilizes crash data and
community input on safety concerns to prioritize projects that will improve safety and reduce
fatalities. In 2015, NYCDOT developed Borough Pedestrian Safety Action Plans, which
analyzed roadway safety data in all five boroughs to determine the most dangerous corridors,
intersections and areas. In 2019, those plans were updated with current data and new actions.
Focusing on priority locations (i.e., corridors, intersections, or areas) where pedestrians have
been killed or severely injured, has changed the way resources are directed. NYCDOT uses a
combination of local, state and federal resources to fund the priorities identified in the Borough
Pedestrian Safety Action Plans. This TIP includes projects programmed with HSIP funds and
other fund sources that are expected to materially benefit the safety of the traveling public on
roadways throughout the metropolitan planning area.
New York State DOT: The NYMTC TIP includes transportation projects that are specifically
intended to reduce fatalities and serious injuries. Projects funded with HSIP funds reduce
fatalities and injuries by implementing substantive improvements at High Accident Locations
(HALs) and using approved systemic treatments. The programming in the TIP also addresses
preventive and corrective maintenance of nominal safety assets through projects such as
pavement markings, signs and guiderail.
Putnam County: Safety is a top consideration and significant component to Putnam County’s
TIP selection process and both transit and highway projects aim to improve the safety aspects of
federally funded projects.
Rockland County: Safety improvements include a project at Route 29 and Zukor Road to
develop a modern roundabout (876245) in the 2020-2024 TIP.

9
Suffolk County: Highway safety is considered in the development and implementation of all
County programs and projects for reducing deaths, injuries, and total accidents occurring on the
County highway system. Safety is considered in the planning and design of all Suffolk County
programs and projects. To accomplish this, Suffolk County has an ongoing safety study program
whereas intersections and roadway segment accident history is reviewed and evaluated for safety
improvement recommendations which are then incorporated into the project selection process.
Additionally, the Suffolk County Department of Public Works has incorporated the
recommendations of the NYSDOT Pedestrian Safety Action plan into all projects. The County’s
program contains a Pedestrian Safety Action plan (PSAP) intersection safety project under PIN
076149.
Westchester County: Westchester County considers safety in all its procurement, capital
programming and operating decisions. The County recently launched a safety awareness
campaign aimed at improving safety among pedestrians at bus stops.

Transit Asset Management (TAM)


On July 26, 2016, FTA published the final Transit Asset Management rule. This rule applies to
all recipients and subrecipients of Federal transit funding that own, operate, or manage public
transportation capital assets. The rule defines the term “state of good repair,” requires that public
transportation providers develop and implement TAM plans and establishes state of good repair
standards and performance measures for four asset categories: rolling stock, equipment, transit
infrastructure, and facilities. The rule became effective on October 1, 2016.

Table 2 - TAM Performance Measures

Asset Category Performance Measure and Asset Class

Rolling Stock Percentage of revenue vehicles within an asset class that


have either met or exceeded their useful life benchmark

Equipment Percentage of non-revenue, support-service and


maintenance vehicles that have met or exceeded their
useful life benchmark

Infrastructure Percentage of track segments with performance


restrictions

Facilities Percentage of facilities within an asset class rated below


condition 3 on the TERM scale

In the NYMTC planning area, transit providers are classified as both Tier I (operators of 101 or
more vehicles across all fixed-route modes) and Tier II (operators of 100 vehicles or less across
all fixed-route modes).

10
• Tier I providers include the Metropolitan Transportation Authority (MTA),
Nassau County (Nassau Inter-County Express), Westchester County (Bee-Line
System), and Suffolk County (Suffolk County Transit).
• Tier II providers include New York City Department of Transportation
(NYCDOT), Rockland County (Transport of Rockland), Putnam County (Putnam
Area Rapid Transit), and the City of Long Beach (City of Long Beach Transit)
and the Town of Huntington (Huntington Area Rapid Transit) on Long Island.
The final rule required that Tier I providers develop and carry out their own TAM plans. Tier II
providers may develop their own plans or participate in a Group Plan, which is compiled by a
Group Plan Sponsor; in this case NYSDOT.
All assets used in the provision of public transit have been included in these providers’ TAM
Plan asset inventory. This includes assets that are owned by a third party or shared resources.
The inventory includes all service vehicles and any other owned equipment assets over $50,000
in acquisition value.

The transit providers in the NYMTC planning area set the transit asset targets listed in the
following tables. On June 29, 2017, NYMTC’s PFAC adopted Resolution #2017-7, which
resolved to support the transit asset targets of each of the nine transit providers in the NYMTC
planning area.

11
Table 3 - MTA Providers

MTA New York City MTA Staten Island MTA Bus


Transit Rapid Transit
Asset Asset Useful Life Targets Useful Targets Useful Targets
Category Class Benchmark 2018 Life 2018 Life 2018
(Years) Bench Bench
mark mark
(Years) (Years)

Rolling Stock Articulated 12 20% n/a n/a n/a n/a


Buses

Over the 12 5% n/a n/a 12 55%


Road Buses

Buses 12 25% n/a n/a 12 10%

Heavy Rail 40 15% 40 100% n/a n/a


Passenger
Cars

Equipment Trucks and 7-11 30% 7-11 100% n/a n/a


other
Rubber Tire
Vehicles

Steel Wheel Various 60% 15-35 100% n/a n/a


Service
Vehicles

Rail fixed 25-65 5% 28 0% n/a n/a


guideway
track

Facilities Passenger Various 15% Various 20% n/a n/a


Facilities

Maintenanc Various 20% Various 50% 75 5%


e Facilities

Admin Various 25% n/a n/a Various 25%


Facilities
Source: 2018 MTA FTA Transit Asset Management Plan, NYCT, Page 22 and Appendix B

12
MTA Long Island Rail Road
Asset Category Asset Class Useful Life Targets
Benchmark 2018
(Years)

Rolling Stock RS - Commuter rail, self-propelled 39 0%


passenger car
RP - Commuter rail passenger 39 0%
coach
Commuter rail locomotive 39 0%
Heavy Rail Passenger Cars 31 15%

Equipment Trucks and other Rubber Tire 14 14%


Vehicles
Steel Wheel Service Vehicles 25 74%
Automobiles 8 14%

Infrastructure Rail fixed guideway track 25-65 1.65%

Facilities Passenger/Parking Facilities Various 15.9%

Administrative/Maintenance- Various 38.3%


Facilities

Source: 2018 MTA FTA Transit Asset Management Plan, LIRR, Page 26

13
MTA Metro-North Railroad
Asset Category Asset Class Useful Life Targets
Benchmark 2018
(Years)

Rolling Stock RS- Commuter rail, self-propelled 35 0%


passenger car
RP - Commuter rail passenger 35 0%
coach
RL - Commuter rail locomotive 35 34%

Equipment Trucks and other Rubber Tire 8-14 61%


Vehicles
Steel Wheel Service Vehicles 35 73%

Infrastructure Track segments, signals & 25-65 2%


systems

Facilities Passenger Facilities Various 40%


Passenger Parking Facilities Various 24%
Maintenance Facilities Various 34%
Administrative Facilities Various 28%
Source: 2018 MTA FTA Transit Asset Management Plan, MNR, Appendix B

Table 4 - Nassau County (Nassau Inter-County Express)


Asset Category Asset Class Useful Life Targets
Benchmark (Years) 2018

Rolling Stock Bus 14 5%


Cutaway Bus 10 5%
Articulated Bus 14 5%
Van 8 10%
Automobile 8 10%

Equipment Sedans/SUV 6-8 15%


Van/Trucks and other 10-13 15%
Rubber Tire Vehicles

Facilities Passenger & Parking 3 0%

Administrative & 3 10%


Maintenance

14
Table 5 - Suffolk County (Suffolk County Transit)
Asset Category Asset Class Useful Life Target
Benchmark FFY
(Years) 2019

Rolling Stock Bus 14 10%

Cutaway Bus 10 10%

Equipment Non-Revenue/ 8 20%


Service
Automobile

Table 6 - Westchester County (Bee-Line System)


Asset Category Asset Class Useful Life Targets
Benchmark FFY
(Years) 2018

Rolling Stock Fixed-Route Buses 14-17 24%


Paratransit Vehicles 5-6 15.80%

Equipment Non-Revenue/Service 10 6.60%


Automobile

Table 7 - Rockland County (Transport of Rockland)


Asset Category Asset Class Useful Life Targets
Benchmark FFY
(Years) 2018

Rolling Stock BU1 35 and 40 Foot 10 61%


CU TRIPS Buses 5 25%
BR1 12 0%
CU-CMT 5 77%
BR1 - Shortline 12 0%
BR1 - Monsey 12 0%

15
Table 8 - Putnam County (Putnam Area Rapid Transit)
Asset Category Asset Class Useful Life Targets
Benchmark FFY
(Years) 2018

Rolling Stock Fixed-route Buses 5 4%

Paratransit Buses 5 95%

Facilities Maintenance- 15 30%


Related Assets
Facilities 40 0%

Table 9 - New York City Department of Transportation


Asset Category Asset Class Useful Life Targets
Benchmark 2019
(Years)

Rolling Stock Ferryboat 42 11%

Equipment Non-Revenue/Service 7-8 45%


Automobile
Trucks & other Rubber Tire 8-10 40%
Vehicles
Maintenance Equipment 40-50 20%

Facilities Maintenance n/a 50%

Table 10 - New York City Economic Development Corporation


Asset Category Asset Class Useful Life Targets
Benchmark 2019
(Years)

Rolling Stock Ferryboat 42 0%

Equipment Trucks & other Rubber Tire 8-10 0%


Vehicles

Facilities Maintenance n/a 50%

16
Anticipated Effects of the FFYs 2020-24 TIP

Metropolitan Transportation Authority: MTA prioritizes funding based on the performance,


condition and criticality of transit assets to achieve or maintain the network systems in an
appropriate state-of-good-repair. The MTA Transit Asset Management Plan (TAM Plan)
describes the coordinated processes and resources across disciplines needed to develop, justify
and implement short and medium-term plans for the management of all operational assets. The
purpose of the MTA TAM Plan is to demonstrate responsible management of MTA’s assets -
and communicate and justify funding requirements - in accordance with 49 CFR 625 and 49
U.S.C. 5326 for Transit Asset Management.
For the FFYs 2020-2024 TIP, all projects funded under the Section 5337 State-of-Good-Repair
Program are included in the investment prioritization section of the MTA’s current TAM Plan.
Accordingly, MTA certifies that these projects are included in the 2019 TAM Plan investment
prioritization section and shown in Appendix C.
NYCDOT: The city’s TAM Plan serves as an additional guidance tool for state-of-good-repair
standards and performance measures for four transit asset categories: rolling stock, equipment,
transit, infrastructure, and facilities. The Staten Island Ferry facilities assets are maintained in a
state-of-good-repair to ensure continuous operations to support passenger and ferry operations.
Projects programmed in the FFYs 2020-2024 TIP reflect these standards.
New York City Economic Development Corporation: NYCEDC’s maintenance objective is
to ensure proper care of assets and to maximize asset longevity. The goal is to conduct such
maintenance on a timely basis, which NYCEDC does through regular monthly maintenance
inspections for landings to determine any deficiencies that need to be addressed. The U.S. Coast
Guard also reviews facility safety and security plans on an annual basis.
Nassau County: Nassau County follows its TAM Plan’s useful life benchmarks for asset
replacements. For example, within the FFYs 2020 – 2024 TIP, Nassau County has programmed
projects which address Rolling Stock, Support Equipment and Facilities.
Putnam County: Putnam County prioritizes TIP project selection for reaching TAM goals and,
in particular, those that seek to achieve a vehicle fleet that is within the “useful life” designated
for such asset. Priorities in the FFYs 2020-2024 TIP are programmed for timely vehicle
replacement.
Rockland County: Rockland County is participating the Tier II Group TAM Plan sponsored and
compiled by NYSDOT. To reach Rockland’s targets in this TAM Plan, the County has
programmed funding for the replacement of Transport of Rockland buses and replacement of
TRIPS paratransit vehicles in the 2020-2024 TIP. This will improve performance measures and
system reliability.
Suffolk County: In order to reach the target set out in its TAM plan, Suffolk County has
included funding for the purchase of transit buses and paratransit vehicles in the 2020-2024 TIP.
Westchester County: Westchester’s focus – in accordance with its TAM Plan - is the
replacement of transit vehicles for the Bee-Line System that have reached the end of their useful
life. Vehicle replacement programmed in the FFYs 2020-2024 TIP include 40-foot buses, 30-
foot buses and paratransit vehicles. Another major area of emphasis includes facilities

17
maintenance at the Bee-Line System’s storage and maintenance garages. Enhancements to bus
stops and an update of the Bee-Line System’s Computer Aided Dispatch/Automated Vehicle
Locator System are also planned.

Infrastructure – Pavement and Bridge


In 2016, FHWA published a Final Rule that included Infrastructure Performance Management
(Infrastructure PM) measures to evaluate the pavement and bridge conditions on the National
Highway System (NHS) [23 CFR § 490]. The Infrastructure PM rule became effective on May
20, 2017.

The Infrastructure PM rule requires State DOTs and MPOs to set targets for the following
Infrastructure PM Measures for the NHS and to report on progress toward achieving those.

• For NHS Pavement – two- and four-year targets:


o Percentage of Interstate NHS in Good Condition
o Percentage of Interstate NHS in Poor Condition
o Percentage of non-Interstate NHS in Good Condition
o Percentage of non-Interstate NHS in Poor Condition
• For NHS Bridges – two- and four-year targets
o Percent NHS Bridge Deck Area in Good Condition.
o Percent NHS Bridge Deck Area in Poor Condition.
NYSDOT established statewide Infrastructure PM targets for the NHS on May 18, 2018 and on
September 20, 2018, NYMTC’s PFAC adopted Resolution #472 to support the statewide
Infrastructure PM targets and to program projects to achieve help these targets.

Table 11 - NHS Pavement Condition Targets

18
Table 12 - NHS Bridge Condition Targets

As described in the Transit Asset Management section, system preservation is a critical


component of NYMTC’s shared strategic vision. One of the eight shared goals of NYMTC’s
members in NYMTC’s Plan 2045 is to preserve the existing transportation system. This goal is
described in the Plan as follows:

NYMTC members will continue to maximize the service life of the existing transportation
system with the resources available by systematically and strategically maintaining and replacing
transportation assets based on need. Using asset management principles and data-driven
decision-making will result in a sustainable approach to programming that considers the relative
and cumulative value of transportation assets as they benefit the public, economy and
environment.

The desired outcomes identified for this shared strategic goal include the following:

NYMTC will continue to work in a collaborative fashion to achieve these outcomes:

• Making the investments necessary to maximize the useful life of existing assets
and to manage these assets in the most cost-effective manner through
preventive maintenance and other measures;
• Keeping existing federal-aid eligible and local roadway systems – pavement,
bridges and tunnels safe and functioning as intended;
• Keeping the existing transit infrastructure and equipment safe and functioning
as intended;
• Keeping the existing pedestrian and bicycle facilities safe and functioning as
intended.
• Protecting the existing freight network; and
• Promoting and sustaining asset management and operations activities for the
regional transportation system.

Improving the condition of NHS pavements and bridges is directly related to this shared strategic
goal and several of its desired outcomes.

19
Anticipated Effects of the FFYs 2020-24 TIP

Funding programmed in the FFYs 2020-2024 TIP addresses the condition of infrastructure
assets. NHS highway and bridge conditions are primary considerations in the selection of
projects to be included in the TIP. NYMTC’s member agencies assess, monitor and forecast the
condition of NHS assets that they own or otherwise have jurisdiction over through their
individual capital planning and programming. Throughout the NYMTC region, pavement and
bridge conditions are continuously monitored and projects are programed to support the adopted
infrastructure PM targets. Highlights of NYMTC members’ projects and programs follow:
Nassau County: Nassau County uses the NYSDOT Bridge Condition report to identify needs
throughout the County. Nassau has selected projects to repair joint bearings, concrete decks,
bridge joints, bridge paintings and other structure repairs. The County Department of Public
Works has a pavement rating system in which roads are rated on severity (low, medium, high,
none) to prioritize projects that maintain a state-of-good-repair for the County road system.
NYCDOT: NYCDOT proposes NHS bridge and roadway projects for federal funding that have
sufficiently progressed in design with local funds. The timing and nature of treatment for both
roadways and bridges depend on various factors that vary over time. They include federal
funding availability, condition ratings, conflicts with other construction projects in the vicinity,
equity among the five boroughs, community input, traffic volumes, accident and fatality data,
coordination with private and public utilities, etc. NYCDOT also considers project schedules,
potential delays and availability of local funding to meet matching requirements or to fund the
remainder of the project to ensure successful completion. Thus the TIP includes NYCDOT NHS
projects programmed with NHPP funds and other fund sources. Examples include the
rehabilitation, preventive maintenance and anti-icing activities on East River Bridges.
NYSDOT: NYSDOT’s NHS programming for the TIP reflects sound asset management
practices to focus funding on critical functionality of the existing transportation system. The TIP
includes transportation projects that are specifically intended to maintain and improve the
condition of the NHS, including a mix of reconstruction and rehabilitations to ensure
infrastructure preservation. NHS investments are prioritized based on asset conditions on key
highly-traveled and major trade corridors. The selection of highway segments included in the
program is based on condition data, engineering judgment and pavement modeling.
Putnam County: Throughout Putnam County, NHS roads and bridges are under County
jurisdiction. The County’s goal, among others, in the TIP selection process, includes
maintaining the NHS highways in a state of good repair.
Rockland County: Rockland County continues to maintain and improve bridge conditions,
using the NYSDOT Bridge Condition report to identify needs. The County has programed funds
for capital maintenance to repair joint bearing, concrete and other repairs needed in the FFYs
2020-2024 TIP. The Highway Department rates pavement condition on severity (low, medium,
high, none) and extent (occasional, frequent, extensive, none). This Pavement Condition Index
will continue SOGR for County highway pavement.
Suffolk County: Suffolk County prioritizes bridge needs through a ranking system which
utilizes the NYSDOT bridge rating system along with FHWA sufficiency ratings. Typically the
worst rated bridges are inspected, and priority is given to bridges that have open structural flags

20
to assess need and program accordingly. The County also utilizes the NYSDOT bridge
inspection reports to assess areas of concern and perform our own follow-up inspections. The
age and useful life of a bridge will also play a role in determining need.
The County utilizes the NYSDOT Comprehensive Pavement Design Manual to assess its
roadways. The Manual provides designers with a single-source compilation of pavement
evaluation guidance. The process yields a continuous method for improving the safety, quality
and serviceability of all roadways through an economically feasible solution.
Westchester County: Bridge and pavement ratings are used to prioritize projects and identify
the areas of greatest need in addressing system safety, reliability and performance.

Transportation System Performance


In 2017, FHWA issued a Final Rule for system performance entitled “National Performance
Management Measures; Assessing Performance of the National Highway System, Freight
Movement on the Interstate System, and Congestion Mitigation and Air Quality Improvement
Program,” [23 CFR § 490]. The rule went into effect on May 20, 2017.

The Final Rule addressed several areas of system performance, freight movement, and
congestion/air quality. The Transportation System Performance Management (System PM)
measures under this rule will assess the performance of the Interstate and non-Interstate NHS for
carrying out the National Highway Performance Program (NHPP). The assessment will include
two measures for Level of Travel Time Reliability (LOTTR):

• Movement of People
o Percent of Person Miles Traveled (PMT) on the Interstate NHS that are
reliable.
o Percent of PMT on the non-Interstate NHS that are reliable
• Movement of Freight on the Interstate NHS
o Truck Travel Time Reliability Index (TTTR) – measuring truck travel
time on the Interstate system
The System PM measures under the rule will also assess traffic congestion and on-road mobile
source emissions for carrying out the Congestion Mitigation/Air Quality (CMAQ) Program. The
assessment will include:
• Total Emissions Reduction, for monitoring On-Road Mobile Source Emissions
• Percent Non-Single Occupant Vehicle (Non-SOV) Travel
• Peak Hour Excessive Delay per Capita (PHED)

CMAQ Performance Plan


The CMAQ measures are targeted to urbanized areas (UZAs) that are a part of an air quality non-
attainment or maintenance area for ozone, carbon monoxide, or fine and/or course particulate
matter. NYMTC’s planning area is within several air quality non-attainment areas. As

21
a result, NYMTC is required to address the CMAQ measures specified in the rule and produce a
CMAQ Performance Plan.

On September 20, 2018 NYMTC’s PFAC adopted a CMAQ Performance Plan as required by the
rule. The Plan contained the following CMAQ-related performance measures: Annual Hours of Peak
Hour Excessive Delay per Capita (PHED) and Percent of Non-Single Occupied Vehicle Travel (Non-
SOV Travel) for the relevant urbanized area(s), and Total Emissions Reduction for mobile sources in
the relevant air quality non-attainment and maintenance areas.

For the PHED and Non-SOV Travel measures, State DOTs and MPOs are required to mutually
establish a single target for each UZA within their boundaries, in whole or in part. UZAs which
contain more than a single MPO planning area and/or state still require a single target to be set and
progress against this target measured. In these cases, State DOTs and MPOs are required to work
together to address the target setting for the entire UZA.

NYMTC’s planning area falls within the New York-Newark, NY-NJ-CT UZA so that the PHED and
non-SOV targets were set through coordination and collaboration between relevant MPOs and State
DOTs in New York, New Jersey and Pennsylvania.

The CMAQ Performance Plan also includes a listing of the projects programmed with CMAQ
funding and an assessment of how these projects will contribute to the achievement of the Non-SOV
Travel and PHED targets set for UZA, as well as how they will support progress toward the
cumulative statewide Total Emissions Reduction targets. Listed below are the three CMAQ-related
statewide performance targets.

● PHED Target for the UZA


o The four-year target for Annual Hours of PHED in UZA 63217 is 22 hours
per capita.
● Non-SOV Travel Targets for the UZA
• The two-year target for the Non-SOV Travel measure has been set as
51.6%.
The four-year target for the Non-SOV Travel measure has been set as 51.7%.

Table 13 - CMAQ Mobile Source Emissions Targets

22
Other System PM Targets
State DOTs and MPOs are required to set targets for the Interstate and Non-Interstate NHS, and
to report on progress toward achieving those targets. NYSDOT established statewide system PM
targets on May 18, 2018 and on September 20, 2018 NYMTC’s PFAC adopted Resolution #472
to support the statewide targets and to program projects to achieve these targets.

● Level of Travel Time Reliability (LOTTR) - assessment of the performance of the


Interstate and non-Interstate NHS for carrying out the NHPP.

Table 14 - Level of Travel Time Reliability Targets

● Truck Travel Time Reliability Index (TTTR) - assessment of freight performance


on the Interstate NHS.

Table 15 - Truck Travel Time Reliability Targets

Anticipated Effects of the FFYs 2020-24 TIP


Providing for the reliable movement of people and goods is a critical component of NYMTC’s
mission, and the projects on the TIP are consistent with the need to address the reliability of
travel times. The TIP includes transportation projects that are specifically intended to maintain
and improve travel time reliability. Examples of these are intelligent transportation systems
(ITS) deployment, transportation systems management and operations (TSMO) programs and a

23
variety of projects, large and small that address congestion, e.g., roundabouts, turn lanes,
geometric improvements, and major projects that reduce bottlenecks and improve traffic flow.
The TIP includes projects programmed with funds from various funding programs that have
benefits to reliability in travel times for people and freight. In addition, the TIP includes $717
million of CMAQ funding that will reduce emissions of harmful pollutants and aid in the
reduction of congestion throughout the region by reducing traffic congestion and smoothing
traffic flow.
The anticipated effect of the TIP is that its implementation will contribute to the system
performance, freight, and emissions reductions performance targets established by the State and
the PHED and non-SOV travel performance targets established by NYMTC for the New York-
Newark, NY-NJ-CT urbanized area.
Notable examples of selected projects related to both system performance and emissions
reduction include the following:
Nassau County: The County has programmed multi-purpose trails to support infrastructure
improvements for bicycling and pedestrian activities, many of which connect to State bicycle and
pedestrian facilities.
NYCDOT: The City utilizes a comprehensive complete streets approach to reduce congestion
and improve mobility and access for all users of the transportation system. New York City’s
Bicycle Network Development (BND) Program continues to support infrastructure
improvements for bicycling. The expanded bike infrastructure supported by the BND program
makes biking a viable alternative to the motor vehicle and thereby reduces the number of auto
trips (or partially offsets the increase in vehicle trips that otherwise would have occurred).
Additionally, NYCDOT works with the MTA to improve bus speeds. Projects have been
programmed to improve bus speeds through bus priority improvements. NYCDOT's Traffic
Management Center receives data from a coalition of transportation and public safety agencies in
New York managed by TRANSCOM.
Putnam County: The County selected various bikeway projects for the TIP that address
congestion mitigation, air quality improvement, travel alternatives and inter-modal connectivity
with other modes.
Suffolk County: The County has selected projects for modal-shift/trip reduction via projects
like Bus-Rapid-Transit/High Occupancy Vehicle lanes, Shared Use (Bike/Ped) Paths, as well as
projects to optimize the coordination of traffic signals into a closed loop system. Suffolk County
projects which aim to reduce congestion and improve flow, induce a modal shift and/or reduce
vehicle trips, should in-turn reduce mobile source emissions and produce an ancillary air quality
benefit for the County and Long Island Region.
Westchester County: The County will be using CMAQ and other funding to replace diesel
buses with hybrid electric vehicles, thereby reducing emissions and improving air quality.
Westchester’s Transportation Demand Management Program, known as the SMART Commute
program, will also continue. This program involves outreach to businesses, educational
institutions and other establishments to encourage the use of transit as an alternative to driving.
Several operating services, including the Bee-Line Shuttle System, will continue to receive
funding during the five-year program.

24
23 CFR 450.326 (e)
The TIP shall include capital and non-capital surface transportation projects (or phases of
projects) within the boundaries of the metropolitan planning area proposed for funding under 23
U.S.C. and 49 U.S.C. Chapter 53 (including transportation alternatives; associated transit
improvements; Tribal Transportation Program, Federal Lands Transportation Program, and
Federal Lands Access Program projects; HSIP projects; trails projects; accessible pedestrian
walkways; and bicycle facilities), except the following that may be included:
(1) Safety projects funded under 23 U.S.C. 402 and 49 U.S.C. 31102;
(2) Metropolitan planning projects funded under 23 U.S.C. 104(d), and 49 U.S.C. 5305(d);
(3) State planning and research projects funded under 23 U.S.C. 505 and 49 U.S.C. 5305(e);
(4) At the discretion of the State and MPO, metropolitan planning projects funded with
Surface Transportation Program funds;
(5) Emergency relief projects (except those involving substantial functional, locational, or
capacity changes);
(6) National planning and research projects funded under 49 U.S.C. 5314; and
(7) Project management oversight projects funded under 49 U.S.C. 5327.
The FFYs 2020-2024 TIP has been cooperatively built by NYMTC’s members within the federal
funding targets supplied by NYSDOT based on their sub-allocation within the state of funding
distributed to states nationally by formula from federal appropriations. NYMTC’s members
collaborated to define and select projects for inclusion in the proposed TIP based on their
individual capital plans and considering regional needs when they come together as NYMTC.
In the NYMTC planning area, the transportation system generates a variety of needs ranging
from alleviating congestion, to system maintenance, to improving air quality and safety, to
adapting to the changes caused by shifting travel demands. Improvement concepts must be
consistent with Plan 2045 and major improvements must be studied in detail before they can be
considered for selection as improvement projects. Several key considerations – social, financial,
economic, and environmental – influence the project selection process. Additional performance-
based planning and programing requirements help guide program development while operating
under long standing requirements of consistency with Plan 2045 and maintaining fiscal
constraint during the project selection process. NYMTC’s members aim to address these various
needs and regulatory requirements as they select projects for inclusion in the TIP.

23 CFR 450.326 (f)

The TIP shall contain all regionally significant projects requiring an action by the FHWA or the
FTA whether or not the projects are to be funded under title 23 U.S.C. Chapters 1 and 2 or title
49 U.S.C. Chapter 53 (e.g., addition of an interchange to the Interstate System with State, local,
and/or private funds and congressionally designated projects not funded under 23 U.S.C. or 49
U.S.C. Chapter 53). For public information and conformity purposes, the TIP shall include all

25
regionally significant projects proposed to be funded with Federal funds other than those
administered by the FHWA or the FTA, as well as all regionally significant projects to be funded
with non-Federal funds.

Table 16 below lists regionally significant projects over $100M included in the FFYs 2020-2024
TIP:

Table 16 - Regionally-Significant Projects


PIN Project Title Total
Project
Cost (in
millions of
YOE $)

005423 RECONSTRUCT NY347 FROM GIBBS POND RD TO HALLOCK $115.00


ROAD

G609/01/AA EAST SIDE ACCESS CONSTRUCTION $1,214.93

G710-01AA SECOND AVE SUBWAY PHASE 2 CONSTRUCTION $1,300.00

L703/04/WX MAIN LINE DOUBLE TRACK PHASE 2 $125.00

X72707 REHABILATION OF 6 BRIDGES ON THE CROSS-BRONX $405.00


EXPRESSWAY

X73163 HUNTS POINT ACCESS IMPROVEMENT, PHASE 1 $598.00

X73164 HUNTS POINT ACCESS IMPROVEMENT, PHASE 2 $676.00

X73165 HUNTS POINT ACCESS IMPROVEMENT, PHASE 3 $486.00

X73582 VAN WYCK EXPRESSWAY IMPROVEMENTS TO JFK - $260.00


OVERPASSES

X73583 VAN WYCK EXPRESSWAY IMPROVEMENTS TO JFK - LIRR $460.00


BRIDGES

X73584 VAN WYCK EXPRESSWAY IMPROVEMENTS TO JFK - WIDENING $568.16

26
23 CFR 450.326 (g)
The TIP shall include, for each project or phase (e.g., preliminary engineering,
environment/NEPA, right-of-way, design, or construction), the following:
(1) Sufficient descriptive material (i.e., type of work, termini, and length) to identify the
project or phase;
(2) Estimated total project cost, which may extend beyond the 4 years of the TIP;
(3) The amount of Federal funds proposed to be obligated during each program year for the
project or phase (for the first year, this includes the proposed category of Federal funds and
source(s) of non-Federal funds. For the second, third, and fourth years, this includes the
likely category or possible categories of Federal funds and sources of non-Federal funds);
(4) Identification of the agencies responsible for carrying out the project or phase;
(5) In nonattainment and maintenance areas, identification of those projects that are
identified as TCMs in the applicable SIP;
(6) In nonattainment and maintenance areas, included projects shall be specified in sufficient
detail (design concept and scope) for air quality analysis in accordance with the EPA
transportation conformity regulations (40 CFR part 93, subpart A); and
(7) In areas with Americans with Disabilities Act required paratransit and key station plans,
identification of those projects that will implement these plans.

27
The project listings which comprise the FFYs 2020-2024 TIP comply with the requirements of
23 CFR 450.326 (g) stated above.
Additionally, the FFYs 2020-2024 TIP includes projects which advance the NYMTC members’
transition plans under the Americans with Disabilities Act (ADA). In general, an ADA
Transition Plan provides a self-assessment of the accessibility of sidewalks, rest areas, and other
equipment, buildings and facilities owned and operated directly by a member agency. The Plan
should also contain a schedule for complying with ADA requirements.
Development and implementation of the transition plans are the responsibility of each of
NYMTC’s member agencies. Thus, the transition plans of the five suburban counties, the City of
New York, the State of New York and the MTA contribute key projects for implementation
through the FFYs 2020-2024 TIP.
23 CFR 450.326 (n)
As a management tool for monitoring progress in implementing the transportation plan, the TIP
should:
(1) Identify the criteria and process for prioritizing implementation of transportation plan
elements (including multimodal trade-offs) for inclusion in the TIP and any changes in
priorities from previous TIPs;
(2) List major projects from the previous TIP that were implemented and identify any
significant delays in the planned implementation of major projects; and
(3) In nonattainment and maintenance areas, describe the progress in implementing any
required TCMs, in accordance with 40 CFR part 93.
Plan 2045’s strategic framework of shared goals and desired outcomes and medium-term actions
related to those goals govern the process for prioritizing implementation of Plan elements for
inclusion in the TIP, in addition to the Congestion Management Process and the individual
capital and operational planning processes of NYMTC’s member agencies. Prioritization occurs
through the deliberation of NYMTC’s members, either corporately or at the sub-regional
Transportation Coordinating Committees.
Table 17 below lists the major projects from the previous FFYs 2017-21 TIP. Currently, there
are no active Transportation Control Measures in the NYMTC planning area.

28
Table 17 - Major Projects from the FFYs 2017-21 TIP
Total Project
PIN Project Name Cost (in millions Type
of YOE $)
005423 RECONSTRUCT NY347 FROM $115.00 ENHANCEMENT
GIBBS POND RD TO HALLOCK
ROAD
8TZ101 REPLACEMENT OF TAPPAN $5,400.00 ENHANCEMENT
ZEE BRIDGE
CM09-6891 PURCHASE 940 B-DIV $2,956.43 ENHANCEMENT
RAILCARS (60 FT CARS, R211
CARS)
E-S07-03-02 SIR: RELOCATE HQ TO $166.00 ENHANCEMENT
CLIFTON SHOP
G609/01/AA EAST SIDE ACCESS $10,200.00 ENHANCEMENT
CONSTRUCTION
G610-01AA SECOND AVE SUBWAY PHASE $4,451.00 ENHANCEMENT
1 CONSTRUCTION
G710-01AA SECOND AVE SUBWAY PHASE $1,035.00 ENHANCEMENT
2 CONSTRUCTION
L702/04/UJ VARIOUS LIRR STATIONS - $150.00 ENHANCEMENT
ENHANCEMENT
L702/06/VN PENN STATION CORRIDOR $170.00 ENHANCEMENT
IMPROVEMENTS
L703/04/WX MAIN LINE DOUBLE TRACK $328.00 ENHANCEMENT
PHASE 2
L705/02/LK POSITIVE TRAIN CONTROL $126.00 ENHANCEMENT
(PTC)
MW38-1456 MODERNIZE INTERLOCKING: $165.68 ENHANCEMENT
PARSONS / QUEENS BLVD
MW38-1806 MODERNIZATION OF 30 ST $240.70 ENHANCEMENT
AND 42 ST INTERLOCKINGS:
CBTC 8AV
MW38-6185 MODERNIZE INTERLOCKING: $166.60 ENHANCEMENT
DITMAS & AVE X/ CULVER
LINE
MW38-6822 MODERNIZE INTERLOCKING: $170.07 ENHANCEMENT
KINGS HIGHWAY / CULVER
LINE
MW56-1806 CBTC: 8 AVE (59TH TO HIGH $249.00 ENHANCEMENT
ST) - MOD 30TH & 40TH ST
INTERLOCK
MW56-6185 CBTC: CULVER (CHURCH AVE $429.88 ENHANCEMENT
TO W8TH ST) - X & DITMAS
INTERLOCK

29
Total Project
PIN Project Name Cost (in millions Type
of YOE $)
MW56-7027 CBTC: QUEENS BLVD WEST $338.23 ENHANCEMENT
PHASE 2 (50 ST TO UNION
TPKE
PW08-2548 THREE NEW SUBSTATIONS – $193.16 ENHANCEMENT
CANARSIE LINE (MHTN &
BKLYN)
RC03-2008 NEW FARE PAYMENT SYSTEM, $418.60 ENHANCEMENT
PHASE 2
ST01-1615 HELP POINT: 42 STATIONS $152.72 ENHANCEMENT
ST04-0810 ADA: BEDFORD AVENUE $110.65 ENHANCEMENT
STATION – CANARSIE LINE
ST04-0861 ADA: TIMES SQUARE $239.50 ENHANCEMENT
COMPLEX, PH 3 - SHUTTLE
ST04-6951 ADA ACCESSIBILITY 68 ST- $124.46 ENHANCEMENT
HUNTER COLLEGE STATION
LEX
X05160 KEW GARDENS INTERCHANGE $333.00 ENHANCEMENT
IMPROVEMENTS
X09629 BAYONNE BRIDGE $1,000.00 ENHANCEMENT
NAVIGATIONAL CLEARANCE
PROGRAM
X50049 CROSS-HARBOR RAIL FREIGHT $106.90 ENHANCEMENT
MOVEMENT PROJECT - FIXED
ASSETS
X72977 REPLACEMENT OF $330.50 ENHANCEMENT
KOSCIUSZKO BRIDGE OVER
NEWTOWN CREEK- CONT. 2
X73124 REPLACEMENT OF $685.00 ENHANCEMENT
KOSCIUSZKO BRIDGE OVER
NEWTOWN CREEK - CONT 1
X73163 HUNTS POINT ACCESS $598.00 ENHANCEMENT
IMPROVEMENT, PHASE 1
X73575 REPLACEMENT OF VAN WYCK $140.60 ENHANCEMENT
EXPRESSWAY VIADUCTS AT
THE KGI (2B)
X73580 REHAB OF TWO BRIDGES ON $150.10 ENHANCEMENT
THE VAN WYCK EXPWY/LIE
INTERCHANGE
X73582 VAN WYCK EXPRESSWAY $260.00 ENHANCEMENT
IMPROVEMENTS TO JFK -
OVERPASSES

30
Total Project
PIN Project Name Cost (in millions Type
of YOE $)
X73583 VAN WYCK EXPRESSWAY $460.00 ENHANCEMENT
IMPROVEMENTS TO JFK - LIRR
BRIDGES
X73584 VAN WYCK EXPRESSWAY $520.00 ENHANCEMENT
IMPROVEMENTS TO JFK -
WIDENING
X76425 REPLACEMENT OF 11TH AVE $123.96 ENHANCEMENT
VIADUCT 33ST TO 35 ST
X77047 GOETHALS BRIDGE $1,500.00 ENHANCEMENT
REPLACEMENT (STATEN
ISLAND - ELIZABETH, NJ)
X77243 UNIONPORT BRIDGE $264.01 ENHANCEMENT
REPLACEMENT BRUCKNER
OVER WESTCHESTER CREEK
X77371 WOODHAVEN BLVD SBS - $236.00 ENHANCEMENT
CAPITAL IMPROVEMENTS
X82266 MOYNIHAN STATION $1,665.00 ENHANCEMENT
REDEVELOPMENT /
IMPROVEMENTS, PHASE 2
007214 NY878 OPERATIONAL $131.00 PRESERVATION
IMPROVEMENTS
082682 CAPITAL COST OF $548.00 PRESERVATION
CONTRACTING FOR NASSAU
COUNTY OPERATIONS
E=T06-03-01 PUMPING SYSTEM $382.19 PRESERVATION
IMPROVEMENTS
E-L06-03-ZQ EAST RIVER TUNNELS-HIGH $213.50 PRESERVATION
DENSITY SIGNALING
E-S07-02-09 SIR: STATEN ISLAND RAILWAY $230.00 PRESERVATION
RESTORATION
E-S07-03-01 STATEN ISLAND RAILWAY $140.00 PRESERVATION
FLOOD MITIGATION
E-T04-03-01 SEAL SYSTEM OPENINGS $546.50 PRESERVATION
FROM FLOODWATERS
E-T05-02-02 ROCKAWAY LINE $446.00 PRESERVATION
RESTORATION (SUPERSTORM
SANDY)
E-T05-02-05 TRACK RESTORATION $125.00 PRESERVATION
(SUPERSTORM SANDY)
E-T05-02-09 TRACK RESTORATION - $446.00 PRESERVATION
CANARSIE LINE (SUPERSTORM
SANDY)

31
Total Project
PIN Project Name Cost (in millions Type
of YOE $)
E-T06-02-06 REPAIR/REPLACEMENT LINE $290.00 PRESERVATION
EQUIPMENT ASSETS -
SUPERSTORM SANDY
E-T06-02-13 REPAIR/REPLACEMENT $290.00 PRESERVATION
TUNNEL LIGHTING - CANARSIE
LINE (SANDY)
E-T06-02-19 REPAIR/REPLACEMENT PUMP $290.00 PRESERVATION
ROOM - CANARSIE LINE
(SANDY)
E-T06-03-01 PUMPING SYSTEM $382.19 PRESERVATION
IMPROVEMENTS
E-T06-03-03 HARDENING OF SUBSTATIONS $150.00 PRESERVATION
& PURCHASE OF MOBILE
SUBSTATIONS
E-T06-03-17 PUMPING SYSTEM $382.19 PRESERVATION
IMPROVEMENTS -
CONVERSION OF 2 PUMP
CARS
E-T07-03-01 INTERNAL SEALING: TUNNELS $257.45 PRESERVATION
/ STATION COMPLEXES
E-T07-03-09 LONG-TERM FLOOD $182.40 PRESERVATION
PROTECTION HAMMELS WYE
ROCKAWAY LINE
E-T08-02-01 SOUTH FERRY SIGNAL/COMM $370.00 PRESERVATION
RESTORATION (SUPERSTORM
SANDY)
E-T08-02-07 SIGNAL RESTORATION $234.00 PRESERVATION
(SUPERSTORM SANDY)
E-T08-02-11 SIGNAL RESTORATION - $234.00 PRESERVATION
CANARSIE LINE (SUPERSTORM
SANDY)
E-T09-02-02 ROCKAWAY LINE POWER $446.00 PRESERVATION
RESTORATION (SUPERSTORM
SANDY)
E-T09-02-06 TRACTION POWER $750.00 PRESERVATION
RESTORATION REPAIR /
REPLACEMENT
E-T09-02-11 TRACTION POWER $750.00 PRESERVATION
RESTORATION - CBH
CANARSIE LINE (SANDY)
E-T09-02-12 TRACTION POWER $750.00 PRESERVATION
RESTORATION - CANARSIE
LINE (SANDY)

32
Total Project
PIN Project Name Cost (in millions Type
of YOE $)
E-T09-03-01 POWER MITIGATION: CABLES, $300.00 PRESERVATION
DUCTS
E-T09-03-09 POWER MITIGATION: CABLES, $300.00 PRESERVATION
DUCTS - CANARSIE LINE
E-T10-02-08 REPAIR/REPLACEMENT OF $791.30 PRESERVATION
VARIOUS STORM DAMAGED
ASSETS
E-T10-03-01 CONEY ISLAND FLOOD $429.84 PRESERVATION
MITIGATION
E-T10-03-02 207TH ST, ROCKAWAY PK, $454.80 PRESERVATION
148TH ST YARD FLOOD
MITIGATION
L701/01/ME PROCUREMENT OF NEW M-9 $500.10 PRESERVATION
ELECTRIC TRAIN CARS
(REPLACEMENTS)
L703/01/WE 2019 ANNUAL TRACK $118.13 PRESERVATION
PROGRAM LIFE CYCLE
REPLACEMENT
L706/01/YG DIESEL LOCOMOTIVE SHOP $108.30 PRESERVATION
IMPROVEMENTS
L707/01/XA SUBSTATION REPLACEMENTS $167.00 PRESERVATION
M604-01-01 SIGNAL SYSTEM $187.08 PRESERVATION
IMPROVEMENTS
M701-01-01 M-3 REPLACEMENT $767.82 PRESERVATION
PURCHASE OF LOCOMOTIVES
M702-01-01 GCT TRAINSHED/TUNNEL $138.75 PRESERVATION
STRUCT REPAIRS (INCL ROOF
EXP. JTS)
M703-02-03 UNDERGRADE BRIDGE $117.47 PRESERVATION
REHABILITATION -REPAIR OR
REPLACEMENT
M706-01-01 HARMON SHOP $431.60 PRESERVATION
REPLACEMENT - PHASE V
STAGE II
MW10-1516 PURCHASE LOCOMOTIVES $102.47 PRESERVATION
(52)
MW26-6158 2017 MAINLINE TRACK $230.27 PRESERVATION
REPLACEMENT
MW26-6159 2018 MAINLINE TRACK $219.01 PRESERVATION
REPLACEMENT
MW26-6160 2019 MAINLINE TRACK $219.01 PRESERVATION
REPLACEMENT

33
Total Project
PIN Project Name Cost (in millions Type
of YOE $)
MW64-0845 LINE STRUCTURE REPAIRS: $426.43 PRESERVATION
SYSTEM-WIDE
MW64-7945 LINE STRUCTURE REPAIRS: $426.43 PRESERVATION
1ST AVE & BEDFORD AVE
(CANARSIE LN)
SF02-2450 628 STANDARD DIESEL BUSES $397.79 PRESERVATION
SF02-2452 190 ARTICULATED BUSES $168.30 PRESERVATION
SF02-2454 200 STANDARD DIESEL BUSES $127.80 PRESERVATION
SF02-6204 110 CNG ARTICULATED BUSES $106.40 PRESERVATION
SF03-6567 BUS RADIOS AND CONTROL $322.38 PRESERVATION
CENTER PROJECT
SF06-6024 REPLACEMENT OF JAMAICA $128.36 PRESERVATION
DEPOT (CONSTR ONLY)
SI05-0963 SIR: RELOCATE HQ TO $1,887.40 PRESERVATION
CLIFTON SHOP
SI09-6891 SIR: REPLACE CAR FLEET $280.00 PRESERVATION
ST01-6219 CORE STATION $175.00 PRESERVATION
IMPROVEMENT PROJECT
RESERVE
ST12-0139 ISIM B-DIV: MODULE 2 & $185.93 PRESERVATION
ISIM-B PH MODULE 3: RAIL
TRAF SYSTEMS
U6030225 BUS RADIOS AND CONTROL $320.30 PRESERVATION
CENTER PROJECT (CONTROL
CENTER)
U6030226 BUS RADIOS AND CONTROL $320.30 PRESERVATION
CENTER PROJECT (BUS
RADIOS)
U7030202 PURCHASE 257 EXPRESS $195.54 PRESERVATION
BUSES AS REPLACEMENT
VEHICLES
X11019 BRONX RIVER PARKWAY $290.08 PRESERVATION
BRIDGE REPLACEMENT (3
BINS)
X72030 I-87 MAJOR DEEGAN $257.81 PRESERVATION
EXPRESSWAY REHAB 8
BRIDGES (CONTRACT 1)
X72039 MAJOR DEEGAN REPLACE 3 $146.35 PRESERVATION
BRIDGES (MACOMBS DAM -
AHB)
X72699 REHABILITATION OF CROSS $145.00 PRESERVATION
BRONX EXPWY HIGH BRIDGE
INTERCHANGE

34
Total Project
PIN Project Name Cost (in millions Type
of YOE $)
X72707 REHABILATION OF 6 BRIDGES $405.00 PRESERVATION
ON THE CROSS BRONX
EXPRESSWAY
X73145 REHAB OF BRUCKNER BLVD $209.50 PRESERVATION
VIADUCT (I-278), PHASE 1
X73146 REHAB OF BRUCKNER BLVD $168.48 PRESERVATION
VIADUCT (I-278), PHASE 2
X73147 REPLACEMENT OF FOUR SIE $110.00 PRESERVATION
BRIDGES (I-278) & ONE
GOWANUS BRIDGE
X73152 BRIDGE REHAB OF $175.44 PRESERVATION
BROOKLYN-QUEENS EXPWY
OVER 47TH ST., QNS
X75753 REHABILITATE BROADWAY $160.00 PRESERVATION
BRIDGE LINKING MANHATTAN
AND BRONX
X75989 WTC SITE &TRANSIT $150.00 PRESERVATION
FACILITIES FLOOD MITIGATN
& RESIL IMPROVMT
X76126 REHAB BROOKLYN BRIDGE, $314.00 PRESERVATION
MANHATTAN APPROACHES
(CONTACT 7)
X77050 WEST 79TH STREET/ AMTRAK $150.00 PRESERVATION
(7 BIN#'S) BRIDGE
X77251 REHABILITATE RIVERSIDE $136.00 PRESERVATION
DRIVE BRIDGE/ W158TH
STREET
X77283 REHABILITATE ED KOCH $154.20 PRESERVATION
QUEENSBORO BRIDGE,
QUEENS COUNTY
X77332 REHABILITATE BQE (I-278) $1,901.29 PRESERVATION
FROM SANDS ST TO ATLANTIC
AVE
X77363 RECONSTRUCTION SHORE $300.00 PRESERVATION
ROAD BRIDGE OVER THE
HUTCHINSON RIVER
X82295 NYC FERRY PROGRAM: $331.70 PRESERVATION
REPLACE KENNEDY-CLASS
FERRIES
X82344 STATEN ISLAND FERRY $140.00 PRESERVATION
PREVENTIVE MAINTENANCE
X82352 PATH DUCTBANK $194.00 PRESERVATION
REPLACEMENT

35
Section V. Financing the FFYs 2020-2024 TIP

23 CFR 450.326 (j)


The TIP shall include a financial plan that demonstrates how the approved TIP can be
implemented, indicates resources from public and private sources that are reasonably expected
to be made available to carry out the TIP, and recommends any additional financing strategies
for needed projects and programs. In developing the TIP, the MPO, State(s), and public
transportation operator(s) shall cooperatively develop estimates of funds that are reasonably
expected to be available to support TIP implementation in accordance with §450.314(a). Only
projects for which construction or operating funds can reasonably be expected to be available
may be included.

Fiscal Constraint
All projects in the FFYs 2020-2024 TIP are consistent with the fiscally-constrained element of
Plan 2045. The TIP’s financial envelope is a medium-range subset of Plan 2045’s long-range
financial plan. The financial envelope for the FFYs 2020-2024 TIP includes various federal,
state, and local fund sources which implement maintenance, operation and improvement of the
transportation system.
All funding programmed in the FFYs 2020-2024 TIP is based on currently committed or
“reasonably available” funding. Total and phase-specific project costs are reflected in the TIP
project listings. All project costs are calculated in Year of Expenditure (YOE) dollars to account
for inflation. Details of the individual NYMTC members’ YOE assumptions are presented
below.
Funds are programmed for all years using relevant federal legislation which authorizes
transportation funding. Revenue projections for the FFYs 2020-2024 TIP are based on funding
provided under the Moving Ahead for Progress in the 21st Century Act (MAP-21). Future
updates to federal revenue projections will be based on the Fixing America’s Surface
Transportation (FAST) Act. Federal formula funding is distributed to states and sub-allocated
within states to be programmed. Federal funds that are distributed on a discretionary basis are
programmed based on notice of project selection or awards.
All federally-funded projects programmed in the FFYs 2020-2024 TIP are fiscally constrained
and represent currently committed or reasonably available funding under Title 23 U.S.C. and
Title 49 U.S.C. No illustrative projects are included in the NYMTC TIP. The fiscal constraint of
the TIP is illustrated in Figures 1 - 4, which follow1. Note that these tables indicate the use of
“carryover” funding, which is generally defined as funding not obligated in the previous TIP
which is still available for use. The availability of this carryover funding addresses any balance
beyond the planning targets which appear in the tables, thus demonstrating that the TIP is
fiscally constrained by year and by fund source.

1
See Appendix A for more information on federal funding codes.

36
Operations and Maintenance
Appendix 10 of Plan 2045 contains detailed system-level forecasts of costs and revenue sources
that are reasonably expected to be available to adequately operate and maintain Federal-aid
highways and transit. Specifically, Table 3 in Appendix 10 indicates estimated system-level
operations and maintenance costs of $66.6 billion for FFYs 2014-2018 and $71.9 billion for
FFYs 2019-2023. Table 5 in Appendix 10 estimates system-level resources of $67.9 billion for
FFYs 2014-2018 and $72.2 billion for FFYs 2019-2023 that are/will be available for operations.
The methodologies and assumptions that produced these estimates are fully described in Chapter
6 of Plan 2045. Extrapolating from these system-level forecasts in Plan 2045, operations and
maintenance costs during the period of the FFYs 2020-2024 TIP are forecast at $69.8 billion,
while resources are forecast to be $70.5 billion. Thus the forecasts derived from both Plan 2045
and specifically for the FFYs 2020-2024 TIP fulfill the requirement of 23 CFR 450.326(j) that
the financial plan shall contain system-level estimates of costs and revenue sources that are
reasonably expected to be available to adequately operate and maintain Federal-aid highways (as
defined by 23 U.S.C. 101(a) (6)) and public transportation (as defined by title 49 U.S.C. Chapter
53).

Additional Funding Strategies


Chapter 6 and Appendix 10 of NYMTC’s current Plan 2045 describe the long-range financial
plan for the NYMTC planning area. Specifically, Section 4 of Chapter 6 provides estimates of
funds that will be available to support metropolitan transportation plan implementation. All
necessary financial revenues from public and private sources that are reasonably expected to be
made available to carry out the transportation plan are identified.
The tables which follow detail the portion of the long-range financial plan in Plan 2045 that
applies to the FFYs 2020-2024 TIP. Specifically, Tables 1 and 2 identify the funding
programmed in the TIP by fund source, fiscal year and NYMTC sub-region. Note that the “FTA
other” fund source referenced in this table includes Section 5324 and others as noted in the
listing of federal funding codes in Appendix A.
All federally-funded projects in the FFYs 2020-2024 TIP are programmed with reasonably
available or committed funding. As indicated earlier, the NYMTC planning area is wholly or
partially in non-attainment areas for several pollutants (ozone and fine particulate matter) and a
maintenance area for carbon monoxide. By regulation, the fiscal constraint requirements are
more stringent in air quality nonattainment and maintenance areas. Therefore, NYMTC does not
program projects or project phases where the funding availability cannot be verified. To support
air quality planning under the Clean Air Act Amendments of 1990, USEPA’s transportation
conformity regulations specify that a Transportation Conformity Determination can only be
made on a fiscally-constrained metropolitan transportation plan and TIP in air quality
nonattainment and maintenance areas consistent with federal metropolitan planning regulations
[see 40 CFR 93.108].
Based on these regulations for a TIP developed in air quality non-attainment and maintenance
areas, projects included in the first two years of the TIP shall be limited to those for which funds
are "available" or "committed" [see 23 CFR 450.216(m) and 23 CFR 450.324(i), respectively].
Definitions for the terms "available funds" and "committed funds" are contained in 23 CFR
450.104. Therefore, non-attainment and maintenance areas may not rely upon proposed revenue

37
sources to support projects listed in the first two years of the TIP. Funding derived from a
proposed gas tax increase, bonding, a proposed regional sales tax, or a major funding increase
still under consideration does not qualify as "available" or "committed" until it has been enacted
by legislation or referendum. However, for the third and fourth years, the TIP may include a
project or project phase if full funding can reasonably be expected to be available for the project
within the time contemplated for its completion.

Year of Expenditure
As outlined in the final rule Statewide and Nonmetropolitan Transportation Planning;
Metropolitan Transportation Planning (effective June 27, 2016), cost and revenue estimates for
the STIP, metropolitan transportation plan, and TIP must use an inflation rate(s) to reflect "year
of expenditure” dollars (YOE), based on reasonable financial principles and information,
developed cooperatively by the State DOT, MPOs, and public transportation operators [see 23
CFR 450.218(l), 23 CFR 450.324(f)(11)(iv), and 23 CFR 450.326(j), respectively]. The inflation
rates for forecasting project costs are not the same factors used to estimate available or
committed funding or revenues. Future project costs for NYMTC members are tied to
construction and market costs. Year of expenditure project cost vary by NYMTC member and
project type. The use of YOE ensures sufficient revenues to accommodate the effects of inflation
on costs for construction, operations, and maintenance, of highway and transit projects and
programs during the financially constrained program period. YOE methodologies used by
NYMTC members are detailed below:
Metropolitan Transportation Authority: All MTA project cost estimates incorporate an annual
construction cost inflation factor. These factors are based on a breakdown of projected cost
increases for labor and materials for the construction of capital projects in the New York City
metropolitan region. Project budgets are initially established in current year dollars and are then
inflated to the mid-point year of construction according to the region and type of work, to reflect
actual anticipated costs. Using a proprietary inflation rate the agency’s system preservation needs
were computed through 2024 in YOE dollars.
Nassau County: Nassau County roadway project costs are calculated using inflation factors by
type of work, location and the duration of project. The project costs are also inflated for year of
contract award, with an annual factor for year of award of 2.6%.
For transit, the YOE rate of inflation applied for the 2014 replacement year for the standard 40-
foot CNG buses is 12% from the base 2011 year, and 4% for the years 2016 to 2018. The year
of expenditure rate of inflation applied for the paratransit vehicles is 4% for the years 2014 to
2017. The year of expenditure for other facility and transit support projects is based on past
capital project costs.
NYCDOT: Project budgets for the Staten Island Ferry system are initially established in current
year dollars, which are inflated by 3.0% per year. NYCDOT uses information on the age of the
ferry boats to decide when replacement boats would be needed and adjusted the capital estimates
accordingly to reflect dry-docking costs in the intervening years until the old boats are replaced
with the new boats. Since both the ferry terminals were recently reconstructed, we used our best
estimates on the nature of work that would be required to keep them in a state of good repair.
Project budgets for bridges and roadways are initially established in current year dollars, which
are inflated by 3.0% per year. The inflated cost is further adjusted to account for bridge and road
network condition information, incorporating all indicators of bridge and road network needs
38
into NYCDOT’s YOE project cost calculation, and used for maintaining the systems’ state of
good repair and overall program fiscal constraint.
NYSDOT: The following simple rates of inflation by State Fiscal Year (SFY) (April to March)
are the best available estimates of overall price trends for the transport public works sector in
New York State for the programming period:

Table 18 - NYSDOT Inflation Rates

Annual Period Simple Year over Year


Inflation

FFY19 0.00%

FFY20 2.00%

FFY21 4.00%

FFY22 6.00%

FFY23 8.00%

FFY24 10.00%

FFY25 12.00%

FFY26 14.00%

New York State Thruway Authority: Project costs are inflated for year of contract award with
an annual factor for year of award by 2%.
Putnam and Rockland Counties: Putnam and Rockland counties use the NYSDOT Program
Support System inflation rates for roadway and transit projects.
Suffolk County: Suffolk County Roadway and Bridge project costs are derived by considering
type of work, location, duration of project, and recent bids for similar projects. Additionally,
project costs take YOE into account by utilizing the NYSDOT Program Support System inflation
factors. Suffolk County transit projects use NYSDOT’s Program Support System inflation
factors.
Westchester County: Westchester County roadway projects use the NYSDOT Program Support
System inflation factors. Westchester County addresses YOE in the development of transit
projects by considering prior expenditures and industry standards for similar purchases and
capital project cost. Project cost is also market driven as they are based on bids received for
work to be performed or for procurements. Future year options may also be included in
purchases/procurements with known costs for year of procurement.

39
Planning Factors
The FFY 2020-2024 NYMTC TIP supports the planning factors under 23 USC 134, as modified
by the Fixing America’s Surface Transportation (FAST) Act. They are as follows:
(A) support the economic vitality of the metropolitan area, especially by enabling global
competitiveness, productivity, and efficiency;
(B) increase the safety of the transportation system for motorized and nonmotorized users;
(C) increase the security of the transportation system for motorized and nonmotorized users;
(D) increase the accessibility and mobility of people and for freight;
(E) protect and enhance the environment, promote energy conservation, improve the quality of
life, and promote consistency between transportation improvements and State and local planned
growth and economic development patterns;
(F) enhance the integration and connectivity of the transportation system, across and between
modes, for people and freight;
(G) promote efficient system management and operation; and
(H) emphasize the preservation of the existing transportation system.
(I) improve the resiliency and reliability of the transportation system and reduce or mitigate
storm water impacts of surface transportation; and
(J) enhance travel and tourism.

40
Figures

41
NYMTC Highway Fund Summary (Figure 1A)
(FFY $ in millions)
Fund Source Rollover from FFY 18 FFY 2019 FFY 2020 FFY 2021 FFY 2022 FFY 2023 FFY 2024 STIP TOTAL TIP TOTAL
Congestion Mitigation Air Quality Program Target $78.892 $75.947 $75.947 $75.947 $75.947 $75.947 $303.786 $379.733
(CMAQ) Program $545.894 $173.437 $135.527 $154.538 $157.484 $149.682 $620.987 $770.669
Statewide -$450.000 -$61.743 -$60.279 -$54.702 -$54.702 -$54.022 -$231.426 -$285.448
Carryover $122.993 $0.000 $105.991 $70.243 $70.942 $47.052 $20.216 -$344.009 -$344.009
Balance -$344.009 $70.243 $70.942 $47.052 $20.216 $0.502 -$429.784 -$449.498
Highway Safety Improvement Program Program Target $26.168 $26.931 $27.693 $27.693 $27.693 $27.693 $110.010 $137.703
(HSIP) Program $38.335 $69.795 $50.109 $26.477 $20.793 $24.566 $167.174 $191.740
Statewide -$20.579 -$20.984 -$33.133 $0.000 $0.000 $0.000 -$54.117 -$54.117
Carryover $2.176 $0.000 $6.109 -$21.521 -$5.054 -$3.838 $3.063 $10.588 $10.588
Balance $10.588 -$15.771 -$10.804 -$3.838 $3.063 $6.190 $7.542 $10.669
National Highway Performance Program Program Target $239.952 $281.987 $324.022 $324.022 $324.022 $324.022 $1,254.054 $1,578.076
(NHPP) Program $712.664 $458.393 $356.758 $351.322 $345.106 $308.960 $1,511.579 $1,820.539
Statewide -$493.403 -$87.720 -$49.700 -$1.350 -$13.086 -$2.415 -$151.856 -$154.271
Carryover $115.833 $0.000 $113.356 $24.670 $41.634 $15.685 $7.687 $136.524 $136.524
Balance $136.524 $24.670 $41.634 $15.685 $7.687 $25.165 $30.855 $48.333
Surface Transportation Program (STP) Program Target $29.012 $25.559 $29.242 $26.362 $28.847 $29.229 $110.012 $139.241
STP Flexible Program $21.190 $51.824 $22.172 $32.929 $47.262 $27.302 $154.187 $181.489
Statewide -$0.717 -$7.487 $0.000 -$2.880 -$0.395 -$0.013 -$10.762 -$10.775
Carryover $40.263 $0.000 $41.507 $22.729 $29.800 $26.113 $8.094 $48.802 $48.802
Balance $48.802 $22.729 $29.800 $26.113 $8.094 $10.034 $15.389 $17.329
STP Large Urban Program Target $125.669 $138.247 $152.437 $152.437 $152.437 $152.437 $595.558 $747.995
Program $116.129 $151.367 $175.726 $162.968 $173.244 $151.880 $663.305 $815.184
Statewide $0.000 -$2.207 -$29.914 -$0.004 -$0.004 -$0.004 -$32.129 -$32.133
Carryover $29.405 $0.000 $29.185 $18.272 $24.897 $14.370 -$6.433 $38.945 $38.945
Balance $38.945 $18.272 $24.897 $14.370 -$6.433 -$5.872 $3.327 $3.888
STP Off System Bridge Program Target $20.759 $14.129 $4.121 $4.121 $4.121 $4.121 $26.492 $30.613
Program $5.600 $63.123 $83.730 $2.641 $3.686 $2.849 $153.180 $156.029
Statewide -$5.600 -$1.554 -$6.641 -$1.159 -$1.222 -$2.059 -$10.576 -$12.635
Carryover $98.383 $0.000 $117.006 $65.405 $0.000 $0.000 $0.000 $119.142 $119.142
Balance $119.142 $69.566 -$7.563 $2.639 $1.657 $3.331 $3.030 $6.361
Total Federal Amount Program Target $520.452 $562.799 $613.463 $610.582 $613.067 $613.449 $2,399.912 $3,013.361
Program $1,439.812 $967.939 $824.022 $730.875 $747.575 $665.239 $3,270.411 $3,935.650
Statewide -$970.299 -$181.695 -$179.667 -$60.095 -$69.409 -$58.513 -$490.866 -$549.379
Carryover $409.053 $0.000 $459.992 $236.547 $205.655 $145.458 $80.359 $459.992 $459.992
Balance $459.992 $236.547 $205.655 $145.458 $80.359 $87.082 $80.359 $87.082

42
NSTCC Fund Summary (Figure 1B)
(FFY $ in millions)
Fund Source Rollover from FFY 18 FFY 2019 FFY 2020 FFY 2021 FFY 2022 FFY 2023 FFY 2024 STIP TOTAL TIP TOTAL
Congestion Mitigation Air Quality Program Target $20.357 $20.357 $20.357 $20.357 $20.357 $20.357 $81.426 $101.783
(CMAQ) Program $14.420 $42.233 $26.642 $25.031 $57.531 $46.742 $151.437 $198.179
Statewide $0.000 -$6.671 -$6.671 -$6.671 -$6.671 -$6.671 -$26.684 -$33.355
Carryover $58.000 $0.000 $63.937 $48.732 $49.117 $51.114 $20.610 $63.937 $63.937
Balance $63.937 $48.732 $49.117 $51.114 $20.610 $0.896 $20.610 $0.896
Highway Safety Improvement Program Program Target $6.864 $7.087 $7.309 $7.309 $7.309 $7.309 $29.015 $36.324
(HSIP) Program $17.802 $19.184 $14.282 $7.253 $4.500 $5.940 $45.219 $51.159
Statewide -$16.785 -$10.024 -$1.261 $0.000 $0.000 $0.000 -$11.285 -$11.285
Carryover $2.133 $0.000 $7.980 $5.907 $0.195 $0.252 $3.061 $7.980 $7.980
Balance $7.980 $5.907 $0.195 $0.252 $3.061 $4.430 $3.061 $4.430
National Highway Performance Program Program Target $71.387 $75.419 $79.452 $79.452 $79.452 $79.452 $313.775 $393.227
(NHPP) Program $138.530 $135.542 $65.549 $99.749 $106.224 $63.625 $407.064 $470.689
Statewide -$39.227 -$31.495 -$4.567 $0.000 -$9.662 -$2.415 -$45.724 -$48.139
Carryover $66.673 $0.000 $38.757 $10.129 $28.599 $8.302 -$8.808 $38.757 $38.757
Balance $38.757 $10.129 $28.599 $8.302 -$8.808 $9.434 -$8.808 $9.434
Surface Transportation Program (STP) Program Target $9.349 $9.386 $9.423 $9.423 $9.423 $9.423 $37.657 $47.080
STP Flexible Program $8.822 $16.800 $1.565 $10.071 $23.411 $10.578 $51.847 $62.425
Statewide -$0.717 -$3.841 $0.000 $0.000 $0.000 $0.000 -$3.841 -$3.841
Carryover $9.350 $0.000 $10.594 $7.021 $14.880 $14.232 $0.245 $10.594 $10.594
Balance $10.594 $7.021 $14.880 $14.232 $0.245 -$0.910 $0.245 -$0.910
STP Large Urban Program Target $27.907 $31.183 $34.459 $34.459 $34.459 $34.459 $134.560 $169.019
Program $14.435 $37.702 $42.597 $28.739 $53.263 $34.452 $162.301 $196.752
Statewide $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000
Carryover $14.269 $0.000 $27.741 $21.222 $13.084 $18.804 $0.000 $27.741 $27.741
Balance $27.741 $21.222 $13.084 $18.804 $0.000 $0.007 $0.000 $0.007
STP Off System Bridge Program Target $1.392 $0.696 $0.000 $0.000 $0.000 $0.000 $0.696 $0.696
Program $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000
Statewide $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000
Carryover $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000
Balance $1.392 $0.696 $0.000 $0.000 $0.000 $0.000 $0.696 $0.696
Total Federal Amount Program Target $137.256 $144.128 $151.000 $151.000 $151.000 $151.000 $597.129 $748.129
Program $194.009 $251.461 $150.635 $170.843 $244.929 $161.337 $817.868 $979.204
Statewide -$56.729 -$52.031 -$12.499 -$6.671 -$16.333 -$9.086 -$87.534 -$96.620
Carryover $150.425 $0.000 $150.401 $95.099 $107.964 $94.792 $17.196 $150.401 $150.401
Balance $150.401 $95.099 $107.964 $94.792 $17.196 $15.946 $17.196 $15.946

43
NYCTCC Fund Summary (Figure 1C)
(FFY $ in millions)
Fund Source Rollover from FFY 18 FFY 2019 FFY 2020 FFY 2021 FFY 2022 FFY 2023 FFY 2024 STIP Total TIP Total
Congestion Mitigation Air Quality Program Target $44.535 $44.535 $44.535 $44.535 $44.535 $44.535 $178.140 $222.675
(CMAQ) Program $67.080 $105.931 $83.752 $111.901 $86.859 $86.859 $388.444 $475.303
Statewide $0.000 -$42.325 -$42.325 -$42.325 -$42.325 -$42.325 -$169.300 -$211.625
Carryover $63.549 $0.000 $41.004 $21.932 $25.040 -$0.001 $0.000 $41.004 $41.004
BALANCE $41.004 $21.932 $25.040 -$0.001 $0.000 $0.000 $0.000 $0.000
Highway Safety Improvement Program Program Target $13.735 $14.163 $14.591 $14.591 $14.591 $14.591 $57.935 $72.526
(HSIP) Program $19.443 $40.957 $27.740 $13.435 $14.590 $14.591 $96.722 $111.313
Statewide -$3.794 -$5.750 -$29.572 $0.000 $0.000 $0.000 -$35.322 -$35.322
Carryover $5.379 $0.000 $3.465 -$23.329 -$1.156 $0.000 $0.000 $3.465 $3.465
BALANCE $3.465 -$23.329 -$6.906 $0.000 $0.000 $0.000 $0.000 $0.000
National Highway Performance Program Program Target $93.855 $123.691 $153.526 $153.526 $153.526 $153.526 $584.270 $737.796
(NHPP) Program $522.592 $166.116 $190.451 $159.355 $153.526 $153.527 $669.448 $822.975
Statewide -$454.176 -$3.125 -$35.185 $0.000 $0.000 $0.000 -$38.310 -$38.310
Carryover $21.429 $0.000 $46.868 $7.568 $5.828 $0.000 $0.000 $46.868 $46.868
BALANCE $46.868 $7.568 $5.828 $0.000 $0.000 $0.000 $0.000 $0.000
Surface Transportation Program (STP) Program Target $82.470 $92.152 $101.834 $101.834 $101.834 $101.834 $397.655 $499.489
STP Large Urban Program $91.666 $92.152 $116.739 $114.428 $103.487 $101.834 $426.806 $528.640
Statewide $0.000 $0.000 -$29.151 $0.000 $0.000 $0.000 -$29.151 -$29.151
Carryover $9.196 $0.000 $0.000 $0.000 $14.246 $1.652 $0.000 $0.000 $0.000
BALANCE $0.000 $0.000 $14.246 $1.652 $0.000 $0.000 $0.000 $0.000
STP Off System Program Target $18.623 $9.312 $0.000 $0.000 $0.000 $0.000 $9.312 $9.312
Program $5.600 $60.913 $65.405 $0.000 $0.000 $0.000 $126.318 $126.318
Statewide -$5.600 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000
Carryover $98.383 $0.000 $117.006 $65.405 $0.000 $0.000 $0.000 $117.006 $117.006
BALANCE $117.006 $65.405 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000
Total Federal Amount Program Target $253.218 $283.853 $314.486 $314.486 $314.486 $314.486 $1,227.312 $1,541.798
Program $706.381 $466.069 $484.087 $399.119 $358.462 $356.811 $1,707.738 $2,064.549
Statewide -$463.570 -$51.200 -$136.233 -$42.325 -$42.325 -$42.325 -$272.083 -$314.408
Carryover $197.936 $0.000 $208.343 $87.326 $43.958 $1.651 $0.000 $208.343 $208.343
BALANCE $208.343 $77.326 $53.958 $1.651 $0.000 $0.000 $0.000 $0.000

44
MHSTCC Fund Summary (Figure 1D)
(FFY $ in millions)
Fund Source Rollover from FFY 18 FFY 2019 FFY 2020 FFY 2021 FFY 2022 FFY 2023 FFY 2024 STIP Total TIP Total
Congestion Mitigation Air Quality Target $14.000 $11.055 $11.055 $11.055 $11.055 $11.055 $44.220 $55.275
Program $464.394 $25.273 $25.133 $17.606 $13.094 $16.081 $81.106 $97.187
Statewide -$450.000 -$12.747 -$11.283 -$5.706 -$5.706 -$5.026 -$35.442 -$40.468
Carryover $1.444 $0.000 $1.050 -$0.421 -$3.216 -$4.061 -$0.394 $1.444 $1.444
Balance $1.050 -$0.421 -$3.216 -$4.061 -$0.394 -$0.394 $0.000 $0.000
Highway Safety Improvement Program Target (includes statewide) $5.569 $5.681 $5.793 $5.793 $5.793 $5.793 $23.060 $28.853
(Region 8) Program $1.090 $9.654 $8.087 $5.789 $1.703 $4.035 $25.233 $29.268
Statewide $0.000 -$5.210 -$2.300 $0.000 $0.000 $0.000 -$7.510 -$15.021
Carryover -$5.336 $0.000 -$5.336 -$4.099 -$4.093 -$4.089 $0.001 -$5.336 -$5.336
Balance -$0.857 -$4.099 -$4.093 -$4.089 $0.001 $1.759 $0.001 $9.269
National Highway Performance Program Target (includes statewide) $74.710 $82.877 $91.044 $91.044 $91.044 $91.044 $356.009 $447.053
(Region 8) Program $51.542 $156.735 $100.758 $92.218 $85.356 $91.808 $435.067 $526.875
Statewide $0.000 -$53.100 -$9.948 -$1.350 -$3.424 $0.000 -$67.822 -$67.822
Carryover $27.731 $0.000 $27.731 $6.973 $7.207 $7.383 $16.495 $27.731 $27.731
Balance $50.899 $6.973 $7.207 $7.383 $16.495 $15.731 $16.495 $15.731
STP (Surface Transportation Program) Flexible Target $19.663 $16.173 $19.819 $16.939 $19.424 $19.806 $72.355 $92.161
(for NYSDOT - Region 8) Program $12.368 $35.024 $20.607 $22.858 $23.851 $16.724 $102.340 $119.064
Statewide $0.000 -$3.646 $0.000 -$2.880 -$0.395 -$0.013 -$6.921 -$6.934
Carryover $30.913 $0.000 $30.913 $15.708 $14.920 $11.881 $7.849 $30.913 $30.913
Balance $38.208 $15.708 $14.920 $11.881 $7.849 $10.944 $7.849 $10.944
STP Large Urban Target $15.292 $14.912 $16.144 $16.144 $16.144 $16.144 $63.343 $79.487
Program $10.028 $21.513 $16.390 $19.801 $16.494 $15.594 $74.198 $89.792
Statewide $0.000 -$2.207 -$0.763 -$0.004 -$0.004 -$0.004 -$2.978 -$2.982
Carryover $5.940 $0.000 $1.444 -$2.950 -$2.433 -$6.086 -$6.433 $5.940 $5.940
Balance $1.444 -$2.950 -$2.433 -$6.086 -$6.433 -$5.879 -$1.937 -$1.383
STP Off System Bridge Target (includes statewide) $0.744 $4.121 $4.121 $4.121 $4.121 $4.121 $16.484 $20.605
(Region 8) Program $0.000 $2.210 $18.325 $2.641 $3.686 $2.849 $26.862 $29.711
Statewide $0.000 -$1.554 -$6.641 -$1.159 -$1.222 -$2.059 -$10.576 -$12.635
Carryover $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000
Balance $0.744 $3.465 -$7.563 $2.639 $1.657 $3.331 $0.198 $3.529
Total Federal Amount Target $129.978 $134.819 $147.976 $145.096 $147.581 $147.963 $575.471 $723.434
Program $539.422 $250.409 $189.300 $160.913 $144.184 $147.091 $744.806 $891.897
Statewide -$450.000 -$78.464 -$30.935 -$11.099 -$10.751 -$7.102 -$131.249 -$145.862
Carryover $60.692 $0.000 $101.248 $64.122 $53.733 $49.015 $63.163 $60.692 $60.692
Balance $101.248 $64.122 $53.733 $49.015 $63.163 $71.136 $22.607 $38.091

45
NYMTC Transit Fund Summary (Figure 2)
(FFY $ in millions)
MTA*
5307 2020 2021 2022 2023 2024 Total
Planning Target $713.70 $700.83 $715.49 $729.14 $743.73 $3,602.89
LIRR $97.641 $97.641 $97.641 $97.641 $97.641 $488.205
METRO-NORTH $65.094 $65.094 $65.094 $65.094 $65.094 $325.470
MTA NYCT $488.206 $488.206 $488.206 $488.206 $488.206 $2,441.030
MTA-BUS $57.371 $31.373 $32.001 $32.641 $33.294 $186.680
Federal Subtotal $708.312 $682.314 $682.942 $683.582 $684.235 $3,441.385
Balance (with MTA Bus Target) $5.39 $18.52 $32.55 $45.56 $59.49 $161.51

5337 2020 2021 2022 2023 2024 Total


Planning Target $838.94 $855.72 $872.83 $890.29 $908.09 $4,365.86
LIRR $112.193 $112.193 $112.193 $112.193 $112.193 $560.965
METRO-NORTH $74.796 $74.796 $59.734 $74.796 $74.796 $358.918
MTA NYCT $586.183 $586.183 $586.183 $586.183 $586.183 $2,930.915
Federal Subtotal $773.172 $773.172 $758.110 $773.172 $773.172 $3,850.798
Balance $65.77 $82.54 $114.72 $117.12 $134.92 $515.07

NYCDOT
5307 2020 2021 2022 2023 2024 Total
Planning Target $38.300 $39.066 $39.847 $40.644 $41.457 $199.31
NYCDOT $7.542 $22.493 $4.579 $12.800 $8.163 $55.577
Balance $30.758 $16.573 $35.268 $27.844 $33.294 $143.736

5339 2020 2021 2022 2023 2024 Total


Planning Target $1.794 $1.830 $1.867 $1.904 $1.942 $9.34
Balance $1.794 $1.830 $1.867 $1.904 $1.942 $9.337

Westchester County
5307 2020 2021 2022 2023 2024 Total
Planning Target $10.956 $11.175 $11.398 $11.626 $11.859 $57.01
WESTCHESTER $10.507 $11.007 $12.507 $10.007 $10.007 $54.035
Balance $0.449 $0.168 -$1.109 $1.619 $1.852 $2.980

5339 2020 2021 2022 2023 2024 Total


Planning Target $10.956 $11.175 $11.398 $11.626 $11.859 $57.01
WESTCHESTER $0.000 $1.642 $0.393 $0.393 $0.393 $2.821
Balance $10.956 $9.533 $11.005 $11.233 $11.466 $54.194

Rockland County
5307 2020 2021 2022 2023 2024 Total
Planning Target $6.801 $6.937 $7.076 $7.218 $7.362 $35.39
ROCKLAND $4.940 $1.836 $1.484 $1.660 $1.484 $11.404
Balance $1.861 $5.101 $5.592 $5.558 $5.878 $23.991

46
5339 2020 2021 2022 2023 2024 Total
Planning Target $0.417 $0.217 $0.222 $0.226 $0.230 $1.314
ROCKLAND $0.164 $0.164 $0.164 $0.164 $0.656 $1.312
Balance $0.253 $0.053 $0.058 $0.062 -$0.426 $0.002

Putnam County
5307 2020 2021 2022 2023 2024 Total
Planning Target $0.816 $0.833 $0.849 $0.866 $0.884 $4.25
PUTNAM $0.274 $0.674 $0.120 $0.120 $0.120 $1.308
Balance $0.542 $0.159 $0.729 $0.746 $0.764 $2.940

5339 2020 2021 2022 2023 2024 Total


Planning Target $0.057 $0.068 $0.069 $0.071 $0.072 $0.34
Balance $0.057 $0.068 $0.069 $0.071 $0.072 $0.34

Nassau County
5307 2020 2021 2022 2023 2024 Total
Planning Target $12.014 $12.254 $12.499 $12.749 $13.004 $62.52
NASSAU CO. TRANSIT $12.014 $12.254 $12.499 $12.749 $13.004 $62.520
Balance $0.000 $0.000 $0.000 $0.000 $0.000 $0.000

5339 2020 2021 2022 2023 2024 Total


Planning Target $0.558 $0.570 $0.581 $0.593 $0.605 $2.91
NASSAU CO. TRANSIT $0.559 $0.570 $0.581 $0.593 $0.605 $2.908
Balance $0.000 $0.000 $0.000 $0.000 $0.000 $0.002

Suffolk County
5307 2020 2021 2022 2023 2024 Total
Planning Target $17.724 $10.122 $10.325 $10.531 $10.742 $59.440
SUFFOLK CO.TRANSIT $2.420 $13.320 $21.860 $10.820 $11.020 $59.440
Balance $15.299 -$3.198 -$11.535 -$0.289 -$0.278 $0.000

5339 2020 2021 2022 2023 2024 Total


Planning Target $0.698 $0.413 $0.421 $0.430 $0.438 $2.400
SUFFOLK CO.TRANSIT $0.480 $0.480 $0.480 $0.480 $0.480 $2.400
Balance $0.218 -$0.067 -$0.059 -$0.050 -$0.042 $0.000

NYMTC Unallocated
2020 2021 2022 2023 2024 Total
Planning Target
5310 $10.372 $10.579 $10.791 $11.006 $11.227 $53.97
5337 HI Bus $10.422 $10.630 $10.843 $11.060 $11.281 $54.24

* MTA Bus Funding in 2020 contains carryover and the source of funding is subject to agreement by CDOT, the system
owner.

47
New York Metropolitan Transportation Council
FFYs 2020-2024 Transportation Improvement Program
Figure 3: Federal & Non-Federal Fund Summary by Region $ in Millions
2020 2021 2022 2023 2024 Federal Subtotal
CMAQ $173.437 $135.527 $154.538 $157.484 $149.682 $770.668
FBP $12.359 $0.751 $0.473 $13.583
FTA 5307 $748.147 $745.264 $737.384 $733.159 $729.483 $3,693.437
FTA 5310 $1.174 $1.174
FTA 5311 $0.094 $0.094 $0.094 $0.094 $0.094 $0.470
FTA 5337 $773.172 $773.172 $758.110 $773.172 $773.172 $3,850.798
FEDERAL AID SUMMARY

FTA 5339 $34.222 $35.933 $34.734 $34.783 $34.671 $174.343


HPP $21.212 $8.513 $0.883 $7.199 $37.807
HSIP $56.776 $60.109 $26.477 $20.792 $24.566 $188.720
NHPP $383.360 $351.781 $351.322 $345.106 $308.959 $1,740.528
OTHER FA $0.530 $0.530
REC TRAILS $0.161 $0.161
SAFE RT SCH $0.017 $0.333 $0.350
STBG FLEX $38.787 $19.341 $21.525 $41.025 $20.952 $141.630
STBG LG URB $151.367 $175.726 $164.432 $174.708 $153.344 $819.577
STBG-OFF $61.436 $68.993 $1.100 $1.037 $0.200 $132.766
STP ENHANCE $3.673 $2.500 $6.173
TAP FLEX $1.509 $1.509
TAP LG URBAN $5.274 $12.960 $18.234
Federal Subtotal $2,466.707 $2,388.497 $2,253.572 $2,288.559 $2,195.123 $11,592.458

2020 2021 2022 2023 2024 TIP Total


Local Subtotal $3,116.586 $2,538.363 $1,769.355 $1,117.680 $1,444.849 $9,986.833
Local and Federal Total $5,583.293 $4,926.860 $4,022.927 $3,406.239 $3,639.972 $21,579.291
Note: These fund summaries include the NYS Thruway and Bridge Authorities programs within the NYMTC region.

NYMTC TIP by Federal Fiscal Year


$6,000.000

$5,000.000

$4,000.000

$3,000.000

$2,000.000

$1,000.000

$0.000
2020 2021 2022 2023 2024

Federal Aid Local Aid

48
New York Metropolitan Transportation Council
FFYs 2020-2024 Transportation Improvement Program

Figure 4: Federal & Non-Federal Fund Summary by Region $ in Millions


MHSTCC N/STCC NYCTCC Federal Subtotal
CMAQ $97.187 $198.179 $475.302 $770.668
FBP $1.336 $12.247 $13.583
FTA 5307 $392.217 $617.933 $2,683.287 $3,693.437
FTA 5310 $1.174 $1.174
FTA 5311 $0.470 $0.470
FTA 5337 $358.918 $560.965 $2,930.915 $3,850.798
FEDERAL AID SUMMARY

FTA 5339 $3.477 $5.614 $165.252 $174.343


HPP $5.996 $16.324 $15.487 $37.807
HSIP $26.249 $51.159 $111.312 $188.720
NHPP $446.865 $470.689 $822.974 $1,740.528
OTHER FA $0.530 $0.530
REC TRAILS $0.161 $0.161
SAFE RT SCH $0.350 $0.350
STBG FLEX $79.205 $62.425 $141.630
STBG LG URB $94.184 $196.753 $528.640 $819.577
STBG-OFF $6.448 $126.318 $132.766
STP ENHANCE $3.673 $2.500 $6.173
TAP FLEX $1.509 $1.509
TAP LG URBAN $4.314 $13.920 $18.234
Federal Subtotal $1,517.572 $2,186.202 $7,888.684 $11,592.458

MHSTCC N/STCC NYCTCC TIP Total


Local Subtotal $1,231.458 $2,063.454 $6,691.921 $9,986.833
Local and Federal Total $2,749.030 $4,249.656 $14,580.605 $21,579.291
Note: These fund summaries include the NYS Thruway and Bridge Authorities programs within the NYMTC region.

NYMTC TIP by Transportation Coordinating Committee


$16,000.000
$14,000.000
$12,000.000
$10,000.000
$8,000.000 Local Aid

$6,000.000 Federal Aid Total

$4,000.000
$2,000.000
$0.000
MHSTCC N/STCC NYCTCC

49
Section VI. Project Listings

• New York City Transportation Coordinating Committee


• Nassau/Suffolk Transportation Coordinating Committee
• Mid-Hudson Transportation Coordinating Committee

50
New York City
Project Listing

51
INTENTIONALLY BLANK
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 Bronx County Listing Page 1 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT SAFETY IMPROVEMENTS TO WESTCHESTER AVE PIT BOND 06/2019 0.000 DETLDES 0.400
BRIDGE OVER THE ARTHUR SHERIDAN EXPRESSWAY TO PIT BOND 03/2020 0.800 CONINSP 0.800
X02709 IMPROVE SAFETY FOR MOTORIST, PEDESTRIANS AND PIT BOND 03/2020 5.200 CONST 5.200
SAFETY BICYCLISTS PIT BOND 03/2020 0.100 CONST 0.100
<Exempt>
AQC:A2 BRONX TPC: $6-$9.4 M TOTAL 5YR COST : 6.100 0.400 6.100 0.000 0.000 0.000 0.000 0.000

OPRHP THE BRONX RIVER ALLIANCE WILL KEEP THE BRONX REC TRAILS 06/2019 0.000 CONST 0.191
RIVER OPEN TO RECREATIONAL CANOE AND KAYAK LOCAL 06/2019 0.000 CONST 0.048
X02710 USE IN THE NAVIGABLE LOWER 8 MILES WITHIN BRONX
MISC COUNTY AND MAINTAIN THE BRONX RIVER BLUE-WAY,
<Exempt> A DESIGNATED NATIONAL WATER TRAIL, THROUGH
REMOVAL OF BLOCKAGES AND LITTER, MAINTENANCE
AND IMPROVEMENT OF PUBLIC BOAT LAUNCH
INFRASTRUCTURE AND THE IMPROVEMENT OF
SEVERAL PORTAGE ACCESS POINTS (RTP AWARD
2017 - OPRHP #173969)

AQC:C14 BRONX TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.239 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT REPLACEMENT OF DETERIORATED BRONX RIVER SDF 08/2024 8.000 DETLDES 8.000
PARKWAY BRIDGES AND 17 SPAN VIADUCT OVER
X11019 E.180TH STREET/ MORRIS PARK AVE IN THE BRONX TO
BRIDGE REMOVE STRUCTURAL DEFICIENCIES, BINS 1-07672-9
<Exempt> &1-06710-9 (HSI #N15004: JUN 2015)
AQC:A19 BRONX TPC: $175-$385 M TOTAL 5YR COST : 8.000 0.000 0.000 0.000 0.000 0.000 8.000 0.000

NYSDOT REALIGN BRONX RIVER PKWY MAINLINE AT GUN HILL HSIP 03/2019 0.000 CONINSP 0.166
RD EXITS TO INCLUDE CONSTRUCTION OF SDF 03/2019 0.000 CONINSP 0.018
X11025 DECELERATION LANE IN THE NB DIRECTION; WIDENING HSIP 03/2019 0.000 CONST 0.184
SAFETY OF EXISTING EXIT RAMPS TO TWO LANES & SDF 03/2019 0.000 CONST 0.020
<Exempt> INSTALLATION MEDIAN BARRIER IN THE BRONX TO
REDUCE ACCIDENTS & IMPROVE SAFETY (HSI # N15004:
JUN 2013)

AQC:A6 BRONX TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 0.388 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT REPLACEMENT OF NON-REDUNDANT SDF 07/2019 0.000 DETLDES 2.500


SUPERSTRUCTURE AND SUBSTRUCTURE REPAIR OF STBG LG URB 04/2021 4.000 CONINSP 4.000
X11026 BRONX RIVER PARKWAY BRIDGE, STATE ROUTE 907H SDF 04/2021 1.000 CONINSP 1.000
BRIDGE OVER METRO NORTH, 236TH STREET TO BRING NHPP 04/2021 29.040 CONST 29.040
<Exempt> STRUCTURE TO STATE OF GOOD REPAIR, BRONX (BIN SDF 04/2021 7.260 CONST 7.260
1075049)
STBG LG URB 04/2021 15.600 CONST 15.600
SDF 04/2021 3.900 CONST 3.900
AQC:A19 BRONX TPC: $50-$85 M TOTAL 5YR COST : 60.800 2.500 0.000 60.800 0.000 0.000 0.000 0.000

52
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 Bronx County Listing Page 2 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDPR DEVELOPMENT OF PEDESTRIAN AND BIKE TRAILS IN LOCAL 10/2019 0.105 PRELDES 0.105
HARLEM RIVER GREENWAY BETWEEN HIGH BRIDGE CMAQ 04/2021 1.440 CONST 1.440
X50198 AND HAMILTON BRIDGE IN THE BRONX TO IMPROVE LOCAL 04/2021 0.360 CONST 0.360
BIKE/PED CONNECTIVITY AND ENHANCE SAFETY IN THE REGION. LOCAL 04/2021 2.156 CONST 2.156
<Exempt> PH. 2 OF COMPLETED DEPOT PLACE GREENWAY LOCAL 10/2020 0.215 DETLDES 0.215
PROJECT (X50152).

AQC:C2 BRONX TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.276 0.000 0.105 4.171 0.000 0.000 0.000 0.000

NYCDOT DESIGN AND IMPLEMENT A PROTECTED BICYCLE / PED TAP LG URBAN 06/2021 1.232 CONST 1.232
PATH ALONG BRUCKNER BLVD FROM LONGWOOD AVE LOCAL 06/2021 0.308 CONST 0.308
X55079 TO E 138TH ST TO INCLUDE SIDEWALK EXTENSIONS, TAP LG URBAN 10/2020 0.144 DETLDES 0.144
BIKE/PED ISLANDS, SIGNAL TIMING ADJUSTMENTS, NEW LOCAL 10/2020 0.036 DETLDES 0.036
<Exempt> MARKING, NEW STREETSCAPE AND LANDSCAPING
ELEMENT TO REDUCE PED/TRAFFIC INJURIES, BRONX

AQC:A6 BRONX TPC: $2-$4 M TOTAL 5YR COST : 1.720 0.000 0.000 1.720 0.000 0.000 0.000 0.000

NYSDOT REHABILITATION OF 138TH ST BRIDGE OVER MAJOR SDF 01/2019 0.000 DETLDES 3.120
DEEGAN EXPRESSWAY IN THE BRONX TO ENSURE STBG LG URB 05/2021 1.600 CONINSP 1.600
X72031 STRUCTURAL INTEGRITY / MOTORIST SAFETY (BINS: SDF 05/2021 0.400 CONINSP 0.400
BRIDGE 1066790) NHPP 05/2021 0.200 CONST 0.200
<Exempt>
SDF 05/2021 0.050 CONST 0.050
STBG LG URB 02/2021 12.000 CONST 12.000
SDF 02/2021 3.000 CONST 3.000
AQC:A19 BRONX TPC: $26-$40 M TOTAL 5YR COST : 17.250 3.120 0.000 17.250 0.000 0.000 0.000 0.000

NYSDOT REPLACEMENT OF THREE MAJOR DEEGAN HSIP 11/2018 0.000 CONINSP 0.193
EXPRESSWAY BRIDGES BETWEEN MACOMBS DAM SDF 11/2018 0.000 CONINSP 0.022
X72039 BRIDGE AND ALEXANDER HAMILTON BRIDGE WITH PIT BOND 11/2018 0.000 CONINSP 8.895
BRIDGE AT-GRADE SECTION IN THE BRONX TO ENSURE HSIP 11/2018 0.000 CONST 5.983
<Exempt> STRUCTURAL INTEGRITY / MOTORIST SAFETY (BINS: SDF 11/2018 0.000 CONST 0.665
1067451, 1067452, 1066840)
PIT BOND 11/2018 0.000 CONST 2.100
SDF 11/2018 0.000 CONST 4.855
LOCAL 11/2018 0.000 CONST 0.658
OTHER 11/2018 0.000 CONST 0.359
PIT BOND 11/2018 0.000 CONST 143.426
SDF 11/2018 0.000 CONST 10.298
STBG-OFF 11/2018 0.000 CONST 5.076
SDF 11/2018 0.000 CONST 1.269
SDF 03/2019 0.000 DETLDES 0.492
AQC:A19 BRONX TPC: $175-$385 M TOTAL 5YR COST : 0.000 184.291 0.000 0.000 0.000 0.000 0.000 0.000

53
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 Bronx County Listing Page 3 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDOT REHABILITATION OF WEST TREMONT AVENUE BRIDGES STBG-OFF 03/2021 2.000 CONINSP 2.000
OVER THE MAJOR DEEGAN EXPRESSWAY & METRO LOCAL 03/2021 0.500 CONINSP 0.500
X72045 NORTH RAILROAD IN THE BRONX TO ADDRESS STBG-OFF 03/2021 20.000 CONST 20.000
BRIDGE STRUCTURAL DEFICIENCIES AND IMPROVE LOCAL 03/2021 5.000 CONST 5.000
<Exempt> PEDESTRIAN ACCESS TO MORRIS HEIGHTS MNRR LOCAL 03/2021 27.000 CONST 27.000
STATION AND THE ROBERTO CLEMENTE STATE PARK
(BIN: 2-24146-0 & NYSDOT FUNDED BIN 1-06693-0)

AQC:A19 BRONX TPC: $50-$85 M TOTAL 5YR COST : 54.500 0.000 0.000 54.500 0.000 0.000 0.000 0.000

NYSDOT REHABILITATION OF ARTHUR AVENUE AND 176TH ST STBG LG URB 11/2020 1.040 PRELDES 1.040
BRIDGES OVER CROSS BRONX EXPRESSWAY TO SDF 11/2020 0.260 PRELDES 0.260
X72698 EXTEND THE SERVICE LIFE OF THE STRUCTURES IN THE SDF 05/2021 0.052 ROWINCD 0.052
BRIDGE BRONX (BINS 1066350 & 1066370) STBG LG URB 04/2022 1.120 DETLDES 1.120
<Exempt>
SDF 04/2022 0.280 DETLDES 0.280
NHPP 10/2023 2.200 CONINSP 2.200
SDF 10/2023 0.550 CONINSP 0.550
NHPP 10/2023 22.280 CONST 22.280
SDF 10/2023 5.570 CONST 5.570
AQC:A19 BRONX TPC: $32-$50 M TOTAL 5YR COST : 33.352 0.000 0.000 1.352 1.400 0.000 30.600 0.000

NYSDOT REHABILITATION/REPLACEMENT OF 6 BRIDGES ON NHPP 10/2019 3.125 DETLDES 3.125


CROSS BRONX EXPWY CORRIDOR BETWEEN BOSTON SDF 10/2019 0.781 DETLDES 0.781
X72707 ROAD & BRONX RIVER PARKWAY IN THE BRONX TO NHPP 04/2021 1.000 CONINSP 1.000
BRIDGE ADDRESS STRUCTURAL DEFICIENCIES AND EXTEND SDF 04/2021 0.250 CONINSP 0.250
<Non-Exempt> SERVICE LIFE OF STRUCTURES WITH OPTION TO BUILD SDF 04/2021 11.000 CONINSP 11.000
CONTINUOUS CONNECTOR ROAD IN MISSING SEGMENT
NHPP 04/2021 33.985 CONST 33.985
(BINS 1066407,106641A,1066419, 1067089,1075559,1076270)
SDF 04/2021 8.496 CONST 8.496
SDF 04/2021 118.504 CONST 118.504
PIT BOND 04/2021 165.015 CONST 165.015
STBG LG URB 06/2021 15.551 CONST 15.551
SDF 06/2021 3.888 CONST 3.888
SDF 02/2021 16.300 ROWACQU 16.300
AQC:NON BRONX TPC:$364.9-$449.6 M TOTAL 5YR COST : 377.895 0.000 3.906 373.989 0.000 0.000 0.000 0.000

NYSDOT REHABILITATION OF JEROME AVENUE AND EAST 174TH NHPP 10/2023 0.896 PRELDES 0.896
STREET BRIDGES OVER CROSS BRONX EXPRESSWAY TO SDF 10/2023 0.224 PRELDES 0.224
X72709 EXTEND THE SERVICE LIFE OF THE STRUCTURES IN THE
BRIDGE BRONX (BINS 1066267 1076470, 1076470)
<Exempt>

AQC:A19 BRONX TPC: $26-$40 M TOTAL 5YR COST : 1.120 0.000 0.000 0.000 0.000 0.000 1.120 0.000

54
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 Bronx County Listing Page 4 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT CROSS BRONX EXPRESSWAY MOBILITY SDF 09/2019 0.000 PRELDES 0.050
IMPROVEMENTS, THROUGH ACTIVE TRAFFIC DEMAND SDF 05/2020 1.000 DETLDES 1.000
X72711 MANAGEMENT STRATEGIES ALONG THE CBE CMAQ 10/2021 2.000 CONINSP 2.000
TRAFFIC CORRIDOR IN THE BRONX TO ENHANCE SAFETY, SDF 10/2021 0.500 CONINSP 0.500
<Non-Exempt> MOBILITY AND RELIABILITY [ITS: TM12, TM20, TM22] CMAQ 10/2021 12.800 CONST 12.800
SDF 10/2021 3.200 CONST 3.200
AQC:NON BRONX TPC: $21-$31 M TOTAL 5YR COST : 19.500 0.050 1.000 0.000 18.500 0.000 0.000 0.000

NYSDOT REHABILITATE THE CROSS BRONX EXPWY VIADUCT NHPP 04/2020 1.664 PRELDES 1.664
BETWEEN WEBSTER & THIRD AVE IN THE BRONX - WILL SDF 04/2020 0.416 PRELDES 0.416
X72713 REPLACE CONCRETE DECK, REPAIR SUBSTRUCTURE & NHPP 03/2022 4.240 DETLDES 4.240
BRIDGE OTHER DETERIORATED ELEMENTS TO ENSURE SDF 03/2022 1.060 DETLDES 1.060
<Exempt> CONTINUED SAFE OPERATIONS. IF FEASIBLE, JOINTS
WILL BE ELIMINATED (BIN 1066349)

AQC:A19 BRONX TPC: $100-$225 M TOTAL 5YR COST : 7.380 0.000 2.080 0.000 5.300 0.000 0.000 0.000

NYSDOT MOBILITY IMPROVEMENTS ALONG CONNECTED SDF 09/2019 0.000 DETLDES 1.000
CORRIDOR SEGMENTS OF BRUCKNER EXPWY, CBE & SDF 10/2021 0.750 CONINSP 0.750
X72714 MDE TO MOVE VEHICLES, PEOPLE & GOODS THROUGH SDF 10/2021 5.250 CONST 5.250
TRAFFIC COOPERATIVE TRAFFIC MANAGEMENT STRATEGIES
<Non-Exempt> FOR THE MAINLINE, SERVICE ROADS, & MAJOR
SIGNALIZED INTERSECTIONS/ ARTERIALS IN BRONX
[ITS: TM12, TM20, TM22]

AQC:NON BRONX TPC: $7.5-$12 M TOTAL 5YR COST : 6.000 1.000 0.000 0.000 6.000 0.000 0.000 0.000

NYSDOT CONSTRUCT EXIT RAMP ON THE NORTH BOUND HPP 09/2019 0.000 DETLDES 0.808
HUTCHINSON RIVER PARKWAY AT BARTOW AVE FOR SDF 09/2019 0.000 DETLDES 1.080
X73127 MOBILITY IMPROVEMENT ON NORTH BOUND HPP 04/2019 0.000 PRELDES 0.232
RECON BRUCKNER EXPRESSWAY BETWEEN WILKINSON SDF 04/2019 0.000 PRELDES 0.058
<Non-Exempt> AVENUE AND HUTCHINSON RIVER PARKWAY EXIT STBG LG URB 11/2018 0.000 PRELDES 1.497
RAMP TO REDUCE TRAFFIC CONGESTION, BRONX
SDF 11/2018 0.000 PRELDES 0.374
(NY411 & TRANSFERRED EARMARK: NY118, PROGRAM
CODE RPS0) CMAQ 10/2020 0.848 CONINSP 0.848
SDF 10/2020 0.212 CONINSP 0.212
NHPP 10/2020 1.552 CONINSP 1.552
SDF 10/2020 0.388 CONINSP 0.388
CMAQ 10/2020 8.480 CONST 8.480
SDF 10/2020 2.120 CONST 2.120
HPP 10/2020 1.339 CONST 1.339
SDF 10/2020 0.335 CONST 0.335
SDF 10/2020 10.251 CONST 10.251
STBG LG URB 10/2020 4.780 CONST 4.780
SDF 10/2020 1.195 CONST 1.195
AQC:NON BRONX TPC: $32-$50 M TOTAL 5YR COST : 31.500 4.049 0.000 31.500 0.000 0.000 0.000 0.000

55
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 Bronx County Listing Page 5 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT BRUCKNER EXPRESSWAY (278I) OVERPASS STBG LG URB 08/2019 0.000 PRELDES 1.640
REHABILITATION AT ROSEDALE AVE IN THE BRONX SDF 08/2019 0.000 PRELDES 0.410
X73151 COUNTY TO REPAIR DETERIORATED BRIDGE ELEMENTS STBG LG URB 09/2020 2.880 DETLDES 2.880
BRIDGE TO ASSURE CONTINUED SAFE OPERATIONS & A SDF 09/2020 0.720 DETLDES 0.720
<Exempt> POSSIBLE FULL SUPERSTRUCTURE REPLACEMENT (BIN: NHPP 11/2022 4.800 CONINSP 4.800
1075789)
SDF 11/2022 1.200 CONINSP 1.200
NHPP 11/2022 0.320 CONST 0.320
SDF 11/2022 0.080 CONST 0.080
SDF 11/2022 59.850 CONST 59.850
AQC:A19 BRONX TPC: $70-$130 M TOTAL 5YR COST : 69.850 2.050 3.600 0.000 0.000 66.250 0.000 0.000

NYSDOT HUNTS POINT ACCESS IMPROVEMENT, PHASE 1 NHPP 02/2019 0.000 CONINSP 8.240
(EVERGREEN AVE TO BRUCKNER SHERIDAN PIT BOND 02/2019 0.000 CONINSP 2.060
X73163 INTERCHANGE) WILL RECONSTRUCT THE BRUCKNER NHPP 02/2019 0.000 CONST 320.000
BRIDGE EXPRESSWAY VIADUCT AND CONNECTING RAMPS TO PIT BOND 02/2019 0.000 CONST 80.000
<Non-Exempt> EDGEWATER ROAD TO PROVIDE DIRECT HIGHWAY PIT BOND 02/2019 0.000 CONST 164.000
CONNECTIONS TO HUNTS PT MARKET THEREBY
OTHER 02/2019 0.000 CONST 1.782
REDUCING CONGESTION ON LOCAL STREETS. THIS
PROJECT WILL ALSO RECONSTRUCT BRYANT AVE MTA 02/2019 0.000 CONST 0.016
PEDESTRIAN BRIDGE TO MAKE IT ADA ACCESSIBLE AS
WELL AS BUILD A NEW BIKE/PED PATH TO IMPROVE
ACCESS TO GARRISON PARK AND CONCRETE PLANT.
(BINS: 1075819, 106666H, 1075310, 1066669 & 8 OTHERS, 12
TOTAL)

AQC:NON BRONX TPC:$0.5-$0.7 B TOTAL 5YR COST : 0.000 576.098 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT HUNTS POINT ACCESS IMPROVEMENT, PHASE 2 (E 141 ST PIT BOND 01/2020 10.400 CONINSP 10.400
TO BARRETTO ST) WILL RECONSTRUCT & WIDEN THE PIT BOND 01/2020 655.200 CONST 655.200
X73164 BRUCKNER EXPRESSWAY VIADUCT AND CONNECTING PIT BOND 01/2020 10.400 DETLDES 10.400
BRIDGE RAMPS TO LEGGETT AVE TO PROVIDE DIRECT HIGHWAY
<Non-Exempt> CONNECTIONS TO HUNTS PT MARKET THEREBY
REDUCING CONGESTION ON LOCAL STREETS AND
IMPROVE QUALITY OF LIFE FOR THE SOUTH BRONX
COMMUNITY (BINS: 1066669 & 106666E)

AQC:NON BRONX TPC:$0.6-$0.8 B TOTAL 5YR COST : 676.000 0.000 676.000 0.000 0.000 0.000 0.000 0.000

56
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 Bronx County Listing Page 6 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT HUNTS POINT ACCESS IMPROVEMENT, PHASE 3 SDF 05/2022 10.800 CONINSP 10.800
(BARRETTO ST – BRUCKNER SHERIDAN INTERCHANGE) SDF 05/2022 283.393 CONST 283.393
X73165 IN THE BRONX WILL REPLACE THE CONCRETE DECKS PIT BOND 05/2022 191.800 CONST 191.800
BRIDGE ON BRUCKNER VIADUCT, PERFORM REPAIRS OF
<Non-Exempt> DETERIORATED ELEMENTS & WIDEN THE BRUCKNER
EXPRESSWAY FROM TWO TO THREE LANES. THE
PROJECT WILL ALSO RELOCATE THE MERGING
SHERIDAN EXPRESSWAY RAMPS FROM LEFT HAND TO
RIGHT HAND ENTRANCES. THESE IMPROVEMENTS WILL
REDUCE CONGESTION ON THE HIGHWAY/LOCAL
STREETS AND POLLUTION CAUSED BY IDLING
VEHICLES (BINS: 106666F-G & 1066669)

AQC:NON BRONX TPC:$437.8-$539.5 M TOTAL 5YR COST : 485.993 0.000 0.000 0.000 485.993 0.000 0.000 0.000

NYCDOT GRAND CONCOURSE SAFETY IMPROVEMENTS (PH 4) HSIP 08/2019 0.000 CONST 6.149
FROM E.175 STREET TO E. FORDHAM ROAD IN THE LOCAL 08/2019 0.000 CONST 0.683
X76124 BRONX TO IMPROVE SAFETY & REDUCE TRAFFIC
SAFETY SPEEDS AND ADD INSTALLATION OF BIKE LANES &
<Exempt> LANDSCAPING - PRIORITY CORRIDOR ANALYSIS 2014,
NYSDOT HSIP 2018

AQC:A10 BRONX TPC: $50-$85 M TOTAL 5YR COST : 0.000 6.832 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT SOUTH BRONX GREENWAY, BRUCKNER BOULEVARD LOCAL 04/2021 2.284 CONINSP 2.284
PHASE II (BRUCKNER BLVD BETWEEN 149TH STREET HSIP 04/2021 4.286 CONST 4.286
X76130 AND TIFFANY STREET) SAFETY IMPROVEMENTS LOCAL 04/2021 7.134 CONST 7.134
SAFETY THROUGH CONSTRUCTION OF MEDIAN TIP HSIP 10/2020 0.286 DETLDES 0.286
<Exempt> EXTENSIONS, PEDESTRIAN REFUGE ISLANDS, BIKE LOCAL 10/2020 1.199 DETLDES 1.199
LANES AND OTHER OPERATIONAL & TRAFFIC CALMING
TREATMENTS TO REDUCE PED/TRAFFIC INJURIES,
NYSDOT: HSIP 2019 (SEE X76118)

AQC:A6 BRONX TPC: $12.5-$19 M TOTAL 5YR COST : 15.189 0.000 0.000 15.189 0.000 0.000 0.000 0.000

NYCDOT LAUNCH THE HUNTS POINT CLEAN TRUCK PROGRAM CMAQ 09/2021 3.080 MISC 3.080
TO REPLACE, RETROFIT, OR REPOWER (WITH CNG, EV LOCAL 09/2021 0.770 MISC 0.770
X77005 OR HYBRID) TRUCKS FY 2006 OR OLDER & PROVIDE CMAQ 09/2023 8.950 MISC 8.950
MISC FUNDING FOR CONSTRUCTION OF AN ALTERNATIVE LOCAL 09/2023 2.237 MISC 2.237
<Non-Exempt> FUELS SERVICE STATION FOR VEHICLES SERVING
HUNTS PT / PORT MORRIS, BRONX

AQC:NON BRONX TPC: $26-$40 M TOTAL 5YR COST : 15.037 0.000 0.000 3.850 0.000 11.187 0.000 0.000

57
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 Bronx County Listing Page 7 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDOT LIBRARY LANE-COLES LANE IMPROVEMENTS - FULL HPP 04/2020 0.780 CONST 0.780
RECONSTRUCTION OF COLES LANE, A SHORT STREET LOCAL 04/2020 0.945 CONST 0.945
X77056 (APPX. 216·FOOT ) BETWEEN EAST KINGSBRIDGE ROAD
BIKE/PED AND BAINBRIDGE AVENUE IN THE FORDHAM SECTION
<Exempt> OF THE BRONX (NY709, NY733)

AQC:C2 BRONX TPC: $2-$4 M TOTAL 5YR COST : 1.725 0.000 1.725 0.000 0.000 0.000 0.000 0.000

NYCEDC MODERNIZATION OF HUNTS POINT TERMINAL MARKET CMAQ 04/2021 1.300 DETLDES 1.300
FREIGHT RAIL AS PART OF A COMPREHENSIVE EFFORT LOCAL 04/2021 0.325 DETLDES 0.325
X77265 TO INCREASE THE EFFICIENCY AND ENVIRONMENTAL CMAQ 12/2021 12.466 CONST 12.466
MISC SUSTAINABILITY OF THE MARKET WHICH CONSISTS OF LOCAL 12/2021 5.616 CONST 5.616
<Non-Exempt> FREIGHT RAIL AND TRAFFIC CIRCULATION LOCAL 12/2021 10.000 CONST 10.000
IMPROVEMENTS

AQC:NON BRONX TPC: $50-$85 M TOTAL 5YR COST : 29.707 0.000 0.000 1.625 28.082 0.000 0.000 0.000

NYCDOT RECONSTRUCTION SHORE ROAD BRIDGE OVER THE LOCAL 09/2020 0.266 DETLDES 0.266
HUTCHINSON RIVER IN THE BRONX - COMPLETE LOCAL 09/2022 30.000 CONINSP 30.000
X77363 REPLACEMENT OF MOVEABLE BRIDGE, APPROACHES, CMAQ 09/2022 10.000 CONST 10.000
BRIDGE SUBSTRUCTURE, STRUCTURE, INCLUDING ELECTRICAL, LOCAL 09/2022 2.500 CONST 2.500
<Exempt> MECHANICAL AND BRIDGE CONTROL SYSTEMS TO NHPP 09/2022 50.000 CONST 50.000
ADDRESS STRUCTURAL DEFICIENCIES (BIN 2-24020-0)
LOCAL 09/2022 12.500 CONST 12.500
LOCAL 09/2022 155.734 CONST 155.734
AQC:A19 BRONX TPC:$366.7-$451.8 M TOTAL 5YR COST : 261.000 0.000 0.266 0.000 260.734 0.000 0.000 0.000

NYCDOT UNIONPORT ROAD PED SAFETY IMPROVEMENTS FROM CMAQ 05/2019 0.000 DETLDES 0.136
STARLING AVE TO WESTCHESTER AVE & INTERSECTION LOCAL 05/2019 0.000 DETLDES 0.034
X77368 OF FT INDEPENDENCE ST & HEATH AVE IN THE BRONX – CMAQ 10/2019 0.546 CONST 0.546
SAFETY TO INCREASE PEDESTRIAN SAFETY AND ACCESSIBILITY LOCAL 10/2019 0.136 CONST 0.136
<Exempt> BY CONSTRUCTING MEDIANS, ADDING CROSSWALKS,
AND INSTALLING NEW CURB EXTENSIONS

AQC:C2 BRONX TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.682 0.170 0.682 0.000 0.000 0.000 0.000 0.000

58
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 Bronx County Listing Page 8 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDOT SCHOOL SAFETY 4D - IMPROVE TRANSPORTATION HSIP 09/2021 7.195 CONST 7.195
ELEMENTS THAT PROMOTE AND ENABLE KIDS TO LOCAL 09/2021 0.799 CONST 0.799
X77382 SAFELY USE INFRASTRUCTURE IN THEIR
SAFETY COMMUNITIES. THESE IMPROVEMENTS BENEFIT THE
<Exempt> GREATER COMMUNITY AS WELL AS PROVIDE SAFER
ROUTES TO COMMUNITY FACILITIES AND TO THE BUSY
COMMERCIAL CORRIDORS, PRIMARILY IN JEROME
AVENUE AND GRAND CONCOURSE. THE SCHOOL
LOCATIONS INCLUDE: P.S. 85, P.S. 218, P.S. 307, &
ROSALYN YELLOW CHARTER SCHOOL.

AQC:C2 BRONX TPC: $15-$25 M TOTAL 5YR COST : 7.994 0.000 0.000 7.994 0.000 0.000 0.000 0.000

NYCDOT REHABILITATION OF THE EAST 183RD STREET BRIDGE LOCAL 09/2019 0.000 DETLDES 1.764
OVER THE METRO-NORTH RAILROAD ALONG THE LOCAL 09/2021 2.100 CONINSP 2.100
X77388 HARLEM-LINE IN THE BRONX TO BRING TO A STATE OF STBG-OFF 09/2021 11.200 CONST 11.200
BRIDGE GOOD REPAIR (BIN #: 2-24180-0) (HBBA24180) LOCAL 09/2021 2.800 CONST 2.800
<Exempt>
LOCAL 09/2021 0.700 DETLDES 0.700
AQC:A19 BRONX TPC: $15-$25 M TOTAL 5YR COST : 16.800 1.764 0.000 16.800 0.000 0.000 0.000 0.000

NYCDOT CONNECTING COMMUNITIES: A VISION FOR THE TAP LG URBAN 11/2020 2.065 CONST 2.065
HARLEM RIVER BRIDGES - IMPLEMENT BICYCLE AND LOCAL 11/2020 0.516 CONST 0.516
X77396 PEDESTRIAN FACILITIES IDENTIFIED IN THE HARLEM
BIKE/PED RIVER BRIDGES PLAN INCLUDING (BUT NOT LIMITED
<Exempt> TO) PROTECTED BIKE LANES AND PEDESTRIAN
ISLANDS TO IMPROVE SAFETY & ACCESSIBILITY ON:
WILLIS AVE (WILLIS AVE BRIDGE TO THE HUB); EDWARD
L GRANT HWY (WASHINGTON BRIDGE TO E 167TH ST);
AND, BROADWAY (BROADWAY BRIDGE TO THE NEW
PROTECTED BIKE LANES AT VAN CORTLANDT PARK),
BRONX (TAP 2019)

AQC:C2 BRONX TPC: $2-$4 M TOTAL 5YR COST : 2.581 0.000 0.000 2.581 0.000 0.000 0.000 0.000

NYCDOT SAFE ROUTES FOR NON-DRIVERS - BOSTON RD: TAP LG URBAN 07/2021 0.234 CONST 0.234
IMPROVE PEDESTRIAN INFRASTRUCTURE ON VISION LOCAL 07/2021 0.058 CONST 0.058
X77399 ZERO PRIORITY CORRIDORS AND CREATE NEW
SAFETY PEDESTRIAN ISLANDS AT BOSTON RD (PELHAM PKWY
<Exempt> TO E 233 ST), BRONX (TAP 2019)
AQC:C2 BRONX TPC: < $0.75 M TOTAL 5YR COST : 0.292 0.000 0.000 0.292 0.000 0.000 0.000 0.000

59
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 Bronx County Listing Page 9 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT REHABILITATION OF NELSON AVE, E L GRANT & JESSUP STBG LG URB 02/2022 3.680 CONINSP 3.680
AVE BRIDGES OVER THE CROSS BRONX & MDE DEPOT SDF 02/2022 0.920 CONINSP 0.920
X80656 PLACE BRIDGE TO INCLUDE DECK REPLACEMENT, NHPP 04/2022 0.400 CONST 0.400
BRIDGE STEEL REPAIRS, AND BEARINGS TO ADDRESS SDF 04/2022 0.100 CONST 0.100
<Exempt> STRUCTURAL DEFICIENCIES, BRONX (BINS 1066230, STBG LG URB 02/2022 34.320 CONST 34.320
1066220, 1066840 & 1066240)
SDF 02/2022 8.580 CONST 8.580
SDF 02/2022 2.000 CONST 2.000
AQC:A19 BRONX TPC: $50-$85 M TOTAL 5YR COST : 50.000 0.000 0.000 0.000 50.000 0.000 0.000 0.000

NYSDOT BUILD CURB RAMPS, CROSSWALKS AND SIDEWALKS AT HPP 09/2019 0.000 CONST 0.356
VARIOUS LOCATIONS IN THE BRONX AS REQUIRED BY SDF 09/2019 0.000 CONST 0.089
XM1850 ADA TO BE BROUGHT UP TO ACCESSIBLE STANDARDS, SDF 09/2019 0.000 CONST 0.755
BIKE/PED TRANSFERRED EARMARK: NY670 (PROGRAM CODE SDF 04/2019 0.000 DETLDES 0.250
<Exempt> RPS9) SDF 10/2018 0.000 PRELDES 0.050
SDF 01/2020 0.250 CONINSP 0.250
AQC:A10 BRONX TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.250 1.500 0.250 0.000 0.000 0.000 0.000 0.000

60
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 Kings County Listing (Brooklyn) Page 1 of 4

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT REHABILITATION OF SHORE PARKWAY VIADUCT OVER NHPP 12/2019 3.328 PRELDES 3.328
SHELL ROAD/SUBWAY YARD - REPLACE THE CONCRETE SDF 12/2019 0.832 PRELDES 0.832
X02172 DECKS, REPAIR SUPERSTRUCTURE & SUBSTRUCTURE SDF 10/2022 7.150 DETLDES 7.150
BRIDGE ALONG WITH OTHER DETERIORATED ELEMENTS TO
<Exempt> ENSURE CONTINUED SAFE OPERATIONS, BROOKLYN
(BIN 2231359)

AQC:A19 KINGS TPC: $100-$225 M TOTAL 5YR COST : 11.310 0.000 4.160 0.000 0.000 7.150 0.000 0.000

NYCDOT REHABILITATION OF BELT PARKWAY BRIDGE OVER LOCAL 09/2020 6.035 DETLDES 6.035
NOSTRAND AVENUE IN BROOKLYN TO BRING TO A LOCAL 08/2021 5.535 CONINSP 5.535
X02173 STATE OF GOOD REPAIR (BIN #2-23143) NHPP 08/2021 33.141 CONST 33.141
BRIDGE
LOCAL 08/2021 8.285 CONST 8.285
<Exempt>
AQC:A19 KINGS TPC: $50-$85 M TOTAL 5YR COST : 52.996 0.000 6.035 46.961 0.000 0.000 0.000 0.000

NYSDOT REPLACEMENT OF 4 BRIDGE DECKS OVER NHPP 02/2019 0.000 PRELDES 0.480
BROOKLYN-QUEENS EXPWY IN BROOKLYN: REPLACE SDF 02/2019 0.000 PRELDES 0.120
X73150 CONCRETE DECKS, REPAIR CONCRETE NHPP 11/2020 0.424 DETLDES 0.424
BRIDGE SUBSTRUCTURES & REPAIR OTHER DETERIORATED SDF 11/2020 0.106 DETLDES 0.106
<Exempt> ELEMENTS TO ASSURE CONTINUED SAFE OPERATIONS NHPP 05/2024 0.912 CONINSP 0.912
(BINS: 1065530, 1065549, 1076459, 1076460)
SDF 05/2024 0.228 CONINSP 0.228
STBG LG URB 05/2024 0.912 CONINSP 0.912
SDF 05/2024 0.228 CONINSP 0.228
NHPP 05/2024 7.204 CONST 7.204
SDF 05/2024 1.801 CONST 1.801
STBG LG URB 05/2024 7.022 CONST 7.022
SDF 05/2024 1.756 CONST 1.756
AQC:A19 KINGS TPC: $15-$25 M TOTAL 5YR COST : 20.593 0.600 0.000 0.530 0.000 0.000 20.063 0.000

NYSDOT OPERATING HOV LANE ON GOWANUS & PROSPECT SDF 06/2019 0.000 OPER 2.400
EXPRESSWAYS TO IMPROVE MOBILITY IN BROOKLYN SDF 01/2020 2.400 OPER 2.400
X73156 [ITS: ST06] SDF 01/2021 2.400 OPER 2.400
TRAFFIC
SDF 01/2022 2.400 OPER 2.400
<Exempt>
SDF 01/2023 2.400 OPER 2.400
AQC:A7 KINGS TPC: $15-$25 M TOTAL 5YR COST : 9.600 2.400 2.400 2.400 2.400 2.400 0.000 0.000

61
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 Kings County Listing (Brooklyn) Page 2 of 4

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT ACTIVE TRAFFIC MANAGEMENT FOR IMPROVED SDF 09/2019 0.000 PRELDES 0.383
INCIDENT RESPONSE ON THE GOWANUS SDF 09/2020 1.000 DETLDES 1.000
X73157 EXPRESSWAY - ESTABLISH TECHNICAL BASE SDF 03/2021 7.760 CONST 7.760
MOBIL CONDITIONS AND ADMINISTRATIVE FRAMEWORK FOR
<Non-Exempt> PARTNER AGENCIES WITH THE PURPOSE OF PROVIDING
AN INTEGRATED, EFFICIENT AND FLEXIBLE INCIDENT
RESPONSE SYSTEM ON THE GOWANUS CORRIDOR
FROM THE APPROACH OF THE VERRAZANO BRIDGE TO
THE BROOKLYN BATTERY TUNNEL ENTRANCE,
BROOKLYN [ITS: PS08, PT14, ST06, TM06, TM19, TM22]

AQC:NON KINGS TPC: $7.5-$12 M TOTAL 5YR COST : 8.760 0.383 1.000 7.760 0.000 0.000 0.000 0.000

NYSDOT GOWANUS EXPRESSWAY- REPLACEMENT OF THE SDF 01/2019 0.000 DETLDES 0.150
SOUTHBOUND GOWANUS EXPRESSWAY ENTRANCE STBG LG URB 03/2020 1.650 CONINSP 1.650
X73161 RAMP D CONCRETE DECK, WHICH IS LOCATED AT THE SDF 03/2020 0.412 CONINSP 0.412
RECON PROSPECT AVENUE/HAMILTON AVENUE INTERSECTION, STBG LG URB 03/2020 2.000 CONST 2.000
<Exempt> RESEALING OF THE GOWANUS MAINLINE DECK JOINTS
SDF 03/2020 0.500 CONST 0.500
AND STRUCTURAL STEEL REPAIRS IN BROOKLYN TO
SDF 03/2020 15.250 CONST 15.250
MAINTAIN A STATE OF GOOD REPAIR, IMPROVE SAFETY
AND MOBILITY (BINS: 1065318, 1076750 AND NUMEROUS
OTHER BINS)

AQC:A2 KINGS TPC: $15-$25 M TOTAL 5YR COST : 19.812 0.150 19.812 0.000 0.000 0.000 0.000 0.000

NYCDOT WYCKOFF AVENUE RECONSTRUCTION BETWEEN LOCAL 08/2019 0.000 CONINSP 3.657
FLUSHING AND GATES AVENUES TO BRING TO A STATE HPP 08/2019 0.000 CONST 1.883
X75752 OF GOOD REPAIR DUE TO THE PRESENCE OF LOCAL 08/2019 0.000 CONST 0.471
RECON DETERIORATED PAVEMENT, CURBS, AND SIDEWALKS STBG LG URB 08/2019 0.000 CONST 13.431
<Exempt> AND IMPROPERLY RESTORED UTILITY CUTS, LOCAL 08/2019 0.000 CONST 3.358
BROOKLYN (NY129)
LOCAL 08/2019 0.000 CONST 5.179
AQC:A10 KINGS TPC: $26-$40 M TOTAL 5YR COST : 0.000 27.979 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT RECONSTRUCTION OF SCHENCK AVE FROM JAMAICA LOCAL 03/2019 0.000 DETLDES 0.800
AVE TO FLATLANDS AVE TO IMPROVE PED SAFETY AND HPP 02/2020 3.600 CONST 3.600
X77278 TRAFFIC CIRCULATION WITH CONSTRUCTION OF NEW LOCAL 02/2020 0.900 CONST 0.900
RECON CURBS, REALIGN CROSSWALKS AND REPAIR LOCAL 02/2020 1.000 CONST 1.000
<Exempt> ROADWAYS AT 2 LOCATIONS (COZINE AVE TO STANLEY
AVE & PITKIN AVE TO LIBERTY AVE) BROOKLYN, NY273

AQC:C2 KINGS TPC: $6-$9.4 M TOTAL 5YR COST : 5.500 0.800 5.500 0.000 0.000 0.000 0.000 0.000

62
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 Kings County Listing (Brooklyn) Page 3 of 4

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDOT SOUTHERN BROOKLYN CROSSTOWN SELECT BUS FTA 5339 09/2019 0.000 CONST 4.274
SERVICE ALONG BAY PARKWAY, KINGS HIGHWAY AND LOCAL 09/2019 0.000 CONST 61.069
X77281 FLATLANDS FROM CROPSEY/E-37TH STREET TO
TRANSIT PENNSYLVANIA/SEAVIEW AVENUES TO REDUCE TRAVEL
<Non-Exempt> TIME IN BROOKLYN
AQC:NON KINGS TPC: $70-$130 M TOTAL 5YR COST : 0.000 65.343 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT CONSTRUCT BROOKLYN WATERFRONT GREENWAY STP ENHANCE 08/2019 0.000 CONINSP 0.500
GOWANUS CONNECTOR ON WEST SIDE OF HAMILTON LOCAL 08/2019 0.000 CONINSP 0.419
X77309 AVE & 3RD AVE (SMITH ST-29TH ST) IN BROOKLYN TO OTHER FA 08/2019 0.000 CONST 2.500
BIKE/PED PROVIDE ACCOMMODATION FOR CYCLISTS BY LOCAL 08/2019 0.000 CONST 0.625
<Exempt> CREATING SEPARATED BIKE PATH WITH NEW OTHER 08/2019 0.000 CONST 9.355
LANDSCAPING AND STREETSCAPE IMPROVEMENTS
STP ENHANCE 08/2019 0.000 CONST 2.000
(TIGER)
LOCAL 08/2019 0.000 CONST 0.500
AQC:C2 KINGS TPC: $15-$25 M TOTAL 5YR COST : 0.000 15.899 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT SAFE ROUTES TO SCHOOL PROGRAM TAP LG URBAN 05/2019 0.000 CONST 0.178
(PS135) - IMPLEMENT PEDESTRIAN SAFETY MEASURES LOCAL 05/2019 0.000 CONST 0.044
X77349 SUCH AS ONE CURB EXTENSION AT THE INTERSECTION
SAFETY OF LINDEN BLVD AND EAST 48 ST AND ANOTHER ONE
<Exempt> AT LINDEN BLVD AND TROY AVE, BROOKLYN (SPLIT
WITH X77373)

AQC:A6 KINGS TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.222 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT CROPSEY AVENUE CORRIDOR SAFETY TAP LG URBAN 05/2019 0.000 CONST 0.607
IMPROVEMENTS - TO INCREASE TRAFFIC SAFETY ON LOCAL 05/2019 0.000 CONST 0.152
X77357 CROPSEY AVENUE BETWEEN 26TH AVE & NEPTUNE AVE
SAFETY IN BROOKLYN INCLUDING THE CONSTRUCTION OF
<Exempt> PEDESTRIAN SAFETY ISLANDS AND EXPANDED MEDIAN
TIPS.

AQC:C2 KINGS TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 0.759 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT CONSTRUCT BROOKLYN WATERFRONT GREENWAY ON STATE 07/2019 0.000 DETLDES 0.915
COMMERCIAL ST (DUPONT TO ASH ST) & BOX ST STATE 06/2022 1.220 CONINSP 1.220
X77362 (COMMERCIAL TO MANHATTAN AVE) IN GREENPOINT, STATE 06/2022 6.100 CONST 6.100
BIKE/PED BROOKLYN, WITH A SHARED-USE PATH WITH RAISED
<Exempt> CROSSINGS, STORM-WATER INFRASTRUCTURE AND PED
WAY-FINDING SIGNAGE TO PROVIDE SAFE
ACCOMMODATIONS FOR CYCLISTS AND PEDESTRIANS
(VISION ZERO PROJECT)

AQC:C2 KINGS TPC: $7.5-$12 M TOTAL 5YR COST : 7.320 0.915 0.000 0.000 7.320 0.000 0.000 0.000

63
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 Kings County Listing (Brooklyn) Page 4 of 4

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDOT SAFE ROUTES TO SCHOOL PROGRAM TO IMPLEMENT TAP LG URBAN 08/2019 0.000 CONST 0.178
PEDESTRIAN SAFETY MEASURES, INCLUDING REFUGE LOCAL 08/2019 0.000 CONST 0.044
X77373 ISLANDS, CURB EXTENSIONS AND SIDEWALKS AROUND
SAFETY PS 191 IN THE VICINITY OF PARK PL (BUFFALO
<Exempt> AVE-RALPH AVE) BROOKLYN (SPLIT FROM X77349)

AQC:A6 KINGS TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.222 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT REHABILITATION OF THE SEELEY STREET BRIDGE OVER LOCAL 09/2019 0.000 PRELDES 1.154
PROSPECT AVENUE IN BROOKLYN TO BRING TO A STATE LOCAL 09/2020 2.600 DETLDES 2.600
X77389 OF GOOD REPAIR (BIN # : 2-24447-0) LOCAL 09/2021 4.895 CONINSP 4.895
BRIDGE
STBG-OFF 09/2021 21.463 CONST 21.463
<Exempt>
LOCAL 09/2021 5.366 CONST 5.366
AQC:A19 KINGS TPC: $32-$50 M TOTAL 5YR COST : 34.324 1.154 2.600 31.724 0.000 0.000 0.000 0.000

NYCDOT RECONSTRUCTION OF THE KANE STREET BRIDGE OVER LOCAL 09/2020 2.207 DETLDES 2.207
THE I-278 BROOKLYN-QUEENS EXPRESSWAY (BQE) IN LOCAL 09/2021 2.014 CONINSP 2.014
X77390 BROOKLYN TO BRING TO A STATE OF GOOD REPAIR STBG-OFF 09/2021 10.742 CONST 10.742
BRIDGE (2-23038-0) LOCAL 09/2021 2.685 CONST 2.685
<Exempt>
AQC:A19 KINGS TPC: $15-$25 M TOTAL 5YR COST : 17.648 0.000 2.207 15.441 0.000 0.000 0.000 0.000

64
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 New York County Listing (Manhattan) Page 1 of 4

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT ROUTE 9A BIKEWAY SECURITY PROJECT, W 59TH ST TO SDF 10/2018 0.000 CONINSP 1.000
BATTERY PL IN MANHATTAN - INSTALL PERMANENT SDF 10/2018 0.000 CONST 6.074
X02445 SECURITY CONTROL MEASURES TO PREVENT FUTURE
BIKE/PED UNWANTED VEHICULAR ADMITTANCE TO THE
<Exempt> BIKEWAY WITH PERMANENT ACCESS CONTROLS TO BE
INSTALLED AT 93 LOCATIONS ALONG THE ROUTE

AQC:C2 NEW YORK TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 7.074 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT REPAIR FDR BRIDGE ELEMENTS DAMAGED BY THE SDF 12/2018 0.000 CONINSP 0.200
FLOODING FROM SUPERSTORM SANDY ON SEGMENTS SDF 12/2018 0.000 CONINSP 0.050
X07154 ON FDR FROM BATTERY PARK UNDERPASS TO 42ND ST SDF 12/2018 0.000 CONST 0.705
BRIDGE IN MANHATTAN THAT INCLUDES THE BRIDGE PIER SDF 12/2018 0.000 CONST 0.040
<Exempt> COLUMNS, BASE PEDESTALS AND PAINT; REPAIR SDF 12/2018 0.000 ROWACQU 0.050
HIGHWAY PAVEMENT, BARRIERS AND JOINTS, BINS
2232019 & 1077069 (ER FUNDING)

AQC:C15 NEW YORK TPC: $9.5-15.5 M TOTAL 5YR COST : 0.000 1.045 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT DECK REPLACEMENT OF THREE BRIDGES ON THE SDF 03/2019 0.000 DETLDES 0.700
HARLEM RIVER DRIVE (E135 ST - E139 ST) IN NHPP 04/2023 1.368 CONINSP 1.368
X07155 MANHATTAN TO ADDRESS STRUCTURAL DEFICIENCY SDF 04/2023 0.342 CONINSP 0.342
BRIDGE AND SAFETY ISSUES, BINS: 1077000, 107701A & 1077010 NHPP 04/2023 13.042 CONST 13.042
<Exempt> (SPLIT FROM X80658) SDF 04/2023 3.260 CONST 3.260
AQC:A19 NEW YORK TPC: $15-$25 M TOTAL 5YR COST : 18.012 0.700 0.000 0.000 0.000 18.012 0.000 0.000

NYCDOT TRANS-MANHATTAN EXPRESSWAY REHABILITATION LOCAL 09/2020 50.000 PRELDES 50.000


FROM HARLEM RIVER DRIVE TO GEORGE WASHINGTON LOCAL 09/2024 49.510 CONINSP 49.510
X07157 BRIDGE IN MANHATTAN TO BRING TO A STATE OF GOOD NHPP 09/2024 45.000 CONST 45.000
BRIDGE REPAIR (BIN 2-26724-0) LOCAL 09/2024 11.250 CONST 11.250
<Exempt>
LOCAL 09/2024 270.000 CONST 270.000
AQC:A19 NEW YORK TPC:$387.0-$476.8 M TOTAL 5YR COST : 425.760 0.000 50.000 0.000 0.000 0.000 375.760 0.000

LOCAL TRANSPORTATION PARKING FACILITY SERVING THE HPP 01/2023 7.199 CONST 7.199
HARLEM HOSPITAL COMPLEX: THE PROPOSED PARKING LOCAL 01/2023 1.800 CONST 1.800
X76021 FACILITY WOULD PROVIDE UP TO 99 ADDITIONAL
CONST VEHICLE PARKING SPACES ON THE HARLEM HOSPITAL
<Non-Exempt> CENTER (HHC CAMPUS) NY314
AQC:NON NEW YORK TPC: $7.5-$12 M TOTAL 5YR COST : 8.999 0.000 0.000 0.000 0.000 8.999 0.000 0.000

65
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 New York County Listing (Manhattan) Page 2 of 4

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDPR RECONSTRUCTION AND ADAPTIVE REUSE OF 69TH HPP 07/2019 0.000 CONST 2.800
STREET - PHASE 2: PEDESTRIAN PATHS, STAIRS, LOCAL 07/2019 0.000 CONST 0.700
X76122 SEATING, LANDSCAPING, LIGHTING & OTHER
BIKE/PED TRANSPORTATION ENHANCEMENT ACTIVITIES ALONG
<Exempt> RIVERSIDE BLVD & AT RIVERSIDE PARK SOUTH TO
CREATE PED ACCESS & LIGHTING OF HISTORIC 69TH ST
TRANSFER BRIDGE IN RIVERSIDE PARK SOUTH,
MANHATTAN (NY014)

AQC:C10 NEW YORK TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 3.500 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT REHABILITATE THE MANHATTAN APPROACHES TO THE HPP 01/2019 0.000 CONST 24.326
BROOKLYN BRIDGE IN MANHATTAN INCLUDING LOCAL 01/2019 0.000 CONST 6.082
X76126 MASONRY ARCHES, APPROACH RAMPS NHPP 01/2019 0.000 CONST 19.600
BRIDGE SUBSTRUCTURES, MODULAR JOINT REPLACEMENT AND LOCAL 01/2019 0.000 CONST 4.900
<Exempt> MISC REPAIRS TO BRING TO A STATE OF GOOD REPAIR OTHER FA 01/2019 0.000 CONST 25.000
(CONTRACT 7) - BRIDGE NY 2018, BUILD AWARD 2018,
LOCAL 01/2019 0.000 CONST 6.250
TRANSFERRED EARMARK: NY218, NY242, NY256, NY280,
NY284, NY324, NY325, NY514, NY553, NY610, NY 616
(PROGRAM CODE RPS1)

AQC:A19 NEW YORK TPC: $175-$385 M TOTAL 5YR COST : 0.000 86.158 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT DELANCEY STREET RECONSTRUCTION & SAFETY LOCAL 08/2020 2.842 CONINSP 2.842
IMPROVEMENT FROM BOWERY TO CLINTON ST AND HSIP 08/2020 5.250 CONST 5.250
X76128 RIDGE ST FROM RIVINGTON ST TO DELANCEY ST IN LOCAL 08/2020 13.735 CONST 13.735
SAFETY MANHATTAN TO IMPROVE SAFETY & REDUCE TRAFFIC HSIP 01/2020 0.500 DETLDES 0.500
<Exempt> SPEEDS BY INTERSECTION CURB EXTENSIONS, ROAD
NARROWING AND MEDIAN CONSTRUCTION, BIKE
LANES & LANDSCAPING, NYSDOT HSIP 2019

AQC:A2 NEW YORK TPC: $21-$31 M TOTAL 5YR COST : 22.327 0.000 22.327 0.000 0.000 0.000 0.000 0.000

NYCDOT IMPROVEMENT TO THE NEW YORK PUBLIC LIBRARY LOCAL 07/2019 0.000 DETLDES 0.210
VICINITY: IMPLEMENT PEDESTRIAN/SAFETY LOCAL 02/2020 0.745 CONINSP 0.745
X77227 IMPROVEMENTS TO NYPL IN MANHATTAN ON 40TH AND HPP 02/2020 2.569 CONST 2.569
BIKE/PED 42ND ST. SIDEWALKS; RESTORE UPPER LIBRARY LOCAL 02/2020 0.948 CONST 0.948
<Exempt> TERRACE PAVEMENT & ADA-COMPLIANCE
ACCESSIBILITY IMPROVEMENTS, NY684

AQC:C2 NEW YORK TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.262 0.210 4.262 0.000 0.000 0.000 0.000 0.000

66
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 New York County Listing (Manhattan) Page 3 of 4

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

ROOSEVELT ROOSEVELT ISLAND BRIDGE BIKE RAMP - CONSTRUCT LOCAL 10/2018 0.000 PRELDES 0.099
ISLAND A RAMP FOR BICYCLES CONNECTING THE ROOSEVELT LOCAL 08/2020 0.296 CONINSP 0.296
X77352 ISLAND BRIDGE AND AN ACCESS ROAD. THE RAMP TAP LG URBAN 08/2020 2.964 CONST 2.964
BIKE/PED WILL BE ADDED TO AN EXISTING PARKING AND LOCAL 08/2020 1.976 CONST 1.976
<Exempt> VEHICLE & PEDESTRIAN EXIT RAMP STRUCTURE, LOCAL 03/2020 0.148 DETLDES 0.148
ELIMINATING THE NEED FOR BICYCLES TO SHARE A
DANGEROUS APPROACH INTENDED FOR AUTOMOBILES.
ROOSEVELT ISLAND OPERATING CORP.

AQC:C2 NEW YORK TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.384 0.099 5.384 0.000 0.000 0.000 0.000 0.000

NYCDOT SAFE ROUTES TO SCHOOL PROGRAM TO IMPLEMENT LOCAL 06/2019 0.000 DETLDES 1.953
PEDESTRIAN SAFETY MEASURES, INCLUDING REFUGE LOCAL 06/2020 3.255 CONINSP 3.255
X77370 ISLANDS, MEDIAN TIP EXTENSION, CURB EXTENSIONS CMAQ 06/2020 6.500 CONST 6.500
SAFETY AND SIDEWALKS AROUND THE FOLLOWING SCHOOLS LOCAL 06/2020 1.625 CONST 1.625
<Exempt> IN MANHATTAN: P.S. 153, NEW DESIGN MIDDLE AND LOCAL 06/2020 6.894 CONST 6.894
KIPP INFINITY CHARTER SCHOOL (WAS PREVIOUSLY
NAMED I.S. 195), P.S. 92, J.H.S. 275 / I.S. 275, P.S. 83 LUIS
MUNOZ RIVERA SCHOOL AND P.S. 128 AUDUBON
SCHOOL

AQC:A6 NEW YORK TPC: $15-$25 M TOTAL 5YR COST : 18.274 1.953 18.274 0.000 0.000 0.000 0.000 0.000

NYCDOT 79TH STREET CROSSTOWN SELECT BUS SERVICE LOCAL 07/2019 0.000 PRELDES 1.143
PRIMARILY ALONG 79TH STREET, BETWEEN EAST END LOCAL 07/2020 1.143 DETLDES 1.143
X77391 AVE AND HUDSON PARKWAY ENTRY/EXIT IN LOCAL 07/2022 18.285 CONST 18.285
TRANSIT MANHATTAN WILL MAKE PERMANENT
<Exempt> CORRIDOR-BASED BUS RAPID TRANSIT TREATMENTS
AND PEDESTRIAN SAFETY IMPROVEMENTS ALONG THE
EXISTING M79 BUS ROUTE TO MAKE THE BUS SERVICE
MORE RELIABLE AS WELL AS MAKING THE STREET
SAFER AND MORE ACCESSIBLE. (SBS PREVIOUSLY
IMPLEMENTATED UNDER PIN X77275)

AQC:A10 NEW YORK TPC: $15-$25 M TOTAL 5YR COST : 19.428 1.143 1.143 0.000 18.285 0.000 0.000 0.000

ROOSEVELT ROOSEVELT ISLAND EAST PROMENADE BIKE LOCAL 05/2019 0.000 PRELDES 0.464
ISLAND LANE - CONSTRUCT A BIKE LANE ON THE EASTERN LOCAL 07/2021 0.500 CONINSP 0.500
X77397 PROMENADE FROM LIGHT HOUSE PARK TO AN TAP LG URBAN 07/2021 5.000 CONST 5.000
BIKE/PED EXISTING BIKE LANE LOOP AT THE CORNELL TECH LOCAL 07/2021 1.250 CONST 1.250
<Exempt> CAMPUS ELIMINATING THE NEED FOR BICYCLES TO LOCAL 10/2020 0.380 DETLDES 0.380
SHARE VEHICLE ACCESS ROAD, ROOSEVELT ISLAND
OPERATING CORP (TAP 2019)

AQC:C2 NEW YORK TPC: $6-$9.4 M TOTAL 5YR COST : 7.130 0.464 0.000 7.130 0.000 0.000 0.000 0.000

67
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 New York County Listing (Manhattan) Page 4 of 4

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDPR RANDALL’S ISLAND SUNKEN GARDEN TAP LG URBAN 09/2021 0.793 CONST 0.793
CONNECTOR - RESTORE A CONNECTION BETWEEN THE LOCAL 09/2021 0.198 CONST 0.198
X77398 SUNKEN GARDEN FIELDS ON THE SOUTHERN END OF
BIKE/PED RANDALL’S ISLAND PARK AND THE EXISTING
<Exempt> WATERFRONT PATHWAY ALONG ITS SOUTHWESTERN
SHORELINE TO ENHANCE ACCESSIBILITY FOR
NON-MOTORIZED USERS, NEW YORK COUNTY (TAP
2019)

AQC:C2 NEW YORK TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.991 0.000 0.000 0.991 0.000 0.000 0.000 0.000

MOYNIHAN STN MOYNIHAN STATION REDEVELOPMENT / FTA 5324 CR 10/2018 0.000 CONST 40.200
DEVELOP IMPROVEMENTS: GENERAL CONSTRUCTION FOR OTHER 10/2018 0.000 CONST 43.747
X82266 VARIOUS TRAIN STATION CONCOURSES INCLUDING TIFIA 10/2018 0.000 CONST 521.966
TRANSIT SAFETY ELEMENTS, PLATFORM VENTILATION ETC OTHER 10/2018 0.000 CONST 54.148
<Exempt> INCLUDING GENERAL & ADMIN COSTS, TO PROVIDE STATE 10/2018 0.000 CONST 379.245
AMTRAK WITH A NEW PORTAL RELIEVING PAX
OTHER 09/2020 106.471 CONST 106.471
CONGESTION, MHTN (FRA ADMINISTERED)(TIFIA
FUNDING & D2013-RESL-030 )

AQC:B8 NEW YORK TPC:$1.5-$1.8 B TOTAL 5YR COST : 106.471 1039.306 106.471 0.000 0.000 0.000 0.000 0.000

LOCAL CONDUCT STUDIES, IF NECESSARY, AND CONSTRUCT LOCAL 04/2019 0.000 CONINSP 0.379
INFRASTRUCTURE PROJECTS FOR GOVERNORS FBD 04/2019 0.000 CONST 1.523
X82359 ISLAND - INCLUDING REHAB SLIP 6 PILE CLUSTER AT LOCAL 04/2019 0.000 CONST 0.381
TRANSIT BATTERY MARITIME BUILDING IN LOWER MANHATTAN FBP 04/2019 0.000 CONST 0.750
<Exempt> BY DESIGNING NEW CLUSTER AND SELECTIVE LOCAL 04/2019 0.000 CONST 0.188
REPLACEMENT OF ALL DAMAGED TIMBER PILES AND
HPP 04/2019 0.000 CONST 0.824
TIES WHICH COMPRISE THE CLUSTER AND SECURE TO
EXISTING FENDER STRUCTURE TO BRING TO A SOGR LOCAL 04/2019 0.000 CONST 0.206
(NY550)

AQC:B8 NEW YORK TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 4.251 0.000 0.000 0.000 0.000 0.000 0.000

PANYNJ COMMUTER FERRY VESSELS POWER AND PROPULSION FTA 5307 05/2019 0.000 MISC 2.480
RETROFIT PROGRAM - REPLACING TWO MAIN OTHER 05/2019 0.000 MISC 0.620
X82375 PROPULSION ENGINES (TIER 1) AND JET DRIVE
MISC SYSTEMS PER VESSEL FOR EACH OF THE FOUR VESSELS
<Exempt> WITH TWO NEW MAIN PROPULSION ENGINES AND
PROPELLER DRIVE SYSTEMS TO MEET THE TIER 3
EMISSIONS STANDARDS (D2018-PFGP-013)

AQC:B3 NEW YORK TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 3.100 0.000 0.000 0.000 0.000 0.000 0.000

68
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 Queens County Listing Page 1 of 7

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT REHABILITATION OF THE GRAND CENTRAL PARKWAY NHPP 09/2019 0.000 DETLDES 2.896
BRIDGE OVER WINCHESTER BOULEVARD & RAMP H SDF 09/2019 0.000 DETLDES 0.724
X05159 OVER CROSS ISLAND PARKWAY IN QUEENS TO EXTEND NHPP 12/2021 6.400 CONINSP 6.400
BRIDGE SERVICE LIFE OF STRUCTURES (BINS 106514A, 1065149) SDF 12/2021 1.600 CONINSP 1.600
<Exempt>
NHPP 10/2021 43.040 CONST 43.040
SDF 10/2021 10.760 CONST 10.760
STBG LG URB 10/2021 21.600 CONST 21.600
SDF 10/2021 5.400 CONST 5.400
AQC:A19 QUEENS TPC: $70-$130 M TOTAL 5YR COST : 88.800 3.620 0.000 0.000 88.800 0.000 0.000 0.000

NYSDOT GUIDERAIL UPGRADE ON GRAND CENTRAL PARKWAY SDF 05/2019 0.000 CONST 0.811
BETWEEN 31ST STREET AND NASSAU COUNTY LINE IN
X05167 QUEENS TO IMPROVE THE ROADSIDE SAFETY FOR
SAFETY MOTORISTS BY UPGRADING NON STANDARD
<Exempt> GUIDERAILS
AQC:A9 QUEENS TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 0.811 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT IMPROVE SAFETY ON THE W/B GRAND CENTRAL HSIP 03/2020 0.540 CONINSP 0.540
PARKWAY BY ADDING AN AUXILIARY LANE (0.90 MILES) SDF 03/2020 0.060 CONINSP 0.060
X05172 BETWEEN THE N/B EXIT RAMP TO FRANCIS LEWIS HSIP 12/2019 3.150 CONST 3.150
SAFETY BLVD. (EXIT 20A) AND THE EXIT RAMP TO 188TH ST TO
<Exempt> SDF 12/2019 0.350 CONST 0.350
REDUCE A WEAVING CONDITION. IN ADDITION, A
SHOULDER IS TO BE ADDED WITHIN THE EXISTING
RIGHT-OF-WAY, QUEENS COUNTY

AQC:A2 QUEENS TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.100 0.000 4.100 0.000 0.000 0.000 0.000 0.000

NYSDOT SAFETY IMPROVEMENTS ON ROCKAWAY BLVD HSIP 10/2018 0.000 DETLDES 1.139
BETWEEN FARMERS BLVD AND 3RD ST TO REDUCE SDF 10/2018 0.000 DETLDES 0.127
X07214 FATAL & INJURY ACCIDENTS TO INCLUDE UPGRADING HSIP 09/2020 11.628 CONST 11.628
SAFETY TRAFFIC SIGNALS, SIDEWALKS, CURB RAMPS, SDF 09/2020 1.292 CONST 1.292
<Exempt> CROSSWALKS, RESURFACING/ REPAIRING PAVEMENT, STBG LG URB 10/2020 1.152 CONINSP 1.152
PAVEMENT MARKINGS, SIGNS AND AN EXTENSION OF A
SDF 10/2020 0.128 CONINSP 0.128
LEFT TURN BAY, QUEENS

AQC:A6 QUEENS TPC: $12.5-$19 M TOTAL 5YR COST : 14.200 1.266 12.920 1.280 0.000 0.000 0.000 0.000

NYSDOT CONSTRUCT AN AUXILIARY LANE (0.94 MILES) ON THE STBG-OFF 08/2020 1.600 CONINSP 1.600
EASTBOUND I-495 LONG ISLAND EXPRESSWAY SDF 08/2020 0.400 CONINSP 0.400
X22869 BETWEEN THE EXIT RAMP TO CLEARVIEW EXPRESSWAY SDF 08/2020 1.000 CONINSP 1.000
RECON AND THE EXIT RAMP TO SPRINGFIELD BLVD TO STBG-OFF 08/2020 16.000 CONST 16.000
<Exempt> ADDRESS CONGESTION DUE TO HIGH VOLUME OF
SDF 08/2020 4.000 CONST 4.000
TRUCK TRAFFIC, QUEENS COUNTY - SCOPE INCLUDES
SDF 08/2020 10.350 CONST 10.350
OCEANA BRIDGE (BIN: 1055300)

AQC:A2 QUEENS TPC: $32-$50 M TOTAL 5YR COST : 33.350 0.000 33.350 0.000 0.000 0.000 0.000 0.000

69
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 Queens County Listing Page 2 of 7

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT SAFETY IMPROVEMENTS ON LONG ISLAND HSIP 05/2019 0.000 DETLDES 1.260
EXPRESSWAY FROM 48TH STREET TO LITTLE NECK SDF 05/2019 0.000 DETLDES 0.140
X22872 PARKWAY IN QUEENS, TO CORRECT SAFETY SDF 10/2020 1.860 CONINSP 1.860
SAFETY DEFICIENCIES USING COST EFFECTIVE ACCIDENT CMAQ 10/2020 3.472 CONST 3.472
<Exempt> REDUCTION MEASURES (HSI #14005 & HSI #15001: JUN SDF 10/2020 0.868 CONST 0.868
2015 & MAR 2016) (NYSDOT HSIP 2019)
HSIP 10/2020 15.210 CONST 15.210
SDF 10/2020 1.690 CONST 1.690
SDF 10/2020 2.000 CONST 2.000
AQC:A10 QUEENS TPC: $26-$40 M TOTAL 5YR COST : 25.100 1.400 0.000 25.100 0.000 0.000 0.000 0.000

NYCDOT/NYCEDC/ IMPLEMENT SAFETY IMPROVEMENTS TO THE AREA STP ENHANCE 10/2021 2.500 CONST 2.500
GJDC SURROUNDING THE AIRTRAIN STATION PLAZA LOCAL 10/2021 0.625 CONST 0.625
X55064 INCLUDING RE-STRIPING OF NORTHBOUND &
SAFETY SOUTHBOUND SECTIONS OF SUTPHIN BLVD AND E/B &
<Exempt> WB ARCHER AVENUE IN QUEENS TO ADDRESS
PED/VEHICLE CONFLICT (RELATED PIN X77013)

AQC:A6 QUEENS TPC: $2-$4 M TOTAL 5YR COST : 3.125 0.000 0.000 0.000 3.125 0.000 0.000 0.000

NYSDOT BROOKLYN-QUEENS EXPRESSWAY BRIDGE NHPP 09/2020 2.000 PRELDES 2.000


REHABILITATION OVER 47TH ST QUEENS - REPLACE SDF 09/2020 0.500 PRELDES 0.500
X73152 EXISTING CONCRETE OVERLAY AND PERFORM NHPP 10/2021 5.600 DETLDES 5.600
BRIDGE ISOLATED SUBSTRUCTURE AND SUPERSTRUCTURE SDF 10/2021 1.400 DETLDES 1.400
<Exempt> REPAIRS TO EXTEND THE STRUCTURE USEFUL LIFE (BIN NHPP 02/2023 5.600 CONINSP 5.600
1065589)
SDF 02/2023 1.400 CONINSP 1.400
STBG LG URB 02/2023 5.040 CONINSP 5.040
SDF 02/2023 1.260 CONINSP 1.260
NHPP 02/2023 31.590 CONST 31.590
SDF 02/2023 7.897 CONST 7.897
SDF 02/2023 35.000 CONST 35.000
STBG LG URB 02/2023 47.530 CONST 47.530
SDF 02/2023 11.883 CONST 11.883
AQC:A19 QUEENS TPC: $100-$225 M TOTAL 5YR COST : 156.700 0.000 2.500 0.000 7.000 147.200 0.000 0.000

NYSDOT CONSTRUCTION OF A COMMUNITY PARK IN QUEENS SDF 11/2018 0.000 DETLDES 0.500
UNDER THE NEW KOSCIUSZKO BRIDGE TO MITIGATE STBG LG URB 09/2020 1.600 CONINSP 1.600
X73158 IMPACTS ASSOCIATED WITH THE CONSTRUCTION OF SDF 09/2020 0.400 CONINSP 0.400
BRIDGE THE NEW KOSCIUSZKO BRIDGE - PARK IS UNDER THE STBG LG URB 09/2020 14.400 CONST 14.400
<Exempt> JURISDICTION OF THE NYCDPR
SDF 09/2020 3.600 CONST 3.600
AQC:C14 QUEENS TPC: $15-$25 M TOTAL 5YR COST : 20.000 0.500 20.000 0.000 0.000 0.000 0.000 0.000

70
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 Queens County Listing Page 3 of 7

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT REHABILITATION OF TWO BRIDGES ON THE VAN WYCK NHPP 05/2020 13.500 CONINSP 13.500
EXPRESSWAY (I-678) / LONG ISLAND EXPRESSWAY SDF 05/2020 1.500 CONINSP 1.500
X73580 INTERCHANGE (I-495) IN QUEENS TO EXTEND SERVICE NHPP 12/2019 105.100 CONST 105.100
BRIDGE LIFE OF STRUCTURES (BIN 1055789 & 105578E)
<Exempt> SDF 12/2019 11.678 CONST 11.678
SDF 12/2019 4.922 CONST 4.922
STBG LG URB 05/2020 18.000 CONST 18.000
SDF 05/2020 2.000 CONST 2.000
AQC:A19 QUEENS TPC: $100-$225 M TOTAL 5YR COST : 156.700 0.000 156.700 0.000 0.000 0.000 0.000 0.000

NYSDOT VAN WYCK EXPRESSWAY ACCESS & CAPACITY PIT BOND 10/2019 4.000 CONINSP 4.000
IMPROVEMENTS TO AND FROM JFK INTERNATIONAL PIT BOND 10/2019 236.000 CONST 236.000
X73582 AIRPORT, PHASE 1 (HILLSIDE AVE TO 133RD AVE)
BRIDGE RECONSTRUCTS NINE OVERPASSES TO PROVIDE ROOM
<Non-Exempt> FOR THE IMPROVEMENTS, QUEENS COUNTY (BINS:
1055710, 1055700, 1055680, 1055670, 1055660, 1055650,
1055640, 1055630, 1055620). FFY 2017 WAS
ENVIRONMENTAL EIS WORK

AQC:NON QUEENS TPC: $175-$385 M TOTAL 5YR COST : 240.000 0.000 240.000 0.000 0.000 0.000 0.000 0.000

NYSDOT VAN WYCK EXPRESSWAY ACCESS & CAPACITY SDF 03/2020 2.000 CONINSP 2.000
IMPROVEMENTS TO AND FROM JFK INTERNATIONAL SDF 03/2020 450.000 CONST 450.000
X73583 AIRPORT, PHASE 2 - RECONSTRUCTS/RETROFITS THE SDF 03/2020 8.000 ROWACQU 8.000
BRIDGE LIRR BRIDGES (BINS: 7066688, 7076800, 7066687, 7076810)
<Non-Exempt> & RECONSTRUCTS ONE OVERPASS (BIN 1055690) TO
PROVIDE ROOM FOR THE IMPROVEMENTS, QUEENS

AQC:NON QUEENS TPC:$414.4-$510.6 M TOTAL 5YR COST : 460.000 0.000 460.000 0.000 0.000 0.000 0.000 0.000

NYSDOT VAN WYCK EXPRESSWAY ACCESS & CAPACITY SDF 07/2021 8.480 CONINSP 8.480
IMPROVEMENTS TO AND FROM JFK INTERNATIONAL SDF 07/2021 559.680 CONST 559.680
X73584 AIRPORT, PHASE 3 (QUEENS BLVD - JFK) - WIDEN THE
CONST EXPRESSWAY AS A FOURTH LANE WOULD BE ADDED IN
<Non-Exempt> EACH DIRECTION BETWEEN HOOVER AVENUE AND
FEDERAL CIRCLE. SCOPE ALSO INCLUDES RETAINING
WALLS AND BRIDGES SOUTH OF 133RD AVE (BINS:
1076499, 1055619, 1076489, 1075630, 1075710, 5522079) AND
NORTH OF HILLSIDE AVE (BINS 1055720, 1076449),
QUEENS

AQC:NON QUEENS TPC:$0.5-$0.6 B TOTAL 5YR COST : 568.160 0.000 0.000 568.160 0.000 0.000 0.000 0.000

71
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 Queens County Listing Page 4 of 7

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDOT TRANSPORTATION IMPROVEMENTS TO THE FAR OTHER FA 09/2019 0.000 CONST 12.000
ROCKAWAY BUSINESS DISTRICT IN QUEENS BY OTHER 09/2019 0.000 CONST 1.124
X76079 IMPLEMENTING ENVIRONMENTAL SUSTAINABILITY, LOCAL 02/2019 0.000 DETLDES 1.286
BIKE/PED TRAFFIC AND TRANSIT ENHANCEMENTS AND HPP 12/2018 0.000 PRELDES 1.029
<Exempt> CONSTRUCTING PED PLAZA, REFUGE ISLANDS, CURB LOCAL 12/2018 0.000 PRELDES 1.286
EXTENSIONS, MARKINGS & SIGNS NY533 (ALSO HUD
FUNDING)

AQC:C2 QUEENS TPC: $15-$25 M TOTAL 5YR COST : 0.000 16.725 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT QUEENS BLVD SAFETY IMPROVEMENTS (PHASE 2) LOCAL 04/2021 7.198 CONINSP 7.198
FROM 73TH STREET TO ELLIOT AVE IN QUEENS TO HSIP 04/2021 10.000 CONST 10.000
X76129 IMPROVE SAFETY & REDUCE TRAFFIC SPEEDS BY LOCAL 04/2021 49.995 CONST 49.995
SAFETY EXPANDING EXISTING PEDESTRIAN WALKWAYS, STATE 04/2021 1.765 CONST 1.765
<Exempt> INSTALLATION OF RAISED BIKE LANES, LIGHTING AND LOCAL 10/2020 4.637 DETLDES 4.637
LANDSCAPING, NYSDOT HSIP 2019

AQC:A2 QUEENS TPC: $70-$130 M TOTAL 5YR COST : 73.595 0.000 0.000 73.595 0.000 0.000 0.000 0.000

NYCEDC/DOT/GJDC PHYSICAL IMPROVEMENTS OF STATION PLAZA AT THE CMAQ 10/2021 5.000 CONST 5.000
ARCHER AVE/SUTPHIN BLVD INTERSECTION IN LOCAL 10/2021 0.625 CONST 0.625
X77013 JAMAICA, QUEENS INCLUDING SIGNAL TIMING STATE 10/2021 0.625 CONST 0.625
INTER MODIFICATIONS, LANE RESTRIPING, PED SAFETY LOCAL 10/2021 0.264 CONST 0.264
<Exempt> IMPROVEMENTS, & AIR QUALITY IMPROVEMENTS TO STATE 10/2021 0.264 CONST 0.264
ADDRESS CIRCULATION (RELATED X55064)
LOCAL 10/2021 12.750 CONST 12.750
AQC:D1 QUEENS TPC: $32-$50 M TOTAL 5YR COST : 19.528 0.000 0.000 0.000 19.528 0.000 0.000 0.000

NYCDOT QUEENS BLVD SAFETY IMPROVEMENTS (PHASE 1) LOCAL 04/2021 36.732 CONST 36.732
FROM ROOSEVELT AVE TO 73RD STREET IN QUEENS TO LOCAL 10/2020 4.408 DETLDES 4.408
X77338 IMPROVE SAFETY & REDUCE TRAFFIC SPEEDS BY
SAFETY EXPANDING EXISTING PEDESTRIAN WALKWAYS,
<Exempt> INSTALLATION OF RAISED BIKE LANES, LIGHTING AND
LANDSCAPING

AQC:A2 QUEENS TPC: $40-$60 M TOTAL 5YR COST : 41.140 0.000 0.000 41.140 0.000 0.000 0.000 0.000

NYCDOT ASTORIA PEDESTRIAN IMPROVEMENTS: 30TH AVE: CMAQ 02/2020 0.320 CONST 0.320
MAIN AVE TO 8TH ST, 8TH ST FROM ASTORIA BLVD TO LOCAL 02/2020 0.080 CONST 0.080
X77369 WELLING COURT, MAIN AVE FROM VERNON BLVD TO
BIKE/PED ASTORIA BLVD AND ASTORIA BLVD FROM 8TH ST TO
<Exempt> MAIN AVE - INCREASE PED SAFETY AND ACCESSIBILITY
NEAR THE ASTORIA FERRY TERMINAL BY UPGRADING
SIDEWALKS, AND INSTALLING NEW TRAFFIC
CONTROLS, CURB EXTENSIONS, NECKDOWNS,
SIDEWALK EXTENSIONS, AND CROSSWALKS IN QUEENS

AQC:C2 QUEENS TPC: < $0.75 M TOTAL 5YR COST : 0.400 0.000 0.400 0.000 0.000 0.000 0.000 0.000

72
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 Queens County Listing Page 5 of 7

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDOT WOODHAVEN BLVD SELECT BUS SERVICE FROM BEACH LOCAL 07/2024 214.200 CONST 214.200
116TH STREET TO ROCKAWAY BEACH BLVD TO 61ST LOCAL 07/2024 10.900 DETLDES 10.900
X77371 STREET AND 39TH AVE TO REDUCE TRAVEL TIME IN LOCAL 07/2024 10.900 PRELDES 10.900
TRANSIT QUEENS - MAKE PERMANENT CORRIDOR-BASED
<Exempt> IMPROVEMENTS SUCH AS MEDIAN STATIONS AND/OR
BUS BULB STATIONS TO MAKE THE BUS SERVICE
FASTER AND MORE RELIABLE AS WELL AS MAKING THE
STREET SAFER AND MORE ACCESSIBLE (SBS
PREVIOUSLY IMPLEMENTATED UNDER PIN X77275)

AQC:A10 QUEENS TPC: $175-$385 M TOTAL 5YR COST : 236.000 0.000 0.000 0.000 0.000 0.000 236.000 0.000

NYCDOT ATLANTIC AVENUE RECONSTRUCTION FROM CONDUIT HSIP 09/2020 7.000 CONST 7.000
BOULEVARD TO ROCKAWAY BOULEVARD TO INCLUDE LOCAL 09/2020 0.778 CONST 0.778
X77383 MEDIAN TIP EXTENSIONS, PEDESTRIAN REFUGE
SAFETY RECONSTRUCTION IN CROSSWALKS, AND OTHER
<Exempt> OPERATIONAL & TRAFFIC CALMING TREATMENTS TO
REDUCE INJURIES AND FATALITIES FOR ROAD USERS
AND PEDESTRIANS, QUEENS

AQC:A6 QUEENS TPC: $7.5-$12 M TOTAL 5YR COST : 7.778 0.000 7.778 0.000 0.000 0.000 0.000 0.000

NYCDOT QUEENS BLVD SAFETY IMPROVEMENTS (PHASE 3) HSIP 09/2022 5.000 CONST 5.000
FROM ELLIOT AVE TO YELLOWSTONE BLVD IN QUEENS LOCAL 09/2022 0.556 CONST 0.556
X77384 TO IMPROVE SAFETY & REDUCE TRAFFIC SPEEDS BY LOCAL 09/2022 80.000 CONST 80.000
SAFETY EXPANDING EXISTING PEDESTRIAN WALKWAYS,
<Exempt> INSTALLATION OF RAISED BIKE LANES, LIGHTING AND
LANDSCAPING

AQC:A2 QUEENS TPC: $70-$130 M TOTAL 5YR COST : 85.556 0.000 0.000 0.000 85.556 0.000 0.000 0.000

NYCDOT QUEENS BLVD SAFETY IMPROVEMENTS (PHASE 4) HSIP 09/2023 5.000 CONST 5.000
FROM YELLOWSTONE BLVD TO UNION TURNPIKE IN LOCAL 09/2023 0.556 CONST 0.556
X77385 QUEENS TO IMPROVE SAFETY & REDUCE TRAFFIC
SAFETY SPEEDS BY EXPANDING EXISTING PEDESTRIAN
<Exempt> WALKWAYS, INSTALLATION OF RAISED BIKE LANES,
LIGHTING AND LANDSCAPING

AQC:A2 QUEENS TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.556 0.000 0.000 0.000 0.000 5.556 0.000 0.000

NYCDOT REHABILITATION OF THE METROPOLITAN AVENUE NHPP 09/2020 25.000 CONST 25.000
BRIDGE OVER CSX TRANSPORT IN QUEENS TO BRING IT LOCAL 09/2020 6.250 CONST 6.250
X77386 TO A STATE OF GOOD REPAIR (BIN # 2-24750-0) LOCAL 09/2020 26.750 CONST 26.750
BRIDGE
<Exempt>
AQC:A19 QUEENS TPC: $50-$85 M TOTAL 5YR COST : 58.000 0.000 58.000 0.000 0.000 0.000 0.000 0.000

73
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 Queens County Listing Page 6 of 7

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDOT RECONSTRUCTION OF THE HEMPSTEAD AVENUE LOCAL 09/2020 2.845 DETLDES 2.845
BRIDGE OVER THE CROSS ISLAND PARKWAY QUEENS LOCAL 09/2022 6.740 CONINSP 6.740
X77387 TO BRING TO A STATE OF GOOD REPAIR (BIN # NHPP 09/2023 36.237 CONST 36.237
BRIDGE 2-23178-0) LOCAL 09/2023 9.059 CONST 9.059
<Exempt>
AQC:A19 QUEENS TPC: $50-$85 M TOTAL 5YR COST : 54.881 0.000 2.845 0.000 6.740 45.296 0.000 0.000

NYCDOT NORTHERN BOULEVARD WALKABLE CORRIDORS CMAQ 06/2019 0.000 CONST 0.800
BETWEEN 31ST STREET / 40TH STREET TO 114TH LOCAL 06/2019 0.000 CONST 0.200
X77395 STREET - IMPLEMENT CORRIDOR SAFETY
SAFETY IMPROVEMENT MEASURES TO IMPROVE BIKE/PED
<Exempt> SAFETY (SPLIT FROM X77262)
AQC:C2 QUEENS TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 1.000 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT SAFE ROUTES FOR NON-DRIVERS - ROCKAWAY BLVD: TAP LG URBAN 03/2020 0.321 CONST 0.321
IMPROVE PEDESTRIAN INFRASTRUCTURE ON VISION LOCAL 03/2020 0.080 CONST 0.080
X77400 ZERO PRIORITY CORRIDORS AND CREATE CONCRETE
SAFETY PEDESTRIAN ISLANDS AT ROCKAWAY BLVD FROM
<Exempt> NASSAU EXPRESSWAY TO ATLANTIC AVE TO IMPROVE
SAFETY & REDUCE INJURIES IN QUEENS (TAP 2019)

AQC:C2 QUEENS TPC: < $0.75 M TOTAL 5YR COST : 0.401 0.000 0.401 0.000 0.000 0.000 0.000 0.000

NYCDOT SAFE ROUTES FOR NON-DRIVERS - NORTHERN BLVD: TAP LG URBAN 04/2021 0.321 CONST 0.321
IMPROVE PEDESTRIAN INFRASTRUCTURE ON VISION LOCAL 04/2021 0.080 CONST 0.080
X77401 ZERO PRIORITY CORRIDORS AND CREATE NEW
SAFETY PEDESTRIAN ISLANDS, MEDIAN EXTENSIONS, AND
<Exempt> OTHER PEDESTRIAN ACCESSIBILITY ENHANCEMENTS
ON NORTHERN BLVD, 56 ST -114 ST TO IMPROVE SAFETY
& REDUCE INJURIES IN QUEENS (TAP 2019)

AQC:C2 QUEENS TPC: < $0.75 M TOTAL 5YR COST : 0.401 0.000 0.000 0.401 0.000 0.000 0.000 0.000

NYCDOT SAFE ROUTES FOR NON-DRIVERS - JAMAICA AVE: TAP LG URBAN 04/2020 0.401 CONST 0.401
IMPROVE PEDESTRIAN INFRASTRUCTURE ON VISION LOCAL 04/2020 0.100 CONST 0.100
X77402 ZERO PRIORITY CORRIDORS AND CREATE MEDIAN
SAFETY PEDESTRIAN ISLANDS AND MEDIAN TIP EXTENSIONS AT
<Exempt> JAMAICA AVE, FRANCIS LEWIS BLVD – E 241ST ST TO
IMPROVE SAFETY & REDUCE INJURIES IN QUEENS (TAP
2019)

AQC:C2 QUEENS TPC: < $0.75 M TOTAL 5YR COST : 0.501 0.000 0.501 0.000 0.000 0.000 0.000 0.000

74
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 Queens County Listing Page 7 of 7

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDOT SAFE ROUTES FOR NON-DRIVERS - MERRICK BLVD: TAP LG URBAN 08/2020 0.445 CONST 0.445
IMPROVE PEDESTRIAN INFRASTRUCTURE ON VISION LOCAL 08/2020 0.111 CONST 0.111
X77403 ZERO PRIORITY CORRIDORS AND CREATE FULL
SAFETY CONCRETE MEDIANS AND MEDIAN TIP EXTENSIONS AT
<Exempt> MERRICK BLVD FROM SPRINGFIELD BLVD TO HOOK
CREEK BLVD TO IMPROVE SAFETY & REDUCE INJURIES
IN QUEENS (TAP 2019)

AQC:C2 QUEENS TPC: < $0.75 M TOTAL 5YR COST : 0.556 0.000 0.556 0.000 0.000 0.000 0.000 0.000

NYSDOT DECK REPLACEMENT OF ASTORIA BLVD OVER HPP 09/2019 0.000 CONST 1.410
BROOKLYN-QUEENS EXPRESSWAY TO ADDRESS SDF 09/2019 0.000 CONST 0.352
X80658 STRUCTURAL DEFICIENCY AND SAFETY ISSUES, STBG LG URB 09/2019 0.000 CONST 8.590
BRIDGE QUEENS (BINS: 1072010) (TRANSFERRED EARMARK: SDF 09/2019 0.000 CONST 2.148
<Exempt> NY109, PROGRAM CODE RPS0) SDF 09/2019 0.000 CONST 0.352
STBG LG URB 01/2020 1.328 CONINSP 1.328
SDF 01/2020 0.332 CONINSP 0.332
NHPP 12/2019 0.160 CONST 0.160
SDF 12/2019 0.040 CONST 0.040
AQC:A19 QUEENS TPC: $15-$25 M TOTAL 5YR COST : 1.860 12.852 1.860 0.000 0.000 0.000 0.000 0.000

NYSDOT LONG ISLAND EXPRESSWAY CORRIDOR ACTIVE CMAQ 01/2020 2.000 DETLDES 2.000
TRANSPORTATION & DEMAND MANAGEMENT, QUEENS SDF 01/2020 0.500 DETLDES 0.500
X80659 MIDTOWN TUNNEL TO MAIN STREET IN QUEENS TO CMAQ 10/2021 1.600 CONINSP 1.600
TRAFFIC ENHANCE MOBILITY AND TRAVEL TRIP RELIABILITY SDF 10/2021 0.400 CONINSP 0.400
<Non-Exempt>
CMAQ 10/2021 11.440 CONST 11.440
SDF 10/2021 2.860 CONST 2.860
AQC:NON QUEENS TPC: $21-$31 M TOTAL 5YR COST : 18.800 0.000 2.500 0.000 16.300 0.000 0.000 0.000

PANYNJ INSTALL A FERRY LANDING AT LGA IN QUEENS FOR THE FBP 04/2022 0.237 CONST 0.237
FERRY SERVICE BETWEEN THE AIRPORT AND OTHER 04/2022 0.550 CONST 0.550
X82329 MANHATTAN. THE PROJECT INCLUDES THE FBP 11/2021 0.236 DETLDES 0.236
TRANSIT CONSTRUCTION OF 82FT LONG - 6FT WIDE ALUMINUM OTHER 11/2021 0.550 DETLDES 0.550
<Non-Exempt> GANGWAY AND WILL SERVICE A 90FT STEEL BARGE FOR
DOCK

AQC:NON QUEENS TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.573 0.000 0.000 0.000 1.573 0.000 0.000 0.000

NYCDOT/EDC DEVELOP TERMINAL FACILITIES FOR WATER TAXI LOCAL 07/2019 0.000 CONST 6.500
PROJECTS IN NEW YORK CITY - DESIGN & HPP 07/2019 0.000 CONST 2.247
X82357 CONSTRUCTION TO UPDATE EXISTING PASSENGER LOCAL 07/2019 0.000 CONST 0.562
TRANSIT FERRY LANDING AT HUNTERS POINT SOUTH IN QUEENS LOCAL 07/2019 0.000 DETLDES 0.625
<Exempt> BY REPLACING EXISTING BARGE WITH A 30’X90’
DOUBLE-BOW-LOADING BARGE, NY505

AQC:B8 QUEENS TPC: $9.5-15.5 M TOTAL 5YR COST : 0.000 9.934 0.000 0.000 0.000 0.000 0.000 0.000

75
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 Richmond County Listing (Staten Island) Page 1 of 3

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

PANYNJ BAYONNE BRIDGE NAVIGATIONAL CLEARANCE OTHER 06/2019 0.000 MISC 150.000
PROGRAM TO INCREASE THE AIR DRAFT OF THE
X09629 BRIDGE BY RAISING THE ROADWAY WITHIN THE
BRIDGE EXISTING ARCH SPAN BY 65 FEET AND THE NEW
<Exempt> ROADWAY WIDENED TO ACCOMMODATE PEDESTRIAN
WALKWAY FOR SHARED-USE PEDESTRIANS AND
CYCLISTS.

AQC:A19 RICHMOND TPC:$0.9-$1.1 B TOTAL 5YR COST : 0.000 150.000 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT REHABILITATION OF WOOLLEY AVENUE AND BRADLEY SDF 07/2019 0.000 SCOPING 0.250
AVENUE BRIDGES OVER STATEN ISLAND EXPRESSWAY SDF 11/2019 1.250 PRELDES 1.250
X76168 TO EXTEND SERVICE LIFE OF BRIDGES AND ENSURE SDF 12/2020 1.000 DETLDES 1.000
BRIDGE SAFETY OF TRAVELING PUBLIC IN STATEN ISLAND SDF 04/2022 2.200 CONINSP 2.200
<Exempt> (BINS 1067720, 1067730) SDF 04/2022 22.000 CONST 22.000
AQC:A19 RICHMOND TPC: $21-$31 M TOTAL 5YR COST : 26.450 0.250 1.250 1.000 24.200 0.000 0.000 0.000

NYCDOT INSTALLATION OF EMERGENCY GENERATOR FOR THE LOCAL 07/2021 2.000 CONST 2.000
STATEN ISLAND FERRY MAINTENANCE FACILITY IN
X77905 STATEN ISLAND TO ENABLE THE FACILITY REMAIN
TRANSIT FUNCTIONAL IN TIME OF CRISIS, D2013-SAND-017
<Exempt>

AQC:B8 RICHMOND TPC: $3.3-$5.6 M TOTAL 5YR COST : 2.000 0.000 0.000 2.000 0.000 0.000 0.000 0.000

NYCDOT IMPLEMENT IMPROVEMENTS TO BERTHING FACILITIES FTA 5324 07/2019 0.000 CONST 11.936
& CONSTRUCT RESILIENT MOORINGS POINTS LOCAL 07/2019 0.000 CONST 1.329
X77907 INCLUDING ADDITIONAL PIER FIXED MOORING POINTS,
TRANSIT PIER STRENGTHENING & VESSEL MODIFICATIONS TO
<Exempt> PREVENT MOORED FERRY VESSELS FROM DAMAGING
PIER INFRASTRUCTURE DURING HEAVY WIND AND TIDE
CONDITIONS AND ENABLE FACILITIES TO WITHSTAND
SEVERE WEATHER AT STATEN ISLAND FERRY
FACILITIES ON STATEN ISLAND, D2013-SAND-012 &
D2013-SAND-016

AQC:B8 RICHMOND TPC: $12.5-$19 M TOTAL 5YR COST : 0.000 13.265 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT CONVERT THE DIESEL PROPULSION PLANT OF THE FTA 5307 07/2021 1.600 CONST 1.600
AUSTEN CLASS FERRY BOATS TO OPERATE ON LOCAL 07/2021 0.200 CONST 0.200
X82347 LIQUEFIED NATURAL GAS (LNG) FUEL FOR THE STATEN STATE 07/2021 0.200 CONST 0.200
TRANSIT ISLAND FERRY BETWEEN WHITEHALL FERRY FTA 5307 07/2021 0.200 DETLDES 0.200
<Exempt> TERMINAL, MANHATTAN AND ST. GEORGE TERMINAL, LOCAL 07/2021 0.025 DETLDES 0.025
STATEN ISLAND. D2014-PFGP-002
STATE 07/2021 0.025 DETLDES 0.025
FTA 5307 07/2021 0.200 PRELDES 0.200
LOCAL 07/2021 0.025 PRELDES 0.025
STATE 07/2021 0.025 PRELDES 0.025
AQC:K2 RICHMOND TPC: $4.6-$7.5 M TOTAL 5YR COST : 2.500 0.000 0.000 2.500 0.000 0.000 0.000 0.000

76
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 Richmond County Listing (Staten Island) Page 2 of 3

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDOT NEW YORK CITY DOT FERRY DIVISION - STATEN ISLAND FBP 05/2019 0.000 CONST 0.374
FERRY MAINTENANCE FACILITY PIER AND VESSELS LOCAL 05/2019 0.000 CONST 0.093
X82348 UTILITIES UPGRADE TO HAVE VESSELS IN
TRANSIT MAINTENANCE AT STATEN ISLAND POWERED BY
<Exempt> LANDSIDE ELECTRIC SOURCE VERSUS POWER OFF THE
VESSEL - FBD 2012, FBP 2015, 2016 & 2017

AQC:B8 RICHMOND TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 0.467 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT NEW YORK CITY DOT FERRY DIVISION - ST GEORGE FBD 08/2019 0.000 CONST 2.340
PASSENGER SLIPS WIRE ROPE RECONSTRUCTION LOCAL 08/2019 0.000 CONST 0.585
X82366 REPLACES TRANSFER BRIDGE WIRE ROPES SYSTEM, FBP 08/2019 0.000 CONST 0.338
TRAFFIC RECONDITION AND RESTORE SLIP MACHINERY TO ITS LOCAL 08/2019 0.000 CONST 0.000
<Exempt> ORIGINAL OPERATING PARAMETERS AT THE STATEN LOCAL 08/2019 0.000 CONST 0.085
ISLAND ST GEORGE FERRY TERMINAL (2018: FBP FY2015;
2019: FBD 2011 & FBP 2016)

AQC:B8 RICHMOND TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 3.348 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT NEW YORK CITY DOT FERRY DIVISION - ST GEORGE FBP 12/2018 0.000 PRELDES 0.168
FERRY TERMINAL WATERFRONT BULKHEAD LOCAL 12/2018 0.000 PRELDES 0.042
X82372 RECONSTRUCTION AND SLIP SCOUR FBP 07/2020 0.400 CONINSP 0.400
TRANSIT REMEDIATION - RESTORE SCOUR PROTECTION OF LOCAL 07/2020 0.100 CONINSP 0.100
<Exempt> TRANSFER BRIDGE FOUNDATIONS BY LENGTHENING FBP 07/2020 11.200 CONST 11.200
EXISTING PILE ENCASEMENTS AND BACKFILLING THE
LOCAL 07/2020 2.800 CONST 2.800
IMMEDIATE UNDERWATER AREA WITH RIP-RAP.
REMOVAL & RENEWAL OF DETERIORATED PORTIONS OF FBP 10/2019 0.174 DETLDES 0.174
THE SUBSTRUCTURE STEEL BRACING OF SLIPS 4, 5, & 6 LOCAL 10/2019 0.043 DETLDES 0.043
WHICH SUPPORT THE PILES. RECONSTRUCTION OF THE
STEEL BULKHEAD WHICH SUPPORTS THE FERRY
TERMINAL BUILDING AND IS SUBJECT TO
ACCELERATED CORROSION DUE TO WAVE &
FERRYBOAT ACTION (FERRY BOAT PROGRAM FY2016,
2017 & 2018)

AQC:B8 RICHMOND TPC: $12.5-$19 M TOTAL 5YR COST : 14.717 0.210 14.717 0.000 0.000 0.000 0.000 0.000

NYCDOT IMPROVE THE STATEN ISLAND FERRY VESSEL FTA 5307 07/2019 0.000 CONST 2.400
GANGWAY SYSTEM UTILIZED AT THE ST. GEORGE LOCAL 07/2019 0.000 CONST 0.600
X82373 FERRY TERMINAL AND THE SI FERRY MAINTENANCE
TRANSIT FACILITY BY MODIFYING RAISED PLATFORMS AND
<Exempt> WALKWAYS (GANGWAY SYSTEM) TO INCREASE SAFETY
FOR DEPLOYING THE SYSTEM AND FOR THOSE
TRAVERSING THE GANGWAY IN STATEN ISLAND
(D2018-PFGP-012)

AQC:B8 RICHMOND TPC: $2-$4 M TOTAL 5YR COST : 0.000 3.000 0.000 0.000 0.000 0.000 0.000 0.000

77
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 Richmond County Listing (Staten Island) Page 3 of 3

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDOT STATEN ISLAND FERRY VESSELS WILL BE MODIFIED TO FTA 5307 07/2019 0.000 CONST 3.903
HOLD GREY WATER ONBOARD IN ORDER TO COMPLY LOCAL 07/2019 0.000 CONST 0.976
X82374 WITH THE USEPA NO DISCHARGE ZONE. VESSEL
TRANSIT MODIFICATION WILL REQUIRE TANK FABRICATION AND
<Exempt> INSTALLATION, AS WELL AS PIPE AND PUMP
INSTALLATION FOR GREY WATER AND OILY WATER.
HOLDING TANKS AND HARDWARE WILL BE INSTALLED
ON LAND (D2018-PFGP-012)

AQC:B8 RICHMOND TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 4.879 0.000 0.000 0.000 0.000 0.000 0.000

NYCEDC FULL REHABILITATION OF THE ELECTRICAL SYSTEM OF STATE 04/2020 0.349 DETLDES 0.349
THE ARTHUR KILL LIFT BRIDGE IN STATEN ISLAND, LOCAL 04/2020 0.062 DETLDES 0.062
X93591 RE-TENSIONING THE COUNTERWEIGHT ROPES, AND STATE 12/2019 0.349 PRELDES 0.349
BRIDGE REPLACING TWO COUNTERWEIGHT ROPES (ONE IN LOCAL 12/2019 0.062 PRELDES 0.062
<Exempt> EACH TOWER) THAT LIFT IT, IN ORDER TO INCREASE STATE 10/2020 2.788 CONST 2.788
SAFETY AND ENSURE THE ONGOING USEFULNESS AND
LOCAL 10/2020 0.492 CONST 0.492
RELIABILITY (NYS RAIL INFRASTRUCTURE
IMPROVEMENTS AWARD, 2018)

AQC:A19 RICHMOND TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.102 0.000 0.822 3.280 0.000 0.000 0.000 0.000

78
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 1 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT IMPLEMENT ENVIRONMENTAL PERMIT SUPPORT SDF 10/2018 0.000 MISC 2.400
SERVICES THROUGHOUT NEW YORK BOROUGHS TO
S03000 DETERMINE ENVIRONMENTAL IMPACT FROM
MISC TRANSPORTATION PROJECTS AND DEVELOP
<Exempt> MITIGATION STRATEGIES.
AQC:C3 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 2.400 0.000 0.000 0.000 0.000 0.000 0.000

PANYNJ CONDUCT CROSS HARBOR FREIGHT PROGRAM (CHFP) OTHER 01/2019 0.000 PRELDES 35.000
TIER II ENVIRONMENTAL IMPACT STATEMENT (EIS) TO
X50201 IMPROVE THE REGIONAL MOVEMENT OF GOODS
STUDY ACROSS THE HARBOR. A MORE DETAILED ASSESSMENT
<Exempt> ACROSS NORTHEASTERN NEW JERSEY, NEW YORK CITY,
AND LONG ISLAND, NEW YORK. (PREVIOUS PIN X50019)

AQC:C7 MULTI TPC: $32-$50 M TOTAL 5YR COST : 0.000 35.000 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT MOVABLE BRIDGES CONSTRUCTION CONTRACT FOR NHPP 06/2019 0.000 CONST 8.000
COMPREHENSIVE BRIDGE PREVENTIVE MAINTENANCE LOCAL 06/2019 0.000 CONST 2.000
X76304 PLAN WITHIN NEW YORK CITY TO EXTEND SERVICE
BRIDGE LIFE
<Exempt>
AQC:A6 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 10.000 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT MOVABLE BRIDGES CONSTRUCTION CONTRACT FOR STBG LG URB 09/2024 13.390 CONST 13.390
COMPREHENSIVE BRIDGE PREVENTIVE MAINTENANCE LOCAL 09/2024 3.348 CONST 3.348
X76305 PLAN WITHIN NEW YORK CITY TO EXTEND SERVICE
BRIDGE LIFE
<Exempt>
AQC:A6 MULTI TPC: $15-$25 M TOTAL 5YR COST : 16.738 0.000 0.000 0.000 0.000 0.000 16.738 0.000

NYCDOT COMPREHENSIVE BRIDGE PREVENTIVE MAINTENANCE NHPP 09/2024 9.740 CONST 9.740
PLAN FOR THE MOVABLE BRIDGES WITHIN NEW YORK LOCAL 09/2024 2.435 CONST 2.435
X76306 CITY AND FORCE ACCOUNT TO EXTEND SERVICE LIFE
BRIDGE
<Exempt>
AQC:A6 MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 12.175 0.000 0.000 0.000 0.000 0.000 12.175 0.000

NYCDOT PREVENTIVE MAINTENANCE INITIATIVE FOR THE EAST NHPP 02/2019 0.000 CONST 8.000
RIVER BRIDGES - IN ALL NEW YORK CITY BOROUGHS LOCAL 02/2019 0.000 CONST 2.000
X76422 TO EXTEND SERVICE LIFE OF THE BRIDGES. THIS PIN IS
BRIDGE FOR FORCE ACCOUNT WHICH IS FOR THE USE OF
<Exempt> IN-HOUSE FORCES
AQC:A6 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 10.000 0.000 0.000 0.000 0.000 0.000 0.000

79
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 2 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDOT COMPREHENSIVE BRIDGE PREVENTIVE MAINTENANCE NHPP 05/2019 0.000 CONST 6.000
PLAN FOR THE MOVABLE BRIDGES WITHIN NEW YORK LOCAL 05/2019 0.000 CONST 1.500
X76423 CITY AND FORCE ACCOUNT TO EXTEND SERVICE LIFE
BRIDGE
<Exempt>
AQC:A6 MULTI TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 7.500 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT PREVENTIVE MAINTENANCE INITIATIVE FOR THE EAST NHPP 09/2022 20.250 CONST 20.250
RIVER BRIDGES (CONTRACT) - IN ALL NEW YORK CITY LOCAL 09/2022 5.063 CONST 5.063
X76427 BOROUGHS TO EXTEND SERVICE LIFE OF THE BRIDGES
BRIDGE
<Exempt>
AQC:A6 MULTI TPC: $26-$40 M TOTAL 5YR COST : 25.313 0.000 0.000 0.000 25.313 0.000 0.000 0.000

NYCDOT PREVENTIVE MAINTENANCE INITIATIVE FOR THE EAST NHPP 09/2024 11.850 CONST 11.850
RIVER BRIDGES - IN ALL NEW YORK CITY BOROUGHS LOCAL 09/2024 2.962 CONST 2.962
X76428 TO EXTEND SERVICE LIFE OF THE BRIDGES. THIS PIN IS
BRIDGE FOR FORCE ACCOUNT WHICH IS FOR THE USE OF
<Exempt> IN-HOUSE FORCES
AQC:A6 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 14.812 0.000 0.000 0.000 0.000 0.000 14.812 0.000

NYCDOT EAST RIVER BRIDGES DE-ICING - IMPLEMENT A NHPP 09/2023 10.530 OPER 10.530
PROACTIVE APPROACH TO SNOW AND ICE CONTROL BY LOCAL 09/2023 2.632 OPER 2.632
X76429 COMBINING THE ADVANTAGES OF ANTI-ICING AND THE
BRIDGE USE OF NON-CORROSIVE CHEMICAL TO EXTEND
<Exempt> SERVICE LIFE.
AQC:A2 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 13.162 0.000 0.000 0.000 0.000 13.162 0.000 0.000

NYCDOT JAMAICA BAY GREENWAY IMPLEMENTATION PLAN LOCAL 04/2020 0.804 CONINSP 0.804
WILL DEVELOP PLAN TO COMPLETE THE GREENWAY, OTHER FA 04/2020 0.530 CONST 0.530
X76716 CLOSE GAPS IN EXISTING ROUTE, ENHANCE SECTIONS, LOCAL 04/2020 2.683 CONST 2.683
BIKE/PED IMPROVE ACCESS FROM ADJACENT COMMUNITIES,
<Exempt> ESTABLISH LINKS TO TRANSIT AND IMPLEMENT
BIKE/PED ACCESS (FED LANDS HWY)

AQC:C2 MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 4.017 0.000 4.017 0.000 0.000 0.000 0.000 0.000

80
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 3 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDOT BEACON TECHNOLOGY AND SMART MAPS FOR FTA 5310 07/2019 0.000 MISC 0.422
PERSONS WITH VISUAL IMPAIRMENTS WILL DESIGN LOCAL 07/2019 0.000 MISC 0.105
X76840 AND PILOT HIGH CONTRAST / LOW-VISION MAPS AS
STUDY WELL AS BEACON TECHNOLOGY AND WEB-BASED
<Exempt> APPLICATION DEVELOPMENT AT MAJOR TRAFFIC
CORRIDORS WITH A HIGH CONCENTRATION OF
RESIDENTS WITH VISUAL IMPAIRMENTS PROVIDING
AUDIBLE TO HELP PEDESTRIANS IDENTIFY THEIR
LOCATIONS AND THE LOCATIONS OF THEIR DESIRED
POINTS OF INTEREST. EXACT CORRIDORS
THROUGHOUT NYC WILL BE DETERMINED BY A STUDY
ON HOTSPOTS FOR VISUALLY IMPAIRED PEDESTRIANS.

AQC:C2 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 0.527 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT MUNICIPAL PLUG-IN AND ADVANCED VEHICLE CMAQ 09/2020 1.040 MISC 1.040
PROGRAM TO REDUCE EMISSIONS FROM CITY-OWNED LOCAL 09/2020 0.260 MISC 0.260
X77261 DIESEL & GASOLINE-POWERED FLEET VEHICLES; CMAQ 09/2022 1.020 MISC 1.020
MISC PURCHASE OF NATURAL GAS VEHICLES TO REPLACE LOCAL 09/2022 0.255 MISC 0.255
<Non-Exempt> MEDIUM AND HEAVY DUTY GASOLINE & DIESEL
VEHICLES AS WELL AS PLUG IN HYBRID & BATTERY

AQC:NON MULTI TPC: $15-$25 M TOTAL 5YR COST : 2.575 0.000 1.300 0.000 1.275 0.000 0.000 0.000

NYCDOT MULTI-MODAL ACCESS TO TRANSIT: IMPLEMENT LOCAL 03/2020 0.900 DETLDES 0.900
IMPROVEMENTS TO PEDESTRIAN AND BICYCLE ACCESS CMAQ 09/2023 1.250 CONST 1.250
X77263 TO PUBLIC TRANSPORTATION THROUGH THOUGHTFUL LOCAL 09/2023 0.313 CONST 0.313
BIKE/PED SAFETY IMPROVEMENTS TO STREET INFRASTRUCTURE,
<Exempt> CURB MANAGEMENT AND STREET DESIGN IN NEW
YORK CITY.

AQC:C2 MULTI TPC: $2-$4 M TOTAL 5YR COST : 2.463 0.000 0.900 0.000 0.000 1.563 0.000 0.000

NYCDOT DATA COLLECTION FOR ASSET MANAGEMENT STBG LG URB 08/2019 0.000 MISC 7.000
PLANNING IN FFY 2020 & FFY 2021 FOR CITY OWNED LOCAL 08/2019 0.000 MISC 1.750
X77333 NON EAST RIVER BRIDGES, CITYWIDE
MISC
<Exempt>
AQC:A19 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 8.750 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT DATA COLLECTION FOR ASSET MANAGEMENT STBG LG URB 09/2021 8.190 MISC 8.190
PLANNING IN FFY 2022 & FFY 2023 1 FOR CITY OWNED LOCAL 09/2021 2.047 MISC 2.047
X77334 NON EAST RIVER BRIDGES, CITYWIDE
MISC
<Exempt>
AQC:A19 MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 10.237 0.000 0.000 10.237 0.000 0.000 0.000 0.000

81
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 4 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDOT DATA COLLECTION FOR ASSET MANAGEMENT STBG LG URB 09/2023 9.580 MISC 9.580
PLANNING IN FFY 2024 & 2025 FOR CITY OWNED NON LOCAL 09/2023 2.395 MISC 2.395
X77335 EAST RIVER BRIDGES, CITYWIDE
MISC
<Exempt>
AQC:A19 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 11.975 0.000 0.000 0.000 0.000 11.975 0.000 0.000

NYCDOT SAFE STEPS TO TRANSIT PHASE III, INCREASES TAP LG URBAN 08/2019 0.000 CONST 0.232
PEDESTRIAN SAFETY AND ACCESSIBILITY TO BUS AND LOCAL 08/2019 0.000 CONST 0.058
X77360 RAIL STATIONS BY UPGRADING SIDEWALKS, AND
SAFETY INSTALLING NEW CURB EXTENSIONS, MEDIAN TIP
<Exempt> EXTENSIONS, PEDESTRIAN REFUGE ISLANDS, AND
PEDESTRIAN SIGNALS AT THE FOLLOWING LOCATIONS:
PARK ROW AND BEEKMAN (MANHATTAN) & FLATBUSH
AVE AND UTICA (BROOKLYN)

AQC:C2 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 0.290 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT FT INDEPENDENCE ST & BROADWAY & ISHAM ST PED CMAQ 06/2019 0.000 DETLDES 0.478
IMPROVEMENTS INCREASE PEDESTRIAN SAFETY AND LOCAL 06/2019 0.000 DETLDES 0.119
X77367 ACCESSIBILITY BY UPGRADING SIDEWALKS, AND CMAQ 05/2020 1.911 CONST 1.911
BIKE/PED INSTALLING NEW CURB EXTENSIONS, MEDIAN TIP LOCAL 05/2020 0.478 CONST 0.478
<Exempt> EXTENSIONS, PEDESTRIAN REFUGE ISLANDS, AND
PEDESTRIAN SIGNALS AND BY BUILDING OUT
TEMPORARY CURB EXTENSIONS IN CONCRETE AT THE
FOLLOWING LOCATIONS: FT. INDEPENDENCE ST FROM
SEDGWICK AVE TO W238TH ST & BAILEY AVE FROM
W238TH ST TO VAN CORTLANDT PARK S IN THE BRONX
AND BROADWAY & ISHAM ST IN MANHATTAN

AQC:C2 MULTI TPC: $2-$4 M TOTAL 5YR COST : 2.389 0.597 2.389 0.000 0.000 0.000 0.000 0.000

NYCDOT INSTALL COUNTDOWN PEDESTRIAN SIGNALS (CPS) AT HSIP 05/2019 0.000 CONST 2.900
APPROXIMATELY 2,719 EXISTING SIGNALIZED LOCAL 05/2019 0.000 CONST 0.322
X77372 INTERSECTIONS CITYWIDE TO IMPROVE PEDESTRIAN
TRAFFIC SAFETY AND REDUCE PEDESTRIAN FATALITIES AND
<Exempt> INJURIES, IN LINE WITH NEW YORK STATE STRATEGIC
HIGHWAY SAFETY PLANS

AQC:A6 MULTI TPC: $2-$4 M TOTAL 5YR COST : 0.000 3.222 0.000 0.000 0.000 0.000 0.000 0.000

82
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 5 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDOT IMPLEMENT A TRAFFIC SIGNAL PRIORITY SYSTEM ON CMAQ 06/2019 0.000 MISC 3.500
SEVERAL SELECTED BUS SERVICE (SBS) ROUTES LOCAL 06/2019 0.000 MISC 0.389
X77374 THROUGH SIGNAL PRIORITY IN CONGESTED LOCAL 06/2019 0.000 MISC 4.911
MOBIL CORRIDORS TO REDUCE BUS TRAVEL TIME AND MAKE
<Non-Exempt> BUS SERVICE MORE RELIABLE ON THE FOLLOWING
LOCATIONS: BX6 SBS (155TH ST, 161ST ST, ELTON AVE,
163RD ST, ETC.); B82 SBS (BAY PARKWAY, KINGS HWY,
FLATLANDS AVE; PENNSYLVANIA AVE, ETC); B46 SBS
(UTICA AVE); BX12 SBS (207TH ST, FORDHAM ROAD,
PELHAM PKWY, ETC.) [ITS: PT09]

AQC:NON MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 8.800 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT BICYCLE NETWORK DEVELOPMENT LANE MARKING CMAQ 08/2019 0.000 DETLDES 2.506
CONSTRUCTION TO EXPAND THE PARTIALLY LOCAL 08/2019 0.000 DETLDES 0.626
X77375 IMPLEMENTED NETWORK BY ADDING 150 ADDITIONAL LOCAL 08/2020 2.236 CONINSP 2.236
BIKE/PED MILES CITYWIDE CMAQ 08/2020 8.320 CONST 8.320
<Exempt>
LOCAL 08/2020 2.080 CONST 2.080
LOCAL 08/2020 2.372 CONST 2.372
AQC:C2 MULTI TPC: $15-$25 M TOTAL 5YR COST : 15.008 3.132 15.008 0.000 0.000 0.000 0.000 0.000

NYCDOT BICYCLE NETWORK DEVELOPMENT LANE MARKING CMAQ 09/2021 2.080 DETLDES 2.080
CONSTRUCTION TO EXPAND THE PARTIALLY LOCAL 09/2021 0.520 DETLDES 0.520
X77377 IMPLEMENTED NETWORK BY ADDING 300 ADDITIONAL CMAQ 09/2022 9.000 CONST 9.000
BIKE/PED MILES CITYWIDE. THIS INCLUDES CONCRETE WORK LOCAL 09/2022 2.250 CONST 2.250
<Exempt> WHICH INVOLVES THE CONSTRUCTION OF NEW BIKE
LANES.

AQC:C2 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 13.850 0.000 0.000 2.600 11.250 0.000 0.000 0.000

NYCDOT BICYCLE NETWORK DEVELOPMENT LANE MARKING CMAQ 09/2023 2.250 DETLDES 2.250
CONSTRUCTION TO EXPAND THE PARTIALLY LOCAL 09/2023 0.563 DETLDES 0.563
X77379 IMPLEMENTED NETWORK BY ADDING 300 ADDITIONAL CMAQ 09/2024 9.740 CONST 9.740
BIKE/PED MILES CITYWIDE. THIS INCLUDES CONCRETE WORK LOCAL 09/2024 2.435 CONST 2.435
<Exempt> WHICH INVOLVES THE CONSTRUCTION OF NEW BIKE
LANES.

AQC:C2 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 14.988 0.000 0.000 0.000 0.000 2.813 12.175 0.000

NYCDOT DESIGN AND PROMOTIONAL ACTIVITIES ASSOCIATED CMAQ 09/2024 2.440 DETLDES 2.440
WITH THE BICYCLE NETWORK DEVELOPMENT LOCAL 09/2024 0.610 DETLDES 0.610
X77380 PROGRAM TO REDUCE CONGESTION AND IMPROVE
SAFETY CYCLING SAFETY ON THE NEW YORK CITY BICYCLE
<Exempt> NETWORK
AQC:C2 MULTI TPC: $2-$4 M TOTAL 5YR COST : 3.050 0.000 0.000 0.000 0.000 0.000 3.050 0.000

83
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 6 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDOT NYC CONGESTED CORRIDOR REDUCTION PROGRAM CMAQ 09/2023 3.510 DETLDES 3.510
WILL CONDUCT A PLANNING LEVEL TRAFFIC LOCAL 09/2023 0.877 DETLDES 0.877
X77381 OPERATIONS ANALYSIS OF THE CORRIDORS INCLUDING
SAFETY IDENTIFICATION OF OPERATIONAL DEFICIENCIES FOR
<Exempt> EXISTING AND FUTURE CONDITIONS AND DEVELOPING
A PLAN THAT WILL IMPROVE SAFETY AND PROMOTE
THE USE OF EFFICIENT TRAVEL MODES (BUS, BICYCLE,
WALKING, ETC.) TO IMPROVE MOBILITY, SAFETY, AND
THE QUALITY OF LIFE FOR ALL STREET USERS
THROUGHOUT NEW YORK CITY

AQC:C3 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.387 0.000 0.000 0.000 0.000 4.387 0.000 0.000

NYCDOT RETROFITTING OF MUNICIPAL ON-ROAD VEHICLES CMAQ 09/2020 1.820 MISC 1.820
WITH EMISSIONS CONTROL TECHNOLOGIES LOCAL 09/2020 0.455 MISC 0.455
X77392
MISC
<Exempt>
AQC:K1 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 2.275 0.000 2.275 0.000 0.000 0.000 0.000 0.000

NYCDOT PEDESTRIAN NETWORK DEVELOPMENT V PED CMAQ 01/2020 0.205 DETLDES 0.205
IMPROVEMENTS 2021 - INCREASE PEDESTRIAN SAFETY LOCAL 01/2020 0.068 DETLDES 0.068
X77393 AND ACCESSIBILITY BY UPGRADING SIDEWALKS, CURB CMAQ 04/2021 0.819 CONST 0.819
BIKE/PED EXTENSIONS OR PED REFUGE ISLANDS, ADA LOCAL 04/2021 0.273 CONST 0.273
<Exempt> COMPLIANT RAMPS AND PEDESTRIAN SIGNALS AT THE
FOLLOWING LOCATIONS: 14 ST & WASHINGTON ST
(MHTN); BAYSWATER PARK AT BEACH 35 ST (QNS); AND
3 AVE FROM 135 ST TO 138 ST (BX)

AQC:C2 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.365 0.000 0.273 1.092 0.000 0.000 0.000 0.000

NYCDOT PEDESTRIAN NETWORK DEVELOPMENT V PED CMAQ 01/2021 0.341 DETLDES 0.341
IMPROVEMENTS 2022 - INCREASE PEDESTRIAN SAFETY LOCAL 01/2021 0.085 DETLDES 0.085
X77394 AND ACCESSIBILITY BY UPGRADING SIDEWALKS, CURB CMAQ 04/2022 1.365 CONST 1.365
BIKE/PED EXTENSIONS OR PED REFUGE ISLANDS, ADA LOCAL 04/2022 0.342 CONST 0.342
<Exempt> COMPLIANT RAMPS AND PEDESTRIAN SIGNALS AT THE
FOLLOWING LOCATIONS: E 163RD ST AND BROOK AVE
(BX); BROADWAY, FORM CANAL ST TO 14TH ST (MHTN);
BOSTON RD AND VYSE AVE (BX); COOPER AVE AND 80TH
ST (QNS); FLATBUSH AVE, FOSTER AVE, BEDFORD AVE,
(BK)

AQC:C2 MULTI TPC: $2-$4 M TOTAL 5YR COST : 2.133 0.000 0.000 0.426 1.707 0.000 0.000 0.000

84
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 7 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDOT REIMBURSEMENT OF FUNDS SPENT ON PROJECT FTA 5324 07/2019 0.000 MISC 0.445
MANAGEMENT AND ADMINISTRATION OF SANDY LOCAL 07/2019 0.000 MISC 0.049
X77908 EMERGENCY REPAIR PROJECTS (CAT 1,2 & 3) WORK AND
TRANSIT ONGOING ADMINISTRATIVE FUNCTIONS,
<Exempt> D2013-SAND-015 & D2013-SAND-024
AQC:C15 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 0.494 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT CONDUCT PRELIMINARY FEASIBILITY STUDY TO FTA 5324 CR 08/2019 0.000 CONST 16.000
EVALUATE POTENTIAL LANDINGS AT HUNTERS POINT LOCAL 08/2019 0.000 CONST 5.333
X77913 SOUTH, E.34TH ST & BROOKLYN CRUISE TERMINALS. LOCAL 08/2019 0.000 CONST 16.000
TRANSIT DESIGN AND CONSTRUCT TWO NGV-COMPATIBLE FLEX FTA 5324 CR 08/2019 0.000 DETLDES 1.500
<Exempt> BARGES, TWO STANDARD BARGES AND POTENTIAL LOCAL 08/2019 0.000 DETLDES 0.500
UPGRADES TO TWO OTHER LANDINGS, D2013-RESL-015

AQC:B8 MULTI TPC: $32-$50 M TOTAL 5YR COST : 0.000 39.333 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT PROVIDE FOR UTILITIES SUPPORT TO MANAGE THE SDF 07/2019 0.000 MISC 2.700
JOINT TRANSPORTATION MANAGEMENT CENTER (JTMC)
X80559 ON A 24/7 BASIS TO MANAGE AND PROVIDE REAL TIME
MOBIL TRAFFIC CONDITIONS TO MOTORISTS WITHIN CITY OF
<Exempt> NEW YORK FOR YEAR 2017-2021
AQC:A7 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 2.700 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT PROVIDE FOR UTILITIES SUPPORT TO MANAGE THE SDF 07/2019 0.000 MISC 2.700
JOINT TRANSPORTATION MANAGEMENT CENTER (JTMC) SDF 07/2020 2.750 MISC 2.750
X80565 ON A 24/7 BASIS TO MANAGE AND PROVIDE REAL TIME
TRAFFIC TRAFFIC CONDITIONS TO MOTORISTS WITHIN CITY OF
<Exempt> NEW YORK FOR 2022 - 2025
AQC:A7 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 2.750 2.700 2.750 0.000 0.000 0.000 0.000 0.000

NYSDOT ITS OPERATIONAL SUPPORT FOR STATE FISCAL YEAR NHPP 01/2019 0.000 OPER 0.915
2016-2019 TO MANAGE THE JOINT TRANSPORTATION SDF 01/2019 0.000 OPER 0.229
X80576 MANAGEMENT CENTER (JTMC) ON A 24/7 BASIS BY
TRAFFIC PROVIDING REAL TIME TRAFFIC CONDITION TO
<Exempt> MOTORISTS FOR THE CITY OF NEW YORK [ITS: TM07]

AQC:A7 MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 0.000 1.144 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT ITS OPERATIONAL SUPPORT FOR STATE FISCAL YEAR NHPP 03/2019 0.000 OPER 11.038
2019-2021 TO MANAGE THE JOINT TRANSPORTATION SDF 03/2019 0.000 OPER 2.760
X80577 MANAGEMENT CENTER (JTMC) ON A 24/7 BASIS BY
TRAFFIC PROVIDING REAL TIME TRAFFIC CONDITION TO
<Exempt> MOTORISTS FOR THE CITY OF NEW YORK

AQC:A7 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 0.000 13.798 0.000 0.000 0.000 0.000 0.000 0.000

85
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 8 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PROVIDE MAINTENANCE AND FIELD SUPPORT FOR THE STBG LG URB 03/2019 0.000 CONINSP 1.440
INTELLIGENT TRANSPORTATION SYSTEM TO MANAGE SDF 03/2019 0.000 CONINSP 0.360
X80600 TRAFFIC ON THE STATE HIGHWAY SYSTEM IN NEW STBG LG URB 03/2019 0.000 CONST 6.871
TRAFFIC YORK CITY [ITS: TM01 TM06 TM07] SDF 03/2019 0.000 CONST 1.718
<Exempt>
SDF 08/2019 0.000 OPER 4.500
AQC:A7 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 0.000 14.889 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT PROVIDE MAINTENANCE AND FIELD SUPPORT FOR THE STBG LG URB 03/2021 1.200 CONINSP 1.200
INTELLIGENT TRANSPORTATION SYSTEM TO MANAGE SDF 03/2021 0.300 CONINSP 0.300
X80601 TRAFFIC ON THE STATE HIGHWAY SYSTEM IN NEW STBG LG URB 03/2021 6.400 CONST 6.400
TRAFFIC YORK CITY [ITS: TM01 TM06 TM07] SDF 03/2021 1.600 CONST 1.600
<Exempt>
SDF 01/2022 4.000 OPER 4.000
AQC:A7 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 13.500 0.000 0.000 9.500 4.000 0.000 0.000 0.000

NYSDOT HIGHWAY EMERGENCY LOCAL PATROL (HELP) SFY SDF 02/2022 7.560 OPER 7.560
2022-2027 FOR INCIDENT MANAGEMENT ALONG THE
X80628 LIE, VWE, HRP, & NEW ENGLAND THRUWAY FOR TOTAL
TRAFFIC OF 26 CENTRAL LANE MILES IN QUEENS & THE BRONX
<Exempt> [ITS: PS08]
AQC:A2 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 7.560 0.000 0.000 0.000 7.560 0.000 0.000 0.000

NYSDOT/NYCDOT COORDINATED INTELLIGENT TRANSPORTATION STBG LG URB 10/2018 0.000 MISC 0.400
SYSTEMS DEPLOYMENT IN NEW YORK CITY (CIDNY) IS LOCAL 10/2018 0.000 MISC 0.100
X80670 A MULTI-YEAR RESEARCH, DEVELOPMENT AND
TRAFFIC TRAINING PROJECT FOCUSING ON THREE PROGRAM
<Exempt> AREAS: CONGESTION MANAGEMENT, EMERGENCY
MANAGEMENT AND NTCIP/ITS STANDARDS TESTING.

AQC:C3 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 0.500 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT COORDINATED INTELLIGENT TRANSPORTATION STBG LG URB 09/2021 0.440 MISC 0.440
SYSTEMS DEPLOYMENT IN NEW YORK CITY (CIDNY) IS LOCAL 09/2021 0.110 MISC 0.110
X80671 A MULTI-YEAR RESEARCH, DEVELOPMENT AND
TRAFFIC TRAINING PROJECT FOCUSING ON THREE PROGRAM
<Exempt> AREAS: CONGESTION MANAGEMENT, EMERGENCY
MANAGEMENT AND NTCIP/ITS STANDARDS TESTING.

AQC:C3 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.550 0.000 0.000 0.550 0.000 0.000 0.000 0.000

86
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 9 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDOT COORDINATED INTELLIGENT TRANSPORTATION STBG LG URB 09/2023 0.470 MISC 0.470
SYSTEMS DEPLOYMENT IN NEW YORK CITY (CIDNY) IS LOCAL 09/2023 0.117 MISC 0.117
X80672 A MULTI-YEAR RESEARCH, DEVELOPMENT AND
TRAFFIC TRAINING PROJECT FOCUSING ON THREE PROGRAM
<Exempt> AREAS: CONGESTION MANAGEMENT, EMERGENCY
MANAGEMENT AND NTCIP/ITS STANDARDS TESTING.

AQC:C3 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.587 0.000 0.000 0.000 0.000 0.587 0.000 0.000

NYSDOT INTELLIGENT TRANSPORTATION SYSTEM (ITS) NHPP 10/2021 13.912 MISC 13.912
OPERATIONS FOR FY 2022-2024 AT REGION 11 TO SDF 10/2021 3.478 MISC 3.478
X80702 PROVIDE CONSULTANT STAFF SUPPORT TO MANAGE
TRAFFIC THE JOINT TRANSPORTATION MANAGEMENT CENTER
<Exempt> (JTMC) ON A 24/7 BASIS TO PROVIDE REAL TIME
TRAFFIC CONDITIONS TO MOTORISTS WITHIN NEW
YORK CITY

AQC:A7 MULTI TPC: $15-$25 M TOTAL 5YR COST : 17.390 0.000 0.000 0.000 17.390 0.000 0.000 0.000

NYCDOT IMPLEMENT OPERATIONAL SUPPORT TO TRAFFIC NHPP 07/2019 0.000 OPER 3.000
MANAGEMENT CENTER FACILITY FOR COMPUTERIZED LOCAL 07/2019 0.000 OPER 0.750
X80704 SIGNALIZATION OF THE FIVE BOROUGHS IN NEW YORK STBG LG URB 07/2019 0.000 OPER 33.250
TRAFFIC CITY FOR FISCAL YEAR 2020 [ITS: TM06 & TM07] LOCAL 07/2019 0.000 OPER 8.313
<Exempt>
LOCAL 07/2019 0.000 OPER 21.622
AQC:A7 MULTI TPC: $50-$85 M TOTAL 5YR COST : 0.000 66.935 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT IMPLEMENT OPERATIONAL SUPPORT TO TRAFFIC NHPP 07/2020 3.120 OPER 3.120
MANAGEMENT CENTER FACILITY FOR COMPUTERIZED LOCAL 07/2020 0.780 OPER 0.780
X80705 SIGNALIZATION OF THE FIVE BOROUGHS IN NEW YORK STBG LG URB 07/2020 34.580 OPER 34.580
TRAFFIC CITY FOR FISCAL YEAR 2021 [ITS: TM06 & TM07]
<Exempt> LOCAL 07/2020 8.645 OPER 8.645
LOCAL 07/2020 19.810 OPER 19.810
AQC:A7 MULTI TPC: $50-$85 M TOTAL 5YR COST : 66.935 0.000 66.935 0.000 0.000 0.000 0.000 0.000

NYCDOT IMPLEMENT OPERATIONAL SUPPORT TO TRAFFIC NHPP 07/2021 3.250 OPER 3.250
MANAGEMENT CENTER FACILITY FOR COMPUTERIZED LOCAL 07/2021 0.813 OPER 0.813
X80706 SIGNALIZATION OF THE FIVE BOROUGHS IN NEW YORK STBG LG URB 07/2021 35.970 OPER 35.970
TRAFFIC CITY FOR FISCAL YEAR 2022 [ITS: TM06 & TM07] LOCAL 07/2021 8.993 OPER 8.993
<Exempt>
LOCAL 07/2021 16.909 OPER 16.909
AQC:A7 MULTI TPC: $50-$85 M TOTAL 5YR COST : 65.935 0.000 0.000 65.935 0.000 0.000 0.000 0.000

NYCDOT IMPLEMENT OPERATIONAL SUPPORT TO TRAFFIC NHPP 09/2022 3.380 OPER 3.380
MANAGEMENT CENTER FACILITY FOR COMPUTERIZED LOCAL 09/2022 0.845 OPER 0.845
X80707 SIGNALIZATION OF THE FIVE BOROUGHS IN NEW YORK LOCAL 09/2022 16.284 OPER 16.284
TRAFFIC CITY FOR FISCAL YEAR 2023 [ITS: TM06 & TM07] STBG LG URB 09/2022 37.141 OPER 37.141
<Exempt>
LOCAL 09/2022 9.285 OPER 9.285
AQC:A7 MULTI TPC: $50-$85 M TOTAL 5YR COST : 66.935 0.000 0.000 0.000 66.935 0.000 0.000 0.000

87
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 10 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDOT IMPLEMENT OPERATIONAL SUPPORT TO TRAFFIC NHPP 09/2023 3.510 OPER 3.510
MANAGEMENT CENTER FACILITY FOR COMPUTERIZED LOCAL 09/2023 0.877 OPER 0.877
X80708 SIGNALIZATION OF THE FIVE BOROUGHS IN NEW YORK LOCAL 09/2023 13.923 OPER 13.923
TRAFFIC CITY FOR FISCAL YEAR 2024 [ITS: TM06 & TM07] STBG LG URB 09/2023 38.900 OPER 38.900
<Exempt>
LOCAL 09/2023 9.725 OPER 9.725
AQC:A7 MULTI TPC: $50-$85 M TOTAL 5YR COST : 66.935 0.000 0.000 0.000 0.000 66.935 0.000 0.000

NYCDOT IMPLEMENT OPERATIONAL SUPPORT TO TRAFFIC NHPP 07/2024 10.173 MISC 10.173
MANAGEMENT CENTER FACILITY FOR COMPUTERIZED LOCAL 07/2024 2.543 MISC 2.543
X80709 SIGNALIZATION OF THE FIVE BOROUGHS IN NEW YORK LOCAL 07/2024 11.803 MISC 11.803
TRAFFIC CITY FOR FISCAL YEAR 2025 [ITS: TM06 & TM07] STBG LG URB 07/2024 33.933 MISC 33.933
<Exempt>
LOCAL 07/2024 8.483 MISC 8.483
AQC:A7 MULTI TPC: $50-$85 M TOTAL 5YR COST : 66.935 0.000 0.000 0.000 0.000 0.000 66.935 0.000

NYSDOT SAFETY IMPROVEMENTS AT MULTIPLE HIGH ACCIDENT HSIP 05/2019 0.000 CONINSP 0.360
SPOT LOCATIONS ON VARIOUS STATE OWNED, FEDERAL SDF 05/2019 0.000 CONINSP 0.040
X80728 AID ELIGIBLE HIGHWAYS WITHIN BRONX, KINGS AND HSIP 05/2019 0.000 CONST 2.700
SAFETY QUEENS TO IMPROVE SAFETY TO INCLUDE SDF 05/2019 0.000 CONST 0.300
<Exempt> INSTALLING/MODIFYING PAVEMENT MARKINGS & SDF 11/2018 0.000 DETLDES 0.250
SIGNS, INSTALLING GUIDE RAILS, IMPACT
SDF 11/2018 0.000 PRELDES 0.100
ATTENUATORS, END TERMINALS AND REMOVING
NON-STANDARD CURBS.

AQC:A6 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 3.750 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT PROVIDE MAINTENANCE AND FIELD SUPPORT FOR THE SDF 06/2023 0.300 DETLDES 0.300
INTELLIGENT TRANSPORTATION SYSTEM TO KEEP IT STBG LG URB 01/2024 1.200 CONINSP 1.200
X80729 OPERATIONAL ON THE STATE HIGHWAY SYSTEM IN NEW SDF 01/2024 0.300 CONINSP 0.300
TRAFFIC YORK CITY FIVE BOROUGHS [ITS: TM01 TM06 TM07] STBG LG URB 01/2024 6.400 CONST 6.400
<Exempt>
SDF 01/2024 1.600 CONST 1.600
SDF 01/2024 0.200 CONST 0.200
STBG LG URB 01/2024 3.200 OPER 3.200
SDF 01/2024 0.800 OPER 0.800
AQC:A7 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 14.000 0.000 0.000 0.000 0.000 0.300 13.700 0.000

NYSDOT STUDY OF PRIORITY INVESTIGATION LOCATIONS (PIL) HSIP 06/2020 2.808 SCOPING 2.808
ON VARIOUS SDF 06/2020 0.312 SCOPING 0.312
X80730 STATE HIGHWAYS IN THE CITY OF NEW YORK TO
STUDY ADDRESS SAFETY (07/01/20-07/01/23)
<Exempt>
AQC:C3 MULTI TPC: $2-$4 M TOTAL 5YR COST : 3.120 0.000 3.120 0.000 0.000 0.000 0.000 0.000

88
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 11 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDOT INSTALLATION OF PAVEMENT SAFETY MARKINGS ON STBG LG URB 09/2021 1.090 CONST 1.090
INTERSTATE EXPRESSWAYS AND PARKWAYS ON THE LOCAL 09/2021 0.272 CONST 0.272
X80731 FEDERAL HIGHWAY SYSTEM IN BRONX, KINGS, NEW
SAFETY YORK, QUEENS AND RICHMOND COUNTIES TO
<Exempt> ENHANCE AND MAINTAIN SAFETY (SEP-14)
AQC:A6 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.362 0.000 0.000 1.362 0.000 0.000 0.000 0.000

NYCDOT INSTALLATION OF PAVEMENT SAFETY MARKINGS ON STBG LG URB 09/2023 1.170 CONST 1.170
INTERSTATE EXPRESSWAYS AND PARKWAYS ON THE LOCAL 09/2023 0.293 CONST 0.293
X80732 FEDERAL HIGHWAY SYSTEM CITYWIDE TO ENHANCE
SAFETY AND MAINTAIN SAFETY (SEP-14)
<Exempt>
AQC:A6 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.463 0.000 0.000 0.000 0.000 1.463 0.000 0.000

NYCDOT REPLACE KENNEDY AND BARBERI-CLASS FERRIES, FTA 5307 07/2019 0.000 CONST 5.700
STATEN ISLAND THROUGH THE CONSTRUCTION OF LOCAL 07/2019 0.000 CONST 0.713
X82295 THREE NEW GENERATION VESSELS FEATURING FOUR STATE 07/2019 0.000 CONST 0.712
TRANSIT CYCLOIDAL DRIVES PER FERRY WITH MORE ADVANCED
<Exempt> PROPULSION AND STEERING CONTROL SYSTEMS TO
AUGMENT THE RESILIENCE OF SIF SYSTEM,
D2014-PFGP-002

AQC:B10 MULTI TPC:$298.8-$368.2 M TOTAL 5YR COST : 0.000 7.125 0.000 0.000 0.000 0.000 0.000 0.000

NYCDOT PREVENTIVE MAINTENANCE OF STATEN ISLAND FERRY FTA 5307 06/2019 0.000 MISC 8.483
VESSELS AND FACILITIES FROM WHITEHALL IN LOCAL 06/2019 0.000 MISC 13.396
X82344 MANHATTAN TO ST. GEORGE IN STATEN ISLAND TO LOCAL 06/2019 0.000 MISC 1.061
TRANSIT MAINTAIN A STATE OF GOOD REPAIR STATE 06/2019 0.000 MISC 1.060
<Exempt>
FTA 5307 07/2021 12.800 MISC 12.800
LOCAL 07/2021 11.000 MISC 11.000
LOCAL 07/2021 1.600 MISC 1.600
STATE 07/2021 1.600 MISC 1.600
FTA 5307 07/2023 12.800 MISC 12.800
LOCAL 07/2023 11.000 MISC 11.000
LOCAL 07/2023 1.600 MISC 1.600
STATE 07/2023 1.600 MISC 1.600
FTA 5307 07/2025 0.000 MISC 12.800
LOCAL 07/2025 0.000 MISC 11.000
LOCAL 07/2025 0.000 MISC 1.600
STATE 07/2025 0.000 MISC 1.600
AQC:B3 MULTI TPC: $100-$225 M TOTAL 5YR COST : 54.000 24.000 0.000 27.000 0.000 27.000 0.000 27.000

89
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 12 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDOT BLOCK FUND FOR FUTURE NYCDOT TRANSIT PROJECTS FTA 5339 01/2019 0.000 MISC 14.330
TO BE IDENTIFIED THROUGH TIP ACTIONS (SEE LOCAL 01/2019 0.000 MISC 3.582
X82351 U80303XX FOR MTA-BUS BLOCK) FTA 5307 01/2020 7.542 MISC 7.542
MISC
LOCAL 01/2020 1.885 MISC 1.885
<Exempt>
FTA 5307 01/2021 7.693 MISC 7.693
LOCAL 01/2021 1.923 MISC 1.923
FTA 5307 01/2022 4.579 MISC 4.579
LOCAL 01/2022 1.145 MISC 1.145
FTA 5307 01/2024 8.163 MISC 8.163
LOCAL 01/2024 2.041 MISC 2.041
AQC:J1 MULTI TPC: $50-$85 M TOTAL 5YR COST : 34.971 17.912 9.427 9.616 5.724 0.000 10.204 0.000

NYCDOT DESIGN, BUILD AND IMPLEMENT COMPREHENSIVE FTA 5324 CR 07/2019 0.000 CONST 5.625
FLOOD MITIGATION & RESILIENCY STRATEGY ACROSS LOCAL 07/2019 0.000 CONST 13.835
X82358 ALL STATEN ISLAND FERRY FACILITIES & ALL RELATED LOCAL 07/2019 0.000 DETLDES 2.096
TRANSIT PIERS, LANDINGS, DOCKING FACILITIES & ASSOCIATED LOCAL 07/2019 0.000 PRELDES 0.899
<Exempt> CRITICAL SYSTEMS LOCATED THEREIN TO PROTECT
ALL ASSETS D2013-RESL-015

AQC:B8 MULTI TPC: $21-$31 M TOTAL 5YR COST : 0.000 22.455 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT LANDSCAPING REQUIREMENTS INCLUDING SOIL SDF 09/2019 0.000 CONINSP 0.750
RESTORATION,TREE TRANSPLANTING, SIDEWALK, WALL SDF 09/2019 0.000 CONST 4.200
XM1526 AND FENCE WORK, AT VARIOUS LOCATIONS SDF 04/2019 0.000 DETLDES 0.250
MISC THROUGHOUT THE FIVE COUNTIES OF NEW YORK CITY
<Exempt>

AQC:C11 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 5.200 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT SIGN AND STRUCTURE REPAIR/REPLACEMENT TO PIT BOND 09/2019 0.000 DETLDES 1.200
IMPROVE SAFETY ON STATE HIGHWAY SYSTEM, SDF 02/2021 0.700 CONINSP 0.700
XM1542 CITYWIDE PIT BOND 02/2021 5.300 CONST 5.300
CONST
SDF 02/2021 7.900 CONST 7.900
<Exempt>
AQC:C13 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 13.900 1.200 0.000 13.900 0.000 0.000 0.000 0.000

NYSDOT PREVENTATIVE MAINTENANCE - REGIONAL DRAINAGE SDF 03/2019 0.000 CONINSP 0.850
CLEANING ON HIGHWAYS AND BRIDGES TO ENHANCE SDF 03/2019 0.000 CONST 4.556
XM1701 SAFETY AND SUSTAINABILITY ON STATE - OWNED
BRIDGE BRIDGES & HIGHWAYS IN NEW YORK CITY, CITYWIDE
<Exempt>

AQC:A19 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 5.406 0.000 0.000 0.000 0.000 0.000 0.000

90
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 13 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT ON-DEMAND MAINTENANCE - WHERE & WHEN BRIDGE SDF 11/2018 0.000 CONINSP 0.690
STEEL REPAIRS TO ADDRESS FLAGS CONDITIONS AND
XM1721 OTHER DEFICIENCIES ON BRIDGES AND TO MAINTAIN
BRIDGE STATE OF GOOD REPAIR AND EXTEND THE SERVICE LIFE
<Exempt> OF STATE OWNED BRIDGES, CITYWIDE, IN NEW YORK
CITY

AQC:A19 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 0.000 0.690 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT BUILD CURB RAMPS, CROSSWALKS AND SIDEWALKS AT SDF 11/2018 0.000 CONINSP 0.200
VARIOUS LOCATIONS IN MANHATTAN, BROOKLYN & HPP 11/2018 0.000 CONST 1.440
XM1750 STATEN ISLAND AS REQUIRED BY ADA TO BE BROUGHT SDF 11/2018 0.000 CONST 0.360
BIKE/PED UP TO ACCESSIBLE STANDARDS, TRANSFERRED
<Exempt> EARMARKS: NY288 (PROGRAM CODE RPS9)

AQC:A10 MULTI TPC: $2-$4 M TOTAL 5YR COST : 0.000 2.000 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT LANDSCAPING REQUIREMENTS INCLUDING SOIL SDF 10/2018 0.000 CONINSP 0.600
RESTORATION, TREE TRANSPLANTING, SIDEWALK, SDF 10/2018 0.000 CONST 1.734
XM1825 WALL AND FENCE WORK, TO MITIGATE CONSTRUCTION
MISC IMPACTS AND/OR BEAUTIFY ROADSIDE ENVIRONMENT
<Exempt> ON STATE HIGHWAY SYSTEM, CITYWIDE, IN NEW YORK
CITY

AQC:C11 MULTI TPC: $2-$4 M TOTAL 5YR COST : 0.000 2.334 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT PREVENTIVE MAINTENANCE OF PAVEMENT ON THE SDF 03/2019 0.000 CONINSP 0.159
STATE HIGHWAY SYSTEM TO EXTEND SERVICE LIFE, BY SDF 03/2019 0.000 CONST 1.060
XM1830 FILLING & SEALING CRACKS AND JOINTS. IN NEW
R&P YORK CITY, CITYWIDE.
<Exempt>
AQC:A10 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 1.219 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT WHERE & WHEN NON-STRUCTURAL REPAIRS ON STATE SDF 08/2019 0.000 CONINSP 0.810
BRIDGES AND HIGHWAYS, INCLUDING GUIDERAIL, SDF 08/2019 0.000 CONST 5.400
XM1845 BARRIER, FENCING, SIGNS, AND OTHER ROADSIDE
SAFETY APPURTENANCES TO ADDRESS SAFETY AND EXTEND
<Exempt> SERVICE LIFE, CITYWIDE IN NEW YORK CITY

AQC:A13 MULTI TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 6.210 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT PREVENTIVE MAINTENANCE - BRIDGE REPAIRS OF SDF 03/2019 0.000 CONINSP 1.700
VARIOUS ELEMENTS TO EXTEND THE SERVICE LIFE OF SDF 03/2019 0.000 CONST 11.000
XM1851 THE STRUCTURES, CITYWIDE, IN NEW YORK CITY
BRIDGE
<Exempt>
AQC:A19 MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 0.000 12.700 0.000 0.000 0.000 0.000 0.000 0.000

91
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 14 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PREVENTIVE AND CORRECTIVE NHPP 02/2019 0.000 CONINSP 0.480


MAINTENANCE - BRIDGE EXPANSION JOINTS SDF 02/2019 0.000 CONINSP 0.120
XM1855 RESEALING/REPAIRS TO EXTEND SERVICE LIFE OF SDF 02/2019 0.000 CONINSP 2.120
BRIDGE BRIDGES ON STATE HIGHWAY SYSTEM, CITYWIDE, IN NHPP 02/2019 0.000 CONST 5.280
<Exempt> NEW YORK CITY SDF 02/2019 0.000 CONST 1.320
SDF 02/2019 0.000 CONST 11.876
AQC:A19 MULTI TPC: $26-$40 M TOTAL 5YR COST : 0.000 21.196 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT MAINTENANCE REPAIR AND PREVENTIVE SDF 12/2018 0.000 CONINSP 1.000
MAINTENANCE OF VARIOUS ELEMENTS ON RETAINING SDF 12/2018 0.000 CONST 13.279
XM1860 WALLS TO ENHANCE SAFETY ON THE STATE HIGHWAY
R&P SYSTEM, CITYWIDE, IN NEW YORK CITY.
<Exempt>

AQC:A2 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 0.000 14.279 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT PREVENTIVE ROUTINE ROADSIDE MAINTENANCE TO SDF 12/2018 0.000 MISC 7.600
ADDRESS DEFICIENCIES ON STATE HIGHWAY SYSTEM,
XM1870 CITYWIDE, IN NEW YORK CITY
R&P
<Exempt>
AQC:A10 MULTI TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 7.600 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT PREVENTATIVE MAINTENANCE - REGIONAL DRAINAGE SDF 12/2018 0.000 DETLDES 0.106
CLEANING ON HIGHWAYS AND BRIDGES TO ENHANCE SDF 12/2018 0.000 PRELDES 0.106
XM1901 SAFETY AND SUSTAINABILITY ON STATE - OWNED SDF 02/2020 0.972 CONINSP 0.972
BRIDGE BRIDGES & HIGHWAYS IN NEW YORK CITY, CITYWIDE SDF 02/2020 7.560 CONST 7.560
<Exempt>

AQC:A19 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 8.532 0.212 8.532 0.000 0.000 0.000 0.000 0.000

NYSDOT ON-DEMAND MAINTENANCE - WHERE & WHEN BRIDGE SDF 12/2018 0.000 CONINSP 1.700
STEEL REPAIRS TO ADDRESS FLAGS CONDITIONS AND SDF 12/2018 0.000 CONST 1.000
XM1921 OTHER DEFICIENCIES ON BRIDGES AND TO MAINTAIN SDF 12/2018 0.000 CONST 10.556
BRIDGE STATE OF GOOD REPAIR AND EXTEND THE SERVICE LIFE
<Exempt> OF STATE OWNED BRIDGES, CITYWIDE, IN NEW YORK
CITY

AQC:A19 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 0.000 13.256 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT ON-DEMAND MAINTENANCE - WHERE & WHEN SDF 12/2018 0.000 CONINSP 3.000
EMERGENCY REPAIR TO ADDRESS NON -STRUCTURAL SDF 12/2018 0.000 CONST 28.680
XM1922 CONDITION OBSERVATION (NSCO) FOUND ON STATE
SAFETY OWNED BRIDGES AND HIGHWAYS, CITYWIDE, IN NEW
<Exempt> YORK CITY
AQC:A19 MULTI TPC: $26-$40 M TOTAL 5YR COST : 0.000 31.680 0.000 0.000 0.000 0.000 0.000 0.000

92
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 15 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PREVENTIVE MAINTENANCE OF PAVEMENT ON THE SDF 12/2018 0.000 DETLDES 0.050
STATE HIGHWAY SYSTEM TO EXTEND SERVICE LIFE, BY SDF 03/2020 0.300 CONINSP 0.300
XM1930 FILLING & SEALING CRACKS AND JOINTS CITYWIDE SDF 03/2020 1.500 CONST 1.500
R&P
<Exempt>
AQC:A10 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.800 0.050 1.800 0.000 0.000 0.000 0.000 0.000

NYSDOT PURCHASE OF IMPACT ATTENUATORS SPARE PARTS FOR SDF 04/2019 0.000 MISC 1.620
EMERGENCY REPAIRS TO ADDRESS SAFETY ON STATE
XM1940 HIGHWAY SYSTEM, IN NEW YORK CITY, CITYWIDE.
SAFETY
<Exempt>
AQC:A9 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 1.620 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT MAINTENANCE REPAIR OF ASPHALT PAVEMENT TO SDF 01/2019 0.000 DETLDES 0.200
EXTEND THE SERVICE LIFE OF STATE HIGHWAY SYSTEM SDF 02/2020 2.000 CONINSP 2.000
XM1948 AT VARIOUS LOCATIONS IN NEW YORK CITY SDF 12/2019 16.100 CONST 16.100
R&P
PIT BOND 12/2019 6.000 CONST 6.000
<Exempt>
AQC:A10 MULTI TPC: $21-$31 M TOTAL 5YR COST : 24.100 0.200 24.100 0.000 0.000 0.000 0.000 0.000

NYSDOT MAINTENANCE REPAIR OF CONCRETE PAVEMENT TO SDF 06/2019 0.000 CONINSP 1.000
EXTEND THE SERVICE LIFE ON STATE HIGHWAY PIT BOND 06/2019 0.000 CONST 5.100
XM1949 SYSTEM, CITYWIDE, IN NEW YORK CITY. SDF 06/2019 0.000 CONST 2.000
R&P
<Exempt>
AQC:A10 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 8.100 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT REPLACE SIGN PANELS ON STATE HIGHWAYS, TO SDF 01/2020 0.300 CONINSP 0.300
PROVIDE ADEQUATE RETRO-REFLECTIVITY FOR NIGHT SDF 01/2020 3.000 CONST 3.000
XM1965 TIME VISIBILITY IN THE BRONX, KINGS, QUEENS, & SDF 01/2020 0.050 CONST 0.050
SAFETY RICHMOND COUNTIES
<Exempt>
AQC:C13 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.350 0.000 3.350 0.000 0.000 0.000 0.000 0.000

NYSDOT PREVENTIVE ROUTINE ROADSIDE MAINTENANCE TO SDF 12/2019 8.900 MISC 8.900
ADDRESS DEFICIENCIES ON STATE HIGHWAY SYSTEM,
XM1970 CITYWIDE, IN NEW YORK CITY
R&P
<Exempt>
AQC:A10 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 8.900 0.000 8.900 0.000 0.000 0.000 0.000 0.000

93
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 16 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PREVENTIVE MAINTENANCE - REGIONAL BRIDGE SDF 08/2019 0.000 PRELDES 0.050
WASHING TO EXTEND LIFE CYCLE ON STATE-OWNED STBG LG URB 09/2020 0.480 CONINSP 0.480
XM2002 BRIDGES CITYWIDE, IN NEW YORK CITY ON STATE SDF 09/2020 0.120 CONINSP 0.120
BRIDGE HIGHWAY SYSTEM STBG LG URB 09/2020 3.200 CONST 3.200
<Exempt>
SDF 09/2020 0.800 CONST 0.800
SDF 11/2019 0.100 DETLDES 0.100
AQC:A19 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 4.700 0.050 4.700 0.000 0.000 0.000 0.000 0.000

NYSDOT ON-DEMAND MAINTENANCE - WHERE & WHEN SDF 01/2019 0.000 DETLDES 0.100
EMERGENCY BRIDGE REPAIRS ON STATE HIGHWAY SDF 10/2019 3.000 CONINSP 3.000
XM2020 SYSTEM TO ADDRESS SAFETY CONCERNS AT VARIOUS SDF 10/2019 20.000 CONST 20.000
BRIDGE LOCATIONS IN NEW YORK CITY
<Exempt>
AQC:A19 MULTI TPC: $21-$31 M TOTAL 5YR COST : 23.000 0.100 23.000 0.000 0.000 0.000 0.000 0.000

NYSDOT PREVENTIVE MAINTENANCE OF PAVEMENT ON THE SDF 02/2021 0.165 CONINSP 0.165
STATE HIGHWAY SYSTEM TO EXTEND SERVICE LIFE, BY SDF 02/2021 1.100 CONST 1.100
XM2030 FILLING & SEALING CRACKS AND JOINTS. IN NEW SDF 07/2021 0.055 DETLDES 0.055
R&P YORK CITY, CITYWIDE.
<Exempt>
AQC:A10 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.320 0.000 0.000 1.320 0.000 0.000 0.000 0.000

NYSDOT PURCHASE OF IMPACT ATTENUATORS SPARE PARTS FOR SDF 04/2020 1.650 MISC 1.650
EMERGENCY REPAIRS TO ADDRESS SAFETY ON STATE
XM2040 HIGHWAY SYSTEM, IN NEW YORK CITY, CITYWIDE.
SAFETY
<Exempt>
AQC:A9 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.650 0.000 1.650 0.000 0.000 0.000 0.000 0.000

NYSDOT WHERE & WHEN NON-STRUCTURAL REPAIRS ON STATE SDF 11/2018 0.000 DETLDES 0.100
BRIDGES AND HIGHWAYS, INCLUDING GUIDERAIL, SDF 01/2020 1.500 CONINSP 1.500
XM2045 BARRIER, FENCING, SIGNS, AND OTHER ROADSIDE SDF 01/2020 8.000 CONST 8.000
SAFETY APPURTENANCES TO ADDRESS SAFETY AND EXTEND
<Exempt> SERVICE LIFE, CITYWIDE IN NEW YORK CITY

AQC:A9 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 9.500 0.100 9.500 0.000 0.000 0.000 0.000 0.000

NYSDOT MAINTENANCE REPAIR OR RESURFACING OF PAVEMENT SDF 08/2019 0.000 DETLDES 0.100
TO EXTEND THE SERVICE LIFE OF THE PAVEMENT ON SDF 01/2021 2.000 CONINSP 2.000
XM2048 STATE HIGHWAY SYSTEM AT VARIOUS LOCATIONS IN SDF 01/2021 16.250 CONST 16.250
R&P NEW YORK CITY
<Exempt>
AQC:A10 MULTI TPC: $15-$25 M TOTAL 5YR COST : 18.250 0.100 0.000 18.250 0.000 0.000 0.000 0.000

94
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 17 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT MAINTENANCE REPAIR OF CONCRETE PAVEMENT TO SDF 04/2020 0.102 DETLDES 0.102
EXTEND THE SERVICE LIFE ON STATE HIGHWAY SDF 03/2021 0.714 CONINSP 0.714
XM2049 SYSTEM, CITYWIDE, IN NEW YORK CITY. SDF 04/2021 3.000 CONST 3.000
R&P
<Exempt>
AQC:A10 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.816 0.000 0.102 3.714 0.000 0.000 0.000 0.000

NYSDOT BUILD CURB RAMPS, CROSSWALKS AND SIDEWALKS IN SDF 08/2019 0.000 DETLDES 0.150
NEW YORK CITY, CITYWIDE AS MANDATED BY 28 CFR SDF 12/2020 0.204 CONINSP 0.204
XM2050 35.150 TO BE INCLUDED IN THE NYSDOT ADA SDF 12/2020 1.632 CONST 1.632
BRIDGE TRANSITION PLAN. NON-ACCESSIBLE ASSETS
<Exempt> IDENTIFIED WILL BE BROUGHT UP TO ACCESSIBLE
STANDARDS

AQC:A10 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.836 0.150 0.000 1.836 0.000 0.000 0.000 0.000

NYSDOT PREVENTIVE MAINTENANCE - BRIDGE REPAIRS OF SDF 12/2019 0.500 DETLDES 0.500
VARIOUS ELEMENTS TO EXTEND THE SERVICE LIFE OF SDF 03/2021 3.060 CONINSP 3.060
XM2051 THE STRUCTURES, CITYWIDE, IN NEW YORK CITY SDF 03/2021 20.000 CONST 20.000
BRIDGE
<Exempt>
AQC:A19 MULTI TPC: $21-$31 M TOTAL 5YR COST : 23.560 0.000 0.500 23.060 0.000 0.000 0.000 0.000

NYSDOT PREVENTIVE AND CORRECTIVE SDF 04/2019 0.000 DETLDES 0.500


MAINTENANCE - BRIDGE EXPANSION JOINTS NHPP 11/2020 1.200 CONINSP 1.200
XM2055 RESEALING/REPAIRS TO EXTEND SERVICE LIFE OF SDF 11/2020 0.300 CONINSP 0.300
BRIDGE BRIDGES ON STATE HIGHWAY SYSTEM, CITYWIDE, IN SDF 11/2020 0.500 CONINSP 0.500
<Exempt> NEW YORK CITY NHPP 11/2020 14.112 CONST 14.112
SDF 11/2020 3.528 CONST 3.528
AQC:A19 MULTI TPC: $15-$25 M TOTAL 5YR COST : 19.640 0.500 0.000 19.640 0.000 0.000 0.000 0.000

NYSDOT PREVENTIVE ROUTINE ROADSIDE MAINTENANCE TO SDF 12/2020 8.900 MISC 8.900
ADDRESS DEFICIENCIES ON STATE HIGHWAY SYSTEM,
XM2070 CITYWIDE, IN NEW YORK CITY
R&P
<Exempt>
AQC:A10 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 8.900 0.000 0.000 8.900 0.000 0.000 0.000 0.000

NYSDOT PREVENTATIVE MAINTENANCE - REGIONAL DRAINAGE SDF 01/2020 0.100 DETLDES 0.100
CLEANING ON HIGHWAYS AND BRIDGES TO ENHANCE SDF 03/2021 0.510 CONINSP 0.510
XM2101 SAFETY AND SUSTAINABILITY ON STATE - OWNED SDF 03/2021 6.000 CONST 6.000
BRIDGE BRIDGES & HIGHWAYS IN NEW YORK CITY, CITYWIDE
<Exempt>

AQC:A19 MULTI TPC: $6-$9.4 M TOTAL 5YR COST : 6.610 0.000 0.100 6.510 0.000 0.000 0.000 0.000

95
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 18 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT ON-DEMAND MAINTENANCE - WHERE & WHEN SDF 09/2020 0.110 DETLDES 0.110
EMERGENCY BRIDGE REPAIRS ON STATE HIGHWAY SDF 09/2021 1.120 CONINSP 1.120
XM2120 SYSTEM TO ADDRESS SAFETY CONCERNS AT VARIOUS SDF 09/2021 8.400 CONST 8.400
BRIDGE LOCATIONS IN NEW YORK CITY
<Exempt>
AQC:A19 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 9.630 0.000 0.110 9.520 0.000 0.000 0.000 0.000

NYSDOT ON-DEMAND MAINTENANCE - WHERE & WHEN BRIDGE SDF 11/2018 0.000 PRELDES 0.100
STEEL REPAIRS TO ADDRESS FLAGS CONDITIONS AND SDF 12/2019 0.500 DETLDES 0.500
XM2121 OTHER DEFICIENCIES ON BRIDGES AND TO MAINTAIN SDF 12/2020 1.734 CONINSP 1.734
BRIDGE STATE OF GOOD REPAIR AND EXTEND THE SERVICE LIFE SDF 12/2020 11.020 CONST 11.020
<Exempt> OF STATE OWNED BRIDGES, CITYWIDE, IN NEW YORK
CITY

AQC:A19 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 13.254 0.100 0.500 12.754 0.000 0.000 0.000 0.000

NYSDOT LANDSCAPING REQUIREMENTS INCLUDING SOIL SDF 04/2020 0.204 DETLDES 0.204
RESTORATION, TREE TRANSPLANTING, SIDEWALK, SDF 06/2021 0.624 CONINSP 0.624
XM2125 WALL AND FENCE WORK, TO MITIGATE CONSTRUCTION SDF 06/2021 4.000 CONST 4.000
MISC IMPACTS AND/OR BEAUTIFY ROADSIDE ENVIRONMENT
<Exempt> ON STATE HIGHWAY SYSTEM, CITYWIDE, IN NEW YORK
CITY

AQC:C11 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 4.828 0.000 0.204 4.624 0.000 0.000 0.000 0.000

NYSDOT PREVENTIVE MAINTENANCE OF PAVEMENT ON THE SDF 01/2021 0.051 DETLDES 0.051
STATE HIGHWAY SYSTEM TO EXTEND SERVICE LIFE, BY SDF 07/2022 0.156 CONINSP 0.156
XM2130 FILLING & SEALING CRACKS AND JOINTS. IN NEW SDF 07/2022 1.500 CONST 1.500
R&P YORK CITY, CITYWIDE.
<Exempt>
AQC:A10 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.707 0.000 0.000 0.051 1.656 0.000 0.000 0.000

NYSDOT PURCHASE OF IMPACT ATTENUATORS SPARE PARTS FOR SDF 04/2021 1.680 MISC 1.680
EMERGENCY REPAIRS TO ADDRESS SAFETY ON STATE
XM2140 HIGHWAY SYSTEM, IN NEW YORK CITY, CITYWIDE.
SAFETY
<Exempt>
AQC:A9 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.680 0.000 0.000 1.680 0.000 0.000 0.000 0.000

NYSDOT SIGN AND STRUCTURE REPAIR/REPLACEMENT TO SDF 02/2021 0.600 DETLDES 0.600
IMPROVE SAFETY ON STATE HIGHWAY SYSTEM, SDF 01/2023 1.200 CONINSP 1.200
XM2142 CITYWIDE SDF 01/2023 6.400 CONST 6.400
SAFETY
<Exempt>
AQC:C13 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 8.200 0.000 0.000 0.600 0.000 7.600 0.000 0.000

96
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 19 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT WHERE & WHEN NON-STRUCTURAL REPAIRS ON STATE SDF 01/2020 0.050 DETLDES 0.050
BRIDGES AND HIGHWAYS, INCLUDING GUIDERAIL, SDF 03/2021 1.500 CONINSP 1.500
XM2145 BARRIER, FENCING, SIGNS, AND OTHER ROADSIDE SDF 03/2021 8.000 CONST 8.000
SAFETY APPURTENANCES TO ADDRESS SAFETY AND EXTEND
<Exempt> SERVICE LIFE, CITYWIDE IN NEW YORK CITY

AQC:A2 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 9.550 0.000 0.050 9.500 0.000 0.000 0.000 0.000

NYSDOT MAINTENANCE REPAIR / RESURFACING OF PAVEMENT SDF 08/2020 0.102 DETLDES 0.102
TO EXTEND THE SERVICE LIFE OF THE PAVEMENT ON SDF 01/2022 2.080 CONINSP 2.080
XM2148 STATE HIGHWAY SYSTEM AT VARIOUS LOCATIONS IN SDF 01/2022 20.000 CONST 20.000
R&P NEW YORK CITY
<Exempt>
AQC:A10 MULTI TPC: $21-$31 M TOTAL 5YR COST : 22.182 0.000 0.102 0.000 22.080 0.000 0.000 0.000

NYSDOT MAINTENANCE REPAIR OF CONCRETE PAVEMENT TO SDF 07/2021 0.104 DETLDES 0.104
EXTEND THE SERVICE LIFE ON STATE HIGHWAY SDF 03/2022 0.728 CONINSP 0.728
XM2149 SYSTEM, CITYWIDE, IN NEW YORK CITY. SDF 03/2022 3.000 CONST 3.000
R&P
<Exempt>
AQC:A10 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.832 0.000 0.000 0.104 3.728 0.000 0.000 0.000

NYSDOT MAINTENANCE REPAIR AND PREVENTIVE SDF 01/2019 0.000 DETLDES 0.250
MAINTENANCE OF VARIOUS ELEMENTS ON RETAINING SDF 01/2019 0.000 DETLDES 2.300
XM2160 WALLS TO ENHANCE SAFETY ON THE STATE HIGHWAY SDF 02/2020 1.500 SCOPING 1.500
R&P SYSTEM, CITYWIDE, IN NEW YORK CITY. SDF 02/2022 0.780 CONINSP 0.780
<Exempt>
SDF 12/2021 2.300 CONST 2.300
SDF 12/2021 0.208 CONST 0.208
AQC:A2 MULTI TPC: $6-$9.4 M TOTAL 5YR COST : 4.788 2.550 1.500 0.000 3.288 0.000 0.000 0.000

NYSDOT REPLACE SIGN PANELS ON STATE HIGHWAYS, TO SDF 09/2020 0.306 DETLDES 0.306
PROVIDE ADEQUATE RETRO-REFLECTIVITY FOR NIGHT SDF 06/2020 0.102 PRELDES 0.102
XM2165 TIME VISIBILITY CITYWIDE, IN NEW YORK CITY SDF 01/2022 0.312 CONINSP 0.312
SAFETY
SDF 01/2022 3.000 CONST 3.000
<Exempt>
SDF 01/2022 0.052 CONST 0.052
AQC:C13 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.772 0.000 0.408 0.000 3.364 0.000 0.000 0.000

NYSDOT PREVENTIVE ROUTINE ROADSIDE MAINTENANCE TO SDF 12/2021 8.900 MISC 8.900
ADDRESS DEFICIENCIES ON STATE HIGHWAY SYSTEM,
XM2170 CITYWIDE, IN NEW YORK CITY
R&P
<Exempt>
AQC:A10 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 8.900 0.000 0.000 0.000 8.900 0.000 0.000 0.000

97
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 20 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PREVENTIVE MAINTENANCE - REGIONAL BRIDGE SDF 08/2021 0.050 PRELDES 0.050
WASHING TO EXTEND LIFE CYCLE ON STATE-OWNED NHPP 09/2022 0.480 CONINSP 0.480
XM2202 BRIDGES CITYWIDE, IN NEW YORK CITY ON STATE SDF 09/2022 0.120 CONINSP 0.120
BRIDGE HIGHWAY SYSTEM NHPP 09/2022 3.200 CONST 3.200
<Exempt>
SDF 09/2022 0.800 CONST 0.800
SDF 11/2021 0.100 DETLDES 0.100
AQC:A19 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 4.750 0.000 0.000 0.050 4.700 0.000 0.000 0.000

NYSDOT ON-DEMAND MAINTENANCE - WHERE & WHEN SDF 07/2020 0.102 DETLDES 0.102
EMERGENCY BRIDGE REPAIRS ON STATE HIGHWAY SDF 08/2021 3.120 CONINSP 3.120
XM2220 SYSTEM TO ADDRESS SAFETY CONCERNS AT VARIOUS SDF 09/2021 20.000 CONST 20.000
BRIDGE LOCATIONS IN NEW YORK CITY
<Exempt>
AQC:A19 MULTI TPC: $21-$31 M TOTAL 5YR COST : 23.222 0.000 0.102 23.120 0.000 0.000 0.000 0.000

NYSDOT PURCHASE OF IMPACT ATTENUATORS SPARE PARTS FOR SDF 04/2022 1.710 MISC 1.710
EMERGENCY REPAIRS TO ADDRESS SAFETY ON STATE
XM2240 HIGHWAY SYSTEM, IN NEW YORK CITY, CITYWIDE.
SAFETY
<Exempt>
AQC:A10 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.710 0.000 0.000 0.000 1.710 0.000 0.000 0.000

NYSDOT WHERE & WHEN NON-STRUCTURAL REPAIRS ON STATE SDF 01/2021 0.051 DETLDES 0.051
BRIDGES AND HIGHWAYS, INCLUDING GUIDERAIL, SDF 02/2022 1.560 CONINSP 1.560
XM2245 BARRIER, FENCING, SIGNS, AND OTHER ROADSIDE SDF 02/2022 8.000 CONST 8.000
SAFETY APPURTENANCES TO ADDRESS SAFETY AND EXTEND
<Exempt> SERVICE LIFE, CITYWIDE IN NEW YORK CITY

AQC:A9 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 9.611 0.000 0.000 0.051 9.560 0.000 0.000 0.000

NYSDOT MAINTENANCE REPAIR OF ASPHALT PAVEMENT TO SDF 01/2021 0.104 DETLDES 0.104
EXTEND THE SERVICE LIFE OF STATE HIGHWAY SYSTEM SDF 02/2022 2.000 CONINSP 2.000
XM2248 AT VARIOUS LOCATIONS IN NEW YORK CITY SDF 02/2022 20.000 CONST 20.000
R&P
<Exempt>
AQC:A10 MULTI TPC: $21-$31 M TOTAL 5YR COST : 22.104 0.000 0.000 0.104 22.000 0.000 0.000 0.000

NYSDOT MAINTENANCE REPAIR OF CONCRETE PAVEMENT TO SDF 02/2022 0.104 DETLDES 0.104
EXTEND THE SERVICE LIFE ON STATE HIGHWAY SDF 03/2023 0.742 CONINSP 0.742
XM2249 SYSTEM, CITYWIDE, IN NEW YORK CITY. SDF 03/2023 3.000 CONST 3.000
R&P
<Exempt>
AQC:A10 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.846 0.000 0.000 0.000 0.104 3.742 0.000 0.000

98
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 21 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PREVENTIVE MAINTENANCE - BRIDGE REPAIRS OF SDF 02/2022 1.040 DETLDES 1.040
VARIOUS ELEMENTS TO EXTEND THE SERVICE LIFE OF SDF 03/2023 3.180 CONINSP 3.180
XM2251 THE STRUCTURES, CITYWIDE, IN NEW YORK CITY SDF 03/2023 20.000 CONST 20.000
BRIDGE
<Exempt>
AQC:A19 MULTI TPC: $21-$31 M TOTAL 5YR COST : 24.220 0.000 0.000 0.000 1.040 23.180 0.000 0.000

NYSDOT PREVENTIVE AND CORRECTIVE SDF 04/2021 0.520 DETLDES 0.520


MAINTENANCE - BRIDGE EXPANSION JOINTS NHPP 12/2022 1.200 CONINSP 1.200
XM2255 RESEALING/REPAIRS TO EXTEND SERVICE LIFE OF SDF 12/2022 0.300 CONINSP 0.300
BRIDGE BRIDGES ON STATE HIGHWAY SYSTEM, CITYWIDE, IN NHPP 12/2022 4.000 CONST 4.000
<Exempt> NEW YORK CITY SDF 12/2022 1.000 CONST 1.000
AQC:A10 MULTI TPC: $6-$9.4 M TOTAL 5YR COST : 7.020 0.000 0.000 0.520 0.000 6.500 0.000 0.000

NYSDOT PREVENTIVE ROUTINE ROADSIDE MAINTENANCE TO SDF 12/2022 7.600 MISC 7.600
ADDRESS DEFICIENCIES ON STATE HIGHWAY SYSTEM,
XM2270 CITYWIDE, IN NEW YORK CITY
R&P
<Exempt>
AQC:A10 MULTI TPC: $6-$9.4 M TOTAL 5YR COST : 7.600 0.000 0.000 0.000 0.000 7.600 0.000 0.000

NYSDOT PREVENTATIVE MAINTENANCE - REGIONAL DRAINAGE SDF 01/2022 0.104 DETLDES 0.104
CLEANING ON HIGHWAYS AND BRIDGES TO ENHANCE SDF 03/2023 0.530 CONINSP 0.530
XM2301 SAFETY AND SUSTAINABILITY ON STATE - OWNED SDF 03/2023 6.000 CONST 6.000
BRIDGE BRIDGES & HIGHWAYS IN NEW YORK CITY, CITYWIDE
<Exempt>

AQC:A19 MULTI TPC: $6-$9.4 M TOTAL 5YR COST : 6.634 0.000 0.000 0.000 0.104 6.530 0.000 0.000

NYSDOT ON-DEMAND MAINTENANCE - WHERE & WHEN SDF 08/2021 0.114 DETLDES 0.114
EMERGENCY BRIDGE REPAIRS ON STATE HIGHWAY
XM2320 SYSTEM TO ADDRESS SAFETY CONCERNS AT VARIOUS
BRIDGE LOCATIONS IN NEW YORK CITY
<Exempt>
AQC:A19 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 0.114 0.000 0.000 0.114 0.000 0.000 0.000 0.000

NYSDOT ON-DEMAND MAINTENANCE - WHERE & WHEN BRIDGE SDF 10/2021 0.102 DETLDES 0.102
STEEL REPAIRS TO ADDRESS FLAGS CONDITIONS AND SDF 12/2022 1.802 CONINSP 1.802
XM2321 OTHER DEFICIENCIES ON BRIDGES AND TO MAINTAIN SDF 12/2022 10.000 CONST 10.000
BRIDGE STATE OF GOOD REPAIR AND EXTEND THE SERVICE LIFE SDF 12/2022 1.060 CONST 1.060
<Exempt> OF STATE OWNED BRIDGES, CITYWIDE, IN NEW YORK
CITY

AQC:A19 MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 12.964 0.000 0.000 0.000 0.102 12.862 0.000 0.000

99
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 22 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PREVENTIVE MAINTENANCE OF PAVEMENT ON THE SDF 02/2023 0.053 DETLDES 0.053
STATE HIGHWAY SYSTEM TO EXTEND SERVICE LIFE, BY STBG LG URB 12/2023 0.240 CONINSP 0.240
XM2330 FILLING & SEALING CRACKS AND JOINTS. IN NEW SDF 12/2023 0.060 CONINSP 0.060
R&P YORK CITY, CITYWIDE. STBG LG URB 12/2023 1.600 CONST 1.600
<Exempt>
SDF 12/2023 0.400 CONST 0.400
AQC:A10 MULTI TPC: $2-$4 M TOTAL 5YR COST : 2.353 0.000 0.000 0.000 0.000 0.053 2.300 0.000

NYSDOT PURCHASE OF IMPACT ATTENUATORS SPARE PARTS FOR SDF 04/2023 1.710 MISC 1.710
EMERGENCY REPAIRS TO ADDRESS SAFETY ON STATE
XM2340 HIGHWAY SYSTEM, IN NEW YORK CITY, CITYWIDE.
SAFETY
<Exempt>
AQC:A19 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.710 0.000 0.000 0.000 0.000 1.710 0.000 0.000

NYSDOT WHERE & WHEN NON-STRUCTURAL REPAIRS ON STATE SDF 01/2022 0.052 DETLDES 0.052
BRIDGES AND HIGHWAYS, INCLUDING GUIDERAIL, SDF 02/2023 1.590 CONINSP 1.590
XM2345 BARRIER, FENCING, SIGNS, AND OTHER ROADSIDE SDF 02/2023 10.000 CONST 10.000
SAFETY APPURTENANCES TO ADDRESS SAFETY AND EXTEND
<Exempt> SERVICE LIFE, CITYWIDE IN NEW YORK CITY

AQC:A2 MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 11.642 0.000 0.000 0.000 0.052 11.590 0.000 0.000

NYSDOT MAINTENANCE REPAIR OF ASPHALT PAVEMENT TO SDF 11/2022 0.100 DETLDES 0.100
EXTEND THE SERVICE LIFE OF STATE HIGHWAY SYSTEM STBG LG URB 12/2023 1.600 CONINSP 1.600
XM2348 AT VARIOUS LOCATIONS IN NEW YORK CITY SDF 12/2023 0.400 CONINSP 0.400
R&P
STBG LG URB 12/2023 16.000 CONST 16.000
<Exempt>
SDF 12/2023 4.000 CONST 4.000
AQC:A10 MULTI TPC: $21-$31 M TOTAL 5YR COST : 22.100 0.000 0.000 0.000 0.000 0.100 22.000 0.000

NYSDOT MAINTENANCE REPAIR OF CONCRETE PAVEMENT TO SDF 02/2023 0.106 DETLDES 0.106
EXTEND THE SERVICE LIFE ON STATE HIGHWAY SDF 03/2024 0.756 CONINSP 0.756
XM2349 SYSTEM, CITYWIDE, IN NEW YORK CITY. SDF 03/2024 3.000 CONST 3.000
R&P
<Exempt>
AQC:A10 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.862 0.000 0.000 0.000 0.000 0.106 3.756 0.000

NYSDOT REPLACE SIGN PANELS ON STATE HIGHWAYS, TO SDF 08/2022 0.318 DETLDES 0.318
PROVIDE ADEQUATE RETRO-REFLECTIVITY FOR NIGHT SDF 05/2022 0.106 PRELDES 0.106
XM2365 TIME VISIBILITY CITYWIDE, IN NEW YORK CITY SDF 01/2024 0.324 CONINSP 0.324
SAFETY
SDF 12/2023 3.000 CONST 3.000
<Exempt>
SDF 12/2023 0.054 CONST 0.054
AQC:C13 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.802 0.000 0.000 0.000 0.424 0.000 3.378 0.000

100
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 23 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PREVENTIVE ROUTINE ROADSIDE MAINTENANCE TO SDF 12/2023 7.600 MISC 7.600
ADDRESS DEFICIENCIES ON STATE HIGHWAY SYSTEM,
XM2370 CITYWIDE, IN NEW YORK CITY
R&P
<Exempt>
AQC:A10 MULTI TPC: $6-$9.4 M TOTAL 5YR COST : 7.600 0.000 0.000 0.000 0.000 0.000 7.600 0.000

NYSDOT PREVENTIVE MAINTENANCE - REGIONAL BRIDGE NHPP 09/2024 0.547 CONINSP 0.547
WASHING TO EXTEND LIFE CYCLE ON STATE-OWNED SDF 09/2024 0.137 CONINSP 0.137
XM2402 BRIDGES CITYWIDE, IN NEW YORK CITY ON STATE NHPP 09/2024 3.648 CONST 3.648
BRIDGE HIGHWAY SYSTEM SDF 09/2024 0.912 CONST 0.912
<Exempt>
SDF 11/2023 0.112 DETLDES 0.112
AQC:A10 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.356 0.000 0.000 0.000 0.000 0.000 5.356 0.000

NYSDOT ON-DEMAND MAINTENANCE - WHERE & WHEN SDF 07/2022 0.112 DETLDES 0.112
EMERGENCY BRIDGE REPAIRS ON STATE HIGHWAY SDF 08/2023 3.240 CONINSP 3.240
XM2420 SYSTEM TO ADDRESS SAFETY CONCERNS AT VARIOUS SDF 09/2023 20.000 CONST 20.000
BRIDGE LOCATIONS, CITYWIDE
<Exempt>
AQC:A19 MULTI TPC: $21-$31 M TOTAL 5YR COST : 23.352 0.000 0.000 0.000 0.112 23.240 0.000 0.000

NYSDOT LANDSCAPING REQUIREMENTS INCLUDING SOIL SDF 07/2022 0.220 DETLDES 0.220
RESTORATION, TREE TRANSPLANTING, SIDEWALK, SDF 05/2024 0.684 CONINSP 0.684
XM2425 WALL AND FENCE WORK, TO MITIGATE CONSTRUCTION SDF 06/2024 4.000 CONST 4.000
MISC IMPACTS AND/OR BEAUTIFY ROADSIDE ENVIRONMENT
<Exempt> ON STATE HIGHWAY SYSTEM, CITYWIDE

AQC:A10 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 4.904 0.000 0.000 0.000 0.220 0.000 4.684 0.000

NYSDOT PURCHASE OF IMPACT ATTENUATORS SPARE PARTS FOR SDF 04/2024 1.710 MISC 1.710
EMERGENCY REPAIRS TO ADDRESS SAFETY ON STATE
XM2440 HIGHWAY SYSTEM, IN NEW YORK CITY, CITYWIDE.
SAFETY
<Exempt>
AQC:A19 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.710 0.000 0.000 0.000 0.000 0.000 1.710 0.000

NYSDOT WHERE & WHEN NON-STRUCTURAL REPAIRS ON STATE SDF 01/2023 0.053 DETLDES 0.053
BRIDGES AND HIGHWAYS, INCLUDING GUIDERAIL, SDF 02/2024 1.620 CONINSP 1.620
XM2445 BARRIER, FENCING, SIGNS, AND OTHER ROADSIDE SDF 02/2024 10.000 CONST 10.000
SAFETY APPURTENANCES TO ADDRESS SAFETY AND EXTEND
<Exempt> SERVICE LIFE, CITYWIDE IN NEW YORK CITY

AQC:A2 MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 11.673 0.000 0.000 0.000 0.000 0.053 11.620 0.000

101
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 24 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT MAINTENANCE REPAIR OF ASPHALT PAVEMENT TO SDF 10/2023 0.112 DETLDES 0.112
EXTEND THE SERVICE LIFE OF STATE HIGHWAY SYSTEM
XM2448 AT VARIOUS LOCATIONS IN NEW YORK CITY
R&P
<Exempt>
AQC:A10 MULTI TPC: $21-$31 M TOTAL 5YR COST : 0.112 0.000 0.000 0.000 0.000 0.000 0.112 0.000

NYSDOT MAINTENANCE REPAIR OF CONCRETE PAVEMENT TO SDF 03/2024 0.112 DETLDES 0.112
EXTEND THE SERVICE LIFE ON STATE HIGHWAY
XM2449 SYSTEM, CITYWIDE, IN NEW YORK CITY.
R&P
<Exempt>
AQC:A10 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.112 0.000 0.000 0.000 0.000 0.000 0.112 0.000

NYSDOT PREVENTIVE MAINTENANCE - BRIDGE REPAIRS OF SDF 12/2023 1.120 DETLDES 1.120
VARIOUS ELEMENTS TO EXTEND THE SERVICE LIFE OF
XM2451 THE STRUCTURES, CITYWIDE, IN NEW YORK CITY
BRIDGE
<Exempt>
AQC:A19 MULTI TPC: $21-$31 M TOTAL 5YR COST : 1.120 0.000 0.000 0.000 0.000 0.000 1.120 0.000

NYSDOT PREVENTIVE AND CORRECTIVE SDF 04/2023 0.560 DETLDES 0.560


MAINTENANCE - BRIDGE EXPANSION JOINTS
XM2455 RESEALING/REPAIRS TO EXTEND SERVICE LIFE OF
BRIDGE BRIDGES ON STATE HIGHWAY SYSTEM, CITYWIDE, IN
<Exempt> NEW YORK CITY
AQC:A19 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 0.560 0.000 0.000 0.000 0.000 0.560 0.000 0.000

NYSDOT MAINTENANCE REPAIR AND PREVENTIVE SDF 03/2022 1.040 DETLDES 1.040
MAINTENANCE OF VARIOUS ELEMENTS ON RETAINING NHPP 11/2023 0.600 CONINSP 0.600
XM2460 WALLS TO ENHANCE SAFETY ON THE STATE HIGHWAY SDF 11/2023 0.150 CONINSP 0.150
R&P SYSTEM, CITYWIDE, IN NEW YORK CITY. NHPP 11/2023 4.000 CONST 4.000
<Exempt>
SDF 11/2023 0.216 CONST 0.216
SDF 11/2023 1.000 CONST 1.000
AQC:A2 MULTI TPC: $6-$9.4 M TOTAL 5YR COST : 7.006 0.000 0.000 0.000 1.040 0.000 5.966 0.000

NYSDOT PREVENTATIVE MAINTENANCE - REGIONAL DRAINAGE SDF 02/2024 0.112 DETLDES 0.112
CLEANING ON HIGHWAYS AND BRIDGES TO ENHANCE SDF 11/2023 0.056 PRELDES 0.056
XM2501 SAFETY AND SUSTAINABILITY ON STATE - OWNED
BRIDGE BRIDGES & HIGHWAYS IN NEW YORK CITY, CITYWIDE
<Exempt>

AQC:A19 MULTI TPC: $6-$9.4 M TOTAL 5YR COST : 0.168 0.000 0.000 0.000 0.000 0.000 0.168 0.000

102
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 25 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT ON-DEMAND MAINTENANCE - WHERE & WHEN BRIDGE SDF 02/2023 0.108 DETLDES 0.108
STEEL REPAIRS TO ADDRESS FLAGS CONDITIONS AND
XM2521 OTHER DEFICIENCIES ON BRIDGES AND TO MAINTAIN
BRIDGE STATE OF GOOD REPAIR AND EXTEND THE SERVICE LIFE
<Exempt> OF STATE OWNED BRIDGES, CITYWIDE, IN NEW YORK
CITY

AQC:A19 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 0.108 0.000 0.000 0.000 0.000 0.108 0.000 0.000

NYSDOT SIGN AND STRUCTURE REPAIR/REPLACEMENT TO SDF 02/2024 0.672 DETLDES 0.672
IMPROVE SAFETY ON STATE HIGHWAY SYSTEM,
XM2542 CITYWIDE
SAFETY
<Exempt>
AQC:C13 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 0.672 0.000 0.000 0.000 0.000 0.000 0.672 0.000

NYSDOT WHERE & WHEN NON-STRUCTURAL REPAIRS ON STATE SDF 11/2023 0.055 DETLDES 0.055
BRIDGES AND HIGHWAYS, INCLUDING GUIDERAIL,
XM2545 BARRIER, FENCING, SIGNS, AND OTHER ROADSIDE
SAFETY APPURTENANCES TO ADDRESS SAFETY AND EXTEND
<Exempt> SERVICE LIFE, CITYWIDE IN NEW YORK CITY

AQC:A2 MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 0.055 0.000 0.000 0.000 0.000 0.000 0.055 0.000

NYSDOT REPLACE SIGN PANELS ON STATE HIGHWAYS, TO SDF 09/2024 0.342 DETLDES 0.342
PROVIDE ADEQUATE RETRO-REFLECTIVITY FOR NIGHT SDF 06/2024 0.114 PRELDES 0.114
XM2565 TIME VISIBILITY CITYWIDE, IN NEW YORK CITY
SAFETY
<Exempt>
AQC:C13 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.456 0.000 0.000 0.000 0.000 0.000 0.456 0.000

NYSDOT ON-DEMAND MAINTENANCE - WHERE & WHEN SDF 07/2024 0.114 DETLDES 0.114
EMERGENCY BRIDGE REPAIRS ON STATE HIGHWAY
XM2620 SYSTEM TO ADDRESS SAFETY CONCERNS AT VARIOUS
BRIDGE LOCATIONS IN NEW YORK CITY
<Exempt>
AQC:A19 MULTI TPC: $21-$31 M TOTAL 5YR COST : 0.114 0.000 0.000 0.000 0.000 0.000 0.114 0.000

NYSDOT FEDERAL FISCAL YEAR 2020-2024 ORDER-ON-CONTRACT HSIP 06/2021 0.662 MISC 0.662
FOR SAFETY PROJECTS WHICH WILL BE IDENTIFIED IN SDF 06/2021 0.074 MISC 0.074
XT1556 FUTURE TIP ACTIONS UNDER OTHER PINS - BLOCK HSIP 07/2022 6.140 MISC 6.140
SAFETY FUND SDF 07/2022 0.682 MISC 0.682
<Exempt>
HSIP 07/2023 7.294 MISC 7.294
SDF 07/2023 0.810 MISC 0.810
HSIP 07/2024 7.296 MISC 7.296
SDF 07/2024 0.811 MISC 0.811
AQC:J1 MULTI TPC: $21-$31 M TOTAL 5YR COST : 23.769 0.000 0.000 0.736 6.822 8.104 8.107 0.000

103
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 26 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT BRIDGE ASSET MANAGEMENT TEAM BLOCK FOR WORK NHPP 06/2022 0.864 MISC 0.864
ORDERS DESIGN TO ADDRESS FLAG SDF 06/2022 0.216 MISC 0.216
XT1557 CONDITIONS - BLOCK FUND NHPP 06/2023 0.880 MISC 0.880
SAFETY
SDF 06/2023 0.220 MISC 0.220
<Exempt>
AQC:J1 MULTI TPC: $21-$31 M TOTAL 5YR COST : 2.180 0.000 0.000 0.000 1.080 1.100 0.000 0.000

NYSDOT FFY 2020 - 2024 CMAQ FOR FUTURE CMAQ ELIGIBLE CMAQ 09/2020 35.799 MISC 35.799
PROJECTS WHICH WILL BE IDENTIFIED IN FUTURE TIP SDF 09/2020 8.950 MISC 8.950
XT1580 ACTIONS UNDER OTHER PINS - BLOCK FUND CMAQ 09/2021 3.895 MISC 3.895
MISC
SDF 09/2021 0.974 MISC 0.974
<Exempt>
CMAQ 09/2023 22.267 MISC 22.267
SDF 09/2023 5.567 MISC 5.567
CMAQ 09/2024 22.267 MISC 22.267
SDF 09/2024 5.567 MISC 5.567
AQC:J1 MULTI TPC: $100-$225 M TOTAL 5YR COST : 105.286 0.000 44.749 4.869 0.000 27.834 27.834 0.000

NYCDOT FFY 2020-2024 CMAQ FOR FUTURE CMAQ ELIGIBLE CMAQ 07/2019 0.000 MISC 23.310
PROJECTS WHICH WILL BE IDENTIFIED IN FUTURE TIP LOCAL 07/2019 0.000 MISC 5.827
XT1582 ACTIONS UNDER OTHER PINS - BLOCK FUND CMAQ 09/2020 5.145 MISC 5.145
TRAFFIC
LOCAL 09/2020 1.286 MISC 1.286
<Exempt>
CMAQ 09/2021 15.672 MISC 15.672
LOCAL 09/2021 3.918 MISC 3.918
CMAQ 09/2022 2.885 MISC 2.885
LOCAL 09/2022 0.721 MISC 0.721
CMAQ 09/2023 6.307 MISC 6.307
LOCAL 09/2023 1.577 MISC 1.577
CMAQ 09/2024 10.087 MISC 10.087
LOCAL 09/2024 2.522 MISC 2.522
AQC:J1 MULTI TPC: $70-$130 M TOTAL 5YR COST : 50.120 29.137 6.431 19.590 3.606 7.884 12.609 0.000

NYCDOT FFY 2020 - 2024 HSIP FOR FUTURE PROJECTS WHICH HSIP 09/2020 0.081 MISC 0.081
WILL BE IDENTIFIED IN FUTURE TIP ACTIONS UNDER LOCAL 09/2020 0.009 MISC 0.009
XT1605 OTHER PINS - BLOCK FUND HSIP 09/2021 0.101 MISC 0.101
MISC
LOCAL 09/2021 0.074 MISC 0.074
<Exempt>
HSIP 09/2022 2.295 MISC 2.295
LOCAL 09/2022 0.255 MISC 0.255
HSIP 09/2023 2.295 MISC 2.295
LOCAL 09/2023 0.255 MISC 0.255
HSIP 09/2024 7.295 MISC 7.295
LOCAL 09/2024 0.811 MISC 0.811
AQC:J1 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 13.471 0.000 0.090 0.175 2.550 2.550 8.106 0.000

104
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 NYCTCC Multi-County Listing Page 27 of 27

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYCDOT FFY 2020-2024 STBG LARGE URBAN AND NHPP FOR NHPP 08/2020 9.119 MISC 9.119
FUTURE PROJECTS WHICH WILL BE IDENTIFIED IN LOCAL 08/2020 2.280 MISC 2.280
XT1607 FUTURE TIP ACTIONS UNDER OTHER PINS - BLOCK STBG LG URB 08/2020 8.196 MISC 8.196
MISC FUND
<Exempt> LOCAL 08/2020 2.049 MISC 2.049
STBG-OFF 08/2020 19.754 MISC 19.754
LOCAL 08/2020 4.938 MISC 4.938
NHPP 08/2021 65.373 MISC 65.373
LOCAL 08/2021 16.343 MISC 16.343
STBG LG URB 08/2021 5.227 MISC 5.227
LOCAL 08/2021 1.307 MISC 1.307
NHPP 08/2022 3.133 MISC 3.133
LOCAL 08/2022 0.783 MISC 0.783
STBG LG URB 08/2022 13.776 MISC 13.776
LOCAL 08/2022 3.444 MISC 3.444
NHPP 08/2023 26.486 MISC 26.486
LOCAL 08/2023 4.800 MISC 4.800
STBG LG URB 08/2023 0.797 MISC 0.797
LOCAL 08/2023 0.199 MISC 0.199
STBG LG URB 08/2024 3.594 MISC 3.594
LOCAL 08/2024 0.898 MISC 0.898
AQC:J1 MULTI TPC: $175-$385 M TOTAL 5YR COST : 192.496 0.000 46.336 88.250 21.136 32.282 4.492 0.000

NYSDOT FEDERAL FISCAL YEAR 2020-2024 ORDER-ON-CONTRACT STBG LG URB 03/2020 3.838 MISC 3.838
FOR PROJECTS WHICH WILL BE IDENTIFIED IN FUTURE SDF 03/2020 0.959 MISC 0.959
XT1816 TIP ACTIONS UNDER OTHER PINS - BLOCK FUND STBG-OFF 03/2020 23.559 MISC 23.559
MISC
<Exempt> SDF 03/2020 5.890 MISC 5.890
NHPP 03/2021 7.174 MISC 7.174
SDF 03/2021 2.000 MISC 2.000
STBG LG URB 03/2021 2.499 MISC 2.499
SDF 03/2021 0.625 MISC 0.625
NHPP 03/2022 4.456 MISC 4.456
SDF 03/2022 1.114 MISC 1.114
STBG LG URB 03/2022 2.791 MISC 2.791
SDF 03/2022 0.698 MISC 0.698
NHPP 03/2023 13.963 MISC 13.963
SDF 03/2023 3.491 MISC 3.491
NHPP 03/2024 34.476 MISC 34.476
SDF 03/2024 8.619 MISC 8.619
STBG LG URB 03/2024 12.743 MISC 12.743
SDF 03/2024 3.186 MISC 3.186
AQC:J1 MULTI TPC: $100-$225 M TOTAL 5YR COST : 132.081 0.000 34.246 12.298 9.059 17.454 59.024 0.000

105
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 1 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA NYCT DESIGN AND PROCUREMENT OF 1025 60-FOOT R211 CMAQ 01/2019 0.000 MISC 57.913
RAILCARS. 940 CARS WILL REPLACE EXISTING FLEET MTA 01/2019 0.000 MISC 47.899
CM09-6891 AND MEET EXPANSION NEEDS SYSTEMWIDE, 10 CARS MTA 01/2019 0.000 MISC
01-NEW CARS WILL BE PROTOTYPE CARS WITH OPEN GANGWAYS FOR 1078.188
<Exempt> FEASIBILITY STUDY (75 WILL REPLACE EXISTING FLEET
ON THE SI RAILWAY UNDER SI09-6891)

AQC:B10 SYSTEM-WIDE TPC:$2.7-$3.3 B TOTAL 5YR COST : 0.000 1184.000 0.000 0.000 0.000 0.000 0.000 0.000

MTA-NYCT REPLACE TWO HYDRAULIC ELEVATORS ON THE IRT FTA 5337 06/2019 0.000 CONST 10.461
LINE AT GRAND CENTRAL STATION TO ACHIEVE A MTA 06/2019 0.000 CONST 2.615
MW48-6682 STATE OF GOOD REPAIR - EL205(SB), EL206(NB) - 7
02-STATIONS ELEVATORS WERE PREVIOUSLY COMPLETED IN 2015
<Exempt> UNDER THIS PIN
AQC:B8 NEW YORK TPC: $12.5-$19 M TOTAL 5YR COST : 0.000 13.076 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT PURCHASE OF 50 EXPRESS OVER-THE-ROAD BUSES. MTA 01/2019 0.000 MISC 36.556
BUSES WILL REPLACE OVER-AGE AND END-OF-LIFE
SF02-2453 BUSES, AS WELL AS INCLUDE ADDITIONAL VEHICLES
03-BUSES FOR MODEST FORECAST RIDERSHIP GROWTH FOR THE
<Exempt> 2015-2020 PERIOD.
AQC:B10 SYSTEM-WIDE TPC: $32-$50 M TOTAL 5YR COST : 0.000 36.556 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT PURCHASE OF 200 40-FOOT LOW FLOOR STANDARD MTA 01/2019 0.000 MISC 127.795
DIESEL BUSES TO BE OPERATED THROUGHOUT NEW
SF02-2454 YORK CITY TO MAINTAIN A STATE OF GOOD REPAIR.
03-BUSES
<Exempt>
AQC:B10 SYSTEM-WIDE TPC: $100-$225 M TOTAL 5YR COST : 0.000 127.795 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT PURCHASE 75 STANDARD HYBRID ELECTRIC BUSES FOR MTA 01/2019 0.000 MISC 66.971
USE SYSTEM-WIDE TO MAINTAIN A STATE OF GOOD
SF02-2455 REPAIR.
03-BUSES
<Exempt>
AQC:B10 MULTI TPC: $50-$85 M TOTAL 5YR COST : 0.000 66.971 0.000 0.000 0.000 0.000 0.000 0.000

MTA-BUS PURCHASE 257 45-FOOT EXPRESS BUSES BASED ON FTA 5307 01/2019 0.000 MISC 40.254
FLEET REQUIREMENTS AND AVAILABLE FUNDING TO STATE 01/2019 0.000 MISC 5.031
U7030202 REPLACE VEHICLES APPROACHING THE END OF THEIR LOCAL 01/2019 0.000 MISC 5.032
03-BUSES USEFUL LIFE. BUSES TO BE OPERATED THROUGHOUT FTA 5339 01/2019 0.000 MISC 52.460
<Exempt> NEW YORK CITY STATE 01/2019 0.000 MISC 6.557
LOCAL 01/2019 0.000 MISC 6.558
AQC:B10 SYSTEM-WIDE TPC: $175-$385 M TOTAL 5YR COST : 0.000 115.892 0.000 0.000 0.000 0.000 0.000 0.000

106
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 2 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA-BUS PURCHASE 25 40-FOOT STANDARD DIESEL BUSES LOCAL 01/2020 16.860 MISC 16.860
BASED ON FLEET REQUIREMENTS AND AVAILABLE
U7030219 FUNDING TO REPLACE VEHICLES APPROACHING THE
03-BUSES END OF THEIR USEFUL LIFE. BUSES TO BE OPERATED IN
<Exempt> QUEENS
AQC:B10 QUEENS TPC: $15-$25 M TOTAL 5YR COST : 16.860 0.000 16.860 0.000 0.000 0.000 0.000 0.000

MTA NYCT SEAL SYSTEM OPENINGS FROM FLOODWATERS: FTA 5324 CR 01/2019 0.000 CONST 52.278
DEVELOP & IMPLEMENT METHODS OF BARRICADING MTA 01/2019 0.000 CONST 17.426
E-T04-03-01 STREET STAIRS, VENTILATOR GRATINGS, MANHOLES,
04-STATIONS EMERGENCY EXIT HATCHES AND STREET-LEVEL
<Exempt> ELEVATOR SHAFTS WHICH COMPROMISED THE
ELEVATOR STRUCTURE AND MACHINERY
(D2013-RESL-022)

AQC:C15 SYSTEM-WIDE TPC:$0.5-$0.6 B TOTAL 5YR COST : 0.000 69.704 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT INTERNAL STATION HARDENING - SEVEN STATIONS FTA 5324 CR 01/2019 0.000 CONST 13.276
AND ONE FAN PLANT INTERNAL ROOM HARDENING. MTA 01/2019 0.000 CONST 4.425
E-T04-03-29 INSTALL REMOVABLE STAIR COVERS, WATER-TIGHT
04-STATIONS FLOOD DOORS, AND FLOOD LOG BARRIERS AT STATION
<Exempt> ENTRANCES. INSTALL WATERTIGHT LID INSERT
DEVICES UNDER MANHOLE COVER. SEAL CONDUITS
IN MANHOLE AND IN CRITICAL FACILITIES. INSTALL
REMOVABLE SIDEWALK VENT COVERS. PART OF
E-T04-03-01 (D2013-RESL-024)

AQC:C15 NEW YORK TPC: $15-$25 M TOTAL 5YR COST : 0.000 17.701 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REPLACEMENT OF 7 ESCALATORS AT THE FOLLOWING FTA 5337 01/2019 0.000 CONST 29.924
STATIONS TO MAINTAIN A STATE OF GOOD REPAIR: MTA 01/2019 0.000 CONST 7.481
MW03-2060 INTERVALE AVE (WPR-BRONX), LEXINGTON AVE
04-STATIONS (QBL-MANHATTAN) AND ROOSEVELT ISLAND (63 ST
<Exempt> LINE-MANHATTAN)
AQC:B8 MULTI TPC: $32-$50 M TOTAL 5YR COST : 0.000 37.405 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REPLACEMENT OF 2 ESCALATORS AT PELHAM FTA 5337 01/2019 0.000 CONST 11.217
PARKWAY ON THE WHITE PLAINS ROAD LINE IN THE MTA 01/2019 0.000 CONST 2.804
MW03-2061 BRONX TO MAINTAIN A STATE OF GOOD REPAIR.
04-STATIONS
<Exempt>
AQC:B8 BRONX TPC: $12.5-$19 M TOTAL 5YR COST : 0.000 14.021 0.000 0.000 0.000 0.000 0.000 0.000

107
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 3 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA NYCT REPLACEMENT OF NINE ESCALATORS AT THE FTA 5337 01/2019 0.000 CONST 21.822
FOLLOWING STATIONS IN MANHATTAN, THE BRONX MTA 01/2019 0.000 CONST 5.455
MW03-2062 AND BROOKLYN TO MAINTAIN A STATE OF GOOD MTA 01/2020 19.151 CONST 19.151
04-STATIONS REPAIR: 125TH ST (BW7), 181 ST (8 AV), PELHAM BAY
<Exempt> PARK (PELHAM), BROADWAY JUNCTION
(FULTON/JAMAICA).

AQC:B8 MULTI TPC: $40-$60 M TOTAL 5YR COST : 19.151 27.277 19.151 0.000 0.000 0.000 0.000 0.000

MTA NYCT REPLACEMENT OF SEVEN ESCALATORS AT THE FTA 5337 01/2019 0.000 CONST 18.238
FOLLOWING STATIONS IN BROOKLYN AND MANHATTAN MTA 01/2019 0.000 CONST 4.560
MW03-6182 TO MAINTAIN A STATE OF GOOD REPAIR: HIGH ST (8 AV), MTA 01/2020 11.415 CONST 11.415
04-STATIONS SMITH ST/9 ST (6 AV), AND BOWLING GREEN (LEX).
<Exempt>

AQC:B8 MULTI TPC: $32-$50 M TOTAL 5YR COST : 11.415 22.798 11.415 0.000 0.000 0.000 0.000 0.000

MTA NYCT REPLACEMENT OF 3 ESCALATORS AT MAIN ST STATION FTA 5337 01/2019 0.000 CONST 14.119
IN QUEENS ON THE IRT FLUSHING LINE TO MAINTAIN A MTA 01/2019 0.000 CONST 3.530
MW03-6183 STATE OF GOOD REPAIR.
04-STATIONS
<Exempt>
AQC:B8 QUEENS TPC: $15-$25 M TOTAL 5YR COST : 0.000 17.649 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REPLACEMENT OF 12 TRACTION ELEVATORS AT THREE FTA 5307 01/2019 0.000 CONST 75.557
STATIONS ON THE BROADWAY-7 AVENUE LINE IN MTA 01/2019 0.000 CONST 18.889
MW48-1505 MANHATTAN TO ACHIEVE A STATE OF GOOD REPAIR.
04-STATIONS
<Exempt>
AQC:B8 NEW YORK TPC: $70-$130 M TOTAL 5YR COST : 0.000 94.446 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REPLACEMENT OF EIGHT TRACTION ELEVATORS AT FTA 5337 01/2019 0.000 CONST 47.040
63RD ST (LEX AVE), 63RD ST (ROOSEVELT ISLAND), MTA 01/2019 0.000 CONST 11.760
MW48-1506 COURT ST (BMT-BKLYN), CLARK ST STATIONS
04-STATIONS (IRT-BKLYN) TO ACHIEVE A STATE OF GOOD REPAIR.
<Exempt>
AQC:B8 MULTI TPC: $50-$85 M TOTAL 5YR COST : 0.000 58.800 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REPLACEMENT OF 6 TRACTION ELEVATORS AT 181ST FTA 5307 01/2019 0.000 CONST 32.696
STREET AND 190TH STREET ON 8TH AVE LINE TO MTA 01/2019 0.000 CONST 8.174
MW48-1507 ACHIEVE A STATE OF GOOD REPAIR.
04-STATIONS
<Exempt>
AQC:B8 NEW YORK TPC: $40-$60 M TOTAL 5YR COST : 0.000 40.870 0.000 0.000 0.000 0.000 0.000 0.000

108
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 4 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA NYCT REPLACEMENT OF THREE HYDRAULIC ELEVATORS TO FTA 5337 01/2019 0.000 CONST 19.509
ACHIEVE A STATE OF GOOD REPAIR, INCLUDING TWO (2) MTA 01/2019 0.000 CONST 4.878
MW48-2044 AT BOROUGH HALL ON THE CLARK ST LINE IN
04-STATIONS BROOKLYN AND ONE (1) AT GRAND CENTRAL ON THE
<Exempt> FLUSHING LINE IN MANHATTAN.
AQC:B8 MULTI TPC: $26-$40 M TOTAL 5YR COST : 0.000 24.387 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REPLACEMENT OF TWO HYDRAULIC ELEVATORS AT FTA 5307 06/2019 0.000 MISC 11.241
FRANKLIN AVE (BMT) BROOKLYN ON FRANKLIN AVE MTA 06/2019 0.000 MISC 2.810
MW48-6184 SHUTTLE TO ACHIEVE A STATE OF GOOD
04-STATIONS REPAIR - WORK INCLUDES OPERATING PANELS,
<Exempt> ELECTRICAL PANELS, COMMUNICATION SYSTEMS,
SMOKE AND FIRE DETECTION SYSTEMS AND PROVIDES
ETHERNET CONNECTION BETWEEN STATUS MONITOR
AND ELEVATORS AND ESCLATORS CONTROL CENTER

AQC:B8 KINGS TPC: $12.5-$19 M TOTAL 5YR COST : 0.000 14.051 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT IMPLEMENTATION OF A NEW CONTACTLESS (SMART MTA 01/2019 0.000 CONST 418.597
CARD) FARE PAYMENT SYSTEM AT ALL OPERATING
RC03-2008 AGENCIES TO ACHIEVE A STATE OF GOOD REPAIR AND
04-STATIONS TO IMPROVE EFFICIENCY OF OPERATIONS.
<Exempt>
AQC:B5 SYSTEM-WIDE TPC:$377.1-$464.6 M TOTAL 5YR COST : 0.000 418.597 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT CONSTRUCT NEW STAIRS ALONG WITH ANCILLARY FTA 5309 01/2019 0.000 CONST 2.761
MODIFICATIONS TO IMPROVE EFFICIENCY IN MTA 01/2019 0.000 CONST 4.445
ST01-0810 OPERATIONS AT 1ST AVENUE STATION IN MANHATTAN
04-STATIONS AND BEDFORD AVE STATION IN BROOKLYN ALONG THE
<Exempt> CANARSIE LINE. D2016-CCIP-003 & D2016-CCIP-14002

AQC:B8 MULTI TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 7.206 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REHABILITATION OF TIMES SQUARE STATION ON 42ND FTA 5337 01/2019 0.000 CONST 20.408
STREET SHUTTLE LINE TO MAINTAIN A STATE OF GOOD MTA 01/2019 0.000 CONST 5.103
ST02-0861 REPAIR AND TO MITIGATE CONGESTION, INCLUDING
04-STATIONS EXPANSION OF STAIRWAYS, REMOVAL OF COLUMNS
<Exempt> AND OTHER PLATFORM WORK.
AQC:B8 NEW YORK TPC: $26-$40 M TOTAL 5YR COST : 0.000 25.511 0.000 0.000 0.000 0.000 0.000 0.000

109
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 5 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA NYCT CONSTRUCTION OF ADA ELEVATORS ALONG WITH FTA 5309 01/2019 0.000 CONST 28.294
ANCILLARY IMPROVEMENTS AT BEDFORD AVENUE MTA 01/2019 0.000 CONST 40.990
ST04-0810 STATION IN CANARSIE BROOKLYN TO IMPROVE
04-STATIONS ACCESSIBILITY. D2016-CCIP-003 & D2016-CCIP-14002
<Exempt>
AQC:B8 KINGS TPC: $100-$225 M TOTAL 5YR COST : 0.000 69.284 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT ADA: TIMES SQUARE COMPLEX, PH 3 FTA 5337 01/2019 0.000 CONST 181.900
(SHUTTLE) - MODIFICATION / EXTENSION OF PLATFORM MTA 01/2019 0.000 CONST 45.492
ST04-0861 TO COMPLY WITH ADA REQUIREMENTS.
04-STATIONS
<Exempt>
AQC:B8 NEW YORK TPC: $175-$385 M TOTAL 5YR COST : 0.000 227.392 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT CONSTRUCTION OF ADA ELEVATORS ALONG WITH FTA 5309 01/2019 0.000 CONST 10.642
ANCILLARY IMPROVEMENTS AT 1ST AVENUE STATION MTA 01/2019 0.000 CONST 27.545
ST04-3484 ALONG THE CANARSIE LINE IN MANHATTAN TO
04-STATIONS IMPROVE ADA ACCESSIBILITY. D2016-CCIP-003 &
<Exempt> D2016-CCIP-14002
AQC:B8 NEW YORK TPC: $32-$50 M TOTAL 5YR COST : 0.000 38.187 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT PROVIDE FULL ADA (AMERICANS WITH DISABILITIES CMAQ 01/2019 0.000 CONST 21.600
ACT) ACCESSIBILITY AT THE WOODHAVEN BOULEVARD MTA 01/2019 0.000 CONST 2.400
ST04-6131 STATION ON THE JAMAICA LINE IN QUEENS. FTA 5337 01/2019 0.000 CONST 3.119
04-STATIONS
MTA 01/2019 0.000 CONST 3.780
<Exempt>
AQC:B8 QUEENS TPC: $26-$40 M TOTAL 5YR COST : 0.000 30.899 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT PROVIDE ADA ACCESSIBILITY AT THE 68 CMAQ 01/2019 0.000 CONST 26.737
STREET - HUNTER COLLEGE STATION ON THE IRT MTA 01/2019 0.000 CONST 6.684
ST04-6951 LEXINGTON AVENUE LINE. (MISC - IS CMAQ MTA 01/2019 0.000 CONST 15.535
04-STATIONS TRANSFERRED IN FFY 2017 - 7/28/17) FTA MISC 01/2019 0.000 MISC 27.137
<Exempt>
AQC:B8 NEW YORK TPC: $100-$225 M TOTAL 5YR COST : 0.000 76.093 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REPAIR OF PLATFORM COMPONENTS AT SELECT MTA 01/2019 0.000 CONST 22.782
LOCATIONS ON THE 6AVE LINE AND 63 ST LINE IN
ST21-2500 MANHATTAN TO MAINTAIN A STATE OF GOOD REPAIR.
04-STATIONS
<Exempt>
AQC:B8 MULTI TPC: $21-$31 M TOTAL 5YR COST : 0.000 22.782 0.000 0.000 0.000 0.000 0.000 0.000

110
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 6 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA NYCT REPAIR OF PLATFORM COMPONENTS AT SELECT MTA 01/2019 0.000 CONST 25.445
LOCATIONS ON THE LEXINGTON AVENUE LINE IN
ST21-2507 MANHATTAN TO MAINTAIN A STATE OF GOOD REPAIR.
04-STATIONS
<Exempt>
AQC:B8 NEW YORK TPC: $21-$31 M TOTAL 5YR COST : 0.000 25.445 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REPLACE PLATFORM EDGES AT 174 ST AND FREEMAN ST MTA 01/2019 0.000 CONST 1.775
STATIONS ON THE WHITE PLAINS ROAD LINE IN THE
ST21-2508 BRONX TO MAINTAIN A STATE OF GOOD REPAIR.
04-STATIONS
<Exempt>
AQC:B8 BRONX TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 1.775 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT STATION PAINTING PROGRAM FOR 2019. PAINTING OF MTA 01/2019 0.000 MISC 8.000
STRUCTURAL COMPONENTS AT STATIONS
ST21-2997 THROUGHOUT THE SYSTEM TO MAINTAIN A STATE OF
04-STATIONS GOOD REPAIR. LOCATIONS DETERMINED BASED ON
<Exempt> STATION CONDITION SURVEY.
AQC:B8 SYSTEM-WIDE TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 8.000 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REPLACE INTERIOR STAIRS AT CANAL ST STATION ON MTA 01/2019 0.000 CONST 0.441
THE BROADWAY LINE IN MANHATTAN TO MAINTAIN A
ST21-3006 STATE OF GOOD REPAIR.
04-STATIONS
<Exempt>
AQC:B8 KINGS TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.441 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REPLACE INTERIOR STAIR AT SELECT LOCATIONS IN MTA 01/2019 0.000 CONST 10.364
THE BRONX, MANHATTAN AND QUEENS TO MAINTAIN A
ST21-3010 STATE OF GOOD REPAIR.
04-STATIONS
<Exempt>
AQC:B8 MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 0.000 10.364 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REPAIR INTERIOR STAIRS AT SELECT LOCATIONS ON MTA 01/2019 0.000 CONST 17.270
THE 8 AV LINE IN MANHATTAN AND THE WHITE PLAINS
ST21-3073 ROAD LINE IN THE BRONX TO MAINTAIN A STATE OF
04-STATIONS GOOD REPAIR.
<Exempt>
AQC:B8 MULTI TPC: $15-$25 M TOTAL 5YR COST : 0.000 17.270 0.000 0.000 0.000 0.000 0.000 0.000

111
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 7 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA NYCT REPAIR OF ELEVATED STREET STAIRS AT THE MTA 01/2019 0.000 CONST 0.387
FOLLOWING STATIONS ON THE WHITE PLAINS ROAD
ST21-3077 LINE IN THE BRONX TO MAINTAIN A STATE OF GOOD
04-STATIONS REPAIR: FREEMAN ST, SIMPSON ST AND PROSPECT AVE.
<Exempt>

AQC:B8 BRONX TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.387 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REPLACEMENT OF STREET STAIRS AT 4 LOCATIONS ON MTA 01/2019 0.000 CONST 1.606
THE 8AV LINE IN MANHATTAN TO MAINTAIN A STATE OF
ST21-3089 GOOD REPAIR: 103 ST STATION, 72 ST STATION, 50 ST
04-STATIONS STATION, AND 14 ST STATION.
<Exempt>
AQC:B8 NEW YORK TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 1.606 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REPLACE INTERIOR STAIRS AND OTHER MEZZANINE MTA 01/2019 0.000 CONST 3.171
COMPONENTS AT THE FOLLOWING STATIONS TO
ST21-3345 MAINTAIN A STATE OF GOOD REPAIR: 96 ST - 8AV LINE,
04-STATIONS 103 ST - 8AV LINE, 149 ST-3 AV - WPR LINE, 149
<Exempt> ST-GRAND CONCOURSE - WPR LINE.
AQC:B8 MULTI TPC: $2-$4 M TOTAL 5YR COST : 0.000 3.171 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REPLACE MEZZANINE COMPONENTS AT THE 23 ST MTA 01/2019 0.000 CONST 1.593
STATION ON THE 8AV LINE IN MANHATTAN TO
ST21-3449 MAINTAIN A STATE OF GOOD REPAIR.
04-STATIONS
<Exempt>
AQC:B8 NEW YORK TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 1.593 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REPLACEMENT OF PLATFORM EDGES AT SELECT MTA 01/2019 0.000 CONST 15.131
LOCATIONS ON THE QUEENS BOULEVARD LINE IN
ST21-3487 QUEENS TO MAINTAIN A STATE OF GOOD REPAIR.
04-STATIONS
<Exempt>
AQC:B8 QUEENS TPC: $12.5-$19 M TOTAL 5YR COST : 0.000 15.131 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REPLACEMENT STATION LIGHTING AT THE FOLLOWING FTA 5337 01/2019 0.000 CONST 4.099
LOCATIONS IN MANHATTAN AND THE BRONX TO MTA 01/2019 0.000 CONST 1.025
ST21-3755 MAINTAIN A STATE OF GOOD REPAIR: 50 ST, 96 ST, 103 ST
04-STATIONS & SPRING ST (IND - 8AV LINE) AS WELL AS 149 ST-3AV &
<Exempt> 149 ST-GRAND CONCOURSE (IRT - WPR LINE).

AQC:B8 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 5.124 0.000 0.000 0.000 0.000 0.000 0.000

112
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 8 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA NYCT REPLACE PLATFORM COMPONENTS AT THE FOLLOWING MTA 01/2019 0.000 CONST 3.847
STATIONS ON THE 8AV LINE IN MANHATTAN TO
ST21-6192 MAINTAIN A STATE OF GOOD REPAIR: SPRING ST , 23 ST
04-STATIONS AND 50 ST.
<Exempt>
AQC:B8 NEW YORK TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 3.847 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT COMPONENT REPAIRS FOR VENTILATORS AT VARIOUS MTA 01/2019 0.000 CONST 17.800
LOCATIONS ACROSS THE SYSTEM TO MAINTAIN A
ST21-6223 STATE OF GOOD REPAIR. PROJECT LOCATIONS AND
04-STATIONS COMPONENTS TO BE DETERMINED BASED ON
<Exempt> CONDITION RATINGS.
AQC:B8 SYSTEM-WIDE TPC: $15-$25 M TOTAL 5YR COST : 0.000 17.800 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT RENEWAL OF 69 STREET STATION, FLUSHING LINE IN MTA 01/2019 0.000 CONST 17.136
THE BOROUGH OF QUEENS. WORK INCLUDES REPAIR
ST22-1556 OR REPLACEMENT OF 3 OR MORE STATION
04-STATIONS COMPONENTS TO BRING COMPONENT DEFICIENCIES TO
<Exempt> A STATE OF GOOD REPAIR.
AQC:B8 QUEENS TPC: $15-$25 M TOTAL 5YR COST : 0.000 17.136 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT RENEWAL OF 61 STREET-WOODSIDE STATION, FLUSHING MTA 01/2019 0.000 CONST 17.693
LINE IN THE BOROUGH OF QUEENS. WORK INCLUDES
ST22-1559 REPAIR OR REPLACEMENT OF 3 OR MORE STATION
04-STATIONS COMPONENTS TO BRING COMPONENT DEFICIENCIES TO
<Exempt> A STATE OF GOOD REPAIR.

AQC:B8 QUEENS TPC: $15-$25 M TOTAL 5YR COST : 0.000 17.693 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT RENEWAL OF 52 STREET STATION, FLUSHING LINE IN MTA 01/2019 0.000 CONST 18.534
THE BOROUGH OF QUEENS. WORK INCLUDES REPAIR
ST22-1588 OR REPLACEMENT OF 3 OR MORE STATION
04-STATIONS COMPONENTS TO BRING COMPONENT DEFICIENCIES TO
<Exempt> A STATE OF GOOD REPAIR.
AQC:B8 QUEENS TPC: $15-$25 M TOTAL 5YR COST : 0.000 18.534 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT RENEWAL OF 3 AVENUE-138 STREET STATION, PELHAM MTA 01/2019 0.000 CONST 22.819
LINE IN THE BRONX. WORK INCLUDES REPAIR OR
ST22-1886 REPLACEMENT OF 3 OR MORE STATION COMPONENTS
04-STATIONS TO BRING COMPONENT DEFICIENCIES TO A STATE OF
<Exempt> GOOD REPAIR.
AQC:B8 BRONX TPC: $21-$31 M TOTAL 5YR COST : 0.000 22.819 0.000 0.000 0.000 0.000 0.000 0.000

113
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 9 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA NYCT PROCUREMENT AND INSTALLATION OF FTA 5309 01/2019 0.000 CONST 9.643
LOW-RESISTANCE CONTACT RAIL WITHIN THE MTA 01/2019 0.000 CONST 19.292
MW11-3766 CANARSIE TUBE, BETWEEN BROOKLYN & MANHATTAN
05-TRACK TO PROVIDE SUFFICIENT POWER FOR OPERATIONS
<Exempt> UNDER COMMUNICATION BASED TRAIN CONTROL
(CBTC) D2016-CCIP-003 & D2016-CCIP-14002

AQC:B9 MULTI TPC: $32-$50 M TOTAL 5YR COST : 0.000 28.935 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT 2019 TRACK FORCE ACCOUNT WILL PROVIDE FOR MTA 01/2019 0.000 MISC 35.000
IN-HOUSE TRACK CHARGES FOR THE REPLACEMENT OF
MW26-6157 TRACK COMPONENTS THROUGHOUT THE SYSTEM TO
05-TRACK MAINTAIN A STATE OF GOOD REPAIR.
<Exempt>
AQC:B9 SYSTEM-WIDE TPC: $32-$50 M TOTAL 5YR COST : 0.000 35.000 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT 2018 MAINLINE TRACK REPLACEMENT THROUGHOUT MTA 01/2019 0.000 CONST 219.006
THE SUBWAY SYSTEM TO MAINTAIN A STATE OF GOOD
MW26-6159 REPAIR. LOCATIONS DETERMINED BY ASSET
05-TRACK CONDITION RATING.
<Exempt>
AQC:B9 SYSTEM-WIDE TPC: $175-$385 M TOTAL 5YR COST : 0.000 219.006 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT 2019 MAINLINE TRACK REPLACEMENT THROUGHOUT MTA 01/2019 0.000 CONST 219.006
THE SUBWAY SYSTEM TO MAINTAIN A STATE OF GOOD
MW26-6160 REPAIR. LOCATIONS DETERMINED BY ASSET
05-TRACK CONDITION RATING.
<Exempt>
AQC:B9 SYSTEM-WIDE TPC: $175-$385 M TOTAL 5YR COST : 0.000 219.006 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT DESIGN FOR 2020 MAINLINE TRACK REPLACMENT MTA 01/2019 0.000 MISC 2.050
PROGRAM TO MAINTAIN A STATE OF GOOD REPAIR.
MW26-6177 LOCATIONS DETERMINED BY ASSET CONDITION
05-TRACK RATING.
<Exempt>
AQC:B9 SYSTEM-WIDE TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 2.050 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT 2018 MAINLINE SWITCH REPLACEMENT THROUGHOUT MTA 01/2019 0.000 CONST 57.333
THE SUBWAY SYSTEM TO MAINTAIN A STATE OF GOOD
MW28-6163 REPAIR. LOCATIONS DETERMINED BY ASSET
05-TRACK CONDITION RATING.
<Exempt>
AQC:B9 SYSTEM-WIDE TPC: $50-$85 M TOTAL 5YR COST : 0.000 57.333 0.000 0.000 0.000 0.000 0.000 0.000

114
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 10 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA NYCT 2019 MAINLINE SWITCH REPLACEMENT THROUGHOUT MTA 01/2019 0.000 CONST 57.333
THE SUBWAY SYSTEM TO MAINTAIN A STATE OF GOOD
MW28-6164 REPAIR. LOCATIONS DETERMINED BY ASSET
05-TRACK CONDITION RATING.
<Exempt>
AQC:B9 SYSTEM-WIDE TPC: $50-$85 M TOTAL 5YR COST : 0.000 57.333 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT DESIGN FOR 2020 MAINLINE SWITCH REPLACEMENT TO MTA 01/2019 0.000 MISC 3.425
MAINTAIN A STATE OF GOOD REPAIR. LOCATIONS
MW28-6178 DETERMINED BY ASSET CONDITION RATING.
05-TRACK
<Exempt>
AQC:B9 SYSTEM-WIDE TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 3.425 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT 2018 CONTINUOUS WELDED RAIL (CWR) PROGRAM MTA 01/2019 0.000 CONST 35.853
REPLACES EXISTING JOINTED RAIL RESTING ON
MW44-6166 OBSOLETE PLATES AND INSTALLS CWR IN SUBWAY
05-TRACK TRACKS THROUGHOUT THE SYSTEM. THIS PROGRAM
<Exempt> WILL IMPROVE THE CONDITION OF THE RAILS, PLATES
AND TIES, EXTENDING USEFUL LIFE.

AQC:B8 SYSTEM-WIDE TPC: $32-$50 M TOTAL 5YR COST : 0.000 35.853 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT 2019 CONTINOUS WELDED RAIL (CWR) PROGRAM MTA 01/2019 0.000 CONST 35.853
REPLACES EXISTING JOINTED RAIL RESTING ON
MW44-6167 OBSOLETE PLATES AND INSTALLS CWR IN SUBWAY
05-TRACK TRACKS THROUGHOUT THE SYSTEM. THIS PROGRAM
<Exempt> WILL IMPROVE THE CONDITION OF THE RAILS, PLATES
AND TIES, EXTENDING USEFUL LIFE.

AQC:B9 SYSTEM-WIDE TPC: $32-$50 M TOTAL 5YR COST : 0.000 35.853 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT HARDENING OF SENSITIVE SUBWAY EQPT(PH.1) IN FTA 5324 CR 01/2019 0.000 CONST 10.675
FLOOD PRONE AREAS INCLUDING FANS, MTA 01/2019 0.000 CONST 3.558
E-T06-03-02 COMMUNICATION ROOMS & SYSTEMS; SIGNAL
06-LINE EQPT SYSTEMS AND POWER SUPPLY/DISTRIBUTION ROOMS &
<Exempt> EQUIPMENT LOCATED IN UNDERGROUND SUBWAY
SYSTEM,14 LOCATIONS (MANHATTAN-9, KINGS-1 &
QUEENS-4, D2013-RESL-026

AQC:C15 MULTI TPC: $15-$25 M TOTAL 5YR COST : 0.000 14.233 0.000 0.000 0.000 0.000 0.000 0.000

115
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 11 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA NYCT FLOOD PROTECTION TO THE VULNERABLE FTA 5324 CR 01/2019 0.000 CONST 112.050
SUBSTATIONS IN THE FLOOD PRONE AREA IN THE MTA 01/2019 0.000 CONST 37.350
E-T06-03-03 BOROUGH OF BROOKLYN, MANHATTAN AND QUEENS.
06-LINE EQPT HARDENING OF THE SUBSTATIONS WORK INCLUDE:
<Exempt> REPLACEMENT OF EXISTING CONVENTION DOORS FOR
PERSONNEL ACCESS WITH FLOOD DOORS;
REPLACEMENT OF ROLL UP DOORS FOR EQUIPMENT
AND VEHICULAR ACCESS WITH HYDRAULIC FLOOD
GATE OR ERECTABLE LOGS; REPLACEMENT OF
PERSONNEL ACCESS HATCH AND VENTILATION; WATER
TIGHT WALL AND CEILING PENETRATION;
REPLACEMENT OF TRACTION DRY TYPE TRANSFORMER
WITH OIL FILLED TRANSFORMER; RAISE THE
ELECTRICAL EQUIPMENT. THE SCOPE FOR THIS WORK
WAS BROKEN OUT TO SEPARATE PINS: E-T09-03-08,
E-T09-03-12, E-T09-03-05, E-T09-03-11, E-T09-03-07,
E-T09-03-06. D2013-RESL-018

AQC:C15 MULTI TPC: $100-$225 M TOTAL 5YR COST : 0.000 149.400 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT IMPLEMENT RESILIENCY INITIATIVES TO PREVENT FTA 5324 01/2019 0.000 MISC 2.160
FUTURE FLOODING AT THE SIGNAL TOWER ADJACENT
E-T06-03-31 TO THE STEINWAY PORTAL (ALSO KNOWN AS HUNTERS
06-LINE EQPT POINT PORTAL), WHICH SERVES THE FLUSHING LINE IN
<Exempt> MANHATTAN AND QUEENS. THIS PROJECT IS FOR THE
DESIGN AND CONSTRUCTION OF FLOOD PROTECTION,
QUEENS (D2013-SAND-023)

AQC:C15 QUEENS TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 2.160 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REHABILITATION OF FOUR (4) PUMP ROOMS TO MTA 01/2019 0.000 CONST 25.000
MAINTAIN A STATE OF GOOD REPAIR, THREE IN
MW19-6556 MANHATTAN AND ONE IN QUEENS.
06-LINE EQPT
<Exempt>
AQC:B9 MULTI TPC: $21-$31 M TOTAL 5YR COST : 0.000 25.000 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT CONSTRUCTION OF A NEW VENT PLANT AT GRAND MTA 01/2019 0.000 MISC 100.000
CENTRAL/LEXINGTON AVE TO COMPLY WITH
MW24-2541 VENTILATION STANDARDS AND TO PROVIDE FULL
06-LINE EQPT EMERGENCY VENTILATION CAPACITY ON IRT
<Exempt> LEXINGTON LINE, MANHATTAN. THIS NEW VENT PLANT
WILL SERVE 4, 5, 6, AND SHUTTLE \\\'S\\\' TRAINS.

AQC:B9 NEW YORK TPC: $70-$130 M TOTAL 5YR COST : 0.000 100.000 0.000 0.000 0.000 0.000 0.000 0.000

116
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 12 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA NYCT DESIGN AND CONSTRUCTION OF RESILIENCY FTA 5324 01/2019 0.000 CONST 35.000
MEASURES TO PROTECT THE ROCKAWAYS’ SHORELINE
E-T07-02-02 AND TRACK FROM DEBRIS DAMAGE AND EROSION
07-STRUCTURE DURING MAJOR STORM EVENTS. THE RESILIENCY
<Exempt> MEASURE AT ALL THREE LOCATIONS IS THE
INSTALLATION OF A WAVE/DEBRIS BARRIER ALONG THE
LOWER LEVEL TRACKS, QUEENS (D2013-SAND-023)

AQC:B9 QUEENS TPC: $32-$50 M TOTAL 5YR COST : 0.000 35.000 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT INTERNAL SEALING OF TUNNELS/STN COMPLEXES TO FTA 5324 CR 01/2019 0.000 MISC 5.689
PROVIDE THE PRE-ENGINEERING & SITE MOBILIZATION MTA 01/2019 0.000 MISC 1.896
E-T07-03-01 TO FACILITATE THE RAPID DEPLOYMENT OF
07-STRUCTURE TEMPORARY STRUCTURES AS POSSIBLE MECHANISMS
<Exempt> FOR SEALING FLOOD PRONE TUNNELS & STN (QNS, BK,
BX, MHTN) D2013-RESL-019

AQC:B9 SYSTEM-WIDE TPC: $175-$385 M TOTAL 5YR COST : 0.000 7.585 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT IMPLEMENT LONG-TERM FLOOD MITIGATION OF FTA 5324 CR 01/2019 0.000 CONST 117.946
HAMMELS WYE SOUTH OF THE BROAD CHANNEL A/S MTA 01/2019 0.000 CONST 39.215
E-T07-03-09 STATION ON THE ROCKAWAY PENINSULA THROUGH
07-STRUCTURE THE DESIGN AND CONSTRUCTION OF PERIMETER
<Exempt> PROTECTION, PUMPING AND FACILITY HARDENING.
WORK INCLUDES INSTALLATION OF FLOOD WALL
AROUND THE PERIMETER OF THE TRIANGLE OF LAND
FORMED AT HAMMELS WYE, GATES AND/OR
ERECTABLE LOGS AND PROTECTION OF COMPRESSOR
ROOM FACILITY. D2013-RESL-028

AQC:B9 QUEENS TPC: $100-$225 M TOTAL 5YR COST : 0.000 157.161 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT FLOOD RESILIENCY FOR THREE CRITICAL SUPPORT FTA 5324 CR 01/2019 0.000 MISC 24.320
FACILITIES INCLUDES COMBINATION OF FLOOD MTA 01/2019 0.000 MISC 8.107
E-T16-03-01 PANELS, GATES, HYDROPHILIC SEALANT, PERIMETER
07-STRUCTURE PROTECTION AND BACKFLOW PREVENTERS AT TIFFANY
<Exempt> CENTRAL WAREHOUSE, ZEREGA CENTRAL
MAINTENANCE AND REVENUE CONTROL FACILITIES
(ASSOCIATED PINS E-T16-03-10 & E-T16-03-12)
D2013-RESL-021

AQC:C15 SYSTEM-WIDE TPC: $32-$50 M TOTAL 5YR COST : 0.000 32.427 0.000 0.000 0.000 0.000 0.000 0.000

117
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 13 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA NYCT STRUCTURAL CONDITION SURVEY, OVERCOAT MTA 01/2019 0.000 MISC 28.536
PAINTING AND COMPONENT REPAIR OF 1.25 MILES
MW62-1152 BETWEEN 48 ST AND 72 ST ON THE FLUSHING LINE TO
07-STRUCTURE ACHIEVE A STATE OF GOOD REPAIR. WILL BE
<Exempt> COORDINATED WITH OTHER PROJECTS WITHIN THE
ELEVATED STEEL PAINTING PROGRAM.

AQC:B9 QUEENS TPC: $26-$40 M TOTAL 5YR COST : 0.000 28.536 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT DESIGN FOR OVERCOAT PAINTING AND COMPONENT MTA 01/2019 0.000 DETLDES 1.210
REPAIR OF 2.35 MILES BETWEEN 9AV PORTAL AND 79 ST
MW62-1198 ON THE WEST END LINE TO ACHIEVE A STATE OF GOOD
07-STRUCTURE REPAIR. WILL BE COORDINATED WITH OTHER PROJECTS
<Exempt> WITHIN THE ELEVATED STEEL PAINTING PROGRAM.

AQC:B9 KINGS TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 1.210 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT STEEL REPAIR AND PAINTING OF ELEVATED LINE MTA 01/2019 0.000 CONST 45.888
STRUCTURE ALONG 2 MILES FROM MYRTLE AVENUE
MW62-7003 STATION TO DE SALES PLACE ALONG THE JAMAICA
07-STRUCTURE AVENUE LINE TO ACHIEVE A STATE OF GOOD REPAIR.
<Exempt>

AQC:B9 KINGS TPC: $40-$60 M TOTAL 5YR COST : 0.000 45.888 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT OVERCOAT PAINTING AND STEEL REPAIR OF THE MTA 01/2019 0.000 CONST 37.927
ELEVATED STRUCTURE ON THE MYRTLE AVENUE LINE
MW62-7006 IN QUEENS AND BROOKLYN TO ACHIEVE A STATE OF
07-STRUCTURE GOOD REPAIR.
<Exempt>
AQC:B9 MULTI TPC: $32-$50 M TOTAL 5YR COST : 0.000 37.927 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT LINE STRUCTURE COMPONENT REPAIR PROGRAM TO FTA 5307 01/2019 0.000 CONST 62.238
ADDRESS KNOWN DEFECTS AND DEFICIENT LINE MTA 01/2019 0.000 CONST 15.560
MW64-0845 STRUCTURE CLUSTERS AT VARIOUS LOCATIONS FTA 5337 01/2019 0.000 CONST 59.822
07-STRUCTURE THROUGHOUT THE SYSTEM TO BRING TO A STATE OF MTA 01/2019 0.000 CONST 14.955
<Exempt> GOOD REPAIR.

AQC:B9 MULTI TPC:$384.2-$473.3 M TOTAL 5YR COST : 0.000 152.575 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REHABILITATION AND WATER MITIGATION AT PRIORITY FTA 5307 01/2019 0.000 CONST 7.058
VENTILATION CHAMBERS OUTSIDE OF STATION MTA 01/2019 0.000 CONST 1.765
MW64-3781 ENVELOPES TO ACHIEVE A STATE OF GOOD REPAIR.
07-STRUCTURE LOCATIONS DETERMINED BASED ON ASSET CONDITION
<Exempt> RATING.
AQC:B8 SYSTEM-WIDE TPC: $32-$50 M TOTAL 5YR COST : 0.000 8.823 0.000 0.000 0.000 0.000 0.000 0.000

118
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 14 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA NYCT FURNISH AND INSTALL ENHANCED SECURITY SIGNAL FTA 5337 01/2019 0.000 MISC 14.351
HARDWARE AND SOFTWARE AT KEY LOCATIONS MTA 01/2019 0.000 MISC 3.588
MW17-1629 SYSTEM-WIDE FOR IMPROVED OPERATIONS AND MTA 01/2019 0.000 MISC 43.061
08-COMM&SIG STANDARDIZATION UNDER ONE SYSTEM.
<Exempt>

AQC:B4 SYSTEM-WIDE TPC: $50-$85 M TOTAL 5YR COST : 0.000 61.000 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT MODERNIZATION OF PARSONS BLVD INTERLOCKING ON CMAQ 01/2019 0.000 MISC 115.173
THE QUEENS BOULEVARD LINE TO SUPPORT THE MTA 01/2019 0.000 MISC 50.504
MW38-1456 IMPLEMENTATION OF COMMUNICATION BASED TRAIN
08-COMM&SIG CONTROL (CBTC).
<Exempt>
AQC:B6 QUEENS TPC: $100-$225 M TOTAL 5YR COST : 0.000 165.677 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REPLACEMENT OF INTERLOCKING CONTROL AND FTA 5337 01/2019 0.000 CONST 26.249
TRAIN OCCUPANCY INDICATION SYSTEM ON THE MTA 01/2019 0.000 CONST 6.562
MW38-1957 BROADWAY-7TH AVENUE LINE TO ACHIEVE A STATE OF MTA 01/2020 37.613 CONST 37.613
08-COMM&SIG GOOD REPAIR.
<Exempt>
AQC:B6 NEW YORK TPC: $50-$85 M TOTAL 5YR COST : 37.613 32.811 37.613 0.000 0.000 0.000 0.000 0.000

MTA NYCT REPLACEMENT OF CODE CABLES ON THE 7 AVENUE FTA 5337 01/2019 0.000 CONST 20.899
LINE WITH FIBER OPTIC CABLES TO INCREASE MTA 01/2019 0.000 CONST 5.224
MW38-1959 RELIABILITY OF SIGNAL SYSTEM ON THE LINE, WHILE
08-COMM&SIG INCREASING ITS FUNCTIONALITY.
<Exempt>
AQC:B6 MULTI TPC: $21-$31 M TOTAL 5YR COST : 0.000 26.123 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT PHASE ONE OF REPLACEMENT OF EXISTING SPEED FTA 5337 01/2019 0.000 CONST 40.685
ENFORCEMENT SYSTEM WITH STANDARDIZED MTA 01/2019 0.000 CONST 11.171
MW53-1958 TECHNOLOGY ACROSS THE SIGNAL SYSTEM TO
08-COMM&SIG ACHIEVE A STATE OF GOOD REPAIR. THIS WORK WILL
<Exempt> INCREASE THE RELIABILITY OF THE SYSTEM, WHILE
SUPERSEDING THE NECESSITY FOR SPARE PARTS.

AQC:B6 SYSTEM-WIDE TPC: $40-$60 M TOTAL 5YR COST : 0.000 51.856 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT DESIGN AND IMPLEMENTATION OF RESILIENCY FTA 5324 01/2019 0.000 CONST 3.500
SOLUTION TO PROTECT THE ROCKAWAY PARK YARD
E-T07-03-13 COMPRESSOR ROOM. FLOOD RESILIENCY WILL BE
09-POWER ACHIEVED BY CONSTRUCTING A NEW COMPRESSOR
<Exempt> ROOM ADJACENT TO THE OLD ROOM ABOVE THE
DESIGN FLOOD ELEVATION, QUEENS (D2013-SAND-023)

AQC:B8 QUEENS TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 3.500 0.000 0.000 0.000 0.000 0.000 0.000

119
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 15 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA NYCT MONTAGUE-FURMAN SUBSTATION HARDENING BY FTA 5324 01/2019 0.000 CONST 9.670
INSTALLING LOUVERS/VENTS ARCHITECTUAL
E-T09-03-04 TREATMENT TO WITHSTAND 100 YR STORM, INSERTS
09-POWER AND COVERS FOR SMALL OPENINGS, REPLACING
<Exempt> EQUIPMENT WITH WATERTIGHT MODELS, AND
INSTALLING BACKWATER VALVES AND SUMP PUMPS,
BROOKLYN (D2013-SAND-015)

AQC:B6 KINGS TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 9.670 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT DESIGN AND IMPLEMENTATION OF AN EMERGENCY FTA 5324 01/2019 0.000 CONST 17.000
POWER CONTROL CENTER (EPCC) AT JAY STREET
E-T09-03-10 SUBSTATION, NEW YORK CITY, AS A BACKUP
09-POWER LOCATION/FACILITY TO ALLOW CENTRALIZED REMOTE
<Exempt> CONTROL OF THE TRACTION POWER SYSTEM WHEN
THE MAIN PCC BECOMES INACCESSIBLE OR
NON-FUNCTIONAL DUE TO NATURAL OR MANMADE
EVENT (REFERENCE MOTHER PIN E-T09-03-01)
(D2013-SAND-023)

AQC:B6 NEW YORK TPC: $15-$25 M TOTAL 5YR COST : 0.000 17.000 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT DESIGN AND IMPLEMENTATION OF RESILIENCY FTA 5324 01/2019 0.000 CONST 1.000
INITIATIVES TO PREVENT FUTURE FLOODING AT THE
E-T09-03-13 TUDOR SUBSTATION, MANHATTAN (D2013-SAND-023)
09-POWER
<Exempt>
AQC:B6 NEW YORK TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 1.000 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT DESIGN AND IMPLEMENTATION OF RESILIENCY FTA 5324 01/2019 0.000 CONST 1.000
INITIATIVES TO PREVENT FUTURE FLOODING AT THE
E-T09-03-14 WEST BROADWAY/MURRAY SUBSTATION, WHICH
09-POWER SERVES THE 7TH AVENUE LINE IN MANHATTAN
<Exempt> (D2013-SAND-023)
AQC:B6 NEW YORK TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 1.000 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT UPDATE THE SUPERVISORY CONTROL AND DATA FTA 5337 01/2019 0.000 CONST 28.461
ACQUISITION (SCADA) SYSTEM AT CRITICAL MTA 01/2019 0.000 CONST 7.115
MW01-2609 LOCATIONS SYSTEM WIDE TO MAINTAIN A STATE OF
09-POWER GOOD REPAIR. THIS WILL ALLOW FOR QUICKER
<Exempt> RESPONSE TIME TO INCIDENTS.

AQC:B6 SYSTEM-WIDE TPC: $32-$50 M TOTAL 5YR COST : 0.000 35.576 0.000 0.000 0.000 0.000 0.000 0.000

120
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 16 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA NYCT UPGRADE OF CABLES CONNECTING SUBSTATIONS TO MTA 01/2019 0.000 CONST 88.066
THIRD RAIL ON QUEENS BOULEVARD LINE IN ORDER TO
MW25-2551 ENSURE CONTINUITY OF SERVICES IN CONTINGENCY
09-POWER CONDITIONS.
<Exempt>
AQC:B6 QUEENS TPC: $70-$130 M TOTAL 5YR COST : 0.000 88.066 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REHABILITATION OF 7 CIRCUIT BREAKER HOUSES (CBH) MTA 01/2019 0.000 CONST 10.000
IN MANHATTAN AND QUEENS TO PROTECT THE
MW25-2553 EQUIPMENT AND ACHIEVE A STATE OF GOOD REPAIR.
09-POWER
<Exempt>
AQC:B6 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 10.000 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REBUILD DUCT IN CENTRAL SUBSTATION ON THE SIXTH MTA 01/2019 0.000 CONST 10.000
AVE LINE IN MANHATTAN TO ACHIEVE A STATE OF
MW25-6193 GOOD REPAIR.
09-POWER
<Exempt>
AQC:B6 NEW YORK TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 10.000 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT CONSTRUCT THREE (3) NEW POWER SUBSTATIONS ON FTA 5309 01/2019 0.000 CONST 48.660
CANARSIE LINE IN MANHATTAN AND BROOKLYN TO MTA 01/2019 0.000 CONST 144.499
PW08-2548 IMPROVE EFFICIENCY OF OPERATIONS UNDER
09-POWER COMMUNICATION BASED TRAIN CONTROL (CBTC)
<Exempt> D2016-CCIP-003 & D2016-CCIP-14002

AQC:B6 MULTI TPC: $175-$385 M TOTAL 5YR COST : 0.000 193.159 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT CONSTRUCT A NEW SUBSTATION SERVING THE IND, 8TH MTA 01/2019 0.000 CONST 45.000
AVENUE LINE AROUND CANAL STREET AND 8TH
PW09-6133 AVENUE TO PROVIDE TRACTION POWER FOR
09-POWER INCREASED RELIABILITY ON THE SUBWAY LINE.
<Exempt>
AQC:B6 NEW YORK TPC: $40-$60 M TOTAL 5YR COST : 0.000 45.000 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT CONSTRUCT A NEW POWER SUBSTATION IN VICINITY MTA 01/2019 0.000 CONST 60.000
OF 34 ST STATION/8TH AV LINE TO SERVE 8TH AVENUE
PW09-6830 LINE IN MANHATTAN TO IMPROVE EFFICIENCY OF
09-POWER OPERATIONS UNDER COMMUNICATION BASED TRAIN
<Exempt> CONTROL (CBTC).
AQC:B6 NEW YORK TPC: $50-$85 M TOTAL 5YR COST : 0.000 60.000 0.000 0.000 0.000 0.000 0.000 0.000

121
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 17 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA NYCT RENEWAL OF CENTRAL SUBSTATION IN MANHATTAN TO FTA 5337 01/2019 0.000 CONST 34.089
IMPROVE RELIABILITY OF TRAIN SERVICES, BY MTA 01/2019 0.000 CONST 8.522
PW11-2544 FURNISHING ADEQUATE ELECTRICAL POWER ALONG
09-POWER THE RIGHT OF WAY.
<Exempt> .
AQC:B6 NEW YORK TPC: $40-$60 M TOTAL 5YR COST : 0.000 42.611 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REPAIR/REPLACEMENT OF VARIOUS STORM DAMAGED FTA 5324 01/2019 0.000 CONST 278.459
ASSETS, INCLUDING POWER CABLES, SIGNAL STOPS,
E-T10-02-08 SWITCH MOTORS, RELAYS, INTERLOCKINGS, AND
10-SHOPS OTHER FLOOD DAMAGED ITEMS AT 148TH ST. YARD,
<Exempt> ROCKAWAY YARD, CONEY ISLAND YARD, AND 207TH ST
YARD. FFY2019 PHASE INCLUDES REPLACEMENT OF
SIGNAL EQUIPMENT, AND YARD TRACK AND SWITCHES
WHICH SUSTAINED DAMAGE DURING SUPER STORM IN
THE CULVER YARD PORTION OF THE CONEY ISLAND
YARD COMPLEX (D2016-SAND-003)

AQC:C15 SYSTEM-WIDE TPC:$0.7-$0.9 B TOTAL 5YR COST : 0.000 278.459 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT 2019 YARD TRACK REPLACEMENT IN THE VARIOUS MTA 01/2019 0.000 MISC 2.300
YARDS BASED ON THE LATEST YARD CONDITION
MW46-6170 SURVEY TO BRING THE YARD TRACK IN STATE OF GOOD
10-SHOPS REPAIR.
<Exempt>
AQC:B9 SYSTEM-WIDE TPC: $2-$4 M TOTAL 5YR COST : 0.000 2.300 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT DESIGN FOR THE 2020 YARD TRACK REPLACEMENT MTA 01/2019 0.000 DETLDES 0.060
PROJECT TO MAINTAIN A STATE OF GOOD REPAIR.
MW46-6179 LOCATIONS DETERMINED BY CONDITION RATING.
10-SHOPS
<Exempt>
AQC:B8 SYSTEM-WIDE TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.060 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT 2018 YARD SWITCH REPLACEMENT WILL PROVIDE FOR MTA 01/2019 0.000 CONST 3.800
THE REPLACEMENT YARD SWITCHES THAT HAVE
MW51-6172 REACHED THE END OF THEIR USEFUL LIFE AT
10-SHOPS SELECTED LOCATIONS BASED ON THE LATEST YARD
<Exempt> SWITCH CONDITION SURVEY.
AQC:B9 SYSTEM-WIDE TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 3.800 0.000 0.000 0.000 0.000 0.000 0.000

122
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 18 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA NYCT 2019 YARD SWITCH REPLACEMENT WILL PROVIDE FOR MTA 01/2019 0.000 CONST 3.800
THE REPLACEMENT YARD SWITCHES THAT HAVE
MW51-6173 REACHED THE END OF THEIR USEFUL LIFE AT
10-SHOPS SELECTED LOCATIONS BASED ON THE LATEST YARD
<Exempt> SWITCH CONDITION SURVEY.
AQC:B9 SYSTEM-WIDE TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 3.800 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT DESIGN FOR 2020 YARD SWITCH REPLACEMENT MTA 01/2019 0.000 DETLDES 0.060
PROGRAM. LOCATIONS DETERMINED BASED ON THE
MW51-6180 LATEST YARD SWITCH CONDITION SURVEY.
10-SHOPS
<Exempt>
AQC:B9 SYSTEM-WIDE TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.060 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT DESIGN & CONSTRUCTION OF RESILIENCY MEASURES FTA 5324 01/2019 0.000 CONST 92.111
TO PROTECT THE CRITICAL ASSETS IN THREE (3) YARDS
E-T10-03-15 (CORONA, WESTCHESTER AND JAMAICA) FROM
11-YARDS FUTURE FLOOD DAMAGE, QUEENS AND WESTCHESTER
<Exempt> (D2013-SAND-023)
AQC:B9 MULTI TPC: $70-$130 M TOTAL 5YR COST : 0.000 92.111 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT FLOOD RESILIENCY FOR CRITICAL BUS DEPOTS: FTA 5324 CR 01/2019 0.000 CONST 44.770
IMPLEMENT FLOOD MITIGATION /RESILIENCY AT MJ MTA 01/2019 0.000 CONST 14.923
E-T12-03-01 QUILL DEPOT (MHTN), CASEY STENGEL (BKLYN), AND
12-DEPOTS CASTLETON & YUKON DEPOTS (SI) TO PROTECT
<Exempt> AGAINST FLOODS TO INCLUDE CONCRETE WALLS,
SEALING WITH FLOOD DOORS, PANELS, CHECK VALVES,
BACKFLOW PREVENTERS, DRAINING AND PUMPING
IMPROVEMENTS (ASSOCIATED PINS: E-T12-03-07,
E-T12-03-08, E-T12-03-09) D2013-RESL-029

AQC:C15 MULTI TPC: $50-$85 M TOTAL 5YR COST : 0.000 59.693 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT PHASE ONE OF RECONSTRUCTION OF EXISTING MTA 01/2019 0.000 CONST 128.356
JAMAICA DEPOT IN QUEENS TO ACHIEVE A STATE OF
SF06-6024 GOOD REPAIR. WORK WILL INCLUDE ADEQUATE SHOP,
12-DEPOTS OFFICE, AND STORAGE SPACE, AS WELL AS,
<Exempt> INSTALLATION OF EQUIPMENT, SUCH AS BUS LIFTS AND
WASHERS.

AQC:B8 QUEENS TPC: $100-$225 M TOTAL 5YR COST : 0.000 128.356 0.000 0.000 0.000 0.000 0.000 0.000

123
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 19 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA-BUS CNG UPGRADE/CONVERSION COLLEGE POINT- TO FTA 5307 01/2019 0.000 CONST 1.837
UPGRADE FACILITY EQUIPMENT NEEDED TO FUEL LOCAL 01/2019 0.000 CONST 0.230
U6030212 COMPRESSED NATURAL GAS (CNG) BUSES AT COLLEGE STATE 01/2019 0.000 CONST 0.229
12-DEPOTS POINT DEPOTS (PARENT IN NY-90-X703)
<Exempt>
AQC:B8 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 2.296 0.000 0.000 0.000 0.000 0.000 0.000

MTA-BUS FACILITY COMPONENT FTA 5307 01/2019 0.000 MISC 4.308


REHABILITATION - REHABILITATE AND REPLACE STATE 01/2019 0.000 MISC 0.539
U7030207 VARIOUS FACILITY COMPONENTS THAT ARE PAST THEIR LOCAL 01/2019 0.000 MISC 0.538
12-DEPOTS USEFUL LIFE, AND BASED ON CONDITION AT THE
<Exempt> LAGUARDIA AND BAISLEY PARK DEPOTS
AQC:B8 QUEENS TPC: $9.5-15.5 M TOTAL 5YR COST : 0.000 5.385 0.000 0.000 0.000 0.000 0.000 0.000

MTA-BUS FACILITY REHABILITATION AND UPGRADE - REPLACE FTA 5339 01/2019 0.000 MISC 2.378
FACILITY COMPONENTS THAT ARE PAST THEIR USEFUL STATE 01/2019 0.000 MISC 0.297
U7030208 LIFE, AND BASED ON CONDITION AT THE SPRING CREEK LOCAL 01/2019 0.000 MISC 0.298
12-DEPOTS DEPOT
<Exempt>
AQC:B8 KINGS TPC: $9.5-15.5 M TOTAL 5YR COST : 0.000 2.973 0.000 0.000 0.000 0.000 0.000 0.000

MTA-BUS FACILITY REHABILITATION AND UPGRADE - REPLACE FTA 5307 01/2019 0.000 MISC 7.615
FACILITY COMPONENTS THAT ARE PAST THEIR USEFUL STATE 01/2019 0.000 MISC 0.952
U7030209 LIFE, AND BASED ON CONDITION AT THE COLLEGE LOCAL 01/2019 0.000 MISC 0.952
12-DEPOTS POINT DEPOT
<Exempt>
AQC:B8 QUEENS TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 9.519 0.000 0.000 0.000 0.000 0.000 0.000

MTA-BUS REPLACE FACILITY PAINT BOOTHS THAT ARE PAST FTA 5307 01/2020 3.913 MISC 3.913
THEIR USEFUL LIFE, AND BASED ON CONDITION AT THE STATE 01/2020 0.489 MISC 0.489
U7030210 EASTCHESTER AND COLLEGE POINT DEPOTS LOCAL 01/2020 0.489 MISC 0.489
12-DEPOTS
<Exempt>
AQC:B8 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 4.891 0.000 4.891 0.000 0.000 0.000 0.000 0.000

MTA-BUS REPLACE THE CHASSIS WASH AND OIL-WATER FTA 5307 01/2020 2.000 MISC 2.000
SEPARATOR THAT ARE PAST THEIR USEFUL LIFE, AND STATE 01/2020 0.250 MISC 0.250
U7030213 BASED ON CONDITION AT THE EASTCHESTER DEPOT LOCAL 01/2020 0.250 MISC 0.250
12-DEPOTS
<Exempt>
AQC:B8 BRONX TPC: $2-$4 M TOTAL 5YR COST : 2.500 0.000 2.500 0.000 0.000 0.000 0.000 0.000

124
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 20 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA-BUS FACILITY REHABILITATION AND UPGRADE - REPLACE FTA 5307 01/2019 0.000 MISC 2.400
FACILITY WINDOWS BASED ON CONDITION AT THE JFK STATE 01/2019 0.000 MISC 0.300
U7030218 DEPOT TO BRING COMPONENT TO A STATE OF GOOD LOCAL 01/2019 0.000 MISC 0.300
12-DEPOTS REPAIR
<Exempt>
AQC:B8 QUEENS TPC: $2-$4 M TOTAL 5YR COST : 0.000 3.000 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT PROCUREMENT OF 24 NON-REVENUE RUBBER TIRE MTA 01/2019 0.000 MISC 4.000
SUPPORT VEHICLES TO MAINTAIN A STATE OF GOOD
FS01-1663 REPAIR. THESE SERVICE VEHICLES ARE USED FOR
13-NON REV ESSENTIAL SERVICES, SUCH AS EMERGENCY RESPONSE,
<Exempt> MATERIAL TRANSPORTATION, TRACK REPAIR AND
ELEVATED STRUCTURE REPAIR.

AQC:B2 SYSTEM-WIDE TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 4.000 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT SECOND AVE SUBWAY PHASE 2 CONSTRUCTION FTA 5309 NS 01/2019 0.000 MISC 500.000
SUPPORT ACTIVITIES (96ST ALONG 2AVE TO 125ST THEN MTA 01/2019 0.000 MISC 270.000
G710-01AA WEST TO 5AVE): SITE PREP FOR NEW TUNNEL AND 3 FTA 5337 01/2020 500.000 MISC 500.000
15-NEW ROUTE NEW STATIONS (125, 116, 106 STREETS), INTERMODAL
<Non-Exempt> CONNECTION, DESIGN DEVELOPMENT, REAL ESTATE,
AND PROFESSIONAL SERVICES

AQC:NON NEW YORK TPC:$1.2-$1.4 B TOTAL 5YR COST : 500.000 770.000 500.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT FUNDS FOR VARIOUS CAPITAL PROJECTS, SUCH AS MTA 01/2019 0.000 MISC 5.000
SMALL-SCALE CONSTRUCTION PROJECTS OR
CB05-2406 MISCELLANEOUS EQUIPMENT PURCHASES,
16-MISC SYSTEMWIDE.
<Exempt>
AQC:B1 SYSTEM-WIDE TPC: $21-$31 M TOTAL 5YR COST : 0.000 5.000 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT FUNDS FOR PRE-DESIGN OF CAPITAL PROGRAM MTA 01/2019 0.000 DETLDES 50.000
PROJECTS SYSTEM-WIDE FOR THE 2015 - 2019 CAPITAL
EN01-2410 PROGRAM. WORK INCLUDES SCOPING AND MASTER
16-MISC PLAN DEVELOPMENT.
<Exempt>
AQC:C3 SYSTEM-WIDE TPC: $70-$130 M TOTAL 5YR COST : 0.000 50.000 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT ENGINEERING SERVICES TO SUPPORT THE MTA 01/2019 0.000 MISC 4.500
IMPLEMENTATION AND SUPERVISION OF CAPITAL
EN01-2411 PROJECTS SYSTEM-WIDE, AS WELL AS ON-GOING
16-MISC GENERAL ADMINISTRATIVE FUNCTIONS.
<Exempt>
AQC:C5 SYSTEM-WIDE TPC: $15-$25 M TOTAL 5YR COST : 0.000 4.500 0.000 0.000 0.000 0.000 0.000 0.000

125
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 21 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA NYCT CONSTRUCTION MANAGEMENT CONSULTING SERVICES MTA 01/2019 0.000 MISC 3.000
FOR PROJECTS SYSTEM-WIDE WITHIN THE CAPITAL
EN01-2413 PROGRAM. THE CONSULTANT CONTRACT MANAGER
16-MISC WILL BE IN CHARGE OF PROJECTS FROM INITIAL
<Exempt> APPROVAL TO CLOSEOUT.
AQC:C5 SYSTEM-WIDE TPC: $9.5-15.5 M TOTAL 5YR COST : 0.000 3.000 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT ADMINISTRATION OF NYC TRANSITS 2019 SMALL MTA 01/2019 0.000 CONST 7.050
BUSINESS MENTORING PROGRAM CAPITAL PROJECTS.
EN01-2576 WORK WILL ADDRESS DEFICIENT ASSETS
16-MISC SYSTEM-WIDE TO ACHIEVE A STATE OF GOOD REPAIR.
<Exempt>

AQC:C3 SYSTEM-WIDE TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 7.050 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT IN-HOUSE FORCES FOR DISSEMINATION OF MTA 01/2019 0.000 MISC 9.000
INFORMATION SYSTEM-WIDE REGARDING PLANNED OR
EN01-6201 EMERGENCY TEMPORARY SERVICE DIVERSIONS IN
16-MISC 2019. WORK INCLUDES DISTRIBUTION OF POSTERS AND
<Exempt> BROCHURES, AS WELL AS, CUSTOMER ASSISTANCE.

AQC:C13 SYSTEM-WIDE TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 9.000 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT FUNDING FOR DEVELOPMENT OF MASTER PLANS FOR MTA 01/2019 0.000 MISC 12.500
PROJECTS FUNDED THROUGH CAPITAL PROGRAM.
EN05-6317 WORK WILL INCLUDE SCOPING, BUDGET ESTIMATES,
16-MISC PRELIMINARY SCHEDULE, AND IDENTIFICATION OF
<Exempt> ENVIRONMENTAL OR HISTORIC PRESERVATION ISSUES.

AQC:C5 SYSTEM-WIDE TPC: $9.5-15.5 M TOTAL 5YR COST : 0.000 12.500 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REPLACEMENT OF SECURITY SYSTEM AT MTA 01/2019 0.000 MISC 8.300
CONSOLIDATED REVENUE FACILITY IN QUEENS TO
FC01-7101 ENSURE UP TO DATE ACCESS CONTROL, INTRUSION
16-MISC DETECTION, AND CCTV SYSTEM, TO PROTECT
<Exempt> EMPLOYEES, REVENUE AND FARE MEDIA.
AQC:B4 SYSTEM-WIDE TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 8.300 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT PROCUREMENT AND INSTALLATION OF ENTERPRISE MTA 01/2019 0.000 MISC 41.000
ASSET MANAGEMENT (EAM) INFORMATION SYSTEM TO
IM02-6137 AID IN OPTIMAL REINVESTMENT IN ASSETS ACROSS
16-MISC THE NEW YORK CITY TRANSIT SUBWAY SYSTEM.
<Exempt> COORDINATED WITH RELATED PROJECTS MANAGED BY
OTHER MTA AGENCIES.

AQC:B4 SYSTEM-WIDE TPC: $32-$50 M TOTAL 5YR COST : 0.000 41.000 0.000 0.000 0.000 0.000 0.000 0.000

126
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 22 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA-BUS CONSTRUCTION MANAGEMENT - TO PROVIDE FTA 5307 01/2019 0.000 MISC 1.774
CONSTRUCTION MANAGEMENT SERVICES TO SUPPORT STATE 01/2019 0.000 MISC 0.221
U6030222 THE CAPITAL PROGRAM LOCAL 01/2019 0.000 MISC 0.222
16-MISC
<Exempt>
AQC:C5 SYSTEM-WIDE TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 2.217 0.000 0.000 0.000 0.000 0.000 0.000

MTA-BUS ENVIRONMENTAL REMEDIATION SERVICES INCLUDING FTA 5307 01/2020 3.600 MISC 3.600
DETECTION OF REMEDIATION NEED AT VARIOUS MTA STATE 01/2020 0.450 MISC 0.450
U7030212 BUS LOCATIONS TO MAINTAIN A STATE OF GOOD LOCAL 01/2020 0.450 MISC 0.450
16-MISC REPAIR
<Exempt>
AQC:A2 SYSTEM-WIDE TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.500 0.000 4.500 0.000 0.000 0.000 0.000 0.000

MTA-BUS PROJECT ADMINISTRATION - TO SUPPORT THE FTA 5307 01/2019 0.000 MISC 2.100
IMPLEMENTATION AND SUPERVISION OF CAPITAL STATE 01/2019 0.000 MISC 0.262
U7030215 PROJECTS AS WELL AS ON-GOING GENERAL LOCAL 01/2019 0.000 MISC 0.263
16-MISC ADMINISTRATIVE FUNCTIONS FTA 5307 01/2020 6.300 MISC 6.300
<Exempt>
STATE 01/2020 0.787 MISC 0.787
LOCAL 01/2020 0.788 MISC 0.788
AQC:B1 SYSTEM-WIDE TPC: $9.5-15.5 M TOTAL 5YR COST : 7.875 2.625 7.875 0.000 0.000 0.000 0.000 0.000

MTA-BUS DESIGN MANAGEMENT - TO PROVIDE ENGINEERING FTA 5307 01/2020 5.400 MISC 5.400
DESIGN SERVICES TO SUPPORT THE CAPITAL PROGRAM STATE 01/2020 0.675 MISC 0.675
U7030216 LOCAL 01/2020 0.675 MISC 0.675
16-MISC
<Exempt>
AQC:C5 SYSTEM-WIDE TPC: $6-$9.4 M TOTAL 5YR COST : 6.750 0.000 6.750 0.000 0.000 0.000 0.000 0.000

MTA-BUS CONSTRUCTION MANAGEMENT - TO PROVIDE FTA 5307 01/2020 5.400 MISC 5.400
CONSTRUCTION MANAGEMENT SERVICES TO SUPPORT STATE 01/2020 0.675 MISC 0.675
U7030217 THE CAPITAL PROGRAM LOCAL 01/2020 0.675 MISC 0.675
16-MISC
<Exempt>
AQC:C5 SYSTEM-WIDE TPC: $6-$9.4 M TOTAL 5YR COST : 6.750 0.000 6.750 0.000 0.000 0.000 0.000 0.000

MTA-BUS FUNDS FOR FUTURE MTA-BUS TRANSIT PROJECTS TO FTA 5307 01/2019 0.000 MISC 4.145
BE IDENTIFIED THROUGH TIP ACTIONS - BLOCK FUND LOCAL 01/2019 0.000 MISC 1.036
U70303XX FTA 5339 01/2019 0.000 MISC 1.549
16-MISC
LOCAL 01/2019 0.000 MISC 0.387
<Exempt>
AQC:J1 MULTI TPC: $32-$50 M TOTAL 5YR COST : 0.000 7.117 0.000 0.000 0.000 0.000 0.000 0.000

127
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 23 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA-BUS FUNDS FOR FUTURE MTA-BUS TRANSIT PROJECTS TO FTA 5307 01/2020 30.758 MISC 30.758
BE IDENTIFIED THROUGH TIP ACTIONS - BLOCK FUND LOCAL 01/2020 7.689 MISC 7.689
U80303XX FTA 5339 01/2020 1.794 MISC 1.794
16-MISC
<Exempt> LOCAL 01/2020 0.448 MISC 0.448
FTA 5307 01/2021 31.373 MISC 31.373
LOCAL 01/2021 7.843 MISC 7.843
FTA 5339 01/2021 1.830 MISC 1.830
LOCAL 01/2021 0.458 MISC 0.458
FTA 5307 01/2022 32.001 MISC 32.001
LOCAL 01/2022 8.000 MISC 8.000
FTA 5339 01/2022 1.867 MISC 1.867
LOCAL 01/2022 0.467 MISC 0.467
FTA 5307 01/2023 32.641 MISC 32.641
LOCAL 01/2023 8.160 MISC 8.160
FTA 5339 01/2023 1.904 MISC 1.904
LOCAL 01/2023 0.476 MISC 0.476
FTA 5307 01/2024 33.294 MISC 33.294
LOCAL 01/2024 8.323 MISC 8.323
FTA 5339 01/2024 1.942 MISC 1.942
LOCAL 01/2024 0.485 MISC 0.485
AQC:J1 MULTI TPC: $175-$385 M TOTAL 5YR COST : 211.753 0.000 40.689 41.504 42.335 43.181 44.044 0.000

MTA NYCT CMAQ FOR VARIOUS MTA-NYCT PROJECTS TO BE CMAQ 01/2020 42.325 MISC 42.325
INCLUDED IN THE NEXT CAPITAL PROGRAM - BLOCK MTA 01/2020 10.581 MISC 10.581
ZZ01-Q400 FUND CMAQ 01/2021 42.325 MISC 42.325
16-MISC
MTA 01/2021 10.581 MISC 10.581
<Exempt>
CMAQ 01/2022 42.325 MISC 42.325
MTA 01/2022 10.581 MISC 10.581
CMAQ 01/2023 42.325 MISC 42.325
MTA 01/2023 10.581 MISC 10.581
CMAQ 01/2024 42.325 MISC 42.325
MTA 01/2024 10.581 MISC 10.581
AQC:J1 SYSTEM-WIDE TPC: $175-$385 M TOTAL 5YR COST : 264.530 0.000 52.906 52.906 52.906 52.906 52.906 0.000

128
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 24 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA NYCT FTA 5307 FUNDS FOR VARIOUS PROJECTS TO BE FTA 5307 01/2019 0.000 MISC 482.596
INCLUDED IN THE NEXT CAPITAL PROGRAM - BLOCK MTA 01/2019 0.000 MISC 120.649
ZZ01-XX07 FUND FTA 5307 01/2020 488.206 MISC 488.206
16-MISC
MTA 01/2020 122.051 MISC 122.051
<Exempt>
FTA 5307 01/2021 488.206 MISC 488.206
MTA 01/2021 122.050 MISC 122.050
FTA 5307 01/2022 488.206 MISC 488.206
MTA 01/2022 122.050 MISC 122.050
FTA 5307 01/2023 488.206 MISC 488.206
MTA 01/2023 122.050 MISC 122.050
FTA 5307 01/2024 488.206 MISC 488.206
MTA 01/2024 122.050 MISC 122.050
AQC:J1 SYSTEM-WIDE TPC:$3.6-$4.4 B TOTAL 5YR COST : 3051.281 603.245 610.257 610.256 610.256 610.256 610.256 0.000

MTA NYCT FTA 5337 FOR VARIOUS MTA-NYCT PROJECTS TO BE FTA 5337 01/2019 0.000 MISC 616.865
INCLUDED IN THE NEXT CAPITAL PROGRAM - BLOCK MTA 01/2019 0.000 MISC 154.216
ZZ01-XX37 FUND FTA 5337 01/2020 86.183 MISC 86.183
16-MISC
MTA 01/2020 21.546 MISC 21.546
<Exempt>
FTA 5337 01/2021 586.183 MISC 586.183
MTA 01/2021 146.546 MISC 146.546
FTA 5337 01/2022 586.183 MISC 586.183
MTA 01/2022 146.546 MISC 146.546
FTA 5337 01/2023 586.183 MISC 586.183
MTA 01/2023 146.546 MISC 146.546
FTA 5337 01/2024 586.183 MISC 586.183
MTA 01/2024 146.546 MISC 146.546
AQC:J1 SYSTEM-WIDE TPC:$3.6-$4.4 B TOTAL 5YR COST : 3038.645 771.081 107.729 732.729 732.729 732.729 732.729 0.000

MTA NYCT FTA 5339 FOR VARIOUS MTA-NYCT PROJECTS TO BE FTA 5339 01/2019 0.000 MISC 27.084
INCLUDED IN THE NEXT CAPITAL PROGRAM - BLOCK MTA 01/2019 0.000 MISC 6.771
ZZ01-XX39 FUND FTA 5339 01/2020 31.183 MISC 31.183
16-MISC
MTA 01/2020 7.796 MISC 7.796
<Exempt>
FTA 5339 01/2021 31.183 MISC 31.183
MTA 01/2021 7.796 MISC 7.796
FTA 5339 01/2022 31.183 MISC 31.183
MTA 01/2022 7.796 MISC 7.796
FTA 5339 01/2023 31.183 MISC 31.183
MTA 01/2023 7.796 MISC 7.796
FTA 5339 01/2024 31.183 MISC 31.183
MTA 01/2024 7.796 MISC 7.796
AQC:J1 SYSTEM-WIDE TPC: $175-$385 M TOTAL 5YR COST : 194.895 33.855 38.979 38.979 38.979 38.979 38.979 0.000

129
** New York Metropolitan Transportation Council**
Monday, July 22, 2019 MTA - New York City Transit Listing Page 25 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA NYCT STATEN ISLAND RAILWAY FLOOD MITIGATION FTA 5324 01/2019 0.000 CONST 51.352
INCLUDING PERIMETER PROTECTION, DRAINAGE AND
E-S07-03-01 PUMPING IMPROVEMENTS, RAISING OR HARDENING OF
17-SI RAILWAY EQUIPMENT TO PROTECT CLIFTON YARD AND SHOP (779
<Exempt> EDGE WATER DRIVE) AND IN THE VICINITY OF ST.
GEORGE FERRY TERMINAL (1 BAY ST) D2013-SAND-015

AQC:B8 RICHMOND TPC: $100-$225 M TOTAL 5YR COST : 0.000 51.352 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT DESIGN AND REBUILD OF CLIFTON SHOP TO ADDRESS FTA 5324 01/2019 0.000 CONST 6.800
DAMAGES FROM SUPERSTORM SANDY AND TO
E-S07-03-02 PROTECT FACILITY FROM DAMAGE BY FUTURE STORM
17-SI RAILWAY SURGE EVENTS. PROJECT ALSO INCLUDES RELOCATION
<Exempt> OF STATEN ISLAND RAILWAY HEADQUARTERS
(RELATED PIN SI05-0963 & PRIOR PIN E-S07-03-01)
D2013-SAND-023

AQC:C15 RICHMOND TPC: $100-$225 M TOTAL 5YR COST : 0.000 6.800 0.000 0.000 0.000 0.000 0.000 0.000

MTA NYCT REPLACE APPROXIMATELY 8 MILES OF TRACK ON THE MTA 01/2019 0.000 CONST 17.400
STATEN ISLAND RAILWAY, INCLUDING REPLACEMENT
SI02-1895 OF THIRD RAIL WITH NEW COMPOSITE RAIL, TO
17-SI RAILWAY ACHIEVE A STATE OF GOOD REPAIR.
<Exempt>

AQC:B9 RICHMOND TPC: $15-$25 M TOTAL 5YR COST : 0.000 17.400 0.000 0.000 0.000 0.000 0.000 0.000

130
Long Island
Project Listing

131
INTENTIONALLY BLANK
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Nassau County Listing Page 1 of 15

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT REPLACEMENT OF NY25 OVER NY107 BRIDGE DECK, NHPP 08/2019 0.000 CONINSP 1.201
TOWN OF OYSTER BAY NASSAU COUNTY TO MAINTAIN SDF 08/2019 0.000 CONINSP 0.300
004242 STATE OF GOOD REPAIR (FORMERLY PIN: 0T2130) NHPP 08/2019 0.000 CONST 7.539
BRIDGE
SDF 08/2019 0.000 CONST 1.885
<Exempt>
AQC:A19 NASSAU TPC: $9.5-15.5 M TOTAL 5YR COST : 0.000 10.925 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT OPERATIONAL IMPROVEMENTS ON NASSAU NHPP 11/2018 0.000 CONINSP (0.530)


EXPRESSWAY(NY878) TOWN OF HEMPSTEAD, NASSAU SDF 11/2018 0.000 CONINSP (0.132)
007214 COUNTY
RECON
<Exempt>
AQC:A7 NASSAU TPC: $70-$130 M TOTAL 5YR COST : 0.000 (0.662) 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT CONCRETE PAVEMENT REPAIR INCLUDING JOINT NHPP 02/2019 0.000 CONINSP 0.260
SEALING, DIAMOND GRINDING ON NY106 FROM NY24 SDF 02/2019 0.000 CONINSP 0.065
012112 (HEMPSTEAD TURNPIKE) TO OLD COUNTRY ROAD, HPP 02/2019 0.000 CONST 0.058
R&P TOWN OF HEMPSTEAD & OYSTER BAY, NASSAU SDF 02/2019 0.000 CONST 0.014
<Exempt> COUNTY TO MAINTAIN STATE OF GOOD REPAIR. NHPP 02/2019 0.000 CONST 2.498
EARMARK #NY576-PROGRAM CODE RPS1.
SDF 02/2019 0.000 CONST 0.624
AQC:A10 NASSAU TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 3.519 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT PROVIDE FOR HIGH OCCUPANCY VEHICLE LANE POLICE NHPP 04/2019 0.000 OPER 1.760
ENFORCEMENT ON I-495 BETWEEN EXIT 32 TO 48 SDF 04/2019 0.000 OPER 0.440
022954 NASSAU COUNTY TO IMPROVE TRAVEL TRIP NHPP 04/2020 0.880 OPER 0.880
MOBIL RELIABILITY AND REDUCE DELAYS IN THE TOWNS OF SDF 04/2020 0.220 OPER 0.220
<Exempt> NORTH HEMPSTEAD AND OYSTER BAY, NASSAU NHPP 04/2021 0.880 OPER 0.880
COUNTY.
SDF 04/2021 0.220 OPER 0.220
(FORMERLY PIN: 022903)

AQC:C1 NASSAU TPC: $12.5-$19 M TOTAL 5YR COST : 2.200 2.200 1.100 1.100 0.000 0.000 0.000 0.000

NYSDOT SAFETY IMPROVEMENTS ON WESTBOUND NORTHERN HSIP 05/2020 0.735 DETLDES 0.735
STATE PARKWAY EXIT RAMP TO GLEN COVE SDF 05/2020 0.082 DETLDES 0.082
051654 ROAD(GCR)/NY25, WIDEN GCR PROVIDING ADDITIONAL HSIP 05/2020 0.717 ROWACQU 0.717
SAFETY LEFT TURN LANE ON N/B GCR AT NY25, REBUILD
<Exempt> SDF 05/2020 0.082 ROWACQU 0.082
SIGNAL ON NY25 AT GCR, NEW SIGNAL W/B NSP EXIT
HSIP 06/2021 0.473 CONINSP 0.473
RAMP AT GCR, TOWN OF NORTH HEMPSTEAD, NASSAU
SDF 06/2021 0.053 CONINSP 0.053
COUNTY. HAL YEAR 2018 PIL 38
HSIP 06/2021 4.728 CONST 4.728
SDF 06/2021 0.525 CONST 0.525
AQC:A6 NASSAU TPC: $7.5-$12 M TOTAL 5YR COST : 7.395 0.000 1.616 5.779 0.000 0.000 0.000 0.000

132
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Nassau County Listing Page 2 of 15

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT MILLING, CONCRETE & ASPHALT PAVEMENT REPAIRS, NHPP 01/2019 0.000 CONINSP 1.037
SINGLE COURSE OVERLAY ON NORTHERN STATE SDF 01/2019 0.000 CONINSP 0.260
051655 PARKWAY FROM NASSAU/QUEENS COUNTY LINE TO NHPP 01/2019 0.000 CONST 12.960
R&P MEADOWBROOK STATE PARKWAY TO MAINTAIN A SDF 01/2019 0.000 CONST 3.240
<Exempt> STATE OF GOOD REPAIR IN THE TOWN OF NORTH
HEMPSTEAD, IN NASSAU COUNTY. (FORMERLY PIN:
0T1536)

AQC:A10 NASSAU TPC: $26-$40 M TOTAL 5YR COST : 0.000 17.497 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT Rout & Seal asphalt pavement cracks and joint overlay repair on SDF 05/2019 0.000 CONINSP 0.245
MSP (NY908E) from Glenn Curtiss Blvd to NSP as well as the SDF 05/2019 0.000 CONST 1.836
052330 CD roads between NY24 and Stewart Ave. Towns of Hempstead
R&P and N Hempstead, Nassau County
<Exempt>
AQC:A10P NASSAU TPC: $2-$4 M TOTAL 5YR COST : 0.000 2.081 0.000 0.000 0.000 0.000 0.000 0.000

NASSAU CO. NASSAU COUNTY SIGNAL EXPANSION PHASE 9: UPDATE CMAQ 09/2020 0.479 CONINSP 0.479
TRAFFIC SIGNALS ON LONG BEACH ROAD IN LOCAL 09/2020 0.120 CONINSP 0.120
076046 OCEANSIDE AT THE INTERSECTION OF LINCOLN CMAQ 09/2020 4.313 CONST 4.313
MOBIL AVENUE, DAVISION AVENUE, AND INTERSECTIONS AT
<Non-Exempt> LOCAL 09/2020 1.078 CONST 1.078
AUSITN BLVD. IN ISLAND PARK SO THEY CAN BE
CONTROLLED AND OPTIMIZED BY THE COUNTY
CENTRAL TRAFFIC CONTROL SYSTEM TO IMPROVE
TRAFFIC FLOW (FORMERLY PIN: 0T2408) ARCHITECTURE
SERVICE PACKAGE # TM03

AQC:NON NASSAU TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.990 0.000 5.990 0.000 0.000 0.000 0.000 0.000

NASSAU CO. MERRICK ROAD SIGNAL EXPANSION PH 1 : CONTROLL & CMAQ 09/2020 0.400 CONINSP 0.400
OPTIMIZE SIGNALS FROM MERRICK TO MASSAPEQUA LOCAL 09/2020 0.100 CONINSP 0.100
076049 WITH THE COMPUTERIZED CONTROL SYSTEM. HEAD CMAQ 09/2020 0.600 CONST 0.600
MOBIL REPLACEMENT TO 12 INCHES FOR ADDED VISIBILITY,
<Non-Exempt> LOCAL 09/2020 3.900 CONST 3.900
IMPROVED TRAFFIC FLOW AND SAFETY IN NASSAU
COUNTY. ITS SERVICE PACKAGE # ARCHITECTURE
PACKAGE # TM03

AQC:NON NASSAU TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.000 0.000 5.000 0.000 0.000 0.000 0.000 0.000

NASSAU CO. NASSAU VARIABLE MESSAGE SIGN PH 2 - INSTALL NEW CMAQ 09/2020 0.178 CONINSP 0.178
VARIABLE MESSAGE SIGNS ON OVERHEAD LOCAL 09/2020 0.044 CONINSP 0.044
076050 STRUCTURES ALONG VARIOUS NASSAU COUNTY CMAQ 09/2020 1.602 CONST 1.602
MOBIL FEDERAL-AID ELIGIBLE ARTERIALS AND CONNECT TO
<Non-Exempt> LOCAL 09/2020 0.400 CONST 0.400
THE TRAFFIC MANAGEMENT CENTER TO ALLOW TMC
OPERATIONS TO PROVIDE REAL-TIME TRAFFIC
INFORMATION. ARCHITECTURE SERVICE PACKAGE #
TM06

AQC:NON NASSAU TPC: $2-$4 M TOTAL 5YR COST : 2.224 0.000 2.224 0.000 0.000 0.000 0.000 0.000

133
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Nassau County Listing Page 3 of 15

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NASSAU CO. NASSAU COUNTY TRAFFIC SIGNAL SYSTEM OPERATION STBG LG URB 09/2019 0.000 OPER 2.990
PHASE 5: PROVIDES DAY-TO-DAY OPERATION OF LOCAL 09/2019 0.000 OPER 0.748
076059 COUNTY ON-STREET TRAFFIC SIGNAL
TRAFFIC COMMUNICATION PLAN THAT MANAGES TRAFFIC
<Exempt> SIGNALS, CAMERAS, VARIABLE MESSAGE SIGNS,
WEATHER STATIONS, AND HIGHWAY ADVISORY RADIOS
TO IMPROVE THE TRAFFIC FLOW IN NASSAU COUNTY.

AQC:A7 NASSAU TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 3.738 0.000 0.000 0.000 0.000 0.000 0.000

NASSAU CO. NASSAU COUNTY TRAFFIC MANAGEMENT CENTER STBG LG URB 09/2019 0.000 OPER 2.180
PERSONNEL PH 3: INTELLIGENT TRANSPORTATION LOCAL 09/2019 0.000 OPER 0.545
076060 SERVICE PERSONAL SERVICE CONSULTANT CONTRACT
MISC TO PROVIDE SUPPORT STAFF TO TRAFFIC
<Exempt> MANAGEMENT CENTER OPERATIONS
AQC:A7 NASSAU TPC: $2-$4 M TOTAL 5YR COST : 0.000 2.725 0.000 0.000 0.000 0.000 0.000 0.000

NASSAU CO. NASSAU COUNTY PAVEMENT MARKING PH 11: NASSAU STBG LG URB 09/2019 0.000 CONINSP 0.200
COUNTY PAVEMENT MARKINGS ON FEDERAL AID LOCAL 09/2019 0.000 CONINSP 0.050
076061 ELIGIBLE HIGHWAYS TO REPLACE FADED MARKINGS STBG LG URB 09/2019 0.000 CONST 1.800
SAFETY AND ADD NEW MARKINGS TO HELP ENSURE SAFER LOCAL 09/2019 0.000 CONST 0.450
<Exempt> TRAVEL ALONG THESE ROADS (LOCATIONS TBD).

AQC:A10 NASSAU TPC: $2-$4 M TOTAL 5YR COST : 0.000 2.500 0.000 0.000 0.000 0.000 0.000 0.000

NASSAU CO. NASSAU COUNTY REHABILITATION OF BAYVILLE NHPP 09/2019 0.000 CONINSP 0.800
BRIDGE, ALONG WEST SHORE ROAD OVER MILL NECK LOCAL 09/2019 0.000 CONINSP 0.471
076065 CREEK, IN BAYVILLE, TOWN OF OYSTER BAY. WORK STBG LG URB 09/2019 0.000 CONINSP 0.023
BRIDGE WILL INCLUDE, BUT MAY NOT BE LIMITED TO, LOCAL 09/2019 0.000 CONINSP 0.006
<Exempt> REPAIR/REPLACEMENT OF STRUCTURAL, MECHANICAL, NHPP 09/2019 0.000 CONST 7.200
AND ELECTRICAL COMPONENTS OF SUPERSTRUCTURE
LOCAL 09/2019 0.000 CONST 5.550
AND SUBSTRUCTURE OF THE BRIDGE, INCLUDING
SEISMIC UPGRADES AND SCOUR PROTECTION, AS STBG LG URB 09/2019 0.000 CONST 0.200
NECESSARY. IT MAY ALSO INCLUDE MINOR LOCAL 09/2019 0.000 CONST 0.350
REHABILITATION WORK AND PAINTING OF VARIOUS
OTHER BRIDGES, IN NASSAU COUNTY.

AQC:A19 NASSAU TPC: $12.5-$19 M TOTAL 5YR COST : 0.000 14.600 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL CONSTRUCT AND IMPROVE PEDESTRIAN HPP 03/2021 0.400 CONST 0.400
STREETSCAPES ALONG SUNRISE HIGHWAY (NY27) IN LOCAL 03/2021 0.100 CONST 0.100
076074 FREEPORT TO IMPROVE PEDESTRIAN SAFETY NY582 LOCAL 03/2021 1.379 CONST 1.379
RECON (FORMERLY PIN: 0T2024) HPP#3297
<Exempt>
AQC:C2 NASSAU TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.879 0.000 0.000 1.879 0.000 0.000 0.000 0.000

134
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Nassau County Listing Page 4 of 15

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL CONSTRUCT GREEN BIKE LANES ALONG EDWARDS TAP LG URBAN 01/2019 0.000 DETLDES 0.029
BLVD TO CONNECT THE LIRR TRAIN STATION TO THE LOCAL 01/2019 0.000 DETLDES 0.007
076097 BEACH. SIDEWALK IMPROV. WILL INCLUDE 18 TAP LG URBAN 08/2020 0.072 CONINSP 0.072
MOBIL CROSSWALKS WITH RECONSTUCT CURB RAMPS. LOCAL 08/2020 0.018 CONINSP 0.018
<Exempt> CROSSWALKS & VEGETATED MEDIANS WILL BE TAP LG URBAN 08/2020 0.944 CONST 0.944
ESTABLISHED AT 4 INTERSECTIONS IN THE CITY OF
LOCAL 08/2020 0.236 CONST 0.236
LONG BEACH, NASSAU COUNTY

AQC:C2 NASSAU TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.270 0.036 1.270 0.000 0.000 0.000 0.000 0.000

NASSAU CO. NASSAU COUNTY RESURFACING PROGRAM: STBG LG URB 09/2020 0.400 CONINSP 0.400
REHABILITATE MERRICK AVENUE FROM NY27/SUNRISE LOCAL 09/2020 0.100 CONINSP 0.100
076116 HIGHWAY TO CAMP AVENUE AND STBG LG URB 09/2020 3.600 CONST 3.600
R&P CAMP AVENUE TO HENRY ROAD ; OLD COUNTRY ROAD
<Exempt> LOCAL 09/2020 0.900 CONST 0.900
FROM ZECKENDORF BLVD. TO MERRICK AVENUE/POST
AVENUE; OLD COUNTRY ROAD WEST OF CURB LINE OF
CHARLOTTE AVENUE TO WEST OF CURBLINE OF NY106;
OLD COUNTRY ROAD FROM EAST CURBLINE NY106 TO
WEST OF CURBLINE NY107 TO PROVIDE FOR BETTER
AND SAFER SURFACES IN NASSAU COUNTY

AQC:A10 NASSAU TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.000 0.000 5.000 0.000 0.000 0.000 0.000 0.000

NASSAU CO. NASSAU COUNTY RESURFACING PROGRAM: STBG LG URB 09/2021 0.400 CONINSP 0.400
REHABILITATE LIDO BLVD FROM APPROX. 350 FEET LOCAL 09/2021 0.100 CONINSP 0.100
076117 EAST OF PRESCOTT STREET TO POINT LOOKOUT STBG LG URB 09/2021 3.600 CONST 3.600
R&P BORDER; ATLANTIC AVE FROM MILBURN CREEK LOCAL 09/2021 0.900 CONST 0.900
<Exempt> BRIDGE TO MAIN STREET; MILL ROAD FROM W
BROADWAY TO PENINSULA BLVD; AND BROADWAY
FROM 878 TO WESTON PL/DILLON DRIVE TO PROVIDE
BETTER AND SAFER SURFACES IN THE TOWN OF
HEMPSTEAD, NASSAU COUNTY.

AQC:A10 NASSAU TPC: $6-$9.4 M TOTAL 5YR COST : 5.000 0.000 0.000 5.000 0.000 0.000 0.000 0.000

135
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Nassau County Listing Page 5 of 15

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NASSAU CO. NASSAU COUNTY RESURFACING PROGRAM: STBG LG URB 09/2022 0.400 CONINSP 0.400
REHABILITATE OLD COUNTRY RD FROM E CURBLINE LOCAL 09/2022 0.100 CONINSP 0.100
076118 (NY107) TO WEST SIDE OF SEAFORD-OYSTER BAY EXPY STBG LG URB 09/2022 3.600 CONST 3.600
R&P BRIDGE (NY135); GLEN COVE RD FROM NORTHERN LOCAL 09/2022 0.900 CONST 0.900
<Exempt> BLVD (NY25A) TO NYS LIMITS AT BACK RD; LIE NORTH
SERVICE RD FROM APPROX 1000 FEET EAST OF THE
WEST WATERLINE OF SUNNYSIDE BLVD TO
SUNNYSIDE BLVD; LIE SOUTH SERVICE RD/ EXECUTIVE
DR FROM APPROX 800 FEET EAST OF SUNNYSIDE BLVD
TO APPROX 800 FEET WEST OF ROUND SWAMP RD
(SUFFOLK COUNTY BORDER); AND LIE SOUTH SERVICE
RD (SOUTH MARGINAL RD) FROM JERICHO TPK (NY25)
TO BROADWAY (NY106) TO PROVIDE BETTER AND
SAFER SURFACES IN THE TOWN OF NORTH HEMPSTEAD
AND OYSTERBAY, NASSAU COUNTY.

AQC:A10 NASSAU TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.000 0.000 0.000 0.000 5.000 0.000 0.000 0.000

NASSAU CO. REPLACEMENT OF THE CUTTER MILL ROAD BRIDGE STBG LG URB 09/2020 0.320 CONINSP 0.320
(REPLACEMENT-IN KIND). THE WORK WILL INCLUDE LOCAL 09/2020 0.080 CONINSP 0.080
076119 THE COMPLETE DEMOLITION OF THE STBG LG URB 09/2020 2.880 CONST 2.880
BRIDGE SUPERSTRUCTURE AND SUBSTRUCTURE WITH
<Exempt> LOCAL 09/2020 0.720 CONST 0.720
CONSTRUCTION OF A NEW MODERN BRIDGE FROM THE
FOUNDATIONS UP, WITH NO BETTERMENT TO THE
ROAD CORRIDOR. THE CUTTER MILL ROAD BRIDGE
OVER THE LIRR IS LOCATED JUST WEST OF GREAT NECK
ROAD IN THE VILLAGES OF GREAT NECK PLAZA AND
GREAT NECK ESTATES, NASSAU COUNTY.

AQC:A19 NASSAU TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.000 0.000 4.000 0.000 0.000 0.000 0.000 0.000

NASSAU CO. NASSAU COUNTY BRIDGE REHABILITATION; PAINTING STBG LG URB 09/2021 0.320 CONINSP 0.320
AND MINOR REHABILITATION OF LONG BEACH BRIDGE, LOCAL 09/2021 0.080 CONINSP 0.080
076120 EAST AND WEST BOUND, TO BRING EXISTING BRIDGES STBG LG URB 09/2021 2.880 CONST 2.880
BRIDGE TO A STATE-OF-GOOD-REPAIR, VILLAGE OF ISLAND LOCAL 09/2021 0.720 CONST 0.720
<Exempt> PARK; TOWN OF HEMPSTEAD IN NASSAU COUNTY

AQC:A19 NASSAU TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.000 0.000 0.000 4.000 0.000 0.000 0.000 0.000

NASSAU CO. NASSAU COUNTY BRIDGE REHABILITATION; PAINTING STBG LG URB 09/2023 0.320 CONINSP 0.320
AND MINOR REHABILITATION OF VARIOUS COUNTY LOCAL 09/2023 0.080 CONINSP 0.080
076121 FEDERAL-AID ELIGIBLE BRIDGES TO MAINTAIN A STBG LG URB 09/2023 2.880 CONST 2.880
BRIDGE STATE-OF-GOOD-REPAIR (LOCATIONS TBD). LOCAL 09/2023 0.720 CONST 0.720
<Exempt>

AQC:A19 NASSAU TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.000 0.000 0.000 0.000 0.000 4.000 0.000 0.000

136
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Nassau County Listing Page 6 of 15

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NASSAU CO. NASSAU COUNTY PAVEMENT MARKING PH 12: NASSAU STBG LG URB 09/2019 0.000 CONINSP 0.100
COUNTY PAVEMENT MARKINGS ON ARRANDALE LOCAL 09/2019 0.000 CONINSP 0.050
076122 AVENUE FROM BAYVIEW AVENUE TO MIDDLE NECK STBG LG URB 09/2019 0.000 CONST 0.900
SAFETY ROAD; ON BAYVIEW AVENUE FROM CUTTER MILL LOCAL 09/2019 0.000 CONST 0.200
<Exempt> ROAD TO ARRANDALE AVENUE; ON BAYVILLE AVENUE
FROM LATTINGTOWN VILLAGE LINE TO LUDLAM
AVENUE; FROM LUDLAM AVENUE TO CENTRE ISLAND
VILLAGE LINE; ON CEDAR SWAMP ROAD FROM
OYSTER BAY TOWN LINE TO LIRR GRADE CROSSING; ON
DOGWOOD AVENUE FROM COLONADE AVENUE TO
NASSAU BOULEVARD TO REPLACE FADED MARKINGS,
AND ADD NEW MARKINGS TO HELP ENSURE SAFER
TRAVEL IN THE VILLAGE OF GREAT NECK, GLENCOVE
AND TOWN OF WEST HEMPSTEAD, OYSTER BAY IN
NASSAU COUNTY

AQC:A10 NASSAU TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 1.250 0.000 0.000 0.000 0.000 0.000 0.000

NASSAU CO. NASSAU COUNTY PAVEMENT MARKING PH 13: NASSAU STBG FLEX 09/2020 0.100 CONINSP 0.100
COUNTY PAVEMENT MARKINGS ON FEDERAL AID LOCAL 09/2020 0.025 CONINSP 0.025
076123 ELIGIBLE HIGHWAYS TO REPLACE FADED MARKINGS, STBG FLEX 09/2020 0.900 CONST 0.900
SAFETY AND ADD NEW MARKINGS TO HELP ENSURE SAFER
<Exempt> LOCAL 09/2020 0.225 CONST 0.225
TRAVEL ALONG THESE ROADS (LOCATIONS TBD).

AQC:A10 NASSAU TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.250 0.000 1.250 0.000 0.000 0.000 0.000 0.000

NASSAU CO. MERRICK ROAD SIGNAL EXPANSION PH 2 (VALLEY LOCAL 05/2024 0.500 DETLDES 0.500
STREAM TO FREEPORT, NASSAU COUNTY), SO SIGNALS CMAQ 09/2025 0.000 CONINSP 0.575
076124 CAN BE CONTROLLED & OPTIMIZED BY THE LOCAL 09/2025 0.000 CONINSP 0.144
MOBIL COMPUTERIZED CONTROL SYSTEM & HEAD CMAQ 09/2025 0.000 CONST 5.175
<Non-Exempt> REPLACEMENT TO 12 INCHES FOR ADDED VISIBILITY, LOCAL 09/2025 0.000 CONST 1.294
IMPROVE TRAFFIC FLOW AND SAFETY.

AQC:NON NASSAU TPC: $7.5-$12 M TOTAL 5YR COST : 0.500 0.000 0.000 0.000 0.000 0.000 0.500 7.188

NASSAU CO. NASSAU COUNTY TRAFFIC SIGNAL EXPANSION, PH 10: CMAQ 09/2020 1.040 CONINSP 1.040
UPDATE THE SIGNALS AT VARIOUS INTERSECTIONS LOCAL 09/2020 0.260 CONINSP 0.260
076125 ALONG GLEN COVE AVENUE, FRANKLIN AVENUE AND CMAQ 09/2020 9.300 CONST 9.300
MOBIL WILLIS AVENUE SO THEY CAN BE CONTROLLED &
<Non-Exempt> LOCAL 09/2020 2.325 CONST 2.325
OPTIMIZED BY THE COUNTY\\\\\\\'S COMPUTERIZED
CONTROL SYSTEM TO PROVIDE SAFER PED CROSSINGS
AND REDUCE PED/TRAFFIC INJURIES, NASSAU COUNTY.
ARCHITECTURE SERVICE PACKAGE #TM03

AQC:NON NASSAU TPC: $9.5-15.5 M TOTAL 5YR COST : 12.925 0.000 12.925 0.000 0.000 0.000 0.000 0.000

137
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Nassau County Listing Page 7 of 15

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NASSAU CO. NASSAU COUNTY TRAFFIC SIGNAL SYSTEM STBG LG URB 09/2021 3.600 OPER 3.600
OPERATIONS PHASE 6: PROVIDES DAY-TO DAY LOCAL 09/2021 0.900 OPER 0.900
076126 OPERATION OF COUNTY ON-STREET TRAFFIC SIGNAL
TRAFFIC COMMUNICATION PLAN THAT MANAGES TRAFFIC
<Exempt> SIGNALS, CAMERAS, VARIABLE MESSAGE SIGNS,
WEATHER STATIONS, AND HIGHWAY ADVISORY RADIOS
TO IMPROVE TRAFFIC FLOW IN NASSAU COUNTY.
ARCHITECTURE SERVICE PACKAGE #ATMS08

AQC:A7 NASSAU TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.500 0.000 0.000 4.500 0.000 0.000 0.000 0.000

NASSAU CO. NASSAU COUNTY TRAFFIC MANAGEMENT CENTER STBG LG URB 09/2021 2.616 OPER 2.616
PERSONNEL PH 4: ITS PERSONAL SERVICES LOCAL 09/2021 0.654 OPER 0.654
076127 CONSULTANT CONTRACT TO PROVIDE STAFF TO
MISC TRAFFIC MANAGEMENT CENTER OPERATIONS.
<Exempt>
AQC:A7 NASSAU TPC: $2-$4 M TOTAL 5YR COST : 3.270 0.000 0.000 3.270 0.000 0.000 0.000 0.000

NASSAU CO. IMPROVE GRAND AVENUE CORRIDOR AROUND LOCAL 09/2019 0.000 CONINSP 0.620
BALDWIN LIRR STATION BY CONSTRUCTING COMPLETE HPP 09/2019 0.000 CONST 4.700
076136 STREET AND TRAFFIC CALMING MEASURES TO LOCAL 09/2019 0.000 CONST 1.175
MOBIL PROVIDE SAFER PEDESTRIAN ENVIRONMENT AND
<Exempt> IMPROVE ACCESSIBILITY AND SAFETY FOR ALL USERS
INCLUDING MOTORISTS, PEDESTRIANS AND CYCLISTS
IN THE HAMLET OF BALDWIN, TOWN OF HEMPSTEAD.
ADDITIONALLY, IT INCLUDES A SPORADIC ROAD DIET
AND INSTALLATION OF BICYCLE LANES FROM THE
INTERSECTION OF MERRICK ROAD NORTH TO THE
INTERSECTION OF MILBURN AVENUE (2 OPTIONS TO
CONVERT 4 LANES TO THREE LANES), TO INCLUDE
WIDENING OF SIDEWALKS, CURB EXTENSIONS/BULB
OUTS AND SIGNAL TIMING ENHANCEMENTS.
(TRANSFERRED EARMARK #NY745, NY345 (PROGRAM
CODE RPS9) “

AQC:C2 NASSAU TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 6.495 0.000 0.000 0.000 0.000 0.000 0.000

138
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Nassau County Listing Page 8 of 15

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NASSAU CO. REHABILITATION OF MERRICK ROAD OVER MILLBURN NHPP 01/2019 0.000 CONINSP 0.488
CREEK BRIDGE FROM MILBURN AVENUE TO SOUTH LOCAL 01/2019 0.000 CONINSP 0.026
076137 BROOKSIDE AVENUE INCLUDING REMOVING NHPP 01/2019 0.000 CONST 4.100
BRIDGE DAMAGED CONCRETE AREAS LOCATED ON THE LOCAL 01/2019 0.000 CONST 0.216
<Exempt> CULVERT AND REPLACE THEM WITH AN APPROVED
PATCH MATERIAL. CLEAN, REPAIR OR REPLACE
EXPOSED REINFORCEMENT. ALSO, WATERPROOF
MEMBRANE ON THE ROOF OF THE CULVERT TO HELP
MAINTAIN STRUCTURE INTEGRITY IN TOWN OF
HEMPSTEAD, NASSAU COUNTY. BIN# 330020
BRIDGE NY PROJECT: CONSTRUCTION FUNDING IS 95%
FEDERAL USING 15% TOLL CREDIT WITH A 5% LOCAL
MATCH.

AQC:A19 NASSAU TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 4.830 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL PEDESTRIAN SAFETY IMPROVEMENTS TO UPGRADE TAP LG URBAN 04/2020 0.028 DETLDES 0.028
OLD CURB RAMPS AND CROSSWALKS TO ADA LOCAL 04/2020 0.007 DETLDES 0.007
076138 COMPLIANCE AND TO PROVIDE SAFER AND EASIER TAP LG URBAN 03/2021 0.031 CONINSP 0.031
SAFETY ACCESS TO PEDESTRIANS ON GLEN STREET, BRIDGE LOCAL 03/2021 0.008 CONINSP 0.008
<Exempt> STREET, AND SCHOOL STREET WITHIN THE DOWNTOWN TAP LG URBAN 03/2021 0.258 CONST 0.258
BUSINESS DISTRICT IN THE CITY OF GLENCOVE,
LOCAL 03/2021 0.065 CONST 0.065
NASSAU COUNTY .

AQC:A6 NASSAU TPC: < $0.75 M TOTAL 5YR COST : 0.397 0.000 0.035 0.362 0.000 0.000 0.000 0.000

NASSAU CO. NASSAU COUNTY INCIDENT MANAGEMENT SYSTEM CMAQ 09/2021 0.000 CONINSP 0.000
PHASE 5. MAXIMIZE EFFICIENCY OF TRAFFIC FLOW LOCAL 09/2021 0.324 CONINSP 0.324
076143 ALONG MAJOR ARTERIES THROUGHOUT NASSAU CMAQ 09/2021 0.000 CONST 0.000
MOBIL COUNTY BY INSTALLING AN INCIDENT MANAGEMENT LOCAL 09/2021 2.916 CONST 2.916
<Exempt> SYSTEM (VIDEO CAMERAS). ARCHITECTURE SERVICE
PACKAGE #TM08

AQC:A6 NASSAU TPC: $2-$4 M TOTAL 5YR COST : 3.240 0.000 0.000 3.240 0.000 0.000 0.000 0.000

NASSAU CO. MERRICK AVENUE SIGNAL EXPANSION FROM CMAQ 02/2021 0.400 CONINSP 0.400
HEMPSTEAD TURNPIKE TO MERRICK ROAD SO SIGNALS LOCAL 02/2021 0.100 CONINSP 0.100
076144 CAN BE CONTROLLED & OPTIMIZED BY THE CMAQ 02/2021 3.600 CONST 3.600
MOBIL COMPUTERIZED CONTROL SYSTEM. HEAD LOCAL 02/2021 0.900 CONST 0.900
<Non-Exempt> REPLACEMENT TO 12 INCHES FOR ADDED VISIBILITY,
TRAFFIC FLOW AND SAFETY IN NASSAU COUNTY.
ARCHITECTURE SERVICE PACKAGE #TM03

AQC:NON NASSAU TPC: $6-$9.4 M TOTAL 5YR COST : 5.000 0.000 0.000 5.000 0.000 0.000 0.000 0.000

139
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Nassau County Listing Page 9 of 15

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NASSAU CO. REHABILITATION OF GLENN CURTIS BRIDGE OVER NHPP 08/2020 0.693 DETLDES 0.693
MEADOWBROOK STATE PARKWAY INCLUDING LOCAL 08/2020 0.036 DETLDES 0.036
076147 REPAIRING OF DECK, BEARINGS, CONCRETE NHPP 02/2020 0.297 PRELDES 0.297
BRIDGE ABUTMENTS, STEEL CURBS AND SCUPPERS TO
<Exempt> LOCAL 02/2020 0.016 PRELDES 0.016
MAINTAIN STATE OF GOOD REPAIR IN THE HAMLETS
NHPP 08/2021 0.593 CONINSP 0.593
OF EAST MEADOW AND UNIONDALE; TOWN OF
LOCAL 08/2021 0.031 CONINSP 0.031
HEMPSTEAD. BIN #3360559 BRIDGE NY PROJECT:
FUNDING IS 95% FEDERAL USING 15% TOLL NHPP 08/2021 3.974 CONST 3.974
LOCAL 08/2021 0.209 CONST 0.209

AQC:A19 NASSAU TPC: $6-$9.4 M TOTAL 5YR COST : 5.849 0.000 1.042 4.807 0.000 0.000 0.000 0.000

LOCAL DOWNTOWN OYSTER BAY - DESIGN & PIT BOND 06/2019 0.000 CONST 0.500
IMPLEMENTATION OF WALKABILITY/BIKEABILITY
076152 IMPROVEMENTS TO THE DOWNTOWN AREA INCLUDING
MOBIL DECORATIVE PAVER CROSSWALKS & A COVERED BIKE
<Exempt> RACK. TOWN OF OYSTER BAY, NASSAU COUNTY.

AQC:C2Z NASSAU TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.500 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL PAVEMENT REHABILITATION PROJECTS ON ALL OR PART PIT BOND 09/2019 0.000 CONST 0.500
OF MOUNTAIN AVENNUE, CREEK ROAD, PERRY AVENUE,
076153 GODFREY AVENUE, SCHOOL STREET, AND MERRETT
R&P LANE IN THE VILLAGE OF BAYVILLE. TOWNS OF
<Exempt> OYSTER BAY. NASSAU COUNTIES.

AQC:A10Z NASSAU TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.500 0.000 0.000 0.000 0.000 0.000 0.000

140
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Nassau County Listing Page 10 of 15

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NASSAU CO. NASSAU COUNTY ROADS. THIS PROJECT WILL COLLECT HSIP 09/2019 0.000 DETLDES 0.248
AND ANALYZE DATA RELEVANT TO BASIC AND HSIP 09/2020 0.287 CONINSP 0.287
076158 ENHANCED SAFETY IMPROVEMENTS. THE SAFETY HSIP 09/2020 3.687 CONST 3.687
SAFETY IMPROVEMENT COUNTERMEASURES ARE NOT LIMITED
<Exempt> TO HIGH VISIBILITY CROSSWALK MARKINGS,
PEDESTRIAN CROSSINGS AND ADVANCED WARNING
SIGNS WITH FLUORESCENT YELLOW-GREEN
BACKGROUND AND REFLECTIVE SIGN POSTS, SHARK
TEETH/ADVANCED YIELD HERE MARKINGS, YIELD TO
PEDESTRIAN SIGNS, PARKING RESTRICTIONS,
IN-STREET PEDESTRIAN SIGNS, YIELD TO PEDESTRIAN
SIGNS, PARKING (RRFB’S), FULL (3 COLOR)
SIGNALIZATION, CURB EXTENSIONS AND RAISED
PEDESTRIAN REFUGE ISLANDS, ENHANCED
ILLUMINATION AND CURB RAMP UPGRADES TO
IMPROVE THE SAFETY OF MOTORIZED AND
NON-MOTORIZED USERS AND TO ENHANCE THE
INTERGRATION AND CONNECTIVITY OF THE
TRANSPORATION SYSTEM IN NASSAU COUNTY. 2018
PSAP AWARD. 100% FEDERAL (USING 10% TOLL
CREDIT).

AQC:A7 NASSAU TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.974 0.248 3.974 0.000 0.000 0.000 0.000 0.000

NASSAU CO. DEVELOP A TRAFFIC MANAGEMENT MOBILE PHONE LOCAL 09/2021 1.000 CONST 1.000
APP THAT CAN BE USED BY THE PUBLIC TO GET
076159 COUNTYWIDE TRAFFIC INFORMATION. ARCHITECTURE
MOBIL PACKAGE # ATIS01
<Exempt>
AQC:A7 NASSAU TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.000 0.000 0.000 1.000 0.000 0.000 0.000 0.000

NASSAU CO. NASSAU VARIABLE MESSAGE SIGN PH3- INSTALL NEW CMAQ 09/2022 0.440 CONINSP 0.440
VARIABLE MESSAGE SIGNS ON OVERHEAD LOCAL 09/2022 0.110 CONINSP 0.110
076160 STRUCTURES ALONG CENTRAL AVENUE, BALDWIN CMAQ 09/2022 3.960 CONST 3.960
MOBIL ROAD, NASSAU ROAD, NORTH BROADWAY, SOUTH LOCAL 09/2022 0.990 CONST 0.990
<Non-Exempt> OYSTERBAY ROAD, ROSLYN ROAD, AND ROCKAWAY
TURNPIKE AND CONNECT TO THE TRAFFIC
MANAGEMENT CENTER TO ALLOW TMC OPERATIONS
TO PROVIDE REAL-TIME TRAFFIC INFORMATION IN
NASSAU COUNTY. ARCHITECTURE PACKAGE #ATMS06

AQC:NON NASSAU TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.500 0.000 0.000 0.000 5.500 0.000 0.000 0.000

141
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Nassau County Listing Page 11 of 15

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NASSAU CO. TRAFFIC SIGNAL EXPANSION PH 11: PROJECT WILL CMAQ 09/2023 0.400 CONINSP 0.400
UPGRADE AND REPLACE TRAFFIC SIGNAL CONTROL LOCAL 09/2023 0.100 CONINSP 0.100
076161 EQUIPMENT AND COMMUNICATIONS ALONG NEW HYDE CMAQ 09/2023 3.600 CONST 3.600
MOBIL PARK ROAD AND ELMONT ROAD SO THEY CAN BE LOCAL 09/2023 0.900 CONST 0.900
<Non-Exempt> CONTROLLED & OPTIMIZED BY THE COUNTY
COMPUTERIZED CONTROL SYSTEM. NASSAU COUNTY.
REGIONAL ARCHITECTURE PACKAGE #ATMS06

AQC:NON NASSAU TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.000 0.000 0.000 0.000 0.000 5.000 0.000 0.000

NASSAU CO. THE REHABILITATION OF CHARLES LINDBERGH BRIDGE STBG LG URB 09/2021 0.416 CONINSP 0.416
OVER MEADOWBROOK STATE PARKWAY (MSP) WILL LOCAL 09/2021 0.104 CONINSP 0.104
076162 INCLUDE REPLACEMENT OF THE DECK SLAB, STBG LG URB 09/2021 4.784 CONST 4.784
BRIDGE REPLACEMENT OF ALL BEARINGS, AND A SEISMIC LOCAL 09/2021 1.196 CONST 1.196
<Exempt> RETROFIT ADJUSTMENT. REHABILITATION OF THE
SUB-STRUCTURE, GUIDE RAILS AND OTHER ELEMENTS
WILL BE PERFORMED, AS NECESSARY TO MAINTAIN
THE STATE OF GOOD REPAIR IN THE HAMLETS OF EAST
MEADOW AND UNIONDALE; TOWN OF HEMPSTEAD,
NASSAU COUNTY. BIN # 305663-9

AQC:A19 NASSAU TPC: $6-$9.4 M TOTAL 5YR COST : 6.500 0.000 0.000 6.500 0.000 0.000 0.000 0.000

NASSAU CO. REHABILITATION OF DALY BLVD OVER LIRR BRIDGE STBG LG URB 09/2024 0.320 CONINSP 0.320
INCLUDING, AND MAY NOT BE LIMITED TO, DECK SLAB LOCAL 09/2024 0.080 CONINSP 0.080
076163 REPAIR, EVALUATION OF ALL BEARINGS AND SEISMIC STBG LG URB 09/2024 2.880 CONST 2.880
R&P RETROFIT, REHABILITATION OF SUBSTRUCTURE, GUIDE LOCAL 09/2024 0.720 CONST 0.720
<Exempt> RAILS AND OTHER ELEMENTS AS NECESSARY IN THE
TOWN OF HEMPSTEAD IN NASSAU COUNTY. BIN #
330024-0

AQC:A19 NASSAU TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.000 0.000 0.000 0.000 0.000 0.000 4.000 0.000

NASSAU CO. PAINTING AND MINOR REHABILITATION OF VARIOUS LOCAL 07/2024 0.960 DETLDES 0.960
FEDERAL AID ELIGIBLE NASSAU COUNTY BRIDGES TO STBG LG URB 09/2025 0.000 CONINSP 0.640
076164 BRING THEM UP TO A STATE OF GOOD REPAIR LOCAL 09/2025 0.000 CONINSP 0.160
R&P (LOCATIONS TBD). STBG LG URB 09/2025 0.000 CONST 5.760
<Exempt>
LOCAL 09/2025 0.000 CONST 1.440
AQC:A19 NASSAU TPC: $7.5-$12 M TOTAL 5YR COST : 0.960 0.000 0.000 0.000 0.000 0.000 0.960 8.000

NASSAU CO. REHABILITATE FEDERAL AID-ELIGIBLE EXISTING ROAD LOCAL 07/2024 0.600 DETLDES 0.600
PAVEMENT IN NASSAU COUNTY TO PROVIDE FOR STBG LG URB 09/2025 0.000 CONINSP 0.400
076165 BETTR AND SAFER SURFACES (LOCATIONS TBD). LOCAL 09/2025 0.000 CONINSP 0.100
R&P
STBG LG URB 09/2025 0.000 CONST 3.600
<Exempt>
LOCAL 09/2025 0.000 CONST 0.900
AQC:A6 NASSAU TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.600 0.000 0.000 0.000 0.000 0.000 0.600 5.000

142
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Nassau County Listing Page 12 of 15

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NASSAU CO. REHABILITATION OF LAWSON BLVD OVER POWELL STBG LG URB 09/2022 0.320 CONINSP 0.320
CREEK BRIDGE IN OCEANSIDE MAY INCLUDE DECK LOCAL 09/2022 0.080 CONINSP 0.080
076166 SLAB REPLACEMENT, AS WELL AS REPLACEMENT OF STBG LG URB 09/2022 2.880 CONST 2.880
R&P ALL BEARINGS AND SEISMIC RETROFIT ADJUSTMENT, LOCAL 09/2022 0.720 CONST 0.720
<Exempt> REHABILITATION OF SUBSTRUCTURE, GUIDE RAILS
AND OTHER ELEMENTS AS DEEMED NECESSARY IN
OCEANSIDE IN THE TOWN OF HEMPSTEAD IN NASSAU
COUNTY. BIN # 305663-9 (SPECIFIC SCOPE TBD) BIN#
330022-0

AQC:A19 NASSAU TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.000 0.000 0.000 0.000 4.000 0.000 0.000 0.000

NASSAU CO. PAVEMENT MARKINGS PH 14: REPLACE WORN STBG LG URB 09/2022 0.320 CONINSP 0.320
PAVEMENT MARKINGS ON FEDERAL AID ELIGIBLE LOCAL 09/2022 0.080 CONINSP 0.080
076167 NASSAU COUNTY ROADS (LOCATIONS TBD) TO STBG LG URB 09/2022 2.880 CONST 2.880
SAFETY ASSURE GOOD VISIBILITY AND PROMOTE SAFE, LOCAL 09/2022 0.720 CONST 0.720
<Exempt> EFFICIENT TRAFFIC MOVEMENT AND OPERATION
AQC:A11 NASSAU TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.000 0.000 0.000 0.000 4.000 0.000 0.000 0.000

NASSAU CO. REHABILITATE FEDERAL AID-ELIGIBLE EXISTING ROAD STBG LG URB 11/2023 0.400 CONINSP 0.400
PAVEMENT IN NASSAU COUNTY TO PROVIDE A BETTER LOCAL 11/2023 0.100 CONINSP 0.100
076168 AND SAFER ROAD SURFACE (LOCATIONS TBD) IN STBG LG URB 11/2023 3.600 CONST 3.600
R&P NASSAU COUNTY. LOCAL 11/2023 0.900 CONST 0.900
<Exempt>
AQC:A6 NASSAU TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.000 0.000 0.000 0.000 0.000 0.000 5.000 0.000

NASSAU CO. PAVEMENT MARKINGS PH 15: REPLACE WORN STBG LG URB 09/2023 0.320 CONINSP 0.320
PAVEMENT MARKINGS ON NASSAU COUNTY LOCAL 09/2023 0.080 CONINSP 0.080
076169 FEDERAL-AID ELIGIBLE COUNTY ROADS (LOCATIONS STBG LG URB 09/2023 2.880 CONST 2.880
SAFETY TBD) TO ASSURE GOOD VISIBILITY AND PROMOTE SAFE, LOCAL 09/2023 0.720 CONST 0.720
<Exempt> EFFICIENT TRAFFIC MOVEMENT AND OPERATION IN
NASSAU COUNTY

AQC:A11 NASSAU TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.000 0.000 0.000 0.000 0.000 4.000 0.000 0.000

NASSAU CO. NASSAU COUNTY TRAFFIC SIGNAL STBG LG URB 09/2024 4.140 OPER 4.140
SYSTEMOPERATIONS PHASE 7:PROVIDES DAY-TO DAY LOCAL 09/2024 1.035 OPER 1.035
076170 MAINTENANCE & OPERATION OF COUNTY ON-STREET
TRAFFIC TRAFFIC
<Exempt> SIGNAL COMMUNICATION PLANT THAT MANAGES
TRAFFIC SIGNALS, CAMERAS, VARIABLE MESSAGE
SIGNS, WEATHER STATIONS, AND HIGHWAY
ADVISORY RADIOS TO IMPROVE TRAFFIC FLOW IN
NASSAU COUNTY. ARCHITECTURE SERVICE PACKAGE
#ATMS08

AQC:A7 NASSAU TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.175 0.000 0.000 0.000 0.000 0.000 5.175 0.000

143
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Nassau County Listing Page 13 of 15

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NASSAU CO. NASSAU COUNTY TRAFFIC MANAGEMENT CENTER STBG LG URB 09/2024 3.009 OPER 3.009
PERSONNEL PH 5: THIS PROJECT PROVIDES FOR LOCAL 09/2024 0.752 OPER 0.752
076171 PERSONNEL FOR 24-HOUR OPERATION OF THE COUNTY
MISC TRAFFIC MANAGEMENT CENTER TO MAINTAIN
<Exempt> TRAFFIC MANAGEMENT CENTER (TMC)
FUNCTIONALITY. ARCHITECTURE SERVICE PACKAGE
#ATMS08, ATMS06, AND ATMS03.

AQC:A7 NASSAU TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.761 0.000 0.000 0.000 0.000 0.000 3.761 0.000

LOCAL RECONST.OF PAVMENT AND DRAINAGE EAST LINCOLN HPP 12/2019 0.140 DETLDES 0.140
AVE,RIVERDALE AVE, AND PIRATES COVE MASSEPEQUA LOCAL 12/2019 0.035 DETLDES 0.035
076178 TO ALLEVIATE FLOODING FROM STORM WATER HPP 10/2019 0.080 PRELDES 0.080
RECON RUNOFF&TIDAL INFLUENCE AND MINIMIZE DISCHARGE
<Exempt> LOCAL 10/2019 0.020 PRELDES 0.020
OF POLLUTANTS FROM STORMWATER RUNOFF IN THE
HPP 04/2020 0.080 ROWACQU 0.080
TOWN OF OYSTERBAY, NASSAU COUNTY. REPURPOSE
EARMARK NY404(RPS1). LOCAL 04/2020 0.020 ROWACQU 0.020
HPP 10/2019 0.048 SCOPING 0.048
LOCAL 10/2019 0.012 SCOPING 0.012
HPP 12/2020 0.182 CONINSP 0.182
LOCAL 12/2020 0.045 CONINSP 0.045
HPP 12/2020 1.700 CONST 1.700
LOCAL 12/2020 0.425 CONST 0.425
AQC:A2 NASSAU TPC: $3.3-$5.6 M TOTAL 5YR COST : 2.787 0.000 0.435 2.352 0.000 0.000 0.000 0.000

NYSDOT TRAFFIC SIGNAL TIMING AND ARTERIAL OPTIMIZATION CMAQ 04/2019 0.000 OPER 1.200
VARIOUS STATE HIGHWAYS IN NASSAU COUNTY SDF 04/2019 0.000 OPER 0.300
080768
TRAFFIC
<Exempt>
AQC:A7 NASSAU TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 1.500 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT REIMBURSEMENTS FOR NASSAU POLICE FOR SDF 10/2018 0.000 MISC 0.650
CONSTRUCTION AND MAINTENANCE OPERATIONS SDF 10/2019 0.650 MISC 0.650
080825 SDF 10/2020 0.650 MISC 0.650
MISC
SDF 10/2021 0.650 MISC 0.650
<Exempt>
AQC:A2 NASSAU TPC: $6-$9.4 M TOTAL 5YR COST : 1.950 0.650 0.650 0.650 0.650 0.000 0.000 0.000

NYSDOT INSTALL OVERHEIGHT DETECTORS TO PREVENT HSIP 11/2018 0.000 CONINSP 0.223
BRIDGE STRIKES ON PARKWAY OVERPASSES. SDF 11/2018 0.000 CONINSP 0.025
080955 LOCATIONS INCLUDE WB I495 TO WB NSP, EB I495 TO EB
SAFETY NSP, NB PENNINSULA BLVD TO EB SSP AND SB NY135 TO
<Exempt> WB SSP. TOWNS OF HEMPSTEAD & OYSTER BAY.
NASSAU COUNTY.

AQC:A2 NASSAU TPC: $2-$4 M TOTAL 5YR COST : 0.000 0.248 0.000 0.000 0.000 0.000 0.000 0.000

144
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Nassau County Listing Page 14 of 15

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS ON SDF 12/2018 0.000 DETLDES 0.193
MEADOWBROOK STATE PARKWAY FROM OCEAN PKWY SDF 08/2020 0.353 CONINSP 0.353
080996 TO NORTHERN STATE PKWY &BETHPAGE STATEPKWY SDF 08/2020 3.529 CONST 3.529
SAFETY FROM PLAINVIEW RD TO SOUTHERN STATE PKWY IN
<Exempt> TOWN OF HEMPSTEAD,NORTH HEMPSTEAD, AND
OYSTERBAY, NASSAU COUNTY
(FORMERLY PIN: 0T2038)

AQC:A9P NASSAU TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.882 0.193 3.882 0.000 0.000 0.000 0.000 0.000

NYSDOT PAVEMENT REHABILITATION NY25-NY112 TO WADING NHPP 11/2019 1.378 CONINSP 1.378
RIVER MANOR RD, NY25B- QUEENS/NASSAU LINE TO SDF 11/2019 0.344 CONINSP 0.344
081003 LIRR TRACKS (E.WILLISTON), AND NY107-MERRICK RD NHPP 11/2019 5.975 CONST 5.975
R&P TO NY24, TOWNS OF BROOKHAVEN, N HEMPSTEAD,
<Exempt> SDF 11/2019 11.248 CONST 11.248
OYSTER BAY & RIVERHEAD, NASSAU & SUFFOLK
COUNTIES.

AQC:A10 NASSAU TPC: $15-$25 M TOTAL 5YR COST : 18.945 0.000 18.945 0.000 0.000 0.000 0.000 0.000

NYSDOT OVERHEAD SIGN STRUCTURE REPLACEMENT TO SDF 07/2022 0.540 DETLDES 0.540
MAINTAIN THEIR STRUCTURAL INTEGRITY ALONG THE NHPP 07/2023 0.814 CONINSP 0.814
0T1865 NORTHERN STATE PKWY AND SOUTHERN STATE PKWY SDF 07/2023 0.203 CONINSP 0.203
R&P IN THE TOWNS OF HEMPSTEAD AND OYSTER BAY, NHPP 07/2023 4.072 CONST 4.072
<Exempt> NASSAU COUNTY SDF 07/2023 1.018 CONST 1.018
AQC:C13 NASSAU TPC: $6-$9.4 M TOTAL 5YR COST : 6.647 0.000 0.000 0.000 0.540 6.107 0.000 0.000

NYSDOT PREVENTATIVE MAINTENANCE BRIDGE REPAIRS ON NHPP 04/2021 0.814 DETLDES 0.814
SEAGIRT BLVD. OVER NY878 AND NY25B OVER NY25 SDF 04/2021 0.203 DETLDES 0.203
0T2124 TOWNS OF HEMPSTEAD AND NORTH HEMPSTEAD IN NHPP 09/2022 1.634 CONINSP 1.634
BRIDGE NASSAU COUNTY. BIN #1056539, 1060770 SDF 09/2022 0.408 CONINSP 0.408
<Exempt>
NHPP 09/2022 10.886 CONST 10.886
SDF 09/2022 2.721 CONST 2.721
AQC:A19 NASSAU TPC: $15-$25 M TOTAL 5YR COST : 16.666 0.000 0.000 1.017 15.649 0.000 0.000 0.000

NYSDOT ASPHALT PAVEMENT REHABILITATION ON 908E SDF 09/2022 0.491 DETLDES 0.491
BETWEEN OCEAN PARKWAY & MERRICK RD AND NY106 NHPP 05/2024 1.600 CONINSP 1.600
0T2374 BETWEEN NY105 & THE WALMART DRIVEWAY TO SDF 05/2024 0.400 CONINSP 0.400
R&P BRING PAVEMENT TO A STATE OF GOOD REPAIR IN THE NHPP 05/2024 8.000 CONST 8.000
<Exempt> TOWNS OF HEMPSTEAD AND OYSTER BAYIN NASSAU SDF 05/2024 2.000 CONST 2.000
COUNTY.

AQC:A10 NASSAU TPC: $9.5-15.5 M TOTAL 5YR COST : 12.491 0.000 0.000 0.000 0.491 0.000 12.000 0.000

145
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Nassau County Listing Page 15 of 15

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT ROUT & SEAL CRACKS & JOINT OVERLAY REPAIR ON SDF 08/2020 0.520 DETLDES 0.520
NY107 FROM NY24 TO PULASKI STREET TO BRING NHPP 05/2021 0.530 CONINSP 0.530
0T2558 PAVEMENT TO A STATE OF GOOD REPAIR IN THE CITY OF SDF 05/2021 0.133 CONINSP 0.133
R&P GLEN COVE, TOWNS OF HEMPSTEAD & OYSTER BAY IN NHPP 05/2021 2.652 CONST 2.652
<Exempt> NASSAU COUNTY. SDF 05/2021 0.663 CONST 0.663
AQC:A10 NASSAU TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.498 0.000 0.520 3.978 0.000 0.000 0.000 0.000

NYSDOT CONCRETE PAVEMENT REPAIR INCLUDING JOINT SDF 01/2023 0.540 DETLDES 0.540
SEALING AND DIAMOND GRINDING TO BRING STBG FLEX 02/2024 0.590 CONINSP 0.590
0T2559 PAVEMENT TO A STATE OF GOOD REPAIR AT NY25 EB SDF 02/2024 0.150 CONINSP 0.150
R&P FROM NY25B TO ROXBURY RD, AND NY25 WB FROM STBG FLEX 02/2024 3.028 CONST 3.028
<Exempt> BRUSH HOLLOW RD TO NY25B IN THE TOWNS OF SDF 02/2024 0.757 CONST 0.757
NORTH HEMPSTEAD AND OYSTER BAY, NASSAU
STBG LG URB 02/2024 0.900 CONST 0.900
COUNTY.
SDF 02/2024 0.225 CONST 0.225
AQC:A10 NASSAU TPC: $6-$9.4 M TOTAL 5YR COST : 6.190 0.000 0.000 0.000 0.000 0.540 5.650 0.000

NYSDOT ASPHALT PAVEMENT REPAIRS AND SINGLE COURSE SDF 06/2021 0.520 DETLDES 0.520
OVERLAY ON SSP FROM THE QUEENS/NASSAU LINE TO NHPP 07/2022 1.561 CONINSP 1.561
0T2597 GRAND AVE/BALDWIN RD TO BRING PAVEMENT TO A SDF 07/2022 0.390 CONINSP 0.390
R&P STATE OF GOOD REPAIR, TOWN OF HEMPSTEAD, NHPP 07/2022 10.400 CONST 10.400
<Exempt> NASSAU COUNTY. SDF 07/2022 2.600 CONST 2.600
AQC:A10 NASSAU TPC: $12.5-$19 M TOTAL 5YR COST : 15.471 0.000 0.000 0.520 14.951 0.000 0.000 0.000

146
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Suffolk County Listing Page 1 of 20

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PROVIDE CONCRETE PAVEMENT REPAIRS ON NY231 SDF 06/2019 0.000 DETLDES 0.183
(DEER PARK AVENUE) BETWEEN ACORN STREET AND NHPP 02/2020 0.271 CONINSP 0.271
001145 INTERSTATE 495 (LONG ISLAND EXPRESSWAY) TO SDF 02/2020 0.069 CONINSP 0.069
R&P IMPROVE ITS EFFICIENCY AND PROVIDE A SMOOTHER NHPP 02/2020 2.707 CONST 2.707
<Exempt> DRIVING SURFACE TO HELP ASSURE THE CONTINUED
SDF 02/2020 0.690 CONST 0.690
SAFETY OF THE TRAVELING PUBLIC. TOWNS OF
BABYLON AND HUNTINGTON IN SUFFOLK COUNTY

AQC:A10 SUFFOLK TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.737 0.183 3.737 0.000 0.000 0.000 0.000 0.000

NYSDOT NY112 SAFETY IMPROVEMENTS FROM I-495 TO GRANNY HSIP 10/2018 0.000 CONINSP 0.054
ROAD, INCLUDING NY112 HIGHWAY RECONSTRUCTION SDF 10/2018 0.000 CONINSP 0.006
001627 BETWEEN HORSEBLOCK RD (CR16) AND GRANNY RD NHPP 10/2018 0.000 CONINSP 0.224
SAFETY INCLUDING 1 LANE IN EACH DIRECTION, A CENTER SDF 10/2018 0.000 CONINSP 0.056
<Exempt> TURN LANE, 5 FOOT SHOULDERS, DRAINAGE
IMPROVEMENTS, CONTINUOUS CURB, SIDEWALK &
BIKE LANES. TO ADDRESS SAFETY IN THE TOWN OF
BROOKHAVEN, SUFFOLK COUNTY.( FORMERLY PIN :
OT2534 )THE STATE CERTIFIES THAT THIS PROJECT HAS
BEEN APPROVED BY THE REGIONAL SAFETY
EVALUATION ENGINEER AND SIGNED OFF BY THE
REGIONAL TRAFFIC ENGINEER. NYSDOT HSIP 2016
SOLICITATION. THIS PIN NOW INCLUDES PIN 001628

AQC:A6 SUFFOLK TPC: $50-$85 M TOTAL 5YR COST : 0.000 0.340 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT THIS PROJECT WILL REPAIR/REPLACE STEEL NHPP 01/2019 0.000 CONINSP 0.235
COMPONENT OF ROBERT MOSES CAUSEWAY OVER FIRE SDF 01/2019 0.000 CONINSP 0.059
001766 ISLAND INLET BRIDGE TO RESTORE THE LOAD
BRIDGE CAPACITY OF THE BRIDGE. THE WORK INCLUDES
<Exempt> REPAIR TO THE FLOOR BEAM SYSTEMS ON THE
APPROACH SPANS AND MISCELLANEOUS REPAIRS TO
THE TRUSS IN TOWN OF ISLIP, SUFFOLK COUNTY (BIN#
1058770)

AQC:A19 SUFFOLK TPC: $15-$25 M TOTAL 5YR COST : 0.000 0.294 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT REHABILITATE THE ROBERT MOSES CAUSEWAY BRIDGE NHPP 11/2018 0.000 DETLDES 0.412
OVER FIRE ISLAND INLET INCLUDING SPOT PAINTING SDF 11/2018 0.000 DETLDES 0.103
001767 AND STRUCTURAL ELEMENT REPAIRS TO MAINTAIN NHPP 10/2019 4.243 CONINSP 4.243
BRIDGE THE STRUCTURAL INTEGRITY AND SAFETY FOR THE SDF 10/2019 1.061 CONINSP 1.061
<Exempt> TRAVELING PUBLIC, TOWN OF ISLIP, SUFFOLK COUNTY NHPP 10/2019 21.216 CONST 21.216
BIN#1058770 (FORMERLY PIN: 0T2464)
SDF 10/2019 5.304 CONST 5.304

AQC:A19 SUFFOLK TPC: $32-$50 M TOTAL 5YR COST : 31.824 0.515 31.824 0.000 0.000 0.000 0.000 0.000

147
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Suffolk County Listing Page 2 of 20

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT RECONSTRUCT DRAINAGE ALONG NY454 BETWEEN SDF 04/2020 0.634 CONINSP 0.634
JOHNSON AVE AND BROADWAY AVE INCLUDING A NEW SDF 04/2020 6.339 CONST 6.339
003015 CLOSED CONDUIT SYSTEM AND RECHARGE BASINS,
MISC TOWN OF ISLIP, SUFFOLK COUNTY TO BRING TO A
<Exempt> STATE OF GOOD REPAIR
AQC:A2Z SUFFOLK TPC: $6-$9.4 M TOTAL 5YR COST : 6.973 0.000 6.973 0.000 0.000 0.000 0.000 0.000

NYSDOT RECONSTRUCT NY347 FROM HALLOCK RD TO CR97 TO SDF 10/2018 0.000 DETLDES 5.300
IMPROVE SAFETY, OPERATION, AND MOBILITY FOR SDF 08/2021 2.800 DETLDES 2.800
005409 VEHICLES, PEDESTRIANS, BICYCLISTS AND TRANSIT SDF 11/2020 17.325 ROWACQU 17.325
BRIDGE USERS. TOWN OF BROOKHAVEN, SUFFOLK COUNTY
<Non-Exempt>

AQC:NON SUFFOLK TPC: $50-$85 M TOTAL 5YR COST : 20.125 5.300 0.000 20.125 0.000 0.000 0.000 0.000

NYSDOT Reconstruct NY347 from CR97 to Old Town Rd to improve SDF 02/2023 11.970 ROWACQU 11.970
safety, operation, and mobility for vehicles, pedestrians, bicyclists SDF 02/2024 6.616 DETLDES 6.616
005410 and transit users. Town of Brookhaven, Suffolk County
RECON
<Non-Exempt>
AQC:NON SUFFOLK TPC: $50-$85 M TOTAL 5YR COST : 18.586 0.000 0.000 0.000 0.000 11.970 6.616 0.000

NYSDOT RECONSTRUCT NY347 FROM GIBBS POND RD TO PIT BOND 10/2019 1.000 DETLDES 1.000
HALLOCK ROAD TO PROVIDE A CONTINUOUS THIRD PIT BOND 10/2019 13.500 ROWACQU 13.500
005423 TRAVEL LANE IN EACH DIRECTION; IMPROVE STORM PIT BOND 10/2019 0.400 ROWINCD 0.400
RECON WATER RUNOFF; A SEPARATE SHARED USE PATH; MAJOR CMAQ 07/2023 1.000 CONINSP 1.000
<Non-Exempt> INTERSECTION IMPROVEMENTS; ENHANCED BUS STOPS SDF 07/2023 0.250 CONINSP 0.250
& AMENITIES IN THE TOWN OF SMITHTOWN AND
NHPP 07/2023 7.300 CONINSP 7.300
BROOKHAVEN.THE STATE CERTIFIES THAT THIS
PROJECT HAS BEEN APPROVED BY THE REGIONAL SDF 07/2023 1.886 CONINSP 1.886
SAFETY EVALUATION ENGINEER AND SIGNED OFF BY STBG LG URB 07/2023 1.867 CONINSP 1.867
THE REGIONAL TRAFFIC ENGINEER. HAL YEAR 2018 PIL LOCAL 07/2023 0.467 CONINSP 0.467
126 CMAQ 07/2023 4.000 CONST 4.000
SDF 07/2023 1.000 CONST 1.000
HSIP 07/2023 4.500 CONST 4.500
SDF 07/2023 0.500 CONST 0.500
NHPP 07/2023 48.500 CONST 48.500
SDF 07/2023 12.125 CONST 12.125
STBG LG URB 07/2023 12.444 CONST 12.444
LOCAL 07/2023 3.111 CONST 3.111
AQC:NON SUFFOLK TPC: $100-$225 M TOTAL 5YR COST : 113.850 0.000 14.900 0.000 0.000 98.950 0.000 0.000

NYSDOT INSTALL MEDIAN BARRIER ON NY27 (SUNRISE SDF 09/2022 0.354 DETLDES 0.354
HIGHWAY) FROM ROBERT MOSES CAUSEWAY TO 5TH NHPP 10/2023 7.274 CONST 7.274
005903 AVENUE AS SAFETY IMPROVEMENT IN THE ISLIP SDF 10/2023 1.818 CONST 1.818
SAFETY TOWN, SUFFOLK COUNTY.
<Exempt>
AQC:A9 SUFFOLK TPC: $7.5-$12 M TOTAL 5YR COST : 9.446 0.000 0.000 0.000 0.354 0.000 9.092 0.000

148
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Suffolk County Listing Page 3 of 20

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT NY27 OAKDALE MERGE PLANNING/FEASIBILTY STUDY, OTHER 10/2019 3.120 PRELDES 3.120
TOWN OF ISLIP, SUFFOLK COUNTY.
005928
STUDY
<Exempt>
AQC:C7Z SUFFOLK TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.120 0.000 3.120 0.000 0.000 0.000 0.000 0.000

NYSDOT CONSTRUCT NEW INTERCHANGE ON NY27 AT BARNES PIT BOND 08/2019 0.000 DETLDES 0.728
ROAD INCLUDING RAMPS AND ANCILILLARY PIT BOND 01/2021 1.800 CONINSP 1.800
005930 FACILITIES TO IMPROVE SAFETY AND MOBILITY IN THE PIT BOND 01/2021 9.000 CONST 9.000
SAFETY TOWN OF BROOKHAVEN, SUFFOLK COUNTY.
<Non-Exempt>

AQC:NON SUFFOLK TPC: $9.5-15.5 M TOTAL 5YR COST : 10.800 0.728 0.000 10.800 0.000 0.000 0.000 0.000

NYSDOT REPLACE ALUMINUM BRIDGE NHPP 01/2019 0.000 CONST 0.689


NY110 OVER NY27 (BIN 1019119) IN BABYLON TOWN, LOCAL 01/2019 0.000 CONST 0.172
011257 SUFFOLK COUNTY.
BRIDGE
<Exempt>
AQC:A19 SUFFOLK TPC: $21-$31 M TOTAL 5YR COST : 0.000 0.861 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT HUNTINGTON:BRIDGE REPLACEMENT ON CARLLS NHPP 01/2019 0.000 CONST (0.298)


STRAIGHT PATH OVER INTERSTATE 495., SUFFOLK SDF 01/2019 0.000 CONST (0.074)
022940 COUNTY
BRIDGE
<Exempt>
AQC:A19 SUFFOLK TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 (0.372) 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT REPAIR 11 BRIDGES ON I495 IN SUFFOLK COUNTY. NHPP 11/2018 0.000 CONINSP 0.426
WORK WILL INCLUDE PIER CAP REPAIR, BEARING AND SDF 11/2018 0.000 CONINSP 0.106
022947 JOINT REPLACEMENT DUE TO DETERIORATION TO
BRIDGE MAINTAIN STATE OF GOOD REPAIR. BINS INCLUDE
<Exempt> 1049330, 1049400, 1049489, 1049509, 1053271, 1053272,
1064121, 1064122, 1064151, 1064152, 1064160.
BROOKHAVEN, ISLIP, HUNTINGTON

AQC:A19 SUFFOLK TPC: $26-$40 M TOTAL 5YR COST : 0.000 0.532 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT I495/CROOKED HILL ROAD INTERCHANGE NHPP 01/2020 2.950 CONINSP 2.950
CONSTRUCTION : CONSTRUCT NEW ACCESS TO SDF 01/2020 0.737 CONINSP 0.737
022948 CROOKED HILL ROAD FROM I-495 TO PROVIDE NHPP 01/2020 19.500 CONST 19.500
CONST VEHICLES (INCLUDING TRUCKS) TRAVELING ON THE
<Non-Exempt> SDF 01/2020 4.875 CONST 4.875
LONG ISLAND EXPRESSWAY (I-495) IN BOTH THE
NHPP 04/2020 0.416 DETLDES 0.416
EASTBOUND AND WESTBOUND DIRECTIONS WITH
ACCESS TO CROOKED HILL ROAD (CR13) IN THE TOWN SDF 04/2020 0.104 DETLDES 0.104
OF ISLIP, SUFFOLK COUNTY.

AQC:NON SUFFOLK TPC: $26-$40 M TOTAL 5YR COST : 28.582 0.000 28.582 0.000 0.000 0.000 0.000 0.000

149
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Suffolk County Listing Page 4 of 20

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT I495 HOV ENFORCEMENT CONTRACT EXIT 48 TO 64 NHPP 11/2018 0.000 OPER 0.760
TOWNS OF BROOKHAVEN, ISLIP, HUNTINGTON AND SDF 11/2018 0.000 OPER 0.190
022955 SMITHTOWN IN THE SUFFOLK COUNTY TO IMPROVE NHPP 11/2019 0.760 OPER 0.760
MOBIL TRAVEL TRIP RELIABILITY AND REDUCE DELAYS SDF 11/2019 0.190 OPER 0.190
<Exempt>
NHPP 11/2020 0.760 OPER 0.760
SDF 11/2020 0.190 OPER 0.190
AQC:A7 SUFFOLK TPC: $6-$9.4 M TOTAL 5YR COST : 1.900 0.950 0.950 0.950 0.000 0.000 0.000 0.000

NYSDOT CONDUCT OPERATIONAL STUDY ON SAGTIKOS STATE NHPP 03/2019 0.000 PRELDES 7.683
PKWY/SUNKEN MEADOW STATE PKWY FROM SDF 03/2019 0.000 PRELDES 1.921
033909 SOUTHERN STATE PKWY TO NY25A INCLUDING THE
STUDY PARALLEL ROADWAY IN THE TOWNS OF ISLIP AND
<Exempt> SMITHTOWN, SUFFOLK COUNTY
AQC:C3 SUFFOLK TPC: $12.5-$19 M TOTAL 5YR COST : 0.000 9.604 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS AS A NHPP 07/2019 0.000 CONINSP 0.612
SAFETY IMPROVEMENTS ON SUNKEN MEADOW SDF 07/2019 0.000 CONINSP 0.153
033915 PARKWAY FROM I495 TO SUNKEN MEADOW STATE PARK NHPP 07/2019 0.000 CONST 4.600
SAFETY TOLL BOOTH, TOWNS OF SMITHTOWN & ISLIP, SUFFOLK SDF 07/2019 0.000 CONST 1.150
<Exempt> COUNY.
AQC:A9 SUFFOLK TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 6.515 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT REPLACE RUSTIC GUIDERAIL SECTIONS WITH NEW SDF 03/2019 0.000 DETLDES 0.100
GUIDERAIL WHICH MEETS CURRENT ENGINEERING STBG FLEX 11/2019 0.640 CONINSP 0.640
051656 STANDARDS FOR SAFETY IMPROVEMENTS ON THE SDF 11/2019 0.160 CONINSP 0.160
SAFETY NORTHERN STATE PARKWAY BETWEEN THE STBG FLEX 11/2019 3.201 CONST 3.201
<Exempt> NASSAU/SUFFOLK COUNTY LINE AND COMMACK ROAD
SDF 11/2019 0.800 CONST 0.800
TO MAINTAIN A STATE OF GOOD REPAIR IN THE TOWN
OF HUNTINGTON,SUFFOLK COUNTY.

AQC:A9 SUFFOLK TPC: $4.6-$7.5 M TOTAL 5YR COST : 4.801 0.100 4.801 0.000 0.000 0.000 0.000 0.000

LOCAL IMPROVEMENTS AND ENHANCEMENTS FOR OAK HPP 09/2021 0.456 CONINSP 0.456
BEACH ROAD IN THE TOWN OF BABYLON. RELOCATE LOCAL 09/2021 0.140 CONINSP 0.140
075887 OAK BEACH ROAD NORTHWARD TO RESULT IN A HPP 09/2021 4.076 CONST 4.076
RECON HIGHWAY INTERCHANGE AT OCEAN PARKWAY THAT LOCAL 09/2021 1.019 CONST 1.019
<Exempt> MEETS MODERN DESIGN STANDARDS, IN THE TOWN OF
BABYLON. NY326, NY401, NY672

AQC:D4 SUFFOLK TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.691 0.000 0.000 5.691 0.000 0.000 0.000 0.000

150
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Suffolk County Listing Page 5 of 20

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL ROAD IMPROVEMENTS, VILLAGE OF PATCHOGUE. HPP 07/2019 0.000 CONINSP 0.117
RESURFACING TOTAL OF 2.5 MILES ON VARIOUS LOCAL 07/2019 0.000 CONINSP 0.029
075888 VILLAGE ROADS. RESURFACING, REPAIR EXISTING HPP 07/2019 0.000 CONST 0.975
R&P DRAINAGE SYSTEMS TO PREVENT FLOODING AND LOCAL 07/2019 0.000 CONST 0.244
<Exempt> REPAIR TO DAMAGED CURB & SIDEWALK IN SUFFOLK
COUNTY. NY628

AQC:A10 SUFFOLK TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 1.365 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL INSTALLATION OF TRAFFIC SIGNAL PREEMPTION HPP 09/2021 0.008 CONINSP 0.008
DEVICES ON TRAFFIC SIGNALS THROUGHOUT THE LOCAL 09/2021 0.002 CONINSP 0.002
075904 TOWN OF SMITHTOWN, SUFFOLK COUNTY. THESE HPP 09/2021 0.352 CONST 0.352
MISC DEVICES WILL AUTOMATICALLY CHANGE TRAFFIC LOCAL 09/2021 0.088 CONST 0.088
<Exempt> SIGNALS TO GREEN FOR EMERGENCY VEHICLE DURING
EMERGENCIES. NY316

AQC:A7 SUFFOLK TPC: < $0.75 M TOTAL 5YR COST : 0.450 0.000 0.000 0.450 0.000 0.000 0.000 0.000

SUFFOLK CO. BRIDGE REPLACEMENT OF CR 46 (WILLIAM FLOYD NHPP 11/2018 0.000 DETLDES 1.601
PARKWAY) OVER NARROW BAY, DUE TO STRUCTURAL LOCAL 11/2018 0.000 DETLDES 0.400
075978 DEFICIENCIES AND TO IMPROVE ALIGNMENT, IN THE STBG LG URB 11/2018 0.000 DETLDES 1.591
BRIDGE TOWN OF BROOKHAVEN. BIN 3300770. (ASSOCIATED PIN LOCAL 11/2018 0.000 DETLDES 0.398
<Exempt> SCBLKSB) LOCAL 08/2020 7.500 CONINSP 7.500
NHPP 08/2020 0.960 CONST 0.960
LOCAL 08/2020 0.240 CONST 0.240
STBG LG URB 08/2020 10.988 CONST 10.988
LOCAL 08/2020 55.312 CONST 55.312
AQC:A19 SUFFOLK TPC: $70-$130 M TOTAL 5YR COST : 75.000 3.990 75.000 0.000 0.000 0.000 0.000 0.000

LOCAL TOWN OF ISLIP CONSTRUCT A SIDEWALKS BETWEEN SAFE RT SCH 08/2020 0.017 DETLDES 0.017
O\'NEILL ELEMENTARY SCHOOL,THE LIRR STATION & LOCAL 08/2020 0.004 DETLDES 0.004
076027 THE NEIGHBORHOOD TO THE WEST TO ENCOURAGE SAFE RT SCH 09/2021 0.333 CONST 0.333
SAFETY CHILDERN TO WALK AND BIKE TO SCHOOL BY LOCAL 09/2021 0.083 CONST 0.083
<Exempt> PROVIDING SAFE ENVIRONMENT,TOWN OF ISLIP,
SUFFOLK COUNTY

AQC:C2 SUFFOLK TPC: < $0.75 M TOTAL 5YR COST : 0.437 0.000 0.021 0.416 0.000 0.000 0.000 0.000

151
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Suffolk County Listing Page 6 of 20

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

SUFFOLK CO. RECONSTRUCTION OF CR97 NICOLLS RD CORRIDOR CMAQ 08/2020 7.600 CONST 7.600
BETWEEN NY25A & CR65 / DIVISION ST INCLUDING LOCAL 08/2020 1.900 CONST 1.900
076032 ROADWAY RECONFIGURATION AT KEY INTERSECTIONS CMAQ 09/2020 4.000 DETLDES 4.000
RECON AND 3RD LANE/ BRT OPTIONS TO PATCHOGUE &
<Non-Exempt> LOCAL 09/2020 1.000 DETLDES 1.000
RONKONKOMA RR STATIONS TO ADDRESS SAFETY,
CMAQ 08/2021 11.600 CONST 11.600
CONGESTION & MOBILITY CONCERNS. IN THE TOWN OF
LOCAL 08/2021 2.900 CONST 2.900
ISLIP AND BROOKHAVEN, SUFFOLK COUNTY. (FUND
WILL BE TRANSFERRED TO FTA) OTHER 08/2021 1.875 CONST 1.875
CMAQ 08/2022 1.160 CONINSP 1.160
LOCAL 08/2022 0.290 CONINSP 0.290
CMAQ 08/2022 10.440 CONST 10.440
LOCAL 08/2022 2.610 CONST 2.610
CMAQ 08/2023 0.160 CONINSP 0.160
LOCAL 08/2023 0.040 CONINSP 0.040
CMAQ 08/2023 1.440 CONST 1.440
LOCAL 08/2023 0.360 CONST 0.360
AQC:NON SUFFOLK TPC: $70-$130 M TOTAL 5YR COST : 47.375 0.000 14.500 16.375 14.500 2.000 0.000 0.000

LOCAL RECONSTRUCTION OF BAYSHORE FERRY TERMINAL LOCAL 07/2020 0.010 DETLDES 0.010
DETERIORATED BULKHEAD IN THE VILLAGE OF FBP 07/2021 0.010 CONINSP 0.010
076048 SALTAIRE IN THE TOWN OF ISLIP, SUFFOLK COUNTY. LOCAL 07/2021 0.020 CONINSP 0.020
TRANSIT 2010FBD AWARD. FBP 07/2021 0.240 CONST 0.240
<Exempt>
LOCAL 07/2021 0.060 CONST 0.060
AQC:B8 SUFFOLK TPC: < $0.75 M TOTAL 5YR COST : 0.340 0.000 0.010 0.330 0.000 0.000 0.000 0.000

LOCAL IMPROVEMENT OF HOSPITAL ROAD BRIDGE (BIN# NHPP 09/2020 1.700 CONINSP 1.700
1064109) OVER NYS ROUTE 27, SUNRISE HIGHWAY NY 27 PIT BOND 09/2020 0.425 CONINSP 0.425
076078 AT EXIT 54 FROM VICINITY OF POND VIEW DRIVE TO HPP 09/2020 4.319 CONST 4.319
BRIDGE VICINITY OF FISH THICKET ROAD BETWEEN CR99 AND
<Exempt> PIT BOND 09/2020 1.080 CONST 1.080
CR101 TO RELIEVE TRAFFIC CONGESTION.
NHPP 09/2020 12.680 CONST 12.680
ADDITIONALLY, IT INCLUDES APPROACH ROADWAY
RECONSTRUCTION AND IMPROVEMENTS TO THE PIT BOND 09/2020 3.170 CONST 3.170
HOSPITAL ROAD/NY 27 SERVICE ROAD INTERSECTIONS NHPP 11/2019 1.700 DETLDES 1.700
BETWEEN CR99 AND CR101 IN THE TOWN OF PIT BOND 11/2019 0.425 DETLDES 0.425
BROOKHAVEN, COUNTY OF SUFFOLK. NY379 NHPP 05/2020 0.400 ROWACQU 0.400
BIN#1064109 PIT BOND 05/2020 0.100 ROWACQU 0.100

AQC:D3 SUFFOLK TPC: $21-$31 M TOTAL 5YR COST : 25.999 0.000 25.999 0.000 0.000 0.000 0.000 0.000

SUFFOLK CO. RESURFACING OF CR80, MONTAUK HIGHWAY IN THE STBG LG URB 02/2019 0.000 CONST 0.960
VICINITY OF CR101 TO VICINITY OF NY24 IN THE TOWN LOCAL 02/2019 0.000 CONST 0.240
076090 OF BROOKHAVEN AND SOUTHAMPTON TO RESURFACE
R&P ROADWAY WITH 2 INCHES OVERLAY AND REPAIR
<Exempt> DRAINAGE,CURBS AND SIDEWALKS AS NECESSARY,
SUFFOLK COUNTY

AQC:A10 SUFFOLK TPC: $15-$25 M TOTAL 5YR COST : 0.000 1.200 0.000 0.000 0.000 0.000 0.000 0.000

152
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Suffolk County Listing Page 7 of 20

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL NORTH COUNTRY RD COMPLETE STREETS WITH NEW TAP LG URBAN 07/2019 0.000 CONINSP 0.074
PAVEMENT MARKING, BIKE LANE &SHARE ROAD LOCAL 07/2019 0.000 CONINSP 0.044
076096 SIGNAGE,CONST. ADA COMPLIANT RAMPS,SIDE WALKS TAP LG URBAN 07/2019 0.000 CONST 0.573
R&P FROM HONEY LANE TO ROLLING ROAD,HAMLET OF LOCAL 07/2019 0.000 CONST 0.633
<Exempt> MILLER PLACE & FROM LOWER ROCKY POINT ROAD TO
ROLLING ROAD IN THE TOWN OF BROOKHAVEN,
SUFFOLK COUNTY

AQC:C2 SUFFOLK TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 1.324 0.000 0.000 0.000 0.000 0.000 0.000

SUFFOLK CO. SAFE ACCESS TO TRANSIT ALONG NICOLLS ROAD BRT TAP LG URBAN 09/2021 0.144 CONINSP 0.144
CORRIDOR INCLUDING CONST. OF ADA COMPLIANT LOCAL 09/2021 0.036 CONINSP 0.036
076113 RAMP, WALKWAY, BUS SHELTERS, PEDESTRIAN TAP LG URBAN 09/2021 1.308 CONST 1.308
RECON CROSSING SIGNALS AND LIGHTS TO ACCESS TRANSIT LOCAL 09/2021 0.327 CONST 0.327
<Non-Exempt> STOPS IN VICINITY OF LIRR TRAIN STATIONS IN TOWN
OF BROOKHAVEN, SUFFOLK COUNTY

AQC:NON SUFFOLK TPC: $4.6-$7.5 M TOTAL 5YR COST : 1.815 0.000 0.000 1.815 0.000 0.000 0.000 0.000

SUFFOLK CO. SAGTIKOS STATE PARKWAY ALTERNATIVES ANALYSIS LOCAL 12/2023 0.250 MISC 0.250
STUDY FROM KINGS PARK TO BABYLON TO EXPLORE
076115 TRANSIT OPTIONS ALONG THE PARKWAY CORRIDOR,
STUDY TOWNS OF ISLIP AND SMITHTOWN, SUFFOLK COUNTY
<Exempt>

AQC:C3 SUFFOLK TPC: < $0.75 M TOTAL 5YR COST : 0.250 0.000 0.000 0.000 0.000 0.000 0.250 0.000

SUFFOLK CO. PROJECT WOULD RESURFACE COUNTY ROAD 4, STBG LG URB 12/2018 0.000 CONINSP 0.104
COMMACK ROAD FROM THE VICINITY OF JULIA CIRCLE LOCAL 12/2018 0.000 CONINSP 0.026
076129 TO THE VICINITY OF NY 25, AND COUNTY ROAD 13, STBG LG URB 12/2018 0.000 CONST 1.096
R&P CROOKED HILL ROAD FROM THE VICINITY OF HENRY LOCAL 12/2018 0.000 CONST 0.274
<Exempt> STREET TO THE VICINITY OF CR4, COMMACK ROAD IN
TOWNS OF HUNTINGTON & SMITHTOWN. PROJECT
WOULD RESURFACE ROADWAY WITH 2 INCH OVERLAY,
WITH DRAINAGE REPAIRS, SPOT FULL DEPTH REPAIR
PAVEMENT AND REPAIR CURB AND SIDEWALK WHERE
NECESSARY. SUFFOLK COUNTY.

AQC:A10 SUFFOLK TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 1.500 0.000 0.000 0.000 0.000 0.000 0.000

153
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Suffolk County Listing Page 8 of 20

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

SUFFOLK CO. FFY 19 SUFFOLK COUNTY PAVEMENT MAINTENANCE STBG LG URB 09/2019 0.000 CONINSP 0.080
PROGRAM. PROJECT WILL SEAL CRACKS ON VARIOUS LOCAL 09/2019 0.000 CONINSP 0.020
076130 FEDERAL AID ELIGIBLE COUNTY ROADS IN THE TOWNS STBG LG URB 09/2019 0.000 CONST 0.720
R&P OF BABYLON, BROOKHAVEN, EAST HAMPTON, LOCAL 09/2019 0.000 CONST 0.180
<Exempt> HUNTINGTON, ISLIP, RIVERHEAD, AND
SOUTHAMPTON IN SUFFOLK COUNTY.

AQC:A10 SUFFOLK TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 1.000 0.000 0.000 0.000 0.000 0.000 0.000

SUFFOLK CO. SUFFOLK COUNTY NHS PAVEMENT MAINTENANCE NHPP 09/2020 0.400 CONINSP 0.400
PROGRAM. PROJECT WILL RESURFACE (IMPROVE LOCAL 09/2020 0.100 CONINSP 0.100
076131 RIDING SURFACE) AND REPAIR DAMAGED DRAINAGE NHPP 09/2020 3.600 CONST 3.600
R&P STRUCTURES ON COUNTY NHPP FEDERAL AID ELIGIBLE
<Exempt> LOCAL 09/2020 0.900 CONST 0.900
ROADS TO KEEP THE NATIONAL HIGHWAY SYSTEM IN A
STATE OF GOOD REPAIR.

AQC:A10 SUFFOLK TPC: $6-$9.4 M TOTAL 5YR COST : 5.000 0.000 5.000 0.000 0.000 0.000 0.000 0.000

LOCAL PH.2: IMPROVEMENTS TO THE FERRY INFRASTRUCTURE LOCAL 05/2021 0.125 CONINSP 0.125
WITH REHAB OF THE REMAINING 250’ BULKHEAD; FBP 05/2021 0.501 CONST 0.501
076134 INSTALLATION OF BIKE RACKS, BENCHES, DRAINAGE LOCAL 05/2021 0.775 CONST 0.775
R&P AND DECORATIVE LIGHTING SYSTEM TO THE DOCK
<Exempt> FACILITY, MAPLE AVE., TOWN OF ISLIP TO CONTINUE
FERRY OPERATIONS

AQC:A2 SUFFOLK TPC: $3.3-$5.6 M TOTAL 5YR COST : 1.401 0.000 0.000 1.401 0.000 0.000 0.000 0.000

NYSDOT WIDEN THE EXISTING WALT WHITMAN ROAD OVER NHPP 12/2018 0.000 CONINSP 2.240
INTERSTATE 495 (LONG ISLAND EXPRESSWAY) BRIDGE SDF 12/2018 0.000 CONINSP 0.560
076135 TO INCREASE CAPACITY AND ALLOW THE NHPP 10/2018 0.000 CONST 22.567
BRIDGE INSTALLATION OF AN ADDITIONAL THROUGH LANE IN SDF 10/2018 0.000 CONST 5.642
<Exempt> THE SOUTHBOUND DIRECTION , A NEW LEFT TURN
LANE IN THE NORTHBOUND DIRECTION AS WELL AS
INTERSECTION IMPROVEMENTS AT BOTH THE NORTH
AND SOUTH SERVICE ROADS. THE BRIDGE IS LOCATED
IN THE TOWN OF HUNTINGTON, SUFFOLK COUNTY.
BIN#1049290

AQC:K1 SUFFOLK TPC: $26-$40 M TOTAL 5YR COST : 0.000 31.009 0.000 0.000 0.000 0.000 0.000 0.000

154
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Suffolk County Listing Page 9 of 20

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL VILLAGE OF THE BRANCH WILL RE-PURPOSE AN REC TRAILS 02/2019 0.000 DETLDES 0.010
ABANDONED ROADWAY CORRIDOR TO ESTABLISH A LOCAL 02/2019 0.000 DETLDES 0.003
076139 TRAILHEAD FACILITY AT OLD ROUTE 111 IN THE REC TRAILS 04/2020 0.017 CONINSP 0.017
BIKE/PED VILLAGE. THE TRAILHEAD WILL LINK THE LOCAL 04/2020 0.004 CONINSP 0.004
<Exempt> NEIGHBORING RESIDENTIAL AND COMMERCIAL AREAS REC TRAILS 04/2020 0.144 CONST 0.144
TO THE 32-MILE LONG ISLAND GREENBELT TRAIL. IN
LOCAL 04/2020 0.036 CONST 0.036
ADDITION TO ENHANCING RECREATIONAL
OPPORTUNITIES, IT WILL ALSO PROVIDE ALTERNATE
AND SAFE PATHWAY TO THE BICYCLIST AND
PEDESTRIANS IN SMITHTOWN,SUFFOLK COUNTY.
OPRHP PROJECT # 153499

AQC:C2 SUFFOLK TPC: < $0.75 M TOTAL 5YR COST : 0.201 0.013 0.201 0.000 0.000 0.000 0.000 0.000

LOCAL CONSTRUCTION OF 2.1 MILES OF NEW SIDEWALK AND TAP LG URBAN 03/2020 0.099 DETLDES 0.099
1.2 MILES OF CURB ON SOUTHWEST SIDE OF OLD LOCAL 03/2020 0.025 DETLDES 0.025
076140 TOWN ROAD BETWEEN SEGMENTS OF NY347 AND TAP LG URBAN 03/2021 0.118 CONINSP 0.118
SAFETY NY112 TO ENHANCE THE PEDESTRIAN SAFETY IN THE LOCAL 03/2021 0.030 CONINSP 0.030
<Exempt> TOWN OF BROOKHAVEN, SUFFOLK COUNTY. TAP LG URBAN 03/2021 1.312 CONST 1.312
LOCAL 03/2021 0.328 CONST 0.328
AQC:A6 SUFFOLK TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.912 0.000 0.124 1.788 0.000 0.000 0.000 0.000

SUFFOLK CO. DESIGN AND CONSTRUCTION OF STREETSCAPE STBG LG URB 04/2019 0.000 DETLDES 0.064
IMPROVEMENTS IN DOWNTOWN KINGS PARK ON NY25A LOCAL 04/2019 0.000 DETLDES 0.016
076141 FROM DAWSON AVE TO PATIKY ST INCLUDING STBG LG URB 12/2018 0.000 PRELDES 0.016
RECON BULBOUTS, HIGH-VISIBILITY CROSSWALKS, AND LOCAL 12/2018 0.000 PRELDES 0.004
<Exempt> OTHER ENHANCEMENTS TO CREATE A SAFER LOCAL 12/2019 0.075 CONINSP 0.075
PEDESTRIAN ENVIRONMENT IN THE TOWN OF
LOCAL 12/2019 0.750 CONST 0.750
SMITHTOWN, SUFFOLK COUNTY

AQC:C2 SUFFOLK TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.825 0.100 0.825 0.000 0.000 0.000 0.000 0.000

SUFFOLK CO. BRIDGE REPLACEMENT OF CR80 MONTAUK HIGHWAY NHPP 09/2020 1.713 CONINSP 1.713
BRIDGE OVER LONG ISLAND RAIL ROAD (HAMPTON LOCAL 09/2020 0.090 CONINSP 0.090
076146 BAYS OVERPASS) DUE TO DETERIORATED CONDITION NHPP 09/2020 11.421 CONST 11.421
BRIDGE AND STRUCTURAL DEFICIENCIES, IN THETOWN OF
<Exempt> LOCAL 09/2020 0.601 CONST 0.601
SOUTHAMPTON. BIN 3019560. PROJECT WILL
NHPP 01/2020 0.475 ROWACQU 0.475
ELIMINATE THE SUBSTANDARD FEATURES AND
IMPROVE THE SAFETY AND SERVICEABILITY OF THE LOCAL 01/2020 0.025 ROWACQU 0.025
BRIDGE. BRIDGE NY PROJECT: FUNDING IS 95%
FEDERAL USING 15% TOLL CREDIT WITH A 5% LOCAL
MATCH

AQC:A19 SUFFOLK TPC: $15-$25 M TOTAL 5YR COST : 14.325 0.000 14.325 0.000 0.000 0.000 0.000 0.000

155
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Suffolk County Listing Page 10 of 20

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL MILL ROAD (CORAM-YAPHANK ROAD) OVER LOCAL 08/2019 0.000 DETLDES 0.080
CARMANS RIVER CULVERT (16FEET WIDE X 68FEET LOCAL 04/2019 0.000 PRELDES 0.040
076148 LONG )REPLACEMENT. THIS PROJECT WILL REPLACE LOCAL 02/2021 0.105 CONINSP 0.105
BRIDGE DETERIORATED CULVERT WITH SINGLE CONCRETE BOX LOCAL 02/2021 0.216 CONST 0.216
<Exempt> CULVERT ALONG WITH NEW DRAINAGE STRUCTURE PIT BOND 02/2021 1.000 CONST 1.000
AND NEW PEDESTRIAN ACCESS TO IMPROVE TRUCK
AND PEDESTRIAN ACCESS IN TOWN OF BROOKHAVEN,
SUFFOLK COUNTY

AQC:A2 SUFFOLK TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.321 0.120 0.000 1.321 0.000 0.000 0.000 0.000

SUFFOLK CO. FFY2020 SUFFOLK COUNTY PEDESTRIAN SAFETY HSIP 04/2019 0.000 DETLDES 0.915
ACTION PLAN PHASE I AND PHASE II. PEDESTRIAN HSIP 08/2020 0.790 CONINSP 0.790
076149 SAFETY IMPROVEMENT PROJECT TO ADDRESS UP TO HSIP 08/2020 5.200 CONST 5.200
SAFETY 145 INTERSECTIONS ON VARIOUS COUNTY ROADS WITH
<Exempt> PEDESTRIAN CROSSWALKS THAT DO NOT HAVE
PEDESTRIAN COUNTDOWN SIGNALS OR DO NOT
CONTAIN PEDESTRIAN SIGNALS . PROJECT INCLUDES
INSTALLATION OF PEDESTRIAN COUNTDOWN SIGNALS,
PUSHBUTTON ASSEMBLIES, AND SIGNS IN
ACCORDANCE WITH THE NATIONAL MUTCD AND
PROWAG. CROSSWALK MARKINGS WILL BE REPAIRED
OR REPLACED AS NEEDED. SIDEWALK CURB RAMPS
IMPACTED BY THE INSTALLATION OF THE NEW
PUSHBUTTON ASSEMBLIES WILL BE REPLACED AND/OR
IMPROVED IN ACCORDANCE WITH ADA/PRWOAG IN
THE TOWN OF ISLIP,HUNTINGTON,
BABYLON.SMITHTOWN, BROOKHAVEN AND
RIVERHEAD IN SUFFOLK COUNTY.100% FEDERAL
(USING 10% TOLL CREDIT)

AQC:A6 SUFFOLK TPC: $6-$9.4 M TOTAL 5YR COST : 5.990 0.915 5.990 0.000 0.000 0.000 0.000 0.000

156
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Suffolk County Listing Page 11 of 20

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL FFY2020 TOWN OF BROOKHAVEN PEDESTRIAN SAFETY HSIP 03/2020 0.060 PRELDES 0.060
ACTION PLAN -IMPROVE PEDESTRIAN SAFETY AT 40 HSIP 07/2021 0.070 CONINSP 0.070
076150 SIGNALIZED AND UNSIGNALIZED INTERSECTIONS HSIP 07/2021 1.106 CONST 1.106
SAFETY THROUGHOUT TOWN. TOWN WILL UTILIZE HSIP 12/2020 0.085 DETLDES 0.085
<Exempt> RECTANGULAR RAPID-FLASHING BEACONS WHICH
WILL BE ACTIVATED BY USE OF PUSH BUTTON IN
ACCORDANCE WITH MUTCD. TOWN ALSO
RECONSTRUCT/CONSTRUCT PEDESTRIAN RAMPS AT
ALL SIGNAL LOCATIONS TO ENSURE THEY ARE IN
COMPLIANCE WITH THE ADA/PROWAG. ADVANCED
SIGNING WILL BE REPLACED AS REQUIRED AT EACH OF
THE LOCATIONS AS WELL AS REFURBISHING THE
CROSSWALKS OR ADDING A CROSSWALK. TOWN WILL
ALSO MODIFY PEDESTRIAN SIGNAL AND PUSHBUTTON
AND SIGNAL CONTROLLER ON SIGNALIZED
INTERSECTIONS AS REQUIRED IN THE TOWN OF
BROOKHAVEN IN SUFFOLK COUNTY.100% FEDERAL
(USING 10% TOLL CREDIT)

AQC:A7 SUFFOLK TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.321 0.000 0.060 1.261 0.000 0.000 0.000 0.000

LOCAL Traffic Signal Equipment & Pedestrian Markings, Village of PIT BOND 09/2019 0.000 CONST 0.125
Patchogue, Town of Brookhaven, Suffolk County.
076154
SAFETY
<Exempt>
AQC:A11Z SUFFOLK TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.125 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL BAYPORT AERODROME - REFURBISHMENT OF GRASS PIT BOND 09/2019 0.000 CONST 0.125
RUNWAY AND HISTORIC BUILDINGS OF THE BAYPORT
076155 AERODROME, TOWN OF ISLIP, SUFFOLK COUNTY.
R&P
<Exempt>
AQC:C10Z SUFFOLK TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.125 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL Brown\'s River Dredging and Bulkheading, Town of Islip, Suffolk PIT BOND 01/2020 0.500 CONST 0.500
County
076156
MISC
<Exempt>
AQC:A10Z SUFFOLK TPC: < $0.75 M TOTAL 5YR COST : 0.500 0.000 0.500 0.000 0.000 0.000 0.000 0.000

157
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Suffolk County Listing Page 12 of 20

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL Mill & Fill - Station Rd & Bellport Lane along with PIT BOND 01/2020 0.460 CONST 0.460
accompanying sidewalks, Village of Bellport, Town of
076157 Brookhaven, Suffolk County.
R&P
<Exempt>
AQC:A10Z SUFFOLK TPC: < $0.75 M TOTAL 5YR COST : 0.460 0.000 0.460 0.000 0.000 0.000 0.000 0.000

SUFFOLK CO. SUFFOLK COUNTY NHS PAVEMENT MAINTENANCE NHPP 08/2021 0.400 CONINSP 0.400
PROGRAM. PROJECT WILL RESURFACE (IMPROVE LOCAL 08/2021 0.100 CONINSP 0.100
076172 RIDING SURFACE) AND REPAIR DAMAGED DRAINAGE NHPP 08/2021 3.600 CONST 3.600
R&P STRUCTURES ON COUNTY NHPP FEDERAL AID ELIGIBLE LOCAL 08/2021 0.900 CONST 0.900
<Exempt> ROADS TO KEEP THE NATIONAL HIGHWAY SYSTEM IN A
STATE OF GOOD REPAIR.

AQC:A10 SUFFOLK TPC: $6-$9.4 M TOTAL 5YR COST : 5.000 0.000 0.000 5.000 0.000 0.000 0.000 0.000

SUFFOLK CO. SUFFOLK COUNTY NHS PAVEMENT MAINTENANCE NHPP 08/2022 0.400 CONINSP 0.400
PROGRAM. PROJECT WILL RESURFACE (IMPROVE LOCAL 08/2022 0.100 CONINSP 0.100
076173 RIDING SURFACE) AND REPAIR DAMAGED DRAINAGE NHPP 08/2022 3.600 CONST 3.600
R&P STRUCTURES ON COUNTY NHPP FEDERAL AID ELIGIBLE LOCAL 08/2022 0.900 CONST 0.900
<Exempt> ROADS TO KEEP THE NATIONAL HIGHWAY SYSTEM IN A
STATE OF GOOD REPAIR.

AQC:A10 SUFFOLK TPC: $6-$9.4 M TOTAL 5YR COST : 5.000 0.000 0.000 0.000 5.000 0.000 0.000 0.000

SUFFOLK CO. SUFFOLK COUNTY NHS PAVEMENT MAINTENANCE NHPP 08/2023 0.400 CONINSP 0.400
PROGRAM. PROJECT WILL RESURFACE (IMPROVE LOCAL 08/2023 0.100 CONINSP 0.100
076174 RIDING SURFACE) AND REPAIR DAMAGED DRAINAGE NHPP 08/2023 3.600 CONST 3.600
R&P STRUCTURES ON COUNTY NHPP FEDERAL AID ELIGIBLE LOCAL 08/2023 0.900 CONST 0.900
<Exempt> ROADS TO KEEP THE NATIONAL HIGHWAY SYSTEM IN A
STATE OF GOOD REPAIR.

AQC:A10 SUFFOLK TPC: $6-$9.4 M TOTAL 5YR COST : 5.000 0.000 0.000 0.000 0.000 5.000 0.000 0.000

SUFFOLK CO. SUFFOLK COUNTY NHS PAVEMENT MAINTENANCE NHPP 08/2024 0.400 CONINSP 0.400
PROGRAM. PROJECT WILL RESURFACE (IMPROVE LOCAL 08/2024 0.100 CONINSP 0.100
076175 RIDING SURFACE) AND REPAIR DAMAGED DRAINAGE NHPP 08/2024 3.600 CONST 3.600
R&P STRUCTURES ON COUNTY NHPP FEDERAL AID ELIGIBLE LOCAL 08/2024 0.900 CONST 0.900
<Exempt> ROADS TO KEEP THE NATIONAL HIGHWAY SYSTEM IN A
STATE OF GOOD REPAIR.

AQC:A10 SUFFOLK TPC: $6-$9.4 M TOTAL 5YR COST : 5.000 0.000 0.000 0.000 0.000 0.000 5.000 0.000

158
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Suffolk County Listing Page 13 of 20

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

SUFFOLK CO. CONSTRUCT PEDESTRIAN AND BICYCLE TRAIL ALONG CMAQ 07/2019 0.000 PRELDES 0.320
CR97 TO PROVIDE A SAFE, NEW, NON-MOTORIZED LOCAL 07/2019 0.000 PRELDES 0.080
076176 TRANSPORTATION FACILITY OVER 11 MILES FROM CMAQ 07/2022 0.320 DETLDES 0.320
MOBIL HOLTSVILLE TO EAST SETAUKET. CONSTRUCTION OF A LOCAL 07/2022 0.080 DETLDES 0.080
<Exempt> BICYCLE/PEDESTRIAN ROUTE (MULTI-USE PATHS, CMAQ 07/2024 0.480 CONINSP 0.480
BICYCLE LANES AND SHARED ROADWAYS). CONVERT
LOCAL 07/2024 0.120 CONINSP 0.120
MOTORIZED TRIPS TO BICYCLING/WALKING MODES,
IMPROVE AIR QUALITY, AND IMPROVE SAFETY FOR ALL CMAQ 07/2024 4.320 CONST 4.320
MODES.THIS PEDESTRIAN AND BICYCLE FACILITY LOCAL 07/2024 1.080 CONST 1.080
PROJECT SUPPORTS THE REDUCTION OF EMISSIONS BY
DIVERTING SOV TRIPS TO WALKING OR BIKING IN THE
TOWN OF BROOKHAVEN, SUFFOLK COUNTY.

AQC:C2 SUFFOLK TPC: $6-$9.4 M TOTAL 5YR COST : 6.400 0.400 0.000 0.000 0.400 0.000 6.000 0.000

SUFFOLK CO. BRIDGE REPLACEMENT OF POST LANE MOVABLE STBG LG URB 12/2023 0.876 CONINSP 0.876
BRIDGE OVER QUOGUE CANAL DUE TO DETERIORATED LOCAL 12/2023 0.219 CONINSP 0.219
076177 CONDITION AND STRUCTURAL DEFICIENCIES, IN THE STBG LG URB 12/2023 7.900 CONST 7.900
BRIDGE TOWN OF SOUTHAMPTON SUFFOLK COUNTY. BIN LOCAL 12/2023 1.975 CONST 1.975
<Exempt> 3300620.
AQC:A19 SUFFOLK TPC: $12.5-$19 M TOTAL 5YR COST : 10.970 0.000 0.000 0.000 0.000 0.000 10.970 0.000

LOCAL VILLAGE OF GREENPORT IS TO RECONSTRUCT FBP 09/2019 0.000 DETLDES 0.400


EXISTING NORTH FERRY TERMINAL AT TERMINUS OF LOCAL 09/2019 0.000 DETLDES 0.100
076179 THIRD ST. TO PROVIDE ACCESS TO BOTH A LONG FBP 07/2019 0.000 PRELDES 0.400
TRANSIT ISLAND RAILROAD STATION AND A COMMERCIAL BUS LOCAL 07/2019 0.000 PRELDES 0.100
<Exempt> DROP-OFF/PICKUP LOCATION. PROJECT INCLUDES LOCAL 06/2020 0.200 CONINSP 0.200
ADDING A MULTI-LANE APPROACH AT THE FACILITY TO
FBP 06/2020 0.585 CONST 0.585
REPLACE THE CURRENT SINGLE LANE ACCESS SO
QUEUE WOULD BE REMOVED FROM RESIDENTIAL LOCAL 06/2020 1.415 CONST 1.415
STREETS AND BE RE-DIRECTED TO FERRY TERMINAL
PROPERTY. INCLUDES ENHANCED PARKING AND
PEDESTRIAN ACCESS VIA NEW SIDEWALKS AND
UPGRADED LIGHTING; AND AESTHETIC AND SITE
IMPROVEMENTS. IMPROVEMENTS TO AN EXISTING
INTERMODAL FACILITY WITH ACCENTS ON COMMUTER
AND PEDESTRIAN TRAFFIC IN THE VILLAGE OF
GREENPORT IN SUFFOLK COUNTY

AQC:B8 SUFFOLK TPC: $3.3-$5.6 M TOTAL 5YR COST : 2.200 1.000 2.200 0.000 0.000 0.000 0.000 0.000

159
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Suffolk County Listing Page 14 of 20

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL OCEAN BEACH FERRY TERMINAL IMPROVEMENTS, LOCAL 09/2019 0.000 CONINSP 0.095
PHASE II: .THE PROJECT INCLUDES IMPROVEMENTS TO FBP 09/2019 0.000 CONST 0.956
076180 THE OCEAN BEACH FERRY TERMINAL INCLUDING LOCAL 09/2019 0.000 CONST 0.240
TRANSIT ENHANCED PARKING AND PEDESTRIAN ACCESS, LOCAL 05/2019 0.000 DETLDES 0.095
<Exempt> CHANNELIZATION FOR TERMINAL USERS, DOCK
REPAIRS, AND BULKHEAD AND BOARDWALK
REPLACEMENT IN THE VILLAGE OF OCEAN BEACH,
SUFFOLK COUNTY

FBP 2013,2014,2015 AND 2016

AQC:B8 SUFFOLK TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 1.386 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT OPERATIONAL FUNDING FOR SMOOTH RUNNING OF STBG FLEX 03/2019 0.000 OPER 1.520
SUFFOLK EXPRESS COMMUTER BUS SERVICE ALONG SDF 03/2019 0.000 OPER 0.380
080659 THE LONG ISLAND EXPRESSWAY I495 FROM CENTRAL STBG FLEX 03/2020 0.760 OPER 0.760
MOBIL SUFFOLK COUNTY TO THE HAUPPAUGE INDUSTRIAL SDF 03/2020 0.190 OPER 0.190
<Exempt> PARK AND NY 110 CORRIDOR STBG FLEX 03/2021 0.760 OPER 0.760
SDF 03/2021 0.190 OPER 0.190
STBG FLEX 03/2022 0.760 OPER 0.760
SDF 03/2022 0.190 OPER 0.190
STBG FLEX 03/2023 0.760 OPER 0.760
SDF 03/2023 0.190 OPER 0.190
STBG FLEX 03/2024 0.760 OPER 0.760
SDF 03/2024 0.190 OPER 0.190
AQC:B1 SUFFOLK TPC: $6-$9.4 M TOTAL 5YR COST : 4.750 1.900 0.950 0.950 0.950 0.950 0.950 0.000

NYSDOT SIGNAL TIMING UPGRADE AND ARTERIAL CMAQ 04/2019 0.000 OPER 1.200
OPTIMIZATION VARIOUS STATE HIGHWAYS IN SUFFOLK SDF 04/2019 0.000 OPER 0.300
080769 COUNTY
TRAFFIC
<Exempt>
AQC:A7 SUFFOLK TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 1.500 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT REIMBURSEMENT FOR SUFFOLK COUNTY POLICE SDF 10/2018 0.000 MISC 0.650
WORK FOR CONSTRUCTION AND MAINTENANCE SDF 10/2019 0.650 MISC 0.650
080826 OPERATIONS SDF 10/2020 0.650 MISC 0.650
MISC
SDF 10/2021 0.650 MISC 0.650
<Exempt>
AQC:A2 SUFFOLK TPC: $7.5-$12 M TOTAL 5YR COST : 1.950 0.650 0.650 0.650 0.650 0.000 0.000 0.000

160
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Suffolk County Listing Page 15 of 20

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT HIGHWAY RUNOFF MITIGATION: CORRECT PRIORITY STBG LG URB 04/2019 0.000 DETLDES 0.400
HIGHWAY FLOODING AND REPLACE CATCH BASINS SDF 04/2019 0.000 DETLDES 0.100
080838 WITH VORTEX BASINS AT FOLLOWING FEDERAL AID STBG LG URB 07/2021 0.456 CONINSP 0.456
SAFETY ELIGIBLE LOCATIONS: NY 108 CULVERT LOCATED SDF 07/2021 0.114 CONINSP 0.114
<Exempt> BETWEEN SAW MILL ROAD AND LAWRENCE HILL ROAD, STBG LG URB 07/2021 4.560 CONST 4.560
NORTHERN STATE PARKWAY AT DEFOREST ROAD, NY25
SDF 07/2021 1.140 CONST 1.140
AT WARNER ROAD, SAGTIKOS STATE PARKWAY AT PINE
AIRE DRIVE, NY454 AT CONNECTQUOTE BROOK, NY231
BETWEEN NY27 AND NY27A, NY27 AT EAST BRANCH
SANTAPOGUE CREEK, AND NY27A AT LAKE
CAPRI/WILLET CREEK IN THE TOWNS OF BABYLON,
HUNTINGTON & ISLIP IN SUFFOLK COUNTY

AQC:A2 SUFFOLK TPC: $7.5-$12 M TOTAL 5YR COST : 6.270 0.500 0.000 6.270 0.000 0.000 0.000 0.000

NYSDOT IMPROVE DEBILITATED DRAINAGE SYSTEMS AND STBG FLEX 09/2020 1.075 ROWACQU 1.075
ISOLATED FLOODING AREAS; CONTROL FLOODING TO SDF 09/2020 0.269 ROWACQU 0.269
080874 PROMOTE SAFER TRAFFIC MOVEMENT; IMPROVE NHPP 10/2021 1.201 CONINSP 1.201
SAFETY QUALITY OF HIGHWAY RUNOFF TO ADJACENT SURFACE SDF 10/2021 0.300 CONINSP 0.300
<Exempt> WATERS IN THE TOWNS OF E. HAMPTON, RIVERHEAD, NHPP 10/2021 6.001 CONST 6.001
SOUTHAMPTON & SOUTHOLD, SUFFOLK CO.
SDF 10/2021 1.500 CONST 1.500

AQC:A2 SUFFOLK TPC: $9.5-15.5 M TOTAL 5YR COST : 10.346 0.000 1.344 0.000 9.002 0.000 0.000 0.000

NYSDOT ADDRESS ADA NON- COMPLIANT CURB RAMPS ON NHPP 12/2018 0.000 CONINSP (0.166)
FEDERAL AID ELIGIBLE HIGHWAYS IN NASSAU AND SDF 12/2018 0.000 CONINSP (0.041)
080968 SUFFOLK COUNTIES. LOCATIONS HAVE BEEN NHPP 12/2018 0.000 CONST (1.359)
MOBIL DETERMINED AS: NY27 FROM WANTAGH STATE SDF 12/2018 0.000 CONST (0.340)
<Exempt> PARKWAY TO NASSAU/SUFFOLK COUNTY LINE, NY 25
FROM ROXBURY ROAD TO ROBBINS LANE, NY25 FROM
KINGS PARK ROAD TO NY111, NY25A FROM
NASSAU/SUFFOLK LINE TO BREAD & CHEESE HOLLOW
ROAD, NY24 FROM EAST OF MEADOWBROOK STATE
PKWY. TO NY110, NY24 FROM RIVERHEAD TRAFFIC
CIRCLE TO BELLOWS POND ROAD, AND NY27
NORTH/SOUTH SERVICE ROADS FROM BELMONT
AVENUE TO UDALL ROAD IN THE TOWNS OF BABYLON,
HEMPSTEAD, ISLIP, OYSTERBAY, SMITHTOWN AND
SOUTHAMPTON . TRANSFERRED EARMARK NY318,
NY525 AND NY413 (PROGRAM CODE RPS9).

AQC:C2 SUFFOLK TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 (1.906) 0.000 0.000 0.000 0.000 0.000 0.000

161
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Suffolk County Listing Page 16 of 20

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT REPLACE APPROXIMATELY 20 OVERHEAD SIGN NHPP 12/2018 0.000 CONINSP 0.416
STRUCTURES BASED UPON INSPECTION REPORTS THAT SDF 12/2018 0.000 CONINSP 0.104
080993 DESIGNATE DEFICIENT STRUCTURES TO MAINTAIN A NHPP 12/2018 0.000 CONST 4.155
R&P STATE OF GOOD REPAIR ON NY27, NY231 & NY110 IN SDF 12/2018 0.000 CONST 1.039
<Exempt> THE TOWNS OF BABYLON, BROOKHAVEN & ISLIP,
SUFFOLK COUNTY (FORMERLY PIN: 0T2206

AQC:C13 SUFFOLK TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 5.714 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT CONCRETE & ASPHALT PAVEMENT REPAIRS, SINGLE NHPP 01/2019 0.000 CONINSP 0.600
COURSE OVERLAY LOCATIONS IDENTIFIED AS: NY111 SDF 01/2019 0.000 CONINSP 0.150
080994 FROM NY454 (VETERANS MEMORIAL HIGHWAY) TO STBG LG URB 01/2019 0.000 CONINSP 0.320
R&P NY347 (NESCONSET-PORT JEFFERSON HIGHWAY), NY25A SDF 01/2019 0.000 CONINSP 0.080
<Exempt> (NORTH COUNTRY ROAD) FROM MAIN STREET TO CR97 NHPP 01/2019 0.000 CONST 6.000
(NICOLLS ROAD), NY25A FROM NORTH COUNTRY ROAD
SDF 01/2019 0.000 CONST 1.500
TO THE BEGINNING OF NY25A BY-PASS, AND NY454
(VETERANS MEMORIAL HIGHWAY) FROM 906B
(INTERSTATE 495 LONG ISLAND EXPRESSWAY NORTH
SERVICE ROAD) TO SYCAMORE LANE TOWNS OF
BROOKHAVEN, ISLIP AND SMITHTOWN, SUFFOLK
COUNTY, TO MAINTAIN A STATE OF GOOD REPAIR.

AQC:A10 SUFFOLK TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 8.650 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT MILLING, CONCRETE & ASPHALT PAVEMENT REPAIRS, NHPP 01/2019 0.000 CONINSP 0.640
SINGLE COURSE OVERLAY ON NY25A (MAIN STREET) SDF 01/2019 0.000 CONINSP 0.160
080995 FROM INDIAN HEAD ROAD (CR14) TO LAWRENCE ROAD, STBG LG URB 01/2019 0.000 CONINSP 0.240
R&P NY27A FROM 5TH AVENUE (CR13) TO ISLIP AVENUE SDF 01/2019 0.000 CONINSP 0.060
<Exempt> (NY111), LONG ISLAND EXPRESSWAY SOUTH SERVICE NHPP 01/2019 0.000 CONST 6.906
ROAD (ROUTE 906A) FROM UPPER HALF HOLLOW ROAD
SDF 01/2019 0.000 CONST 1.726
TO BAGATELLE ROAD, AND LONG ISLAND EXPRESSWAY
NORTH SERVICE ROAD (ROUTE 906B) FROM DEER PARK NHPP 12/2018 0.000 DETLDES 0.027
AVENUE (NY231) TO PINELAWN ROAD TO MAINTAIN A SDF 12/2018 0.000 DETLDES 0.007
STATE OF GOOD REPAIR IN THE TOWNS OF
HUNTINGTON, ISLIP AND SMITHTOWN, SUFFOLK
COUNTY.

AQC:A10 SUFFOLK TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 9.766 0.000 0.000 0.000 0.000 0.000 0.000

162
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Suffolk County Listing Page 17 of 20

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT BRIDGE DECK REPLACEMENT AND REPAIRS ON I495 NHPP 08/2019 0.000 CONINSP 2.340
WB/RIVER RD BIN #1056191, I495 EB/RIVER RD BIN# SDF 08/2019 0.000 CONINSP 0.585
080997 1056192, NYS 25 WB/CR58 BIN #1056230 AND LINCOLN NHPP 08/2019 0.000 CONST 15.600
BRIDGE AVE/NYS 27 BIN# 1073300. TOWNS OF ISLIP AND SDF 08/2019 0.000 CONST 3.900
<Exempt> RIVERHEAD, SUFFOLK COUNTY. NHPP 11/2018 0.000 DETLDES 0.400
SDF 11/2018 0.000 DETLDES 0.100
AQC:A19 SUFFOLK TPC: $21-$31 M TOTAL 5YR COST : 0.000 22.925 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT SAFETY IMPROVEMENTS - WIDEN INTERSECTION & SDF 08/2019 0.000 PRELDES 0.510
ADD TURNING LANES AT NY25 AT EDWARDS AVE, NY114 SDF 05/2020 0.848 DETLDES 0.848
081001 AT STEPHENS HANDS PATH, NY114 AT GOODFRIEND DR, HSIP 03/2020 0.072 ROWINCD 0.072
SAFETY POTENTIAL ROUNDABOUT AT NY25 AT CR48 AND NY25A SDF 03/2020 0.008 ROWINCD 0.008
<Exempt> AT STONY BROOK RD, IN THE TOWNS OF RIVERHEAD, HSIP 07/2021 0.668 ROWACQU 0.668
EAST HAMPTON, SOUTHOLD AND BROOKHAVEN,
SDF 07/2021 0.074 ROWACQU 0.074
SUFFOLK COUNTY.
CMAQ 09/2022 0.100 CONINSP 0.100
SDF 09/2022 0.025 CONINSP 0.025
HSIP 09/2022 0.518 CONINSP 0.518
SDF 09/2022 0.058 CONINSP 0.058
CMAQ 09/2022 1.000 CONST 1.000
SDF 09/2022 0.250 CONST 0.250
HSIP 09/2022 5.176 CONST 5.176
SDF 09/2022 0.575 CONST 0.575
AQC:A6 SUFFOLK TPC: $7.5-$12 M TOTAL 5YR COST : 9.372 0.510 0.928 0.742 7.702 0.000 0.000 0.000

NYSDOT PREVENTATIVE MAINTENANCE BRIDGE REPAIRS ON BIN SDF 06/2020 0.200 PRELDES 0.200
#1059969, HECKSCHER STATE PARKWAY OVER NHPP 03/2021 0.282 CONINSP 0.282
081010 HAWTHORNE AVE AND LIRR; SDF 03/2021 0.072 CONINSP 0.072
BRIDGE BIN #1059979, HECKSCHER STATE PARKWAY OVER NHPP 03/2021 2.823 CONST 2.823
<Exempt> UNION BLVD; AND BIN # 1059989, HECKSCHER STATE SDF 03/2021 0.720 CONST 0.720
PARKWAY OVER NY27A TO EXTEND SERVICE LIFE THE
IN THE TOWN OF ISLIP & SUFFOLK COUNTIES.

AQC:A19 SUFFOLK TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.097 0.000 0.200 3.897 0.000 0.000 0.000 0.000

NYSDOT CLEAN BASINS FILLED W/DEBRIS, REPAIR, REPLACE OR STBG LG URB 07/2020 0.540 CONINSP 0.540
PROVIDE MISSING COLLARS, REPAIR BASIN WALLS, SDF 07/2020 0.135 CONINSP 0.135
081014 CLEAN CLOGGED PIPES, REPAIR OR REPLACE BROKEN STBG LG URB 07/2020 3.600 CONST 3.600
R&P PIPES, REPLACE GRATES, REPLACE BASINS, CONNECT
<Exempt> SDF 07/2020 0.900 CONST 0.900
ISOLATED BASINS TO DRAINAGE SYSTEM IN MULTIPLE
SDF 10/2019 0.486 DETLDES 0.486
LOCATIONS IN SUFFOLK COUNTY.

AQC:A2 SUFFOLK TPC: $7.5-$12 M TOTAL 5YR COST : 5.661 0.000 5.661 0.000 0.000 0.000 0.000 0.000

163
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Suffolk County Listing Page 18 of 20

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT OVERHEAD SIGN STRUCTURE REPLACEMENT TO SDF 07/2019 0.000 DETLDES 0.090
MAINTAIN STATE OF GOOD REPAIR IN TOWN OF NHPP 06/2020 0.440 CONINSP 0.440
081016 BABYLON, BROOKHAVEN, HUNTINGTON, ISLIP, SDF 06/2020 0.110 CONINSP 0.110
R&P RIVERHEAD AND SMITHTOWN, SUFFOLK COUNTY NHPP 06/2020 4.400 CONST 4.400
<Exempt>
SDF 06/2020 1.100 CONST 1.100
AQC:C13 SUFFOLK TPC: $4.6-$7.5 M TOTAL 5YR COST : 6.050 0.090 6.050 0.000 0.000 0.000 0.000 0.000

NYSDOT CONCRETE PAVEMENT REPAIR INCLUDING JOINT SDF 05/2021 0.468 DETLDES 0.468
SEALING AND DIAMOND GRINDING ON I495 FROM STBG FLEX 04/2022 0.600 CONINSP 0.600
0T1392 NY112 TO YAPHANK AVENUE TO PROVIDE A SMOOTHER SDF 04/2022 0.150 CONINSP 0.150
R&P DRIVING SURFACE IN THE TOWN OF BROOKHAVEN, STBG FLEX 04/2022 4.000 CONST 4.000
<Exempt> SUFFOLK COUNTY. SDF 04/2022 1.000 CONST 1.000
AQC:A10 SUFFOLK TPC: $6-$9.4 M TOTAL 5YR COST : 6.218 0.000 0.000 0.468 5.750 0.000 0.000 0.000

NYSDOT Painting of the Robert Moses Causeway over Great South Bay SDF 08/2024 0.605 PRELDES 0.605
bridges. Town of Islip Suffolk County
0T1476
BRIDGE
<Exempt>
AQC:A19Z SUFFOLK TPC: $40-$60 M TOTAL 5YR COST : 0.605 0.000 0.000 0.000 0.000 0.000 0.605 0.000

NYSDOT OVERHEAD SIGN STRUCTURE REPLACEMENT TO SDF 07/2020 0.500 DETLDES 0.500
MAINTAIN THEIR STRUCTURAL INTEGRITY ALONG NHPP 01/2021 0.802 CONINSP 0.802
0T1864 NY27, I495 AND THE SAGTIKOS PKWY/SOUTHERN STATE SDF 01/2021 0.200 CONINSP 0.200
R&P PKWY INTERCHANGE IN THE TOWNS OF BABYLON, NHPP 01/2021 4.000 CONST 4.000
<Exempt> BROOKHAVEN, EAST HAMPTON, HUNTINGTON, ISLIP, SDF 01/2021 1.000 CONST 1.000
RIVERHEAD, SMITHTOWN, AND SOUTHAMPTON,
SUFFOLK COUNTY.

AQC:C13 SUFFOLK TPC: $6-$9.4 M TOTAL 5YR COST : 6.502 0.000 0.500 6.002 0.000 0.000 0.000 0.000

NYSDOT CLEAN BASINS FILLED W/DEBRIS, REPAIR, REPLACE OR SDF 09/2021 0.486 DETLDES 0.486
PROVIDE MISSING COLLARS, REPAIR BASIN WALLS, STBG LG URB 07/2022 0.836 CONINSP 0.836
0T1874 CLEAN CLOGGED PIPES, REPAIR OR REPLACE BROKEN SDF 07/2022 0.209 CONINSP 0.209
R&P PIPES, REPLACE GRATES, REPLACE BASINS, CONNECT STBG LG URB 07/2022 5.600 CONST 5.600
<Exempt> ISOLATED BASINS TO DRAINAGE SYSTEM TO AVOID SDF 07/2022 1.400 CONST 1.400
FLOODINGAND TO PROVIDE CONTINUED SAFETY OF
THE TRAVELING PUBLIC, IN MULTIPLE LOCATIONS IN
SUFFOLK COUNTY.

AQC:A2 SUFFOLK TPC: $7.5-$12 M TOTAL 5YR COST : 8.531 0.000 0.000 0.486 8.045 0.000 0.000 0.000

164
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Suffolk County Listing Page 19 of 20

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT CONCRETE PAVEMENT REPAIR INCLUDING JOINT SDF 05/2022 0.477 DETLDES 0.477
SEALING AND DIAMOND GRINDING ON 909D (OCEAN STBG LG URB 04/2023 0.601 CONINSP 0.601
0T2105 PARKWAY) EAST BOUND ONLY, FROM END OF ASPHALT SDF 04/2023 0.150 CONINSP 0.150
R&P OVERLAY TO BEGINNING OF ASPHALT OVERLAY AT STBG LG URB 04/2023 4.000 CONST 4.000
<Exempt> CAPTREE STATE PARK TOLL PLAZA TO MAINTAIN A SDF 04/2023 1.000 CONST 1.000
STATE OF GOOD REPAIR IN THE TOWNS OF BABYLON
AND ISLIP, SUFFOLK COUNTY.

AQC:A10 SUFFOLK TPC: $6-$9.4 M TOTAL 5YR COST : 6.228 0.000 0.000 0.000 0.477 5.751 0.000 0.000

NYSDOT PREVENTATIVE MAINTENANCE BRIDGE REPAIRS SDF 07/2022 0.559 DETLDES 0.559
(LOCATIONS TO-BE-DETERMINED) ON VARIOUS NHPP 09/2023 0.618 CONINSP 0.618
0T2123 FEDERAL AID ELIGIBLE STATE HIGHWAYS & PARKWAYS SDF 09/2023 0.154 CONINSP 0.154
BRIDGE IN NASSAU & SUFFOLK COUNTIES. NHPP 09/2023 6.182 CONST 6.182
<Exempt>
SDF 09/2023 1.545 CONST 1.545
AQC:A19 SUFFOLK TPC: $7.5-$12 M TOTAL 5YR COST : 9.058 0.000 0.000 0.000 0.559 8.499 0.000 0.000

NYSDOT RECONSTRUCT OF NY347 FROM OLD TOWN RD TO SDF 08/2020 4.080 DETLDES 4.080
NY25A TO IMPROVE SAFETY, OPERATION, AND NHPP 09/2021 3.764 ROWACQU 3.764
0T2155 MOBILITY FOR VEHICLES, PEDESTRIANS, BICYCLISTS SDF 09/2021 0.941 ROWACQU 0.941
RECON AND TRANSIT USERS. TOWN OF BROOKHAVEN,
<Non-Exempt> SUFFOLK COUNTY
AQC:NON SUFFOLK TPC: $50-$85 M TOTAL 5YR COST : 8.785 0.000 4.080 4.705 0.000 0.000 0.000 0.000

NYSDOT MILLING, CONCRETE & ASPHALT PAVEMENT REPAIRS, SDF 09/2020 0.778 DETLDES 0.778
SINGLE COURSE OVERLAY ON I495 FROM NHPP 10/2021 2.788 CONINSP 2.788
0T2200 NASSAU/SUFFOLK LINE TO MOTOR PARKWAY TO BRING SDF 10/2021 0.310 CONINSP 0.310
R&P PAVEMENT TO A STATE OF GOOD REPAIR IN THE TOWNS NHPP 10/2021 18.586 CONST 18.586
<Exempt> OF ISLIP, HUNTINGTON & SMITHTOWN IN SUFFOLK SDF 10/2021 2.065 CONST 2.065
COUNTY.

AQC:A10 SUFFOLK TPC: $32-$50 M TOTAL 5YR COST : 24.527 0.000 0.778 0.000 23.749 0.000 0.000 0.000

NYSDOT CONCRETE PAVEMENT REPAIR INCLUDING JOINT STBG LG URB 09/2023 1.200 CONINSP 1.200
SEALING AND DIAMOND GRINDING ON I-495 BETWEEN SDF 09/2023 0.300 CONINSP 0.300
0T2202 YAPHANK AVE & WADING RIVER RD, AND ON NY27 STBG LG URB 09/2023 8.000 CONST 8.000
R&P BETWEEN CR101 & HORSEBLOCK ROAD TO BRING SDF 09/2023 2.000 CONST 2.000
<Exempt> PAVEMENT TO A STATE OF GOOD REPAIR IN THE TOWN SDF 10/2022 0.550 DETLDES 0.550
OF BROOKHAVEN, SUFFOLK COUNTY

AQC:A10 SUFFOLK TPC: $9.5-15.5 M TOTAL 5YR COST : 12.050 0.000 0.000 0.000 0.000 12.050 0.000 0.000

NYSDOT Rehabilitate and replace sound barriers along I495 between exits SDF 03/2023 1.329 DETLDES 1.329
49 and 57 Town of Huntington and Islip, Suffolk County
0T2237
MISC
<Exempt>
AQC:A6Z SUFFOLK TPC: $15-$25 M TOTAL 5YR COST : 1.329 0.000 0.000 0.000 0.000 1.329 0.000 0.000

165
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 Suffolk County Listing Page 20 of 20

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT Milling, concrete & asphalt pavement repairs, single course SDF 02/2023 0.560 DETLDES 0.560
overlay on Veteran\\\'s Memorial Highway (NY454) between STBG LG URB 12/2024 0.000 CONINSP 0.719
0T2586 Jericho Turnpike (NY25) and Old Willets Path in the Town of SDF 12/2024 0.000 CONINSP 0.180
R&P Smithtown, Suffolk County. STBG LG URB 12/2024 0.000 CONST 4.799
<Exempt>
SDF 12/2024 0.000 CONST 0.100
AQC:A6Z SUFFOLK TPC: $6-$9.4 M TOTAL 5YR COST : 0.560 0.000 0.000 0.000 0.000 0.560 0.000 5.798

NYSDOT PREVENTATIVE MAINTENANCE BRIDGE REPAIRS SDF 09/2022 0.540 DETLDES 0.540
(LOCATIONS TO-BE-DETERMINED) ON VARIOUS STBG FLEX 09/2023 1.120 CONINSP 1.120
0T2599 FEDERAL AID ELIGIBLE STATE HIGHWAYS & PARKWAYS SDF 09/2023 0.279 CONINSP 0.279
BRIDGE IN NASSAU & SUFFOLK COUNTIES. STBG FLEX 09/2023 5.600 CONST 5.600
<Exempt>
SDF 09/2023 1.400 CONST 1.400
AQC:A19 SUFFOLK TPC: $15-$25 M TOTAL 5YR COST : 8.939 0.000 0.000 0.000 0.540 8.399 0.000 0.000

NYSDOT REPLACE RUSTIC GUIDERAIL SECTIONS TO ADDRESS NHPP 04/2023 1.386 DETLDES 1.386
THE SAFETY CONCERN OF MOTORIST AT THE ROBERT SDF 04/2023 0.346 DETLDES 0.346
0T2602 MOSES CAUSEWAY FROM OCEAN PARKWAY TO NHPP 04/2024 1.260 CONINSP 1.260
SAFETY SOUTHERN STATE PARKWAY, NY27 FROM WAINSCOTT SDF 04/2024 0.315 CONINSP 0.315
<Exempt> STONE ROAD TO STEPHEN HANDS PATH, & NY27 FROM NHPP 04/2024 8.400 CONST 8.400
EDGEMERE STREET TO MONTAUK POINT IN THE TOWNS
SDF 04/2024 2.100 CONST 2.100
OF EAST HAMPTON AND ISLIP IN SUFFOLK

AQC:A9 SUFFOLK TPC: $12.5-$19 M TOTAL 5YR COST : 13.807 0.000 0.000 0.000 0.000 1.732 12.075 0.000

SUFFOLK CO. BRIDGE REPLACEMENT OF CR 46 (WILLIAM FLOYD STBG LG URB 08/2020 8.114 CONST 8.114
PARKWAY) OVER NARROW BAY, DUE TO STRUCTURAL LOCAL 08/2020 2.028 CONST 2.028
SCBLKSB DEFICIENCIES AND TO IMPROVE ALIGNMENT, IN THE NHPP 08/2021 6.600 CONST 6.600
BRIDGE TOWN OF BROOKHAVEN. BIN 3300770. (ASSOCIATED PIN LOCAL 08/2021 1.650 CONST 1.650
<Exempt> 075978, FUNDING FOR 075978 TO OFFSET LOCAL). STBG LG URB 08/2021 8.776 CONST 8.776
LOCAL 08/2021 2.194 CONST 2.194
NHPP 01/2022 1.800 CONST 1.800
LOCAL 01/2022 0.450 CONST 0.450
STBG LG URB 01/2022 8.776 CONST 8.776
LOCAL 01/2022 2.194 CONST 2.194
NHPP 01/2023 1.800 CONST 1.800
LOCAL 01/2023 0.450 CONST 0.450
STBG LG URB 01/2023 8.776 CONST 8.776
LOCAL 01/2023 2.194 CONST 2.194
NHPP 01/2024 3.600 CONST 3.600
LOCAL 01/2024 0.900 CONST 0.900
AQC:A19 SUFFOLK TPC: $70-$130 M TOTAL 5YR COST : 60.302 0.000 10.142 19.220 13.220 13.220 4.500 0.000

166
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 1 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT CONSTRUCTION OF 3RD PHASE OF 14 MILE SHARED-USE HPP 09/2019 0.000 CONINSP 0.658
PATH ALONG THE NORTH SIDE OF OCEAN PARKWAY. SDF 09/2019 0.000 CONINSP 0.164
000616 PHASE 3 EXTENDS BETWEEN TOBAY AND CAPTREE NHPP 09/2019 0.000 CONINSP 0.759
MOBIL STATE PARK TOWNS OF OYSTER BAY, ISLIP AND SDF 09/2019 0.000 CONINSP 0.190
<Exempt> BABYLON, NASSAU AND SUFFOLK COUNTIES. HPP 09/2019 0.000 CONST 11.142
TRANSFERRED EARMARK # NY313, NY620, NY622,
SDF 09/2019 0.000 CONST 2.786
NY544, NY629, NY490, NY627, NY413, NY438, NY587,
NY509, NY506, NY745, NY630 (PROGRAM CODE RPS9), NHPP 09/2019 0.000 CONST 1.920
NY672, NY326 (PROGRAM CODE RPS1), NY008(PROGRAM SDF 09/2019 0.000 CONST 0.480
CODE NR9), NY077, NY079, NY080, NY083, NY114, NY16,
NY147, NY162, NY328, NY556, NY479, NY480, NY746
(PROGRAM CODE RPS9), NY678 (PROGRAM CODE RPS9).

AQC:C2 MULTI TPC: $15-$25 M TOTAL 5YR COST : 0.000 18.099 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT PEDESTRIAN SAFETY IMPROVEMENTS ALONG NY25 HSIP 06/2019 0.000 CONINSP 1.060
BETWEEN THE NEW YORK CITY LINE AND ORIENT HSIP 06/2019 0.000 CONST 8.763
004241 POINT, IN THE TOWNS OF HEMPSTEAD, NORTH
SAFETY HEMPSTEAD, OYSTER BAY, HUNTINGTON, SMITHTOWN,
<Exempt> BROOKHAVEN, RIVERHEAD AND SOUTHOLD IN NASSAU
AND SUFFOLK COUNTIES. THE SCOPE OF WORK
INCLUDES INSTALLING NEW TRAFFIC SIGNALS OR
UPGRADING EXISTING SIGNALS, INSTALLING
RECTANGULAR RAPID FLASHING BEACONS (RRFB),
INSTALLING NEW SIDEWALKS, BRINGING EXISTING
CURB RAMPS INTO COMPLIANCE WITH THE
AMERICANS WITH DISABILITY ACT (ADA), INSTALLING
NEW CROSSWALKS AT SIGNALIZED INTERSECTIONS,
AND INSTALLING PEDESTRIAN REFUGE ISLANDS.THE
STATE CERTIFIES THAT THIS PROJECT HAS BEEN
APPROVED BY THE REGIONAL SAFETY EVALUATION
ENGINEER AND SIGNED OFF BY THE REGIONAL
TRAFFIC ENGINEER. 100% FEDERAL (USING 10% TOLL
CREDIT)

AQC:A6 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 9.823 0.000 0.000 0.000 0.000 0.000 0.000

167
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 2 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PEDESTRIAN SAFETY ACTION PLAN PHASE 2 TO HSIP 04/2019 0.000 CONINSP 0.502
IMPROVE PEDESTRIAN SAFETY AT VARIOUS HSIP 04/2019 0.000 CONST 5.020
00PS02 INTERSECTIONS INCLUDING NEW WARNING SIGNS,
SAFETY PAVEMENT MARKINGS, PEDESTRIAN COUNTDOWN
<Exempt> TIMERS,TRAFFIC SIGNAL BACKING PLATES ETC. ON
NY106, NY107, NY109, NY110, NY111, NY24, NY25, NY25A,
NY25B, NY25C, NY347, NY454, NY27, NY27A, NY27 NSR,
NY27 SSR, I495 NSR, I495 SSR, NY878, 900D, 904, NY231,
NY108, NY101, NY102, NY105, NY112 AND NY114 IN
NASSAU AND SUFFOLK COUNTIES. THE STATE
CERTIFIES THAT THIS PROJECT HAS BEEN APPROVED BY
THE REGIONAL SAFETY EVALUATION ENGINEER AND
SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER.
100% FEDERAL (USING 10% TOLL CREDIT)

AQC:A6 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 5.522 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT BRIDGE REPLACEMENT OF NY107 OVER I495 TOWN OF SDF 11/2019 1.350 DETLDES 1.350
OYSTER BAY NASSAU COUNTY TO BRING TO STATE OF
015625 GOOD REPAIR (Formerly PIN: 0T2231)
BRIDGE
<Exempt>
AQC:A19Z MULTI TPC: $21-$31 M TOTAL 5YR COST : 1.350 0.000 1.350 0.000 0.000 0.000 0.000 0.000

NYSDOT REGIONAL SIGNS NPS FUNDING FOR SFY 19/20 SDF 05/2019 0.000 OPER 0.232

01BM19
BRIDGE
<Exempt>
AQC:A10Z MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.232 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT REGIONAL SIGNS NPS FUNDING FOR SFY 20/21 SDF 05/2020 0.232 OPER 0.232

01BM20
BRIDGE
<Exempt>
AQC:A10Z MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.232 0.000 0.232 0.000 0.000 0.000 0.000 0.000

NYSDOT REGIONAL SIGNS NPS FUNDING FOR SFY 21/22 SDF 05/2021 0.232 OPER 0.232

01BM21
BRIDGE
<Exempt>
AQC:A19Z MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.232 0.000 0.000 0.232 0.000 0.000 0.000 0.000

168
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 3 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT REGIONAL SIGNS NPS FUNDING FOR SFY 22/23 SDF 05/2022 0.232 OPER 0.232

01BM22
BRIDGE
<Exempt>
AQC:A19Z MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.232 0.000 0.000 0.000 0.232 0.000 0.000 0.000

NYSDOT REGIONAL SIGNS NPS FUNDING FOR SFY 23/24 SDF 05/2023 0.232 OPER 0.232

01BM23
BRIDGE
<Exempt>
AQC:A19Z MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.232 0.000 0.000 0.000 0.000 0.232 0.000 0.000

NYSDOT REGIONAL SIGNS NPS FUNDING FOR SFY 24/25 SDF 05/2024 0.232 OPER 0.232

01BM24
BRIDGE
<Exempt>
AQC:A19Z MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.232 0.000 0.000 0.000 0.000 0.000 0.232 0.000

NYSDOT REGIONAL DRAINAGE NPS FUNDING FOR SFY 19/20 SDF 05/2019 0.000 OPER 0.645

01DR19
R&P
<Exempt>
AQC:A10Z MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 0.645 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT REGIONAL DRAINAGE NPS FUNDING FOR SFY 14/15 SDF 04/2019 0.000 OPER 0.645

01DR20
R&P
<Exempt>
AQC:A10Z MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 0.645 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT REGIONAL DRAINAGE NPS FUNDING FOR SFY 21/22 SDF 04/2021 0.645 OPER 0.645

01DR21
R&P
<Exempt>
AQC:A10Z MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.645 0.000 0.000 0.645 0.000 0.000 0.000 0.000

169
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 4 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT REGIONAL DRAINAGE NPS FUNDING FOR SFY 22/23 SDF 04/2022 0.645 OPER 0.645

01DR22
R&P
<Exempt>
AQC:A10Z MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.645 0.000 0.000 0.000 0.645 0.000 0.000 0.000

NYSDOT REGIONAL DRAINAGE NPS FUNDING FOR SFY 23/24 SDF 05/2023 0.645 OPER 0.645

01DR23
R&P
<Exempt>
AQC:A10Z MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.645 0.000 0.000 0.000 0.000 0.645 0.000 0.000

NYSDOT REGIONAL DRAINAGE NPS FUNDING FOR SFY 24/25 SDF 05/2024 0.645 OPER 0.645

01DR24
R&P
<Exempt>
AQC:A10Z MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.645 0.000 0.000 0.000 0.000 0.000 0.645 0.000

NYSDOT REGIONAL ENVIRONMENT NPS FUNDING FOR SFY 20/21 SDF 05/2020 0.539 OPER 0.539

01EN19
MISC
<Exempt>
AQC:A2Z MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.539 0.000 0.539 0.000 0.000 0.000 0.000 0.000

NYSDOT REGIONAL ENVIRONMENT NPS FUNDING FOR SFY 20/21 SDF 05/2020 0.539 OPER 0.539

01EN20
MISC
<Exempt>
AQC:A2Z MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.539 0.000 0.539 0.000 0.000 0.000 0.000 0.000

NYSDOT REGIONAL ENVIRONMENT NPS FUNDING FOR SFY 21/22 SDF 05/2021 0.539 OPER 0.539

01EN21
MISC
<Exempt>
AQC:A2Z MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.539 0.000 0.000 0.539 0.000 0.000 0.000 0.000

170
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 5 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT REGIONAL ENVIRONMENT NPS FUNDING FOR SFY 20/21 SDF 06/2020 0.539 OPER 0.539

01EN22
MISC
<Exempt>
AQC:A10 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.539 0.000 0.539 0.000 0.000 0.000 0.000 0.000

NYSDOT REGIONAL ENVIRONMENT NPS FUNDING FOR SFY 23/24 SDF 05/2023 0.539 OPER 0.539

01EN23
MISC
<Exempt>
AQC:A2Z MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.539 0.000 0.000 0.000 0.000 0.539 0.000 0.000

NYSDOT REGIONAL ENVIRONMENT NPS FUNDING FOR SFY 24/25 SDF 04/2024 0.539 OPER 0.539

01EN24
MISC
<Exempt>
AQC:A2Z MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.539 0.000 0.000 0.000 0.000 0.000 0.539 0.000

NYSDOT REGIONAL GUIDERAIL NPS FUNDING FOR SFY 19/20 SDF 05/2019 0.000 OPER 1.000

01GR19
SAFETY
<Exempt>
AQC:A6Z MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 1.000 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT REGIONAL GUIDERAIL NPS FUNDING FOR SFY 20/21 SDF 05/2020 1.000 OPER 1.000

01GR20
SAFETY
<Exempt>
AQC:A6Z MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.000 0.000 1.000 0.000 0.000 0.000 0.000 0.000

NYSDOT REGIONAL GUIDERAIL NPS FUNDING FOR SFY 21/22 SDF 05/2021 1.000 OPER 1.000

01GR21
SAFETY
<Exempt>
AQC:A6Z MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.000 0.000 0.000 1.000 0.000 0.000 0.000 0.000

171
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 6 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT REGIONAL GUIDERAIL NPS FUNDING FOR SFY 22/23 SDF 05/2022 1.000 OPER 1.000

01GR22
SAFETY
<Exempt>
AQC:A6Z MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.000 0.000 0.000 0.000 1.000 0.000 0.000 0.000

NYSDOT REGIONAL GUIDERAIL NPS FUNDING FOR SFY 23/24 SDF 05/2023 1.000 OPER 1.000

01GR23
SAFETY
<Exempt>
AQC:A2Z MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.000 0.000 0.000 0.000 0.000 1.000 0.000 0.000

NYSDOT REGIONAL GUIDERAIL NPS FUNDING FOR SFY 24/25 SDF 06/2024 1.000 OPER 1.000

01GR24
SAFETY
<Exempt>
AQC:A2Z MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.000 0.000 0.000 0.000 0.000 0.000 1.000 0.000

NYSDOT REGIONAL PAVEMENT MARKING NPS FUNDING FOR SFY SDF 05/2019 0.000 OPER 0.045
19/20
01MK19
SAFETY
<Exempt>
AQC:A11Z MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.045 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT REGIONAL PAVEMENT MARKING NPS FUNDING FOR SFY SDF 04/2020 0.045 OPER 0.045
20/21
01MK20
SAFETY
<Exempt>
AQC:A11Z MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.045 0.000 0.045 0.000 0.000 0.000 0.000 0.000

NYSDOT REGIONAL PAVEMENT MARKING NPS FUNDING FOR SFY SDF 05/2021 0.045 OPER 0.045
21/22
01MK21
SAFETY
<Exempt>
AQC:A11Z MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.045 0.000 0.000 0.045 0.000 0.000 0.000 0.000

172
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 7 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT REGIONAL PAVEMENT MARKING NPS FUNDING FOR SFY SDF 05/2022 0.045 OPER 0.045
22/23
01MK22
SAFETY
<Exempt>
AQC:A11Z MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.045 0.000 0.000 0.000 0.045 0.000 0.000 0.000

NYSDOT REGIONAL PAVEMENT MARKING NPS FUNDING FOR SFY SDF 06/2023 0.045 OPER 0.045
23/24
01MK23
SAFETY
<Exempt>
AQC:A11Z MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.045 0.000 0.000 0.000 0.000 0.045 0.000 0.000

NYSDOT REGIONAL PAVEMENT MARKING NPS FUNDING FOR SFY SDF 06/2024 0.045 OPER 0.045
24/25
01MK24
SAFETY
<Exempt>
AQC:A11Z MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.045 0.000 0.000 0.000 0.000 0.000 0.045 0.000

NYSDOT capital funding to supplement NPS funding into the Regional SDF 06/2019 0.000 OPER 0.590
Maintenance budget for SFY 19/20
01PM19
R&P
<Exempt>
AQC:A10Z MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.590 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT capital funding to supplement NPS funding into the Regional SDF 05/2020 0.590 OPER 0.590
Maintenance budget for SFY 20/21
01PM20
R&P
<Exempt>
AQC:A10Z MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.590 0.000 0.590 0.000 0.000 0.000 0.000 0.000

NYSDOT capital funding to supplement NPS funding into the Regional SDF 05/2021 0.590 OPER 0.590
Maintenance budget for SFY 21/22
01PM21
R&P
<Exempt>
AQC:A10Z MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.590 0.000 0.000 0.590 0.000 0.000 0.000 0.000

173
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 8 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT CAPITAL FUNDING TO SUPPLEMENT NPS FUNDING INTO SDF 06/2022 0.590 OPER 0.590
THE REGIONAL MAINTENANCE BUDGET FORSFY 22/23
01PM22
R&P
<Exempt>
AQC:A10Z MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.590 0.000 0.000 0.000 0.590 0.000 0.000 0.000

NYSDOT capital funding to supplement NPS funding into the Regional SDF 05/2023 0.590 OPER 0.590
Maintenance budget for SFY 23/24
01PM23
R&P
<Exempt>
AQC:A10Z MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.590 0.000 0.000 0.000 0.000 0.590 0.000 0.000

NYSDOT capital funding to supplement NPS funding into the Regional SDF 05/2024 0.590 OPER 0.590
Maintenance budget for SFY 24/25
01PM24
R&P
<Exempt>
AQC:A10Z MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.590 0.000 0.000 0.000 0.000 0.000 0.590 0.000

NYSDOT REGIONAL SIGNS NPS FUNDING FOR SFY 19/20 SDF 06/2019 0.000 OPER 0.710

01SS19
SAFETY
<Exempt>
AQC:A6Z MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 0.710 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT REGIONAL SIGNS NPS FUNDING FOR SFY 20/21 SDF 06/2020 0.710 OPER 0.710

01SS20
SAFETY
<Exempt>
AQC:A6Z MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.710 0.000 0.710 0.000 0.000 0.000 0.000 0.000

NYSDOT REGIONAL SIGNS NPS FUNDING FOR SFY 21/22 SDF 05/2021 0.710 OPER 0.710

01SS21
SAFETY
<Exempt>
AQC:A6Z MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.710 0.000 0.000 0.710 0.000 0.000 0.000 0.000

174
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 9 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT REGIONAL SIGNS NPS FUNDING FOR SFY 22/23 SDF 05/2022 0.710 OPER 0.710

01SS22
SAFETY
<Exempt>
AQC:A6Z MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.710 0.000 0.000 0.000 0.710 0.000 0.000 0.000

NYSDOT REGIONAL SIGNS NPS FUNDING FOR SFY 23/24 SDF 06/2023 0.710 OPER 0.710

01SS23
SAFETY
<Exempt>
AQC:A6Z MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.710 0.000 0.000 0.000 0.000 0.710 0.000 0.000

NYSDOT INCIDENT MANAGEMENT - HELP VEHICLES ON THE NHPP 01/2019 0.000 OPER 3.332
LONG ISLAND EXPRESSWAY AND PARKWAYS TO SDF 01/2019 0.000 OPER 0.833
080556 REDUCE HIGHWAY CONGESTION. NASSAU AND NHPP 01/2021 3.200 OPER 3.200
MOBIL SUFFOLK COUNTIES SDF 01/2021 0.800 OPER 0.800
<Exempt>
NHPP 01/2023 3.200 OPER 3.200
SDF 01/2023 0.833 OPER 0.833
AQC:A6 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 8.033 4.165 0.000 4.000 0.000 4.033 0.000 0.000

NYSDOT INTELLIGENT TRANSPORTATION SERVICE PERSONAL NHPP 01/2019 0.000 OPER (0.040)
SERVICE CONSULTANT CONTRACT TO PROVIDE SDF 01/2019 0.000 OPER (0.010)
080665 SUPPORT STAFF, ITS ELECTRICITY, TELEPHONE,
MISC PERSONAL SERVICE, EQUIPMENT TO INFORM
<Exempt> OPERATIONS COUNTYWIDE, NASSAU AND SUFFOLK
COUNTIES

AQC:A6 MULTI TPC: $26-$40 M TOTAL 5YR COST : 0.000 (0.050) 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT ANNUAL PROGRAM TO PROVIDE STAFF TO OPERATE NHPP 03/2020 3.152 OPER 3.152
THE INFORM CONTROL CENTER IN HAUPPAUGE, SDF 03/2020 0.788 OPER 0.788
080676 SUFFOLK COUNTY NHPP 03/2021 3.152 OPER 3.152
MISC
SDF 03/2021 0.788 OPER 0.788
<Exempt>
NHPP 03/2022 3.200 OPER 3.200
SDF 03/2022 0.800 OPER 0.800
NHPP 03/2023 3.200 OPER 3.200
SDF 03/2023 0.800 OPER 0.800
NHPP 03/2024 3.200 OPER 3.200
SDF 03/2024 0.800 OPER 0.800
AQC:A7 MULTI TPC: $26-$40 M TOTAL 5YR COST : 19.880 0.000 3.940 3.940 4.000 4.000 4.000 0.000

175
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 10 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PIL & HSI SAFETY STUDIES-MULTIPLE HIGHWAY SAFETY HSIP 04/2019 0.000 DETLDES 0.540
INVESTIGATION (HSI) STUDIES AT LOCATIONS BE SDF 04/2019 0.000 DETLDES 0.060
080899 DETERMINED. EACH STUDY WILL CONSIST OF
STUDY TABULATING POLICE ACCIDENT REPORTS, ANALYSIS OF
<Exempt> TRAFFIC ACCIDENTS & PERFORMING OPERATION
STUDIES ON VARIOUS HIGHWAYS NASSAU & SUFFOLK
COUNTY.

AQC:A6 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 0.600 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT PERFORM TRAFFIC DATA COLLECTION, SAFETY NHPP 04/2019 0.000 DETLDES 0.320
STUDIES AND OTHER TRAFFIC AND SAFETY TASKS ON SDF 04/2019 0.000 DETLDES 0.080
080900 VARIOUS HIGHWAYS & PARKWAYS IN NASSAU & NHPP 04/2020 0.320 DETLDES 0.320
STUDY SUFFOLK COUNTIES. LOCATIONS TO BE DETERMINED SDF 04/2020 0.080 DETLDES 0.080
<Exempt> ON AN AS-NEEDED-BASIS (FORMERLY PIN: 0T2397)

AQC:A7 MULTI TPC: $2-$4 M TOTAL 5YR COST : 0.400 0.400 0.400 0.000 0.000 0.000 0.000 0.000

NYSDOT SIGN REPAIRS & INSTALLATIONS ON VARIOUS STATE STBG FLEX 12/2018 0.000 CONINSP 0.717
HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK SDF 12/2018 0.000 CONINSP 0.179
080944 COUNTIES
SAFETY
<Exempt>
AQC:C13 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 0.896 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT RETROFIT EXISTING VARIABLE MESSAGE SIGNS TO NHPP 12/2018 0.000 CONST 0.361
MODERNIZE DATED TECHNOLOGY FOR INFORM SDF 12/2018 0.000 CONST 0.090
080966 SYSTEM ON VARIOUS FEDERAL-AID ELIGIBLE STATE
TRAFFIC HIGHWAYS IN NASSAU AND SUFFOLK COUNTY
<Exempt> (FORMERLY PIN: 0T2549)
AQC:A7 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 0.451 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT REPLACE OR UPGRADE SIGNALS AND/OR STBG FLEX 04/2019 0.000 CONINSP 0.281
APPURTENANCES & INSTALL NEW SIGNALS, REPAIR OR SDF 04/2019 0.000 CONINSP 0.070
080982 REPLACE LIGHTING SYSTEMS AND APPURTENANCES STBG LG URB 04/2019 0.000 CONINSP 0.451
MOBIL ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS SDF 04/2019 0.000 CONINSP 0.113
<Exempt> TO IMPROVE MOBILITY IN NASSAU & SUFFOLK SDF 04/2019 0.000 CONST 0.201
COUNTIES (FORMERLY PIN: 0T2110)
STBG FLEX 04/2019 0.000 CONST 2.647
SDF 04/2019 0.000 CONST 0.662
AQC:D2Z MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 4.425 0.000 0.000 0.000 0.000 0.000 0.000

176
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 11 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT INSTALLATION OF UPGRADED OR REPLACEMENT OF NHPP 10/2018 0.000 CONINSP 0.480


DAMAGED PAVEMENT MARKINGS & PLOWABLE SDF 10/2018 0.000 CONINSP 0.120
080991 REFLECTIVE MARKERS TO IMPROVE VISIBILITY ON STBG FLEX 10/2018 0.000 CONINSP 0.120
SAFETY VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS & SDF 10/2018 0.000 CONINSP 0.030
<Exempt> PARKWAYS IN NASSAU & SUFFOLK COUNTIES NHPP 10/2018 0.000 CONST 5.100
(FORMERLY PIN: 0T1585)
SDF 10/2018 0.000 CONST 1.257
STBG FLEX 10/2018 0.000 CONST 1.416
SDF 10/2018 0.000 CONST 0.354
AQC:A10 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 8.877 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT RESPOND TO EMERGENCIES AND REPAIRS ON AN AS SDF 10/2018 0.000 CONINSP 0.650
NEEDED BASIS WHERE AN IMMEDIATE RESPONSE IS SDF 10/2018 0.000 CONST 6.500
080992 REQUIRED TO ENSURE THE SAFETY OF THE PUBLIC
BRIDGE (LOCATIONS TO BE DETERMINED) ON VARIOUS STATE
<Exempt> HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK
COUNTIES. (Formerly PIN: 0T2057)

AQC:A19 MULTI TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 7.150 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT SIGN REPAIR & INSTALLATION INCLUDES REPAIR AND NHPP 06/2019 0.000 CONINSP 0.163
REPLACE WORN OR DAMAGED SIGNS AS WELL SDF 06/2019 0.000 CONINSP 0.041
080999 INSTALLATION OF NEW SIGNS TO ADDRESS SAFETY STBG FLEX 06/2019 0.000 CONINSP 0.326
SAFETY AND OPERATIONAL ISSUES ON VARIOUS FEDERAL-AID SDF 06/2019 0.000 CONINSP 0.081
<Exempt> ELIGIBLE STATE HIGHWAYS & PARKWAYS IN NASSAU & NHPP 06/2019 0.000 CONST 0.832
SUFFOLK COUNTIES.
SDF 06/2019 0.000 CONST 0.208
STBG FLEX 06/2019 0.000 CONST 1.795
SDF 06/2019 0.000 CONST 0.449
AQC:C13 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 3.895 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT SAFETY IMPROVEMENTS INCLUDING DIAMOND HSIP 02/2019 0.000 DETLDES 0.477
GRINDING ON CONCRETE PAVEMENT TO IMPROVE SKID SDF 02/2019 0.000 DETLDES 0.053
081000 RESISTANCE ON NY27 (SUNRISE HIGHWAY) E/B AT EXIT HSIP 05/2020 1.170 CONINSP 1.170
SAFETY 39 INTERCHANGE AND THE SAGTIKOS /SOUTHERN SDF 05/2020 0.130 CONINSP 0.130
<Exempt> STATE PARKWAY INTERCHANGE. THE PROJECT WILL HSIP 05/2020 5.850 CONST 5.850
ALSO EXTEND LEFT TURN, ACCELERATION LANES
SDF 05/2020 0.650 CONST 0.650
ABOUT 500 FEET ON NY231, NY454, SOUTHERN STATE
PARKWAY, NY107, NY27, GLEN COVE ROAD AND NY110
TO IMPROVE TRAFFIC FLOW IN NASSAU AND SUFFOLK
COUNTIES. (FORMERLY PIN: 0T2226)
HAL YEAR 2018 PIL 145

AQC:A6 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 7.800 0.530 7.800 0.000 0.000 0.000 0.000 0.000

177
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 12 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT SAFETY IMPROVEMENTS AT INTERSECTIONS: NY25 AT HSIP 12/2019 0.225 PRELDES 0.225
DIX HILLS RD & BROADWAY, NY27 AT NY114 SDF 12/2019 0.025 PRELDES 0.025
081002 (POTENTIAL ROUNDABOUT), SSP W/B AT NORTH HSIP 04/2022 0.505 DETLDES 0.505
SAFETY CORONA AVE, TOWNS OF HUNTINGTON, EAST SDF 04/2022 0.056 DETLDES 0.056
<Exempt> HAMPTON & HEMPSTEAD, NASSAU & SUFFOLK HSIP 04/2022 0.900 ROWACQU 0.900
COUNTIES. HAL YEAR 2018 PIL 134
SDF 04/2022 0.100 ROWACQU 0.100
HSIP 04/2022 0.154 ROWINCD 0.154
SDF 04/2022 0.017 ROWINCD 0.017
CMAQ 08/2024 0.100 CONINSP 0.100
SDF 08/2024 0.025 CONINSP 0.025
HSIP 08/2024 0.990 CONINSP 0.990
LOCAL 08/2024 0.110 CONINSP 0.110
CMAQ 08/2024 1.000 CONST 1.000
SDF 08/2024 0.250 CONST 0.250
HSIP 08/2024 4.950 CONST 4.950
SDF 08/2024 0.550 CONST 0.550
AQC:A6 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 9.957 0.000 0.250 0.000 1.732 0.000 7.975 0.000

NYSDOT CLEAN BASINS FILLED W/DEBRIS, REPAIR, REPLACE OR SDF 01/2019 0.000 DETLDES 0.655
PROVIDE MISSING COLLARS, REPAIR BASIN WALLS, STBG FLEX 11/2019 0.800 CONINSP 0.800
081004 CLEAN CLOGGED PIPES, REPAIR OR REPLACE BROKEN SDF 11/2019 0.200 CONINSP 0.200
R&P PIPES, REPLACE GRATES, REPLACE BASINS, AND STBG FLEX 11/2019 4.000 CONST 4.000
<Exempt> CONNECT ISOLATED BASINS TO DRAINAGE SYSTEM TO
SDF 11/2019 1.000 CONST 1.000
PREVENT HIGHWAY FLOODING IN NASSAU & SUFFOLK
COUNTY.

AQC:A2 MULTI TPC: $6-$9.4 M TOTAL 5YR COST : 6.000 0.655 6.000 0.000 0.000 0.000 0.000 0.000

NYSDOT INTELLIGENT TRANSPORTATION SERVICE PERSONAL NHPP 11/2018 0.000 OPER 6.800
SERVICE CONSULTANT CONTRACT TO PROVIDE SDF 11/2018 0.000 OPER 1.700
081005 SUPPORT STAFF, ITS ELECTRICITY, TELEPHONE, NHPP 04/2020 3.400 OPER 3.400
TRAFFIC PERSONAL SERVICE, EQUIPMENT TO INFORM SDF 04/2020 0.850 OPER 0.850
<Exempt> OPERATIONS COUNTYWIDE, NASSAU AND SUFFOLK NHPP 04/2021 3.400 OPER 3.400
COUNTIES
SDF 04/2021 0.850 OPER 0.850
NHPP 04/2022 3.400 OPER 3.400
SDF 04/2022 0.850 OPER 0.850
NHPP 04/2023 3.400 OPER 3.400
SDF 04/2023 0.850 OPER 0.850
NHPP 04/2024 3.400 OPER 3.400
SDF 04/2024 0.850 OPER 0.850
AQC:A6 MULTI TPC: $50-$85 M TOTAL 5YR COST : 21.250 8.500 4.250 4.250 4.250 4.250 4.250 0.000

178
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 13 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PROVIDE ENGINEERING SERVICES & CONSTRUCTION NHPP 12/2018 0.000 PRELDES 1.880
SUPPORT FOR THE INFORMATION SYSTEM FOR SDF 12/2018 0.000 PRELDES 0.470
081006 EFFECTIVE COMMUNICATION COUNTYWIDE NHPP 12/2019 1.870 PRELDES 1.870
MISC
SDF 12/2019 0.467 PRELDES 0.467
<Exempt>
NHPP 12/2020 1.870 PRELDES 1.870
SDF 12/2020 0.467 PRELDES 0.467
NHPP 12/2021 1.920 PRELDES 1.920
SDF 12/2021 0.480 PRELDES 0.480
NHPP 12/2022 1.920 PRELDES 1.920
SDF 12/2022 0.480 PRELDES 0.480
NHPP 12/2023 1.920 PRELDES 1.920
SDF 12/2023 0.480 PRELDES 0.480
AQC:A7 MULTI TPC: $32-$50 M TOTAL 5YR COST : 11.874 2.350 2.337 2.337 2.400 2.400 2.400 0.000

NYSDOT BRIDGE CLEANING (APPROXIMATELY 266 BRIDGES) ON SDF 10/2018 0.000 DETLDES 0.150
VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS & STBG LG URB 10/2019 0.600 CONINSP 0.600
081007 PARKWAYS TO MAINTAIN STRUCTURAL INTEGRITY IN SDF 10/2019 0.150 CONINSP 0.150
BRIDGE NASSAU & SUFFOLK COUNTIES. STBG LG URB 10/2019 4.000 CONST 4.000
<Exempt>
SDF 10/2019 1.000 CONST 1.000
AQC:A19 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.750 0.150 5.750 0.000 0.000 0.000 0.000 0.000

NYSDOT INSTALLATION OF UPGRADED OR REPLACEMENT OF NHPP 10/2019 0.384 CONINSP 0.384


DAMAGED PAVEMENT MARKINGS & PLOWABLE SDF 10/2019 0.096 CONINSP 0.096
081008 REFLECTIVE MARKERS ON VARIOUS FEDERAL AID STBG FLEX 10/2019 0.224 CONINSP 0.224
SAFETY ELIGIBLE STATE HIGHWAYS & PARKWAYS TO ASSURE
<Exempt> SDF 10/2019 0.056 CONINSP 0.056
GOOD VISIBILITY AND PROMOTE SAFE, EFFICIENT
NHPP 10/2019 3.840 CONST 3.840
TRAFFIC MOVEMENT AND OPERATION IN NASSAU &
SUFFOLK COUNTIES. SDF 10/2019 0.960 CONST 0.960
STBG FLEX 10/2019 2.240 CONST 2.240
SDF 10/2019 0.560 CONST 0.560
AQC:A11 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 8.360 0.000 8.360 0.000 0.000 0.000 0.000 0.000

179
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 14 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PROVIDES SAFETY IMPROVEMENTS BY EXTENDING HSIP 10/2019 0.391 DETLDES 0.391
LEFT TURN LANES, ADDING NEW DECELERATION SDF 10/2019 0.044 DETLDES 0.044
081009 LANES, U-TURN LANES & RIGHT TURN LANES AT HSIP 04/2021 1.192 CONINSP 1.192
SAFETY VARIOUS LOCATIONS: NY454 W/B@ OLD NICHOLS RD SDF 04/2021 0.132 CONINSP 0.132
<Exempt> ADD SECOND LEFT TURN LANE & REPLACE EXIST HSIP 04/2021 5.960 CONST 5.960
MEDIAN RAIL W/CONCRETE BARRIER; NORTHERN
SDF 04/2021 0.662 CONST 0.662
STATE PKWY E/B @EXIT 37A INSTALL A NEW DECEL
LANE; NY231 TIANA PL, NY106 N/B@ OPENING 600FT S/O
WINDSOR DR, AND NY106 S/B@ OPENING 600FT S/O
WINDSOR DR. PROVIDE NEW U-TURN LANES;
908K(SAGTIKOS STATE PKWY)BETWEEN SCHOLAR
LANE & PULASKI RD. PROVIDE MEDIAN OPENING FOR
EMERGENCY VEHICLES TO REDUCE THE RESPONSE
TIME FOR FIRST RESPONDERS; MEADOWBROOK STATE
PKWY S/B@ EXIT M3W (MERCHANTS CONCOURSE), &
MEADOWBROOK STATE PKWY N/B @ EXIT M3E
(MERCHANTS CONCOURSE) INSTALL NEW DECEL
LANES & NYS ROUTE 231 AT HUNTER AVE, INSTALL N/B
& S/B RIGHT TURN LANES. LANE EXTENSIONS AT
VARIOUS LOCATIONS: NY27(SUNRISE HWY) W/B @
LIBERTY AVE, SHOPPING CENTER, AND BEECH ST IN
THE TOWNS OF ISLIP, OYSTER BAY, BABYLON,
SMITHTOWN, HEMPSTEAD, HUNTINGTON, NASSAU &
SUFFOLK COUNTY.

AQC:A6 MULTI TPC: $15-$25 M TOTAL 5YR COST : 8.381 0.000 0.435 7.946 0.000 0.000 0.000 0.000

NYSDOT ROUT & SEAL ASPHALT PAVEMENT CRACKS AND JOINT SDF 03/2019 0.000 DETLDES 0.187
OVERLAY REPAIR ON NY25 TO MAINTAIN STATE OF STBG LG URB 02/2020 0.285 CONINSP 0.285
081011 GOOD REPAIR FROM SOUTH OYSTER BAY ROAD TO SDF 02/2020 0.071 CONINSP 0.071
R&P NASSAU/SUFFOLK COUNTY LINE, NY27A FROM THE STBG LG URB 02/2020 2.375 CONST 2.375
<Exempt> ROBERT MOSES CAUSEWAY TO CR13 (FIFTH AVENUE),
SDF 02/2020 0.594 CONST 0.594
NY106 FROM OLD COUNTRY ROAD TO NY106/107
(HICKSVILLE ROAD), NY25A FROM GLEN COVE ROAD
TO 600 FEET WEST OF MILL RIVER ROAD. 900W FROM
CR80 (KNOLL ROAD) TO TUCKAHOE LANE, 906A FROM
NORTH OCEAN AVENUE TO NY112, AND NY106 FROM
NY25A TO NORTHERN TERMINUS (BAY AVE) IN THE
TOWN OF OYSTER BAY, BROOKHAVEN, ISLIP, NORTH
HEMPSTEAD AND SOUTHAMPTON IN NASSAU AND
SUFFOLK COUNTIES.

AQC:A10 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.325 0.187 3.325 0.000 0.000 0.000 0.000 0.000

180
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 15 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT REPLACE OR UPGRADE SIGNALS AND/OR STBG FLEX 04/2020 0.260 CONINSP 0.260
APPURTENANCES & INSTALL NEW SIGNALS, REPAIR OR SDF 04/2020 0.065 CONINSP 0.065
081015 REPLACE LIGHTING SYSTEMS AND APPURTENANCES STBG FLEX 04/2020 2.600 CONST 2.600
SAFETY ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS
<Exempt> SDF 04/2020 1.450 CONST 1.450
IN NASSAU & SUFFOLK COUNTIES FOR MOBILITY
IMPROVEMENTS

AQC:D2Z MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.375 0.000 4.375 0.000 0.000 0.000 0.000 0.000

NYSDOT ASPHALT PAVEMENT REPAIRS, SINGLE COURSE SDF 06/2019 0.000 DETLDES 0.500
OVERLAY ON OCEAN PKWY FROM MEADOWBROOK NHPP 08/2020 1.601 CONINSP 1.601
081017 STATE PKWY TO TOLL BOOTHS AT CAPTREE STATE SDF 08/2020 0.400 CONINSP 0.400
R&P PARK AND ON NY27 E/B SERVICE ROAD FROM MALTS NHPP 08/2020 8.000 CONST 8.000
<Exempt> AVE TO MANOR LANE TO MAINTAIN A STATE GOOD
SDF 08/2020 2.000 CONST 2.000
REPAIR IN THE TOWNS OF HEMPSTEAD, OYSTER BAY,
BABYLON & ISLIP IN THE NASSAU & SUFFOLK
COUNTIES.

AQC:A10 MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 12.001 0.500 12.001 0.000 0.000 0.000 0.000 0.000

NYSDOT REMOVAL OR PAINT OVER OF GRAFITTI, REPAIR NOISE SDF 07/2019 0.000 DETLDES 0.190
WALLS, TREE TRIMMING, MAINTAIN THE 7 PARK & RIDE SDF 10/2020 0.350 CONINSP 0.350
081019 LOTS ALONG I495, ALL NYS BIKEWAYS, REST AREAS, SDF 10/2020 3.500 CONST 3.500
MISC PUBLIC TELEPHONE AREAS ALONG PARKWAYS & BUS
<Exempt> SHELTERS ON NYS RIGHT-OF-WAY NASSAU AND
SUFFOLK COUNTIES (Formerly PIN: 0T2135)

AQC:C11P MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.850 0.190 0.000 3.850 0.000 0.000 0.000 0.000

NYSDOT RECONSTRUCTION OF SIDE WALK RAMP TO MEET ADA HPP 05/2019 0.000 CONINSP 0.320
COMPLIANCE. LOCATIONS INCLUDE NY24 FROM SDF 05/2019 0.000 CONINSP 0.080
0ADA01 MEADOW BROOK STATE PARKWAY TO NY110, NY25A HPP 05/2019 0.000 CONST 1.910
SAFETY FROM NASSAU/SUFFOLK COUNTY LINE TO BREAD & SDF 05/2019 0.000 CONST 0.477
<Exempt> CHEESE HOLLOW ROAD AND NY27 BETWEEN CHURCH
LANE AND CR79, THIS LOCATION WILL ALSO REPLACE
OR INSTALL SIDEWALK AS WELL AS ADDRESS THE ADA
RAMP COMPLIANCE ISSUES IN SUFFOLK AND NASSAU
COUNTIES. TRANSFERRED EARMARK FUNDING . NY318,
NY391. (PROGRAM CODE RPS9),NY661 (PROGRAM CODE
RPS0).

AQC:A6 MULTI TPC: $2-$4 M TOTAL 5YR COST : 0.000 2.787 0.000 0.000 0.000 0.000 0.000 0.000

181
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 16 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT ADDRESS ADA NON COMPLIANT CURB RAMPS ON HPP 07/2019 0.000 CONINSP 0.240
FEDERAL AID ELIGIBLE HIGHWAYS AT LOCATIONS SDF 07/2019 0.000 CONINSP 0.060
0ADA02 DETERMINED AS: NY27 FROM NSR TO STATESMAN HPP 07/2019 0.000 CONST 2.400
MOBIL ST(N/W), NY24 FROM NYC LINE TO NASSAU BLVD, NY27 SDF 07/2019 0.000 CONST 0.600
<Exempt> FROM NORTH CENTER AVENUE TO HENRY STREET, HPP 10/2018 0.000 ROWACQU 0.189
NY27A FROM NY111 TO CONNECTQUOT AVENUE, NY25A
SDF 10/2018 0.000 ROWACQU 0.047
FROM HOYT LANE TO BEACH STREET, NY27 FROM WSP
TO N/S LINE, NY25 FROM ROXBURY TO ROBBINS LANE, HPP 10/2018 0.000 ROWINCD 0.118
NY25 FROM KINGS PARK ROAD TO NY111, NY24 FROM SDF 10/2018 0.000 ROWINCD 0.030
RIVERHEAD TRAFFIC CIRCLE TO BELLOWS POND ROAD,
NY25 FROM SOUTH OYSTERBAY ROAD TO N/S LINE AND
NY27A FROM RMC TO CR13 IN THE TOWNS OF
BABYLON, HEMPSTEAD, ISLIP, OYSTERBAY AND
SOUTHAMPTON IN NASSAU AND SUFFOLK COUNTIES.
TRANSFERRED EARMARK #NYF01, NY745, NY391, NY321,
NY525, NY624, NY432, NY546, NY630 (PROGRAM CODE
RPS9) .

AQC:C2 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 3.684 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT BRIDGE PAINTING, CLEANING, RUST REMOVAL & SDF 03/2023 0.560 DETLDES 0.560
DISPOSAL NHPP 11/2024 0.000 CONINSP 0.840
0BPT24 SDF 11/2024 0.000 CONINSP 0.210
BRIDGE
NHPP 11/2024 0.000 CONST 5.600
<Exempt>
SDF 11/2024 0.000 CONST 1.400
AQC:A19Z MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 0.560 0.000 0.000 0.000 0.000 0.560 0.000 8.050

NYSDOT PROVIDE BRIDGE REPAIRS ON AN AS-NEEDED OR SDF 08/2024 0.560 DETLDES 0.560
EMERGENCY BASIS ON VARIOUS STATE HIGHWAYS &
0BWW24 PARKWAYS IN NASSAU & SUFFOLK COUNTIES.
BRIDGE
<Exempt>
AQC:A19Z MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.560 0.000 0.000 0.000 0.000 0.000 0.560 0.000

NYSDOT INSTALLATION OF UPGRADED OR REPLACEMENT OF SDF 11/2022 0.500 DETLDES 0.500


DAMAGED PAVEMENT MARKINGS & PLOWABLE NHPP 08/2024 0.612 CONINSP 0.612
0DPM23 REFLECTIVE MARKERS TO ASSURE GOOD VISIBILITY SDF 08/2024 0.153 CONINSP 0.153
SAFETY AND PROMOTE SAFE, EFFICIENT TRAFFIC MOVEMENT STBG LG URB 08/2024 0.357 CONINSP 0.357
<Exempt> AND OPERATION ON VARIOUS FEDERAL AID ELIGIBLE SDF 08/2024 0.089 CONINSP 0.089
STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK
NHPP 08/2024 4.079 CONST 4.079
COUNTIES
SDF 08/2024 1.020 CONST 1.020
STBG LG URB 08/2024 2.380 CONST 2.380
SDF 08/2024 0.595 CONST 0.595
AQC:A11 MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 9.785 0.000 0.000 0.000 0.000 0.500 9.285 0.000

182
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 17 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT INSTALLATION OF UPGRADED OR REPLACEMENT OF SDF 10/2023 0.500 DETLDES 0.500


DAMAGED PAVEMENT MARKINGS & PLOWABLE NHPP 08/2025 0.000 CONINSP 0.815
0DPM24 REFLECTIVE MARKERS TO ASSURE GOOD VISIBILITY SDF 08/2025 0.000 CONINSP 0.204
SAFETY AND PROMOTE SAFE, EFFICIENT TRAFFIC MOVEMENT STBG FLEX 08/2025 0.000 CONINSP 0.477
<Exempt> AND OPERATION ON VARIOUS FEDERAL AID ELIGIBLE SDF 08/2025 0.000 CONINSP 0.119
STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK
NHPP 08/2025 0.000 CONST 4.080
COUNTIES
SDF 08/2025 0.000 CONST 1.020
STBG FLEX 08/2025 0.000 CONST 2.380
SDF 08/2025 0.000 CONST 0.595
AQC:A11 MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 0.500 0.000 0.000 0.000 0.000 0.000 0.500 9.690

NYSDOT INSTALLATION OF UPGRADED OR REPLACEMENT OF SDF 08/2024 0.500 DETLDES 0.500


DAMAGED PAVEMENT MARKINGS & PLOWABLE
0DPM25 REFLECTIVE MARKERS ON VARIOUS FEDERAL AID
SAFETY ELIGIBLE STATE HIGHWAYS & PARKWAYS IN NASSAU &
<Exempt> SUFFOLK COUNTIES
AQC:A11Z MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 0.500 0.000 0.000 0.000 0.000 0.000 0.500 0.000

NYSDOT PROVIDE MAINTENANCE TO COMMUNICATION NHPP 04/2020 3.000 OPER 3.000


EQUIPMENT INCLUDING COMPUTERIZED TRAFFIC SDF 04/2020 0.750 OPER 0.750
0ITS01 MANAGEMENT SYSTEMS, VIDEO SURVEILLANCE & NHPP 04/2022 9.280 OPER 9.280
TRAFFIC DETECTORS, VARIABLE MESSAGE SIGNS, CLOSED SDF 04/2022 2.320 OPER 2.320
<Exempt> CIRCUIT TELEVISIONS, HIGHWAY ADVISORY RADIO & NHPP 04/2024 9.280 OPER 9.280
RELATED EQUIPMENT TO MAINTAIN STATE OF GOOD
SDF 04/2024 2.320 OPER 2.320
REPAIR IN NASSAU AND SUFFOLK
COUNTIES.FORMERLY 080814 AND 080720

AQC:A7 MULTI TPC: $32-$50 M TOTAL 5YR COST : 26.950 0.000 3.750 0.000 11.600 0.000 11.600 0.000

NYSDOT REGIONAL ENGINEERING SERVICES SFY 19/20 SDF 06/2019 0.000 MISC 13.500

0RES19
RECON
<Exempt>
AQC:C7Z MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 0.000 13.500 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT REGIONAL ENGINEERING SERVICES SFY 20/21 SDF 06/2020 13.500 MISC 13.500

0RES20
RECON
<Exempt>
AQC:C7Z MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 13.500 0.000 13.500 0.000 0.000 0.000 0.000 0.000

183
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 18 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT REGIONAL ENGINEERING SERVICES SFY 21/22 SDF 07/2021 13.500 MISC 13.500

0RES21
RECON
<Exempt>
AQC:C7Z MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 13.500 0.000 0.000 13.500 0.000 0.000 0.000 0.000

NYSDOT REGIONAL ENGINEERING SERVICES SFY 22/23 SDF 06/2022 13.500 MISC 13.500

0RES22
RECON
<Exempt>
AQC:C7Z MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 13.500 0.000 0.000 0.000 13.500 0.000 0.000 0.000

NYSDOT REGIONAL ENGINEERING SERVICES SFY 23/24 SDF 06/2023 13.500 MISC 13.500

0RES23
RECON
<Exempt>
AQC:C7Z MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 13.500 0.000 0.000 0.000 0.000 13.500 0.000 0.000

NYSDOT REGIONAL ENGINEERING SERVICES SFY 24/25 SDF 06/2024 13.500 MISC 13.500

0RES24
RECON
<Exempt>
AQC:C7Z MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 13.500 0.000 0.000 0.000 0.000 0.000 13.500 0.000

NYSDOT TRAFFIC SIGNAL IMPROVEMENT PROGRAM - Purchase SDF 06/2019 0.000 OPER 0.625
Traffic Signal Equipment.
0SIP19
SAFETY
<Exempt>
AQC:A7Z MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 0.625 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT TRAFFIC SIGNAL IMPROVEMENT PROGRAM - Purchase SDF 06/2020 0.625 OPER 0.625
Traffic Signal Equipment.
0SIP20
SAFETY
<Exempt>
AQC:A7Z MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.625 0.000 0.625 0.000 0.000 0.000 0.000 0.000

184
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 19 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT TRAFFIC SIGNAL IMPROVEMENT PROGRAM - Purchase SDF 05/2021 0.625 OPER 0.625
Traffic Signal Equipment.
0SIP21
SAFETY
<Exempt>
AQC:A7Z MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.625 0.000 0.000 0.625 0.000 0.000 0.000 0.000

NYSDOT TRAFFIC SIGNAL IMPROVEMENT PROGRAM - Purchase SDF 06/2022 0.625 OPER 0.625
Traffic Signal Equipment.
0SIP22
SAFETY
<Exempt>
AQC:A7Z MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.625 0.000 0.000 0.000 0.625 0.000 0.000 0.000

NYSDOT TRAFFIC SIGNAL IMPROVEMENT PROGRAM - Purchase SDF 06/2023 0.625 OPER 0.625
Traffic Signal Equipment.
0SIP23
SAFETY
<Exempt>
AQC:A7Z MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.625 0.000 0.000 0.000 0.000 0.625 0.000 0.000

NYSDOT REPLACE OR UPGRADE SIGNALS AND/OR SDF 05/2022 0.500 DETLDES 0.500
APPURTENANCES & INSTALL NEW SIGNALS, REPAIR OR STBG LG URB 04/2023 0.396 CONINSP 0.396
0SLR23 REPLACE LIGHTING SYSTEMS APPURTENANCES TO SDF 04/2023 0.099 CONINSP 0.099
SAFETY ADDRESS SAFETY CONCERNS, IMPROVE THE STBG LG URB 04/2023 2.640 CONST 2.640
<Exempt> RELIABILITY, OPERATION OF TRAFFIC SIGNALS AND SDF 04/2023 0.660 CONST 0.660
LIGHTING SYSTEMS ON VARIOUS FEDERAL AID
ELIGIBLE STATE HIGHWAYS IN NASSAU & SUFFOLK
COUNTIES.

AQC:D2Z MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.295 0.000 0.000 0.000 0.500 3.795 0.000 0.000

NYSDOT REPLACE OR UPGRADE SIGNALS AND/OR STBG FLEX 04/2024 0.538 CONINSP 0.538
APPURTENANCES & INSTALL NEW SIGNALS, REPAIR OR SDF 04/2024 0.134 CONINSP 0.134
0SLR24 REPLACE LIGHTING SYSTEMS AND APPURTENANCES STBG FLEX 04/2024 2.687 CONST 2.687
SAFETY TO ADDRESS SAFETY CONCERNS, IMPROVE THE SDF 04/2024 0.672 CONST 0.672
<Exempt> RELIABILITY, OPERATION OF TRAFFIC SIGNALS AND
LIGHTING SYSTEMS ON VARIOUS FEDERAL AID
ELIGIBLE STATE HIGHWAYS IN NASSAU & SUFFOLK
COUNTIES.

AQC:D2 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 4.031 0.000 0.000 0.000 0.000 0.000 4.031 0.000

185
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 20 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT CONCRETE PAVEMENT REPAIR INCLUDING JOINT SDF 03/2020 0.510 DETLDES 0.510
SEALING, DIAMOND GRINDING ON 908E STBG LG URB 02/2021 0.589 CONINSP 0.589
0T1391 (MEADOWBROOK STATE PARKWAY) NORTHBOUND SDF 02/2021 0.147 CONINSP 0.147
R&P ONLY BETWEEN S/O BABYLON TPKE & SSP, 908E SB STBG LG URB 02/2021 3.925 CONST 3.925
<Exempt> ONLY BETWEEN SSP & S/O SSP, 27A BTW OLD SUNRISE SDF 02/2021 0.981 CONST 0.981
HWY & MERRICK RD, AND 909D (OCEAN PKWY) WB
ONLY BETWEEN ZACH BAY & SUFFOLK LINE IN THE
TOWN BABYLON, HEMPSTEAD AND OYSTER BAY,
NASSAU &SUFFOLK COUNTIES.

AQC:A10 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 6.152 0.000 0.510 5.642 0.000 0.000 0.000 0.000

NYSDOT BRIDGE CLEANING (LOCATIONS TO-BE-DETERMINED) SDF 09/2022 0.050 DETLDES 0.050
TO LAST FOR THEIR INTENDED LIFE CYCLE ON STBG FLEX 08/2023 0.601 CONINSP 0.601
0T1601 VARIOUS FEDERAL- AID ELIGIBLE STATE HIGHWAYS & SDF 08/2023 0.150 CONINSP 0.150
BRIDGE PARKWAYS IN NASSAU & SUFFOLK COUNTIES. STBG FLEX 08/2023 4.000 CONST 4.000
<Exempt>
SDF 08/2023 1.000 CONST 1.000
AQC:A19 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.801 0.000 0.000 0.000 0.050 5.751 0.000 0.000

NYSDOT PROVIDE BRIDGE REPAIRS ON AN AS-NEEDED OR SDF 09/2021 0.540 DETLDES 0.540
EMERGENCY BASIS ON VARIOUS STATE HIGHWAYS & SDF 10/2022 0.700 CONINSP 0.700
0T1881 PARKWAYS IN NASSAU & SUFFOLK COUNTIES. SDF 10/2022 3.500 CONST 3.500
BRIDGE
<Exempt>
AQC:A19Z MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 4.740 0.000 0.000 0.540 0.000 4.200 0.000 0.000

NYSDOT REHABILITATE RECHARGE BASINS INCLUDING SLOPE SDF 05/2021 0.166 DETLDES 0.166
STABILIZATION, HEAD WALL REPAIR, ET AL TO SDF 09/2022 0.284 CONINSP 0.284
0T1882 MAINTAIN STATE OF GOOD REPAIR (LOCATIONS SDF 09/2022 2.370 CONST 2.370
R&P TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS &
<Exempt> PARKWAYS IN NASSAU & SUFFOLK COUNTIES.

AQC:A2 MULTI TPC: $2-$4 M TOTAL 5YR COST : 2.820 0.000 0.000 0.166 2.654 0.000 0.000 0.000

NYSDOT RESURFACE ASPHALT PAVEMENTS, SINGLE COURSE SDF 07/2019 0.000 DETLDES 0.110
OVERLAY: GLEN COVE RD FROM HELEN ST TO NY107, NHPP 09/2020 0.800 CONINSP 0.800
0T2015 AND NY25 FROM N/S LINE TO DEER PARK RD TO SDF 09/2020 0.200 CONINSP 0.200
R&P MAINTAIN A STATE OF GOOD REPAIR IN THE TOWNS OF NHPP 09/2020 8.000 CONST 8.000
<Exempt> NORTH HEMPSTEAD, OYSTER BAY & HUNTINGTON,
SDF 09/2020 2.000 CONST 2.000
NASSAU & SUFFOLK COUNTIES.

AQC:A10 MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 11.000 0.110 11.000 0.000 0.000 0.000 0.000 0.000

186
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 21 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS SDF 10/2020 0.194 DETLDES 0.194
(LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE SDF 11/2021 0.465 CONINSP 0.465
0T2040 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK SDF 11/2021 4.650 CONST 4.650
SAFETY COUNTIES.
<Exempt>
AQC:A9 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.309 0.000 0.000 0.194 5.115 0.000 0.000 0.000

NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS SDF 05/2021 0.194 DETLDES 0.194
(LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE SDF 07/2022 0.473 CONINSP 0.473
0T2041 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK SDF 07/2022 4.734 CONST 4.734
SAFETY COUNTIES.
<Exempt>
AQC:A9 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.401 0.000 0.000 0.194 5.207 0.000 0.000 0.000

NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS SDF 06/2022 0.345 DETLDES 0.345
(LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE SDF 07/2023 0.355 CONINSP 0.355
0T2042 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK SDF 07/2023 3.552 CONST 3.552
SAFETY COUNTIES.
<Exempt>
AQC:A6Z MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.252 0.000 0.000 0.000 0.345 3.907 0.000 0.000

NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS SDF 03/2023 0.201 DETLDES 0.201
(LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE SDF 07/2024 0.380 CONINSP 0.380
0T2043 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK SDF 07/2024 3.800 CONST 3.800
SAFETY COUNTIES.
<Exempt>
AQC:A6Z MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.381 0.000 0.000 0.000 0.000 0.201 4.180 0.000

NYSDOT CLEAN BASINS FILLED W/DEBRIS, REPAIR, REPLACE OR SDF 06/2022 0.100 DETLDES 0.100
PROVIDE MISSING COLLARS, REPAIR BASIN WALLS, STBG FLEX 07/2023 1.033 CONINSP 1.033
0T2044 CLEAN CLOGGED PIPES, REPAIR OR REPLACE BROKEN SDF 07/2023 0.258 CONINSP 0.258
R&P PIPES, REPLACE GRATES, REPLACE BASINS, CONNECT STBG FLEX 07/2023 6.888 CONST 6.888
<Exempt> ISOLATED BASINS TO DRAINAGE SYSTEM TO PREVENT SDF 07/2023 1.722 CONST 1.722
FLOODING AND TO PROVIDE CONTINUED SAFETY OF
MOTORIST IN NASSAU & SUFFOLK COUNTY.

AQC:A2 MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 10.001 0.000 0.000 0.000 0.100 9.901 0.000 0.000

187
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 22 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT CLEAN BASINS FILLED W/DEBRIS, REPAIR, REPLACE OR SDF 04/2023 0.100 DETLDES 0.100
PROVIDE MISSING COLLARS, REPAIR BASIN WALLS, STBG LG URB 07/2024 1.003 CONINSP 1.003
0T2045 CLEAN CLOGGED PIPES, REPAIR OR REPLACE BROKEN SDF 07/2024 0.251 CONINSP 0.251
R&P PIPES, REPLACE GRATES, REPLACE BASINS, CONNECT STBG LG URB 07/2024 6.687 CONST 6.687
<Exempt> ISOLATED BASINS TO DRAINAGE SYSTEM TO AVOID SDF 07/2024 1.672 CONST 1.672
THE FLOODING AND TO PROVIDE CONTINUED SAFETY
OF THE TRAVELING PUBLIC IN NASSAU & SUFFOLK
COUNTY.

AQC:A2 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 9.713 0.000 0.000 0.000 0.000 0.100 9.613 0.000

NYSDOT ASPHALT PAVEMENT REPAIRS, SINGLE COURSE SDF 08/2020 0.285 DETLDES 0.285
OVERLAY ON NY25B BETWEEN NORTHERN PKWY & NHPP 05/2021 0.995 CONINSP 0.995
0T2049 NY25, NY27 BETWEEN HORSEBLOCK RD & WILLIAM SDF 05/2021 0.249 CONINSP 0.249
R&P FLOYD PKWY & NY110 BETWEEN DEPOT RD & HENRY NHPP 05/2021 4.976 CONST 4.976
<Exempt> ST, TOWNS OF NORTH HEMPSTEAD, HUNTINGTON & SDF 05/2021 1.244 CONST 1.244
BROOKHAVEN IN NASSAU & SUFFOLK COUNTIES.

AQC:A10 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 7.749 0.000 0.285 7.464 0.000 0.000 0.000 0.000

NYSDOT RESPOND TO EMERGENCIES AND REPAIRS ON AN AS SDF 10/2019 0.468 DETLDES 0.468
NEEDED BASIS WHERE AN IMMEDIATE RESPONSE IS SDF 11/2020 1.509 CONINSP 1.509
0T2058 REQUIRED TO ENSURE THE SAFETY OF THE PUBLIC SDF 11/2020 7.547 CONST 7.547
BRIDGE (LOCATIONS TO BE DETERMINED) ON VARIOUS STATE
<Exempt> HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK
COUNTIES.

AQC:A10 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 9.524 0.000 0.468 9.056 0.000 0.000 0.000 0.000

NYSDOT RESPOND TO EMERGENCIES AND REPAIRS ON AN AS SDF 11/2021 0.540 DETLDES 0.540
NEEDED BASIS WHERE AN IMMEDIATE RESPONSE IS SDF 11/2022 1.545 CONINSP 1.545
0T2059 REQUIRED TO ENSURE THE SAFETY OF THE PUBLIC SDF 11/2022 7.727 CONST 7.727
BRIDGE (LOCATIONS TO BE DETERMINED) ON VARIOUS STATE
<Exempt> HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK
COUNTIES.

AQC:A2Z MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 9.812 0.000 0.000 0.000 0.540 9.272 0.000 0.000

NYSDOT RESPOND TO EMERGENCIES AND REPAIRS ON AN AS SDF 07/2024 0.560 DETLDES 0.560
NEEDED BASIS WHERE AN IMMEDIATE RESPONSE IS
0T2060 REQUIRED TO ENSURE THE SAFETY OF THE PUBLIC
BRIDGE (LOCATIONS TO BE DETERMINED) ON VARIOUS STATE
<Exempt> HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK
COUNTIES.

AQC:A12Z MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 0.560 0.000 0.000 0.000 0.000 0.000 0.560 0.000

188
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 23 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT ROUT AND SEAL CRACKED PAVEMENT ALONG NY 25A SDF 07/2021 0.179 DETLDES 0.179
BETWEEN MAIN STREET AND NICOLLS ROAD, ON ISLIP NHPP 05/2022 0.129 CONINSP 0.129
0T2086 AVENUE (NY 111) BETWEEN VETERANS MEMORIAL SDF 05/2022 0.032 CONINSP 0.032
R&P HIGHWAY (NY 454) AND JUGHANDLE, MONTAUK STBG FLEX 05/2022 0.129 CONINSP 0.129
<Exempt> HIGHWAY (NY 27A) BETWEEN NORTH OCEAN AVENUE SDF 05/2022 0.032 CONINSP 0.032
AND ISLIP AVENUE, LONG ISLAND EXPRESSWAY SOUTH
NHPP 05/2022 1.295 CONST 1.295
SERVICE ROAD (906A) BETWEEN UPPER HALF HOLLOW
ROAD AND BAGATELLE ROAD, NORTHERN STATE SDF 05/2022 0.324 CONST 0.324
PARKWAY (908G) BETWEEN THE QUEENS/NASSAU STBG FLEX 05/2022 1.294 CONST 1.294
COUNTY LINE AND MEADOWBROOK STATE PARKWAY SDF 05/2022 0.323 CONST 0.323
(908E), LONG ISLAND EXPRESSWAY NORTH SERVICE
ROAD (906B) BETWEEN DEER PARK AVENUE (NY 231)
AND PINELAWN ROAD, AND VETERANS MEMORIAL
HIGHWAY (NY 454) BETWEEN LONG ISLAND
EXPRESSWAY NORTH SERVICE ROAD (906B) AND
SYCAMORE LANE IN THE TOWNS OF BROOKHAVEN,
HUNTINGTON, ISLIP, NORTH HEMPSTEAD, SMITHTOWN
IN NASSAU AND SUFFOLK COUNTIES TO MAINTAIN
STATE OF GOOD REPAIR.

AQC:A10 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.737 0.000 0.000 0.179 3.558 0.000 0.000 0.000

NYSDOT ROUT & SEAL ASPHALT PAVEMENT CRACKS ON NY25 SDF 03/2022 0.540 DETLDES 0.540
FROM MOUNT SINAI CORAM RD TO WADING RIVER STBG LG URB 02/2023 0.615 CONINSP 0.615
0T2087 MANOR RD, NY25B FROM QUEENS LINE TO LIRR EAST SDF 02/2023 0.154 CONINSP 0.154
R&P WILLISTON AND ON NY107 FROM MERRICK RD TO STBG LG URB 02/2023 3.200 CONST 3.200
<Exempt> MARVIN AVENUE IN THE TOWNS OF BROOKHAVEN, SDF 02/2023 0.800 CONST 0.800
HEMPSTEAD, NORTH HEMPSTEAD, OYSTER BAY,
RIVERHEAD IN NASSAU &SUFFOLK COUNTIES.

AQC:A10 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.309 0.000 0.000 0.000 0.540 4.769 0.000 0.000

NYSDOT ROUT & SEAL ASPHALT PAVEMENT CRACKS ON NY110 SDF 04/2023 0.515 DETLDES 0.515
FROM HENRY STREET TO LOWNDES AVE, ON NY454 STBG FLEX 02/2024 0.575 CONINSP 0.575
0T2088 FROM 13TH AVE TO NY27, ON NY25 FROM WADING SDF 02/2024 0.144 CONINSP 0.144
R&P RIVER MANOR RD TO NY25A, ON NY114 FROM NY27 TO STBG FLEX 02/2024 2.400 CONST 2.400
<Exempt> STEPHEN HANDS PATH AND ON NY106 FROM NY25A TO SDF 02/2024 0.600 CONST 0.600
NORTH TERMINUS TO MAINTAIN A STATE OF GOOD
REPAIR IN THE TOWNS OF OYSTER BAY, ISLIP,
RIVERHEAD & E HAMPTON, NASSAU AND SUFFOLK
COUNTIES.

AQC:A10 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.234 0.000 0.000 0.000 0.000 0.515 3.719 0.000

189
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 24 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT ROUT & SEAL ASPHALT PAVEMENT CRACKS SDF 04/2024 0.185 DETLDES 0.185
(LOCATIONS TO-BE-DETERMINED)
0T2089
R&P
<Exempt>
AQC:A10Z MULTI TPC: $2-$4 M TOTAL 5YR COST : 0.185 0.000 0.000 0.000 0.000 0.000 0.185 0.000

NYSDOT ROUT & SEAL CRACKS & JOINT OVERLAY REPAIR NY24 SDF 06/2020 0.468 DETLDES 0.468
FROM QUEENS/NASSAU LINE TO MUNSON AV, NY105 NHPP 02/2021 0.549 CONINSP 0.549
0T2096 FROM NY106 TO WANTAGH AV, NY101 FROM NY25A TO SDF 02/2021 0.137 CONINSP 0.137
R&P HARBOR RD AND NY25 FROM DEER PARK RD TO KINGS NHPP 02/2021 2.749 CONST 2.749
<Exempt> PARK RD IN THE TOWNS OF HEMPSTEAD, HUNTINGTON, SDF 02/2021 0.687 CONST 0.687
NORTH HEMPSTEAD, AND SMITHTOWN IN NASSAU &
SUFFOLK COUNTIES.

AQC:A10 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.590 0.000 0.468 4.122 0.000 0.000 0.000 0.000

NYSDOT INSTALLATION OF UPGRADED OR REPLACEMENT OF SDF 11/2019 0.555 DETLDES 0.555


DAMAGED PAVEMENT MARKINGS & PLOWABLE NHPP 10/2020 0.842 CONINSP 0.842
0T2102 REFLECTIVE MARKERS ON VARIOUS FEDERAL AID SDF 10/2020 0.211 CONINSP 0.211
SAFETY ELIGIBLE STATE HIGHWAYS & PARKWAYS TO ADDRESS STBG LG URB 10/2020 0.439 CONINSP 0.439
<Exempt> SAFETY CONCERNS IN NASSAU & SUFFOLK COUNTIES SDF 10/2020 0.110 CONINSP 0.110
NHPP 10/2020 4.200 CONST 4.200
SDF 10/2020 1.050 CONST 1.050
STBG LG URB 10/2020 2.200 CONST 2.200
SDF 10/2020 0.550 CONST 0.550
AQC:A10 MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 10.157 0.000 0.555 9.602 0.000 0.000 0.000 0.000

NYSDOT INSTALLATION OF UPGRADED OR REPLACEMENT OF SDF 05/2020 0.565 DETLDES 0.565


DAMAGED PAVEMENT MARKINGS & PLOWABLE NHPP 10/2021 0.611 CONINSP 0.611
0T2103 REFLECTIVE MARKERS TO ADDRESS SAFETY SDF 10/2021 0.153 CONINSP 0.153
SAFETY CONCERNS ON VARIOUS FEDERAL AID ELIGIBLE STATE STBG LG URB 10/2021 0.408 CONINSP 0.408
<Exempt> HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK SDF 10/2021 0.102 CONINSP 0.102
COUNTIES
NHPP 10/2021 4.080 CONST 4.080
SDF 10/2021 1.020 CONST 1.020
STBG LG URB 10/2021 2.719 CONST 2.719
SDF 10/2021 0.680 CONST 0.680
AQC:A11 MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 10.338 0.000 0.565 0.000 9.773 0.000 0.000 0.000

190
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 25 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT INSTALLATION OF UPGRADED OR REPLACEMENT OF SDF 12/2021 0.576 DETLDES 0.576


DAMAGED PAVEMENT MARKINGS & PLOWABLE NHPP 10/2022 0.356 CONINSP 0.356
0T2104 REFLECTIVE MARKERS ON VARIOUS FEDERAL AID SDF 10/2022 0.089 CONINSP 0.089
SAFETY ELIGIBLE STATE HIGHWAYS & PARKWAYS TO ADDRESS STBG LG URB 10/2022 0.284 CONINSP 0.284
<Exempt> SAFETY CONCERNS IN NASSAU & SUFFOLK COUNTIES SDF 10/2022 0.071 CONINSP 0.071
NHPP 10/2022 3.563 CONST 3.563
SDF 10/2022 0.891 CONST 0.891
STBG LG URB 10/2022 2.840 CONST 2.840
SDF 10/2022 0.710 CONST 0.710
AQC:A11 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 9.380 0.000 0.000 0.000 0.576 8.804 0.000 0.000

NYSDOT REPLACE OR UPGRADE SIGNALS AND/OR SDF 04/2021 0.140 DETLDES 0.140
APPURTENANCES & INSTALL NEW SIGNALS, REPAIR OR STBG FLEX 04/2022 0.299 CONINSP 0.299
0T2109 REPLACE LIGHTING SYSTEMS AND APPURTENANCES SDF 04/2022 0.075 CONINSP 0.075
SAFETY ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS STBG FLEX 04/2022 2.989 CONST 2.989
<Exempt> IN NASSAU & SUFFOLK COUNTIES SDF 04/2022 1.447 CONST 1.447

AQC:D2 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 4.950 0.000 0.000 0.140 4.810 0.000 0.000 0.000

NYSDOT REPLACE OR UPGRADE SIGNALS AND/OR SDF 04/2020 0.140 DETLDES 0.140
APPURTENANCES & INSTALL NEW SIGNALS, REPAIR OR STBG LG URB 04/2021 0.395 CONINSP 0.395
0T2112 REPLACE LIGHTING SYSTEMS AND APPURTENANCES SDF 04/2021 0.099 CONINSP 0.099
SAFETY ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS STBG LG URB 04/2021 2.641 CONST 2.641
<Exempt> IN NASSAU & SUFFOLK COUNTIES SDF 04/2021 0.660 CONST 0.660

AQC:D2 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.935 0.000 0.140 3.795 0.000 0.000 0.000 0.000

NYSDOT BRIDGE PAINTING, CLEANING, RUST REMOVAL & SDF 08/2021 0.283 DETLDES 0.283
DISPOSAL (LOCATIONS TO-BE-DETERMINED) ON NHPP 10/2022 0.568 CONINSP 0.568
0T2133 VARIOUS FEDERAL-AID STATE HIGHWAYS & PARKWAYS SDF 10/2022 0.142 CONINSP 0.142
BRIDGE IN NASSAU & SUFFOLK COUNTIES. NHPP 10/2022 5.683 CONST 5.683
<Exempt>
SDF 10/2022 1.421 CONST 1.421
AQC:A19 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 8.097 0.000 0.000 0.283 0.000 7.814 0.000 0.000

NYSDOT REMOVAL OR PAINT OVER OF GRAFITTI, REPAIR NOISE SDF 07/2021 0.197 DETLDES 0.197
WALLS, TREE TRIMMING, MAINTAIN THE 7 PARK & RIDE
0T2136 LOTS ALONG I495, ALL NYS BIKEWAYS, REST AREAS,
MISC PUBLIC TELEPHONE AREAS ALONG PARKWAYS & BUS
<Exempt> SHELTERS ON NYS RIGHT-OF-WAY NASSAU AND
SUFFOLK COUNTIES

AQC:C11 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.197 0.000 0.000 0.197 0.000 0.000 0.000 0.000

191
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 26 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT REMOVAL OR PAINT OVER OF GRAFITTI, REPAIR NOISE SDF 09/2024 0.200 DETLDES 0.200
WALLS, TREE TRIMMING, MAINTAIN THE 7 PARK & RIDE
0T2137 LOTS ALONG I495, ALL NYS BIKEWAYS, REST AREAS,
MISC PUBLIC TELEPHONE AREAS ALONG PARKWAYS & BUS
<Exempt> SHELTERS ON NYS RIGHT-OF-WAY NASSAU AND
SUFFOLK COUNTIES

AQC:A6Z MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.200 0.000 0.000 0.000 0.000 0.000 0.200 0.000

NYSDOT SIGN REPAIRS & INSTALLATIONS ON VARIOUS STATE NHPP 06/2021 0.423 CONINSP 0.423
HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK SDF 06/2021 0.106 CONINSP 0.106
0T2139 COUNTIES TO ADDRESS SAFETY CONCERNS OF STBG FLEX 06/2021 0.133 CONINSP 0.133
SAFETY MOTORIST. SDF 06/2021 0.036 CONINSP 0.036
<Exempt>
NHPP 06/2021 2.119 CONST 2.119
SDF 06/2021 0.530 CONST 0.530
STBG FLEX 06/2021 0.672 CONST 0.672
SDF 06/2021 0.168 CONST 0.168
AQC:C13 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.187 0.000 0.000 4.187 0.000 0.000 0.000 0.000

NYSDOT SIGN REPAIRS & INSTALLATIONS ON VARIOUS SDF 07/2022 0.125 DETLDES 0.125
FEDERAL-AID ELIGIBLESTATE HIGHWAYS & PARKWAYS STBG FLEX 06/2023 0.568 CONINSP 0.568
0T2140 TO ADDRESS SAFETY AND OPERATIONAL CONCERNS IN SDF 06/2023 0.142 CONINSP 0.142
SAFETY NASSAU & SUFFOLK COUNTIES STBG FLEX 06/2023 2.841 CONST 2.841
<Exempt>
SDF 06/2023 0.710 CONST 0.710
AQC:C13 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.386 0.000 0.000 0.000 0.125 4.261 0.000 0.000

NYSDOT SIGN REPAIRS & INSTALLATIONS ON VARIOUS STATE SDF 08/2024 0.125 DETLDES 0.125
HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK
0T2141 COUNTIES
SAFETY
<Exempt>
AQC:A7Z MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.125 0.000 0.000 0.000 0.000 0.000 0.125 0.000

NYSDOT BRIDGE CLEANING (LOCATIONS TO-BE-DETERMINED) SDF 07/2020 0.050 DETLDES 0.050
ON VARIOUS FEDERAL-AID ELIGIBLE STATE HIGHWAYS NHPP 09/2021 0.600 CONINSP 0.600
0T2166 & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. SDF 09/2021 0.151 CONINSP 0.151
BRIDGE
NHPP 09/2021 4.000 CONST 4.000
<Exempt>
SDF 09/2021 1.000 CONST 1.000
AQC:A19 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.801 0.000 0.050 5.751 0.000 0.000 0.000 0.000

NYSDOT PROVIDE BRIDGE REPAIRS ON AN AS-NEEDED OR SDF 10/2019 0.108 DETLDES 0.108
EMERGENCY BASIS ON VARIOUS STATE HIGHWAYS & SDF 11/2020 0.300 CONINSP 0.300
0T2172 PARKWAYS IN NASSAU & SUFFOLK COUNTIES TO BRING SDF 11/2020 2.500 CONST 2.500
BRIDGE COMPONENT DEFICIENCIES TO A STATE OF GOOD
<Exempt> REPAIR
AQC:A19P MULTI TPC: $2-$4 M TOTAL 5YR COST : 2.908 0.000 0.108 2.800 0.000 0.000 0.000 0.000

192
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 27 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT Milling, concrete & asphalt pavement repairs, single course SDF 09/2023 1.400 DETLDES 1.400
overlay on SSP from Grand Av/Baldwin Rd to Nassau/Suffolk NHPP 10/2024 0.000 CONINSP 0.852
0T2203 line, and 908M from Nassau/Suffolk line to Straight Path, Towns STBG LG URB 10/2024 0.000 CONINSP 1.710
R&P of Oyster Bay, Hempstead & Babylon in Nassau & Suffolk NHPP 10/2024 0.000 CONST 5.700
<Exempt> Counties. STBG LG URB 10/2024 0.000 CONST 11.400
AQC:A10Z MULTI TPC: $21-$31 M TOTAL 5YR COST : 1.400 0.000 0.000 0.000 0.000 1.400 0.000 19.662

NYSDOT SAFETY IMPROVEMENTS ON VARIOUS STATE HIGHWAYS SDF 03/2022 0.560 DETLDES 0.560
in Nassau and Suffolk counties(LOCATIONS AND SCOPE TO HSIP 10/2024 0.000 CONINSP 1.170
0T2224 BE DETERMINED) SDF 10/2024 0.000 CONINSP 0.130
R&P
HSIP 10/2024 0.000 CONST 5.850
<Exempt>
SDF 10/2024 0.000 CONST 0.650
AQC:A6Z MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 0.560 0.000 0.000 0.000 0.560 0.000 0.000 7.800

NYSDOT CONCRETE PAVEMENT REPAIR INCLUDING JOINT SDF 09/2024 0.550 DETLDES 0.550
SEALING, DIAMOND GRINDING ET AL(LOCATIONS
0T2560 TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS &
R&P PARKWAYS IN NASSAU & SUFFOLK COUNTIES.
<Exempt>

AQC:A10Z MULTI TPC: $6-$9.4 M TOTAL 5YR COST : 0.550 0.000 0.000 0.000 0.000 0.000 0.550 0.000

NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS SDF 04/2024 0.570 DETLDES 0.570
(LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE
0T2572 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK
SAFETY COUNTIES.
<Exempt>
AQC:A6Z MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.570 0.000 0.000 0.000 0.000 0.000 0.570 0.000

NYSDOT CLEAN BASINS FILLED W/DEBRIS, REPAIR, REPLACE OR SDF 04/2024 0.570 DETLDES 0.570
PROVIDE MISSING COLLARS, REPAIR BASIN WALLS,
0T2574 CLEAN CLOGGED PIPES, REPAIR OR REPLACE BROKEN
R&P PIPES, REPLACE GRATES, REPLACE BASINS, CONNECT
<Exempt> ISOLATED BASINS TO DRAINAGE SYSTEM IN NASSAU
& SUFFOLK COUNTY

AQC:A10Z MULTI TPC: $6-$9.4 M TOTAL 5YR COST : 0.570 0.000 0.000 0.000 0.000 0.000 0.570 0.000

NYSDOT Milling, concrete & asphalt pavement repairs, single course SDF 04/2024 0.570 DETLDES 0.570
overlay (locations to-be-determined) on various state highways in
0T2587 Nassau and Suffolk counties.
R&P
<Exempt>
AQC:A10Z MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 0.570 0.000 0.000 0.000 0.000 0.000 0.570 0.000

193
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 28 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT ASPHALT PAVEMENT REPAIRS AND SINGLE COURSE SDF 06/2021 0.520 DETLDES 0.520
OVERLAY ON NY25A FROM QUEEN/NASSAU LINE TO NHPP 07/2022 1.441 CONINSP 1.441
0T2596 OLD NORTHERN BLVD, FROM FOREST DR TO GLEN SDF 07/2022 0.360 CONINSP 0.360
R&P COVE RD, FROM ANNANDALE DR TO NASSAU/SUFFOLK NHPP 07/2022 9.600 CONST 9.600
<Exempt> LINE, AND FROM NASSAU/SUFFOLK LINE TO NY108, TO SDF 07/2022 2.400 CONST 2.400
PAVEMENT TO A STATE OF GOOD REPAIR IN THE TOWNS
OF OYSTER BAY, NORTH HEMPSTEAD, AND
HUNTINGTON IN NASSAU & SUFFOLK COUNTIES.

AQC:A10 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 14.321 0.000 0.000 0.520 13.801 0.000 0.000 0.000

NYSDOT THIS PROPOSED PROJECT WILL APPLY A PREVENTATIVE SDF 07/2021 0.265 DETLDES 0.265
MAINTENANCE TREATMENT TO SEAL CRACKS IN THE NHPP 07/2022 0.600 CONINSP 0.600
0T2598 PAVEMENT TO BRING THE HIGHWAY SYSTEM TO A SDF 07/2022 0.150 CONINSP 0.150
R&P STATE OF GOOD REPAIR ON NORTH COUNTRY ROAD NHPP 07/2022 4.000 CONST 4.000
<Exempt> (NY25A) FROM ROUTE 25A BYPASS TO DEFENSE HILL SDF 07/2022 1.000 CONST 1.000
ROAD, EAST MAIN STREET (NY25A) FROM INDIAN HEAD
ROAD TO LAWRENCE ROAD, MONTAUK HIGHWAY
(NY27A) FROM 5TH AVENUE (CR13) TO NORTH OCEAN
AVENUE, SEAFORD OYSTER BAY EXPRESSWAY (NY135)
FROM SOUTH OF HEMPSTEAD TURNPIKE (NY24) TO
JERICHO TURNPIKE (NY25), AND MEADOWBROOK STATE
PARKWAY (908E) FROM OCEAN PARKWAY (909D) TO
MERRICK ROAD, IN THE TOWNS OF OYSTER BAY,
SMITHTOWN, ISLIP AND BROOKHAVEN IN NASSAU AND
SUFFOLK COUNTIES.

AQC:A10 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 6.015 0.000 0.000 0.265 5.750 0.000 0.000 0.000

194
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 NSTCC Multi-County Listing Page 29 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT REPLACE RUSTIC GUIDERAIL SECTION ON WSP FROM NHPP 02/2022 1.336 DETLDES 1.336
OP TO SSP & OLD COUNTRY RD TO NSP. REPLACE SDF 02/2022 0.334 DETLDES 0.334
0T2601 EXISTING RUSTIC GUIDERAIL WITH NEW GUIDERAIL NHPP 04/2023 1.261 CONINSP 1.261
SAFETY THAT MEETS CURRENT ENGINEERING STANDARDS. IN SDF 04/2023 0.315 CONINSP 0.315
<Exempt> ADDITION, NEW SECTIONS OF GUIDERAIL WILL BE NHPP 04/2023 8.401 CONST 8.401
ADDED, IF WARRANTED, TO ENSURE THE SAFETY OF
SDF 04/2023 2.100 CONST 2.100
THE TRAVELING PUBLIC ON WANTAGH STATE PARKWAY
(908T) FROM OCEAN PARKWAY (909D) TO SOUTHERN
STATE PARKWAY (908M) AND OLD COUNTRY ROAD TO
NORTHERN STATE PARKWAY (908G), LOOP PARKWAY
(908C) FROM LIDO BOULEVARD TO MEADOWBROOK
STATE PARKWAY (908E), NY25A FROM THE
NASSAU/SUFFOLK COUNTY LINE TO TERRACE PLACE,
NY25A FROM SUMMERSET DRIVE TO NY25, AND NY27A
FROM UNION BOULEVARD TO CR 85 IN THE TOWNS OF
HEMPSTEAD, HUNTINGTON, ISLIP, NORTH HEMPSTEAD,
AND SMITHTOWN IN NASSAU AND SUFFOLK COUNTIES.

AQC:A9 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 13.747 0.000 0.000 0.000 1.670 12.077 0.000 0.000

195
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 MTA - Long Island Rail Road Listing Page 1 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LIRR PORT WASHINGTON STATION FTA 5307 01/2019 0.000 MISC 6.400
IMPROVEMENTS - REPLACEMENT OF THE EXISTING MTA 01/2019 0.000 MISC 1.600
L702/04/UP STATION PEDESTRIAN OVERPASS AND PLATFORM
02-STATIONS CANOPIES, ALONG WITH OTHER ASSOCIATED STATION
<Exempt> IMPROVEMENTS.
AQC:B8 NASSAU TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 8.000 0.000 0.000 0.000 0.000 0.000 0.000

LIRR PROVIDES MENTOR ALLOWANCE FOR CONSTRUCTION FTA 5337 02/2019 0.000 MISC 4.500
CONTRACTS FOR STATIONS PROJECTS THROUGH MTA 02/2019 0.000 MISC 1.125
L702/04/UU MTA\\\'S BUSINESS DEVELOPMENT PROGRAM IN
02-STATIONS SUPPORT OF VARIOUS STATION PROJECTS TO SUSTAIN
<Exempt> CONTINUED OPERATIONS OF SERVICE

AQC:B8 SYSTEM-WIDE TPC: $32-$50 M TOTAL 5YR COST : 0.000 5.625 0.000 0.000 0.000 0.000 0.000 0.000

LIRR NEW FARE PAYMENT SYSTEM PURPOSE IS TO PROGRESS MTA 01/2019 0.000 MISC 5.000
DEPLOYMENT OF A NEXT-GENERATION FARE PAYMENT
L702/04/UV SYSTEM, WHICH AIMS TO INCORPORATE NEW
02-STATIONS TECHNOLOGY AND IMPROVE INTEROPERABILITY WITH
<Exempt> OTHER TRANSIT PROVIDERS.

AQC:B5 SYSTEM-WIDE TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 5.000 0.000 0.000 0.000 0.000 0.000 0.000

LIRR ENVIRONMENTAL REVIEW AND PRELIMINARY DESIGN MTA 08/2019 0.000 PRELDES 1.000
TO SUPPORT A FUTURE ELMHURST STATION ON THE
L702/04/UY PORT WASHINGTON BRANCH, TO REPLACE THE
02-STATIONS FORMER STATION WHICH WAS CLOSED IN 1985. STATION
<Non-Exempt> WOULD INCLUDES NEW PLATFORMS, STAIRCASES,
LIGHTING, RAILINGS, PLATFORM SHELTERS, TICKET
MACHINES & NEW ELEVATORS.

AQC:NON QUEENS TPC: $26-$40 M TOTAL 5YR COST : 0.000 1.000 0.000 0.000 0.000 0.000 0.000 0.000

LIRR NEW REPUBLIC STATION - UNDERTAKE MTA 01/2019 0.000 MISC 5.000
ENVIRONMENTAL REVIEW & PRELIMINARY DESIGN FOR
L702/04/UZ THE FUTURE CONSTRUCTION OF A REPUBLIC STATION
02-STATIONS ON THE MAIN LINE BETWEEN FARMINGDALE AND
<Exempt> PINELAWN STATIONS TO PROVIDE ACCESS TO ROUTE
110 CORRIDOR.

AQC:C7 SUFFOLK TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 5.000 0.000 0.000 0.000 0.000 0.000 0.000

196
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 MTA - Long Island Rail Road Listing Page 2 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LIRR PENN STATION ELEVATOR/ESCALATOR FTA 5307 01/2019 0.000 MISC 6.000
REPLACEMENT-PROJECT WILL RENEW/REHABILITATE MTA 01/2019 0.000 MISC 1.000
L702/06/VP LIRR OWNED ESCALATORS AND ELEVATORS IN PENN FTA 5337 01/2019 0.000 MISC 6.000
02-STATIONS STATION TO IMPROVE RELIABILITY AND INCORPORATE
<Exempt> THE LATEST SAFETY FEATURES

AQC:B8 NEW YORK TPC: $9.5-15.5 M TOTAL 5YR COST : 0.000 13.000 0.000 0.000 0.000 0.000 0.000 0.000

LIRR 2019 ANNUAL TRACK PROGRAM PROVIDES FOR THE FTA 5307 01/2019 0.000 CONST 28.000
LIFE CYCLE REPLACEMENT OF TRACK COMPONENTS IN FTA 5337 05/2019 0.000 CONST 74.100
L703/01/WE SELECTED SEGMENTS OF THE RIGHT OF WAY TO MTA 05/2019 0.000 CONST 16.025
03-TRACK EXTEND SERVICE LIFE, SYSTEMWIDE
<Exempt>

AQC:B9 SYSTEM-WIDE TPC: $100-$225 M TOTAL 5YR COST : 0.000 118.125 0.000 0.000 0.000 0.000 0.000 0.000

LIRR RIGHT OF WAY FENCING PROJECT WILL INSTALL HIGH FTA 5307 01/2019 0.000 MISC 1.000
SECURITY FENCING ALONG THE RIGHT OF WAY TO MTA 01/2019 0.000 MISC 0.500
L703/01/WF ENHANCE SAFETY AND SECURITY AND PREVENT
03-TRACK UNAUTHORIZED ENTRY INTO THE RIGHT OF WAY TO
<Exempt> EXTEND SERVICE LIFE,SYSTEMWIDE
AQC:B9 SYSTEM-WIDE TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 1.500 0.000 0.000 0.000 0.000 0.000 0.000

LIRR JAMAICA CAPACITY IMPROVEMENTS (PH 2) WILL FTA 5307 01/2019 0.000 MISC 20.000
MODERNIZE INFRASTRUCTURE & REDUCE MTA 01/2019 0.000 MISC 10.000
L703/04/WU CONFLICTING ROUTES/CROSSOVERS TO ALLOW FASTER
03-TRACK TRAIN OPERATION VIA HIGHER SPEED SWITCHES. ALSO
<Non-Exempt> ADDRESS STATE OF GOOD REPAIR FOR THE SIGNAL
SYSTEM & OTHER INFRASTRUCTURE COMPONENTS.

AQC:NON QUEENS TPC: $26-$40 M TOTAL 5YR COST : 0.000 30.000 0.000 0.000 0.000 0.000 0.000 0.000

LIRR MAIN LINE DOUBLE TRACK PHASE 2 - BUILD A FULL FTA 5307 01/2019 0.000 MISC 55.000
DOUBLE TRACK BETWEEN FARMINGDALE AND FTA 5337 01/2019 0.000 MISC 60.000
L703/04/WX RONKONKOMA. THIS PHASE CONSTRUCTS THE MTA 01/2019 0.000 MISC 10.000
03-TRACK CENTRAL ISLIP TO FARMINGDALE PORTION, INCLUDING
<Non-Exempt> STATION IMPROVEMENTS TO WYANDANCH AND
PINELAWN STATIONS.

AQC:NON SUFFOLK TPC: $100-$225 M TOTAL 5YR COST : 0.000 125.000 0.000 0.000 0.000 0.000 0.000 0.000

197
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 MTA - Long Island Rail Road Listing Page 3 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LIRR BRIDGE PAINTING / WATERPROOFING OF VARIOUS FTA 5307 01/2019 0.000 MISC 3.000
BRIDGES AND VIADUCTS TO REDUCE MAINTENANCE & FTA 5337 01/2019 0.000 MISC 2.000
L704/01/BS PROLONG LIFE OF A STRUCTURE AS A PART OF THE MTA 01/2019 0.000 MISC 0.200
04-LINE OVERALL EFFORT TO IMPROVE CONDITION OF BRIDGES
<Exempt> AND VIADUCTS & BRING THEM TO A STATE OF GOOD
REPAIR AT VARIOUS LOCATIONS.

AQC:B9 SYSTEM-WIDE TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 5.200 0.000 0.000 0.000 0.000 0.000 0.000

LIRR MENTOR ALLOWANCE - LINE STRUCTURES PROJECT FTA 5307 01/2019 0.000 MISC 2.400
PROVIDES FOR CONSTRUCTION CONTRACTS FOR LINE FTA 5337 01/2019 0.000 MISC 2.400
L704/01/BU STRUCTURES PROJECTS THROUGH THE MTA\\\'S MTA 01/2019 0.000 MISC 1.200
04-LINE BUSINESS DEVELOPMENT PROGRAM TO SUSTAIN
<Exempt> CONTINUED OPERATIONS OF SERVICE.
AQC:B9 SYSTEM-WIDE TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 6.000 0.000 0.000 0.000 0.000 0.000 0.000

LIRR REPLACE DETERIORATED COMMUNICATION POLES AT FTA 5307 01/2019 0.000 MISC 1.000
VARIOUS LOCATIONS ALONG ROW & INCLUDE FTA 5337 01/2019 0.000 MISC 1.000
L705/01/SE REMOVAL OF DEAD CABLE, ALONG WITH MTA 01/2019 0.000 MISC 0.900
05-COMM&SIG REPLACEMENT OF ANCHORS, INSULATORS, BRACKETS,
<Exempt> GROUND RODS/CLAMPS, U-GUARDS, HAND HOLES,
C-CASES, POLE MOUNTED CABLE BOXES & OTHER
HARDWARE.

AQC:B6 SYSTEM-WIDE TPC: $2-$4 M TOTAL 5YR COST : 0.000 2.900 0.000 0.000 0.000 0.000 0.000 0.000

LIRR PHASE I-BABYLON INTERLOCKING RENEWAL AND FTA 5307 04/2019 0.000 MISC 31.860
UPGRADE TO ALL SIGNAL COMPONENTS IN BABYLON MTA 04/2019 0.000 MISC 7.965
L705/02/LH INTERLOCKING, WHICH HAVE REACHED AND/OR FTA 5337 01/2019 0.000 MISC 10.000
05-COMM&SIG EXCEEDED THEIR USEFUL LIVES TO EXTEND SERVICE MTA 01/2019 0.000 MISC 1.000
<Exempt> LIFE
AQC:B6 SUFFOLK TPC: $50-$85 M TOTAL 5YR COST : 0.000 50.825 0.000 0.000 0.000 0.000 0.000 0.000

LIRR SIGNAL REPLACEMENT PROGRAM REPLACES FTA 5307 01/2019 0.000 MISC 10.000
COMPONENTS THAT HAVE REACHED USEFUL LIFE MTA 01/2019 0.000 MISC 2.500
L705/02/LJ INCLUDES: SIGNALS, SWITCH MACHINES, CABLE, FTA 5337 01/2019 0.000 MISC 10.000
05-COMM&SIG IMPEDENCE BONDS, INTERLOCKINGS, WAYSIDE & MTA 01/2019 0.000 MISC 2.500
<Exempt> CROSSING CASE EQUIPMENT, RELAYS, ELECTRONIC
EQUIP, SUPERVISORY/CONTROL SYSTEMS
SYSTEMWIDE.

AQC:B6 SYSTEM-WIDE TPC: $21-$31 M TOTAL 5YR COST : 0.000 25.000 0.000 0.000 0.000 0.000 0.000 0.000

198
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 MTA - Long Island Rail Road Listing Page 4 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LIRR RONKONKOMA TO YAPHANK SIGNALIZATION -DESIGN A FTA 5337 01/2019 0.000 DETLDES 1.500
NEW SIGNAL SYSTEM & EQUIPMENT, INCLUDING MTA 01/2019 0.000 DETLDES 0.500
L705/02/LL SIGNALS, CABLE, BATTERIES, CROSSING GATES,
05-COMM&SIG WAYSIDE DC TRACK CIRCUITS AND TWO-DIRECTION
<Exempt> 100HZ CAB SIGNALS.& CROSSING CASE EQUIPMENT TO
ADDRESS AN UNSIGNALIZED AREA.

AQC:B6 SUFFOLK TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 2.000 0.000 0.000 0.000 0.000 0.000 0.000

LIRR CENTRALIZED TRAIN CONTROL - PROGRESS MTA 01/2019 0.000 MISC 10.000
MIGRATION FROM THE CURRENT SYSTEM OF
L705/02/LQ TERRITORY-BASED CONTROL TOWERS TO A
05-COMM&SIG CENTRALIZED SYSTEM WHERE TRAIN DISPATCHING
<Exempt> AND TRAIN SUPERVISION IS DONE FROM A SINGLE
LOCATION IN JAMAICA, QUEENS

AQC:B6 SYSTEM-WIDE TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 10.000 0.000 0.000 0.000 0.000 0.000 0.000

LIRR RIVER TO RIVER RESILIENCY - WEST SIDE YARD & EAST FTA 5324 CR 05/2019 0.000 CONST 4.400
RIVER TUNNEL (ERT) MITIGATION WILL CONSTRUCT MTA 05/2019 0.000 CONST 1.467
E-L06-03-ZP YARD PERIMETER PROTECTION & NEW PUMPING
06-SHOP&YARD SYSTEMS TO PREVENTING FLOODING. IT WILL ALSO
<Exempt> CONSTRUCT NEW PORTAL FLOOD WALLS IN QUEENS TO
PROTECT ERT INFRASTRUCTURE (D2013-RESL-027)

AQC:C15 MULTI TPC: $70-$130 M TOTAL 5YR COST : 0.000 5.867 0.000 0.000 0.000 0.000 0.000 0.000

LIRR MENTOR ALLOWANCE PROVIDES FOR CONSTRUCTION FTA 5337 04/2019 0.000 CONST 3.650
CONTRACTS FOR SHOPS & YARDS PROJECTS THROUGH MTA 04/2019 0.000 CONST 4.150
L706/04/YJ MTA\\\'S BUSINESS DEVELOPMENT PROGRAM TO
06-SHOP&YARD SUSTAIN CONTINUED OPERATIONS OF SERVICE
<Exempt>

AQC:B1 SYSTEM-WIDE TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 7.800 0.000 0.000 0.000 0.000 0.000 0.000

LIRR REHAB/REPLACE SELECTED BLDG COMPONENTS AT FTA 5307 01/2019 0.000 MISC 4.000
VARIOUS EMPLOYEE FACILITIES TO MAINTAIN A SOGR: FTA 5337 01/2019 0.000 MISC 5.000
L706/04/YW ROOFS, PARKING LOTS, SIDEWALKS, RESTROOMS, MTA 01/2019 0.000 MISC 1.000
06-SHOP&YARD DRIVEWAYS, FIRE ALARMS, DOORS, WINDOWS,
<Exempt> ELECTRICAL SYSTEMS, HVAC SYSTEMS, LIGHTING,
STRUCTURAL REPAIRS,. ALSO PROGRESS
DEVELOPMENT OF AN LIRR ENGINEERING
HEADQUARTER FACILITY.

AQC:B8 SYSTEM-WIDE TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 10.000 0.000 0.000 0.000 0.000 0.000 0.000

199
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 MTA - Long Island Rail Road Listing Page 5 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LIRR REPLACE UP TO 8 SUBSTATIONS WITH NEW FTA 5307 01/2019 0.000 MISC 10.000
PRE-INSTALLED EQPT IN MODULAR BLDGS: AC & DC MTA 01/2019 0.000 MISC 0.400
L707/01/XA SWITCHGEARS, TRANSFORMERS, RECTIFIERS, FTA 5337 01/2019 0.000 MISC 14.000
07-POWER CONTROL CABINETS; JAMAICA, MEADOWBROOK,
<Exempt> FOREST HILLS, BELLMORE, MURRAY HILL, QUEENS
BREAKER, OCEAN AVE AND WINFIELD TO IMPROVE
EFFICIENCY

AQC:B6 MULTI TPC: $21-$31 M TOTAL 5YR COST : 0.000 24.400 0.000 0.000 0.000 0.000 0.000 0.000

LIRR SUBSTATION COMPONENT RENEWALS AT VARIOUS LIRR FTA 5337 01/2019 0.000 MISC 20.000
SUBSTATIONS. WORK INCLUDES REPLACEMENT OF MTA 01/2019 0.000 MISC 3.800
L707/01/XB TRANSFORMERS, RECTIFIERS, MOTOR GENERATORS,
07-POWER REMOTE TERMINAL UNITS, BALLAST, CABLES &
<Exempt> BUILDING COMPONENTS.
AQC:B6 SYSTEM-WIDE TPC: $21-$31 M TOTAL 5YR COST : 0.000 23.800 0.000 0.000 0.000 0.000 0.000 0.000

LIRR 3RD RAIL - REPLACES/UPGRADES AGED, DETERIORATED FTA 5337 01/2019 0.000 MISC 0.800
AND INADEQUATE 2000 MCM DC FEEDER AND JUMPER MTA 01/2019 0.000 MISC 0.600
L707/01/XC CABLES SYSTEMWIDE, IN AREAS WHERE THEY ARE
07-POWER BEYOND THEIR USEFUL LIFE AND ARE UNDERSIZED TO
<Exempt> PROPERLY SUPPORT THE ELECTRIC FLEET.

AQC:B6 SYSTEM-WIDE TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 1.400 0.000 0.000 0.000 0.000 0.000 0.000

LIRR 3RD RAIL - REPLACES AND/OR UPGRADES FTA 5337 01/2019 0.000 MISC 3.130
DETERIORATED, AGED AND INADEQUATE DC FEEDER MTA 01/2019 0.000 MISC 0.782
L707/01/XD DISCONNECT SWITCHES SYSTEMWIDE. THIS PROJECT
07-POWER WILL ADDRESS CRITICAL AREAS INCLUDING
<Exempt> SUBSTATIONS, YARDS AND SECTIONALIZING
LOCATIONS.

AQC:B6 SYSTEM-WIDE TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 3.912 0.000 0.000 0.000 0.000 0.000 0.000

LIRR 3RD RAIL - REPLACE AND UPGRADE DETERIORATED, FTA 5307 01/2019 0.000 MISC 3.500
AGED AND INADEQUATE PROTECTION BOARD MTA 01/2019 0.000 MISC 0.300
L707/01/XE SYSTEMWIDE. WORK INCLUDES REPLACEMENT OF FTA 5337 01/2019 0.000 MISC 3.000
07-POWER ALL HARDWARE AND THIRD RAIL BRACKETS, IN MTA 01/2019 0.000 MISC 0.750
<Exempt> ADDITION TO INSTALLATION OF NEW PROTECTION
BOARD.

AQC:B6 SYSTEM-WIDE TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 7.550 0.000 0.000 0.000 0.000 0.000 0.000

200
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 MTA - Long Island Rail Road Listing Page 6 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LIRR 3RD RAIL - REPLACE AND UPGRADE WORN, AGED AND FTA 5307 01/2019 0.000 MISC 3.400
INADEQUATE CONDUCTOR THIRD RAIL SYSTEMWIDE MTA 01/2019 0.000 MISC 0.850
L707/01/XF BY INSTALLING NEW COMPOSITE THIRD RAIL. WORK
07-POWER INCLUDES REMOVAL/REINSTALLATION OF HARDWARE,
<Exempt> MOUNTING BRACKETS, INSULATORS, THIRD RAIL AND
PROTECTION BOARD.

AQC:B6 SYSTEM-WIDE TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 4.250 0.000 0.000 0.000 0.000 0.000 0.000

LIRR 3RD RAIL - REPLACE AND UPGRADE THIRD RAIL FTA 5337 01/2019 0.000 MISC 3.130
FEEDER CABLE IN AREAS (SYSTEMWIDE) WHERE IT IS MTA 01/2019 0.000 MISC 0.782
L707/01/XG BEYOND ITS USEFUL LIFE AND UNDERSIZED TO
07-POWER PROPERLY SUPPORT THE ELECTRIC FLEET. PROJECT
<Exempt> WILL ALSO REMOVE OLD FEEDER CABLE.
AQC:B6 SYSTEM-WIDE TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 3.912 0.000 0.000 0.000 0.000 0.000 0.000

LIRR REPLACE BATTERIES AND ASSOCIATED EQUIPMENT FTA 5337 01/2019 0.000 MISC 0.200
INSIDE LIRR SUBSTATIONS TO MAINTAIN STATE OF MTA 01/2019 0.000 MISC 0.050
L707/01/XJ GOOD REPAIR. LOCATIONS IDENTIFIED FOR THIS
07-POWER EFFORT INCLUDE THE FOLLOWING SUBSTATIONS:
<Exempt> GRAND AVENUE, CEDAR MANOR, LANDIA, FREEPORT,
WANTAGH, DOUGLASTON AND JAY BREAKER.

AQC:B6 NASSAU TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.250 0.000 0.000 0.000 0.000 0.000 0.000

LIRR REPLACE SELECTED EXISTING SIGNAL POWER MOTOR FTA 5307 01/2019 0.000 MISC 5.000
GENERATOR FREQUENCY CONVERTERS THAT ARE MTA 01/2019 0.000 MISC 1.000
L707/01/XK BEYOND THEIR USEFUL LIFE TO EXTEND SERVICE
07-POWER LIFE. THE FOLLOWING LOCATIONS HAVE BEEN
<Exempt> IDENTIFIED: LAURELTON, HALL, WOODHAVEN,
GREENLAWN, SMITHTOWN ,BABYLONAND PORT
JEFFERSON.

AQC:B6 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 6.000 0.000 0.000 0.000 0.000 0.000 0.000

LIRR REPLACEMENT OF EXISTING DC BREAKER PROTECTION FTA 5337 01/2019 0.000 MISC 0.400
AND AUTO RECLOSE AT VARIOUS SUBSTATION MTA 01/2019 0.000 MISC 0.100
L707/01/XL LOCATIONS IN HEWLETT, CEDARHURST, LAURELTON,
07-POWER AND WEST HEMPSTEAD. WORK ALSO INCLUDES
<Exempt> REPLACEMENT OF PILOT WIRES AND RELAY
REPLACEMENT TO EXTEND SERVICE LIFE

AQC:B6 SYSTEM-WIDE TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.500 0.000 0.000 0.000 0.000 0.000 0.000

201
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 MTA - Long Island Rail Road Listing Page 7 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LIRR SIGNAL POWER LINE PROJECT REPLACES EXISTING FTA 5337 01/2019 0.000 MISC 0.800
DETERIORATED 5KV POWER LINES UTILIZED BY THE MTA 01/2019 0.000 MISC 0.200
L707/01/XM SIGNAL DEPARTMENT AT VARIOUS LOCATIONS
07-POWER INCLUDING REMOVING/REPLACING ASSOCIATED LINE
<Exempt> HARDWARE (SWITCHES, TRANSFORMERS, INSULATORS,
CROSS ARMS AND CONTROL CABLES)

AQC:B6 SYSTEM-WIDE TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 1.000 0.000 0.000 0.000 0.000 0.000 0.000

LIRR REPLACEMENT OF POWER POLE LINES & HARDWARE AT FTA 5337 01/2019 0.000 MISC 0.800
VARIOUS LOCATIONS INCLUDING REMOVING EXISTING MTA 01/2019 0.000 MISC 0.200
L707/01/XN POLES AND ANCILLARY HARDWARE: NEW CLASS 2
07-POWER FIBER REINFORCED POLYMER POLES, CROSS ARMS,
<Exempt> INSULATORS, BRACKETS, GROUND CABLES &
SWITCHES TO IMPROVE OPERATIONS

AQC:B6 SYSTEM-WIDE TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 1.000 0.000 0.000 0.000 0.000 0.000 0.000

LIRR PROGRAM DEVELOPMENT PROJECT FUNDS VARIOUS MTA 01/2019 0.000 MISC 2.000
DESIGNS, STUDIES AND OTHER PRELIMINARY
L709/04/NJ PLANNING EFFORTS SYSTEMWIDE FOR FUTURE
08-MISC CAPITAL PROJECTS
<Exempt>
AQC:C5 SYSTEM-WIDE TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 2.000 0.000 0.000 0.000 0.000 0.000 0.000

LIRR INDEPENDENT ENGINEER FOR PROJECTS THROUGHOUT MTA 01/2019 0.000 MISC 2.000
THE CAPITAL PROGRAM. THE INDEPENDENT
L709/04/NL ENGINEER SERVES AS QUALITY CHECK, EXAMINING
08-MISC THE MATERIALS AND THE WORK BEING PERFORMED IN
<Exempt> THE LIRR CAPITAL PROGRAM SYSTEMWIDE TO
MAINTAIN EFFICIENCY

AQC:C5 SYSTEM-WIDE TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 2.000 0.000 0.000 0.000 0.000 0.000 0.000

LIRR PROGRAM ADMINISTRATION LIRR COSTS ASSOCIATED MTA 01/2019 0.000 MISC 24.000
WITH THE SUPPORT, ADMINISTRATION AND
L709/04/NQ MANAGEMENT OF THE 2015 - 2019 SYSTEMWIDE
08-MISC CAPITAL PROGRAM TO MAINTAIN OPERATIONS
<Exempt>

AQC:B1 SYSTEM-WIDE TPC: $21-$31 M TOTAL 5YR COST : 0.000 24.000 0.000 0.000 0.000 0.000 0.000 0.000

202
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 MTA - Long Island Rail Road Listing Page 8 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LIRR BLOCK FUND FOR LIRR PROJECTS TO BE INCLUDED IN CMAQ 01/2020 6.671 MISC 6.671
THE NEXT CAPITAL PROGRAM (2020 - 2024) MTA 01/2020 1.330 MISC 1.330
L801/01/XX FTA 5307 01/2020 97.641 MISC 97.641
08-MISC
<Exempt> MTA 01/2020 19.530 MISC 19.530
FTA 5337 01/2020 112.193 MISC 112.193
MTA 01/2020 22.440 MISC 22.440
CMAQ 01/2021 6.671 MISC 6.671
MTA 01/2021 1.330 MISC 1.330
FTA 5307 01/2021 97.641 MISC 97.641
MTA 01/2021 19.530 MISC 19.530
FTA 5337 01/2021 112.193 MISC 112.193
MTA 01/2021 22.440 MISC 22.440
CMAQ 01/2022 6.671 MISC 6.671
MTA 01/2022 1.330 MISC 1.330
FTA 5307 01/2022 97.641 MISC 97.641
MTA 01/2022 19.530 MISC 19.530
FTA 5337 01/2022 112.193 MISC 112.193
MTA 01/2022 22.440 MISC 22.440
CMAQ 01/2023 6.671 MISC 6.671
MTA 01/2023 1.330 MISC 1.330
FTA 5307 01/2023 97.641 MISC 97.641
MTA 01/2023 19.530 MISC 19.530
FTA 5337 01/2023 112.193 MISC 112.193
MTA 01/2023 22.440 MISC 22.440
CMAQ 01/2024 6.671 MISC 6.671
MTA 01/2024 1.330 MISC 1.330
FTA 5307 01/2024 97.641 MISC 97.641
MTA 01/2024 19.530 MISC 19.530
FTA 5337 01/2024 112.193 MISC 112.193
MTA 01/2024 22.440 MISC 22.440
AQC:J1Z SYSTEM-WIDE TPC:$1.2-$1.4 B TOTAL 5YR COST : 1299.025 0.000 259.805 259.805 259.805 259.805 259.805 0.000

LIRR TRANSIT TECHNICAL ASSISTANCE PROGRAM CMAQ 01/2019 0.000 MISC 0.300
(FORMERLY TRANTECH) TO GENERATE AWARENESS OF MTA 01/2019 0.000 MISC 0.075
TRANTECH TRANSIT OPTIONS PRE-TAX BENEFIT SAVINGS CMAQ 01/2020 0.300 MISC 0.300
08-MISC PROGRAMS TO LONG ISLAND EMPLOYEES/EMPLOYERS. MTA 01/2020 0.075 MISC 0.075
<Exempt> IMPROVE ENVIRONMENTAL SUSTAINABILITY CMAQ 01/2021 0.300 MISC 0.300
INCREASING TRANSIT USAGE/OPTIONS ON LONG
MTA 01/2021 0.075 MISC 0.075
ISLAND.
CMAQ 01/2022 0.300 MISC 0.300
MTA 01/2022 0.075 MISC 0.075
CMAQ 01/2023 0.300 MISC 0.300
MTA 01/2023 0.075 MISC 0.075
CMAQ 01/2024 0.300 MISC 0.300
MTA 01/2024 0.075 MISC 0.075
AQC:C1 SYSTEM-WIDE TPC: $9.5-15.5 M TOTAL 5YR COST : 1.875 0.375 0.375 0.375 0.375 0.375 0.375 0.000

203
** New York Metropolitan Transportation Council**
Friday, July 19, 2019 MTA - Long Island Rail Road Listing Page 9 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LIRR EAST SIDE ACCESS CONSTRUCTION:CONSTRUCT NEW FTA 5309 NS 01/2019 0.000 MISC 47.223
TUNNELS BTWN SUNNYSIDE YARD IN QUEENS & MTA 01/2019 0.000 MISC 838.132
G609/01/AA LOWER LEVEL OF THE EXISTING 63 ST TUNNEL UNDER MTA 01/2020 240.101 MISC 240.101
09-ESA EAST RIVER, NEW TUNNELS UNDER PARK AVE IN MHTN MTA 01/2021 89.478 MISC 89.478
<Non-Exempt> TO GRAND CENTRAL TERMINAL; ROLLING STOCK,
REAL ESTATE & PROFESSIONAL SERVICES

AQC:NON MULTI TPC:$1.1-$1.3 B TOTAL 5YR COST : 329.579 885.355 240.101 89.478 0.000 0.000 0.000 0.000

LIRR THIS PROJECT WILL ADDRESS STATION COMPONENT MTA 08/2019 0.000 MISC 7.000
REPLACEMENT AT SELECTED LIRR STATIONS (TBD),
L702/04/UA INCLUDING: REPLACEMENT OF ORNAMENTAL
MISC FENCING AND LIGHTING AT HEMPSTEAD STATION,
<Exempt> REPLACEMENT/RENEWAL OF VARIOUS COMPONENTS AT
ST. ALBANS STATION, AND FULL REPLACEMENT OF
SIGNAGE AT 9 LIRR STATIONS (LOCATIONS TO BE
IDENTIFIED). STATION EFFORTS AT OTHER LOCATIONS
WILL ALSO BE INCLUDED IN THIS PROJECT. THIS
PROJECT ALSO COVERS SUPPORT COSTS, INCLUDING
PROJECT MANAGEMENT, DESIGN, AND CONSTRUCTION
SUPPORT BY LIRR ENGINEERING FORCES, AS IT
RELATES TO THE ABOVE WORK

AQC:B8 SUFFOLK TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 7.000 0.000 0.000 0.000 0.000 0.000 0.000

204
** New York Metropolitan Transportation Council **
Friday, July 19, 2019 Nassau-Suffolk Transit Listing Page 1 of 11

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NASSAU CO. ENGINEERING/DESIGN SERVICES - TO PROVIDE FTA 5307 02/2020 0.160 MISC 0.160
TRANSIT GENERAL ENGINEERING NEEDS TO SUPPORT THE LOCAL 02/2020 0.020 MISC 0.020
082572 CAPITAL PROGRAM FOR NASSAU INTER-COUNTY STATE 02/2020 0.020 MISC 0.020
MISC EXPRESS (NICE). FTA 5307 02/2021 0.160 MISC 0.160
<Exempt>
LOCAL 02/2021 0.020 MISC 0.020
STATE 02/2021 0.020 MISC 0.020
FTA 5307 02/2023 0.160 MISC 0.160
LOCAL 02/2023 0.020 MISC 0.020
STATE 02/2023 0.020 MISC 0.020
AQC:C7 NASSAU TPC: < $0.75 M TOTAL 5YR COST : 0.600 0.000 0.200 0.200 0.000 0.200 0.000 0.000

NASSAU CO. PURCHASE NEW/REPLACEMENT SERVICE SUPPORT FTA 5307 02/2019 0.000 MISC 0.800
TRANSIT EQUIPMENT, AND VEHICLES TO REPLACE THOSE THAT LOCAL 02/2019 0.000 MISC 0.100
082582 ARE BEYOND THEIR USEFUL LIVES FOR THE NASSAU STATE 02/2019 0.000 MISC 0.100
MISC INTER-COUNTY EXPRESS (NICE) TO IMPROVE FTA 5307 02/2020 0.400 MISC 0.400
<Exempt> EFFICIENCY IN OPERATIONS LOCAL 02/2020 0.050 MISC 0.050
STATE 02/2020 0.050 MISC 0.050
FTA 5307 02/2021 0.632 MISC 0.632
LOCAL 02/2021 0.079 MISC 0.079
STATE 02/2021 0.079 MISC 0.079
FTA 5307 02/2022 0.420 MISC 0.420
LOCAL 02/2022 0.052 MISC 0.052
STATE 02/2022 0.053 MISC 0.053
FTA 5307 02/2023 0.400 MISC 0.400
LOCAL 02/2023 0.050 MISC 0.050
STATE 02/2023 0.050 MISC 0.050
FTA 5307 02/2024 0.360 MISC 0.360
LOCAL 02/2024 0.045 MISC 0.045
STATE 02/2024 0.045 MISC 0.045
AQC:B2 NASSAU TPC: $6-$9.4 M TOTAL 5YR COST : 2.765 1.000 0.500 0.790 0.525 0.500 0.450 0.000

SUFFOLK PURCHASE AND INSTALL BUS SHELTERS AT VARIOUS FTA 5307 09/2021 1.200 MISC 1.200
CO.TRANSIT LOCATIONS THROUGHOUT SUFFOLK COUNTY TO LOCAL 09/2021 0.150 MISC 0.150
082606 IMPROVE SYSTEM VISIBILITY, CUSTOMER COMFORT STATE 09/2021 0.150 MISC 0.150
MISC AND CONVENIENCE. THE SHELTERS WILL BE REPLACED FTA 5307 09/2023 1.200 MISC 1.200
<Exempt> WHERE THEY HAVE REACHED THEIR USEFUL LIFE AND LOCAL 09/2023 0.150 MISC 0.150
ADDED TO THE LOCATIONS WHERE THEY DO NOT
STATE 09/2023 0.150 MISC 0.150
EXIST.

AQC:B7 SUFFOLK TPC: $2-$4 M TOTAL 5YR COST : 3.000 0.000 0.000 1.500 0.000 1.500 0.000 0.000

205
** New York Metropolitan Transportation Council **
Friday, July 19, 2019 Nassau-Suffolk Transit Listing Page 2 of 11

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

SUFFOLK PROJECT ADMINISTRATION FOR SUFFOLK COUNTY FTA 5307 09/2020 0.200 MISC 0.200
CO.TRANSIT SECTION 5307 GRANT APPLICATIONS TO MAINTAIN LOCAL 09/2020 0.025 MISC 0.025
082630 OPERATIONS AND MEET REQUIREMENTS FOR STATE 09/2020 0.025 MISC 0.025
MISC CONTINUED OPERATION FTA 5307 09/2021 0.200 MISC 0.200
<Exempt>
LOCAL 09/2021 0.025 MISC 0.025
STATE 09/2021 0.025 MISC 0.025
FTA 5307 09/2022 0.200 MISC 0.200
LOCAL 09/2022 0.025 MISC 0.025
STATE 09/2022 0.025 MISC 0.025
FTA 5307 09/2023 0.200 MISC 0.200
LOCAL 09/2023 0.025 MISC 0.025
STATE 09/2023 0.025 MISC 0.025
FTA 5307 09/2024 0.200 MISC 0.200
LOCAL 09/2024 0.025 MISC 0.025
STATE 09/2024 0.025 MISC 0.025
AQC:B1 SUFFOLK TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.250 0.000 0.250 0.250 0.250 0.250 0.250 0.000

SUFFOLK CAPITAL COST OF CONTRACTING FOR SUFFOLK FTA 5307 09/2020 0.920 MISC 0.920
CO.TRANSIT COUNTY PARA-TRANSIT OPERATIONS TO ENABLE AND STATE 09/2020 0.115 MISC 0.115
082680 SUSTAIN CONTINUED OPERATION OF SERVICE. LOCAL 09/2020 35.937 MISC 35.937
MISC PROVIDES FINANCIAL ASSISTANCE TOWARDS CAPITAL FTA 5307 09/2021 0.920 MISC 0.920
<Exempt> CONSUMED IN COURSE OF SUFFOLK COUNTY’S STATE 09/2021 0.115 MISC 0.115
CONTRACTS WITH BUS SERVICE AND MAINTENANCE
LOCAL 09/2021 37.965 MISC 37.965
OPERATORS. 40% OF TOTAL CONTRACT COSTS ARE
ELIGIBLE FOR 80% FEDERAL SHARE AS CONTRACTOR FTA 5307 09/2022 0.920 MISC 0.920
PROVIDES MAINTENANCE AND TRANSIT SERVICE AND STATE 09/2022 0.115 MISC 0.115
COUNTY PROVIDES VEHICLES. LOCAL 09/2022 40.305 MISC 40.305
FTA 5307 09/2023 0.920 MISC 0.920
STATE 09/2023 0.115 MISC 0.115
LOCAL 09/2023 42.786 MISC 42.786
FTA 5307 09/2024 0.920 MISC 0.920
STATE 09/2024 0.115 MISC 0.115
LOCAL 09/2024 45.415 MISC 45.415
AQC:B1 SUFFOLK TPC: $175-$385 M TOTAL 5YR COST : 207.583 0.000 36.972 39.000 41.340 43.821 46.450 0.000

SUFFOLK INSTALLATION OF SURVEILLANCE CAMERAS ON FTA 5307 05/2019 0.000 MISC 0.400
CO.TRANSIT SUFFOLK COUNTY TRANSIT BUSES TO ENHANCE LOCAL 05/2019 0.000 MISC 0.050
082684 SYSTEM SECURITY. STATE 05/2019 0.000 MISC 0.050
MISC
<Exempt>
AQC:B5 SUFFOLK TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.500 0.000 0.000 0.000 0.000 0.000 0.000

206
** New York Metropolitan Transportation Council **
Friday, July 19, 2019 Nassau-Suffolk Transit Listing Page 3 of 11

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

SUFFOLK CONDUCT STUDY FOR SUFFOLK COUNTY TRANSIT FTA 5307 06/2019 0.000 MISC 0.120
CO.TRANSIT FIXED ROUTE BUS SYSTEM TO IMPROVE ON TIME LOCAL 06/2019 0.000 MISC 0.015
082685 PERFORMANCE, ENHANCED CONNECTIONS STATE 06/2019 0.000 MISC 0.015
MISC BETWEEN ROUTES AND IMPROVE EFFICIENCY IN
<Exempt> OPERATION.
AQC:B6 SUFFOLK TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.150 0.000 0.000 0.000 0.000 0.000 0.000

HART PREVENTIVE MAINTENANCE PROGRAM FOR FTA 5307 04/2019 0.000 MISC 0.100
HUNTINGTON RAPID TRANSIT - NEED TO EXTEND THE LOCAL 04/2019 0.000 MISC 0.012
082837 SERVICE LIFE OF TRANSIT ROLLING STOCK AND STATE 04/2019 0.000 MISC 0.013
MISC SUPPORT VEHICLES AND MAINTAIN THEM IN GOOD
<Exempt> REPAIR.
AQC:B1 SUFFOLK TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.125 0.000 0.000 0.000 0.000 0.000 0.000

NASSAU CO. MANAGEMENT INFORMATION SYSTEM FTA 5307 02/2021 0.020 MISC 0.020
TRANSIT UPGRADE/REPLACEMENT OF HARDWARE AND LOCAL 02/2021 0.002 MISC 0.002
082906 SOFTWARE FOR THE NASSAU INTER-COUNTY EXPRESS. STATE 02/2021 0.003 MISC 0.003
MISC
FTA 5307 02/2022 0.380 MISC 0.380
<Exempt>
LOCAL 02/2022 0.047 MISC 0.047
STATE 02/2022 0.048 MISC 0.048
FTA 5307 04/2025 0.000 MISC 0.400
LOCAL 04/2025 0.000 MISC 0.050
STATE 04/2025 0.000 MISC 0.050
AQC:B4 NASSAU TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.500 0.000 0.000 0.025 0.475 0.000 0.000 0.500

SUFFOLK CO. ROUTE 110 BUS RAPID TRANSIT (BRT) CORRIDOR CMAQ 09/2019 0.000 DETLDES 1.600
(HALESITE-AMITYVILLE LIRR) TO SERVE MAJOR ASSETS LOCAL 09/2019 0.000 DETLDES 0.400
076114 & EMPLOYMENT GENERATORS & ADDRESS SAFETY, CMAQ 09/2023 1.000 CONINSP 1.000
MOBIL CONGESTION & MOBILITY CONCERNS. EXPLORE LOCAL 09/2023 0.250 CONINSP 0.250
<Non-Exempt> DEDICATED LANES, QUEUE JUMPS & TRANSIT SIGNAL CMAQ 09/2023 9.000 CONST 9.000
PRIORITY
LOCAL 09/2023 2.250 CONST 2.250
CMAQ 09/2024 0.680 CONINSP 0.680
LOCAL 09/2024 0.170 CONINSP 0.170
CMAQ 09/2024 6.120 CONST 6.120
LOCAL 09/2024 1.530 CONST 1.530
AQC:NON SUFFOLK TPC: $32-$50 M TOTAL 5YR COST : 21.000 2.000 0.000 0.000 0.000 12.500 8.500 0.000

NASSAU CO. ASSISTANCE FOR ADA COMPLEMENTARY PARATRANSIT FTA 5307 02/2024 0.180 MISC 0.180
TRANSIT SERVICE THROUGHOUT NASSAU COUNTY BY THE LOCAL 02/2024 0.022 MISC 0.022
082598 NASSAU INTER-COUNTY EXPRESS (NICE) TO ENABLE STATE 02/2024 0.023 MISC 0.023
MOBIL AND SUSTAIN CONTINUED OPERATION OF SERVICE
<Exempt>

AQC:B1 NASSAU TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.225 0.000 0.000 0.000 0.000 0.000 0.225 0.000

207
** New York Metropolitan Transportation Council **
Friday, July 19, 2019 Nassau-Suffolk Transit Listing Page 4 of 11

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

SUFFOLK PURCHASE OF DUAL-MODE HYBRID-ELECTRIC / DIESEL FTA 5307 09/2021 2.700 MISC 2.700
CO.TRANSIT TRANSIT BUSES FOR REPLACEMENT PURPOSES TO BE LOCAL 09/2021 0.338 MISC 0.338
082602 UTILIZED ON FIXED BUS ROUTES THROUGHOUT STATE 09/2021 0.337 MISC 0.337
MOBIL SUFFOLK COUNTY. FTA 5307 09/2024 3.800 MISC 3.800
<Exempt>
LOCAL 09/2024 0.475 MISC 0.475
STATE 09/2024 0.475 MISC 0.475
AQC:B10 SUFFOLK TPC: $7.5-$12 M TOTAL 5YR COST : 8.125 0.000 0.000 3.375 0.000 0.000 4.750 0.000

SUFFOLK PURCHASE PARATRANSIT VEHICLES FOR FTA 5307 09/2020 1.300 MISC 1.300
CO.TRANSIT COMPLEMENTARY ADA SERVICES WHICH ARE LOCAL 09/2020 0.163 MISC 0.163
082603 OPERATED IN CONJUCTION WITH THE FIXED BUS STATE 09/2020 0.163 MISC 0.163
MOBIL ROUTE OPERATIONS TO ENABLE AND SUSTAIN FTA 5339 09/2020 0.480 MISC 0.480
<Exempt> CONTINUED OPERATION OF SERVICE.
LOCAL 09/2020 0.060 MISC 0.060
STATE 09/2020 0.060 MISC 0.060
FTA 5307 09/2021 1.300 MISC 1.300
LOCAL 09/2021 0.163 MISC 0.163
STATE 09/2021 0.163 MISC 0.163
FTA 5339 09/2021 0.480 MISC 0.480
LOCAL 09/2021 0.060 MISC 0.060
STATE 09/2021 0.060 MISC 0.060
FTA 5307 09/2022 1.300 MISC 1.300
LOCAL 09/2022 0.163 MISC 0.163
STATE 09/2022 0.163 MISC 0.163
FTA 5339 09/2022 0.480 MISC 0.480
LOCAL 09/2022 0.060 MISC 0.060
STATE 09/2022 0.060 MISC 0.060
FTA 5307 09/2023 1.300 MISC 1.300
LOCAL 09/2023 0.163 MISC 0.163
STATE 09/2023 0.163 MISC 0.163
FTA 5339 09/2023 0.480 MISC 0.480
LOCAL 09/2023 0.060 MISC 0.060
STATE 09/2023 0.060 MISC 0.060
FTA 5307 09/2024 1.300 MISC 1.300
LOCAL 09/2024 0.163 MISC 0.163
STATE 09/2024 0.163 MISC 0.163
FTA 5339 09/2024 0.480 MISC 0.480
LOCAL 09/2024 0.060 MISC 0.060
STATE 09/2024 0.060 MISC 0.060
AQC:B10 SUFFOLK TPC: $9.5-15.5 M TOTAL 5YR COST : 11.130 0.000 2.226 2.226 2.226 2.226 2.226 0.000

208
** New York Metropolitan Transportation Council **
Friday, July 19, 2019 Nassau-Suffolk Transit Listing Page 5 of 11

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NASSAU CO. PURCHASE 50 PARATRANSIT VEHICLES (47 FTA 5339 02/2019 0.000 MISC 0.547
TRANSIT REPLACEMENT/3 EXPANSION)TO MAINTAIN THE STATE 02/2019 0.000 MISC 0.067
082683 OPERATING EFFICIENCY AND CAPACITY OF THE LOCAL 02/2019 0.000 MISC 0.067
MOBIL NASSAU INTER -COUNTY EXPRESS ABLE-RIDE FTA 5307 02/2020 0.496 MISC 0.496
<Exempt> SERVICE. LOCAL 02/2020 0.062 MISC 0.062
STATE 02/2020 0.062 MISC 0.062
FTA 5339 02/2020 0.559 MISC 0.559
LOCAL 02/2020 0.070 MISC 0.070
STATE 02/2020 0.070 MISC 0.070
FTA 5339 02/2021 0.570 MISC 0.570
LOCAL 02/2021 0.071 MISC 0.071
STATE 02/2021 0.071 MISC 0.071
AQC:B10 NASSAU TPC: $2-$4 M TOTAL 5YR COST : 2.031 0.681 1.319 0.712 0.000 0.000 0.000 0.000

SUFFOLK SUFFOLK COUNTY TRANSIT CLEAN FUEL BUSES. FTA 5307 09/2022 18.000 MISC 18.000
CO.TRANSIT PURCHASE 30 NEW HYBRID-ELECTRIC BUSES FOR LOCAL 09/2022 2.250 MISC 2.250
082688 PROJECT 076032 TO IMPROVE EFFICIENCY IN STATE 09/2022 2.250 MISC 2.250
MOBIL OPERATIONS OF CR 97 BUS RAPID TRANSIT SYSTEM.
<Exempt>
AQC:B10 SUFFOLK TPC: $21-$31 M TOTAL 5YR COST : 22.500 0.000 0.000 0.000 22.500 0.000 0.000 0.000

LONG BEACH REPLACE 3 HEAVY DUTY BUSES THAT ARE BEYOND FTA 5307 05/2020 1.246 MISC 1.246
THEIR USEFUL LIVES FOR THE CITY OF LONG BEACH TO STATE 05/2020 0.156 MISC 0.156
082749 IMPROVE EFFICIENCY IN OPERATIONS. OTHER 05/2020 0.142 MISC 0.142
MOBIL
LOCAL 05/2020 0.156 MISC 0.156
<Exempt>
AQC:B10 NASSAU TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.700 0.000 1.700 0.000 0.000 0.000 0.000 0.000

NASSAU CO. PURCHASE 103 CNG 40 FOOT BUSES, INSPECTION CMAQ 02/2019 0.000 MISC 9.800
TRANSIT SERVICES & ASSOCIATED CAPITAL ITEMS (100 STATE 02/2019 0.000 MISC 1.225
082904 REPLACEMENT/3 EXPANSION) - TO MAINTAIN LOCAL 02/2019 0.000 MISC 1.225
MOBIL OPERATING EFFICIENCY, CAPACITY, AND THE FTA 5307 04/2019 0.000 MISC 9.115
<Exempt> CONTINUED USE OF ALTERNATIVE FUEL FOR THE LOCAL 04/2019 0.000 MISC 1.139
NASSAU INTER-COUNTY EXPRESS(NICE).
STATE 04/2019 0.000 MISC 1.140
CMAQ 02/2020 5.750 MISC 5.750
LOCAL 02/2020 0.719 MISC 0.719
STATE 02/2020 0.719 MISC 0.719
FTA 5307 02/2020 4.144 MISC 4.144
LOCAL 02/2020 0.518 MISC 0.518
STATE 02/2020 0.518 MISC 0.518
FTA 5307 02/2021 4.388 MISC 4.388
LOCAL 02/2021 0.548 MISC 0.548
STATE 02/2021 0.549 MISC 0.549
LOCAL 02/2022 1.080 MISC 1.080
AQC:B10 NASSAU TPC:$398.7-$491.3 M TOTAL 5YR COST : 18.933 23.644 12.368 5.485 1.080 0.000 0.000 0.000

209
** New York Metropolitan Transportation Council **
Friday, July 19, 2019 Nassau-Suffolk Transit Listing Page 6 of 11

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NASSAU CO. PURCHASE FIVE NEW SHUTTLE REPLACEMENT BUSES FTA 5307 02/2024 0.400 MISC 0.400
TRANSIT TO REPLACE THOSE THAT ARE BEYOND THEIR USEFUL LOCAL 02/2024 0.050 MISC 0.050
082910 LIVES FOR THE NASSAU INTER-COUNTY EXPRESS STATE 02/2024 0.050 MISC 0.050
MOBIL (NICE) TO IMPROVE EFFICIENCY IN OPERATIONS IN
<Exempt> NASSAU COUNTY
AQC:B10 NASSAU TPC: < $0.75 M TOTAL 5YR COST : 0.500 0.000 0.000 0.000 0.000 0.000 0.500 0.000

LOCAL THE CITY OF GLENCOVE PURCHASE OF A NEW FTA 5339 06/2019 0.000 MISC 0.060
WHEELCHAIR ACCESSIBLE, ADA-COMPLIANT BUS THAT LOCAL 06/2019 0.000 MISC 0.006
082911 WILL BE UTILIZED FOR THE CITY’S LOOP BUS SERVICE. STATE 06/2019 0.000 MISC 0.006
MOBIL THE NEW BUS VEHICLE WILL REPLACE THE EXISTING
<Exempt> BUS VEHICLE THAT HAS BROKEN DOWN TO IMPROVE
EFFICIENCY IN OPERATIONS FOR THE CITY OF GLEN
COVE IN NASSAU COUNTY.GRANT #FTA-2017-004-TPM

AQC:B10 NASSAU TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.072 0.000 0.000 0.000 0.000 0.000 0.000

NASSAU CO. PURCHASE OF 87 COMPRESSED NATURAL GAS (CNG) FTA 5307 09/2020 0.414 MISC 0.414
TRANSIT BUSES AND INSPECTION SERVICES AND ASSOCIATED LOCAL 09/2020 0.052 MISC 0.052
082912 CAPITAL ITEMS TO REPLACE 84 BUSES AND ADD 3 STATE 09/2020 0.051 MISC 0.051
MOBIL BUSES FOR EXPANSION TO MAINTAIN OPERATING CMAQ 09/2021 4.071 MISC 4.071
<Exempt> EFFICIENCY, CAPACITY, AND THE CONTINUED USE OF LOCAL 09/2021 1.018 MISC 1.018
ALTERNATIVE FUEL FOR THE NASSAU INTER-COUNTY
FTA 5307 09/2021 0.654 MISC 0.654
EXPRESS (NICE).
LOCAL 09/2021 0.082 MISC 0.082
STATE 09/2021 0.081 MISC 0.081
FTA 5307 09/2022 5.059 MISC 5.059
LOCAL 09/2022 0.632 MISC 0.632
STATE 09/2022 0.633 MISC 0.633
FTA 5307 09/2023 5.789 MISC 5.789
LOCAL 09/2023 0.723 MISC 0.723
STATE 09/2023 0.724 MISC 0.724
CMAQ 09/2024 4.071 MISC 4.071
LOCAL 09/2024 1.018 MISC 1.018
FTA 5307 09/2024 5.484 MISC 5.484
LOCAL 09/2024 0.686 MISC 0.686
STATE 09/2024 0.686 MISC 0.686
FTA 5307 09/2025 0.000 MISC 4.000
LOCAL 09/2025 0.000 MISC 0.500
STATE 09/2025 0.000 MISC 0.500
AQC:B10 NASSAU TPC: $40-$60 M TOTAL 5YR COST : 31.928 0.000 0.517 5.906 6.324 7.236 11.945 5.000

210
** New York Metropolitan Transportation Council **
Friday, July 19, 2019 Nassau-Suffolk Transit Listing Page 7 of 11

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NASSAU CO. PURCHASE OF TWENTY (20) PARA-TRANSIT VEHICLES FTA 5339 09/2022 0.581 MISC 0.581
TRANSIT (15 REPLACEMENTS AND 5 ADDITIONAL VEHICLES FOR LOCAL 09/2022 0.072 MISC 0.072
082913 EXPANSION) TO MAINTAIN OPERATING EFFICIENCY STATE 09/2022 0.073 MISC 0.073
MOBIL AND CAPACITY OF THE NASSAU INTER-COUNTY FTA 5339 09/2023 0.593 MISC 0.593
<Exempt> EXPRESS (NICE) ABLE RIDE SERVICE LOCATED IN LOCAL 09/2023 0.074 MISC 0.074
NASSAU COUNTY.
STATE 09/2023 0.074 MISC 0.074
FTA 5339 09/2024 0.605 MISC 0.605
LOCAL 09/2024 0.075 MISC 0.075
STATE 09/2024 0.076 MISC 0.076
AQC:B10 NASSAU TPC: $2-$4 M TOTAL 5YR COST : 2.223 0.000 0.000 0.000 0.726 0.741 0.756 0.000

NASSAU CO. FACILITY CAPITAL REPLACEMENT/IMPROVEMENT - TO FTA 5307 02/2019 0.000 MISC 1.040
TRANSIT MAINTAIN THE FACILITIES IN A STATE OF GOOD REPAIR LOCAL 02/2019 0.000 MISC 0.130
082584 FOR NASSAU INTER-COUNTY EXPRESS (NICE). STATE 02/2019 0.000 MISC 0.130
R&P
FTA 5307 02/2020 0.800 MISC 0.800
<Exempt>
LOCAL 02/2020 0.100 MISC 0.100
STATE 02/2020 0.100 MISC 0.100
FTA 5307 02/2021 0.800 MISC 0.800
LOCAL 02/2021 0.100 MISC 0.100
STATE 02/2021 0.100 MISC 0.100
FTA 5307 02/2022 1.040 MISC 1.040
LOCAL 02/2022 0.130 MISC 0.130
STATE 02/2022 0.130 MISC 0.130
FTA 5307 02/2023 0.800 MISC 0.800
LOCAL 02/2023 0.100 MISC 0.100
STATE 02/2023 0.100 MISC 0.100
FTA 5307 02/2024 0.800 MISC 0.800
LOCAL 02/2024 0.100 MISC 0.100
STATE 02/2024 0.100 MISC 0.100
AQC:B8 NASSAU TPC: $9.5-15.5 M TOTAL 5YR COST : 5.300 1.300 1.000 1.000 1.300 1.000 1.000 0.000

NASSAU CO. CNG FACILITY MODIFICATIONS - TO REPLACE CNG FTA 5307 02/2024 0.180 MISC 0.180
TRANSIT OPERATING SYSTEMS THAT HAVE REACHED THE END LOCAL 02/2024 0.022 MISC 0.022
082593 OF THEIR USEFUL LIFE FOR NASSAU INTER-COUNTY STATE 02/2024 0.023 MISC 0.023
R&P EXPRESS (NICE) TO IMPROVE EFFICIENCY IN
<Exempt> OPERATIONS.
AQC:B8 NASSAU TPC: < $0.75 M TOTAL 5YR COST : 0.225 0.000 0.000 0.000 0.000 0.000 0.225 0.000

211
** New York Metropolitan Transportation Council **
Friday, July 19, 2019 Nassau-Suffolk Transit Listing Page 8 of 11

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NASSAU CO. DESIGN / CONSTRUCT INITIAL OPERATING SEGMENT OF HPP 08/2020 3.600 PRELDES 3.600
LOCALLY PREFERRED ALTERNATIVE FOR BUS RAPID LOCAL 08/2020 0.900 PRELDES 0.900
082498 TRANSIT SERVICE BETWEEN HEMPSTEAD VILLAGE AND CMAQ 01/2022 0.640 DETLDES 0.640
TRANSIT ROOSEVELT FIELD, ALSO SERVING HOFSTRA LOCAL 01/2022 0.160 DETLDES 0.160
<Non-Exempt> UNIVERSITY, NASSAU COLISEUM PROPERTY, AND HPP 01/2022 0.883 DETLDES 0.883
NASSAU COMMUNITY COLLEGE IN NASSAU COUNTY.
LOCAL 01/2022 0.221 DETLDES 0.221
TRANSFERRED EARMARK: NY637 (PROGRAM CODE
RPS9) CMAQ 08/2023 1.500 CONINSP 1.500
LOCAL 08/2023 0.370 CONINSP 0.370
CMAQ 08/2023 13.460 CONST 13.460
LOCAL 08/2023 3.370 CONST 3.370
AQC:NON NASSAU TPC: $21-$31 M TOTAL 5YR COST : 25.104 0.000 4.500 0.000 1.904 18.700 0.000 0.000

SUFFOLK ACQUIRE ADP SOFTWARE TO IMPROVE EFFICIENCY IN FTA 5307 06/2019 0.000 MISC 0.360
CO.TRANSIT PARATRANSIT OPERATIONS. SOFTWARE WILL AID IN LOCAL 06/2019 0.000 MISC 0.045
082662 MANAGEMENT OF PARATRANSIT. ELIGIBILIY PROCESS STATE 06/2019 0.000 MISC 0.045
TRANSIT AND ENFORCEMENT OF NO-SHOW, LATE
<Exempt> CANCELLATION POLICIES AND IMPROVE EFFICIENCY IN
OPEARTIONS.

AQC:B4Z SUFFOLK TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.450 0.000 0.000 0.000 0.000 0.000 0.000

SUFFOLK ACQUIRE ADP SOFTWARE TO IMPROVE EFFICIENCY IN FTA 5307 06/2019 0.000 MISC 0.144
CO.TRANSIT THE COUNTY WIDE OPERATIONS. SOFTWARE WILL LOCAL 06/2019 0.000 MISC 0.018
082681 ALLOW FOR COST ESTIMATION FOR TRANSIT STATE 06/2019 0.000 MISC 0.018
TRANSIT PLANNING, DEMOGRAPHIC ANALYSIS, TITLE VI
<Exempt> ANALYSIS, TRAVEL TIME ISOCHRONES, AND
COMMUNICATION FEATURES.

AQC:B4 SUFFOLK TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.180 0.000 0.000 0.000 0.000 0.000 0.000

212
** New York Metropolitan Transportation Council **
Friday, July 19, 2019 Nassau-Suffolk Transit Listing Page 9 of 11

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NASSAU CO. CAPITAL COST OF THIRD PARTY CONTRACTING FOR FTA 5307 06/2019 0.000 MISC 11.200
TRANSIT NASSAU COUNTY TRANSIT TO PROVIDE OPERATION LOCAL 06/2019 0.000 MISC 1.400
082682 AND MAINTENANCE OF THE NASSAU INTERCOUNTY STATE 06/2019 0.000 MISC 1.400
TRANSIT EXPRESS (NICE) OTHER 06/2019 0.000 MISC 250.000
<Exempt>
FTA 5307 02/2020 5.600 MISC 5.600
LOCAL 02/2020 0.700 MISC 0.700
STATE 02/2020 0.700 MISC 0.700
OTHER 02/2020 133.000 MISC 133.000
FTA 5307 02/2021 5.600 MISC 5.600
LOCAL 02/2021 0.700 MISC 0.700
STATE 02/2021 0.700 MISC 0.700
OTHER 02/2021 137.000 MISC 137.000
FTA 5307 02/2022 5.600 MISC 5.600
LOCAL 02/2022 0.700 MISC 0.700
STATE 02/2022 0.700 MISC 0.700
OTHER 02/2022 141.000 MISC 141.000
FTA 5307 02/2023 5.600 MISC 5.600
LOCAL 02/2023 0.700 MISC 0.700
STATE 02/2023 0.700 MISC 0.700
OTHER 02/2023 146.000 MISC 146.000
FTA 5307 02/2024 5.600 MISC 5.600
LOCAL 02/2024 0.700 MISC 0.700
STATE 02/2024 0.700 MISC 0.700
OTHER 02/2024 150.000 MISC 150.000
AQC:B1 NASSAU TPC:$0.9-$1.1 B TOTAL 5YR COST : 742.000 264.000 140.000 144.000 148.000 153.000 157.000 0.000

SUFFOLK SUFFOLK COUNTY TRANSIT CLEAN FUEL BUSES. FTA 5307 09/2023 7.200 MISC 7.200
CO.TRANSIT PURCHASE 12 NEW HYBRID-ELECTRIC BUSES FOR LOCAL 09/2023 0.900 MISC 0.900
082686 PROJECT 076114 TO IMPROVE EFFICIENCY IN STATE 09/2023 0.900 MISC 0.900
TRANSIT OPERATIONS OF NY110 BUS RAPID TRANSIT SYSTEM IN
<Exempt> SUFFOLK COUNTY.
AQC:B10 SUFFOLK TPC: $7.5-$12 M TOTAL 5YR COST : 9.000 0.000 0.000 0.000 0.000 9.000 0.000 0.000

SUFFOLK PURCHASE AND INSTALL BUS SHELTERS FOR PROJECT FTA 5307 09/2024 4.800 MISC 4.800
CO.TRANSIT 076114 - NYS RTE 110 BRT SYSTEM TO PROVIDE LOCAL 09/2024 0.600 MISC 0.600
082687 DEDICATED STATIONS FOR BRT SYSTEM. STATE 09/2024 0.600 MISC 0.600
TRANSIT
<Exempt>
AQC:B7 SUFFOLK TPC: $4.6-$7.5 M TOTAL 5YR COST : 6.000 0.000 0.000 0.000 0.000 0.000 6.000 0.000

SUFFOLK PURCHASE AND INSTALL BUS SHELTERS FOR PROJECT FTA 5307 09/2022 1.440 MISC 1.440
CO.TRANSIT 076032 - CR 97 BRT SYSTEM TO PROVIDE DEDICATED LOCAL 09/2022 0.180 MISC 0.180
082689 STATIONS FOR BRT SYSTEM. STATE 09/2022 0.180 MISC 0.180
TRANSIT
<Exempt>
AQC:B7 SUFFOLK TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.800 0.000 0.000 0.000 1.800 0.000 0.000 0.000

213
** New York Metropolitan Transportation Council **
Friday, July 19, 2019 Nassau-Suffolk Transit Listing Page 10 of 11

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

SUFFOLK REPLACEMENT OF SUFFOLK COUNTY AUTOMATIC FTA 5307 09/2021 7.000 MISC 7.000
CO.TRANSIT VEHICAL LOCATOR SYSTEM FOR TRANSIT AND LOCAL 09/2021 0.875 MISC 0.875
082690 PARATRANSIT BUSES TO IMPROVE EFFICIENCY IN STATE 09/2021 0.875 MISC 0.875
TRANSIT OPERATIONS.
<Exempt>
AQC:B5 SUFFOLK TPC: $7.5-$12 M TOTAL 5YR COST : 8.750 0.000 0.000 8.750 0.000 0.000 0.000 0.000

HART BLOCK FUND FOR FUTURE TOWN OF HUNTINGTON FTA 5307 02/2019 0.000 MISC 0.875
TRANSIT PROJECTS TO BE DETERMINED LOCAL 02/2019 0.000 MISC 0.110
HRBLOCK STATE 02/2019 0.000 MISC 0.109
TRANSIT
FTA 5339 02/2019 0.000 MISC 0.041
<Exempt>
LOCAL 02/2019 0.000 MISC 0.005
STATE 02/2019 0.000 MISC 0.005
FTA 5307 02/2020 0.892 MISC 0.892
LOCAL 02/2020 0.103 MISC 0.103
STATE 02/2020 0.103 MISC 0.103
FTA 5339 02/2020 0.042 MISC 0.042
LOCAL 02/2020 0.005 MISC 0.005
STATE 02/2020 0.005 MISC 0.005
FTA 5307 02/2021 0.910 MISC 0.910
LOCAL 02/2021 0.113 MISC 0.113
STATE 02/2021 0.114 MISC 0.114
FTA 5339 02/2021 0.043 MISC 0.043
LOCAL 02/2021 0.005 MISC 0.005
STATE 02/2021 0.006 MISC 0.006
FTA 5307 02/2022 0.928 MISC 0.928
LOCAL 02/2022 0.116 MISC 0.116
STATE 02/2022 0.116 MISC 0.116
FTA 5339 02/2022 0.044 MISC 0.044
LOCAL 02/2022 0.006 MISC 0.006
STATE 02/2022 0.005 MISC 0.005
FTA 5307 02/2023 0.947 MISC 0.947
LOCAL 02/2023 0.118 MISC 0.118
STATE 02/2023 0.118 MISC 0.118
FTA 5339 02/2023 0.044 MISC 0.044
LOCAL 02/2023 0.005 MISC 0.005
STATE 02/2023 0.006 MISC 0.006
FTA 5307 02/2024 0.966 MISC 0.966
LOCAL 02/2024 0.120 MISC 0.120
STATE 02/2024 0.121 MISC 0.121
FTA 5339 02/2024 0.045 MISC 0.045
LOCAL 02/2024 0.006 MISC 0.006
STATE 02/2024 0.005 MISC 0.005
AQC:J1 SUFFOLK TPC: $6-$9.4 M TOTAL 5YR COST : 6.057 1.145 1.150 1.191 1.215 1.238 1.263 0.000

214
** New York Metropolitan Transportation Council **
Friday, July 19, 2019 Nassau-Suffolk Transit Listing Page 11 of 11

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LONG BEACH FUNDING FOR CITY OF LONG BEACH TRANSIT FTA 5307 02/2021 0.456 MISC 0.456
PROJECTS TO BE DETERMINED THROUGH TIP LOCAL 02/2021 0.057 MISC 0.057
LBBLOCK AMENDMENTS STATE 02/2021 0.057 MISC 0.057
TRANSIT
FTA 5339 02/2021 0.021 MISC 0.021
<Exempt>
LOCAL 02/2021 0.002 MISC 0.002
STATE 02/2021 0.003 MISC 0.003
FTA 5307 02/2022 0.465 MISC 0.465
LOCAL 02/2022 0.058 MISC 0.058
STATE 02/2022 0.058 MISC 0.058
FTA 5339 02/2022 0.022 MISC 0.022
LOCAL 02/2022 0.003 MISC 0.003
STATE 02/2022 0.003 MISC 0.003
FTA 5307 02/2023 0.474 MISC 0.474
LOCAL 02/2023 0.059 MISC 0.059
STATE 02/2023 0.059 MISC 0.059
FTA 5339 02/2023 0.022 MISC 0.022
LOCAL 02/2023 0.002 MISC 0.002
STATE 02/2023 0.003 MISC 0.003
FTA 5307 02/2024 0.484 MISC 0.484
LOCAL 02/2024 0.060 MISC 0.060
STATE 02/2024 0.061 MISC 0.061
FTA 5339 02/2024 0.023 MISC 0.023
LOCAL 02/2024 0.003 MISC 0.003
STATE 02/2024 0.003 MISC 0.003
AQC:J1 NASSAU TPC: $3.3-$5.6 M TOTAL 5YR COST : 2.458 0.000 0.000 0.596 0.609 0.619 0.634 0.000

NSTCC BLOCK FUND FOR FUTURE CMAQ AND NHPP PROJECTS CMAQ 01/2023 15.000 MISC 15.000
TO BE DETERMINED LOCAL 01/2023 5.250 MISC 5.250
NSBLK CMAQ 01/2024 23.000 MISC 23.000
TRANSIT
LOCAL 01/2024 3.250 MISC 3.250
<Exempt>
NHPP 01/2024 7.000 MISC 7.000
LOCAL 01/2024 4.250 MISC 4.250
AQC:J1 SUFFOLK TPC: $50-$85 M TOTAL 5YR COST : 57.750 0.000 0.000 0.000 0.000 20.250 37.500 0.000

215
Lower Hudson Valley
Project Listing

216
INTENTIONALLY BLANK
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Putnam County Listing Page 1 of 8

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT ROUTE 312 @ I84 RAMPS. THE PROJECT WILL HSIP 12/2018 0.000 CONINSP 0.059
COORDINATE THE THREE TRAFFIC SIGNALS AT THIS HSIP 12/2018 0.000 CONST 0.354
805812 INTERCHANGE AND SMOOTH THE TRANSITIONS TO THE HSIP 11/2018 0.000 PRELDES 0.262
SAFETY TURNING LANES IN ORDER TO REDUCE THE REAR-END SDF 11/2018 0.000 PRELDES 0.029
<Exempt> ACCIDENTS. THIS PROJECT IS LOCATED IN THE TOWN
OF SOUTHEAST, PUTNAM COUNTY. THE STATE
CERTIFIES THAT (THE HSIP PORTION OF) THIS PROJECT
HAS BEEN APPROVED BY THE REGIONAL SAFETY
EVALUATION ENGINEER AND SIGNED OFF BY THE
REGIONAL TRAFFIC ENGINEER. 100% FEDERAL USING
10% TOLL CREDIT FOR DETLDES, ROWINCD, ROWACQU,
CONINSP, AND CONST.

AQC:A6 PUTNAM TPC: $2-$4 M TOTAL 5YR COST : 0.000 0.704 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT TACONIC STATE PARKWAY @ PUDDING STREET NHPP 06/2019 0.000 CONINSP 2.085
INTERCHANGE, REPLACE AN EXISTING AT-GRADE PIT BOND 06/2019 0.000 CONINSP 0.521
812726 INTERSECTION OF THE TSP AND PUDDING STREET WITH NHPP 06/2019 0.000 CONST 20.848
INTER A GRADE SEPARATED INTERCHANGE. TOWN OF PIT BOND 06/2019 0.000 CONST 5.212
<Exempt> PUTNAM VALLEY, PUTNAM COUNTY. NY264 HPP#85

AQC:D3 PUTNAM TPC: $26-$40 M TOTAL 5YR COST : 0.000 28.666 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL VILLAGE OF BREWSTER MAIN ST & RTE 6 RELATED HPP 06/2019 0.000 ROWACQU 0.014
CONSTRUCTION & IMPROVEMENTS. INTERSECTION OF SDF 06/2019 0.000 ROWACQU 1.727
839200 RT 6 & PEACEABLE HILL RD -INTERSECTION OF RTE 6 & LOCAL 06/2019 0.000 ROWACQU 0.003
MISC HILLSIDE PARK (1.36 MILES). PROVIDE SIDEWALKS & HPP 06/2020 0.049 CONINSP 0.049
<Exempt> HANDICAP RAMPS. NY262 HPP#79. VILLAGE BREWSTER SDF 06/2020 0.060 CONINSP 0.060
& TOWN SOUTHEAST.
LOCAL 06/2020 0.012 CONINSP 0.012
HPP 06/2020 0.639 CONST 0.639
SDF 06/2020 0.007 CONST 0.007
LOCAL 06/2020 0.160 CONST 0.160
AQC:C2 PUTNAM TPC: $2-$4 M TOTAL 5YR COST : 0.927 1.744 0.927 0.000 0.000 0.000 0.000 0.000

NYSDOT ROUTE 6/MNRR HARLEM LINE; BIN 1003510; BRIDGE NHPP 12/2018 0.000 CONINSP 1.248
REPLACEMENT IN KIND. PROJECT WILL REPLACE THE SDF 12/2018 0.000 CONINSP 0.312
839201 STATE ROUTE 6 BRIDGE OVER THE HARLEM LINE OF NHPP 12/2018 0.000 CONST 8.486
BRIDGE THE METRO NORTH RAILROAD. TOWN OF SOUTHEAST; SDF 12/2018 0.000 CONST 2.122
<Exempt> VILLAGE OF BREWSTER PUTNAM COUNTY NHPP 01/2019 0.000 DETLDES 0.600
SDF 01/2019 0.000 DETLDES 0.150
NHPP 01/2019 0.000 ROWACQU 0.100
SDF 01/2019 0.000 ROWACQU 0.025
AQC:A19 PUTNAM TPC: $12.5-$19 M TOTAL 5YR COST : 0.000 13.043 0.000 0.000 0.000 0.000 0.000 0.000

217
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Putnam County Listing Page 2 of 8

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

PUTNAM SODOM ROAD BRIDGE REPLACEMENT OVER EAST STBG LG URB 10/2018 0.000 DETLDES 0.080
BRANCH OF CROTON RIVER TO INCLUDE APPROACH LOCAL 10/2018 0.000 DETLDES 0.020
875604 WORK, PAVEMENT MARKINGS, BRIDGE RAILINGS, AND STBG LG URB 10/2018 0.000 ROWACQU 0.001
BRIDGE GUIDERAILS - BIN 2224030. TOWN OF SOUTHEAST LOCAL 10/2018 0.000 ROWACQU 0.001
<Exempt>
STBG LG URB 10/2019 0.320 CONINSP 0.320
LOCAL 10/2019 0.080 CONINSP 0.080
STBG LG URB 10/2019 2.000 CONST 2.000
LOCAL 10/2019 0.500 CONST 0.500
AQC:A19 PUTNAM TPC: $2-$4 M TOTAL 5YR COST : 2.900 0.102 2.900 0.000 0.000 0.000 0.000 0.000

PUTNAM FAIR ST FROM ROUTE 52 TO JOHN SIMPSON RD LOCAL 05/2019 0.000 PRELDES 0.400
IMPROVEMENTS. PROJECT INCLUDES PAVEMENT LOCAL 05/2019 0.000 PRELDES 1.600
875609 REHABILITATION, DRAINAGE AND INTERSECTIONS STBG LG URB 02/2019 0.000 ROWINCD 0.240
RECON IMPROVEMENTS AT THE SIMPSON ROAD, HILL, AND STATE 02/2019 0.000 ROWINCD 0.045
<Exempt> DALE, AND CR 60 BRIDGE REPLACEMENT OVER MIDDLE LOCAL 02/2019 0.000 ROWINCD 0.015
BRANCH CROTON (PIN 8756.03). TOWN OF CARMEL,
STBG LG URB 10/2019 0.400 DETLDES 0.400
PUTNAM COUNTY.
STATE 10/2019 0.085 DETLDES 0.085
LOCAL 10/2019 0.015 DETLDES 0.015
STBG LG URB 10/2019 1.200 ROWACQU 1.200
LOCAL 10/2019 0.300 ROWACQU 0.300
STBG LG URB 11/2020 1.200 CONINSP 1.200
LOCAL 11/2020 0.300 CONINSP 0.300
CMAQ 04/2021 2.500 CONST 2.500
LOCAL 04/2021 0.625 CONST 0.625
STBG LG URB 11/2020 9.119 CONST 9.119
LOCAL 11/2020 2.325 CONST 2.325
AQC:A10 PUTNAM TPC: $15-$25 M TOTAL 5YR COST : 18.069 2.300 2.000 16.069 0.000 0.000 0.000 0.000

PUTNAM MAYBROOK BIKEWAY II (PHASE A) CONSTRUCTS A 2.54 CMAQ 10/2018 0.000 CONST 0.815
MILE SEGMENT BIKEWAY FROM PUMPHOUSE ROAD IN LOCAL 10/2018 0.000 CONST 0.204
875684 BREWSTER TO ROUTE 22 ONRAMP IN THE TOWN OF
MOBIL SOUTHEAST, PUTNAM COUNTY. THIS INCLUDES
<Exempt> ALTERNATIVE ONE AND BRIDGE FIVE.
AQC:C2 PUTNAM TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 1.019 0.000 0.000 0.000 0.000 0.000 0.000

PUTNAM CONSTRUCT (CR 21) PEEKSKILL HOLLOW ROAD CMAQ 04/2019 0.000 CONINSP 0.240
RENOVATION PROJECT FROM OSCAWANA LAKE ROAD LOCAL 04/2019 0.000 CONINSP 0.060
875748 (CR20) TO CHURCH ROAD / MILL STREET: IMPROVE HPP 04/2019 0.000 CONINSP 0.565
RECON GEOMETRICS, ADD SHOULDERS, AND IMPROVE LOCAL 04/2019 0.000 CONINSP 0.141
<Exempt> DRAINAGE. TOWN OF PUTNAM VALLEY, PUTNAM CMAQ 04/2019 0.000 CONST 0.800
COUNTY. NY121
LOCAL 04/2019 0.000 CONST 0.200
HPP 04/2019 0.000 CONST 5.600
LOCAL 04/2019 0.000 CONST 1.400
AQC:A3 PUTNAM TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 9.006 0.000 0.000 0.000 0.000 0.000 0.000

218
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Putnam County Listing Page 3 of 8

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

PUTNAM DREWVILLE ROAD (CR 36) SUPERSTRUCTURE STBG LG URB 05/2019 0.000 DETLDES 0.196
REPLACEMENT OVER WEST BRANCH CROTON RIVER. LOCAL 05/2019 0.000 DETLDES 0.049
875765 PROJECT WILL REPLACE THE BRIDGE THAT CARRIES STBG LG URB 05/2019 0.000 PRELDES 0.192
BRIDGE DREWVILLE RD OVER THE WEST BRANCH OF THE LOCAL 05/2019 0.000 PRELDES 0.048
<Exempt> CROTON RIVER. TOWN OF CARMEL - BIN 3345550. STBG LG URB 05/2019 0.000 ROWINCD 0.012
LOCAL 05/2019 0.000 ROWINCD 0.003
STBG LG URB 05/2020 0.100 ROWACQU 0.100
LOCAL 05/2020 0.025 ROWACQU 0.025
STBG LG URB 07/2021 0.216 CONINSP 0.216
LOCAL 07/2021 0.054 CONINSP 0.054
STBG LG URB 07/2021 1.440 CONST 1.440
LOCAL 07/2021 0.360 CONST 0.360
AQC:A19 PUTNAM TPC: $2-$4 M TOTAL 5YR COST : 2.195 0.500 0.125 2.070 0.000 0.000 0.000 0.000

PUTNAM HORTON HOLLOW ROAD BRIDGE REPLACEMENT OVER STBG LG URB 05/2020 0.106 DETLDES 0.106
CANOPUS CREEK. PROJECT WILL REPLACE THE BRIDGE LOCAL 05/2020 0.027 DETLDES 0.027
875766 IN KIND OVER CANOPUS CREEK . -BIN 2223990. TOWN STBG LG URB 05/2020 0.106 PRELDES 0.106
BRIDGE OF PUTNAM VALLEY
<Exempt> LOCAL 05/2020 0.027 PRELDES 0.027
STBG LG URB 05/2020 0.013 ROWINCD 0.013
LOCAL 05/2020 0.003 ROWINCD 0.003
STBG LG URB 05/2021 0.019 ROWACQU 0.019
LOCAL 05/2021 0.005 ROWACQU 0.005
STBG LG URB 07/2022 0.120 CONINSP 0.120
LOCAL 07/2022 0.030 CONINSP 0.030
STBG LG URB 07/2022 1.166 CONST 1.166
LOCAL 07/2022 0.292 CONST 0.292
AQC:A19 PUTNAM TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.914 0.000 0.282 0.024 1.608 0.000 0.000 0.000

PUTNAM FARMERS MILLS ROAD (CR 42)/SEVEN HILLS LAKE STBG FLEX 05/2021 0.089 DETLDES 0.089
OUTLET DECK REPLACEMENT WITH A WIDER BRIDGE LOCAL 05/2021 0.022 DETLDES 0.022
875767 THAT WILL BE SUPPORTED ON PILES. (BIN 3345630). STBG FLEX 05/2021 0.089 PRELDES 0.089
BRIDGE TOWN OF KENT, PUTNAM COUNTY LOCAL 05/2021 0.022 PRELDES 0.022
<Exempt>
STBG FLEX 05/2021 0.012 ROWINCD 0.012
LOCAL 05/2021 0.003 ROWINCD 0.003
STBG FLEX 05/2022 0.020 ROWACQU 0.020
LOCAL 05/2022 0.005 ROWACQU 0.005
STBG-OFF 04/2023 0.096 CONINSP 0.096
LOCAL 04/2023 0.024 CONINSP 0.024
STBG-OFF 04/2023 0.741 CONST 0.741
LOCAL 04/2023 0.185 CONST 0.185
AQC:A19 PUTNAM TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.308 0.000 0.000 0.237 0.025 1.046 0.000 0.000

219
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Putnam County Listing Page 4 of 8

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

PUTNAM PUTNAM BIKEWAY II, STAGE 4: CONTINUATION OF CMAQ 10/2018 0.000 CONST 2.665
PUTNAM BIKEWAY FROM THE TERMINUS OF STAGE 3 TO LOCAL 10/2018 0.000 CONST 0.666
875905 NORTH MAIN ST IN BREWSTER VILLAGE AND FTA 5307 11/2018 0.000 CONST 0.240
MOBIL MAYBROOK BIKEWAY II. THE NEW PROJECT FUNDING STATE 11/2018 0.000 CONST 0.030
<Exempt> SHOWN IS FOR THE FINAL 0.9 MILE LONG STAGE. TOWN LOCAL 11/2018 0.000 CONST 0.030
OF SOUTHEAST, PUTNAM COUNTY.

AQC:C2Z PUTNAM TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 3.631 0.000 0.000 0.000 0.000 0.000 0.000

PUTNAM MAHOPAC FALLS TRAILWAY: DESIGN & CONSTRUCTION CMAQ 10/2020 0.078 DETLDES 0.078
OF A 1.5 MILE PAVED BICYCLE/PEDESTRIAN TRAIL LOCAL 10/2020 0.020 DETLDES 0.020
875906 FROM BALDWIN PLACE (TERMINUS OF PUTNAM CMAQ 10/2020 0.078 PRELDES 0.078
MOBIL BIKEWAY I) TO MYRTLE AVENUE IN MAHOPAC FALLS LOCAL 10/2020 0.020 PRELDES 0.020
<Exempt> ALONG ABANDONED RAILROAD LINE IN THE TOWN OF CMAQ 10/2020 0.016 ROWINCD 0.016
CARMEL. PUTNAM COUNTY
LOCAL 10/2020 0.004 ROWINCD 0.004
CMAQ 10/2021 0.451 ROWACQU 0.451
LOCAL 10/2021 0.113 ROWACQU 0.113
CMAQ 10/2022 0.080 CONINSP 0.080
LOCAL 10/2022 0.020 CONINSP 0.020
CMAQ 10/2022 0.823 CONST 0.823
LOCAL 10/2022 0.206 CONST 0.206
AQC:C2 PUTNAM TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.909 0.000 0.000 0.216 0.564 1.129 0.000 0.000

LOCAL REALIGN UNION VALLEY RD IN TOWN OF CARMEL: HPP 07/2019 0.000 CONINSP 0.008
RE-ALIGN UNION VALLEY RD IN THE VICINITY OF KIA LOCAL 07/2019 0.000 CONINSP 0.002
875952 ORA BLVD TO IMPROVE SIGHT DISTANCE. INCLUDES HPP 07/2019 0.000 CONST 0.354
RECON ROW ACQUISITION , DRAINAGE WORK & OTHER WORK LOCAL 07/2019 0.000 CONST 0.089
<Exempt> INCIDENTAL TO PROJECT OBJECTIVE. TOWN OF HPP 11/2018 0.000 ROWACQU 0.008
CARMEL. NY567 HPP#3116
LOCAL 11/2018 0.000 ROWACQU 0.002
HPP 11/2018 0.000 ROWINCD 0.002
AQC:A5 PUTNAM TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.465 0.000 0.000 0.000 0.000 0.000 0.000

PUTNAM MAYBROOK BIKEWAY II (PHASE B) CONSTRUCTION & CMAQ 04/2019 0.000 CONST 0.896
INSPECTION OF 2.92 MILES BIKE PATH FROM THE END LOCAL 04/2019 0.000 CONST 0.224
876105 OF PHASE A (RT 6 & RT 684) TO THE STATE LINE.
MOBIL (FORMERLY PIN: 8TM014)
<Exempt>
AQC:C2 PUTNAM TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 1.120 0.000 0.000 0.000 0.000 0.000 0.000

220
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Putnam County Listing Page 5 of 8

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

PUTNAM PUTNAM COUNTY ADA TRANSIT ACCESSIBILITY II. THE FTA 5339 06/2019 0.000 CONINSP 0.037
PUTNAM COUNTY AMERICANS WITH DISABILITIES ACT LOCAL 06/2019 0.000 CONINSP 0.009
876192 (ADA) TRANSIT ACCESSIBILITY II PROJECT INVOLVES
MOBIL THE CONSTRUCTION OF FOUR SEGMENTS OF ADA
<Exempt> COMPLIANT SIDEWALKS TO PROVIDE ACCESS WHERE
SIDEWALKS ARE LACKING AT THE FOUR LOCATIONS OF
OLD ROUTE 6 IN THE TOWN OF CARMEL, NORTH MAIL
STREET IN THE VILLAGE OF BREWSTER, PEACEABLE
HILL ROAD IN THE VILLAGE OF BREWSTER, AND ROUTE
6/ALLVIEW AVENUE IN THE TOWN OF SOUTHEAST. 2015
5339 GRANT AMENDMENT FOR CI

AQC:C2 PUTNAM TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.046 0.000 0.000 0.000 0.000 0.000 0.000

PUTNAM STONELEIGH AVENUE @ DREWVILLE ROAD STBG LG URB 01/2020 0.240 DETLDES 0.240
INTERSECTION IMPROVEMENTS. THIS PROJECT AT THE LOCAL 01/2020 0.060 DETLDES 0.060
876197 INTERSECTION OF STONELEIGH AVENUE AND CMAQ 01/2020 0.160 ROWACQU 0.160
INTER DREWVILLE ROAD WILL PROVIDE SAFE ACCESS
<Exempt> LOCAL 01/2020 0.040 ROWACQU 0.040
THROUGH THE INTERSECTION TO THE HOSPITAL,
HSIP 01/2020 0.100 ROWACQU 0.100
MODERNIZE THE SIGNALIZATION AND CREATE
STORAGE. THIS PROJECT WILL ALSO INCLUDE THE LOCAL 01/2020 0.025 ROWACQU 0.025
ADDITION OF TURN LANES IN ORDER TO IMPROVE STBG LG URB 01/2020 0.480 ROWACQU 0.480
OVERALL TRAFFIC AND SAFETY CONDITIONS WHILE LOCAL 01/2020 0.120 ROWACQU 0.120
TREATING ROAD RUNOFF. THIS PROJECT IS LOCATED IN CMAQ 10/2020 0.264 CONINSP 0.264
THE TOWN OF CARMEL, PUTNAM COUNTY. LOCAL 10/2020 0.066 CONINSP 0.066
CMAQ 10/2020 2.376 CONST 2.376
LOCAL 10/2020 0.594 CONST 0.594
AQC:D3 PUTNAM TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.525 0.000 1.225 3.300 0.000 0.000 0.000 0.000

PUTNAM SPROUT BROOK ROAD OVER CANOPUS CREEK BRIDGE NHPP 07/2019 0.000 DETLDES 0.130
REPLACEMENT. THIS PROJECT WILL REPLACE THE LOCAL 07/2019 0.000 DETLDES 0.033
876213 BRIDGE CARRYING CR 15 SPROUT BROOK ROAD OVER NHPP 07/2019 0.000 PRELDES 0.130
BRIDGE CANOPUS CREEK IN THE TOWN OF PHILLIPSTOWN, LOCAL 07/2019 0.000 PRELDES 0.033
<Exempt> PUTNAM COUNTY. TO INSTALL NEW WIDER NHPP 07/2019 0.000 ROWINCD 0.016
ABUTMENTS, NEW WINGWALLS, AND WIDER DECK TO
LOCAL 07/2019 0.000 ROWINCD 0.004
PROVIDE SHOULDERS FOR PEDESTRIANS AND
BICYCLES. 2018 BRIDGE NY PROJECT. 95% FEDERAL NHPP 07/2020 0.160 ROWACQU 0.160
USING 15% TOLL CREDIT WITH A 5% MATCH. BIN 3345690 LOCAL 07/2020 0.040 ROWACQU 0.040
NHPP 08/2021 0.124 CONINSP 0.124
LOCAL 08/2021 0.031 CONINSP 0.031
NHPP 08/2021 1.135 CONST 1.135
LOCAL 08/2021 0.284 CONST 0.284
AQC:A19 PUTNAM TPC: $2-$4 M TOTAL 5YR COST : 1.774 0.346 0.200 1.574 0.000 0.000 0.000 0.000

221
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Putnam County Listing Page 6 of 8

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

PUTNAM ACCESS TO EMPIRE STATE TRAIL. PROJECT WILL FTA 5307 07/2020 0.020 DETLDES 0.020
DESIGN AND CONSTRUCT ACCESS POINTS TO THE LOCAL 07/2020 0.005 DETLDES 0.005
876243 EMPIRE STATE TRAIL AT ROUTE 312 AND ROUTE 311, FTA 5307 07/2020 0.020 PRELDES 0.020
MOBIL PUTNAM COUNTY.
<Exempt> LOCAL 07/2020 0.005 PRELDES 0.005
FTA 5307 07/2021 0.040 CONINSP 0.040
LOCAL 07/2021 0.010 CONINSP 0.010
FTA 5307 07/2021 0.480 CONST 0.480
LOCAL 07/2021 0.120 CONST 0.120
AQC:A1 PUTNAM TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.700 0.000 0.050 0.650 0.000 0.000 0.000 0.000

PUTNAM SECTION 5311 OPERATING ASSISTANCE TO ENABLE AND FTA 5311 01/2019 0.000 MISC 0.094
SUSTAIN CONTINUED OPERATIONS OF PUTNAM AREA LOCAL 01/2019 0.000 MISC 0.094
882246 RAPID TRANSIT (PART). FTA 5311 01/2020 0.094 MISC 0.094
TRANSIT
LOCAL 01/2020 0.094 MISC 0.094
<Exempt>
FTA 5311 01/2021 0.094 MISC 0.094
LOCAL 01/2021 0.094 MISC 0.094
FTA 5311 01/2022 0.094 MISC 0.094
LOCAL 01/2022 0.094 MISC 0.094
FTA 5311 01/2023 0.094 MISC 0.094
LOCAL 01/2023 0.094 MISC 0.094
FTA 5311 01/2024 0.094 MISC 0.094
LOCAL 01/2024 0.094 MISC 0.094
AQC:B1 PUTNAM TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.940 0.188 0.188 0.188 0.188 0.188 0.188 0.000

PUTNAM PUTNAM COUNTY TRANSIT FACILITY - PARKING LOT STATE 07/2020 0.413 MISC 0.413
PAVING AND GARAGE DOORS REPLACEMENT. LOCAL 07/2020 0.077 MISC 0.077
8TM064 PAVEMENT OF PARKING LOT TO MAINTAIN STATE OF
TRANSIT GOOD REPAIR TO MAINTAIN THE TRANSIT FACILITIES.
<Exempt> PROJECT WILL ALSO REPLACE 12 COMMERCIAL
GARAGE DOORS. THE PROJECT IS USING STATE
MODERNIZATION AND ENHANCEMENT PROGRAM
FUNDING.

AQC:A10 PUTNAM TPC: < $0.75 M TOTAL 5YR COST : 0.490 0.000 0.490 0.000 0.000 0.000 0.000 0.000

PUTNAM PUTNAM COUNTY PART BUS TRANSFER.THE 5 PART FTA 5307 01/2020 0.080 MISC 0.080
BUSES HAVE A TRANSFER PULSE POINT WHERE STATE 01/2020 0.010 MISC 0.010
8TM065 PASSENGERS CAN TRANSFER BETWEEN BUSES. LOCAL 01/2020 0.010 MISC 0.010
TRANSIT
<Exempt>
AQC:B7 PUTNAM TPC: < $0.75 M TOTAL 5YR COST : 0.100 0.000 0.100 0.000 0.000 0.000 0.000 0.000

222
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Putnam County Listing Page 7 of 8

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

PUTNAM PUTNAM COUNTY PART BUS PURCHASES AS PART OF FTA 5307 01/2020 0.040 MISC 0.040
THE REGULAR LIFECYCLE REPLACEMENT FOR BUSES STATE 01/2020 0.005 MISC 0.005
8TM066 THAT HAVE REACHED THEIR USEFUL LIFE. LOCAL 01/2020 0.005 MISC 0.005
TRANSIT
FTA 5307 01/2021 0.040 MISC 0.040
<Exempt>
LOCAL 01/2021 0.005 MISC 0.005
STATE 01/2021 0.005 MISC 0.005
FTA 5307 01/2022 0.040 MISC 0.040
LOCAL 01/2022 0.005 MISC 0.005
STATE 01/2022 0.005 MISC 0.005
FTA 5307 01/2023 0.040 MISC 0.040
STATE 01/2023 0.005 MISC 0.005
LOCAL 01/2023 0.005 MISC 0.005
FTA 5307 01/2024 0.040 MISC 0.040
STATE 01/2024 0.005 MISC 0.005
LOCAL 01/2024 0.005 MISC 0.005
AQC:B2 PUTNAM TPC: < $0.75 M TOTAL 5YR COST : 0.250 0.000 0.050 0.050 0.050 0.050 0.050 0.000

PUTNAM PUTNAM COUNTY 5307 BLOCK. THE COUNTY WILL KEEP FTA 5307 01/2019 0.000 MISC 0.034
THIS AMOUNT OF FORMULA MONEY IN RESERVE FOR STATE 01/2019 0.000 MISC 0.004
8TM068 UNANTICIPATED TRANSIT NEEDS THAT MAY OCCURE LOCAL 01/2019 0.000 MISC 0.004
TRANSIT OVER THE 5 YEAR PERIOD. FTA 5307 01/2020 0.034 MISC 0.034
<Exempt>
LOCAL 01/2020 0.004 MISC 0.004
STATE 01/2020 0.004 MISC 0.004
FTA 5307 01/2021 0.034 MISC 0.034
STATE 01/2021 0.004 MISC 0.004
LOCAL 01/2021 0.004 MISC 0.004
AQC:J1 PUTNAM TPC: < $0.75 M TOTAL 5YR COST : 0.084 0.042 0.042 0.042 0.000 0.000 0.000 0.000

PUTNAM PUTNAM COUNTY TRANSIT FACILITY - COMMERCIAL STATE 07/2020 0.205 MISC 0.205
ROOF REPLACEMENT. THIS PROJECT WILL REMOVE LOCAL 07/2020 0.011 MISC 0.011
8TM111 AND REPLACE THE COMMERCIAL ROOF, PURPOSE IS TO
TRANSIT MAINTAIN STATE OF GOOD REPAIR. THE PROJECT IS
<Exempt> USING STATE MODERNIZATION AND ENHANCEMENT
PROGRAM FUNDING.

AQC:A10 PUTNAM TPC: < $0.75 M TOTAL 5YR COST : 0.216 0.000 0.216 0.000 0.000 0.000 0.000 0.000

223
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Putnam County Listing Page 8 of 8

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

PUTNAM SECTION 5307 PROGRAM ADMINISTRATION TO FTA 5307 01/2019 0.000 MISC 0.080
MAINTAIN OPERATIONS AND MEET REQUIREMENTS STATE 01/2019 0.000 MISC 0.010
8TRM61 FOR CONTINUED OPERATIONS OF PUTNAM AREA RAPID LOCAL 01/2019 0.000 MISC 0.010
TRANSIT TRANSIT (PART) BUS SERVICE. FTA 5307 01/2020 0.080 MISC 0.080
<Exempt>
STATE 01/2020 0.010 MISC 0.010
LOCAL 01/2020 0.010 MISC 0.010
FTA 5307 01/2021 0.080 MISC 0.080
LOCAL 01/2021 0.010 MISC 0.010
STATE 01/2021 0.010 MISC 0.010
FTA 5307 01/2022 0.080 MISC 0.080
LOCAL 01/2022 0.010 MISC 0.010
STATE 01/2022 0.010 MISC 0.010
FTA 5307 01/2023 0.080 MISC 0.080
LOCAL 01/2023 0.010 MISC 0.010
STATE 01/2023 0.010 MISC 0.010
FTA 5307 01/2024 0.080 MISC 0.080
LOCAL 01/2024 0.010 MISC 0.010
STATE 01/2024 0.010 MISC 0.010
AQC:B1 PUTNAM TPC: < $0.75 M TOTAL 5YR COST : 0.500 0.100 0.100 0.100 0.100 0.100 0.100 0.000

224
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Rockland County Listing Page 1 of 16

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT ROUTE 17 SLOATSBURG COMPLETE HPP 07/2019 0.000 CONINSP 0.104


STREETS/INFRASTRUCTURE IMPROVEMENTS ALONG PIT BOND 07/2019 0.000 CONINSP 0.026
806507 ORANGE TPK AND VILLAGE CENTER. VILLAGE OF HSIP 07/2019 0.000 CONINSP 0.090
R&P SLOATSBURG, TOWN OF RAMAPO, ROCKLAND COUNTY. SDF 07/2019 0.000 CONINSP 0.010
<Exempt>
STBG FLEX 07/2019 0.000 CONINSP 0.240
SDF 07/2019 0.000 CONINSP 0.060
HPP 07/2019 0.000 CONST 1.040
PIT BOND 07/2019 0.000 CONST 0.260
SDF 07/2019 0.000 CONST 0.083
SDF 07/2019 0.000 CONST 0.009
HSIP 07/2019 0.000 CONST 0.900
SDF 07/2019 0.000 CONST 0.100
STBG FLEX 07/2019 0.000 CONST 2.400
SDF 07/2019 0.000 CONST 0.600
AQC:K1 ROCKLAND TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 6.290 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT ROUTE 9W AT OAK TREE RD TRAFFIC SIGNAL SDF 08/2019 0.000 DETLDES 0.450
REPLACEMENT. THIS PROJECT WILL REPLACE A SDF 03/2019 0.000 PRELDES 0.050
823951 TRAFFIC SIGNAL TO MITIGATE CONGESTION AT THE SDF 08/2019 0.000 ROWACQU 0.100
SAFETY INTERSECTION OF ROUTE 9W AT OAK TREE ROAD IN SDF 03/2019 0.000 ROWINCD 0.050
<Non-Exempt> THE TOWN OF ORANGETOWN, ROCKLAND COUNTY. STBG FLEX 04/2020 0.062 CONINSP 0.062
SDF 04/2020 0.016 CONINSP 0.016
STBG FLEX 04/2020 0.520 CONST 0.520
SDF 04/2020 0.130 CONST 0.130
AQC:NON ROCKLAND TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.728 0.650 0.728 0.000 0.000 0.000 0.000 0.000

NYSDOT RTE 202 @ PIP INNOVATIVE INTERSECTION HSIP 08/2019 0.000 CONINSP 0.487
RECONFIGURATION TOWNS OF HAVERSTRAW AND NHPP 08/2019 0.000 CONINSP 0.330
848040 RAMAPO, ROCKLAND COUNTY. THIS PROJECT WILL SDF 08/2019 0.000 CONINSP 0.083
INTER USE INNOVATIVE INTERSECTION DESIGNS TO REDUCE HSIP 08/2019 0.000 CONST 4.870
<Exempt> THE NUMBER OF ACCIDENTS. THIS IS A STATEWIDE HSIP 12/2018 0.000 DETLDES 0.240
SELECTED HSIP PROJECT. 100% HSIP THROUGH USE OF
HSIP 12/2018 0.000 ROWACQU 0.090
TOLL CREDITS.

AQC:A6 ROCKLAND TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 6.100 0.000 0.000 0.000 0.000 0.000 0.000

225
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Rockland County Listing Page 2 of 16

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT RTE 202: ROSMAN ROAD TO OAKLEY BOULEVARD. IN NHPP 01/2019 0.000 CONINSP 0.086
ORDER TO REDUCE THESE CRASHES AND IMPROVE SDF 01/2019 0.000 CONINSP 0.021
848041 SAFETY FOR THE TRAVELING PUBLIC, THE SIGNALS ON NHPP 01/2019 0.000 CONST 0.720
SAFETY STATE ROUTE 202 AT ROSMAN ROAD, OAKLEY SDF 01/2019 0.000 CONST 0.180
<Exempt> BOULEVARD AND MAIN STREET WILL BE REPLACED
AND PROGRAMMED IN COORDINATION WITH
NEIGHBORING SIGNALS ON STATE ROUTE 202. THIS
PROJECT IS LOCATED IN THE TOWN OF HAVERSTRAW,
COUNTY OF ROCKLAND. 100% FEDERAL USING 10%
TOLL CREDIT.

AQC:A6 ROCKLAND TPC: $2-$4 M TOTAL 5YR COST : 0.000 1.007 0.000 0.000 0.000 0.000 0.000 0.000

ROCKLAND CONGERS ROAD RECONSTRUCTION (CR 80-BREWERY NHPP 10/2019 0.970 CONINSP 0.970
ROAD TO STRAWTOWN ROAD- 1.0 MILES): PROVIDE LOCAL 10/2019 0.243 CONINSP 0.243
875458 TURNING LANES AT BREWERY ROAD, CAIRNSMUIR NHPP 10/2019 6.465 CONST 6.465
RECON ROAD AND STRAWTOWN ROAD; RECONSTRUCT
<Exempt> LOCAL 10/2019 1.616 CONST 1.616
DRAINAGE SYSTEMS AND INSTALL CURB AND
SIDEWALK. TOWN OF CLARKSTOWN. ROCKLAND
COUNTY.

AQC:D4 ROCKLAND TPC: $7.5-$12 M TOTAL 5YR COST : 9.294 0.000 9.294 0.000 0.000 0.000 0.000 0.000

ROCKLAND SMITH ROAD (CR 60-PASCACK ROAD TO NORTH STBG LG URB 10/2021 0.520 CONINSP 0.520
MIDDLETOWN ROAD). RECONSTRUCT 1.1 MILES OF LOCAL 10/2021 0.130 CONINSP 0.130
875459 SMITH ROAD; RECONSTRUCT DRAINAGE SYSTEMS AND STBG LG URB 10/2021 2.951 CONST 2.951
RECON INSTALL CURB AND SIDEWALK. TOWN OF LOCAL 10/2021 0.738 CONST 0.738
<Exempt> CLARKSTOWN, ROCKLAND COUNTY
AQC:A10 ROCKLAND TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.339 0.000 0.000 0.000 4.339 0.000 0.000 0.000

ROCKLAND RIVER ROAD (CR 1-STEVENSON STREET TO TAPPAN ZEE STBG LG URB 10/2018 0.000 CONINSP 1.017
BRIDGE)-TOWN OF ORANGETOWN. RECONSTRUCT 1.6 LOCAL 10/2018 0.000 CONINSP 0.254
875522 MILES OF RIVER ROAD; RECONSTRUCT DRAINAGE STBG LG URB 10/2018 0.000 CONST 5.762
RECON SYSTEMS INCLUDING UNDERDRAIN, CURB, AND LOCAL 10/2018 0.000 CONST 1.441
<Exempt> SIDEWALK INSTALLATION.

AQC:A10 ROCKLAND TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 8.474 0.000 0.000 0.000 0.000 0.000 0.000

226
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Rockland County Listing Page 3 of 16

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

ROCKLAND BRIDGE REPLACEMENT IN KIND: WILLIAM STREET STBG-OFF 12/2019 0.147 DETLDES 0.147
BRIDGE/SPARKILL CREEK REPLACEMENT AND SDF 12/2019 0.595 DETLDES 0.595
875768 RECONSTRUCT APPROACHES. TOWN OF LOCAL 12/2019 0.037 DETLDES 0.037
BRIDGE ORANGETOWN, ROCKLAND COUNTY. BIN 3346070 STBG-OFF 12/2019 0.147 PRELDES 0.147
<Exempt>
LOCAL 12/2019 0.037 PRELDES 0.037
STBG-OFF 12/2019 0.005 ROWINCD 0.005
LOCAL 12/2019 0.001 ROWINCD 0.001
STBG-OFF 12/2020 0.035 ROWACQU 0.035
LOCAL 12/2020 0.009 ROWACQU 0.009
STBG-OFF 11/2021 0.090 CONINSP 0.090
LOCAL 11/2021 0.023 CONINSP 0.023
STBG-OFF 01/2022 0.810 CONST 0.810
SDF 01/2022 2.320 CONST 2.320
LOCAL 01/2022 0.203 CONST 0.203
AQC:A19 ROCKLAND TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.459 0.000 0.969 0.044 3.446 0.000 0.000 0.000

NYSDOT REHABILITATION STATE BIKE ROUTE 9: ROCKLAND HPP 08/2019 0.000 CONINSP 0.271
LAKE RIVER TRAIL & DUNDERBURG MOUNTAIN TRAIL. SDF 08/2019 0.000 CONINSP 0.068
875904 TOWNS OF CLARKSTOWN & STONY POINT. ROCKLAND HPP 08/2019 0.000 CONST 2.260
MOBIL COUNTY. TRANSFERRED EARMARKS: NY055, NY090, SDF 08/2019 0.000 CONST 0.565
<Exempt> NY113, NY127, NY154, NY276, NY535, NY538, NY595 HPP 04/2019 0.000 DETLDES 0.049
(PROGRAM CODE RPS9); NY016 (PROGRAM CODE RNV9).
SDF 04/2019 0.000 DETLDES 0.012

AQC:C2 ROCKLAND TPC: $2-$4 M TOTAL 5YR COST : 0.000 3.225 0.000 0.000 0.000 0.000 0.000 0.000

ROCKLAND PASCACK ROAD @ LAWRENCE STREET, ADD A LEFT CMAQ 10/2018 0.000 ROWACQU 0.008
TURN LANE ON SOUTHBOUND PASCACK APPROACH, SDF 10/2018 0.000 ROWACQU 0.671
875907 DRAINAGE IMPROVEMENTS AND INSTALL SIDEWALK. LOCAL 10/2018 0.000 ROWACQU 0.002
RECON TOWN OF CLARKSTOWN, ROCKLAND COUNTY. CMAQ 10/2019 0.104 CONINSP 0.104
<Exempt>
SDF 10/2019 2.320 CONINSP 2.320
LOCAL 10/2019 0.026 CONINSP 0.026
CMAQ 10/2019 0.936 CONST 0.936
SDF 10/2019 2.320 CONST 2.320
LOCAL 10/2019 0.234 CONST 0.234
AQC:D1 ROCKLAND TPC: $6-$9.4 M TOTAL 5YR COST : 5.940 0.681 5.940 0.000 0.000 0.000 0.000 0.000

ROCKLAND WEST SHORE RIVER LN RR CROSSING & HPP 04/2020 0.135 CONINSP 0.135
IMPROVEMENTS (BEAR MTN MAINTENANCE SDF 04/2020 0.080 CONINSP 0.080
875964 RD - ANDRE AVE): SAFETY MEASURES TO IMPROVE LOCAL 04/2020 0.525 CONINSP 0.525
SAFETY SAFETY & DESIGNATION OF QUIET ZONES FOR THE 13 LOCAL 04/2020 0.034 CONINSP 0.034
<Exempt> PUBLIC AND 7 PRIVATE RR/ROADWAY INTERSECTIONS HPP 04/2020 2.463 CONST 2.463
(NY 299 HPP#443, NY421 #1611, NY578 #3256)
SDF 04/2020 0.130 CONST 0.130
LOCAL 04/2020 0.616 CONST 0.616
LOCAL 04/2020 4.020 CONST 4.020
AQC:A1 ROCKLAND TPC: $7.5-$12 M TOTAL 5YR COST : 8.003 0.000 8.003 0.000 0.000 0.000 0.000 0.000

227
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Rockland County Listing Page 4 of 16

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

ROCKLAND GERMONDS RD: PALISADES INTERSTATE PKWY (PIP) CMAQ 12/2020 0.160 DETLDES 0.160
RAMPS INTERSECTION RECONSTRUCTION: LOCAL 12/2020 0.040 DETLDES 0.040
875966 MIDDLETOWN ROAD/LITTLE TOR ROAD. INCLUDES CMAQ 12/2020 0.240 PRELDES 0.240
INTER CHANNELIZED LANES & TURN LANE FROM NB PIP LOCAL 12/2020 0.060 PRELDES 0.060
<Exempt> RAMP. PROJECT PART OF ROCKLAND COUNTY SIGNAL CMAQ 12/2020 0.064 ROWACQU 0.064
RETIMING STUDY. TOWN OF CLARKSTOWN.
LOCAL 12/2020 0.016 ROWACQU 0.016
CMAQ 12/2020 0.016 ROWINCD 0.016
LOCAL 12/2020 0.004 ROWINCD 0.004
CMAQ 12/2022 0.400 CONINSP 0.400
LOCAL 12/2022 0.100 CONINSP 0.100
CMAQ 12/2022 1.920 CONST 1.920
LOCAL 12/2022 0.480 CONST 0.480
AQC:D1 ROCKLAND TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.500 0.000 0.000 0.600 0.000 2.900 0.000 0.000

LOCAL TOWN OF ORANGETOWN TRAFFIC SIGNALS CMAQ 12/2023 0.004 DETLDES 0.004
IMPROVEMENTS: RETIME AND REPLACE SUBSTANDARD LOCAL 12/2023 0.001 DETLDES 0.001
875967 TRAFFIC SIGNALS WITH MODERN EQUIPMENT AT 28 CMAQ 12/2023 0.004 PRELDES 0.004
TRAFFIC INTERSECTIONS IDENTIFIED IN ROCKLAND LOCAL 12/2023 0.001 PRELDES 0.001
<Exempt> COUNTY\\\\\\\'S SIGNAL RE-TIMING PROJECT. TOWN OF CMAQ 07/2025 0.000 CONINSP 0.004
ORANGETOWN, ROCKLAND COUNTY.
LOCAL 07/2025 0.000 CONINSP 0.001
CMAQ 07/2025 0.000 CONST 0.220
LOCAL 07/2025 0.000 CONST 0.053
AQC:D2 ROCKLAND TPC: < $0.75 M TOTAL 5YR COST : 0.010 0.000 0.000 0.000 0.000 0.000 0.010 0.278

ROCKLAND WEST WASHINGTON AVE. (CR 30): OLD PASCACK ROAD STBG LG URB 07/2019 0.000 ROWACQU 0.056
TO HIGHLAND AVENUE. REHABILITATION AND LOCAL 07/2019 0.000 ROWACQU 0.014
875977 REPLACEMENT IN KIND OF THE WEST WASHINGTON STBG LG URB 07/2020 0.735 CONINSP 0.735
BRIDGE BRIDGE OVER PASCACK BROOK. TOWN OF LOCAL 07/2020 0.184 CONINSP 0.184
<Exempt> ORANGETOWN, ROCKLAND COUNTY STBG LG URB 07/2020 4.165 CONST 4.165
LOCAL 07/2020 1.041 CONST 1.041
AQC:A19 ROCKLAND TPC: $4.6-$7.5 M TOTAL 5YR COST : 6.125 0.070 6.125 0.000 0.000 0.000 0.000 0.000

LOCAL NEW CONNECTIVITIES FOR NYACK: NORTH & SOUTH TAP LG URBAN 12/2018 0.000 CONINSP 0.196
BROADWAY FROM INTERSECTION OF CEDAR HILL SDF 12/2018 0.000 CONINSP 0.800
876128 AVE-APPROXIMATELY 212\\\' NORTH OF TALLMAN LOCAL 12/2018 0.000 CONINSP 0.076
MOBIL AVENUE: INSTALLATION OF SIDEWALKS, GRANITE TAP LG URBAN 12/2018 0.000 CONST 1.084
<Exempt> CURBING, PED CROSSWALK, STREET LIGHTS & BUS SDF 12/2018 0.000 CONST 0.034
SHELTERS. VILLAGE OF NYACK, ROCKLAND CO
LOCAL 12/2018 0.000 CONST 0.422

AQC:C2 ROCKLAND TPC: $2-$4 M TOTAL 5YR COST : 0.000 2.612 0.000 0.000 0.000 0.000 0.000 0.000

228
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Rockland County Listing Page 5 of 16

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL ROUTE 306 PEDESTRIAN SIDEWALK: INSTALLATION OF TAP LG URBAN 03/2019 0.000 CONINSP 0.076
SIDEWALKS ALONG NYS RTE 306 FROM VIOLA RD TO SDF 03/2019 0.000 CONINSP 0.080
876131 INTERSECTION WITH RITA AVE. WORK INCLUDES LOCAL 03/2019 0.000 CONINSP 0.019
MOBIL CONCRETE SIDEWALKS & ADA COMPLIANT CURB TAP LG URBAN 03/2019 0.000 CONST 0.861
<Exempt> IMPROVEMENTS. TOWN OF RAMAPO, ROCKLAND SDF 03/2019 0.000 CONST 0.080
COUNTY
LOCAL 03/2019 0.000 CONST 0.215
AQC:C2 ROCKLAND TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 1.331 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL VILLAGE OF NEW SQUARE PALISADES INTERSTATE HPP 07/2019 0.000 CONINSP 0.052
PARKWAY MITIGATION MEASURES. THE PROJECT WILL LOCAL 07/2019 0.000 CONINSP 0.013
876154 RECONSTRUCT A DRAINAGE DITCH LOCATED NEAR HPP 07/2019 0.000 CONST 0.400
SAFETY STELLA DRIVE. THE IMPROVEMENTS INCLUDE LOCAL 07/2019 0.000 CONST 0.100
<Exempt> CLEARING, WIDENING, AND DEEPENING OF HPP 12/2018 0.000 ROWACQU 0.048
APPROXIMATELY 1100 LINEAR FEET OF THE DRAINAGE
LOCAL 12/2018 0.000 ROWACQU 0.190
DITCH. ADDITIONALLY, A FOUR FOOT WALL WILL BE
CONSTRUCTED ALONG THE SIDE OF THE DITCH IN THE LOCAL 12/2018 0.000 ROWACQU 0.012
AREA LOCATED AT STELLA DRIVE. PURPOSE AS A
SAFETY IMPROVEMENT. VILLAGE OF NEW SQUARE AND
TOWN OF RAMAPO, ROCKLAND COUNTY.
TRANSFERRED EARMARKS: NY153 (PROGRAM CODE
RPS9)

AQC:A2 ROCKLAND TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 0.815 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL SNAKE HILL ROAD/CSX RIVER LINE SUPERSTRUCTURE NHPP 09/2019 0.000 ROWACQU 0.024
REPLACEMENT. THIS PROJECT WILL REPLACE THE LOCAL 09/2019 0.000 ROWACQU 0.006
876160 SUPERSTRUCTURE OF THE EXISTING BRIDGE THAT NHPP 10/2019 0.128 CONINSP 0.128
BRIDGE CARRIES SNAKE HILL ROAD OVER THE CSX TRANSIT LOCAL 10/2019 0.032 CONINSP 0.032
<Exempt> RIVER LINE LOCATED IN THE TOWN OF CLARKSTOWN, NHPP 10/2019 1.093 CONST 1.093
ROCKLAND COUNTY. PURPOSE - DUE TO
LOCAL 10/2019 0.273 CONST 0.273
DETERIORATION TO BRING TO STATE OF GOOD REPAIR.
BRIDGE NY PROJECT. FUNDED IS 95% FEDERAL USING
15% TOLL CREDIT WITH A 5% LOCAL MATCH. BIN
3345780

AQC:A19 ROCKLAND TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.526 0.030 1.526 0.000 0.000 0.000 0.000 0.000

229
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Rockland County Listing Page 6 of 16

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL VILLAGE OF SOUTH NYACK RT 9W PEDESTRIAN HPP 02/2019 0.000 CONINSP 0.026
IMPROVEMENTS. THIS PROJECT WILL REPLACE LOCAL 02/2019 0.000 CONINSP 0.006
876173 SIDEWALKS ALONG ROUTE 9W (HILLSIDE AVENUE) ON HPP 02/2019 0.000 CONST 0.088
SAFETY THE SOUTHBOUND SIDE FROM LONGVIEW CT TO LOCAL 02/2019 0.000 CONST 0.022
<Exempt> SOUTH FRANKLIN STREET. THE SIDEWALK WILL BE
RECONSTRUCTED FOR A LENGTH OF APPROXIMATELY
1000 FEET. THE PROPOSED SIDEWALK WILL BE 4 FEET
WIDE WITH FIVE FOOT BY FIVE FOOT TURNAROUND
SPACES INTERSPERSED PER THE AMERICAN WITH
DISABILITIES ACT ACCESSIBILITY GUIDELINES
(ADAAG) AND PUBLIC RIGHTS OF WAY ACCESSIBILITY
GUIDELINES (PROWAG). VILLAGE OF SOUTH NYACK,
ROCKLAND COUNTY. TRANSFERRED EARMARK: NY276
(PROGRAM CODE RPS9).

AQC:C2 ROCKLAND TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.142 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL THE INFRASTRUCTURE IMPROVEMENTS ALONG TAP FLEX 02/2019 0.000 CONINSP 0.048
ORANGE TURNPIKE AND VILLAGE CENTER PROJECT LOCAL 02/2019 0.000 CONINSP 0.012
876188 CONSISTS OF NEW AND RECONSTRUCTION OF TAP FLEX 02/2019 0.000 CONST 0.436
MOBIL SIDEWALKS TO ALLOW FOR THE ACCESS OF LOCAL 02/2019 0.000 CONST 0.109
<Exempt> PEDESTRIANS/RESIDENTS TO THE DOWNTOWN AREAS.
THIS PROJECT IS LOCATED IN THE VILLAGE OF
SLOATSBURG, ROCKLAND COUNTY.

AQC:C2 ROCKLAND TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.605 0.000 0.000 0.000 0.000 0.000 0.000

230
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Rockland County Listing Page 7 of 16

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL TOWN OF RAMAPO PEDESTRIAN SAFETY HSIP 11/2018 0.000 DETLDES 0.035
IMPROVEMENTS. AT SIGNALIZED INTERSECTIONS, HSIP 11/2018 0.000 PRELDES 0.035
876205 IMPROVEMENT WILL INCLUDE TWO HIGH VISIBILITY HSIP 11/2018 0.000 ROWINCD 0.001
SAFETY CROSSWALKS, FOUR COUNTDOWN TIMERS, AND FOUR HSIP 09/2020 0.060 CONINSP 0.060
<Exempt> APS BUTTONS. AT UNCONTROLLED CROSSWALKS, HSIP 09/2020 0.408 CONST 0.408
ENHANCEMENTS INCLUDE THE BASIC TREATMENTS OF
HSIP 11/2019 0.009 ROWACQU 0.009
HIGH VISIBILITY CROSSWALKS, YIELD TO PEDESTRIAN
SIGNS, AND SOLAR SIGNS. FOUR NEW CROSSWALKS
ARE PROPOSED WITH THE ADDITION OF NEW CURB
CUTS TO COMPLY WITH AMERICANS WITH DISABILITIES
ACT. THE STATE CERTIFIES THAT THIS PROJECT HAS
BEEN APPROVED BY THE REGIONAL SAFETY
EVALUATION ENGINEER AND SIGNED OFF BY THE
REGIONAL TRAFFIC ENGINEER. 100% FEDERAL USING
10% TOLL CREDIT. THIS PROJECT WAS SELECTED IN THE
LOCAL CALL FOR PSAP PROJECTS AND NO OFFSET
NEEDED. DOES NOT COUNT AGAINST THE REGIONAL
PLANNING TARGET. TOWN OF RAMAPO, ROCKLAND
COUNTY

AQC:A6 ROCKLAND TPC: < $0.75 M TOTAL 5YR COST : 0.477 0.071 0.477 0.000 0.000 0.000 0.000 0.000

LOCAL VILLAGE OF NYACK PEDESTRIAN SAFETY HSIP 09/2019 0.000 CONINSP 0.037
IMPROVEMENTS. TO UPGRADE UNCONTROLLED HSIP 09/2019 0.000 CONST 0.370
876206 CROSSWALKS AND SIGNALIZED INTERSECTIONS HSIP 11/2018 0.000 DETLDES 0.019
SAFETY THROUGHOUT THE VILLAGE OF NYACK. UPDATES HSIP 11/2018 0.000 PRELDES 0.019
<Exempt> INCLUDE NEW PEDESTRIAN SIGNALS, INSTALLATION
OF AMERICANS WITH DISABILITIES ACT (ADA)
COMPLIANT RAMPS, HIGH VISIBILITY CROSSWALK
MARKINGS, AND PEDESTRIAN SIGNAGE. THE STATE
CERTIFIES THAT THIS PROJECT HAS BEEN APPROVED BY
THE REGIONAL SAFETY EVALUATION ENGINEER AND
SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER.
100% FEDERAL USING 10% TOLL CREDIT. THIS PROJECT
WAS SELECTED IN THE LOCAL CALL FOR PSAP
PROJECTS AND NO OFFSET NEEDED. DOES NOT COUNT
AGAINST THE REGIONAL PLANNING TARGET. VILLAGE
OF NYACK, ROCKLAND COUNTY.

AQC:A6 ROCKLAND TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.445 0.000 0.000 0.000 0.000 0.000 0.000

231
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Rockland County Listing Page 8 of 16

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

ROCKLAND GRASSY POINT ROAD OVER MINISCEONGO CREEK STBG LG URB 07/2019 0.000 DETLDES 0.190
BRIDGE REPLACEMENT. THIS PROJECT WILL REPLACE LOCAL 07/2019 0.000 DETLDES 0.010
876214 GRASSY POINT ROAD OVER MINISCEONGO CREEK LOCAL 07/2019 0.000 DETLDES 0.500
BRIDGE BRIDGE IN THE TOWN OF STONY POINT, ROCKLAND STBG LG URB 07/2019 0.000 PRELDES 0.190
<Exempt> COUNTY. COMPLETE REPLACEMENT OF THE EXISTING LOCAL 07/2019 0.000 PRELDES 0.011
STRUCTURE WITH A MODERN STRUCTURE CAPABLE OF
STATE 07/2019 0.000 PRELDES 1.126
CARRYING ALL LEGAL LOADS. 2018 BRIDGE NY
PROJECT. 95% FEDERAL USING 15% TOLL CREDIT WITH LOCAL 07/2019 0.000 PRELDES 1.126
A 5% MATCH. BIN 3346300 STBG LG URB 02/2021 0.153 CONINSP 0.153
LOCAL 02/2021 0.008 CONINSP 0.008
LOCAL 02/2021 0.035 CONINSP 0.035
STATE 02/2021 0.035 CONINSP 0.035
STBG LG URB 02/2021 1.389 CONST 1.389
LOCAL 02/2021 0.072 CONST 0.072
LOCAL 02/2021 0.500 CONST 0.500
AQC:A19 ROCKLAND TPC: $4.6-$7.5 M TOTAL 5YR COST : 2.192 3.153 0.000 2.192 0.000 0.000 0.000 0.000

ROCKLAND CALLS HOLLOW RD OVER MINISCEONGO CREEK STBG LG URB 07/2019 0.000 DETLDES 0.081
BRIDGE REHABILITATION. THIS PROJECT WILL REPAIR LOCAL 07/2019 0.000 DETLDES 0.004
876215 THE CALLS HOLLOW ROAD OVER MINISCEONGO CREEK STBG LG URB 07/2019 0.000 PRELDES 0.081
BRIDGE BRIDGE IN THE TOWN OF HAVERSTRAW, ROCKLAND LOCAL 07/2019 0.000 PRELDES 0.004
<Exempt> COUNTY. THE PROJECT WILL STABILIZE THE STEAM STBG LG URB 02/2021 0.065 CONINSP 0.065
BANKS TO IMPROVE STREAM GEOMETRY FOR FLOW
LOCAL 02/2021 0.003 CONINSP 0.003
EFFICIENCY AND ENSURE SUSTAINABILITY OF THE
BRIDGE AND ROADWAY. 2018 BRIDGE NY PROJECT. 95% STBG LG URB 02/2021 0.581 CONST 0.581
FEDERAL USING 15% TOLL CREDIT WITH A 5% MATCH. LOCAL 02/2021 0.032 CONST 0.032
BIN 3345900

AQC:A19 ROCKLAND TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.681 0.170 0.000 0.681 0.000 0.000 0.000 0.000

ROCKLAND TOWNLINE ROAD (CR42) CULVERT REPLACEMENT STBG LG URB 07/2019 0.000 DETLDES 0.000
BETWEEN WORTHINGTON CT AND HARTSHORN LN STATE 07/2019 0.000 DETLDES 0.035
876225 TOWN OF ORANGETOWN ROCKLAND COUNTY LOCAL 07/2019 0.000 DETLDES 2.380
BRIDGE
STBG LG URB 07/2019 0.000 PRELDES 0.000
<Exempt>
STATE 07/2019 0.000 PRELDES 0.035
LOCAL 07/2019 0.000 PRELDES 0.731
STBG LG URB 02/2021 0.000 CONINSP 0.000
STATE 02/2021 0.060 CONINSP 0.060
LOCAL 02/2021 2.380 CONINSP 2.380
STBG LG URB 02/2021 0.000 CONST 0.000
STATE 02/2021 0.218 CONST 0.218
LOCAL 02/2021 2.380 CONST 2.380
AQC:A2 ROCKLAND TPC: $7.5-$12 M TOTAL 5YR COST : 5.038 3.181 0.000 5.038 0.000 0.000 0.000 0.000

232
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Rockland County Listing Page 9 of 16

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

ROCKLAND HUNGRY HOLLOW ROAD (CR71) CULVERT STBG LG URB 07/2019 0.000 DETLDES 0.000
REPLACEMENT BETWEEN SPARROW AVENUE AND STATE 07/2019 0.000 DETLDES 0.046
876226 RAYMOND AVENUE TOWN OF RAMAPO ROCKLAND LOCAL 07/2019 0.000 DETLDES 0.731
BRIDGE COUNTY STBG LG URB 07/2019 0.000 PRELDES 0.000
<Exempt>
STATE 07/2019 0.000 PRELDES 0.046
LOCAL 07/2019 0.000 PRELDES 0.731
STBG LG URB 02/2021 0.000 CONINSP 0.000
STATE 02/2021 0.060 CONINSP 0.060
LOCAL 02/2021 0.731 CONINSP 0.731
STBG LG URB 02/2021 0.000 CONST 0.000
STATE 02/2021 0.403 CONST 0.403
LOCAL 02/2021 0.731 CONST 0.731
AQC:A2 ROCKLAND TPC: $3.3-$5.6 M TOTAL 5YR COST : 1.925 1.554 0.000 1.925 0.000 0.000 0.000 0.000

ROCKLAND BRIDGE CAPITAL MAINTENANCE - ANNUAL CAPITAL STBG-OFF 10/2019 0.200 MISC 0.200
MAINTENANCE CONTRACT TO REPAIR JOINT BEARING LOCAL 10/2019 0.050 MISC 0.050
876244 AND CONCRETE, ETC. STBG-OFF 10/2020 0.200 MISC 0.200
BRIDGE
LOCAL 10/2020 0.050 MISC 0.050
<Exempt>
STBG-OFF 10/2021 0.200 MISC 0.200
LOCAL 10/2021 0.050 MISC 0.050
STBG-OFF 10/2022 0.200 MISC 0.200
LOCAL 10/2022 0.050 MISC 0.050
STBG-OFF 10/2023 0.200 MISC 0.200
LOCAL 10/2023 0.050 MISC 0.050
AQC:A2 ROCKLAND TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.250 0.000 0.250 0.250 0.250 0.250 0.250 0.000

ROCKLAND INTERSECTION IMPROVEMENT COUNTY ROUTE 29 AND STBG LG URB 01/2022 0.250 PRELDES 0.250
ZUKOR RD. PROJECT WILL REPLACE STOP AND YIELD LOCAL 01/2022 0.063 PRELDES 0.063
876245 CONTROL INTERSECTION WITH MODERN LOCAL 01/2022 2.000 PRELDES 2.000
RECON ROUNDABOUT. THIS PROJECT WILL NOT ONLY STBG LG URB 06/2022 0.050 ROWINCD 0.050
<Exempt> IMPROVE TRAFFIC FLOW AND AIR QUALITY, BUT IT LOCAL 06/2022 0.013 ROWINCD 0.013
WILL PROVIDE A COST EFFECTIVE TRANSPORTATION
STBG LG URB 01/2023 0.250 DETLDES 0.250
SYSTEM GATEWAY ENHANCEMENT AT THE NORTHERN
END OF NEW CITY. LOCAL 01/2023 0.063 DETLDES 0.063
STBG LG URB 01/2024 0.100 CONINSP 0.100
LOCAL 01/2024 0.025 CONINSP 0.025
STBG LG URB 01/2024 0.750 CONST 0.750
LOCAL 01/2024 0.188 CONST 0.188
AQC:D3 ROCKLAND TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.752 0.000 0.000 0.000 2.376 0.313 1.063 0.000

233
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Rockland County Listing Page 10 of 16

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL LAWRENCE STREET SIDEWALKS: SECOND STREET TO STP ENHANCE 02/2020 0.800 CONST 0.800
PASCACK ROAD. INSTALL 1200 LINER FEET (LF) OF NEW SDF 02/2020 0.071 CONST 0.071
878028 SIDEWALK FROM SECOND STREET TO PASCACK RD & LOCAL 02/2020 0.200 CONST 0.200
MOBIL 720 LF OF NEW SIDEWALK ALONG PASCACK LOCAL 02/2020 0.400 CONST 0.400
<Exempt> RD-CLARKSTOWN RD. TOWN OF CLARKSTOWN,
ROCKLAND COUNTY TEP-#85064

AQC:C2 ROCKLAND TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.471 0.000 1.471 0.000 0.000 0.000 0.000 0.000

LOCAL REVITALIZATION OF WEST NYACK PHASE 2 SDF 06/2020 0.005 CONINSP 0.005
STEETSCAPE IMPROVEMENTS. LOCAL 06/2020 0.536 CONINSP 0.536
878052 STRAWTOWN/SICKLETOWN ROAD FROM DEMONEST STP ENHANCE 06/2020 2.321 CONST 2.321
SAFETY AVE. NORTH TO ROUTE 59 OVERPASS. WORK INCLUDES SDF 06/2020 0.053 CONST 0.053
<Exempt> SIDEWALKS, CURBING, PAVERS, LIGHTING, BIKE RACKS LOCAL 06/2020 1.250 CONST 1.250
& LANDSCAPING. TOWN OF CLARKSTOWN, ROCKLAND
COUNTY TEP 20

AQC:C2 ROCKLAND TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.165 0.000 4.165 0.000 0.000 0.000 0.000 0.000

LOCAL NORTH MIDDLETOWN ROAD PEDESTRIAN CORRIDOR STP ENHANCE 04/2019 0.000 CONINSP 0.219
LINK: PEARL RIVER CENTRAL BUSINESS DISTRICT & LOCAL 04/2019 0.000 CONINSP 0.190
878054 TRANSPORTATION HUB FROM THE CROOKED HILL LOCAL 04/2019 0.000 CONINSP 0.075
SAFETY ROAD SOUTH TO CENTRAL AVE. SIDEWALKS, CURBS, STP ENHANCE 04/2019 0.000 CONST 1.447
<Exempt> AUDIBLE PED SIGNALS & SIGNAGE. TOWN OF LOCAL 04/2019 0.000 CONST 0.190
ORANGETOWN, ROCKLAND COUNTY TEP 2014
LOCAL 04/2019 0.000 CONST 0.482

AQC:C2 ROCKLAND TPC: $2-$4 M TOTAL 5YR COST : 0.000 2.603 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT AMERICANS WITH DISABILITIES ACT SIDEWALK & HPP 08/2019 0.000 CONINSP 0.289
RAMPS: THIS PROJECT WILL BUILD OR REPAIR PIT BOND 08/2019 0.000 CONINSP 0.072
881342 SIDEWALKS AND RAMPS ON STATE HIGHWAY HPP 08/2019 0.000 CONST 2.892
MOBIL RIGHT-OF-WAY TO ASSURE COMPLIANCE WITH THE PIT BOND 08/2019 0.000 CONST 0.723
<Exempt> AMERICANS WITH DISABILITIES ACT. ROCKLAND
COUNTY. PROGRAM CODE RPS9. TRANSFERRED
EARMARKS: NY 595, NY 531, NY528, NY338, NY363, NY
557. (FORMERLY PIN: 8T0342)

AQC:C2 ROCKLAND TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 3.976 0.000 0.000 0.000 0.000 0.000 0.000

234
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Rockland County Listing Page 11 of 16

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

ROCKLAND ROCKLAND COUNTY COMMUTE ALTERNATIVES: CMAQ 10/2018 0.000 OPER 0.640
FOCUSES ON STRATEGIES INTENDED TO CHANGE THE LOCAL 10/2018 0.000 OPER 0.160
882370 TRAVEL BEHAVIOR OF COMMUTERS INCLUDING MODE CMAQ 10/2019 0.640 OPER 0.640
MOBIL CHOICE & THE DIRECTION/TIME OF TRAVEL, AND LOCAL 10/2019 0.160 OPER 0.160
<Non-Exempt> THEREBY REDUCE CONGESTION, IMPROVE MOBILITY & CMAQ 10/2020 0.680 OPER 0.680
IMPROVE AIR QUALITY. (Formerly PIN: 880689)
LOCAL 10/2020 0.170 OPER 0.170
CMAQ 10/2021 0.680 OPER 0.680
LOCAL 10/2021 0.170 OPER 0.170
CMAQ 10/2022 0.720 OPER 0.720
LOCAL 10/2022 0.180 OPER 0.180
CMAQ 10/2023 0.720 OPER 0.720
LOCAL 10/2023 0.180 OPER 0.180
AQC:NON ROCKLAND TPC: $4.6-$7.5 M TOTAL 5YR COST : 4.300 0.800 0.800 0.850 0.850 0.900 0.900 0.000

ROCKLAND DESIGN & ENGINEER FOR SIDEWALKS TO IMPROVE FTA 5307 10/2022 0.240 MISC 0.240
ACCESS TO PUBLIC TRANSIT USERS. SANATORIUM LOCAL 10/2022 0.030 MISC 0.030
8TM008 ROAD: ROUTE 45 TO BUILDING L. POMONA, ROCKLAND STATE 10/2022 0.030 MISC 0.030
MOBIL COUNTY
<Exempt>
AQC:C2 ROCKLAND TPC: < $0.75 M TOTAL 5YR COST : 0.300 0.000 0.000 0.000 0.000 0.300 0.000 0.000

ROCKLAND CAPITAL COST OF CONTRACTING FOR THE OPERATIONS FTA 5307 10/2018 0.000 MISC 0.800
OF TRANSPORT OF ROCKLAND (TOR). TO MAINTAIN LOCAL 10/2018 0.000 MISC 0.100
8TM018 OPERATIONS AND MEET REQUIREMENTS FOR STATE 10/2018 0.000 MISC 0.100
TRANSIT CONTINUED OPERATION. FTA 5307 10/2019 0.800 MISC 0.800
<Exempt>
LOCAL 10/2019 0.100 MISC 0.100
STATE 10/2019 0.100 MISC 0.100
FTA 5307 10/2020 0.800 MISC 0.800
LOCAL 10/2020 0.100 MISC 0.100
STATE 10/2020 0.100 MISC 0.100
FTA 5307 10/2021 0.400 MISC 0.400
STATE 10/2021 0.050 MISC 0.050
LOCAL 10/2021 0.050 MISC 0.050
FTA 5307 10/2022 0.400 MISC 0.400
STATE 10/2022 0.050 MISC 0.050
LOCAL 10/2022 0.050 MISC 0.050
FTA 5307 10/2023 0.400 MISC 0.400
STATE 10/2023 0.050 MISC 0.050
LOCAL 10/2023 0.050 MISC 0.050
AQC:B1 ROCKLAND TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.500 1.000 1.000 1.000 0.500 0.500 0.500 0.000

235
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Rockland County Listing Page 12 of 16

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

ROCKLAND PURCHASE (2) < 30\' CUTAWAY REPLACEMENT BUSES SDF 01/2019 0.000 MISC 0.153
FOR TRANSPORTATION RESOURCES, INTRACOUNTY STATE 01/2019 0.000 MISC 0.140
8TM027 PARATRANSIT SERVICE (TRIPS) TO IMPROVE
TRANSIT EFFICIENCY IN OPERATIONS. PROJECT IS USING FUNDS
<Exempt> FROM THE STATE MODERNIZATION AND
ENHANCEMENT PROGRAM.

AQC:B10P ROCKLAND TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.293 0.000 0.000 0.000 0.000 0.000 0.000

ROCKLAND ROCKLAND COUNTY 5339 BLOCK BUS FACILITIES FTA 5339 10/2018 0.000 MISC 0.164
PROGRAM. THIS CAPITAL PROGRAM PROVIDES LOCAL 10/2018 0.000 MISC 0.021
8TM037 FUNDING TO REPLACE, REHABILITATE, AND PURCHASE STATE 10/2018 0.000 MISC 0.021
TRANSIT BUSES AND RELATED EQUIPMENT, AND TO CONSTRUCT FTA 5339 10/2019 0.164 MISC 0.164
<Exempt> BUS-RELATED FACILITIES. STATE 10/2019 0.021 MISC 0.021
LOCAL 10/2019 0.021 MISC 0.021
FTA 5339 10/2020 0.164 MISC 0.164
STATE 10/2020 0.021 MISC 0.021
LOCAL 10/2020 0.021 MISC 0.021
FTA 5339 10/2021 0.164 MISC 0.164
STATE 10/2021 0.021 MISC 0.021
LOCAL 10/2021 0.021 MISC 0.021
FTA 5339 10/2022 0.164 MISC 0.164
STATE 10/2022 0.021 MISC 0.021
LOCAL 10/2022 0.021 MISC 0.021
AQC:B10 ROCKLAND TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.824 0.206 0.206 0.206 0.206 0.206 0.000 0.000

ROCKLAND PURCHASE (6) 30\\\\\\\' REPLACEMENT BUSES FOR FTA 5307 05/2019 0.000 MISC 2.520
TRANSPORT OF ROCKLAND (TOR) BUS SERVICE. LOCAL 05/2019 0.000 MISC 0.315
8TM070 STATE 05/2019 0.000 MISC 0.315
TRANSIT
<Exempt>
AQC:B10 ROCKLAND TPC: $2-$4 M TOTAL 5YR COST : 0.000 3.150 0.000 0.000 0.000 0.000 0.000 0.000

ROCKLAND PURCHASE (8) 35\\\\\\\' REPLACEMENT BUSES FOR FTA 5307 05/2019 0.000 MISC 3.360
TRANSPORT OF ROCKLAND (TOR) BUS SERVICE. LOCAL 05/2019 0.000 MISC 0.420
8TM071 STATE 05/2019 0.000 MISC 0.420
TRANSIT
<Exempt>
AQC:B10 ROCKLAND TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 4.200 0.000 0.000 0.000 0.000 0.000 0.000

ROCKLAND PURCHASE (2) 40 FOOT REPLACEMENT BUSES FOR FTA 5307 05/2019 0.000 MISC 0.840
TRANSPORT OF ROCKLAND (TOR) BUS SERVICE. STATE 05/2019 0.000 MISC 0.105
8TM072 LOCAL 05/2019 0.000 MISC 0.105
TRANSIT
<Exempt>
AQC:B10 ROCKLAND TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 1.050 0.000 0.000 0.000 0.000 0.000 0.000

236
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Rockland County Listing Page 13 of 16

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

ROCKLAND PURCHASE (5) MV-1 VEHICLES FOR REPLACEMENT STATE 10/2018 0.000 MISC 0.350
TRANSPORTATION RESOURCES, INTERCOUNTY
8TM074 PARATRANSIT (TRIPS) REPLACEMENT. PROJECT IS
TRANSIT USING FUNDS FROM THE STATE MODERNIZATION AND
<Exempt> ENHANCEMENT PROGRAM.
AQC:B10 ROCKLAND TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 0.350 0.000 0.000 0.000 0.000 0.000 0.000

ROCKLAND REHAB/RENOVATE BUILDING T PARKING LOT IN STATE 10/2020 0.200 MISC 0.200
POMONA. THIS PROJECT WILL REPAIR DRAINAGE,
8TM093 REPAVE, AND RESTRIPE BUILDING T PARKING LOT IN
TRANSIT POMONA, NY TO A STATE OF GOOD REPAIR. PROJECT IS
<Exempt> USING FUNDS FROM THE STATE MODERNIZATION AND
ENHANCEMENT PROGRAM.

AQC:A10 ROCKLAND TPC: < $0.75 M TOTAL 5YR COST : 0.200 0.000 0.000 0.200 0.000 0.000 0.000 0.000

ROCKLAND REHAB/RENOVATE PARKING LOT #2 NEAR NANUET STATE 01/2020 0.160 MISC 0.160
RAILROAD STATION IN NANUET. PROJECT WILL REPACE
8TM094 AND RESTRIPE PARKING LOT TO A STATE OF GOOD
TRANSIT REPAIR. PROJECT IS USING FUNDS FROM THE STATE
<Exempt> MODERNIZATION AND ENHANCEMENT PROGRAM.
ROCKLAND COUNTY.

AQC:A10 ROCKLAND TPC: < $0.75 M TOTAL 5YR COST : 0.160 0.000 0.160 0.000 0.000 0.000 0.000 0.000

ROCKLAND PURCHASE (5) < 30\\\' REPLACEMENT BUSES FOR STATE 10/2018 0.000 MISC 0.140
TRANSPORT OF ROCKLAND (TOR) TO IMPROVE
8TM095 EFFICIENCY IN OPERATIONS. ROCKLAND COUNTY.
TRANSIT PROJECT IS USING FUNDS FROM THE STATE
<Exempt> MODERNIZATION AND ENHANCEMENT PROGRAM.
AQC:B10 ROCKLAND TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.140 0.000 0.000 0.000 0.000 0.000 0.000

ROCKLAND PURCHASE (21) CUTAWAY FOR TRANSPORTATION FTA 5307 05/2019 0.000 MISC 1.260
RESOURCES, INTRACOUNTY PARATRANSIT SERVICE STATE 05/2019 0.000 MISC 0.158
8TM107 (TRIPS) TO IMPROVE EFFICIENCY IN OPERATIONS. LOCAL 05/2019 0.000 MISC 0.158
TRANSIT ROCKLAND COUNTY
<Exempt>
AQC:B10 ROCKLAND TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 1.576 0.000 0.000 0.000 0.000 0.000 0.000

ROCKLAND PURCHASE THREE (3) 35 FT TRANSIT BUSES FOR FTA 5307 10/2019 1.260 MISC 1.260
TRANSPORT OF ROCKLAND (TOR) TO IMPROVE STATE 10/2019 0.158 MISC 0.158
8TM108 EFFICIENCY IN OPERATIONS. ROCKLAND COUNTY. LOCAL 10/2019 0.158 MISC 0.158
TRANSIT
<Exempt>
AQC:B10 ROCKLAND TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.576 0.000 1.576 0.000 0.000 0.000 0.000 0.000

237
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Rockland County Listing Page 14 of 16

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

ROCKLAND PURCHASE THREE (3) 40 FT TRANSIT BUSES FOR FTA 5307 10/2019 1.260 MISC 1.260
TRANSPORT OF ROCKLAND (TOR) TO IMPROVE STATE 10/2019 0.158 MISC 0.158
8TM109 EFFICIENCY IN OPERATIONS. ROCKLAND COUNTY LOCAL 10/2019 0.158 MISC 0.158
TRANSIT
<Exempt>
AQC:B10 ROCKLAND TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.576 0.000 1.576 0.000 0.000 0.000 0.000 0.000

ROCKLAND PURCHASE FOUR (4) BUSES FOR CLARKSTOWN STATE 01/2019 0.000 MISC 0.300
MINI-TRANS (REPLACEMENT). ROCKLAND COUNTY.
8TM110 USING FUNDS FROM STATE MODERNIZATION AND
TRANSIT ENHANCEMENT PROGRAM.
<Exempt>
AQC:B10 ROCKLAND TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.300 0.000 0.000 0.000 0.000 0.000 0.000

ROCKLAND FUNDING FOR ROCKLAND COUNTY TO MANAGE ALL FTA 5307 10/2018 0.000 MISC 0.680
FTA GRANTS AND FOR COST ASSOCIATED WITH ALL STATE 10/2018 0.000 MISC 0.085
8TRM18 FEDERAL TRAINING. LOCAL 10/2018 0.000 MISC 0.085
TRANSIT
FTA 5307 10/2019 0.680 MISC 0.680
<Exempt>
LOCAL 10/2019 0.085 MISC 0.085
STATE 10/2019 0.085 MISC 0.085
FTA 5307 10/2020 0.176 MISC 0.176
STATE 10/2020 0.022 MISC 0.022
LOCAL 10/2020 0.022 MISC 0.022
FTA 5307 10/2021 0.144 MISC 0.144
STATE 10/2021 0.018 MISC 0.018
LOCAL 10/2021 0.018 MISC 0.018
FTA 5307 10/2022 0.160 MISC 0.160
STATE 10/2022 0.020 MISC 0.020
LOCAL 10/2022 0.020 MISC 0.020
FTA 5307 10/2023 0.144 MISC 0.144
STATE 10/2023 0.018 MISC 0.018
LOCAL 10/2023 0.018 MISC 0.018
AQC:B1 ROCKLAND TPC: $2-$4 M TOTAL 5YR COST : 1.630 0.850 0.850 0.220 0.180 0.200 0.180 0.000

238
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Rockland County Listing Page 15 of 16

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

ROCKLAND CONSTRUCTION AND REPLACEMENT OF STANDARD FTA 5307 10/2018 0.000 MISC 0.080
BUS SHELTERS FOR TRANSIT OPERATIONS. PROJECT STATE 10/2018 0.000 MISC 0.010
8TRM20 WILL ALSO INCLUDE ADA COMPLIANT RAMPS AND LOCAL 10/2018 0.000 MISC 0.010
TRANSIT DETECTABLE WARNING DEVICES. PROJECT IS USING FTA 5307 10/2019 0.080 MISC 0.080
<Exempt> FUNDS FROM THE STATE MODERNIZATION AND LOCAL 10/2019 0.010 MISC 0.010
ENHANCEMENT PROGRAM.
STATE 10/2019 0.010 MISC 0.010
STATE 10/2019 0.200 MISC 0.200
FTA 5307 10/2021 0.080 MISC 0.080
STATE 10/2021 0.010 MISC 0.010
LOCAL 10/2021 0.010 MISC 0.010
FTA 5307 10/2023 0.080 MISC 0.080
STATE 10/2023 0.010 MISC 0.010
LOCAL 10/2023 0.010 MISC 0.010
AQC:B7 ROCKLAND TPC: < $0.75 M TOTAL 5YR COST : 0.500 0.100 0.300 0.000 0.100 0.000 0.100 0.000

ROCKLAND PREVENTATIVE MAINTENANCE COST TO EXTEND FTA 5307 10/2018 0.000 MISC 0.700
SERVICE LIFE OF TRANSPORT OF ROCKLAND (TOR) STATE 10/2018 0.000 MISC 0.087
8TRM21 BUSES. LOCAL 10/2018 0.000 MISC 0.088
TRANSIT
FTA 5307 10/2019 0.700 MISC 0.700
<Exempt>
STATE 10/2019 0.087 MISC 0.087
LOCAL 10/2019 0.088 MISC 0.088
FTA 5307 10/2020 0.700 MISC 0.700
STATE 10/2020 0.087 MISC 0.087
LOCAL 10/2020 0.088 MISC 0.088
FTA 5307 10/2021 0.700 MISC 0.700
STATE 10/2021 0.087 MISC 0.087
LOCAL 10/2021 0.088 MISC 0.088
FTA 5307 10/2022 0.700 MISC 0.700
STATE 10/2022 0.087 MISC 0.087
LOCAL 10/2022 0.088 MISC 0.088
FTA 5307 10/2023 0.700 MISC 0.700
STATE 10/2023 0.087 MISC 0.087
LOCAL 10/2023 0.088 MISC 0.088
AQC:B3 ROCKLAND TPC: $4.6-$7.5 M TOTAL 5YR COST : 4.375 0.875 0.875 0.875 0.875 0.875 0.875 0.000

239
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Rockland County Listing Page 16 of 16

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

ROCKLAND TRANSPORTATION PLANNING CONSULTANT FUNDING FTA 5307 10/2018 0.000 MISC 0.160
TO MAINTAIN OPERATIONS AND MEET REQUIREMENTS STATE 10/2018 0.000 MISC 0.020
8TRM69 FOR VARIOUS PROJECTS. LOCAL 10/2018 0.000 MISC 0.020
TRANSIT
FTA 5307 10/2019 0.160 MISC 0.160
<Exempt>
STATE 10/2019 0.020 MISC 0.020
LOCAL 10/2019 0.020 MISC 0.020
FTA 5307 10/2020 0.160 MISC 0.160
STATE 10/2020 0.020 MISC 0.020
LOCAL 10/2020 0.020 MISC 0.020
FTA 5307 10/2021 0.160 MISC 0.160
STATE 10/2021 0.020 MISC 0.020
LOCAL 10/2021 0.020 MISC 0.020
FTA 5307 10/2022 0.160 MISC 0.160
STATE 10/2022 0.020 MISC 0.020
LOCAL 10/2022 0.020 MISC 0.020
FTA 5307 10/2023 0.160 MISC 0.160
STATE 10/2023 0.020 MISC 0.020
LOCAL 10/2023 0.020 MISC 0.020
AQC:C3 ROCKLAND TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.000 0.200 0.200 0.200 0.200 0.200 0.200 0.000

ROCKLAND THE TOWN OF ORANGETOWN WILL INSTALL A PARK & STATE 10/2019 0.646 MISC 0.646
RIDE FACILITY TO ACCOMMODATE UP TO 50 SPACES IN
8TRM73 SPARKILL, NY. THE PROJECT WILL INCLUDE: PAVEMENT,
TRANSIT SHRUBS, TREES, CURBING, DRAINAGE, LIGHTING, NEW
<Exempt> BUS SHELTER & APPROPRIATE STRIPING & SIGNAGE.
PROJECT IS USING FUNDS FROM THE STATE
MODERNIZATION AND ENHANCEMENT PROGRAM.

AQC:K1 ROCKLAND TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.646 0.000 0.646 0.000 0.000 0.000 0.000 0.000

LOCAL ORANGETOWN DIESEL RETROFITS: INSTALL MOST CMAQ 10/2021 0.424 MISC 0.424
APPROPRIATE/BEST AVAILABLE DIESEL RETROFIT LOCAL 10/2021 0.106 MISC 0.106
8TRM86 TECHNOLOGY ON EVERY DIESEL POWERED, TOWN
MISC OWNED VEHICLE 8,500 POUNDS AND GREATER. TOWN
<Non-Exempt> OF ORANGETOWN, ROCKLAND COUNTY.
AQC:NON ROCKLAND TPC: < $0.75 M TOTAL 5YR COST : 0.530 0.000 0.000 0.000 0.530 0.000 0.000 0.000

240
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 1 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT EMPIRE STATE TRAILWAY - ROUTE 100 NORTH COUNTY HPP 06/2019 0.000 CONINSP 0.298
TRAILWAY SAFETY IMPROVEMENTS WILL PROVIDE A SDF 06/2019 0.000 CONINSP 0.075
802249 SEGREGATED PATH WITHIN THE RIGHT OF WAY OF HPP 06/2019 0.000 CONST 2.982
MOBIL ROUTE 100 FOR BICYCLES AND PEDESTRIANS ON A SDF 06/2019 0.000 CONST 0.745
<Exempt> MULTI-USE, TWO-DIRECTIONAL PATH SEPERATED FROM HPP 11/2018 0.000 DETLDES 0.360
THE HIGHWAY BY CONCRETE BARRIER. THE PATH
SDF 11/2018 0.000 DETLDES 0.090
WILL RUN BETWEEN CAMPFIRE ROAD IN THE TOWN OF
NEW CASTLE TO ROUTE 9A OVERPASS IN THE TOWN OF
MOUNT PLEASANT IN WESTCHESTER COUNTY.
TRANSFERRED EARMARKS: NY375, 285, 388, 527, 565,
489, 383, 389 (PROGRAM CODE RPS9).

AQC:C2 WESTCHESTER TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 4.550 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT HRP:VICINITY OF EAST LINCOLN NHPP 09/2019 0.000 CONST 38.320


AVENUE - REPLACMENT OF TWO BRIDGES (BIN 5500100 PIT BOND 09/2019 0.000 CONST 9.580
810146 & BIN 3348300) AND INCREASE THE ELEVATION OF HRP NHPP 03/2019 0.000 ROWACQU 0.640
BRIDGE WITHIN THE CITY OF MOUNT VERNON IN THE TOWN OF PIT BOND 03/2019 0.000 ROWACQU 0.160
<Exempt> PELHAM, WESTCHESTER COUNTY NHPP 03/2019 0.000 ROWINCD 0.022
PIT BOND 03/2019 0.000 ROWINCD 0.006
AQC:A19 WESTCHESTER TPC: $40-$60 M TOTAL 5YR COST : 0.000 48.728 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL REPLACE SIDEWALK ALONG ROUTE 9A IN HAMLET OF HPP 10/2018 0.000 CONINSP 0.018
MONTROSE: KINGS FERRY RD- VA HOSPITAL, LOCAL 10/2018 0.000 CONINSP 0.004
810350 CONSTRUCT 5 FOOT WIDE CONCRETE SIDEWALK AND HPP 10/2018 0.000 CONST 0.195
SAFETY IMPROVE CURB AND DRAINAGE ON THE WEST SIDE OF LOCAL 10/2018 0.000 CONST 0.049
<Exempt> RTE 9A (ALBANY POST RD). HAMLET OF MONTROSE, LOCAL 10/2018 0.000 CONST 0.221
TOWN OF CORTLANDT. NY405 HPP 1500

AQC:C2 WESTCHESTER TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.487 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT ROUTE 9A BYPASS:ROUTE 119-WAREHOUSE LANE. THIS NHPP 10/2019 1.940 PRELDES 1.940
PROJECT WILL CONSTRUCT A ROAD CONNECTING SDF 10/2019 0.485 PRELDES 0.485
810352 ROUTE 119 AT THE I-287 EXIT 1 EASTBOUND OFF-RAMP NHPP 03/2023 0.920 DETLDES 0.920
CONST TO ROUTE 9A AT WAREHOUSE LANE. VILLAGE OF SDF 03/2023 0.230 DETLDES 0.230
<Non-Exempt> ELMSFORD, TOWN OF GREENBURGH, WESTCHESTER NHPP 03/2023 0.880 ROWACQU 0.880
COUNTY.
SDF 03/2023 0.220 ROWACQU 0.220
NHPP 02/2023 0.060 ROWINCD 0.060
SDF 02/2023 0.015 ROWINCD 0.015
NHPP 11/2024 0.000 CONINSP 1.613
SDF 11/2024 0.000 CONINSP 0.403
NHPP 11/2024 0.000 CONST 16.128
SDF 11/2024 0.000 CONST 4.032
AQC:NON WESTCHESTER TPC: $21-$31 M TOTAL 5YR COST : 4.750 0.000 2.425 0.000 0.000 2.325 0.000 22.176

241
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 2 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT ROUTE 9A PREVENTIVE MAINTENANCE INITIATIVE HPP 03/2019 0.000 CONINSP 0.053
PAVING FROM MAIDEN LANE TO WELCHER AVE. THIS SDF 03/2019 0.000 CONINSP 0.013
810353 PROJECT WILL REPAVE NEW YORK STATE ROUTE 9A STBG FLEX 03/2019 0.000 CONINSP 0.149
R&P FROM MAIDEN LANE TO WELCHER AVENUE IN THE SDF 03/2019 0.000 CONINSP 0.037
<Exempt> TOWN OF CORTLANDT & CITY OF PEEKSKILL, VILLAGES HPP 03/2019 0.000 CONST 0.525
OF BUCHANON AND CROTON-ON-HUDSON IN
SDF 03/2019 0.000 CONST 0.131
WESTCHESTER COUNTY. REPURPOSED EARMARK
FUNDS USING NY389, NY382 & NY557 (PROGRAM CODE STBG FLEX 03/2019 0.000 CONST 1.155
RPS0). SDF 03/2019 0.000 CONST 0.289

AQC:A10 WESTCHESTER TPC: $2-$4 M TOTAL 5YR COST : 0.000 2.352 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT SPRAIN BROOK PARKWAY NB/PAYNE STREET BRIDGE NHPP 01/2022 0.560 DETLDES 0.560
REPLACEMENT. THIS PROJECT WILL REPLACE THE SDF 01/2022 0.140 DETLDES 0.140
810630 NORTHBOUND SPRAIN BROOK PARKWAY BRIDGE OVER NHPP 01/2022 0.040 ROWACQU 0.040
BRIDGE PAYNE STREET WITH A SPAN BRIDGE. THIS PROJECT IS SDF 01/2022 0.010 ROWACQU 0.010
<Exempt> LOCATED IN THE TOWN OF GREENBURGH IN NHPP 10/2022 0.600 CONINSP 0.600
WESTCHESTER COUNTY. BIN 1070482.
SDF 10/2022 0.150 CONINSP 0.150
NHPP 10/2022 4.000 CONST 4.000
SDF 10/2022 1.000 CONST 1.000
AQC:A19 WESTCHESTER TPC: $6-$9.4 M TOTAL 5YR COST : 6.500 0.000 0.000 0.000 0.750 5.750 0.000 0.000

NYSDOT SPRAIN BROOK PKWY/PAYNE ST MSES WALL REPAIR. NHPP 06/2019 0.000 DETLDES 0.160
PROJECT WILL ADDRESS THE WEAKENING OF THE SDF 06/2019 0.000 DETLDES 0.040
810632 MECHANICALLY STABILIZED EARTH SYSTEM (MSES) STBG FLEX 03/2019 0.000 PRELDES 0.080
BRIDGE WALL TO ELIMINATE STABILITY CONCERNS SDF 03/2019 0.000 PRELDES 0.020
<Exempt> REGARDING THE SPRAIN BROOK PARKWAY BRIDGES NHPP 02/2020 0.960 CONINSP 0.960
OVER PAYNE STREET. TOWN OF GREENBURGH,
SDF 02/2020 0.240 CONINSP 0.240
WESTCHESTER COUNTY.
NHPP 02/2020 6.400 CONST 6.400
SDF 02/2020 1.600 CONST 1.600
AQC:A2 WESTCHESTER TPC: $7.5-$12 M TOTAL 5YR COST : 9.200 0.300 9.200 0.000 0.000 0.000 0.000 0.000

NYSDOT I684 BRIDGE DECK REPLACEMENTS: BROAD BROOK STBG-OFF 08/2019 0.000 CONINSP 0.580
ROAD OVER I684 (BIN 1053090) AND GUARD HILL ROAD SDF 08/2019 0.000 CONINSP 0.145
811363 OVER I684 (BIN 1053080) IN THE TOWN OF BEDFORD, STBG-OFF 08/2019 0.000 CONST 5.800
BRIDGE WESTCHESTER COUNTY. SDF 08/2019 0.000 CONST 1.450
<Exempt>
STBG-OFF 05/2019 0.000 DETLDES 0.160
SDF 05/2019 0.000 DETLDES 0.040
STBG-OFF 04/2019 0.000 PRELDES 0.160
SDF 04/2019 0.000 PRELDES 0.040
SDF 11/2018 0.000 SCOPING 0.050
AQC:A19 WESTCHESTER TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 8.425 0.000 0.000 0.000 0.000 0.000 0.000

242
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 3 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT I-684 PAVING: HARRIS ROAD TO EXIT 6. I-684 PAVING: NHPP 04/2019 0.000 CONINSP 1.080
THIS PROJECT WILL REPAVE THE REMAINING SDF 04/2019 0.000 CONINSP 0.120
811364 CONCRETE PORTION OF I-684 FROM HARRIS ROAD TO NHPP 04/2019 0.000 CONST 6.193
R&P EXIT 6, APPROXIMATELY 2 MILES IN LENGTH. TOWN OF SDF 04/2019 0.000 CONST 0.688
<Exempt> BEDFORD, WESTCHESTER COUNTY. STBG LG URB 04/2019 0.000 CONST 4.607
SDF 04/2019 0.000 CONST 0.512
SDF 12/2018 0.000 DETLDES 0.100
AQC:A10 WESTCHESTER TPC: $12.5-$19 M TOTAL 5YR COST : 0.000 13.300 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT SMRP:TSP-PLEASANTVILLE RD--FLOOD NHPP 08/2019 0.000 CONST 44.400


MITIGATION - STRUCTURE AT GRADE ON PILES AND PIT BOND 08/2019 0.000 CONST 11.100
821684 POSSIBLE BRIDGE RECONSTRUCTION (BIN 5500839 & NHPP 04/2019 0.000 ROWACQU 0.320
BRIDGE BIN 5500859) WITHIN THE TOWN OF MT. PLEASANT, PIT BOND 04/2019 0.000 ROWACQU 0.080
<Exempt> WESTCHESTER COUNTY NHPP 04/2019 0.000 ROWINCD 0.080
PIT BOND 04/2019 0.000 ROWINCD 0.020
AQC:A2 WESTCHESTER TPC: $50-$85 M TOTAL 5YR COST : 0.000 56.000 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL ROUTE 6 @ WESTBROOK DRIVE, INTERSECTION CMAQ 02/2019 0.000 CONINSP 0.054
IMPROVEMENTS. ADD A RIGHT TURN LANE ON LOCAL 02/2019 0.000 CONINSP 0.013
839096 WESTBROOK DRIVE FOR VEHICLES HEADING WEST ON CMAQ 02/2019 0.000 CONST 0.429
INTER ROUTE 6. RECONFIGURE THE DRIVEWAY FROM THE LOCAL 02/2019 0.000 CONST 0.107
<Exempt> CORTLANDT TOWN CENTER TO ROUTE 6. TOWN OF
CORTLANDT, WESTCHESTER COUNTY

AQC:D1 WESTCHESTER TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 0.603 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT ROUTE 6/9 @ ANNSVILLE CIRCLE ELEVATION FLOOD NHPP 09/2019 0.000 CONINSP 0.096
MITIGATION. THIS PROJECT WILL RAISE THE ELEVATION SDF 09/2019 0.000 CONINSP 0.024
839204 OF THE ANNSVILLE CIRCLE AND THE APPROACH(ES) TO NHPP 09/2019 0.000 CONST 0.800
SAFETY PREVENT TIDAL FLOODING THAT OCCURS DURING SDF 09/2019 0.000 CONST 0.200
<Exempt> STORMS. CITY OF PEEKSKILL AND TOWN OF NHPP 10/2018 0.000 DETLDES 0.080
CORTLANDT, WESTCHESTER COUNTY.
SDF 10/2018 0.000 DETLDES 0.020
NHPP 10/2018 0.000 PRELDES 0.064
SDF 10/2018 0.000 PRELDES 0.016
NHPP 11/2018 0.000 ROWACQU 0.080
SDF 11/2018 0.000 ROWACQU 0.020
NHPP 10/2018 0.000 ROWINCD 0.040
SDF 10/2018 0.000 ROWINCD 0.010
NHPP 10/2018 0.000 SCOPING 0.040
SDF 10/2018 0.000 SCOPING 0.010
AQC:A2 WESTCHESTER TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 1.500 0.000 0.000 0.000 0.000 0.000 0.000

243
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 4 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT ROUTE 1 OVER MAMARONECK RIVER BRIDGE NHPP 09/2019 0.000 CONST 4.560
REPLACEMENT IN KIND. PROJECT WILL REPLACE THE PIT BOND 09/2019 0.000 CONST 1.140
847314 EXISTING BRIDGE THAT CARRIES ROUTE 1 OVER THE NHPP 03/2019 0.000 ROWACQU 0.040
BRIDGE MAMARONECK RIVER. BIN 1000040 TOWN OF PIT BOND 03/2019 0.000 ROWACQU 0.010
<Exempt> MAMARONECK WESTCHESTER COUNTY
AQC:A19 WESTCHESTER TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 5.750 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT RAVENSDALE AVENUE / SAW MILL RIVER PARKWAY; NHPP 08/2019 0.000 CONINSP 1.360
PROJECT WILL REPLACE THE BRIDGE CARRYING PIT BOND 08/2019 0.000 CONINSP 0.340
875476 RAVENSDALE AVENUE OVER THE SAW MILL RIVER NHPP 08/2019 0.000 CONST 12.000
BRIDGE PARKWAY VILLAGE OF HASTINGS-ON-HUDSON PIT BOND 08/2019 0.000 CONST 3.000
<Exempt> WESTCHESTER COUNTY; BRIDGE REPLACEMENT IN OTHER 08/2019 0.000 CONST 0.002
KIND; BIN 5520100
NHPP 04/2019 0.000 DETLDES 1.000
PIT BOND 04/2019 0.000 DETLDES 0.250
NHPP 04/2019 0.000 ROWACQU 0.113
PIT BOND 04/2019 0.000 ROWACQU 0.028
NHPP 04/2019 0.000 ROWINCD 0.040
PIT BOND 04/2019 0.000 ROWINCD 0.010
AQC:A19 WESTCHESTER TPC: $15-$25 M TOTAL 5YR COST : 0.000 18.143 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH BRIDGE REPLACEMENT IN KIND: NORTH BARRY STBG LG URB 06/2019 0.000 CONINSP 0.632
AVENUE OVER METRO NORTH RAILROAD. BIN 1165170. LOCAL 06/2019 0.000 CONINSP 0.158
875774 TOWN OF MAMARONECK, WESTCHESTER COUNTY STBG LG URB 06/2019 0.000 CONST 6.907
BRIDGE
LOCAL 06/2019 0.000 CONST 1.727
<Exempt>
OTHER 06/2019 0.000 CONST 0.217
AQC:A19 WESTCHESTER TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 9.641 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL PELHAM ROAD TRAFFIC SIGNALS: REPLACEMENT OF 9 CMAQ 10/2018 0.000 ROWACQU 0.052
TRAFFIC SIGNALS ALONG PELHAM ROAD FROM LOCAL 10/2018 0.000 ROWACQU 0.013
875899 PELHAM MANOR TO MAIN STREET; CONNECT EXISTING CMAQ 09/2021 0.041 DETLDES 0.041
TRAFFIC SIGNALS WITH THE TRAFFIC SIGNAL COORDINATION LOCAL 09/2021 0.010 DETLDES 0.010
<Non-Exempt> SYSTEM. CITY OF NEW ROCHELLE, WESTCHESTER CMAQ 09/2021 0.052 ROWACQU 0.052
COUNTY.
LOCAL 09/2021 0.013 ROWACQU 0.013
CMAQ 09/2021 0.017 ROWINCD 0.017
LOCAL 09/2021 0.004 ROWINCD 0.004
CMAQ 05/2022 0.527 CONINSP 0.527
LOCAL 05/2022 0.033 CONINSP 0.033
STATE 05/2022 0.098 CONINSP 0.098
CMAQ 05/2022 2.335 CONST 2.335
LOCAL 05/2022 0.146 CONST 0.146
STATE 05/2022 0.438 CONST 0.438
AQC:NON WESTCHESTER TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.714 0.065 0.000 0.137 3.577 0.000 0.000 0.000

244
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 5 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL THE REPLACEMENT AND MODIFICATION OF 38 CMAQ 11/2018 0.000 DETLDES 0.098
SIGNALIZED INTERSECTIONS ON MAIN STREET AND LOCAL 11/2018 0.000 DETLDES 0.024
875900 HUGUENOT STREET AND CONVERSION OF HUGUENOT LOCAL 11/2018 0.000 DETLDES 0.300
TRAFFIC STREET AND MAIN STREET BETWEEN PINTARD AVE CMAQ 04/2019 0.000 ROWACQU 0.008
<Non-Exempt> AND PRATT ST FROM ONE-WAY TO TWO-WAY LOCAL 04/2019 0.000 ROWACQU 0.003
OPERATION. CITY OF NEW ROCHELLE. WESTCHESTER
CMAQ 03/2020 1.348 CONINSP 1.348
COUNTY.
LOCAL 03/2020 0.337 CONINSP 0.337
LOCAL 03/2020 0.173 CONINSP 0.173
CMAQ 03/2020 5.722 CONST 5.722
LOCAL 03/2020 1.431 CONST 1.431
LOCAL 03/2020 2.000 CONST 2.000
LOCAL 03/2020 0.137 CONST 0.137
AQC:NON WESTCHESTER TPC: $9.5-15.5 M TOTAL 5YR COST : 11.148 0.433 11.148 0.000 0.000 0.000 0.000 0.000

LOCAL WEBSTER AVENUE TRAFFIC SIGNALS: REPLACEMENT CMAQ 12/2022 0.095 DETLDES 0.095
OF 11 TRAFFIC SIGNALS FROM MAIN STREET TO LOCAL 12/2022 0.025 DETLDES 0.025
875902 EASTCHESTER ROAD; CONNECT TO THE EXISTING CMAQ 12/2022 0.092 PRELDES 0.092
TRAFFIC TRAFFIC SIGNAL COORDINATION SYSTEM. CITY OF LOCAL 12/2022 0.028 PRELDES 0.028
<Non-Exempt> NEW ROCHELLE. CMAQ 12/2022 0.008 ROWINCD 0.008
LOCAL 12/2022 0.003 ROWINCD 0.003
CMAQ 12/2023 0.009 ROWACQU 0.009
LOCAL 12/2023 0.003 ROWACQU 0.003
CMAQ 07/2025 0.000 CONINSP 0.215
LOCAL 07/2025 0.000 CONINSP 0.054
CMAQ 07/2025 0.000 CONST 2.398
LOCAL 07/2025 0.000 CONST 0.599
AQC:NON WESTCHESTER TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.263 0.000 0.000 0.000 0.000 0.251 0.012 3.266

LOCAL WILMOT ROAD SIGNALS: GRAND BLVD - GOLDEN CMAQ 11/2020 0.009 DETLDES 0.009
HORSE SHOPPING CENTER. REPLACE TRAFFIC SIGNAL LOCAL 11/2020 0.003 DETLDES 0.003
875973 CONTROLLERS W/ UPGRADES FOR DETECTION AT CMAQ 10/2020 0.009 PRELDES 0.009
TRAFFIC INTERSECTION OF GRAND BLVD, BARAUD RD & THE LOCAL 10/2020 0.003 PRELDES 0.003
<Exempt> GOLDEN HORSE SHOPPING CTR DRIVEWAY WITH CMAQ 07/2024 0.009 CONINSP 0.009
WILMONT RD. CITY OF NEW ROCHELLE.
LOCAL 07/2024 0.003 CONINSP 0.003
CMAQ 07/2024 0.092 CONST 0.092
LOCAL 07/2024 0.026 CONST 0.026
AQC:D2 WESTCHESTER TPC: < $0.75 M TOTAL 5YR COST : 0.154 0.000 0.000 0.024 0.000 0.000 0.130 0.000

245
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 6 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL PELHAM SIGNALS: LINCOLN AVENUE & WOLFS CMAQ 10/2023 0.012 DETLDES 0.012
LANE/FIFTH AVENUE. INSTALL VEHICLE DETECTION LOCAL 10/2023 0.001 DETLDES 0.001
875975 LOOPS AT INDIVIDUAL INTERSECTIONS WITHOUT STATE 10/2023 0.003 DETLDES 0.003
TRAFFIC OPERATING LOOPS. SIGNALS WILL BE COORDINATED CMAQ 10/2023 0.009 PRELDES 0.009
<Exempt> BY PRESET TIMING, NOT INTERCONNECTED. VILLAGE PIT BOND 10/2023 5.377 PRELDES 5.377
OF PELHAM.
LOCAL 10/2023 0.001 PRELDES 0.001
STATE 10/2023 0.002 PRELDES 0.002
CMAQ 05/2025 0.000 CONINSP 0.009
LOCAL 05/2025 0.000 CONINSP 0.003
CMAQ 05/2025 0.000 CONST 0.100
LOCAL 05/2025 0.000 CONST 0.025
AQC:D2 WESTCHESTER TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.405 0.000 0.000 0.000 0.000 0.000 5.405 0.137

LOCAL RECONFIGURE ROAD THROUGH FDR VA HOSPITAL TO HPP 07/2019 0.000 CONINSP 0.034
PROVIDE ACCESS TO BATTERY PLACE TOWN OF LOCAL 07/2019 0.000 CONINSP 0.009
876010 CORTLANDT. RECONFIGURE THE EXISTING FDR VA HPP 07/2019 0.000 CONST 0.133
RECON HOSPITAL ACCESS RD TO PROVIDE A SAFE ACCESS TO LOCAL 07/2019 0.000 CONST 0.033
<Exempt> BATTERY PLACE & VISITORS TO THE HOSPITAL. NY358 LOCAL 07/2019 0.000 CONST 0.785
HPP#1050. TOWN OF CORTLANDT.
HPP 10/2018 0.000 DETLDES 0.072
PIT BOND 10/2018 0.000 DETLDES 0.560
LOCAL 10/2018 0.000 DETLDES 0.018
HPP 10/2018 0.000 PRELDES 0.018
LOCAL 10/2018 0.000 PRELDES 0.004
HPP 10/2018 0.000 ROWACQU 0.021
LOCAL 10/2018 0.000 ROWACQU 0.005
HPP 10/2018 0.000 ROWINCD 0.009
LOCAL 10/2018 0.000 ROWINCD 0.002
AQC:A10 WESTCHESTER TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 1.703 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL CROTON-ON-HUDSON, NY RESTORATION OF VAN HPP 12/2018 0.000 CONINSP 0.344


CORTLANDT MANOR ENTRANCE ROAD, AND SDF 12/2018 0.000 CONINSP 0.229
876011 RESTORATION OF THE VAN CORTLANDT MANOR LOCAL 12/2018 0.000 CONINSP 0.086
RECON ENTRANCE NEAR CROTON. NY674 HPP#4613, NY503 HPP 12/2018 0.000 CONST 1.214
<Exempt> HPP#2372. VILLAGE OF CROTON-ON-HUDSON, SDF 12/2018 0.000 CONST 0.204
WESTCHESTER COUNTY
LOCAL 12/2018 0.000 CONST 0.304
LOCAL 12/2018 0.000 CONST 0.400
AQC:A10 WESTCHESTER TPC: $2-$4 M TOTAL 5YR COST : 0.000 2.781 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL ROUTE 6 TRAFFIC CALMING. CONKLIN AVE ON WEST TO HPP 07/2020 0.100 CONINSP 0.100
LEXINGTON AVE ON EAST. COMPLETE SIDEWALK LOCAL 07/2020 0.040 CONINSP 0.040
876094 NETWORK & PROVIDE ENHANCED BUS SHELTERS, HPP 07/2020 1.800 CONST 1.800
RECON PROVIDE RAISED, LANDSCAPE CENTER ISLANDS AT
<Exempt> LOCAL 07/2020 0.450 CONST 0.450
CERTAIN INTERSECTIONS. TOWN CORTLANDT. NY 738
2008 SECTION 129, PL110-161

AQC:C2 WESTCHESTER TPC: $2-$4 M TOTAL 5YR COST : 2.390 0.000 2.390 0.000 0.000 0.000 0.000 0.000

246
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 7 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL STREETSCAPE, ROADWAY, PEDESTRIAN, AND PARKING HPP 11/2019 0.074 CONINSP 0.074
IMPROVEMENTS AT THE INTERSECTION OF MEADOW SDF 11/2019 1.140 CONINSP 1.140
876104 LANE, CHESTNUT LANE, WILLOW DRIVE AND LIBERTY LOCAL 11/2019 0.018 CONINSP 0.018
MOBIL AVENUE FOR THE COLLEGE OF NEW ROCHELLE HPP 11/2019 0.736 CONST 0.736
<Exempt> CAMPUS. CITY OF NEW ROCHELLE. NY 686 HPP#309
SDF 11/2019 0.268 CONST 0.268
(FORMERLY PIN: 8TROCH)
LOCAL 11/2019 0.184 CONST 0.184
AQC:A10 WESTCHESTER TPC: $2-$4 M TOTAL 5YR COST : 2.420 0.000 2.420 0.000 0.000 0.000 0.000 0.000

LOCAL PUBLIC SCHOOLS OF THE TARRYTOWNS PEDESTRIAN SAFE RT SCH 09/2019 0.000 CONINSP 0.020
IMPROVEMENTS AND SAFETY EDUCATION. VILLAGE OF SDF 09/2019 0.000 CONINSP 1.500
876115 SLEEPY HOLLOW, WESTCHESTER COUNTY SAFE RT SCH 09/2019 0.000 CONST 0.145
MOBIL
SDF 09/2019 0.000 CONST 0.060
<Exempt>
SAFE RT SCH 01/2019 0.000 DETLDES 0.031
SDF 01/2019 0.000 DETLDES 0.300
AQC:C2 WESTCHESTER TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 2.056 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL ROUTE 9 DRAINAGE IMPROVEMENTS, PHILIPSBURG STBG FLEX 10/2023 0.040 PRELDES 0.040
MANOR: FROM NEW BROADWAY - POCANTICO STREET. LOCAL 10/2023 0.010 PRELDES 0.010
876118 DRAINAGE IMPROVEMENTS TO PREVENT SILTATION OF STBG FLEX 10/2023 0.008 ROWINCD 0.008
SAFETY MILL PONDS @ HISTORIC SITE; REQUIREMENT FOR LOCAL 10/2023 0.002 ROWINCD 0.002
<Exempt> FHWA PARTICIPATION IN TEP PROJECT AT MANOR. STBG FLEX 12/2025 0.000 DETLDES 0.024
VILLAGE OF TARRYTOWN. (FORMERLY 801051)
LOCAL 12/2025 0.000 DETLDES 0.006
STBG FLEX 02/2026 0.000 ROWACQU 0.004
LOCAL 02/2026 0.000 ROWACQU 0.001
STBG FLEX 12/2026 0.000 CONINSP 0.024
LOCAL 12/2026 0.000 CONINSP 0.006
STBG FLEX 12/2026 0.000 CONST 0.160
LOCAL 12/2026 0.000 CONST 0.040
AQC:A2 WESTCHESTER TPC: < $0.75 M TOTAL 5YR COST : 0.060 0.000 0.000 0.000 0.000 0.000 0.060 0.265

LOCAL WEAVER STREET (ROUTE 125) SIDEWALK EXTENSION: TAP LG URBAN 03/2019 0.000 CONINSP 0.012
INSTALLATION OF A SIDEWALK ON THE WEST SIDE OF SDF 03/2019 0.000 CONINSP 0.057
876132 WEAVER STREET FROM BONNIE WAY TO THE EXISTING LOCAL 03/2019 0.000 CONINSP 0.003
MOBIL SIDEWALK ON MURRAY AVE. WORK INCLUDES TAP LG URBAN 03/2019 0.000 CONST 0.283
<Exempt> CURBING, CATCH BASINS & DRANAIGE. TOWN OF SDF 03/2019 0.000 CONST 0.000
MAMARONECK, WESTCHESTER COUNTY
LOCAL 03/2019 0.000 CONST 0.071
TAP LG URBAN 12/2018 0.000 ROWACQU 0.020
SDF 12/2018 0.000 ROWACQU 0.123
LOCAL 12/2018 0.000 ROWACQU 0.005
AQC:C2 WESTCHESTER TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.574 0.000 0.000 0.000 0.000 0.000 0.000

247
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 8 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL BEEKMAN AVE PEDESTRIAN IMPROVEMENTS. THE HPP 07/2019 0.000 CONINSP 0.032
PROJECT WILL REPLACE SIDEWALKS ON BOTH SIDES OF LOCAL 07/2019 0.000 CONINSP 0.008
876150 BEEKMAN AVENUE BETWEEN CORTLANDT STREET AND HPP 07/2019 0.000 CONST 0.414
SAFETY ROUTE 9. THE SIDEWALK CONSTRUCTION WILL BE FOR LOCAL 07/2019 0.000 CONST 0.103
<Exempt> AN APPROXIMATE LENGTH OF 1,793 LINEAR FEET ON
EACH SIDE OF THE STREET AND AN APPROXIMATE
WIDTH OF 6 FEET. VILLAGE OF SLEEPY HOLLOW,
WESTCHESTER COUNTY. TRANSFERRED EARMARKS:
NY275; NY469 (PROGRAM CODE RPS9)

AQC:C2 WESTCHESTER TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.557 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL RECONSTRUCTION OF OAKWOOD DRIVE. THE PROJECT HPP 07/2019 0.000 CONINSP 0.108
WILL UPGRADE SIDEWALKS AND RECONSTRUCT LOCAL 07/2019 0.000 CONINSP 0.027
876151 APPROXIMATELY 1200 LINEAR FEET OF ROADWAY ON HPP 07/2019 0.000 CONST 0.654
SAFETY OAKWOOD DRIVE BETWEEN NORTH DIVISION STREET LOCAL 07/2019 0.000 CONST 0.190
<Exempt> AND THE HAMPTON OAKS APARTMENT ENTRANCE TO LOCAL 07/2019 0.000 CONST 0.277
MEET AMERICANS WITH DISABILITIES ACT
HPP 01/2019 0.000 ROWACQU 0.001
ACCESSIBILITY GUIDELINES (ADAAG) AND PUBLIC
RIGHTS OF WAY ACCESSIBILITY GUIDELINES (PROWAG). LOCAL 01/2019 0.000 ROWACQU 0.001
CITY OF PEEKSKILL, WESTCHESTER COUNTY.
TRANSFERRED EARMARKS: NY469; NY687 (PROGRAM
CODE RPS9)

AQC:C2 WESTCHESTER TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 1.258 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL VILLAGE OF DOBBS FERRY MAIN STREET STREETSCAPE HPP 06/2019 0.000 CONINSP 0.017
IMPROVEMENTS. THIS PROJECT WILL UPGRADE LOCAL 06/2019 0.000 CONINSP 0.004
876152 SIDEWALKS ON MAIN STREET BETWEEN CHESTNUT HPP 06/2019 0.000 CONST 0.263
SAFETY STREET AND CEDAR STREET TO MEET AMERICANS LOCAL 06/2019 0.000 CONST 0.066
<Exempt> WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES HPP 11/2018 0.000 ROWACQU 0.001
(ADAAG) AND PUBLIC RIGHTS OF WAY ACCESSIBILITY
LOCAL 11/2018 0.000 ROWACQU 0.001
GUIDELINES (PROWAG). THE VILLAGE OF DOBBS FERRY,
WESTCHESTER COUNTY. TRANSFERRED EARMARKS:
NY687 (PROGRAM CODE RPS9)

AQC:C2 WESTCHESTER TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.352 0.000 0.000 0.000 0.000 0.000 0.000

248
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 9 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL TOWN OF HARRISON PEDESTRIAN IMPROVEMENTS. HPP 10/2018 0.000 CONINSP 0.021
THIS PROJECT WILL REPLACE SIDEWALKS ON HILLSIDE SDF 10/2018 0.000 CONINSP 0.050
876153 AVENUE TO ENHANCE ACCESS TO THE METRO NORTH LOCAL 10/2018 0.000 CONINSP 0.005
SAFETY RAIL STATION, THE HARRISON LIBRARY AND THE HPP 10/2018 0.000 CONST 0.124
<Exempt> HALSTEAD AVENUE BUSINESS DISTRICT. THIS PROJECT SDF 10/2018 0.000 CONST 0.100
WILL UPGRADE SIDEWALKS TO BE IN CONFORMANCE
LOCAL 10/2018 0.000 CONST 0.031
WITH AMERICANS WITH DISABILITIES ACT
ACCESSIBILITY GUIDELINES (ADAAG) AND PUBLIC
RIGHT OF WAY ACCESSIBILITY GUIDELINES (PROWAG).
TOWN OF HARRISON, WESTCHESTER COUNTY.
TRANSFERRED EARMARKS: NY687 (PROGRAM CODE
RPS9)

AQC:C2 WESTCHESTER TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.331 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL BABCOCK PLACE/MNRR HUDSON LINE BRIDGE DECK NHPP 01/2019 0.000 CONINSP 0.095
REPLACEMENT. THIS PROJECT WILL REPLACE LOCAL 01/2019 0.000 CONINSP 0.005
876162 CONCRETE SIDEWALKS AND CURBS IN ADDITION TO NHPP 01/2019 0.000 CONST 1.045
BRIDGE THE EXISTING CONCRETE BRIDGE DECK OF THE LOCAL 01/2019 0.000 CONST 0.055
<Exempt> STRUCTURE THAT CARRIES BABCOCK PLACE OVER THE
METRO NORTH RAILROAD HUDSON LINE AS WELL AS
REPLACE THE ARMORED JOINTS AT BOTH ABUTMENTS.
PURPOSE - DUE TO DETERIORATION TO BRING TO STATE
OF GOOD REPAIR. THE CITY OF YONKERS,
WESTCHESTER COUNTY. BRIDGE NY PROJECT.
FUNDED IS 95% FEDERAL USING 15% TOLL CREDIT WITH
A 5% LOCAL MATCH. BIN 2254740.

AQC:A19 WESTCHESTER TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 1.200 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL MAIN & RIVER STS/MNRR BRIDGE STEEL REPAIR NHPP 10/2018 0.000 CONINSP 0.031
VILLAGE OF TARRYTOWN. THIS PROJECT WILL SDF 10/2018 0.000 CONINSP 0.049
876163 REHABILITATE THE H-BRIDGE THAT CARRIES BOTH LOCAL 10/2018 0.000 CONINSP 0.002
BRIDGE MAIN AND RIVER STREETS OVER THE METRO NORTH NHPP 10/2018 0.000 CONST 0.253
<Exempt> RAILROAD LOCATED IN THE VILLAGE OF TARRYTOWN, SDF 10/2018 0.000 CONST 0.099
WESTCHESTER COUNTY. PURPOSE - DUE TO
LOCAL 10/2018 0.000 CONST 0.013
DETERIORATION TO BRING TO STATE OF GOOD REPAIR.
BRIDGE NY PROJECT. FUNDED IS 95% FEDERAL USING
15% TOLL CREDIT WITH A 5% LOCAL MATCH. BIN
2263200.

AQC:A19 WESTCHESTER TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.447 0.000 0.000 0.000 0.000 0.000 0.000

249
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 10 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL MAIN AND WILDEY STREETS OVER METRO NORTH STBG-OFF 10/2018 0.000 CONINSP 0.010
RAILROAD BRIDGE. THIS PROJECT WILL REHABILITATE SDF 10/2018 0.000 CONINSP 0.990
876164 THE H-BRIDGE THAT CARRIES BOTH MAIN STREET AND LOCAL 10/2018 0.000 CONINSP 0.001
BRIDGE WILDEY STREETS TO THE METRO NORTH RAIL ROAD STBG-OFF 10/2018 0.000 CONST 0.085
<Exempt> LOCATED IN THE VILLAGE OF TARRYTOWN, SDF 10/2018 0.000 CONST 0.153
WESTCHESTER COUNTY. PURPOSE - DUE TO
LOCAL 10/2018 0.000 CONST 0.004
DETERIORATION TO BRING TO STATE OF GOOD
REPAIR.BRIDGE NY PROJECT. FUNDED IS 95% FEDERAL
USING 15% TOLL CREDIT WITH A 5% LOCAL MATCH. BIN
2263210.

AQC:A19 WESTCHESTER TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 1.243 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL HILLSIDE AVENUE/MAMARONECK RIVER BRIDGE STBG-OFF 04/2019 0.000 CONINSP 0.285
REPLACEMENT. THIS PROJECT WILL REPLACE THE LOCAL 04/2019 0.000 CONINSP 0.015
876165 ESISTING BRIDGE CARRYING HILLSIDE AVENUE OVER STBG-OFF 04/2019 0.000 CONST 2.280
BRIDGE THE MAMARONECK RIVER. VILLAGE AND TOWN OF LOCAL 04/2019 0.000 CONST 0.120
<Exempt> MAMARONECK, WESTCHESTER COUNTY. STBG-OFF 10/2018 0.000 ROWACQU 0.040
PURPOSE - DUE TO DETERIORATION TO BRING TO STATE
LOCAL 10/2018 0.000 ROWACQU 0.002
OF GOOD REPAIR. BRIDGE NY PROJECT. FUNDED IS 95%
FEDERAL USING 15% TOLL CREDIT WITH A 5% LOCAL
MATCH. BIN 2225070.

AQC:A19 WESTCHESTER TPC: $2-$4 M TOTAL 5YR COST : 0.000 2.742 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL HILL BOULEVARD/TRIBUTARY OF BARGER BROOK STBG-OFF 10/2018 0.000 CONINSP 0.229
BRIDGE REPLACEMENT. THIS PROJECT WILL REPLACE LOCAL 10/2018 0.000 CONINSP 0.012
876166 THE EXISTING BRIDGE CARRYING HILL BOULEVARD STBG-OFF 10/2018 0.000 CONST 2.052
BRIDGE OVER A TRIBUTARY TO BARGER BROOK IN THE TOWN LOCAL 10/2018 0.000 CONST 0.108
<Exempt> OF YORKTOWN, WESTCHESTER COUNTY.
PURPOSE - DUE TO DETERIORATION TO BRING TO STATE
OF GOOD REPAIR. BRIDGE NY PROJECT. FUNDED IS 95%
FEDERAL USING 15% TOLL CREDIT WITH A 5% LOCAL
MATCH. BIN 2265539.

AQC:A19 WESTCHESTER TPC: $2-$4 M TOTAL 5YR COST : 0.000 2.401 0.000 0.000 0.000 0.000 0.000 0.000

WESTCHESTER COUNTY ROAD 306/CANOPUS BROOK BRIDGE PIT BOND 07/2019 0.000 CONINSP 0.280
REPLACEMENT. PROJECT WILL REPLACE THE EXISTING LOCAL 07/2019 0.000 CONINSP 0.800
876167 BRIDGE CARRYING COUNTY ROAD 306 OVER THE NHPP 07/2019 0.000 CONST 4.890
BRIDGE CANOPUS BROOK (SPROUT BROOK). THE TOWN OF PIT BOND 07/2019 0.000 CONST 0.250
<Exempt> CORTLANDT, WESTCHESTER COUNTY. PURPOSE - DUE LOCAL 07/2019 0.000 CONST 0.617
TO DETERIORATION TO BRING TO STATE OF GOOD
NHPP 10/2018 0.000 ROWACQU 0.062
REPAIR. BRIDGE NY PROJECT. FUNDED IS 95% FEDERAL
USING 15% TOLL CREDIT WITH A 5% LOCAL MATCH. BIN LOCAL 10/2018 0.000 ROWACQU 0.003
1050460.

AQC:A19 WESTCHESTER TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 6.902 0.000 0.000 0.000 0.000 0.000 0.000

250
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 11 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL VILLAGE OF IRVINGTON MAIN STREET PEDESTRIAN HPP 02/2019 0.000 CONINSP 0.014
IMPROVEMENTS. THIS PROJECT WILL REPLACE THE LOCAL 02/2019 0.000 CONINSP 0.004
876172 PEDESTRIAN CURB RAMPS AND CROSSWALKS OF HPP 02/2019 0.000 CONST 0.080
SAFETY SEVEN INTERSECTIONS ON MAIN STREET. THE LOCAL 02/2019 0.000 CONST 0.020
<Exempt> INTERSECTIONS WITH MAIN STREET INCLUDED IN THIS HPP 01/2019 0.000 ROWACQU 0.001
PROJECT ARE: BUCKOUT STREET, COTTENET STREET,
LOCAL 01/2019 0.000 ROWACQU 0.001
DUTCHER STREET, ECKAR STREET, FERRIS STREET,
GRINNELL STREET AND DEARMAN STREET. THIS
PROJECT WILL ALSO UPGRADE CURB RAMPS TO BE IN
CONFORMANCE WITH THE AMERICANS WITH
DISABILITIES ACT ACCESSIBILITY GUIDELINES
(ADAAG) AND PUBLIC RIGHT OF WAY ACCESSIBILITY
GUIDELINES (PROWAG). VILLAGE OF TARRYTOWN,
TOWN OF GREENBURGH, WESTCHESTER COUNTY.
TRANSFERRED EARMARKS: NY687 (PROGRAM CODE
RPS9)

AQC:C2 WESTCHESTER TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.120 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL THE QUAKER RIDGE ROAD: COMPLETE STREETS TAP FLEX 02/2019 0.000 CONINSP 0.373
PROJECT WILL TRANSFORM QUAKER RIDGE ROAD LOCAL 02/2019 0.000 CONINSP 0.094
876180 FROM THE EXISTING +/- 48 FT. WIDE ROADWAY INTO HPP 02/2019 0.000 CONST 0.906
MOBIL DISCRETE USER SEGMENTS THAT INCLUDE: REDUCED LOCAL 02/2019 0.000 CONST 0.227
<Exempt> NUMBER OF TRAVEL LANES FROM FOUR TO TWO TAP FLEX 02/2019 0.000 CONST 2.524
LANES; A DEDICATED BICYCLE LANE AND SIDEWALK
LOCAL 02/2019 0.000 CONST 1.361
ON EACH SIDE OF THE STREET; NEW HIGH VISIBILITY
CROSSWALKS. ALL FACILITIES WILL EXCEED
AMERICANS WITH DISABILITIES ACT (ADA) AND
AMERICAN ASSOCIATION OF STATE HIGHWAY AND
TRANSPORTATION OFFICIALS (AASHTO) STANDARDS.
ADDITIONAL TRAFFIC SIGNALS ARE PROPOSED AT KEY
LOCATIONS ALONG THE CORRIDOR TO FACILITATE
SAFE CROSSING AND CONNECT ALL USERS TO
NEIGHBORHOOD FACILITIES AND TRANSIT ROUTES FOR
COMMUTING PURPOSES. THIS PROJECT IS LOCATED IN
THE CITY OF NEW ROCHELLE, WESTCHESTER COUNTY.

AQC:C2 WESTCHESTER TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 5.485 0.000 0.000 0.000 0.000 0.000 0.000

251
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 12 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL THE PURDY\\\'S TRAIN STATION PEDESTRIAN ACCESS TAP FLEX 06/2019 0.000 CONINSP 0.036
PROJECT WILL ADD SIDEWALKS FROM THE HAMLET OF LOCAL 06/2019 0.000 CONINSP 0.009
876181 PURDY\\\'S ACROSS ROUTE 22 AND ALONG ROUTE 116 TO TAP FLEX 06/2019 0.000 CONST 0.308
MOBIL THE PURDY\\\'S TRAIN STATION. THE PROJECT CONSISTS LOCAL 06/2019 0.000 CONST 0.077
<Exempt> OF SIDEWALK INSTALLATION STARTING AT THE NORTH TAP FLEX 03/2019 0.000 ROWACQU 0.001
SALEM LIONS BUILDING TO THE INTERSECTION OF
LOCAL 03/2019 0.000 ROWACQU 0.001
TITICUS RIVER ROAD AND ROUTE 22. CONSTRUCTION
WILL ALSO INCLUDE THE INSTALLATION OF
SIDEWALKS SOUTH ALONG ROUTE 22 FOR 105 FEET AND
FROM EXIT 8 OF 116/ROUTE 22 INTERSECTION TO THE
NORTHBOUND EXIT RAMP. THIS PROJECT WILL ALSO
ADD LIGHTING TO IMPROVE PEDESTRIAN VISIBILITY
AND ACCESS TO NEARBY FACILITIES. LOCATED IN THE
TOWN OF NORTH SALEM, WESTCHESTER COUNTY.

AQC:C2 WESTCHESTER TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.432 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL THE MANVILLE ROAD CORRIDOR IMPROVEMENTS TAP FLEX 07/2019 0.000 ROWACQU 0.001
PROJECT WILL REMOVE A FREE RIGHT TURN FROM LOCAL 07/2019 0.000 ROWACQU 0.001
876183 MEMORIAL PLAZA ONTO MANVILLE ROAD TO IMPROVE TAP FLEX 10/2019 0.209 CONINSP 0.209
MOBIL PEDESTRIAN SAFETY WHEN CROSSING MANVILLE LOCAL 10/2019 0.052 CONINSP 0.052
<Exempt> ROAD. A RAISED PLANTED MEDIAN ON MANVILLE TAP FLEX 10/2019 1.300 CONST 1.300
ROAD BETWEEN WASHINGTON AND TOMPKINS
LOCAL 10/2019 0.700 CONST 0.700
AVENUES WILL PROVIDE PEDESTRIAN REFUGE. CURB
EXTENSIONS BETWEEN WHEELER AND TOMPKINS
AVENUES WILL REDUCE THE CROSSING DISTANCE FOR
PEDESTRIANS. SELECT SIDEWALK TREATMENTS AND
THE EXPANDED PARK SPACE IN MEMORIAL PLAZA WILL
EXPAND AND ENHANCE THE HIGHLY UTILIZED PUBLIC
SPACE NEAR THE TRAIN STATION. LOCATED IN THE
VILLAGE OF PLEASANTVILLE, WESTCHESTER COUNTY.

AQC:C2 WESTCHESTER TPC: $2-$4 M TOTAL 5YR COST : 2.261 0.002 2.261 0.000 0.000 0.000 0.000 0.000

252
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 13 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL THE DOWNTOWN WHITE PLAINS TRANSIT DISTRICT TAP FLEX 02/2019 0.000 CONINSP 0.120
PEDESTRIAN AND BICYCLE IMPROVEMENTS PROJECT LOCAL 02/2019 0.000 CONINSP 0.030
876185 WILL INCLUDE HIGH VISIBILITY CROSSWALKS, A TAP FLEX 02/2019 0.000 CONST 0.958
MOBIL MID-BLOCK PEDESTRIAN CROSS SIGNAL AND LOCAL 02/2019 0.000 CONST 0.240
<Exempt> RECONSTRUCTION OF SIDEWALKS; BICYCLIST
IMPROVEMENTS, WILL INCLUDE A PROTECTED BIKE
LANE, INSTALLATION OF GREEN BIKE BOXES,
RE-STRIPING EXISTING BIKE LANES FOR HIGH
VISIBILITY, AND THE PURCHASE OF PARKING
FACILITIES. THIS PROJECT IS LOCATED IN THE CITY OF
WHITE PLAINS, WESTCHESTER COUNTY.

AQC:C2 WESTCHESTER TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 1.348 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL THE YONKERS GREENWAY PROJECT WILL CONVERT TAP FLEX 05/2019 0.000 CONINSP 0.253
THE ABANDONED DOWNTOWN SPUR OF THE OLD LOCAL 05/2019 0.000 CONINSP 0.063
876186 PUTNAM RAILROAD INTO A MULTI-USE PEDESTRIAN TAP FLEX 05/2019 0.000 CONST 2.650
MOBIL TRAIL. THE 2.2 MILE TRAIL WILL BE BUILT IN PHASES LOCAL 05/2019 0.000 CONST 0.662
<Exempt> TO CONNECT THE #1 METROPOLITAN TRANSIT LOCAL 05/2019 0.000 CONST 0.326
AUTHORITY SUBWAY IN THE RIVERDALE SECTION OF
TAP FLEX 10/2018 0.000 ROWACQU 0.040
THE BRONX TO THE METRO NORTH AND AMTRAK AT
THE YONKERS RAIL STATION AND BUS HUB. THIS LOCAL 10/2018 0.000 ROWACQU 0.010
PROJECT IS LOCATED IN THE CITY OF YONKERS,
WESTCHESTER COUNTY.

AQC:C2 WESTCHESTER TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 4.004 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL THE IRVINGTON MAIN STATION PEDESTRIAN TAP LG URBAN 02/2019 0.000 CONINSP 0.084
IMPROVEMENT PROJECT CONSISTS OF THE LOCAL 02/2019 0.000 CONINSP 0.026
876187 INSTALLATION OF A NEW SIDEWALK ALONG STATION TAP LG URBAN 02/2019 0.000 CONST 0.612
MOBIL ROAD ALONG WITH PEDESTRIAN FACILITIES AT THE LOCAL 02/2019 0.000 CONST 0.189
<Exempt> INTERSECTION OF MAIN STREET AND ROUTE 9 TAP LG URBAN 10/2018 0.000 ROWACQU 0.001
(BROADWAY) AND IN THE STATION ROAD TUNNEL.
LOCAL 10/2018 0.000 ROWACQU 0.001
THIS PROJECT IS LOCATED IN THE VILLAGE OF
IRVINGTON, WESTCHESTER COUNTY.

AQC:C2 WESTCHESTER TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 0.913 0.000 0.000 0.000 0.000 0.000 0.000

253
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 14 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL THE TOWN OF GREENBURGH CENTRAL PARK AVENUE TAP FLEX 02/2019 0.000 CONINSP 0.078
SIDEWALK PROJECT ENTAILS CONSTRUCTING LOCAL 02/2019 0.000 CONINSP 0.190
876189 APPROXIMATELY 3,400 LINEAR FEET OF 5 FOOT WIDE LOCAL 02/2019 0.000 CONINSP 0.019
MOBIL AMERICANS WITH DISABILITIES ACT (ADA) COMPLIANT TAP FLEX 02/2019 0.000 CONST 0.608
<Exempt> CONCRETE SIDEWALK AND CURBING ALONG CENTRAL SDF 02/2019 0.000 CONST 0.038
PARK AVENUE IN THE TOWN OF GREENBURGH. THIS
LOCAL 02/2019 0.000 CONST 0.402
PROJECT IS LOCATED IN THE TOWN OF GREENBURGH,
WESTCHESTER COUNTY.

AQC:C2 WESTCHESTER TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.000 1.335 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL VILLAGE OF PORT CHESTER PEDESTRIAN SAFETY HSIP 11/2018 0.000 DETLDES 0.034
IMPROVEMENTS. THE PROPOSED PROJECT WILL HSIP 11/2018 0.000 PRELDES 0.034
876208 INVOLVE THE INSTALLATION OF A VARIETY OF NEW HSIP 11/2018 0.000 ROWINCD 0.001
SAFETY PEDESTRIAN FACILITIES AT CERTAIN INTERSECTIONS: HSIP 09/2020 0.046 CONINSP 0.046
<Exempt> CURB RAMPS, NEW COUNTDOWN TIMERS, THE HSIP 09/2020 0.480 CONST 0.480
ADDITION OF HIGH VISIBILITY CROSSWALK MARKINGS,
HSIP 11/2019 0.001 ROWACQU 0.001
AND AMERICANS WITH DISABILITIES ACT (ADA)
ACCESSIBLE SIGNALS. THE PROJECT WILL ALSO
INVOLVE MODIFICATION TO EXISTING FACILITIES SUCH
AS STRIPING CERTAIN CROSSWALKS, RELOCATING
SIGNAGE, MODIFYING COUNTDOWN TIMERS TO ALLOW
PEDESTRIANS ADDITIONAL TIME TO CROSS ROADWAYS,
AND RELOCATING STOP BARS. THE STATE CERTIFIES
THAT THIS PROJECT HAS BEEN APPROVED BY THE
REGIONAL SAFETY EVALUATION ENGINEER AND
SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER.
100% FEDERAL USING 10% TOLL CREDIT. THIS PROJECT
WAS SELECTED IN THE LOCAL CALL FOR PSAP
PROJECTS AND NO OFFSET NEEDED. DOES NOT COUNT
AGAINST THE REGIONAL PLANNING TARGET. VILLAGE
OF PORT CHESTER, WESTCHESTER COUNTY.

AQC:A6 WESTCHESTER TPC: < $0.75 M TOTAL 5YR COST : 0.527 0.069 0.527 0.000 0.000 0.000 0.000 0.000

254
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 15 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL CITY OF NEW ROCHELLE PEDESTRIAN SAFETY HSIP 11/2018 0.000 DETLDES 0.120
IMPROVEMENTS. PROJECT TO INSTALL PEDESTRIAN HSIP 11/2018 0.000 PRELDES 0.120
876209 SIGNAL HEADS, AMERICANS WITH DISABILITIES ACT HSIP 11/2018 0.000 ROWINCD 0.001
SAFETY (ADA) COMPLIANT RAMPS, HIGH VISIBILITY HSIP 11/2019 0.001 ROWACQU 0.001
<Exempt> CROSSWALKS AND COUNTDOWN TIMERS AT HSIP 02/2021 0.200 CONINSP 0.200
SIGNALIZED INTERSECTIONS THROUGHOUT THE CITY
HSIP 02/2021 2.100 CONST 2.100
OF NEW ROCHELLE. THE STATE CERTIFIES THAT THIS
PROJECT HAS BEEN APPROVED BY THE REGIONAL
SAFETY EVALUATION ENGINEER AND SIGNED OFF BY
THE REGIONAL TRAFFIC ENGINEER. 100% FEDERAL
USING 10% TOLL CREDIT. THIS PROJECT WAS SELECTED
IN THE LOCAL CALL FOR PSAP PROJECTS AND NO
OFFSET NEEDED. DOES NOT COUNT AGAINST THE
REGIONAL PLANNING TARGET. WESTCHESTER COUNTY.

AQC:A6 WESTCHESTER TPC: $2-$4 M TOTAL 5YR COST : 2.301 0.241 0.001 2.300 0.000 0.000 0.000 0.000

WESTCHESTER WESTCHESTER COUNTY PEDESTRIAN SAFETY HSIP 11/2018 0.000 DETLDES 0.020
IMPROVEMENTS. AT SIGNALIZED INTERSECTIONS, HSIP 11/2018 0.000 PRELDES 0.005
876210 COUNTERMEASURES PROPOSED INCLUDE SIGNAL HSIP 01/2020 0.030 CONINSP 0.030
SAFETY TIMING, COUNTDOWN TIMERS, HIGH VISIBILITY HSIP 01/2020 0.720 CONST 0.720
<Exempt> CROSSWALK MARKINGS, ACCESSIBLE PEDESTRIAN
SIGNALS, NEW PEDESTRIAN SIGNALS, AND LEFT TURN
PHASING. AT UNCONTROLLED CROSSWALKS, BASIC
AND ENHANCED TREATMENT COUNTERMEASURES
WILL INCLUDE IN-STREET PEDESTRIAN SIGNS, RAISED
PEDESTRIAN REFUGE/ CURB EXTENSIONS, AND
ADDITIONAL SIGNS AND MARKINGS IN ADVANCE OF
CROSSWALKS. THE STATE CERTIFIES THAT THIS
PROJECT HAS BEEN APPROVED BY THE REGIONAL
SAFETY EVALUATION ENGINEER AND SIGNED OFF BY
THE REGIONAL TRAFFIC ENGINEER. 100% FEDERAL
USING 10% TOLL CREDIT. THIS PROJECT WAS SELECTED
IN THE LOCAL CALL FOR PSAP PROJECTS AND NO
OFFSET NEEDED. DOES NOT COUNT AGAINST THE
REGIONAL PLANNING TARGET. WESTCHESTER COUNTY.

AQC:A6 WESTCHESTER TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.750 0.025 0.750 0.000 0.000 0.000 0.000 0.000

255
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 16 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL NYS ROUTE 119 OVER BRONX RIVER PARKWAY BRIDGE NHPP 09/2019 0.000 DETLDES 0.523
REHABILITATION. THIS PROJECT WILL REHABILITATE SDF 09/2019 0.000 DETLDES 0.249
876218 THE BRIDGE CARRYING NYS ROUTE 119 EAST OVER THE NHPP 09/2019 0.000 PRELDES 0.523
BRIDGE BRONX RIVER PARKWAY IN THE CITY OF WHITE PLAINS, SDF 09/2019 0.000 PRELDES 1.672
<Exempt> WESTCHESTER COUNTY. TO UPDATE DRAINAGE, NHPP 09/2019 0.000 ROWINCD 0.009
REPLACE THE SATURATED ARCH FILL, WATERPROOF
SDF 09/2019 0.000 ROWINCD 1.243
BOTH ARCHES AND REPAIR DAMAGE DONE BY THE
INTRUDING WATER. 2018 BRIDGE NY PROJECT. 95% NHPP 03/2021 0.665 CONINSP 0.665
FEDERAL USING 15% TOLL CREDIT WITH 5% MATCH. SDF 03/2021 0.032 CONINSP 0.032
BIN 3348690 NHPP 03/2021 3.271 CONST 3.271
SDF 03/2021 0.323 CONST 0.323
NHPP 10/2020 0.009 ROWACQU 0.009
SDF 10/2020 0.032 ROWACQU 0.032
AQC:A19 WESTCHESTER TPC: $7.5-$12 M TOTAL 5YR COST : 4.332 4.219 0.000 4.332 0.000 0.000 0.000 0.000

LOCAL WAVERLY AVENUE OVER SHELDRAKE RIVER BRIDGE STBG-OFF 03/2019 0.000 DETLDES 0.083
REPLACEMENT. THIS PROJECT WILL REPLACE THE LOCAL 03/2019 0.000 DETLDES 0.005
876219 EXISTING BRIDGE CROSSING INCLUDING ABUTMENTS STBG-OFF 03/2019 0.000 PRELDES 0.083
BRIDGE AND WINGWALLS FOR THE BRIDGE CARRYING LOCAL 03/2019 0.000 PRELDES 0.005
<Exempt> WAVERLY AVENUE OVER SHELDRAKE RIVER IN THE STBG-OFF 03/2019 0.000 ROWINCD 0.024
TOWN OF MAMARONECK IN WESTCHESTER COUNTY.
LOCAL 03/2019 0.000 ROWINCD 0.001
IMPROVED ALIGNMENT OF THE REPLACEMENT BRIDGE
ADJOINING ROADWAYS IS INTENDED TO BE EVALUATED STBG-OFF 10/2019 0.024 ROWACQU 0.024
TO CORRECT EXISTING SHIFT IN THE ROADWAY. 2018 LOCAL 10/2019 0.001 ROWACQU 0.001
BRIDGE NY PROJECT. 95% FEDERAL USING 15% TOLL STBG-OFF 03/2021 0.238 CONINSP 0.238
CREDIT WITH A 5% MATCH. BIN 2225140 LOCAL 03/2021 0.012 CONINSP 0.012
STBG-OFF 03/2021 1.298 CONST 1.298
LOCAL 03/2021 0.069 CONST 0.069
LOCAL 03/2021 0.150 CONST 0.150
AQC:A19 WESTCHESTER TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.792 0.201 0.025 1.767 0.000 0.000 0.000 0.000

LOCAL PRESTON WAY OVER METRO NORTH RAILROAD BRIDGE STBG-OFF 03/2019 0.000 DETLDES 0.048
REHABILITATION. THIS PROJECT WILL REHABILITATE LOCAL 03/2019 0.000 DETLDES 0.002
876220 THE EXISTING BRIDGE CARRYING PRESTON WAY OVER STBG-OFF 03/2019 0.000 PRELDES 0.048
BRIDGE THE METRO NORTH RAILROAD HARLEM LINE IN THE LOCAL 03/2019 0.000 PRELDES 0.002
<Exempt> VILLAGE OF MOUNT KISCO IN WESTCHESTER COUNTY. STBG-OFF 03/2021 0.162 CONINSP 0.162
CONSTRUCTION INCLUDES CONCRETE REPAIRS OF
LOCAL 03/2021 0.008 CONINSP 0.008
EXISTING ABUTMENTS, PIERS, PIER CAPS, STRUCTURAL
DECK ELEMENTS, WEARING SURFACE, CURBS, AND STBG-OFF 03/2021 1.655 CONST 1.655
SIDEWALKS. 2018 BRIDGE NY PROJECT. 95% FEDERAL LOCAL 03/2021 0.089 CONST 0.089
USING 15% TOLL CREDIT WITH A 5% MATCH. BIN 2265420

AQC:A19 WESTCHESTER TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.914 0.100 0.000 1.914 0.000 0.000 0.000 0.000

256
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 17 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL HEATHCOTE ROAD OVER COUNTY ROUTE 143 BRIDGE NHPP 06/2019 0.000 DETLDES 0.124
REHABILITATION. THIS PROJECT WILL REHABILITATE LOCAL 06/2019 0.000 DETLDES 0.006
876221 THE BRIDGE CARRYING HEATHCOTE ROAD OVER NHPP 06/2019 0.000 PRELDES 0.124
BRIDGE COUNTY ROUTE 143 IN THE VILLAGE OF SCARSDALE IN LOCAL 06/2019 0.000 PRELDES 0.006
<Exempt> WESTCHESTER COUNTY. CONSTRUCTION INCLUDES NHPP 10/2021 0.123 CONINSP 0.123
REHABILITATION TO DETERIORATED ABUTMENT
LOCAL 10/2021 0.006 CONINSP 0.006
WALLS, CENTER PIER SUPPORTS, BEARING PADS, STEEL
PLATE GIRDERS, CAP BEAM, PAINT AND EXPANSION NHPP 10/2021 1.227 CONST 1.227
JOINT. 2018 BRIDGE NY PROJECT. 95% FEDERAL USING LOCAL 10/2021 0.065 CONST 0.065
15% TOLL CREDIT WITH A 5% MATCH. BIN 2265300

AQC:A19 WESTCHESTER TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.421 0.260 0.000 0.000 1.421 0.000 0.000 0.000

LOCAL LUDLOW ST OVER METRO NORTH RAILROAD BRIDGE NHPP 03/2019 0.000 DETLDES 0.185
REHABILITATION. THIS PROJECT WILL REHABILITATE LOCAL 03/2019 0.000 DETLDES 0.010
876222 THE BRIDGE CARRYING LUDLOW STREET OVER METRO NHPP 03/2019 0.000 PRELDES 0.185
BRIDGE NORTH RAILROAD HUDSON LINE IN THE CITY OF LOCAL 03/2019 0.000 PRELDES 0.010
<Exempt> YONKERS IN WESTCHESTER COUNTY. CONSTRUCTION NHPP 03/2021 0.178 CONINSP 0.178
INCLUDES REPLACEMENT OF ARMORED JOINTS, REPAIR
LOCAL 03/2021 0.009 CONINSP 0.009
OF DETERIORATED STRUCTURAL STEEL MEMBERS,
REPAIR OF EXISTING BEARING PLATE, AND NHPP 03/2021 1.475 CONST 1.475
REINFORCED CONCRETE ABUTMENT REPAIR. 2018 LOCAL 03/2021 0.077 CONST 0.077
BRIDGE NY PROJECT. 95% FEDERAL USING 15% TOLL
CREDIT WITH A 5% MATCH. BIN 2254720

AQC:A19 WESTCHESTER TPC: $2-$4 M TOTAL 5YR COST : 1.739 0.390 0.000 1.739 0.000 0.000 0.000 0.000

LOCAL LINKING LANDMARKS ALONG THE HUDSON: STP ENHANCE 12/2019 0.552 CONST 0.552
RECONSTRUCT APPROX 1 MILE OF TRAIL THRU NEW LOCAL 12/2019 0.138 CONST 0.138
878012 COUNTY PARK TO LINK LYNDHURST & SUNNYSIDE
MOBIL HISTORIC SITES; DEVELOP LANDSCAPING PLAN FOR
<Exempt> PARK; IMPLEMENT VARIOUS LANDSCAPING
IMPROVEMENTS. TEP # 8063. TOWN GREENBURGH.
WESTCHESTER COUNTY.

AQC:C2 WESTCHESTER TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.690 0.000 0.690 0.000 0.000 0.000 0.000 0.000

NYSDOT HIGHWAY EMERGENCY LOCAL PATROLS (HELP) NHPP 01/2020 0.480 OPER 0.480
MONITORING & DISPATCH SERVICES. THIS PROJECT SDF 01/2020 0.120 OPER 0.120
881034 INCLUDES FIELD OBSERVATION; PAPERWORK NHPP 01/2022 0.480 OPER 0.480
MOBIL MONITORING; DISPATCH SERVICES; PREPARATION OF SDF 01/2022 0.120 OPER 0.120
<Exempt> MONTHLY, QUARTERLY, & ANNUAL ACTIVITY REPORTS; NHPP 01/2024 0.480 OPER 0.480
& INVESTIGATION OF COMPLAINTS.
SDF 01/2024 0.120 OPER 0.120
AQC:A6 WESTCHESTER TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.800 0.000 0.600 0.000 0.600 0.000 0.600 0.000

257
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 18 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT ADA SIDEWALKS AND RAMPS NORTHERN PIT BOND 12/2018 0.000 DETLDES 0.020
WESTCHESTER. THIS PROJECT WILL BUILD OR REPAIR PIT BOND 02/2019 0.000 ROWACQU 0.100
881318 SIDEWALKS AND RAMPS ON STATE HIGHWAY PIT BOND 12/2018 0.000 ROWINCD 0.020
SAFETY RIGHT-OF-WAY TO ASSURE COMPLIANCE WITH THE NHPP 01/2020 0.090 CONINSP 0.090
<Exempt> AMERICANS WITH DISABILITIES ACT. THIS WORK WILL PIT BOND 01/2020 0.022 CONINSP 0.022
TAKE PLACE IN VARIOUS LOCATIONS ALONG THE
STBG FLEX 01/2020 0.189 CONINSP 0.189
FOLLOWING ROUTES: ROUTE 6, ROUTE 9, ROUTE 133,
ROUTE 117, ROUTE 120, ROUTE 129, ROUTE 134, ROUTE PIT BOND 01/2020 0.047 CONINSP 0.047
35, AND ROUTE 128 THROUGHOUT NORTHERN NHPP 01/2020 0.749 CONST 0.749
WESTCHESTER COUNTY. WESTCHESTER COUNTY. PIT BOND 01/2020 0.187 CONST 0.187
STBG FLEX 01/2020 1.578 CONST 1.578
PIT BOND 01/2020 0.395 CONST 0.395
AQC:C2 WESTCHESTER TPC: $2-$4 M TOTAL 5YR COST : 3.257 0.140 3.257 0.000 0.000 0.000 0.000 0.000

NYSDOT BRIDGE REHABILITATION: PROJECT WILL UNDERTAKE NHPP 07/2019 0.000 CONINSP 1.069
CORRECTIVE AND PREVENTATIVE MAINTENANCE SDF 07/2019 0.000 CONINSP 0.267
881327 ACTIONS TO EXTEND THE SERVICE LIFE OF BRIDGES ON NHPP 07/2019 0.000 CONST 8.466
BRIDGE STATE HIGHWAYS- BIN\\\'S 1036069, 5348090, 5501520, & SDF 07/2019 0.000 CONST 2.116
<Exempt> 5501560 IN CITY OF YONKERS, WESTCHESTER COUNTY
AND BINS 1091480, 5501660, 5501670, 5501680, 5501690, &
5501710 IN THE TOWN OF GREENBURGH, WESTCHESTER
COUNTY

AQC:A19 WESTCHESTER TPC: $9.5-15.5 M TOTAL 5YR COST : 0.000 11.918 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT BRIDGE REHABILITATION/REPLACEMENTS: THIS NHPP 05/2019 0.000 PRELDES 0.064


PROJECT WILL UNDERTAKE CORRECTIVE AND SDF 05/2019 0.000 PRELDES 0.016
881368 PREVENTATIVE MAINTENANCE ACTIONS TO EXTEND NHPP 07/2020 2.240 CONINSP 2.240
BRIDGE THE SERVICE LIFE OF FOUR BRIDGES IN THE CITY OF SDF 07/2020 0.560 CONINSP 0.560
<Exempt> YONKERS AND TOWNS OF GREENBURGH AND MOUNT NHPP 07/2020 22.400 CONST 22.400
PLEASANT IN WESTCHESTER COUNTY. BINS 5500749,
SDF 07/2020 5.600 CONST 5.600
1070500, 5501520, 5501670. (FORMERLY PIN: 8T0702)
NHPP 01/2020 0.096 DETLDES 0.096
SDF 01/2020 0.024 DETLDES 0.024
AQC:A19 WESTCHESTER TPC: $26-$40 M TOTAL 5YR COST : 30.920 0.080 30.920 0.000 0.000 0.000 0.000 0.000

NYSDOT ADA SIDEWALKS & RAMPS, UPPER WESTCHESTER HPP 10/2018 0.000 CONINSP 0.192
COUNTY. THIS PROJECT WILL BUILD OR REPAIR SDF 10/2018 0.000 CONINSP 0.048
881435 SIDEWALKS AND RAMPS ON STATE HIGHWAY HPP 10/2018 0.000 CONST 1.600
SAFETY RIGHT-OF-WAY TO ASSURE COMPLIANCE WITH THE SDF 10/2018 0.000 CONST 0.400
<Exempt> AMERICANS WITH DISABILITIES ACT. THIS WORK WILL
TAKE PLACE IN VARIOUS MUNICIPALITIES IN
NORTHERN WESTCHESTER COUNTY. TRANSFERRED
EARMARKS: NY271; NY272; NY366 (PROGRAM CODE
RPS9). (FORMERLY PIN: 8T0561)

AQC:C2Z WESTCHESTER TPC: $2-$4 M TOTAL 5YR COST : 0.000 2.240 0.000 0.000 0.000 0.000 0.000 0.000

258
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 19 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT GUIDE SIGNS: HUTCHINSON RIVER PARKWAY THIS NHPP 04/2019 0.000 DETLDES 0.160
PROJECT WILL REPLACE OR UPGRADE GUIDE SIGNS SDF 04/2019 0.000 DETLDES 0.040
881459 THAT HAVE REACHED THE END OF THEIR SERVICE LIFE NHPP 02/2020 0.540 CONINSP 0.540
SAFETY ON THE HUTCHINSON RIVER PARKWAY IN THE CITIES SDF 02/2020 0.135 CONINSP 0.135
<Exempt> OF NEW ROCHELLE AND WHITE PLAINS; AND TOWNS OF NHPP 02/2020 3.600 CONST 3.600
EASTCHESTER, HARRISON, PELHAM, SCARSDALE AND
SDF 02/2020 0.900 CONST 0.900
RYE IN WESTCHESTER COUNTY. (FORMERLY PIN:
8T0208)

AQC:C13 WESTCHESTER TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.175 0.200 5.175 0.000 0.000 0.000 0.000 0.000

NYSDOT RUSTIC RAIL REPLACEMENT ON SPRAIN BROOK SDF 06/2019 0.000 DETLDES 0.200
PARKWAY; RUSTIC, SELF-OXIDIZING GUIDERAIL WILL NHPP 08/2020 0.322 CONINSP 0.322
881475 BE REPLACED WITH GALVANIZED RAIL ALONG THE SDF 08/2020 0.080 CONINSP 0.080
SAFETY SPRAIN BROOK PARKWAY IN THE TOWNS OF NHPP 08/2020 3.214 CONST 3.214
<Exempt> GREENBURGH AND MOUNT PLEASANT AND THE CITY
SDF 08/2020 0.804 CONST 0.804
OF YONKERS IN WESTCHESTER COUNTY. (FORMERLY
PIN: 8T0552) CONSTRUCTION FUNDS DO NOT COUNT
AGAINST THE REGIONAL PLANNING TARGET.

AQC:A9 WESTCHESTER TPC: $3.3-$5.6 M TOTAL 5YR COST : 4.420 0.200 4.420 0.000 0.000 0.000 0.000 0.000

NYSDOT CATCH BASINS: PROJECT WILL REPAIR OR REPLACE SDF 04/2019 0.000 DETLDES 0.050
STORM WATER CATCH BASINS ALONG SEGMENTS OF STBG FLEX 12/2019 0.120 CONINSP 0.120
881510 THE SAW MILL RIVER PARKWAY (SMRP), SPRAIN BROOK SDF 12/2019 0.030 CONINSP 0.030
MISC PARKWAY (SBP), AND HUTCHINSON RIVER PARKWAY STBG FLEX 12/2019 1.000 CONST 1.000
<Exempt> (HRP) IN WESTCHESTER COUNTY TO ENSURE THAT THE
SDF 12/2019 0.250 CONST 0.250
DRAINAGE SYSTEMS ALONG THESE PARKWAYS
FUNCTION AS ORIGINALLY DESIGNED.

AQC:A2 WESTCHESTER TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.400 0.050 1.400 0.000 0.000 0.000 0.000 0.000

WESTCHESTER WESTCHESTER COUNTY BUS STOP ENHANCEMENTS. LOCAL 07/2019 0.000 MISC 0.500
COUNTY-WIDE BUS STOP IMPROVEMENTS. COUNTY STBG LG URB 01/2020 0.400 MISC 0.400
882145 WILL ENHANCE AND IMPROVE VARIOUS BUS STOPS LOCAL 01/2020 0.100 MISC 0.100
TRANSIT THROUGHOUT COUNTY. LOCAL 07/2021 0.500 MISC 0.500
<Exempt>
LOCAL 07/2022 0.500 MISC 0.500
LOCAL 07/2023 0.500 MISC 0.500
LOCAL 07/2024 0.500 MISC 0.500
AQC:B7 WESTCHESTER TPC: $2-$4 M TOTAL 5YR COST : 2.500 0.500 0.500 0.500 0.500 0.500 0.500 0.000

259
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 20 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT STAMFORD-WHITE PLAINS EXPRESS BUS (I-BUS): STBG FLEX 01/2019 0.000 OPER 0.224
COMMUTER BUS SERVICE BETWEEN STAMFORD, CT SDF 01/2019 0.000 OPER 0.056
882185 AND WHITE PLAINS, WESTCHESTER COUNTY. STBG FLEX 01/2020 0.224 OPER 0.224
TRANSIT
SDF 01/2020 0.056 OPER 0.056
<Exempt>
STBG FLEX 01/2021 0.224 OPER 0.224
SDF 01/2021 0.056 OPER 0.056
STBG FLEX 01/2022 0.224 OPER 0.224
SDF 01/2022 0.056 OPER 0.056
STBG FLEX 01/2023 0.224 OPER 0.224
SDF 01/2023 0.056 OPER 0.056
STBG FLEX 01/2024 0.224 OPER 0.224
SDF 01/2024 0.056 OPER 0.056
STBG FLEX 01/2025 0.000 OPER 0.224
SDF 01/2025 0.000 OPER 0.056
AQC:B1 WESTCHESTER TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.400 0.280 0.280 0.280 0.280 0.280 0.280 0.280

WESTCHESTER PREVENTIVE MAINTENANCE FUNDING TO EXTEND FTA 5307 07/2019 0.000 MISC 9.007
SERVICE LIFE OF WESTCHESTER COUNTY BEE-LINE BUS LOCAL 07/2019 0.000 MISC 1.126
882206 SYSTEM. STATE 07/2019 0.000 MISC 1.126
TRANSIT
FTA 5307 07/2020 9.007 MISC 9.007
<Exempt>
LOCAL 07/2020 1.126 MISC 1.126
STATE 07/2020 1.126 MISC 1.126
FTA 5307 07/2021 9.007 MISC 9.007
STATE 07/2021 1.126 MISC 1.126
LOCAL 07/2021 1.126 MISC 1.126
FTA 5307 07/2022 9.007 MISC 9.007
LOCAL 07/2022 1.126 MISC 1.126
STATE 07/2022 1.126 MISC 1.126
FTA 5307 07/2023 9.007 MISC 9.007
STATE 07/2023 1.126 MISC 1.126
LOCAL 07/2023 1.126 MISC 1.126
FTA 5307 07/2024 9.007 MISC 9.007
STATE 07/2024 1.126 MISC 1.126
LOCAL 07/2024 1.126 MISC 1.126
AQC:B3 WESTCHESTER TPC: $50-$85 M TOTAL 5YR COST : 56.295 11.259 11.259 11.259 11.259 11.259 11.259 0.000

WESTCHESTER REPLACE (20) PARATRANSIT VAN AS PART OF THE LOCAL 07/2021 1.600 MISC 1.600
REGULAR LIFECYCLE REPLACEMENT FOR THE
882223 BEE-LINE BUS SYSTEM.
TRANSIT
<Exempt>
AQC:B10 WESTCHESTER TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.600 0.000 0.000 1.600 0.000 0.000 0.000 0.000

260
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 21 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

WESTCHESTER BEE-LINE PLANNING FUNDING FOR THE PLANNING FTA 5307 07/2019 0.000 MISC 0.280
ACTIVITIES TO MAINTAIN OPERATIONS AND MEET LOCAL 07/2019 0.000 MISC 0.035
882235 REQUIREMENTS FOR CONTINUED OPERATION OF THE STATE 07/2019 0.000 MISC 0.035
TRANSIT WESTCHESTER COUNTY BEE-LINE BUS SYSTEM. FTA 5307 07/2020 0.280 MISC 0.280
<Exempt>
STATE 07/2020 0.035 MISC 0.035
LOCAL 07/2020 0.035 MISC 0.035
FTA 5307 07/2021 0.280 MISC 0.280
LOCAL 07/2021 0.035 MISC 0.035
STATE 07/2021 0.035 MISC 0.035
FTA 5307 07/2022 0.280 MISC 0.280
LOCAL 07/2022 0.035 MISC 0.035
STATE 07/2022 0.035 MISC 0.035
FTA 5307 07/2023 0.280 MISC 0.280
LOCAL 07/2023 0.035 MISC 0.035
STATE 07/2023 0.035 MISC 0.035
FTA 5307 07/2024 0.280 MISC 0.280
LOCAL 07/2024 0.035 MISC 0.035
STATE 07/2024 0.035 MISC 0.035
AQC:C3 WESTCHESTER TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.750 0.350 0.350 0.350 0.350 0.350 0.350 0.000

WESTCHESTER MODERNIZATION OF THE BEE-LINE MAINTENANCE FTA 5339 07/2019 0.000 MISC 0.196
FACILITIES INCLUDES THE REPLACEMENT OF LOCAL 07/2019 0.000 MISC 0.025
882297 EQUIPMENT FOR FACILITIES THAT HAVE MET THEIR STATE 07/2019 0.000 MISC 0.025
TRANSIT USEFUL LIFE SUCH AS: REPLACE BUILDING HVAC FTA 5307 07/2020 0.500 MISC 0.500
<Exempt> FACILITIES OR BUS RELATED MAINTENANCE LOCAL 07/2020 0.125 MISC 0.125
EQUIPMENT AT VALHALLA AND YONKERS FACILITIES.
FTA 5307 07/2021 1.000 MISC 1.000
LOCAL 07/2021 0.250 MISC 0.250
FTA 5307 07/2022 2.500 MISC 2.500
LOCAL 07/2022 0.625 MISC 0.625
AQC:B8 WESTCHESTER TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.000 0.246 0.625 1.250 3.125 0.000 0.000 0.000

WESTCHESTER WESTCHESTER EMPLOYEE COMMUTE OPTIONS CMAQ 01/2020 0.560 MISC 0.560
PROGRAM: PROJECT STUDIES WESTCHESTER COUNTY LOCAL 01/2020 0.140 MISC 0.140
882376 COMMUTING ALTERNATIVES AND FOCUSES ON CMAQ 01/2021 0.560 MISC 0.560
MOBIL STRATEGIES INTENDED TO CHANGE THE TRAVEL LOCAL 01/2021 0.140 MISC 0.140
<Exempt> BEHAVIOR OF COMMUTERS, INCLUDING MODE CHOICE, CMAQ 01/2022 0.560 MISC 0.560
AND TIME AND DIRECTION OF TRAVEL. THE GOAL IS TO
LOCAL 01/2022 0.140 MISC 0.140
REDUCE CONGESTION, THEREBY IMPROVING MOBILITY
AND IMPROVING AIR QUALITY. (FORMERLY PIN 880688). CMAQ 01/2023 0.560 MISC 0.560
LOCAL 01/2023 0.140 MISC 0.140
CMAQ 01/2024 0.560 MISC 0.560
LOCAL 01/2024 0.140 MISC 0.140
AQC:C1 WESTCHESTER TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.500 0.000 0.700 0.700 0.700 0.700 0.700 0.000

261
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 22 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT TRANSPORTATION MGMT CENTER OPERATIONS: NHPP 02/2020 5.092 OPER 5.092
ON-GOING COSTS TO OPERATE THE TMC, INCLUDING SDF 02/2020 1.273 OPER 1.273
882385 STAFF, SALARIES, OFFICE EXPENSES, SUPPLIES, NHPP 02/2021 5.252 OPER 5.252
TRAFFIC MATERIALS, EQUIPMENT, ETC. (FORMERLY PIN 880691). SDF 02/2021 1.313 OPER 1.313
<Exempt>
NHPP 02/2022 5.412 OPER 5.412
SDF 02/2022 1.353 OPER 1.353
NHPP 02/2023 5.412 OPER 5.412
SDF 02/2023 1.353 OPER 1.353
NHPP 02/2024 5.412 OPER 5.412
SDF 02/2024 1.353 OPER 1.353
AQC:A7 WESTCHESTER TPC: $32-$50 M TOTAL 5YR COST : 33.225 0.000 6.365 6.565 6.765 6.765 6.765 0.000

NYSDOT HIGHWAY EMERGENCY LOCAL PATROLS (HELP) NHPP 04/2019 0.000 OPER 0.240
PROJECT HANDLES TECHNOLOGY NEEDS SUCH AS SDF 04/2019 0.000 OPER 0.060
882387 COMPUTER AIDED DISPATCH (CAD), WIRELESS NHPP 04/2020 0.240 OPER 0.240
MOBIL COMMUNICATIONS, AUTOMATIC VEHICLE LOCATION SDF 04/2020 0.060 OPER 0.060
<Exempt> (AVL), REAL TIME INFORMATION & INCIDENT NHPP 04/2021 0.240 OPER 0.240
MANAGEMENT. WESTCHESTER COUNTY. (FORMERLY
SDF 04/2021 0.060 OPER 0.060
PIN: 881036)
NHPP 04/2022 0.240 OPER 0.240
SDF 04/2022 0.060 OPER 0.060
NHPP 04/2023 0.240 OPER 0.240
SDF 04/2023 0.060 OPER 0.060
NHPP 04/2024 0.240 OPER 0.240
SDF 04/2024 0.060 OPER 0.060
AQC:A7 WESTCHESTER TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.500 0.300 0.300 0.300 0.300 0.300 0.300 0.000

WESTCHESTER WESTECHESTER BEE-LINE CAD/AVL SYSTEMS STBG LG URB 01/2020 6.400 MISC 6.400
INTEGRATION PROJECT. THIS PROJECT WILL UPGRADE LOCAL 01/2020 6.930 MISC 6.930
882389 AND ENHANCE THE CAD/AVL SYSTEM, DATA
MOBIL COMMUNICATIONS, AND SCHEDULING SYSTEMS TO
<Exempt> IMPROVE OPERATIONS PLANNING AND DATA
MANAGEMENT, ENHANCE CUSTOMER INFORMATION
FOR THE BEE-LINE SYSTEM.

AQC:B4 WESTCHESTER TPC: $12.5-$19 M TOTAL 5YR COST : 13.330 0.000 13.330 0.000 0.000 0.000 0.000 0.000

262
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 23 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

WESTCHESTER CO WHITE PLAINS SHUTTLE BUS NETWORK: SHUTTLE STBG LG URB 10/2018 0.000 MISC 1.120
BUS NETWORK SERVING REVERSE COMMUTE TRAVEL LOCAL 10/2018 0.000 MISC 2.380
895005 TO EMPLOYMENT CENTERS, DOWNTOWN WHITE STBG LG URB 10/2019 1.120 MISC 1.120
TRANSIT PLAINS, ALONG THE CORRIDORS IN AND AROUND LOCAL 10/2019 2.380 MISC 2.380
<Exempt> WHITE PLAINS AND BUS SERVICE TO THE OSSINING STBG LG URB 10/2020 1.120 MISC 1.120
RAILROAD STATION. FUNDS ARE FOR THE CAPITAL
LOCAL 10/2020 2.380 MISC 2.380
COST OF CONTRACTING.
STBG LG URB 10/2021 1.120 MISC 1.120
LOCAL 10/2021 2.380 MISC 2.380
STBG LG URB 10/2022 1.120 MISC 1.120
LOCAL 10/2022 2.380 MISC 2.380
STBG LG URB 10/2023 1.120 MISC 1.120
LOCAL 10/2023 2.380 MISC 2.380
AQC:B1 WESTCHESTER TPC: $15-$25 M TOTAL 5YR COST : 17.500 3.500 3.500 3.500 3.500 3.500 3.500 0.000

WESTCHESTER WESTCHESTER PROJECT ADMINISTRATION: TO FTA 5307 07/2019 0.000 MISC 0.720
MAINTAIN OPERATIONS AND MEET REQUIREMENTS LOCAL 07/2019 0.000 MISC 0.090
8T97XP FOR CONTINUED OPERATION OF THE COUNTY\\\\\\\'S STATE 07/2019 0.000 MISC 0.090
TRANSIT TRANSIT SYSTEM. FTA 5307 07/2020 0.720 MISC 0.720
<Exempt>
LOCAL 07/2020 0.090 MISC 0.090
STATE 07/2020 0.090 MISC 0.090
FTA 5307 07/2021 0.720 MISC 0.720
STATE 07/2021 0.090 MISC 0.090
LOCAL 07/2021 0.090 MISC 0.090
FTA 5307 07/2022 0.720 MISC 0.720
STATE 07/2022 0.090 MISC 0.090
LOCAL 07/2022 0.090 MISC 0.090
FTA 5307 07/2023 0.720 MISC 0.720
LOCAL 07/2023 0.090 MISC 0.090
STATE 07/2023 0.090 MISC 0.090
FTA 5307 07/2024 0.720 MISC 0.720
LOCAL 07/2024 0.090 MISC 0.090
STATE 07/2024 0.090 MISC 0.090
AQC:B1 WESTCHESTER TPC: $4.6-$7.5 M TOTAL 5YR COST : 4.500 0.900 0.900 0.900 0.900 0.900 0.900 0.000

WESTCHESTER BEE-LINE BUSES-REPLACE 78 ARTICULATED BUSES TO FTA 5339 10/2018 0.000 MISC 3.600
IMPROVE EFFICIENCY IN OPERATIONS. LOCAL 10/2018 0.000 MISC 0.635
8TM012
TRANSIT
<Exempt>
AQC:B10 WESTCHESTER TPC: $70-$130 M TOTAL 5YR COST : 0.000 4.235 0.000 0.000 0.000 0.000 0.000 0.000

263
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 24 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

WESTCHESTER PURCHASE SEVENTEEN (17) 30 FOOT REPLACEMENT FTA 5339 10/2020 0.393 MISC 0.393
HYBRID BUSES FOR WESTCHESTER COUNTY BEE-LINE LOCAL 10/2020 0.049 MISC 0.049
8TM033 SYSTEM TO IMPROVE EFFICIENCY IN OPERATIONS. STATE 10/2020 0.049 MISC 0.049
TRANSIT
LOCAL 10/2021 13.050 MISC 13.050
<Exempt>
AQC:B10 WESTCHESTER TPC: $12.5-$19 M TOTAL 5YR COST : 13.541 0.000 0.000 0.491 13.050 0.000 0.000 0.000

WESTCHESTER PURCHASE OF (108) 40 FOOT REPLACEMENT BUSES FOR CMAQ 10/2019 2.000 MISC 2.000
WESTCHESTER COUNTY BEE-LINE SYSTEM. LOCAL 10/2019 0.500 MISC 0.500
8TM061 REPLACEMENT OF BUSES THAT HAVE REACH THEIR CMAQ 10/2020 6.000 MISC 6.000
TRANSIT USEFUL LIFE. PROJECT IS USING FUNDS FROM THE LOCAL 10/2020 1.500 MISC 1.500
<Exempt> STATE MODERNIZATION AND ENHANCEMENT FTA 5339 07/2021 1.249 MISC 1.249
PROGRAM.
LOCAL 07/2021 0.156 MISC 0.156
STATE 07/2021 0.156 MISC 0.156
STATE 07/2021 5.581 MISC 5.581
CMAQ 10/2021 6.233 MISC 6.233
LOCAL 10/2021 1.558 MISC 1.558
STBG LG URB 10/2021 14.000 MISC 14.000
LOCAL 10/2021 3.500 MISC 3.500
CMAQ 10/2022 2.000 MISC 2.000
LOCAL 10/2022 0.500 MISC 0.500
STBG LG URB 10/2022 15.500 MISC 15.500
LOCAL 10/2022 3.875 MISC 3.875
CMAQ 10/2023 2.000 MISC 2.000
LOCAL 10/2023 0.500 MISC 0.500
STBG LG URB 10/2023 14.000 MISC 14.000
LOCAL 10/2023 3.500 MISC 3.500
AQC:B2 WESTCHESTER TPC: $70-$130 M TOTAL 5YR COST : 84.308 0.000 2.500 14.642 25.291 21.875 20.000 0.000

WESTCHESTER PURCHASE OF (95) 40 FOOT REPLACEMENT BUSES FOR FTA 5339 07/2023 0.393 MISC 0.393
WESTCHESTER COUNTY BEE-LINE SYSTEM. STATE 07/2023 0.049 MISC 0.049
8TM062 REPLACEMENT OF BUSES THAT HAVE REACHED THEIR LOCAL 07/2023 38.075 MISC 38.075
TRANSIT USEFUL LIFE. LOCAL 07/2024 38.075 MISC 38.075
<Exempt>
AQC:B2 WESTCHESTER TPC: $70-$130 M TOTAL 5YR COST : 76.592 0.000 0.000 0.000 0.000 38.517 38.075 0.000

WESTCHESTER PURCHASE UP TO TWENTY-FOUR (24) 40 FOOT FTA 5339 07/2022 0.393 MISC 0.393
REPLACEMENT BUSES FOR WESTCHESTER COUNTY LOCAL 07/2022 0.049 MISC 0.049
8TM063 BEE-LINE SYSTEM TO REPLACE BUSES THAT HAVE STATE 07/2022 0.049 MISC 0.049
TRANSIT REACHED THE END OF THEIR USEFUL LIFE. LOCAL 07/2023 19.150 MISC 19.150
<Exempt>
AQC:B2 WESTCHESTER TPC: $15-$25 M TOTAL 5YR COST : 19.641 0.000 0.000 0.000 0.491 19.150 0.000 0.000

264
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 Westchester County Listing Page 25 of 25

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

WESTCHESTER FAREBOX UPGRADE FOR THE BEE-LINE SYSTEM LOCAL 01/2021 2.500 MISC 2.500
PURPOSE IS TO IMPROVE EFFICIENCY IN OPERATIONS.
8TM081 WESTCHESTER COUNTY.
TRANSIT
<Exempt>
AQC:B5 WESTCHESTER TPC: $2-$4 M TOTAL 5YR COST : 2.500 0.000 0.000 2.500 0.000 0.000 0.000 0.000

WESTCHESTER 257 BIKE RACKS FOR BEE-LINE BUS SYSTEM. THIS CMAQ 10/2018 0.000 MISC 0.395
PROJECT WILL PLACE BIKE RACKS ON PART OF THE LOCAL 10/2018 0.000 MISC 0.099
8TM104 WESTCHESTER COUNTY BEE-LINE BUS SYSTEM FLEET.
TRANSIT
<Exempt>
AQC:B5 WESTCHESTER TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.494 0.000 0.000 0.000 0.000 0.000 0.000

LOCAL WESTCHESTER COUNTY DEPARTMENT OF PUBLIC FTA 5310 10/2018 0.000 MISC 0.587
WORKS AND TRANSPORTATION PARATRANSIT LOCAL 10/2018 0.000 MISC 0.587
8TM105 SERVICES - THIS PROJECT INCREASES MOBILITY FOR FTA 5310 10/2019 1.174 MISC 1.174
TRANSIT INDIVIDUALS WITH DISABILITIES BEYOND ADA LOCAL 10/2019 1.174 MISC 1.174
<Exempt> REQUIREMENTS BY ASSURING CONTINUATION OF
PARATRANSIT SERVICE TO ALL ELIGIBLE USERS
WITHOUT REGARD TO PROXIMITY TO FIXED-ROUTE
TRANSIT. THIS PROJECT WILL ALLOW THE COUNTY TO
ACCOMMODATE INCREASING DEMAND ON ITS
PARATRANSIT SERVICE. FFY 2016 AND FFY 2017
PROGRAM.

AQC:K1 WESTCHESTER TPC: $3.3-$5.6 M TOTAL 5YR COST : 2.348 1.174 2.348 0.000 0.000 0.000 0.000 0.000

WESTCHESTER BEE-LINE MAINTENANCE FACILITY EQUIPMENT FTA 5339 07/2024 0.393 MISC 0.393
UPGRADES. INCLUDES REPLACEMENT OF EQUIPMENT LOCAL 07/2024 0.049 MISC 0.049
8TRM12 THAT HAVE MET THEIR USEFUL LIFE. STATE 07/2024 0.049 MISC 0.049
TRANSIT
<Exempt>
AQC:B4 WESTCHESTER TPC: < $0.75 M TOTAL 5YR COST : 0.491 0.000 0.000 0.000 0.000 0.000 0.491 0.000

265
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 1 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PEDESTRIAN SAFETY ACTION PLAN IMPLEMENTATION HSIP 05/2019 0.000 CONINSP 0.960
PHASE III - THE PROJECT WILL IDENTIFY AND IMPROVE HSIP 05/2019 0.000 CONST 7.835
80PS01 PEDESTRIAN SAFETY IN URBAN AREAS AS DESCRIBED
SAFETY IN THE JUNE 20, 2016 NEW YORK STATE PEDESTRIAN
<Exempt> SAFETY ACTION PLAN. 100% FEDERAL USING 10% TOLL
CREDIT.

AQC:A6 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 8.795 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT I684 INTERCHANGE STUDY EXIT 5 TO EXIT 10 AND FROM STBG FLEX 10/2018 0.000 SCOPING 0.449
I684 TO CONNECTICUT STATE LINE: I684 AND SMRP SDF 10/2018 0.000 SCOPING 0.112
811359 INTERCHANGE, I684 AND ROUTE 35 INTERCHANGE,
STUDY TOWN OF BEDFORD, WESTCHESTER COUNTY AND I684
<Exempt> AND I84 INTERCHANGE, TOWN OF SOUTHEAST,
PUTNAM COUNTY. PROJECT WILL EXAMINE EXISTING
TRAFFIC CONDITIONS AS WELL AS FUTURE NO-BUILD
TRAFFIC CONDITIONS UNDER A RANGE OF
ALTERNATIVE TRANSPORTATION IMPROVEMENTS.
T/BEDFORD

AQC:C3 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.561 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT PREVENTIVE MAINTENANCE INITIATIVE PAVING: NHPP 05/2019 0.000 CONINSP 0.920
TACONIC STATE PARKWAY: WESTCHESTER CO LINE TO SDF 05/2019 0.000 CONINSP 0.230
812745 PUDDING ST, TOWNS OF CARMEL AND PUTNAM NHPP 05/2019 0.000 CONST 7.280
R&P VALLEY, PUTNAM COUNTY. SDF 05/2019 0.000 CONST 1.820
<Exempt>
AQC:A10 MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 0.000 10.250 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT PMI PAVING: ROUTES 303 AND 17: PROJECT WILL REPAVE STBG FLEX 12/2019 0.408 CONINSP 0.408
AND INCLUDE PEDESTRIAN IMPROVEMENTS AS SDF 12/2019 0.102 CONINSP 0.102
850223 WARRANTED ALONG ROUTE 303, FROM THE NJ LINE TO STBG FLEX 12/2019 4.080 CONST 4.080
R&P RAIL TRAIL BRIDGE UNDERPASS, IN THE TOWN OF
<Exempt> SDF 12/2019 1.020 CONST 1.020
ORANGETOWN, ROCKLAND COUNTY AND ROUTE 17 IN
THE VILLAGE OF HARRIMAN IN THE TOWN OF MONROE
AND THE VILLAGE OF WOODBURY IN THE TOWN OF
WOODBURY AND THE TOWN OF TUXEDO IN ORANGE
COUNTY.

AQC:A10 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.610 0.000 5.610 0.000 0.000 0.000 0.000 0.000

266
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 2 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL HARRIMAN-BEAR MOUNTAIN TRAILS IMPROVEMENT REC TRAILS 01/2019 0.000 CONST 0.154
PROJECT. THE NEW YORK-NEW JERSEY TRAIL OTHER 01/2019 0.000 CONST 0.038
876201 CONFERENCE WILL BUILD AND REHABILITATE ERODED REC TRAILS 01/2019 0.000 DETLDES 0.002
MISC AND WORN SECTIONS OF THE RAMAPO-DUNDERBERG OTHER 01/2019 0.000 DETLDES 0.001
<Exempt> TRAIL AND KAKIAT, TRIANGLE, AND TUXEDO-MT. IVY REC TRAILS 10/2018 0.000 PRELDES 0.001
TRAILS IN BEAR MOUNTAIN AND HARRIMAN STATE
OTHER 10/2018 0.000 PRELDES 0.001
PARKS IN ORANGE AND ROCKLAND COUNTIES. THESE
TRAILS INTERSECT WITH EACH OTHER AND CONNECT
WITH LONG-DISTANCE TRAIL SYSTEMS, INCLUDING
THE APPALACHIAN TRAIL, THE LONG PATH, THE
150-MILE HIGHLANDS TRAIL, AND THE ROUTE OF THE
NEW EMPIRE STATE TRAIL.

AQC:A2 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.197 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT GUIDERAIL REPLACEMENT: PROJECT WILL REPLACE OR STBG FLEX 04/2022 0.040 DETLDES 0.040
REPAIR DEFICIENT OR OBSOLETE GUIDERAIL ALONG SDF 04/2022 0.010 DETLDES 0.010
880935 FEDERAL AID ELIGIBLE STATE HIGHWAYS IN STBG FLEX 02/2023 0.240 CONINSP 0.240
SAFETY COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, SDF 02/2023 0.060 CONINSP 0.060
<Exempt> ULSTER AND WESTCHESTER COUNTIES. STBG FLEX 02/2023 2.400 CONST 2.400
SDF 02/2023 0.600 CONST 0.600
AQC:A11 MULTI TPC: $2-$4 M TOTAL 5YR COST : 3.350 0.000 0.000 0.000 0.050 3.300 0.000 0.000

NYSDOT HIGHWAY EMERGENCY LOCAL PATROL (HELP) FREEWAY NHPP 01/2019 0.000 MISC 3.200
INCIDENT MANAGEMENT. PROJECT INCLUDES PAY FOR SDF 01/2019 0.000 MISC 0.800
881033 THE CONTRACT OPERATORS, THE TRUCKS, ALL NHPP 01/2020 3.200 MISC 3.200
MOBIL EQUIPMENT ON BOARD, GASOLINE, AND OTHER SDF 01/2020 0.800 MISC 0.800
<Exempt> OPERATIONAL NEEDS AT VARIOUS LOCATIONS IN THE NHPP 01/2021 3.200 MISC 3.200
HUDSON VALLEY.
SDF 01/2021 0.800 MISC 0.800
AQC:A6 MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 8.000 4.000 4.000 4.000 0.000 0.000 0.000 0.000

267
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 3 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT SIGNAL IMPROVEMENTS INSTALL TRAFFIC SIGNALS STBG FLEX 04/2019 0.000 DETLDES 0.400
&/OR UPGRADE/MODIFY EXISTING SIGNALS SDF 04/2019 0.000 DETLDES 0.100
881204 THROUGHOUT VARIOUS MUNICIPALITIES ON VARIOUS STBG FLEX 04/2019 0.000 ROWACQU 0.693
TRAFFIC FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE SDF 04/2019 0.000 ROWACQU 0.173
<Exempt> COUNTIES OF DUTCHESS, ULSTER AND WESTCHESTER. STBG FLEX 02/2019 0.000 ROWINCD 0.083
SDF 02/2019 0.000 ROWINCD 0.021
STBG FLEX 04/2020 0.136 CONINSP 0.136
SDF 04/2020 0.034 CONINSP 0.034
STBG LG URB 04/2020 0.344 CONINSP 0.344
SDF 04/2020 0.086 CONINSP 0.086
STBG FLEX 04/2020 0.904 CONST 0.904
SDF 04/2020 0.226 CONST 0.226
STBG LG URB 04/2020 2.296 CONST 2.296
SDF 04/2020 0.574 CONST 0.574
AQC:D2 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 4.600 1.470 4.600 0.000 0.000 0.000 0.000 0.000

NYSDOT BRIDGE PAINTING: PROJECT WILL CONSIST OF NHPP 10/2018 0.000 CONINSP 0.400
PAINTING STEEL SURFACES ON BRIDGES TO PROTECT SDF 10/2018 0.000 CONINSP 0.100
881316 AGAINST NORMAL ENVIRONMENTAL EFFECTS OF STBG FLEX 10/2018 0.000 CONINSP 0.148
BRIDGE CORROSION, ACID RAIN, & DEICING AGENTS. BINS SDF 10/2018 0.000 CONINSP 0.037
<Exempt> 1025160; 1037210; 1016810; 1027600; 1029040; 1041350; NHPP 10/2018 0.000 CONST 4.000
1053080; 5501650 IN COLUMBIA, DUTCHESS, ROCKLAND,
SDF 10/2018 0.000 CONST 1.000
ULSTER & WESTCHESTER COUNTIES (FORMERLY PIN:
8T0628) STBG FLEX 10/2018 0.000 CONST 1.483
SDF 10/2018 0.000 CONST 0.371
AQC:A19 MULTI TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 7.539 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT GUIDERAIL REPLACEMENT: THIS PROJECT WILL STBG FLEX 01/2019 0.000 CONINSP 0.160
REPLACE DAMAGED OR NON-FUNCTIONAL GUIDERAIL SDF 01/2019 0.000 CONINSP 0.040
881330 AND BRIDGE RAIL ON STATE HIGHWAYS IN VARIOUS STBG FLEX 01/2019 0.000 CONST 1.600
SAFETY MUNICIPALITIES THROUGHOUT THE COUNTIES OF SDF 01/2019 0.000 CONST 0.400
<Exempt> ROCKLAND, PUTNAM AND WESTCHESTER. (FORMERLY
PIN: 8T0319)

AQC:A9 MULTI TPC: $2-$4 M TOTAL 5YR COST : 0.000 2.200 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT REPAIR REHAB/REPLACE BRIDGES TO CORRECT OR NHPP 05/2019 0.000 DETLDES 0.100
PREVENT PROBLEMS RELATED TO THE DETERIORATION SDF 05/2019 0.000 DETLDES 0.025
881341 OF A VARIETY OF BRIDGE COMPONENTS THROUGHOUT NHPP 10/2018 0.000 PRELDES 0.060
BRIDGE VARIOUS MUNICIPALITIES IN DUTCHESS, PUTNAM AND SDF 10/2018 0.000 PRELDES 0.015
<Exempt> ULSTER COUNTIES. BINS 1005220, 1032300, 1005190, NHPP 12/2019 1.120 CONINSP 1.120
5502509, 1041050.
SDF 12/2019 0.280 CONINSP 0.280
NHPP 12/2019 11.200 CONST 11.200
SDF 12/2019 2.800 CONST 2.800
AQC:A19 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 15.400 0.200 15.400 0.000 0.000 0.000 0.000 0.000

268
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 4 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT TRAVEL DEMAND MANAGEMENT (TDM) PROGRAM TO CMAQ 10/2018 0.000 OPER 2.300
DEVELOP PROJECTS & STRATEGIES TO OPTIMIZE THE SDF 10/2018 0.000 OPER 0.575
881343 TRANSPORTATION SYSTEM PERFORMANCE BY
MOBIL PROMOTING MODE CHOICES, DIRECTION/TIME OF
<Exempt> TRAVEL WHICH LEADS TO REDUCED CONGESTION &
IMPROVED AIR QUALITY IN MHSTCC AREA. (FORMERLY
PIN: 8T0402)

AQC:C4 MULTI TPC: $2-$4 M TOTAL 5YR COST : 0.000 2.875 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT GEOTECH SUBSURFACE EXPLORATIONS CONTRACT: STBG FLEX 10/2018 0.000 CONINSP 0.059
THIS PROJECT WILL EXPLORE SUBSURFACE SOIL SDF 10/2018 0.000 CONINSP 0.013
881344 CONDITIONS TO PROVIDE DATA NEEDED IN ADVANCE STBG FLEX 10/2018 0.000 CONST 0.480
STUDY OF HIGHWAY AND BRIDGE DESIGN. COLUMBIA, SDF 10/2018 0.000 CONST 0.120
<Exempt> DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM
AND WESTCHESTER COUNTIES (FORMERLY PIN: 8T0599)

AQC:C5P MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 0.672 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT GEOTECH SUBSURFACE EXPLORATIONS CONTRACT: SDF 05/2019 0.000 DETLDES 0.015
PROJECT WILL EXPLORE SUBSURFACE SOIL STBG FLEX 11/2019 0.058 CONINSP 0.058
881345 CONDITIONS TO PROVIDE DATA NEEDED IN ADVANCE SDF 11/2019 0.014 CONINSP 0.014
STUDY OF HIGHWAY & BRIDGE DESIGN ON VARIOUS FEDERAL STBG FLEX 11/2019 0.480 CONST 0.480
<Exempt> AID ELIGIBLE STATE HIGHWAYS IN THE COUNTIES OF
SDF 11/2019 0.120 CONST 0.120
COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND,
ULSTER & WESTCHESTER (FORMERLY PIN: 8T0630)

AQC:C5 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.672 0.015 0.672 0.000 0.000 0.000 0.000 0.000

NYSDOT GEOTECH SUBSURFACE EXPLORATIONS CONTRACT: SDF 02/2020 0.015 DETLDES 0.015
PROJECT WILL EXPLORE SUBSURFACE SOIL STBG FLEX 11/2020 0.062 CONINSP 0.062
881346 CONDITIONS TO PROVIDE DATA NEEDED IN ADVANCE SDF 11/2020 0.016 CONINSP 0.016
STUDY OF HIGHWAY & BRIDGE DESIGN ON VARIOUS FEDERAL STBG FLEX 11/2020 0.520 CONST 0.520
<Exempt> AID ELIGIBLE STATE HIGHWAYS IN THE COUNTIES OF SDF 11/2020 0.130 CONST 0.130
COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND,
ULSTER & WESTCHESTER (FORMERLY PIN: 8T0708)

AQC:C5 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.743 0.000 0.015 0.728 0.000 0.000 0.000 0.000

269
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 5 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT GEOTECH SUBSURFACE EXPLORATIONS CONTRACT: SDF 02/2021 0.015 DETLDES 0.015
PROJECT WILL EXPLORE SUBSURFACE SOIL STBG FLEX 11/2021 0.062 CONINSP 0.062
881347 CONDITIONS TO PROVIDE DATA NEEDED IN ADVANCE SDF 11/2021 0.016 CONINSP 0.016
STUDY OF HIGHWAY & BRIDGE DESIGN ON VARIOUS FEDERAL STBG FLEX 11/2021 0.520 CONST 0.520
<Exempt> AID ELIGIBLE STATE HIGHWAYS IN THE COUNTIES OF SDF 11/2021 0.130 CONST 0.130
COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND,
ULSTER & WESTCHESTER (FORMERLY PIN: 8T0709)

AQC:C5 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.743 0.000 0.000 0.015 0.728 0.000 0.000 0.000

NYSDOT BIENNIAL ACCIDENT INVESTIGATION (HSIP): THIS HSIP 04/2020 1.350 MISC 1.350
PROJECT CONSISTS OF INVESTIGATING ACCIDENT SDF 04/2020 0.150 MISC 0.150
881349 LOCATIONS TO IDENTIFY THOSE THAT WILL BE
STUDY SPECIFICALLY TARGETED FOR SAFETY IMPROVEMENTS
<Exempt> IN REGION 8 COUNTIES: COLUMBIA, DUTCHESS,
ORANGE, PUTNAM, ROCKLAND, ULSTER,
WESTCHESTER (FORMERLY PIN: 8T0477).

AQC:A6 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.500 0.000 1.500 0.000 0.000 0.000 0.000 0.000

NYSDOT BIENNIAL ACCIDENT INVESTIGATION (HSIP): THIS HSIP 04/2022 1.350 MISC 1.350
PROJECT CONSISTS OF INVESTIGATING ACCIDENT SDF 04/2022 0.150 MISC 0.150
881350 LOCATIONS TO IDENTIFY THOSE THAT WILL BE
STUDY SPECIFICALLY TARGETED FOR SAFETY IMPROVEMENTS
<Exempt> IN REGION 8 COUNTIES: COLUMBIA, DUTCHESS,
ORANGE, PUTNAM, ROCKLAND, ULSTER &
WESTCHESTER (FORMERLY PIN: 8T0478)

AQC:A6 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.500 0.000 0.000 0.000 1.500 0.000 0.000 0.000

NYSDOT BIENNIAL ACCIDENT INVESTIGATION (HSIP): THIS HSIP 04/2024 1.350 MISC 1.350
PROJECT CONSISTS OF INVESTIGATING ACCIDENT SDF 04/2024 0.150 MISC 0.150
881351 LOCATIONS TO IDENTIFY THOSE THAT WILL BE
STUDY SPECIFICALLY TARGETED FOR SAFETY IMPROVEMENTS
<Exempt> IN REGION 8 COUNTIES: COLUMBIA, DUTCHESS,
ORANGE, PUTNAM, ROCKLAND, ULSTER &
WESTCHESTER (FORMERLY PIN: 8T0711)

AQC:A6Z MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.500 0.000 0.000 0.000 0.000 0.000 1.500 0.000

270
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 6 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT SYSTEM REPAIR: PROJECT WILL REPAIR OR SDF 05/2019 0.000 PRELDES 0.200
REHABILITATE STATE HIGHWAY INFRASTRUCTURE NHPP 03/2020 0.080 DETLDES 0.080
881353 ELEMENTS THAT ARE BEYOND THE MEANS OF THE SDF 03/2020 0.020 DETLDES 0.020
BRIDGE DEPARTMENTS MAINTENANCE FORCES SUCH AS NHPP 04/2020 0.160 ROWACQU 0.160
<Exempt> RETAINING WALLS ON VARIOUS FEDERAL AID
SDF 04/2020 0.040 ROWACQU 0.040
ELIGIBLE STATE HIGHWAYS IN THE COUNTIES OF
SDF 12/2019 0.030 ROWINCD 0.030
COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND,
ULSTER & WESTCHESTER. NHPP 01/2021 0.144 CONINSP 0.144
SDF 01/2021 0.036 CONINSP 0.036
NHPP 01/2021 1.200 CONST 1.200
SDF 01/2021 0.300 CONST 0.300
AQC:A2 MULTI TPC: $2-$4 M TOTAL 5YR COST : 2.010 0.200 0.330 1.680 0.000 0.000 0.000 0.000

NYSDOT SYSTEM REPAIR: PROJECT WILL REPAIR OR STBG FLEX 01/2020 0.120 PRELDES 0.120
REHABILITATE HIGHWAY INFRASTRUCTURE ELEMENTS SDF 01/2020 0.030 PRELDES 0.030
881355 THAT ARE BEYOND THE MEANS OF THE DEPARTMENT STBG FLEX 09/2020 0.024 ROWINCD 0.024
RECON MAINTENANCE FORCES SUCH AS RETAINING WALLS IN
<Exempt> SDF 09/2020 0.006 ROWINCD 0.006
REGION 8 COUNTIES: COLUMBIA, DUTCHESS, ORANGE,
STBG FLEX 09/2020 0.040 SCOPING 0.040
PUTNAM, ROCKLAND, ULSTER, WESTCHESTER
(FORMERLY PIN: 8T0710). WORK WILL BE DONE ON SDF 09/2020 0.010 SCOPING 0.010
VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS. STBG FLEX 01/2021 0.080 DETLDES 0.080
SDF 01/2021 0.020 DETLDES 0.020
STBG FLEX 02/2021 0.160 ROWACQU 0.160
SDF 02/2021 0.040 ROWACQU 0.040
STBG FLEX 02/2022 0.144 CONINSP 0.144
SDF 02/2022 0.036 CONINSP 0.036
STBG FLEX 02/2022 1.200 CONST 1.200
SDF 02/2022 0.300 CONST 0.300
AQC:A2 MULTI TPC: $2-$4 M TOTAL 5YR COST : 2.210 0.000 0.230 0.300 1.680 0.000 0.000 0.000

NYSDOT BRIDGE PAINTING: PROJECT WILL PAINT STEEL NHPP 09/2021 0.400 CONINSP 0.400
SURFACES ON BRIDGES TO PROTECT AGAINST NORMAL SDF 09/2021 0.100 CONINSP 0.100
881356 ENVIRONMENTAL EFFECTS OF CORROSION, ACID RAIN, NHPP 09/2021 4.000 CONST 4.000
BRIDGE AND DEICING AGENTS. WORK WILL TAKE PLACE ON SDF 09/2021 1.000 CONST 1.000
<Exempt> VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN SDF 12/2020 0.100 DETLDES 0.100
COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE,
PUTNAM AND WESTCHESTER COUNTIES.

AQC:A19 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.600 0.000 0.000 5.600 0.000 0.000 0.000 0.000

271
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 7 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT BRIDGE PAINTING: PROJECT WILL PAINT STEEL NHPP 09/2022 0.400 CONINSP 0.400
SURFACES ON BRIDGES TO PROTECT AGAINST NORMAL SDF 09/2022 0.100 CONINSP 0.100
881357 ENVIRONMENTAL EFFECTS OF CORROSION, ACID RAIN, NHPP 09/2022 4.000 CONST 4.000
BRIDGE AND DEICING AGENTS. VARIOUS FEDERAL AID SDF 09/2022 1.000 CONST 1.000
<Exempt> ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, SDF 11/2021 0.100 DETLDES 0.100
ULSTER, ROCKLAND, ORANGE, PUTNAM AND
WESTCHESTER COUNTIES.

AQC:A19 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.600 0.000 0.000 0.000 5.600 0.000 0.000 0.000

NYSDOT BRIDGE PAINTING: PROJECT WILL CONSIST OF NHPP 09/2019 0.000 CONINSP 0.400
PAINTING STEEL SURFACES ON BRIDGES TO PROTECT SDF 09/2019 0.000 CONINSP 0.100
881358 AGAINST NORMAL ENVIRONMENTAL EFFECTS OF NHPP 09/2019 0.000 CONST 4.000
BRIDGE CORROSION, ACID RAIN, & DEICING AGENTS. THE SDF 09/2019 0.000 CONST 1.000
<Exempt> WORK WILL BE DONE ON SELECT BRIDGES ON STBG-OFF 09/2019 0.000 CONST 0.960
FEDERAL-AID ELIGIBLE HIGHWAYS IN VARIOUS
SDF 09/2019 0.000 CONST 0.240
MUNICIPALITIES IN THE COUNTIES OF COLUMBIA
DUTCHESS, ORANGE, PUTNAM, ULSTER AND SDF 10/2018 0.000 DETLDES 0.150
WESTCHESTER. BINS 1053050, 1053030, 5501270.
(FORMERLY PIN: 8T0706)

AQC:A19 MULTI TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 6.850 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT BRIDGE PAINTING: PROJECT WILL CONSIST OF NHPP 09/2020 0.432 CONINSP 0.432
PAINTING STEEL SURFACES ON BRIDGES TO PROTECT SDF 09/2020 0.108 CONINSP 0.108
881360 AGAINST NORMAL ENVIRONMENTAL EFFECTS OF NHPP 09/2020 4.320 CONST 4.320
BRIDGE CORROSION, ACID RAIN, & DEICING AGENTS ON
<Exempt> SDF 09/2020 1.080 CONST 1.080
VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS.
SDF 12/2019 0.100 DETLDES 0.100
COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND,
ULSTER & WESTCHESTER COUNTIES (FORMERLY PIN:
8T0707)

AQC:A19 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 6.040 0.000 6.040 0.000 0.000 0.000 0.000 0.000

NYSDOT BRIDGE WASHING/DECK SEALING: PROJECT CONSISTS NHPP 12/2018 0.000 CONINSP 0.072
OF CLEANING/WASHING BRIDGES &SEALING DECKS AS SDF 12/2018 0.000 CONINSP 0.018
881361 NEEDED. WORK WILL REMOVE DEBRIS FROM THE NHPP 12/2018 0.000 CONST 0.600
BRIDGE BRIDGES & PROTECT THEM AGAINST CORROSIVE SDF 12/2018 0.000 CONST 0.150
<Exempt> SUBSTANCES ON VARIOUS FEDERAL AID ELIGIBLE NHPP 12/2019 0.072 CONINSP 0.072
STATE HIGHWAYS. COLUMBIA, DUTCHESS, ORANGE,
SDF 12/2019 0.018 CONINSP 0.018
PUTNAM, ROCKLAND, ULSTER & WESTCHESTER
(FORMERLY PIN: 8T0626) NHPP 12/2019 0.600 CONST 0.600
SDF 12/2019 0.150 CONST 0.150

AQC:A19 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 0.840 0.840 0.840 0.000 0.000 0.000 0.000 0.000

272
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 8 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT BRIDGE WASHING/DECK SEALING: PROJECT WILL SDF 02/2020 0.014 DETLDES 0.014
CONSIST OF CLEANING/WASHING BRIDGES &SEALING STBG FLEX 12/2020 0.096 CONINSP 0.096
881363 DECKS AS NEEDED. WORK WILL REMOVE DEBRIS FROM SDF 12/2020 0.024 CONINSP 0.024
BRIDGE THE BRIDGES & PROTECT THEM AGAINST CORROSIVE STBG FLEX 12/2020 0.800 CONST 0.800
<Exempt> SUBSTANCES. ON VARIOUS FEDRAL AID ELIGIBLE SDF 12/2020 0.200 CONST 0.200
BRIDGES IN THE COUNTIES COLUMBIA, DUTCHESS,
ORANGE, PUTNAM, ROCKLAND, ULSTER &
WESTCHESTER (FORMERLY PIN: 8T0704)

AQC:A19 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.134 0.000 0.014 1.120 0.000 0.000 0.000 0.000

NYSDOT BRIDGE WASHING/DECK SEALING: PROJECT WILL SDF 03/2021 0.014 DETLDES 0.014
CONSIST OF CLEANING/WASHING BRIDGES &SEALING STBG FLEX 12/2021 0.096 CONINSP 0.096
881364 DECKS AS NEEDED. WORK WILL REMOVE DEBRIS FROM SDF 12/2021 0.024 CONINSP 0.024
BRIDGE THE BRIDGES & PROTECT THEM AGAINST CORROSIVE STBG FLEX 12/2021 0.800 CONST 0.800
<Exempt> SUBSTANCES. ON VARIOUS FEDERAL AID ELIGIBLE SDF 12/2021 0.200 CONST 0.200
BRIDGES IN THE COUNTIES OF COLUMBIA, DUTCHESS,
ORANGE, PUTNAM, ROCKLAND, ULSTER &
WESTCHESTER (FORMERLY PIN: 8T0705)

AQC:A19 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.134 0.000 0.000 0.014 1.120 0.000 0.000 0.000

NYSDOT BRIDGE WASHING/ DECK SEALING: PROJECT STBG FLEX 02/2022 0.016 DETLDES 0.016
CLEAN/WASH BRIDGES AND SEALING DECKS AS SDF 02/2022 0.004 DETLDES 0.004
881365 NEEDED. THIS WORK WILL REMOVE DEBRIS FROM THE STBG FLEX 12/2022 0.096 CONINSP 0.096
BRIDGE BRIDGES AND PROTECT THEM AGAINST CORROSIVE SDF 12/2022 0.024 CONINSP 0.024
<Exempt> SUBSTANCES. VARIOUS FEDERAL AID ELIGIBLE STATE STBG FLEX 12/2022 0.800 CONST 0.800
HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER,
SDF 12/2022 0.200 CONST 0.200
ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER
COUNTIES.

AQC:A19Z MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.140 0.000 0.000 0.000 0.020 1.120 0.000 0.000

NYSDOT BRIDGE WASHING/ DECK SEALING: PROJECT SDF 02/2023 0.014 DETLDES 0.014
CLEAN/WASH BRIDGES AND SEALING DECKS AS STBG FLEX 12/2023 0.096 CONINSP 0.096
881366 NEEDED. THIS WORK WILL REMOVE DEBRIS FROM THE SDF 12/2023 0.024 CONINSP 0.024
BRIDGE BRIDGES AND PROTECT THEM AGAINST CORROSIVE STBG FLEX 12/2023 0.800 CONST 0.800
<Exempt> SUBSTANCES. VARIOUS FEDERAL AID ELIGIBLE STATE SDF 12/2023 0.165 CONST 0.165
HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER,
ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER
COUNTIES.

AQC:A19 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.099 0.000 0.000 0.000 0.000 0.014 1.085 0.000

273
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 9 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT BRIDGE REHABILITATION: PROJECT WILL UNDERTAKE NHPP 05/2023 0.064 PRELDES 0.064
CORRECTIVE AND PREVENTATIVE MAINTENANCE SDF 05/2023 0.016 PRELDES 0.016
881367 ACTIONS TO EXTEND THE SERVICE LIFE OF BRIDGES ON NHPP 04/2024 2.420 CONINSP 2.420
BRIDGE VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN SDF 04/2024 0.605 CONINSP 0.605
<Exempt> COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, NHPP 04/2024 24.200 CONST 24.200
PUTNAM AND WESTCHESTER COUNTIES.
SDF 04/2024 6.050 CONST 6.050
(FORMERLY PIN: 8T0625)
NHPP 10/2023 0.096 DETLDES 0.096
SDF 10/2023 0.024 DETLDES 0.024
AQC:A19 MULTI TPC: $32-$50 M TOTAL 5YR COST : 33.475 0.000 0.000 0.000 0.000 0.080 33.395 0.000

NYSDOT BRIDGE REHABILITATION: THIS PROJECT WILL NHPP 08/2020 0.096 DETLDES 0.096
UNDERTAKE CORRECTIVE AND PREVENTATIVE SDF 08/2020 0.024 DETLDES 0.024
881369 MAINTENANCE ACTIONS TO EXTEND THE SERVICE LIFE NHPP 11/2019 0.064 PRELDES 0.064
BRIDGE OF BRIDGES ON VARIOUS FEDERAL AID ELIGIBLE STATE
<Exempt> SDF 11/2019 0.016 PRELDES 0.016
HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER,
NHPP 04/2021 2.100 CONINSP 2.100
ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER
SDF 04/2021 0.525 CONINSP 0.525
COUNTIES. (FORMERLY PIN: 8T0703)
NHPP 04/2021 21.000 CONST 21.000
SDF 04/2021 5.250 CONST 5.250
AQC:A19 MULTI TPC: $26-$40 M TOTAL 5YR COST : 29.075 0.000 0.200 28.875 0.000 0.000 0.000 0.000

NYSDOT BRIDGE REHABILITATION: PROJECT WILL UNDERTAKE NHPP 05/2020 0.064 PRELDES 0.064
CORRECTIVE AND PREVENTATIVE MAINTENANCE SDF 05/2020 0.016 PRELDES 0.016
881370 ACTIONS TO EXTEND THE SERVICE LIFE OF BRIDGES ON NHPP 05/2021 0.096 DETLDES 0.096
BRIDGE FEDERAL AID ELIGIBLE STATE HIGHWAYS IN SDF 05/2021 0.024 DETLDES 0.024
<Exempt> COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, NHPP 04/2022 2.300 CONINSP 2.300
PUTNAM AND WESTCHESTER COUNTIES.
SDF 04/2022 0.575 CONINSP 0.575
NHPP 04/2022 22.300 CONST 22.300
SDF 04/2022 5.575 CONST 5.575
AQC:A19 MULTI TPC: $26-$40 M TOTAL 5YR COST : 30.950 0.000 0.080 0.120 30.750 0.000 0.000 0.000

NYSDOT BRIDGE REHABILITATION: PROJECT WILL UNDERTAKE NHPP 05/2021 0.064 PRELDES 0.064
CORRECTIVE AND PREVENTATIVE MAINTENANCE SDF 05/2021 0.016 PRELDES 0.016
881371 ACTIONS TO EXTEND THE SERVICE LIFE OF BRIDGES ON NHPP 05/2022 0.096 DETLDES 0.096
BRIDGE FEDERAL AID ELIGIBLE STATE HIGHWAYS IN SDF 05/2022 0.024 DETLDES 0.024
<Exempt> COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, NHPP 04/2023 1.900 CONINSP 1.900
PUTNAM AND WESTCHESTER COUNTIES.
SDF 04/2023 0.475 CONINSP 0.475
NHPP 04/2023 19.000 CONST 19.000
SDF 04/2023 4.750 CONST 4.750
AQC:A19 MULTI TPC: $21-$31 M TOTAL 5YR COST : 26.325 0.000 0.000 0.080 0.120 26.125 0.000 0.000

274
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 10 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT BRIDGE REHABILITATION: PROJECT WILL UNDERTAKE SDF 05/2023 0.125 PRELDES 0.125
CORRECTIVE AND PREVENTATIVE MAINTENANCE SDF 03/2024 0.250 DETLDES 0.250
881373 ACTIONS TO EXTEND THE SERVICE LIFE OF BRIDGES ON NHPP 01/2025 0.000 CONINSP 1.200
BRIDGE VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN SDF 01/2025 0.000 CONINSP 0.300
<Exempt> COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, NHPP 01/2025 0.000 CONST 12.000
PUTNAM AND WESTCHESTER COUNTIES.
SDF 01/2025 0.000 CONST 3.000
(FORMERLY PIN: 8T0623)

AQC:A19 MULTI TPC: $15-$25 M TOTAL 5YR COST : 0.375 0.000 0.000 0.000 0.000 0.125 0.250 16.500

NYSDOT BRIDGE REHABILITATION: PROJECT WILL UNDERTAKE SDF 09/2019 0.000 PRELDES 0.125
CORRECTIVE AND PREVENTATIVE MAINTENANCE SDF 07/2020 0.250 DETLDES 0.250
881374 ACTIONS TO EXTEND THE SERVICE LIFE OF BRIDGES ON NHPP 01/2021 0.928 CONINSP 0.928
BRIDGE VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN SDF 01/2021 0.232 CONINSP 0.232
<Exempt> COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, NHPP 01/2021 9.280 CONST 9.280
PUTNAM AND WESTCHESTER COUNTIES.
SDF 01/2021 2.320 CONST 2.320
(FORMERLY PIN: 8T0623)

AQC:A19 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 13.010 0.125 0.250 12.760 0.000 0.000 0.000 0.000

NYSDOT BRIDGE REHABILITATION: PROJECT WILL UNDERTAKE SDF 05/2020 0.125 PRELDES 0.125
CORRECTIVE AND PREVENTATIVE MAINTENANCE SDF 03/2021 0.250 DETLDES 0.250
881375 ACTIONS TO EXTEND THE SERVICE LIFE OF BRIDGES ON NHPP 01/2022 1.600 CONINSP 1.600
BRIDGE VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN SDF 01/2022 0.400 CONINSP 0.400
<Exempt> COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, NHPP 01/2022 16.000 CONST 16.000
PUTNAM AND WESTCHESTER COUNTIES.
SDF 01/2022 4.000 CONST 4.000
(FORMERLY PIN: 8T0623)

AQC:A19 MULTI TPC: $21-$31 M TOTAL 5YR COST : 22.375 0.000 0.125 0.250 22.000 0.000 0.000 0.000

NYSDOT BRIDGE REHABILITATION: PROJECT WILL UNDERTAKE SDF 05/2021 0.125 PRELDES 0.125
CORRECTIVE AND PREVENTATIVE MAINTENANCE SDF 03/2022 0.250 DETLDES 0.250
881376 ACTIONS TO EXTEND THE SERVICE LIFE OF BRIDGES ON NHPP 01/2023 1.200 CONINSP 1.200
BRIDGE FEDERAL AID ELIGIBLE STATE HIGHWAYS IN SDF 01/2023 0.300 CONINSP 0.300
<Exempt> COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, NHPP 01/2023 12.000 CONST 12.000
PUTNAM AND WESTCHESTER COUNTIES.
SDF 01/2023 3.000 CONST 3.000

AQC:A19 MULTI TPC: $15-$25 M TOTAL 5YR COST : 16.875 0.000 0.000 0.125 0.250 16.500 0.000 0.000

275
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 11 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT BRIDGE REHABILITATION: PROJECT WILL UNDERTAKE SDF 05/2022 0.125 PRELDES 0.125
CORRECTIVE AND PREVENTATIVE MAINTENANCE SDF 03/2023 0.250 DETLDES 0.250
881377 ACTIONS TO EXTEND THE SERVICE LIFE OF BRIDGES ON NHPP 01/2024 1.600 CONINSP 1.600
BRIDGE FEDERAL AID ELIGIBLE STATE HIGHWAYS IN SDF 01/2024 0.400 CONINSP 0.400
<Exempt> COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, NHPP 01/2024 16.000 CONST 16.000
PUTNAM AND WESTCHESTER COUNTIES.
SDF 01/2024 4.000 CONST 4.000

AQC:A19 MULTI TPC: $21-$31 M TOTAL 5YR COST : 22.375 0.000 0.000 0.000 0.125 0.250 22.000 0.000

NYSDOT BRIDGE JOB ORDER CONTRACT: PROJECT WILL STBG FLEX 06/2019 0.000 DETLDES 0.008
CONSIST OF MAKING REPAIRS & PERFORMING OTHER SDF 06/2019 0.000 DETLDES 0.002
881379 MAINTENANCE-RELATED ACTIVITIES, AS NEEDED, TO STBG FLEX 04/2020 0.096 CONINSP 0.096
BRIDGE PRESERVE THE SAFETY & INTEGRITY OF BRIDGES ON SDF 04/2020 0.024 CONINSP 0.024
<Exempt> VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS. STBG FLEX 04/2020 0.800 CONST 0.800
COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE,
SDF 04/2020 0.200 CONST 0.200
PUTNAM AND WESTCHESTER. (FORMERLY PIN: 8T0698)

AQC:A19 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.120 0.010 1.120 0.000 0.000 0.000 0.000 0.000

NYSDOT BRIDGE JOB ORDER CONTRACT: PROJECT WILL STBG FLEX 06/2020 0.008 DETLDES 0.008
CONSIST OF MAKING REPAIRS & PERFORMING OTHER SDF 06/2020 0.002 DETLDES 0.002
881380 MAINTENANCE-RELATED ACTIVITIES, AS NEEDED, TO STBG FLEX 04/2021 0.096 CONINSP 0.096
BRIDGE PRESERVE THE SAFETY & INTEGRITY OF BRIDGES ON SDF 04/2021 0.024 CONINSP 0.024
<Exempt> VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS. STBG FLEX 04/2021 0.800 CONST 0.800
COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE,
SDF 04/2021 0.200 CONST 0.200
PUTNAM AND WESTCHESTER. (FORMERLY PIN: 8T0699)

AQC:A19 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.130 0.000 0.010 1.120 0.000 0.000 0.000 0.000

NYSDOT BRIDGE JOB ORDER CONTRACT: PROJECT WILL MAKE STBG FLEX 06/2021 0.008 DETLDES 0.008
REPAIRS OTHER MAINTENANCE-RELATED ACTIVITIES, SDF 06/2021 0.002 DETLDES 0.002
881381 AS NEEDED, TO PRESERVE THE SAFETY & INTEGRITY OF STBG FLEX 04/2022 0.096 CONINSP 0.096
BRIDGE BRIDGES ON VARIOUS FEDERAL AID ELIGIBLE STATE SDF 04/2022 0.024 CONINSP 0.024
<Exempt> HIGHWAYS. COLUMBIA, DUTCHESS, ULSTER, STBG FLEX 04/2022 0.800 CONST 0.800
ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER
SDF 04/2022 0.200 CONST 0.200
COUNTIES.

AQC:A19 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.130 0.000 0.000 0.010 1.120 0.000 0.000 0.000

276
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 12 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT BRIDGE JOB ORDER CONTRACT: PROJECT WILL MAKE STBG FLEX 05/2022 0.008 DETLDES 0.008
REPAIRS OTHER MAINTENANCE-RELATED ACTIVITIES, SDF 05/2022 0.002 DETLDES 0.002
881382 AS NEEDED, TO PRESERVE THE SAFETY & INTEGRITY OF STBG FLEX 04/2023 0.096 CONINSP 0.096
BRIDGE BRIDGES ON VARIOUS FEDERAL AID ELIGIBLE STATE SDF 04/2023 0.024 CONINSP 0.024
<Exempt> HIGHWAYS. COLUMBIA, DUTCHESS, ULSTER, STBG FLEX 04/2023 0.800 CONST 0.800
ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER
SDF 04/2023 0.200 CONST 0.200
COUNTIES.

AQC:A19 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.130 0.000 0.000 0.000 0.010 1.120 0.000 0.000

NYSDOT BIENNIAL LONG LINES: THIS PROJECT CONSISTS OF STBG FLEX 04/2019 0.000 DETLDES 0.024
APPLYING EPOXY AND PREFORMED PAVEMENT SDF 04/2019 0.000 DETLDES 0.006
881388 MARKINGS ON FEDERAL AID ELIGIBLE STATE STBG FLEX 01/2020 0.440 CONINSP 0.440
SAFETY HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER, SDF 01/2020 0.110 CONINSP 0.110
<Exempt> ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER STBG FLEX 01/2020 4.400 CONST 4.400
COUNTIES (FORMERLY PIN: 8T0618)
SDF 01/2020 1.100 CONST 1.100
AQC:A10 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 6.050 0.030 6.050 0.000 0.000 0.000 0.000 0.000

NYSDOT BIENNIAL LONG LINES: PROJECT WILL APPLY EPOXY STBG FLEX 09/2021 0.440 CONINSP 0.440
AND PREFORMED PAVEMENT MARKINGS ON STATE SDF 09/2021 0.110 CONINSP 0.110
881389 HIGHWAYS. THIS WORK WILL IMPROVE TRAFFIC STBG FLEX 09/2021 4.400 CONST 4.400
SAFETY SAFETY BY ENSURING THAT THE MARKINGS MAINTAIN SDF 09/2021 1.100 CONST 1.100
<Exempt> THEIR PROPER DELINEATION AND REFLECTIVITY STBG FLEX 10/2020 0.024 DETLDES 0.024
PROPERTIES. THIS WORK WILL TAKE PLACE IN VARIOUS
SDF 10/2020 0.006 DETLDES 0.006
MUNICIPALITIES ON VARIOUS FEDERAL AID ELIGIBLE
STATE HIGHWAYS IN THE COUNTIES OF COLUMBIA,
DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM
AND WESTCHESTER.

AQC:A11 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 6.080 0.000 0.000 6.080 0.000 0.000 0.000 0.000

NYSDOT BIENNIAL SPECIAL MARKINGS: WORK WILL APPLY STBG FLEX 04/2019 0.000 DETLDES 0.024
EPOXY & PREFORMED PAVEMENT MARKINGS (SUCH AS SDF 04/2019 0.000 DETLDES 0.006
881390 STOP BARS, CROSSWALK LINES, ARROWS, ETC.) ON STBG FLEX 01/2020 0.264 CONINSP 0.264
SAFETY FEDERAL AID ELIGIBLE ROUTES IN COLUMBIA, SDF 01/2020 0.066 CONINSP 0.066
<Exempt> DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & STBG FLEX 01/2020 2.200 CONST 2.200
WESTCHESTER COUNTIES (FORMERLY PIN: 8T0695)
SDF 01/2020 0.550 CONST 0.550

AQC:A11 MULTI TPC: $2-$4 M TOTAL 5YR COST : 3.080 0.030 3.080 0.000 0.000 0.000 0.000 0.000

277
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 13 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT BIENNIAL SPECIAL PAVEMENT MARKINGS: PROJECT STBG FLEX 09/2021 0.264 CONINSP 0.264
APPLY EPOXY AND PREFORMED PAVEMENT MARKINGS SDF 09/2021 0.066 CONINSP 0.066
881391 ON STATE HIGHWAYS. THIS WORK WILL IMPROVE STBG FLEX 09/2021 2.200 CONST 2.200
SAFETY TRAFFIC SAFETY BY ENSURING THAT THE MARKINGS SDF 09/2021 0.550 CONST 0.550
<Exempt> MAINTAIN THEIR PROPER DELINEATION AND STBG FLEX 10/2020 0.024 DETLDES 0.024
REFLECTIVITY PROPERTIES. WORK WILL TAKE PLACE
SDF 10/2020 0.006 DETLDES 0.006
ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS
IN THE COUNTIES OF COLUMBIA, DUTCHESS, ULSTER,
ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER.

AQC:A11 MULTI TPC: $2-$4 M TOTAL 5YR COST : 3.110 0.000 0.000 3.110 0.000 0.000 0.000 0.000

NYSDOT SPECIAL SURFACE TREATMENT: THIS PROJECT IS FOR HSIP 11/2018 0.000 CONINSP 0.108
RESURFACING LOCATIONS IDENTIFIED AS WET ROAD SDF 11/2018 0.000 CONINSP 0.012
881392 PILS THROUGH SKARP AND RUTTING & SHOVING HSIP 11/2018 0.000 CONST 0.900
SAFETY LOCATIONS AT INTERSECTIONS IN ORANGE AND SDF 11/2018 0.000 CONST 0.100
<Exempt> ROCKLAND COUNTIES. (FORMERLY PIN: 8T0290)

AQC:A10 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 1.120 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT SPECIAL SURFACE TREATMENT: THIS PROJECT WILL HSIP 04/2020 0.018 DETLDES 0.018
RESURFACE VARIOUS FEDERAL AID ELIGIBLE STATE SDF 04/2020 0.002 DETLDES 0.002
881395 HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER, HSIP 01/2021 0.108 CONINSP 0.108
SAFETY ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER SDF 01/2021 0.012 CONINSP 0.012
<Exempt> COUNTIES THAT ARE IN NEED OF CORRECTIVE HSIP 01/2021 0.900 CONST 0.900
PAVEMENT TREATMENT (FORMERLY PIN: 8T0694)
SDF 01/2021 0.100 CONST 0.100
AQC:A10 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.140 0.000 0.020 1.120 0.000 0.000 0.000 0.000

NYSDOT SPECIAL SURFACE TREATMENT: THIS PROJECT WILL HSIP 04/2021 0.018 DETLDES 0.018
RESURFACE CERTAIN FEDERAL AID ELIGIBLE STATE SDF 04/2021 0.002 DETLDES 0.002
881396 HIGHWAYS THAT ARE IN NEED OF CORRECTIVE HSIP 02/2022 0.108 CONINSP 0.108
SAFETY PAVEMENT TREATMENT IN COLUMBIA, DUTCHESS, SDF 02/2022 0.012 CONINSP 0.012
<Exempt> ORANGE, PUTNAM, ROCKLAND, ULSTER & HSIP 02/2022 0.900 CONST 0.900
WESTCHESTER COUNTIES.
SDF 02/2022 0.100 CONST 0.100
AQC:A10 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.140 0.000 0.000 0.020 1.120 0.000 0.000 0.000

NYSDOT SPECIAL SURFACE TREATMENT: THIS PROJECT WILL HSIP 04/2022 0.018 DETLDES 0.018
RESURFACE CERTAIN FEDERAL AID ELIGIBLE STATE SDF 04/2022 0.002 DETLDES 0.002
881397 HIGHWAYS THAT ARE IN NEED OF CORRECTIVE HSIP 02/2023 0.108 CONINSP 0.108
SAFETY PAVEMENT TREATMENT IN COLUMBIA, DUTCHESS, SDF 02/2023 0.012 CONINSP 0.012
<Exempt> ORANGE, PUTNAM, ROCKLAND, ULSTER & HSIP 02/2023 0.900 CONST 0.900
WESTCHESTER COUNTIES.
SDF 02/2023 0.100 CONST 0.100
AQC:A10 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.140 0.000 0.000 0.000 0.020 1.120 0.000 0.000

278
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 14 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT CRACK SEALING AND MASTIC ON SELECT FEDERAL AID STBG FLEX 06/2019 0.000 CONINSP 0.096
ELIGIBLE ROADWAYS ON THE STATE SYSTEM SDF 06/2019 0.000 CONINSP 0.024
881399 THROUGHOUT COLUMBIA, DUTCHESS, ORANGE, STBG FLEX 06/2019 0.000 CONST 0.800
R&P PUTNAM, ROCKLAND, ULSTER & WESTCHESTER SDF 06/2019 0.000 CONST 0.200
<Exempt> COUNTIES. (FORMERLY PIN: 8T0612) STBG FLEX 01/2019 0.000 DETLDES 0.004
SDF 01/2019 0.000 DETLDES 0.001
AQC:A10 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 1.125 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT CRACK SEALING: PROJECT CONSISTS OF CLEANING STBG FLEX 07/2019 0.000 DETLDES 0.004
&SEALING PAVEMENT CRACKS ON VARIOUS STATE SDF 07/2019 0.000 DETLDES 0.001
881400 HIGHWAYS. WORK WILL IMPROVE & PRESERVE THE STBG FLEX 05/2020 0.144 CONINSP 0.144
R&P INTEGRITY OF THE PAVEMENT BY PREVENTING WATER SDF 05/2020 0.036 CONINSP 0.036
<Exempt> INFILTRATION. VARIOUS FEDERAL AID ELIGIBLE STBG FLEX 05/2020 1.200 CONST 1.200
STRUCTURES IN COLUMBIA, DUTCHESS, ORANGE,
SDF 05/2020 0.300 CONST 0.300
PUTNAM, ROCKLAND, ULSTER & WESTCHESTER
COUNTIES.(FORMERLY PIN: 8T0691)

AQC:A10 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.680 0.005 1.680 0.000 0.000 0.000 0.000 0.000

NYSDOT CRACK SEALING: PROJECT CONSISTS OF CLEANING & STBG FLEX 07/2020 0.004 DETLDES 0.004
SEALING PAVEMENT CRACKS ON VARIOUS STATE SDF 07/2020 0.001 DETLDES 0.001
881401 HIGHWAYS. WORK WILL IMPROVE & PRESERVE THE STBG FLEX 05/2021 0.144 CONINSP 0.144
R&P INTEGRITY OF THE PAVEMENT BY PREVENTING WATER SDF 05/2021 0.036 CONINSP 0.036
<Exempt> INFILTRATION. VARIOUS FEDERAL AID ELIGIBLE STBG FLEX 05/2021 1.200 CONST 1.200
STRUCTURES IN COLUMBIA, DUTCHESS, ORANGE,
SDF 05/2021 0.300 CONST 0.300
PUTNAM, ROCKLAND, ULSTER & WESTCHESTER
COUNTIES.(FORMERLY PIN: 8T0692)

AQC:A10 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.685 0.000 0.005 1.680 0.000 0.000 0.000 0.000

NYSDOT CRACK SEALING: CLEANING &SEALING PAVEMENT STBG FLEX 07/2021 0.004 DETLDES 0.004
CRACKS ON VARIOUS FEDERAL AID ELIGIBLE STATE SDF 07/2021 0.001 DETLDES 0.001
881402 HIGHWAYS IN COLUMBIA, DUTCHESS, ORANGE, STBG FLEX 05/2022 0.144 CONINSP 0.144
R&P PUTNAM, ROCKLAND, ULSTER & WESTCHESTER SDF 05/2022 0.036 CONINSP 0.036
<Exempt> COUNTIES. WORK WILL IMPROVE & PRESERVE THE STBG FLEX 05/2022 1.200 CONST 1.200
INTEGRITY OF THE PAVEMENT BY PREVENTING WATER
SDF 05/2022 0.300 CONST 0.300
INFILTRATION.

AQC:A10 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.685 0.000 0.000 0.005 1.680 0.000 0.000 0.000

NYSDOT CRACK SEALING: CLEANING &SEALING PAVEMENT STBG FLEX 07/2022 0.004 DETLDES 0.004
CRACKS ON VARIOUS FEDERAL AID ELIGIBLE STATE SDF 07/2022 0.001 DETLDES 0.001
881403 HIGHWAYS IN COLUMBIA, DUTCHESS, ORANGE, STBG FLEX 05/2023 0.144 CONINSP 0.144
R&P PUTNAM, ROCKLAND, ULSTER & WESTCHESTER SDF 05/2023 0.036 CONINSP 0.036
<Exempt> COUNTIES. WORK WILL IMPROVE & PRESERVE THE STBG FLEX 05/2023 1.200 CONST 1.200
INTEGRITY OF THE PAVEMENT BY PREVENTING WATER
SDF 05/2023 0.300 CONST 0.300
INFILTRATION.

AQC:A10 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.685 0.000 0.000 0.000 0.005 1.680 0.000 0.000

279
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 15 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PREVENTIVE MAINTENANCE INITIATIVE PAVING: NHPP 04/2019 0.000 CONINSP 0.920
PALISADES INTERSTATE PARKWAY FROM NEW JERSEY SDF 04/2019 0.000 CONINSP 0.230
881405 STATE LINE TO EXIT 10, NORTH MIDDLETOWN ROAD, IN NHPP 04/2019 0.000 CONST 8.720
R&P THE TOWNS OF ORANGETOWN AND CLARKSTOWN IN SDF 04/2019 0.000 CONST 2.180
<Exempt> ROCKLAND COUNTY. (FORMERLY PIN: 8T0611)

AQC:A10 MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 0.000 12.050 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT PREVENTIVE MAINTENANCE INITIATIVE NHPP 06/2020 0.120 DETLDES 0.120


PAVING - PROJECT WILL RESURFACE FEDERAL AID SDF 06/2020 0.030 DETLDES 0.030
881407 ELIGIBLE STATE HIGHWAYS IN THE COUNTIES OF NHPP 04/2021 3.500 CONINSP 3.500
R&P COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, SDF 04/2021 0.875 CONINSP 0.875
<Exempt> PUTNAM AND WESTCHESTER TO RESTORE THE RIDING NHPP 04/2021 35.000 CONST 35.000
SURFACE AND PRESERVE THE PAVEMENT STRUCTURE.
SDF 04/2021 8.750 CONST 8.750
(FORMERLY PIN: 8T0690)

AQC:A10 MULTI TPC: $40-$60 M TOTAL 5YR COST : 48.275 0.000 0.150 48.125 0.000 0.000 0.000 0.000

NYSDOT PREVENTIVE MAINTENANCE INITIATIVE NHPP 06/2021 0.120 DETLDES 0.120


PAVING - PROJECT WILL RESURFACE FEDERAL AID SDF 06/2021 0.030 DETLDES 0.030
881408 ELIGIBLE STATE HIGHWAYS IN THE COUNTIES OF NHPP 06/2022 2.880 CONINSP 2.880
R&P COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, SDF 06/2022 0.720 CONINSP 0.720
<Exempt> PUTNAM AND WESTCHESTER TO RESTORE THE RIDING NHPP 06/2022 28.800 CONST 28.800
SURFACE AND PRESERVE THE PAVEMENT STRUCTURE.
SDF 06/2022 7.200 CONST 7.200

AQC:A10 MULTI TPC: $32-$50 M TOTAL 5YR COST : 39.750 0.000 0.000 0.150 39.600 0.000 0.000 0.000

NYSDOT PREVENTIVE MAINTENANCE INITIATIVE NHPP 05/2022 0.120 DETLDES 0.120


PAVING - PROJECT WILL RESURFACE FEDERAL AID SDF 05/2022 0.030 DETLDES 0.030
881409 ELIGIBLE STATE HIGHWAYS IN THE COUNTIES OF NHPP 04/2023 2.400 CONINSP 2.400
R&P COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, SDF 04/2023 0.600 CONINSP 0.600
<Exempt> PUTNAM AND WESTCHESTER TO RESTORE THE RIDING NHPP 04/2023 24.000 CONST 24.000
SURFACE AND PRESERVE THE PAVEMENT STRUCTURE.
SDF 04/2023 6.000 CONST 6.000

AQC:A10 MULTI TPC: $32-$50 M TOTAL 5YR COST : 33.150 0.000 0.000 0.000 0.150 33.000 0.000 0.000

NYSDOT STORMWATER MANAGEMENT PRACTICE SERIAL STBG FLEX 03/2019 0.000 CONINSP 0.048
NUMBER MAINTENANCE BY CONTRACT: PROJECT WILL SDF 03/2019 0.000 CONINSP 0.012
881421 UNDERTAKE CORRECTIVE & CYCLICAL MAINTENANCE STBG LG URB 03/2019 0.000 CONINSP 0.048
MISC WORK ON FACILITIES & STRUCTURES DESIGNED TO SDF 03/2019 0.000 CONINSP 0.012
<Exempt> COLLECT, STORE & TREAT STORM WATER. VARIOUS STBG FLEX 03/2019 0.000 CONST 0.400
FEDERAL AID ELIGIBLE ROADWAYS IN COLUMBIA,
SDF 03/2019 0.000 CONST 0.100
DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER &
WESTCHESTER COUNTIES. (FORMERLY PIN: 8T0248) STBG LG URB 03/2019 0.000 CONST 0.400
SDF 03/2019 0.000 CONST 0.100

AQC:A2 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 1.120 0.000 0.000 0.000 0.000 0.000 0.000

280
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 16 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT STORMWATER MANAGEMENT PRACTICE SERIAL STBG FLEX 05/2020 0.016 DETLDES 0.016
NUMBER MAINTENANCE BY CONTRACT: PROJECT WILL SDF 05/2020 0.004 DETLDES 0.004
881422 UNDERTAKE CORRECTIVE & CYCLICAL MAINTENANCE STBG FLEX 03/2021 0.096 CONINSP 0.096
MISC WORK ON FACILITIES & STRUCTURES DESIGNED TO SDF 03/2021 0.024 CONINSP 0.024
<Exempt> COLLECT, STORE & TREAT STORM WATER. VARIOUS STBG FLEX 03/2021 0.800 CONST 0.800
FEDERAL AID ELIGIBLE ROADWAYS IN COLUMBIA,
SDF 03/2021 0.200 CONST 0.200
DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER &
WESTCHESTER COUNTIES. (FORMERLY PIN: 8T0683)

AQC:A2 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.140 0.000 0.020 1.120 0.000 0.000 0.000 0.000

NYSDOT STORMWATER MANAGEMENT PRACTICE SERIAL STBG FLEX 04/2022 0.016 DETLDES 0.016
NUMBER MAINTENANCE BY CONTRACT: PROJECT WILL SDF 04/2022 0.004 DETLDES 0.004
881423 UNDERTAKE CORRECTIVE & CYCLICAL MAINTENANCE STBG FLEX 03/2023 0.096 CONINSP 0.096
MISC WORK ON FACILITIES & STRUCTURES DESIGNED TO SDF 03/2023 0.024 CONINSP 0.024
<Exempt> COLLECT, STORE & TREAT STORM WATER. VARIOUS STBG FLEX 03/2023 0.800 CONST 0.800
FEDERAL AID ELIGIBLE STATE HIGHWAYS IN
SDF 03/2023 0.200 CONST 0.200
COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND,
ULSTER & WESTCHESTER COUNTIES.

AQC:A2 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.140 0.000 0.000 0.000 0.020 1.120 0.000 0.000

NYSDOT CATCH BASINS: PROJECT WILL REPAIR/REPLACE NHPP 02/2020 0.040 DETLDES 0.040
STORMWATER CATCH BASINS TO ENSURE THAT THE SDF 02/2020 0.010 DETLDES 0.010
881424 DRAINAGE SYSTEM FUNCTIONS AS ORIGINALLY NHPP 12/2020 0.120 CONINSP 0.120
MISC DESIGNED ON VARIOUS FEDERAL AID ELIGIBLE STATE SDF 12/2020 0.030 CONINSP 0.030
<Exempt> HIGHWAYS. COLUMBIA, DUTCHESS, ORANGE, PUTNAM, NHPP 12/2020 1.000 CONST 1.000
ROCKLAND, ULSTER & WESTCHESTER COUNTIES
SDF 12/2020 0.250 CONST 0.250
(FORMERLY PIN: 8T0682)

AQC:A2 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.450 0.000 0.050 1.400 0.000 0.000 0.000 0.000

NYSDOT CATCH BASINS: PROJECT WILL REPAIR/REPLACE SDF 12/2020 0.050 DETLDES 0.050
STORMWATER CATCH BASINS TO ENSURE THAT THE STBG FLEX 10/2021 0.120 CONINSP 0.120
881426 DRAINAGE SYSTEM FUNCTIONS AS ORIGINALLY SDF 10/2021 0.030 CONINSP 0.030
MISC DESIGNED ON VARIOUS FEDERAL AID ELIGIBLE STATE STBG FLEX 10/2021 1.000 CONST 1.000
<Exempt> HIGHWAYS. COLUMBIA, DUTCHESS, ORANGE, PUTNAM, SDF 10/2021 0.250 CONST 0.250
ROCKLAND, ULSTER & WESTCHESTER COUNTIES

AQC:A2 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.450 0.000 0.000 0.050 1.400 0.000 0.000 0.000

281
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 17 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT CATCH BASINS: CATCH BASINS: PROJECT WILL REPAIR STBG FLEX 12/2021 0.040 DETLDES 0.040
OR REPLACE STORM WATER CATCH BASINS TO ENSURE SDF 12/2021 0.010 DETLDES 0.010
881427 THAT THE DRAINAGE SYSTEM FUNCTIONS AS STBG FLEX 05/2023 0.120 CONINSP 0.120
MISC ORIGINALLY DESIGNED. WORK WILL TAKE PLACE ON SDF 05/2023 0.030 CONINSP 0.030
<Exempt> FEDERAL AID ELIGIBLE ROUTES IN COLUMBIA, STBG FLEX 05/2023 1.000 CONST 1.000
DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER
SDF 05/2023 0.250 CONST 0.250
AND WESTCHESTER COUNTIES.

AQC:A11 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.450 0.000 0.000 0.000 0.050 1.400 0.000 0.000

NYSDOT CATCH BASINS: PROJECT WILL REPAIR/REPLACE NHPP 06/2022 0.120 CONINSP 0.120
STORMWATER CATCH BASINS TO ENSURE THAT THE SDF 06/2022 0.030 CONINSP 0.030
881428 DRAINAGE SYSTEM FUNCTIONS AS ORIGINALLY NHPP 06/2022 1.000 CONST 1.000
MISC DESIGNED ON VARIOUS FEDERAL AID ELIGIBLE STATE SDF 06/2022 0.250 CONST 0.250
<Exempt> HIGHWAYS. COLUMBIA, DUTCHESS, ORANGE, PUTNAM, NHPP 12/2021 0.040 DETLDES 0.040
ROCKLAND, ULSTER & WESTCHESTER COUNTIES
SDF 12/2021 0.010 DETLDES 0.010

AQC:A2Z MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.450 0.000 0.000 0.000 1.450 0.000 0.000 0.000

NYSDOT ADA SIDEWALK & RAMPS: SOUTHERN DUTCHESS & STBG FLEX 01/2024 0.032 DETLDES 0.032
PUTNAM: PROJECT WILL BUILD OR REPAIR SIDEWALKS SDF 01/2024 0.008 DETLDES 0.008
881434 AND RAMPS ON STATE HIGHWAY RIGHT-OF-WAY TO STBG FLEX 10/2024 0.000 CONINSP 0.240
MOBIL ASSURE COMPLIANCE WITH THE AMERICANS WITH SDF 10/2024 0.000 CONINSP 0.060
<Exempt> DISABILITIES ACT. THIS WORK WILL TAKE PLACE AT STBG FLEX 10/2024 0.000 CONST 2.000
VARIOUS LOCATIONS ALONG THE VARIOUS FEDERAL
SDF 10/2024 0.000 CONST 0.500
AID ELIGIBLE ROUTES IN SOUTHERN DUTCHESS AND
PUTNAM COUNTIES.

AQC:C2 MULTI TPC: $2-$4 M TOTAL 5YR COST : 0.040 0.000 0.000 0.000 0.000 0.000 0.040 2.800

NYSDOT CULVERTS REHABILITATION/ REPLACEMENT ON SDF 01/2021 0.010 PRELDES 0.010


FEDERAL AID ELIGIBLE ROUTES IN COLUMBIA, SDF 02/2022 0.050 DETLDES 0.050
881452 DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER SDF 02/2022 0.100 ROWACQU 0.100
MISC AND WESTCHESTER COUNTIES (FORMERLY PIN: 8T0712) SDF 10/2021 0.030 ROWINCD 0.030
<Exempt>
NHPP 02/2023 0.360 CONINSP 0.360
SDF 02/2023 0.090 CONINSP 0.090
NHPP 02/2023 3.600 CONST 3.600
SDF 02/2023 0.900 CONST 0.900
AQC:A2 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.140 0.000 0.000 0.010 0.180 4.950 0.000 0.000

282
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 18 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT SIGNAL IMPROVEMENTS; INSTALL TRAFFIC SIGNALS STBG FLEX 01/2022 0.360 PRELDES 0.360
&/OR UPGRADE/MODIFY EXISTING SIGNALS WHERE SDF 01/2022 0.090 PRELDES 0.090
881462 WARRANTED BY PRIORITY ORDER. VARIOUS FEDERAL STBG FLEX 09/2022 0.080 ROWINCD 0.080
TRAFFIC AID ELIGIBLE ROADWAYS IN COULUMBIA, DUTCHESS, SDF 09/2022 0.020 ROWINCD 0.020
<Exempt> ORANGE, PUTNAM, ROCKLAND, ULSTER AND STBG FLEX 01/2023 0.240 DETLDES 0.240
WESTCHESTER COUNTIES (FORMERLY PIN: 8T0214)
SDF 01/2023 0.060 DETLDES 0.060
STBG FLEX 02/2023 0.160 ROWACQU 0.160
SDF 02/2023 0.040 ROWACQU 0.040
STBG FLEX 02/2024 0.240 CONINSP 0.240
SDF 02/2024 0.060 CONINSP 0.060
STBG FLEX 02/2024 1.440 CONST 1.440
SDF 02/2024 0.360 CONST 0.360
AQC:D2 MULTI TPC: $2-$4 M TOTAL 5YR COST : 3.150 0.000 0.000 0.000 0.550 0.500 2.100 0.000

NYSDOT GUIDERAIL REHAB/REPLACE: PROJECT WILL STBG FLEX 04/2021 0.016 DETLDES 0.016
REHABILITATE OR REPLACE DAMAGED OR SDF 04/2021 0.004 DETLDES 0.004
881465 NON-FUNCTIONAL GUIDERAIL AND BRIDGE RAIL ON STBG FLEX 02/2022 0.192 CONINSP 0.192
SAFETY VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN SDF 02/2022 0.048 CONINSP 0.048
<Exempt> VARIOUS MUNICIPALITIES THROUGHOUT THE STBG FLEX 02/2022 1.600 CONST 1.600
COUNTIES OF COLUMBIA, DUTCHESS, ULSTER,
SDF 02/2022 0.400 CONST 0.400
ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER.

AQC:A9 MULTI TPC: $2-$4 M TOTAL 5YR COST : 2.260 0.000 0.000 0.020 2.240 0.000 0.000 0.000

NYSDOT GUIDERAIL REHAB/REPLAC: REPLACE OR NHPP 04/2019 0.000 DETLDES 0.016


REHABILITATE DAMAGED OR NON-FUNCTIONAL SDF 04/2019 0.000 DETLDES 0.004
881467 GUIDERAIL ON VARIOUS FEDERAL AID ELIGIBLE STATE NHPP 02/2020 0.096 CONINSP 0.096
SAFETY HIGHWAYS IN COLUMBIA, DUTCHESS, ORANGE, SDF 02/2020 0.024 CONINSP 0.024
<Exempt> ROCKLAND, ULSTER & WESTCHESTER COUNTIES STBG FLEX 02/2020 0.096 CONINSP 0.096
(FORMERLY PIN: 8T0225)
SDF 02/2020 0.024 CONINSP 0.024
NHPP 02/2020 0.800 CONST 0.800
SDF 02/2020 0.200 CONST 0.200
STBG FLEX 02/2020 0.800 CONST 0.800
SDF 02/2020 0.200 CONST 0.200
AQC:A9 MULTI TPC: $2-$4 M TOTAL 5YR COST : 2.240 0.020 2.240 0.000 0.000 0.000 0.000 0.000

NYSDOT GUIDERAIL REHABILITATION/ REPLACEMENTS: NHPP 03/2020 0.016 DETLDES 0.016


PROJECT WILL CONSIST OF REPLACING OR SDF 03/2020 0.004 DETLDES 0.004
881469 REHABILITATING DAMAGED OR NON-FUNCTIONAL STBG FLEX 01/2021 0.192 CONINSP 0.192
SAFETY GUIDERAIL AND MEDIAN BARRIERS ON STATE SDF 01/2021 0.048 CONINSP 0.048
<Exempt> HIGHWAYS, THUS IMPROVING ROADWAY SAFETY. STBG FLEX 01/2021 1.600 CONST 1.600
VARIOUS FEDERAL AID ELIGIBLE ROADWAYS IN
SDF 01/2021 0.400 CONST 0.400
COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND,
ULSTER & WESTCHESTER COUNTIES (FORMERLY PIN:
8T0676)

AQC:A9 MULTI TPC: $2-$4 M TOTAL 5YR COST : 2.260 0.000 0.020 2.240 0.000 0.000 0.000 0.000

283
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 19 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT SIGNAL UPGRADES: THE UPGRADING OF TRAFFIC STBG FLEX 08/2022 0.058 CONINSP 0.058
SIGNAL DETECTION EQUIPMENT TO FULL WORKING SDF 08/2022 0.014 CONINSP 0.014
881473 CONDITION, WILL IMPROVE THE EFFICIENCY OF STBG FLEX 08/2022 0.480 CONST 0.480
SAFETY TRAFFIC SIGNALS, LEADING TO BETTER TRAFFIC FLOW SDF 08/2022 0.120 CONST 0.120
<Exempt> & REDUCED VEHICLES EMISSIONS ON VARIOUS SDF 12/2021 0.050 DETLDES 0.050
FEDERAL AID ELIGIBLE STATE HIGHWAYS IN
COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND,
ULSTER & WESTCHESTER COUNTIES

AQC:D2 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.722 0.000 0.000 0.000 0.722 0.000 0.000 0.000

NYSDOT BIENNIAL SIGN CONTRACT: PROJECT WILL REPLACE OR STBG FLEX 01/2023 0.080 DETLDES 0.080
UPGRADE WHICH HAVE EXCEEDED THEIR USEFUL LIFE SDF 01/2023 0.020 DETLDES 0.020
881476 OR INSTALL NEW SIGNAGE AS NEEDED ON VARIOUS STBG FLEX 12/2023 0.020 CONINSP 0.020
SAFETY FEDERAL AID ELIGIBLE STATE HIGHWAYS IN SDF 12/2023 0.005 CONINSP 0.005
<Exempt> COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, STBG FLEX 12/2023 0.100 CONST 0.100
ULSTER AND WESTCHESTER COUNTIES.
SDF 12/2023 0.025 CONST 0.025

AQC:C13 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.250 0.000 0.000 0.000 0.000 0.100 0.150 0.000

NYSDOT SIGNAL UPGRADES: PROJECT WILL REPLACE AND/OR STBG FLEX 08/2024 0.058 CONINSP 0.058
UPGRADE SIGNS WHICH HAVE EXCEEDED THEIR SDF 08/2024 0.014 CONINSP 0.014
881477 USEFUL LIFE. THE PROJECT MAY ALSO INSTALL NEW STBG FLEX 08/2024 0.480 CONST 0.480
SAFETY SIGNS WHICH HAVE BECOME NECESSARY SINCE THE SDF 08/2024 0.120 CONST 0.120
<Exempt> LAST MAJOR CONTRACT ON CERTAIN ROADWAYS STBG FLEX 10/2023 0.040 DETLDES 0.040
VARIOUS FEDERAL AID ELIGIBLE ROADWAYS IN
SDF 10/2023 0.010 DETLDES 0.010
COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND,
ULSTER & WESTCHESTER COUNTIES.

AQC:C13 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.722 0.000 0.000 0.000 0.000 0.000 0.722 0.000

NYSDOT SPECIAL SURFACE TREATMENT: THIS PROJECT WILL HSIP 04/2023 0.018 DETLDES 0.018
RESURFACE VARIOUS FEDERAL AID ELIGIBLE STATE SDF 04/2023 0.002 DETLDES 0.002
881478 HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER, HSIP 02/2024 0.108 CONINSP 0.108
SAFETY ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER SDF 02/2024 0.012 CONINSP 0.012
<Exempt> COUNTIES THAT ARE IN NEED OF CORRECTIVE HSIP 02/2024 0.900 CONST 0.900
PAVEMENT TREATMENT (FORMERLY PIN: 8T0694)
SDF 02/2024 0.100 CONST 0.100
AQC:A10 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.140 0.000 0.000 0.000 0.000 0.020 1.120 0.000

NYSDOT BIENNIAL SPECIAL MARKINGS: BIENNIAL SPECIAL STBG FLEX 01/2023 0.024 DETLDES 0.024
MARKINGS: PROJECT WILL APPLY EPOXY AND SDF 01/2023 0.006 DETLDES 0.006
881479 PREFORMED PAVEMENT MARKINGS ON VARIOUS STBG FLEX 12/2023 0.020 CONINSP 0.020
SAFETY FEDERAL AID ELIGIBLE STATE HIGHWAYS IN SDF 12/2023 0.005 CONINSP 0.005
<Exempt> COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, STBG FLEX 12/2023 0.100 CONST 0.100
ULSTER AND WESTCHESTER COUNTIES.
SDF 12/2023 0.025 CONST 0.025
AQC:A10 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.180 0.000 0.000 0.000 0.000 0.030 0.150 0.000

284
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 20 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT BIENNIAL LONG LINES: PROJECT CONSISTS OF STBG FLEX 09/2023 0.440 CONINSP 0.440
APPLYING EPOXY AND PREFORMED PAVEMENT SDF 09/2023 0.110 CONINSP 0.110
881481 MARKINGS ON STATE HIGHWAYS. VARIOUS FEDERAL STBG FLEX 09/2023 4.400 CONST 4.400
SAFETY AID ELIGIBLE ROADWAYS IN THE COUNTIES OF SDF 09/2023 1.100 CONST 1.100
<Exempt> COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, STBG FLEX 10/2022 0.024 DETLDES 0.024
PUTNAM AND WESTCHESTER.
SDF 10/2022 0.006 DETLDES 0.006
AQC:A11 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 6.080 0.000 0.000 0.000 0.000 6.080 0.000 0.000

NYSDOT GUIDERAIL REHAB/REPLACE: PROJECT WILL STBG FLEX 03/2023 0.040 DETLDES 0.040
REHABILITATE OR REPLACE DAMAGED OR SDF 03/2023 0.010 DETLDES 0.010
881482 NON-FUNCTIONAL GUIDERAIL AND BRIDGE RAIL ON STBG FLEX 02/2024 0.060 CONINSP 0.060
SAFETY FEDERAL AID ELIGIBLE STATE HIGHWAYS IN VARIOUS SDF 02/2024 0.015 CONINSP 0.015
<Exempt> MUNICIPALITIES THROUGHOUT THE COUNTIES OF STBG FLEX 02/2024 0.500 CONST 0.500
COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE,
SDF 02/2024 0.125 CONST 0.125
PUTNAM AND WESTCHESTER.

AQC:A9 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.750 0.000 0.000 0.000 0.000 0.050 0.700 0.000

NYSDOT BRIDGE JOB ORDER CONTRACT: PROJECT WILL STBG FLEX 06/2023 0.008 DETLDES 0.008
CONSIST OF MAKING REPAIRS AND PERFORMING SDF 06/2023 0.002 DETLDES 0.002
881483 OTHER MAINTENANCE-RELATED ACTIVITIES, AS STBG FLEX 04/2024 0.096 CONINSP 0.096
BRIDGE NEEDED, TO PRESERVE THE SAFETY AND INTEGRITY OF SDF 04/2024 0.024 CONINSP 0.024
<Exempt> BRIDGES ON STATE HIGHWAYS. VARIOUS FEDERAL AID STBG FLEX 04/2024 0.800 CONST 0.800
ELIGIBLE ROADWAYS THROUGHOUT THE COUNTIES OF
SDF 04/2024 0.200 CONST 0.200
COLUMBIA, DUTCHESS, ORANGE, ROCKLAND,
WESTCHESTER, PUTNAM AND ULSTER.

AQC:A19 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.130 0.000 0.000 0.000 0.000 0.010 1.120 0.000

NYSDOT BRIDGE WASHING/DECK SEALING: PROJECT CLEAN/ STBG FLEX 02/2024 0.016 DETLDES 0.016
WASH BRIDGES AND SEAL DECKS AS NEEDED. WILL SDF 02/2024 0.004 DETLDES 0.004
881484 REMOVE DEBRIS FROM THE BRIDGES AND PROTECT STBG FLEX 12/2024 0.000 CONINSP 0.096
BRIDGE THEM AGAINST CORROSIVE SUBSTANCES ON FEDERAL SDF 12/2024 0.000 CONINSP 0.024
<Exempt> AID ELIGIBLE STATE HIGHWAYS IN VARIOUS STBG FLEX 12/2024 0.000 CONST 0.800
MUNICIPALITIES IN THE COUNTIES OF COLUMBIA,
SDF 12/2024 0.000 CONST 0.200
DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM
AND WESTCHESTER.

AQC:A19 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.020 0.000 0.000 0.000 0.000 0.000 0.020 1.120

285
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 21 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT BRIDGE PAINTING: PROJECT WILL PAINT STEEL NHPP 09/2023 0.400 CONINSP 0.400
SURFACES ON BRIDGES TO PROTECT AGAINST NORMAL SDF 09/2023 0.100 CONINSP 0.100
881485 ENVIRONMENTAL EFFECTS OF CORROSION, ACID RAIN, NHPP 09/2023 4.000 CONST 4.000
BRIDGE AND DEICING AGENTS. WORK WILL TAKE PLACE ON SDF 09/2023 1.000 CONST 1.000
<Exempt> FEDERAL AID ELIGIBLE STATE HIGHWAYS IN VARIOUS NHPP 11/2022 0.080 DETLDES 0.080
MUNICIPALITIES IN THE COUNTIES OF COLUMBIA,
SDF 11/2022 0.020 DETLDES 0.020
DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER
AND WESTCHESTER.

AQC:A19 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.600 0.000 0.000 0.000 0.000 5.600 0.000 0.000

NYSDOT BRIDGE PAINTING: PROJECT WILL PAINT STEEL NHPP 09/2024 0.400 CONINSP 0.400
SURFACES ON BRIDGES TO PROTECT AGAINST NORMAL SDF 09/2024 0.100 CONINSP 0.100
881486 ENVIRONMENTAL EFFECTS OF CORROSION, ACID RAIN, NHPP 09/2024 4.000 CONST 4.000
BRIDGE AND DEICING AGENTS. WORK WILL TAKE PLACE ON SDF 09/2024 1.000 CONST 1.000
<Exempt> FEDERAL AID ELIGIBLE STATE HIGHWAYS IN VARIOUS NHPP 11/2023 0.080 DETLDES 0.080
MUNICIPALITIES IN THE COUNTIES OF COLUMBIA,
SDF 11/2023 0.020 DETLDES 0.020
DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER
AND WESTCHESTER.

AQC:A19 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.600 0.000 0.000 0.000 0.000 0.000 5.600 0.000

NYSDOT SYSTEM REPAIR: PROJECT WILL REPAIR OR STBG FLEX 01/2021 0.120 PRELDES 0.120
REHABILITATE HIGHWAY INFRASTRUCTURE ELEMENTS SDF 01/2021 0.030 PRELDES 0.030
881487 THAT ARE BEYOND THE MEANS OF THE DEPARTMENTS STBG FLEX 02/2022 0.080 DETLDES 0.080
RECON MAINTENANCE FORCES SUCH AS RETAINING WALLS ON SDF 02/2022 0.020 DETLDES 0.020
<Exempt> FEDERAL AID ELIGIBLE STATE HIGHWAYS IN STBG FLEX 02/2023 0.020 CONINSP 0.020
COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND,
SDF 02/2023 0.005 CONINSP 0.005
ULSTER AND WESTCHESTER COUNTIES.
STBG FLEX 02/2023 0.100 CONST 0.100
SDF 02/2023 0.025 CONST 0.025
AQC:A2 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.400 0.000 0.000 0.150 0.100 0.150 0.000 0.000

NYSDOT SYSTEM REPAIR: PROJECT WILL REPAIR OR STBG FLEX 01/2022 0.120 PRELDES 0.120
REHABILITATE HIGHWAY INFRASTRUCTURE ELEMENTS SDF 01/2022 0.030 PRELDES 0.030
881488 THAT ARE BEYOND THE MEANS OF THE DEPARTMENTS STBG FLEX 02/2023 0.080 DETLDES 0.080
RECON MAINTENANCE FORCES SUCH AS RETAINING WALLS ON SDF 02/2023 0.020 DETLDES 0.020
<Exempt> FEDERAL AID ELIGIBLE STATE HIGHWAYS IN STBG FLEX 02/2023 0.160 ROWACQU 0.160
COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND,
SDF 02/2023 0.040 ROWACQU 0.040
ULSTER & WESTCHESTER COUNTIES.
STBG FLEX 10/2022 0.024 ROWINCD 0.024
SDF 10/2022 0.006 ROWINCD 0.006
STBG FLEX 02/2024 0.144 CONINSP 0.144
SDF 02/2024 0.036 CONINSP 0.036
STBG FLEX 02/2024 1.200 CONST 1.200
SDF 02/2024 0.300 CONST 0.300
AQC:A2 MULTI TPC: $2-$4 M TOTAL 5YR COST : 2.160 0.000 0.000 0.000 0.150 0.330 1.680 0.000

286
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 22 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PREVENTIVE MAINTENANCE INITIATIVE NHPP 06/2023 0.120 DETLDES 0.120


PAVING - PROJECT WILL RESURFACE FEDERAL AID SDF 06/2023 0.030 DETLDES 0.030
881489 ELIGIBLE STATE HIGHWAYS IN THE COUNTIES OF NHPP 04/2024 2.880 CONINSP 2.880
R&P COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, SDF 04/2024 0.720 CONINSP 0.720
<Exempt> PUTNAM AND WESTCHESTER TO RESTORE THE RIDING NHPP 04/2024 28.800 CONST 28.800
SURFACE AND PRESERVE THE PAVEMENT STRUCTURE.
SDF 04/2024 7.200 CONST 7.200

AQC:A10 MULTI TPC: $32-$50 M TOTAL 5YR COST : 39.750 0.000 0.000 0.000 0.000 0.150 39.600 0.000

NYSDOT CRACK SEALING: PROJECT WILL CLEAN AND SEAL SDF 07/2023 0.005 DETLDES 0.005
PAVEMENT CRACKS ON VARIOUS FEDERAL AID STBG FLEX 05/2024 0.144 CONINSP 0.144
881490 ELIGIBLE STATE HIGHWAYS. THIS WORK WILL IMPROVE SDF 05/2024 0.036 CONINSP 0.036
R&P AND PRESERVE THE INTEGRITY OF THE PAVEMENT BY STBG FLEX 05/2024 1.200 CONST 1.200
<Exempt> PREVENTING WATER INFILTRATION. IN THE COUNTIES SDF 05/2024 0.300 CONST 0.300
OF COLUMBIA, DUTCHESS, ORANGE, PUTNAM,
ROCKLAND, ULSTER & WESTCHESTER.

AQC:A10 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.685 0.000 0.000 0.000 0.000 0.005 1.680 0.000

NYSDOT CATCH BASINS: PROJECT WILL REPAIR OR REPLACE NHPP 07/2023 0.040 DETLDES 0.040
STORM WATER CATCH BASINS TO ENSURE THAT THE SDF 07/2023 0.010 DETLDES 0.010
881495 DRAINAGE SYSTEM FUNCTIONS AS ORIGINALLY NHPP 05/2024 0.120 CONINSP 0.120
MISC DESIGNED. THE WORK WILL TAKE PLACE ON FEDERAL SDF 05/2024 0.030 CONINSP 0.030
<Exempt> AID ELIGIBLE STATE HIGHWAYS IN VARIOUS NHPP 05/2024 1.000 CONST 1.000
MUNICIPALITIES THROUGHOUT THE COUNTIES OF
SDF 05/2024 0.250 CONST 0.250
COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE,
PUTNAM AND WESTCHESTER.

AQC:A2 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.450 0.000 0.000 0.000 0.000 0.050 1.400 0.000

NYSDOT GEOTECH SUBSURFACE EXPLORATIONS CONTRACT: SDF 01/2022 0.015 DETLDES 0.015
PROJECT WILL EXPLORE SUBSURFACE SOIL STBG FLEX 11/2022 0.062 CONINSP 0.062
881499 CONDITIONS TO PROVIDE DATA NEEDED IN ADVANCE SDF 11/2022 0.016 CONINSP 0.016
STUDY OF HIGHWAY & BRIDGE DESIGN ON VARIOUS FEDERAL STBG FLEX 11/2022 0.520 CONST 0.520
<Exempt> AID ELIGIBLE STATE HIGHWAYS. COLUMBIA, SDF 11/2022 0.130 CONST 0.130
DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER &
WESTCHESTER COUNTIES.

AQC:C5 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.743 0.000 0.000 0.000 0.015 0.728 0.000 0.000

287
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 23 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT GEOTECH SUBSURFACE EXPLORATIONS CONTRACT: SDF 01/2023 0.015 DETLDES 0.015
PROJECT WILL EXPLORE SUBSURFACE SOIL STBG FLEX 10/2023 0.062 CONINSP 0.062
881500 CONDITIONS TO PROVIDE DATA NEEDED IN ADVANCE SDF 10/2023 0.016 CONINSP 0.016
STUDY OF HIGHWAY & BRIDGE DESIGN ON VARIOUS FEDERAL STBG FLEX 10/2023 0.520 CONST 0.520
<Exempt> AID ELIGIBLE STATE HIGHWAYS. COLUMBIA, SDF 10/2023 0.130 CONST 0.130
DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER &
WESTCHESTER COUNTIES.

AQC:C5 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.743 0.000 0.000 0.000 0.000 0.015 0.728 0.000

NYSDOT GEOTECH SUBSURFACE EXPLORATIONS CONTRACT: SDF 01/2024 0.015 DETLDES 0.015
PROJECT WILL EXPLORE SUBSURFACE SOIL STBG FLEX 11/2024 0.000 CONINSP 0.058
881501 CONDITIONS TO PROVIDE DATA NEEDED IN ADVANCE SDF 11/2024 0.000 CONINSP 0.014
STUDY OF HIGHWAY & BRIDGE DESIGN ON VARIOUS FEDERAL STBG FLEX 11/2024 0.000 CONST 0.480
<Exempt> AID ELIGIBLE STATE HIGHWAYS. COLUMBIA, SDF 11/2024 0.000 CONST 0.120
DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER &
WESTCHESTER COUNTIES.

AQC:C11 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.015 0.000 0.000 0.000 0.000 0.000 0.015 0.672

NYSDOT WETLAND MITIGATION RECONSTRUCTION AND STBG FLEX 04/2021 0.040 DETLDES 0.040
LANDSCAPE IMPROVEMENTS: PROJECT WILL TAKE SDF 04/2021 0.010 DETLDES 0.010
881505 CORRECTIVE ACTION TO RESTORE ENVIRONMENTAL STBG FLEX 02/2022 0.038 CONINSP 0.038
MISC FEATURES, SUCH AS STORM WATER CONTROL SDF 02/2022 0.010 CONINSP 0.010
<Exempt> FACILITIES & LANDSCAPING, TO THEIR INTENDED STBG FLEX 02/2022 0.320 CONST 0.320
FUNCTIONS AS CONSTRUCTED IN PREVIOUS PROJECTS.
SDF 02/2022 0.080 CONST 0.080
VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN
COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND,
ULSTER & WESTCHESTER COUNTIES.

AQC:A2 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.498 0.000 0.000 0.050 0.448 0.000 0.000 0.000

NYSDOT WETLAND MITIGATION RECONSTRUCTION AND STBG FLEX 03/2023 0.040 DETLDES 0.040
LANDSCAPE IMPROVEMENTS: PROJECT WILL TAKE SDF 03/2023 0.010 DETLDES 0.010
881506 CORRECTIVE ACTION TO RESTORE ENVIRONMENTAL STBG FLEX 02/2024 0.038 CONINSP 0.038
MISC FEATURES, SUCH AS STORM WATER CONTROL SDF 02/2024 0.010 CONINSP 0.010
<Exempt> FACILITIES & LANDSCAPING, TO THEIR INTENDED STBG FLEX 02/2024 0.320 CONST 0.320
FUNCTIONS AS CONSTRUCTED IN PREVIOUS PROJECTS.
SDF 02/2024 0.080 CONST 0.080
VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN
COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND,
ULSTER & WESTCHESTER COUNTIES.

AQC:A2 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.498 0.000 0.000 0.000 0.000 0.050 0.448 0.000

288
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 24 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT SIGNAL IMPROVEMENTS PUTNAM & WESTCHESTER CMAQ 06/2019 0.000 CONINSP 0.120
COUNTIES. PROJECT WILL REPLAC OR INSTALL NEW SDF 06/2019 0.000 CONINSP 0.030
881513 TRAFFIC CONTROL DEVICES AT SEVERAL STBG FLEX 06/2019 0.000 CONINSP 0.049
TRAFFIC INTERSECTIONS IN PUTNAM AND WESTCHESTER SDF 06/2019 0.000 CONINSP 0.012
<Exempt> COUNTIES. THIS PROJECT WILL INCLUDE REPLACING STBG LG URB 06/2019 0.000 CONINSP 0.072
SIGNALS, INSTALLING FLASHING BEACONS AND
SDF 06/2019 0.000 CONINSP 0.018
ADDING PEDESTRIAN SIGNALS AND CROSSWALKS AT
THE FOLLOWING LOCATIONS: ROUTE 6 @ ROUTE 6N IN CMAQ 06/2019 0.000 CONST 1.000
THE TOWN OF CARMEL, ROUTE 22 @ LINCOLN AVE. IN SDF 06/2019 0.000 CONST 0.250
THE TOWN OF EASTCHESTER, NY 100 @ NY 100A & EAST STBG LG URB 06/2019 0.000 CONST 0.600
HARTSDALE IN GREENBURGH, & NY 138 @ JFK HIGH SDF 06/2019 0.000 CONST 0.150
SCHOOL, TOWN OF SOMERS.

AQC:D2 MULTI TPC: $2-$4 M TOTAL 5YR COST : 0.000 2.301 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT HOUSATONIC AREA REGIONAL TRANSIT (HART) STBG LG URB 01/2019 0.000 OPER 0.464
SHUTTLES: DANBURY, CT TO BREWSTER, SDF 01/2019 0.000 OPER 0.116
882264 RIDGEFIELD-KATONAH, & NEW FAIRFIELD TO STBG LG URB 01/2020 0.464 OPER 0.464
TRANSIT SOUTHEAST NY TRAIN STATION BUS SERVICE. SDF 01/2020 0.116 OPER 0.116
<Exempt> WEEKDAY SHUTTLE BUS SERVICE CO-FUNDED BY STBG LG URB 01/2021 0.464 OPER 0.464
NYSDOT AND CONN DOT. OPERATED BY HOUSATONIC
SDF 01/2021 0.116 OPER 0.116
AREA TRANSIT (HART) ORIENTED TO GRAND CENTRAL
TERMINAL COMMUTERS STBG LG URB 01/2022 0.464 OPER 0.464
SDF 01/2022 0.116 OPER 0.116
STBG LG URB 01/2023 0.464 OPER 0.464
SDF 01/2023 0.116 OPER 0.116
STBG LG URB 01/2024 0.464 OPER 0.464
SDF 01/2024 0.116 OPER 0.116
STBG LG URB 01/2025 0.000 OPER 0.464
SDF 01/2025 0.000 OPER 0.116
AQC:B1 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 2.900 0.580 0.580 0.580 0.580 0.580 0.580 0.580

WESTCHESTER CO ROUTE 77 BUS SERVICE (FORMERLY KNOW AS TACONIC STBG LG URB 10/2018 0.000 MISC 0.344
EXPRESS BUS SERVICE): COMMUTER BUS SERVICE LOCAL 10/2018 0.000 MISC 0.731
882303 BETWEEN SOUTHERN PUTNAM COUNTY / NORTHERN STBG LG URB 10/2019 0.344 MISC 0.344
TRANSIT WESTCHESTER COUNTY (FDR PARK) AND WHITE LOCAL 10/2019 0.731 MISC 0.731
<Exempt> PLAINS. FUNDS ARE FOR THE CAPITAL COST OF STBG LG URB 10/2020 0.344 MISC 0.344
CONTRACTING.
LOCAL 10/2020 0.731 MISC 0.731
STBG LG URB 10/2021 0.344 MISC 0.344
LOCAL 10/2021 0.731 MISC 0.731
STBG LG URB 10/2022 0.344 MISC 0.344
LOCAL 10/2022 0.731 MISC 0.731
STBG LG URB 10/2023 0.344 MISC 0.344
LOCAL 10/2023 0.731 MISC 0.731
AQC:B1 MULTI TPC: $6-$9.4 M TOTAL 5YR COST : 5.375 1.075 1.075 1.075 1.075 1.075 1.075 0.000

289
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 25 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT TRAILWAYS COMMUTER SERVICE: FEDERAL/STATE STBG FLEX 10/2018 0.000 OPER 0.220
FUNDING TO BE PROVIDED TO TRAILWAYS BY NYSDOT SDF 10/2018 0.000 OPER 0.055
882323 UNDER THE CAPITAL COST OF CONTRACTING CONCEPT STBG FLEX 10/2019 0.220 OPER 0.220
TRANSIT FOR COMMUTER SERVICE BETWEEN KINGSTON AND SDF 10/2019 0.055 OPER 0.055
<Exempt> MANHATTAN WITH STOPS IN ROSENDALE & NEW PALTZ. STBG FLEX 10/2020 0.220 OPER 0.220
TOTAL PROJECT COST INCLUDING FAREBOX RECEIPTS
SDF 10/2020 0.055 OPER 0.055
IS $6.347M. ORANGE, ULSTER, WESTCHESTER
COUNTIES. STBG FLEX 10/2021 0.220 OPER 0.220
SDF 10/2021 0.055 OPER 0.055
STBG FLEX 10/2022 0.220 OPER 0.220
SDF 10/2022 0.055 OPER 0.055
STBG FLEX 10/2023 0.220 OPER 0.220
SDF 10/2023 0.055 OPER 0.055
STBG FLEX 10/2024 0.000 OPER 0.220
SDF 10/2024 0.000 OPER 0.055
AQC:B1 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 1.375 0.275 0.275 0.275 0.275 0.275 0.275 0.275

NYSDOT HUDSON LINK TRANSIT SERVICE: PUBLIC BUS SERVICE STATE 04/2019 0.000 OPER 11.000
DEVELOPED TO REPLACE THE TAPPAN ZEE EXPRESS STATE 04/2020 11.000 OPER 11.000
882349 BUS SERVICE. THE HUDSON LINK WILL SERVE THE I-287 STATE 04/2021 11.000 OPER 11.000
TRANSIT CORRIDOR CROSSING THE GOVERNOR MARIO M. STATE 04/2022 11.000 OPER 11.000
<Exempt> CUOMO BRIDGE BETWEEN ROCKLAND AND STATE 04/2023 11.000 OPER 11.000
WESTCHESTER COUNTIES.
STATE 04/2024 11.000 OPER 11.000
STATE 04/2025 0.000 OPER 11.000
AQC:B1 MULTI TPC: $70-$130 M TOTAL 5YR COST : 55.000 11.000 11.000 11.000 11.000 11.000 11.000 11.000

NYSDOT ROUTE 9W BUS SERVICE: OPERATING SUBSIDY FOR STBG LG URB 10/2018 0.000 OPER 0.280
ALL-DAY BUS SERVICE BETWEEN THE ROUTE 9W SDF 10/2018 0.000 OPER 0.070
882367 CORRIDOR IN ROCKLAND COUNTY AND THE PORT STBG LG URB 10/2019 0.280 OPER 0.280
TRANSIT AUTHORITY OF NY & NJ BUS TERMINAL ON 41ST SDF 10/2019 0.070 OPER 0.070
<Exempt> STREET IN MANHATTAN. (FORMERLY PIN: 882219) STBG LG URB 10/2020 0.280 OPER 0.280
SDF 10/2020 0.070 OPER 0.070
STBG LG URB 10/2021 0.280 OPER 0.280
SDF 10/2021 0.070 OPER 0.070
STBG LG URB 10/2022 0.280 OPER 0.280
SDF 10/2022 0.070 OPER 0.070
STBG LG URB 10/2023 0.280 OPER 0.280
SDF 10/2023 0.070 OPER 0.070
STBG LG URB 10/2024 0.000 OPER 0.280
SDF 10/2024 0.000 OPER 0.070
AQC:B1 MULTI TPC: $2-$4 M TOTAL 5YR COST : 1.750 0.350 0.350 0.350 0.350 0.350 0.350 0.350

290
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 26 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

METRO-NORTH MTA METRO-NORTH RAILROAD MARKETING AND CMAQ 10/2018 0.000 OPER 0.292
CONNECTING SERVICES PROGRAM: PROMOTES THE USE SDF 10/2018 0.000 OPER 0.073
882369 OF BUSES, CAR/VANPOOLING, FERRIES, ETC., TO ACCESS CMAQ 10/2019 0.452 OPER 0.452
TRANSIT MAJOR METRO-NORTH RAIL CORRIDORS. PROGRAM SDF 10/2019 0.113 OPER 0.113
<Exempt> ALSO INCLUDES FUNDING FOR UNI-TICKET USE. CMAQ 10/2020 0.452 OPER 0.452
DUTCHESS, ORANGE, PUTNAM, ROCKLAND,
SDF 10/2020 0.113 OPER 0.113
WESTCHESTER. (FORMERLY PIN: 880690)
CMAQ 10/2021 0.452 OPER 0.452
SDF 10/2021 0.113 OPER 0.113
CMAQ 10/2022 0.452 OPER 0.452
SDF 10/2022 0.113 OPER 0.113
CMAQ 10/2023 0.452 OPER 0.452
SDF 10/2023 0.113 OPER 0.113
CMAQ 10/2024 0.000 OPER 0.452
SDF 10/2024 0.000 OPER 0.113
AQC:C1 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 2.825 0.365 0.565 0.565 0.565 0.565 0.565 0.565

NYSDOT COACH BUS MARKETING AND PARKING CONTRACT: CMAQ 10/2018 0.000 OPER 0.240
COACH USA PROMOTES ITS BUS SERVICES IN ORANGE SDF 10/2018 0.000 OPER 0.100
882371 AND ROCKLAND COUNTIES AS WELL AS LEASES / CMAQ 10/2019 0.240 OPER 0.240
TRAFFIC MAINTAINS PARK & RIDE LOTS FOR TRAVELERS. SDF 10/2019 0.100 OPER 0.100
<Exempt> (FORMERLY PIN: 895009) CMAQ 10/2020 0.240 OPER 0.240
SDF 10/2020 0.100 OPER 0.100
CMAQ 10/2021 0.240 OPER 0.240
SDF 10/2021 0.100 OPER 0.100
CMAQ 10/2022 0.240 OPER 0.240
SDF 10/2022 0.100 OPER 0.100
CMAQ 10/2023 0.240 OPER 0.240
SDF 10/2023 0.100 OPER 0.100
CMAQ 10/2024 0.000 OPER 0.240
SDF 10/2024 0.000 OPER 0.100
AQC:B1 MULTI TPC: $2-$4 M TOTAL 5YR COST : 1.700 0.340 0.340 0.340 0.340 0.340 0.340 0.340

NYSDOT POUGHKEEPSIE-WHITE PLAINS COMMUTER BUS: STBG FLEX 10/2019 1.056 MISC 1.056
WEEKDAY PEAK-HOUR SERVICE ALONG THE ROUTE 9 SDF 10/2019 0.264 MISC 0.264
882377 CORRIDOR SERVING RESIDENTS OF DUTCHESS, STBG FLEX 10/2020 1.056 MISC 1.056
TRANSIT PUTNAM, AND WESTCHESTER COUNTIES. SDF 10/2020 0.264 MISC 0.264
<Exempt>
STBG FLEX 10/2021 1.056 MISC 1.056
SDF 10/2021 0.264 MISC 0.264
STBG FLEX 10/2022 1.056 MISC 1.056
SDF 10/2022 0.264 MISC 0.264
STBG FLEX 10/2023 1.056 MISC 1.056
SDF 10/2023 0.264 MISC 0.264
STBG FLEX 10/2024 0.000 MISC 1.056
SDF 10/2024 0.000 MISC 0.264
AQC:B1 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 6.600 0.000 1.320 1.320 1.320 1.320 1.320 1.320

291
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 27 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT HIGHWAY EMERGENCY LOCAL PATROL (HELP) FREEWAY NHPP 01/2022 3.200 MISC 3.200
INCIDENT MANAGEMENT. PROJECT INCLUDES PAY FOR SDF 01/2022 0.800 MISC 0.800
882386 THE CONTRACT OPERATORS, THE TRUCKS, ALL NHPP 01/2023 3.200 MISC 3.200
MOBIL EQUIPMENT ON BOARD, GASOLINE, AND OTHER SDF 01/2023 0.800 MISC 0.800
<Exempt> OPERATIONAL NEEDS AT VARIOUS LOCATIONS IN THE NHPP 01/2024 3.200 MISC 3.200
HUDSON VALLEY. (FORMERLY PIN: 881033)
SDF 01/2024 0.800 MISC 0.800

AQC:A6 MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 12.000 0.000 0.000 0.000 4.000 4.000 4.000 0.000

PUTNAM PUTNAM MOVES SHUTTLE NETWORK: OPERATIONAL STBG FLEX 01/2019 0.000 OPER 0.300
ASSISTANCE FOR FEEDER BUS SERVICE BETWEEN SDF 01/2019 0.000 OPER 0.075
882388 CARMEL/MAHOPAC IN PUTNAM COUNTY AND STBG FLEX 01/2020 0.300 OPER 0.300
TRANSIT METRO-NORTHS CROTON FALLS STATION IN NORTHERN SDF 01/2020 0.075 OPER 0.075
<Exempt> WESTCHESTER COUNTY. (FORMERLY PIN: 882244) STBG FLEX 01/2021 0.300 OPER 0.300
SDF 01/2021 0.075 OPER 0.075
STBG FLEX 01/2022 0.300 OPER 0.300
SDF 01/2022 0.075 OPER 0.075
STBG FLEX 01/2023 0.300 OPER 0.300
SDF 01/2023 0.075 OPER 0.075
STBG FLEX 01/2024 0.300 OPER 0.300
SDF 01/2024 0.075 OPER 0.075
STBG FLEX 01/2025 0.000 OPER 0.300
SDF 01/2025 0.000 OPER 0.075
AQC:B1 MULTI TPC: $2-$4 M TOTAL 5YR COST : 1.875 0.375 0.375 0.375 0.375 0.375 0.375 0.375

NYSDOT ITS FIELD OPERATIONS: THIS PROJECT ENCOMPASSES NHPP 04/2019 0.000 OPER 1.198
THE TROUBLESHOOTING, DIAGNOSIS, REPAIR, OR SDF 04/2019 0.000 OPER 0.300
894007 DAMAGE ASSESSMENT OF THE VARIOUS COMPONENTS NHPP 04/2020 0.480 OPER 0.480
MISC OF THE INTELLIGENT TRANSPORTATION SYSTEM (ITS). SDF 04/2020 0.120 OPER 0.120
<Exempt> COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, NHPP 04/2021 0.480 OPER 0.480
ULSTER & WESTCHESTER COUNTIES.
SDF 04/2021 0.120 OPER 0.120
NHPP 04/2022 0.480 OPER 0.480
SDF 04/2022 0.120 OPER 0.120
NHPP 04/2023 0.480 OPER 0.480
SDF 04/2023 0.120 OPER 0.120
NHPP 04/2024 0.480 OPER 0.480
SDF 04/2024 0.120 OPER 0.120
AQC:A7 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.000 1.498 0.600 0.600 0.600 0.600 0.600 0.000

292
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 28 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PORTABLE VARIABLE MESSAGE SIGNS (PVMS): PROJECT NHPP 01/2019 0.000 MISC 0.240
WILL REPLACE 20 EXISTING PVMS IN FFY 2018 AND 10-12 SDF 01/2019 0.000 MISC 0.060
894008 EXISTING PVMS IN FFY 2019 WITH NEW ONES FOR THE
SAFETY HUDSON VALLEY TRANSPORTATION MANAGEMENT
<Exempt> CENTER. PROJECT WILL TAKE PLACE REGION-WIDE IN
COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND,
ULSTER, AND WESTCHESTER COUNTIES.

AQC:A7 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.300 0.000 0.000 0.000 0.000 0.000 0.000

NYSDOT ITS ENGINEERING SERVICES: PROJECT WILL PROVIDE NHPP 10/2018 0.000 MISC 0.800
INTELLIGENT TRANSPORTATION SYSTEMS (ITS) SDF 10/2018 0.000 MISC 0.200
894009 PLANNING AND ENGINEERING SERVICES IN ORDER TO NHPP 10/2019 0.800 MISC 0.800
SAFETY IMPROVE THE EFFICIENT USE OF STATE RESOURCES. SDF 10/2019 0.200 MISC 0.200
<Exempt> PROJECT WILL TAKE PLACE IN COLUMBIA, DUTCHESS, NHPP 10/2020 0.800 MISC 0.800
ORANGE, PUTNAM, ROCKLAND, ULSTER, AND
SDF 10/2020 0.200 MISC 0.200
WESTCHESTER COUNTIES.
NHPP 10/2021 0.800 MISC 0.800
SDF 10/2021 0.200 MISC 0.200
NHPP 10/2022 0.400 MISC 0.400
SDF 10/2022 0.100 MISC 0.100
NHPP 10/2023 0.400 MISC 0.400
SDF 10/2023 0.100 MISC 0.100
NHPP 10/2024 0.000 MISC 0.400
SDF 10/2024 0.000 MISC 0.100
AQC:A7 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 4.000 1.000 1.000 1.000 1.000 0.500 0.500 0.500

NYSDOT REGION 8 HSIP BLOCK FUNDING FOR SAFETY HSIP 04/2019 0.000 MISC 4.574
IMPROVEMENTS ON FEDERAL AID ELIGIBLE STATE SDF 04/2019 0.000 MISC 0.508
8HSIPB HIGHWAYS AS NEEDED THROUGHOUT COLUMBIA, HSIP 04/2020 3.412 MISC 3.412
SAFETY DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & SDF 04/2020 0.379 MISC 0.379
<Exempt> WESTCHESTER COUNTIES. HSIP 04/2021 4.761 MISC 4.761
SDF 04/2021 0.529 MISC 0.529
HSIP 04/2022 3.413 MISC 3.413
SDF 04/2022 0.379 MISC 0.379
HSIP 04/2023 0.677 MISC 0.677
SDF 04/2023 0.075 MISC 0.075
HSIP 04/2024 1.677 MISC 1.677
SDF 04/2024 0.186 MISC 0.186
AQC:J1 MULTI TPC: $15-$25 M TOTAL 5YR COST : 15.488 5.082 3.791 5.290 3.792 0.752 1.863 0.000

293
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MHSTCC Multi-County Listing Page 29 of 29

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL MID HUDSON SOUTH BLOCK FUNDING FOR FUTURE CMAQ 01/2020 1.830 MISC 1.830
CMAQ PROJECTS IN PUTNAM, ROCKLAND & CMAQ 01/2024 6.266 MISC 6.266
8T0713 WESTCHESTER COUNTIES
MISC
<Exempt>
AQC:J1 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 8.096 0.000 1.830 0.000 0.000 0.000 6.266 0.000

294
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MTA - Metro North Railroad Listing Page 1 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

METRO-NORTH PENN STATION ACCESS - STATIONS. THIS PROJECT WILL CMAQ 10/2018 0.000 MISC 106.200
CONSTRUCT FOUR STATIONS IN THE BRONX SERVING MTA 10/2018 0.000 MISC 81.800
G711-01-07 CO-OP CITY, MORRIS PARK, PARKCHESTER/VAN NEST
2-STATIONS AND HUNTS POINT. PURPOSE IS TO ENABLE AND
<Non-Exempt> SUSTAIN CONTINUED OPERATION OF SERVICE.

AQC:NON BRONX TPC: $175-$385 M TOTAL 5YR COST : 0.000 188.000 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH GRAND CENTRAL TERMINAL (GCT) TRAINSHED/TUNNEL FTA 5307 01/2019 0.000 MISC 23.374
STRUCT (INCL ROOF EXP. JTS)-CONTINUE PRIORITY LOCAL 01/2019 0.000 MISC 0.092
M702-01-01 REPAIRS AND BEGIN RECONSTRUCTION OF THE GCT MTA 01/2019 0.000 MISC 27.292
2-STATIONS TRAINSHED TO BRING TO A STATE OF GOOD REPAIR FTA 5337 01/2019 0.000 MISC 20.479
<Exempt>
LOCAL 01/2019 0.000 MISC 0.007
MTA 01/2019 0.000 MISC 18.158
AQC:B9 NEW YORK TPC: $70-$130 M TOTAL 5YR COST : 0.000 89.402 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH GRAND CENTRAL TERMINAL ELEVATOR LOCAL 01/2019 0.000 MISC 0.010
IMPROVEMNTS- REHABILITATION OF TWO FREIGHT LOCAL 01/2019 0.000 MISC 8.993
M702-01-06 ELEVATORS - T-35 (C HALL) AND THE WALDORF MTA 01/2019 0.000 MISC 6.217
2-STATIONS ELEVATOR TO BRING TO A STATE OF GOOD REPAIR.
<Exempt>
AQC:B8 NEW YORK TPC: $12.5-$19 M TOTAL 5YR COST : 0.000 15.220 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH LOWER HARLEM LINE STATION IMPROVEMENTS – LOCAL 01/2019 0.000 MISC 0.007
SELECT STATION IMPROVEMENTS AT THE FOLLOWING MTA 01/2019 0.000 MISC 24.550
M702-02-02 STATIONS: WILLIAMS BRIDGE, WOODLAWN, LOCAL 01/2019 0.000 MISC 0.006
2-STATIONS BOTANICAL GARDENS TO BRING TO A STATE OF GOOD MTA 01/2019 0.000 MISC 6.000
<Exempt> REPAIR.
AQC:B8 BRONX TPC: $26-$40 M TOTAL 5YR COST : 0.000 30.563 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH UPPER HUDSON STATION IMPROVEMENTS – LOCAL 01/2019 0.000 MISC 0.069
PRIORITY REPAIRS AT THE FOLLOWING STATIONS: MTA 01/2019 0.000 MISC 15.000
M702-02-03 POUGHKEEPSIE, NEW HAMBURG, BEACON, COLD
2-STATIONS SPRING, GARRISON AND CORTLANDT TO BRING TO A
<Exempt> STATE OF GOOD REPAIR.

AQC:B8 MULTI TPC: $12.5-$19 M TOTAL 5YR COST : 0.000 15.069 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH STRATEGIC FACILITIES - IMPROVE PARKING & ACCESS CMAQ 01/2019 0.000 CONST 8.039
TO METRO-NORTH TRAINS THROUGH PARKING LOCAL 01/2019 0.000 CONST 0.003
M702-03-01 EXPANSION AT LOCATIONS TO BE DETERMINED WITH MTA 01/2019 0.000 CONST 2.010
2-STATIONS POSSIBLE CANDIDATES FOR SUCH FACILITIES TO BE
<Non-Exempt> CONSIDERED BASED ON AVAILABLE LAND.
DEMONSTRATED NEED & TRANSIT ORIENTED
DEVELOPMENT.

AQC:NON WESTCHESTER TPC: $9.5-15.5 M TOTAL 5YR COST : 0.000 10.052 0.000 0.000 0.000 0.000 0.000 0.000

295
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MTA - Metro North Railroad Listing Page 2 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

METRO-NORTH MENTORING PROGRAM - STRATEGIC FACILITIES LOCAL 01/2019 0.000 MISC 0.159
PROVIDES FOR CONSTRUCTION CONTRACTS FOR LOCAL 01/2019 0.000 MISC 0.780
M702-03-02 FACILITIES PROJECTS THROUGH THE MTA\\\'S BUSINESS MTA 01/2019 0.000 MISC 2.000
2-STATIONS DEVELOPMENT PROGRAM TO MAINTAIN OPERATIONS
<Exempt> AND MEET REQUIREMENTS FOR CONTINUED
OPERATIONS.

AQC:B1 SYSTEM-WIDE TPC: $2-$4 M TOTAL 5YR COST : 0.000 2.939 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH PENN STATION ACCESS - TRACK AND STRUCTURES. CMAQ 10/2018 0.000 MISC 237.600
THIS PROJECT WILL PROVIDE TRACK AND STRUCTURES OTHER 10/2018 0.000 MISC 59.400
G711-01-04 WORK NECESSARY TO OPERATE ON THE HELL GATE
3-TRK&STRCT LINE. TRANSPORTATION DEVELOPMENT CREDITS WILL
<Non-Exempt> BE USED FOR MATCH. PURPOSE IS TO IMPROVE
EFFICIENCY IN OPERATIONS.

AQC:NON SYSTEM-WIDE TPC: $175-$385 M TOTAL 5YR COST : 0.000 297.000 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH OVERHEAD BRIDGE PROGRAM - EAST OF FTA 5307 01/2019 0.000 MISC 6.000
HUDSON - THIS PROJECT PROVIDES FOR THE DESIGN, MTA 01/2019 0.000 MISC 0.750
M603-02-12 CONSTRUCTION, REHABILITATION, AND
3-TRK&STRCT CONSTRUCTION SUPERVISION SERVICES FOR THE
<Exempt> CONSTRUCTION OF IDENTIFIED OVERHEAD BRIDGES IN
NEW YORK STATE. PURPOSE AS SAFETY IMPROVEMENT.

AQC:B9 SYSTEM-WIDE TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 6.750 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH CYCLICAL REPL. INSULATED JOINT - CYCLICAL LOCAL 01/2019 0.000 MISC 0.011
PROGRAM TO REPLACE INSULATED JOINTS AT VARIOUS LOCAL 01/2019 0.000 MISC 8.645
M703-01-02 LOCATIONS THROUGHOUT THE ENTIRE METRO-NORTH MTA 01/2019 0.000 MISC 0.410
3-TRK&STRCT TERRITORY IN NEW YORK STATE TO MAINTAIN STATE
<Exempt> OF GOOD REPAIR.
AQC:B9 SYSTEM-WIDE TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 9.066 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH ROCK SLOPE REMEDIATION - EAST OF HUDSON LOCAL 01/2019 0.000 MISC 0.033
REMEDIATION OF PRIORITY ROCK SLOPE LOCATIONS AS MTA 01/2019 0.000 MISC 5.504
M703-01-03 SAFETY IMPROVEMENT.
3-TRK&STRCT
<Exempt>
AQC:B9 SYSTEM-WIDE TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 5.537 0.000 0.000 0.000 0.000 0.000 0.000

296
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MTA - Metro North Railroad Listing Page 3 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

METRO-NORTH TURNOUTS - MAINLINE/HIGH SPEED - CYCLICAL FTA 5307 01/2019 0.000 MISC 2.981
PROGRAM TO REPLACE INTERLOCKING SWITCHES AT
M703-01-04 VARIOUS LOCATIONS THROUGHOUT THE ENTIRE
3-TRK&STRCT METRO-NORTH TERRITORY IN NEW YORK STATE. THIS
<Exempt> PROJECT WILL UTILIZE TRANSPORTATION
DEVELOPMENT CREDITS.

AQC:B9 SYSTEM-WIDE TPC: $2-$4 M TOTAL 5YR COST : 0.000 2.981 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH GCT TURNOUTS/SWITCH RENEWAL -CYCLICAL FTA 5307 01/2019 0.000 MISC 4.000
PROGRAM TO REPLACE TURNOUTS AND SWITCHES LOCAL 01/2019 0.000 MISC 0.009
M703-01-05 THROUGHOUT THE GCT TRAIN SHED AREA TO LOCAL 01/2019 0.000 MISC 1.600
3-TRK&STRCT MAINTAIN STATE OF GOOD REPAIR. THIS PROJECT MTA 01/2019 0.000 MISC 4.000
<Exempt> WILL UTILIZE TRANSPORTATION DEVELOPMENT
CREDITS.

AQC:B9 NEW YORK TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 9.609 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH TURNOUTS - YARDS/SIDINGS - CYCLICAL PROGRAM TO LOCAL 01/2019 0.000 MISC 0.003
REPLACE YARD AND TRACK STRUCTURE AT VARIOUS STATE 01/2019 0.000 MISC 1.600
M703-01-06 LOCATIONS THROUGHOUT THE ENTIRE METRO-NORTH LOCAL 01/2019 0.000 MISC 1.601
3-TRK&STRCT TERRITORY IN NEW YORK STATE TO MAINTAIN STATE LOCAL 01/2019 0.000 MISC 13.396
<Exempt> OF GOOD REPAIR. MTA 01/2019 0.000 MISC 1.913
AQC:B9 SYSTEM-WIDE TPC: $15-$25 M TOTAL 5YR COST : 0.000 18.513 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH PURCHASE MAINTENANCE OF WAY EQUIPMENT LOCAL 01/2019 0.000 MISC 0.005
(MOFW) - CYCLICAL PROGRAM TO REPLACE LOCAL 01/2019 0.000 MISC 1.600
M703-01-09 MAINTENANCE OF WAY EQUIPMENT TO MAINTAIN MTA 01/2019 0.000 MISC 2.364
3-TRK&STRCT STATE OF GOOD REPAIR.
<Exempt>
AQC:B9 SYSTEM-WIDE TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 3.969 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH CYCLICAL TRACK PROGRAM -CYCLICAL PROGRAM TO FTA 5307 01/2019 0.000 MISC 10.400
REPLACE TIES AND RAIL ALONG WITH CYCLICAL MTA 01/2019 0.000 MISC 2.600
M703-01-12 SURFACING AT VARIOUS LOCATIONS THROUGHOUT THE FTA 5337 01/2019 0.000 MISC 10.400
3-TRK&STRCT ENTIRE METRO-NORTH TERRITORY IN NEW YORK MTA 01/2019 0.000 MISC 2.600
<Exempt> STATE. TO MAINTAIN STATE OF GOOD REPAIR.

AQC:B9 SYSTEM-WIDE TPC: $21-$31 M TOTAL 5YR COST : 0.000 26.000 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH UNDERGRADE BRIDGE REHABILITATION - THIS PROJECT FTA 5307 01/2019 0.000 MISC 15.989
WILL REPAIR OR REPLACE BRIDGES AT VARIOUS LOCAL 01/2019 0.000 MISC 0.010
M703-02-03 LOCATIONS THROUGHOUT METRO-NORTH TERRITORY MTA 01/2019 0.000 MISC 9.321
3-TRK&STRCT TO MAINTAIN STATE OF GOOD REPAIR. THIS PROJECT FTA 5337 01/2019 0.000 MISC 10.728
<Exempt> WILL UTILIZE TRANSPORTATION DEVELOPMENT LOCAL 01/2019 0.000 MISC 0.010
CREDITS.
MTA 01/2019 0.000 MISC 2.682
AQC:B9 SYSTEM-WIDE TPC: $32-$50 M TOTAL 5YR COST : 0.000 38.740 0.000 0.000 0.000 0.000 0.000 0.000

297
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MTA - Metro North Railroad Listing Page 4 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

METRO-NORTH PARK AVENUE DIRECT FIXATION - REPAIR OF LOCAL 01/2019 0.000 MISC 0.026
DETERIORATED RAIL FASTENERS AND GROUT PADS ON STATE 01/2019 0.000 MISC 1.600
M703-02-05 THE PARK AVENUE VIADUCT AS SAFETY LOCAL 01/2019 0.000 MISC 1.600
3-TRK&STRCT IMPROVEMENT. MTA 01/2019 0.000 MISC 1.250
<Exempt>
AQC:B9 NEW YORK TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 4.476 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH ROW FENCING - INSTALLATION OF RIGHT OF WAY MTA 01/2019 0.000 MISC 0.212
FENCING AT VARIOUS LOCATIONS INCLUDING YARDS,
M703-02-11 STATIONS, SHOPS, AND ALONG THE RIGHT OF WAY ON
3-TRK&STRCT HUDSON, HARLEM, AND NEW HAVEN LINES IN NEW
<Exempt> YORK STATE.
AQC:B9 SYSTEM-WIDE TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.212 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH CATENARY PAINTING - REHABILITATION, INSPECTION LOCAL 01/2019 0.000 MISC 0.004
AND DESIGN OF CATENARY STRUCTURES BETWEEN MTA 01/2019 0.000 MISC 3.450
M703-02-12 MAMARONECK AND MOUNT VERNON AND THE
3-TRK&STRCT REHABILITATION, INSPECTION AND DESIGN OF
<Exempt> TRANSMISSION TOWERS (TP TOWERS) BETWEEN
MOUNT VERNON AND THE NEW YORK-CONNECTICUT
STATE LINE. PURPOSE IS TO MAINTAIN STATE OF GOOD
REPAIR.

AQC:B9 SYSTEM-WIDE TPC: $3.3-$5.6 M TOTAL 5YR COST : 0.000 3.454 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH DC SUBSTATION/SIGNALHSE ROOF LOCAL 01/2019 0.000 MISC 0.244


REPLACEMENT - CYCLICAL PROGRAM TO REPAIR OR STATE 01/2019 0.000 MISC 0.300
M703-02-13 REPLACE DETERIORATED ROOFING SYSTEMS &OTHER LOCAL 01/2019 0.000 MISC 0.300
3-TRK&STRCT STRUCTURAL COMPONENTS AT SUBSTATIONS & SIGNAL MTA 01/2019 0.000 MISC 1.280
<Exempt> HOUSES ON THE HARLEM, HUDSON, & NEW HAVEN
LINES WITHIN NEW YORK STATE. AS SAFETY
IMPROVEMENT

AQC:B6 SYSTEM-WIDE TPC: $2-$4 M TOTAL 5YR COST : 0.000 2.124 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH MENTORING PROGRAM - STRUCTURES PROVIDES FOR FTA 5337 01/2019 0.000 MISC 1.000
CONSTRUCTION CONTRACTS FOR STRUCTURES LOCAL 01/2019 0.000 MISC 0.010
M703-02-15 PROJECTS THROUGH THE MTA\\\'S BUSINESS MTA 01/2019 0.000 MISC 2.000
3-TRK&STRCT DEVELOPMENT PROGRAM TO MAINTAIN OPERATIONS
<Exempt> AND REQUIREMENTS FOR CONTINUE OPERATIONS.

AQC:B9 SYSTEM-WIDE TPC: $2-$4 M TOTAL 5YR COST : 0.000 3.010 0.000 0.000 0.000 0.000 0.000 0.000

298
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MTA - Metro North Railroad Listing Page 5 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

METRO-NORTH UNDERGRADE BRIDGE REHABILITATION -WEST OF FTA 5307 01/2019 0.000 MISC 2.752
HUDSON REPAIR OR REPLACEMENT OF CRITICAL LOCAL 01/2019 0.000 MISC 0.083
M703-03-03 BRIDGES. TO MAINTAIN STATE OF GOOD REPAIR. MTA 01/2019 0.000 MISC 0.688
3-TRK&STRCT
FTA 5337 01/2019 0.000 MISC 2.752
<Exempt>
LOCAL 01/2019 0.000 MISC 0.008
MTA 01/2019 0.000 MISC 0.688
AQC:B9 SYSTEM-WIDE TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 6.971 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH WEST OF HUDSON IMPROVEMENTS - MNR LOCAL 01/2019 0.000 MISC 0.004
CONTRIBUTION TO NJT FOR IMPROVEMENTS ON THE MTA 01/2019 0.000 MISC 0.690
M703-03-05 PORT JERVIS LINE, THE PASCACK VALLEY LINE AND THE
3-TRK&STRCT HOBOKEN TERMINAL COMPLEX. PURPOSE IS TO
<Exempt> IMPROVE EFFICIENCY IN OPERATIONS.
AQC:B8 SYSTEM-WIDE TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 0.694 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH HARMON TO POUGHKEEPSIE SIGNAL SYSTEM - BEGIN FTA 5337 01/2019 0.000 MISC 8.000
PHASED REPLACEMENT OF EXISTING WAYSIDE SIGNAL, LOCAL 01/2019 0.000 MISC 0.033
M704-01-02 COMMUNICATION SYSTEMS, INFRASTRUCTURE LOCAL 01/2019 0.000 MISC 0.300
4-COMM&SIG INCLUDING COMMUNICATION ,SIGNAL CENTRAL MTA 01/2019 0.000 MISC 12.000
<Exempt> INSTRUMENT LOCATIONS (CILS),FIBER OPTIC & COPPER
CABLE SYSTEM AS SAFETY IMPROVEMENT

AQC:B6 SYSTEM-WIDE TPC: $15-$25 M TOTAL 5YR COST : 0.000 20.333 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH PENN STATION ACCESS - POWER. THIS PROJECT WILL CMAQ 10/2018 0.000 MISC 106.200
PROVIDE FOR POWER IMPROVEMENTS INCLUDING OTHER 10/2018 0.000 MISC 26.550
G711-01-06 THIRD RAIL, POWER SUBSTATIONS AND CATENARY.
5-POWER TRANSPORTATION DEVELOPMENT CREDITS WILL BE
<Non-Exempt> USED FOR MATCH. PURPOSE IS TO IMPROVE
EFFICIENCY IN OPERATIONS.

AQC:NON SYSTEM-WIDE TPC: $100-$225 M TOTAL 5YR COST : 0.000 132.750 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH TRANSFORMER REHABILITATION - CYCLICAL LOCAL 01/2019 0.000 MISC 0.001


PROGRAM TO REHABILITATE CURRENT TRACTION MTA 01/2019 0.000 MISC 0.980
M705-01-02 TRANSFORMERS AND ASSOCIATED CONNECTING
5-POWER COMPONENTS AT VARIOUS LOCATIONS THROUGHOUT
<Exempt> THE H&H LINES. PURPOSE IS TO IMPROVE EFFICIENCY
IN OPERATIONS.

AQC:B6 SYSTEM-WIDE TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 0.981 0.000 0.000 0.000 0.000 0.000 0.000

299
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MTA - Metro North Railroad Listing Page 6 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

METRO-NORTH CYCLICAL PROGRAM TO REPLACE AC SWITCHGEAR LOCAL 01/2019 0.000 MISC 0.047
/CIRCUIT BREAKERS, GROUNDING DEVICE, LOCAL 01/2019 0.000 MISC 2.857
M705-01-03 PROTECTIVE RELAYS, CONTROL RELAYS, & MTA 01/2019 0.000 MISC 0.035
5-POWER ASSOCIATED CONNECTING COMPONENTS AT VARIOUS
<Exempt> LOCATIONS WITHIN MNR TERRITORY TO MAINTAIN
STATE OF GOOD REPAIR.

AQC:B6 SYSTEM-WIDE TPC: $2-$4 M TOTAL 5YR COST : 0.000 2.939 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH THREE SUBSTATION REPLACEMENTS - BEGIN PHASED FTA 5337 01/2019 0.000 MISC 9.000
REPLACEMENT OF THREE SUBSTATIONS--AT WILSON LOCAL 01/2019 0.000 MISC 0.005
M705-01-06 WOODS, PELHAM (SUBSTATION C-16 ON THE NEW LOCAL 01/2019 0.000 MISC 3.362
5-POWER HAVEN LINE); MOUNT VERNON (SUBSTATION B-13 ON MTA 01/2019 0.000 MISC 13.500
<Exempt> THE HARLEM LINE); & BRONXVILLE (SUBSTATION B-15
ON THE HARLEM LINE) FOR SAFETY

AQC:B6 SYSTEM-WIDE TPC: $21-$31 M TOTAL 5YR COST : 0.000 25.867 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH HARMON SHOP REPLACEMENT - PHASE V STAGE FTA 5307 01/2019 0.000 MISC 18.449
II - DESIGN-BUILD OF RUNNING REPAIR AND SUPPORT LOCAL 01/2019 0.000 MISC 0.008
M706-01-01 SHOP FACILITY TO MAINTAIN STATE OF GOOD REPAIR. LOCAL 01/2019 0.000 MISC 2.049
6-SHP&YRD
MTA 01/2019 0.000 MISC 18.639
<Exempt>
FTA 5337 01/2019 0.000 MISC 3.898
LOCAL 01/2019 0.000 MISC 0.003
MTA 01/2019 0.000 MISC 1.783
AQC:B9 WESTCHESTER TPC: $40-$60 M TOTAL 5YR COST : 0.000 44.829 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH MENTORING PROGRAM - SHOPS AND YARDS PROVIDES LOCAL 01/2019 0.000 MISC 0.060
FOR CONSTRUCTION CONTRACTS FOR PROJECTS MTA 01/2019 0.000 MISC 5.700
M706-01-05 THROUGH THE MTA\\\'S BUSINESS DEVELOPMENT
6-SHP&YRD PROGRAM.
<Exempt>
AQC:B1 SYSTEM-WIDE TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 5.760 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH MENTORING PROGRAM ADMINISTRATION PROVIDES LOCAL 01/2019 0.000 MISC 0.028
FOR CONTRACTS FOR PROJECTS THROUGH THE MTA\\\'S LOCAL 01/2019 0.000 MISC 1.307
M708-01-05 BUSINESS DEVELOPMENT PROGRAM TO MAINTAIN MTA 01/2019 0.000 MISC 1.421
8-MISC OPERATIONS AND MEET REQUIREMENTS FOR
<Exempt> CONTINUED OPERATIONS.
AQC:B1 SYSTEM-WIDE TPC: $2-$4 M TOTAL 5YR COST : 0.000 2.756 0.000 0.000 0.000 0.000 0.000 0.000

300
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MTA - Metro North Railroad Listing Page 7 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

METRO-NORTH PROGRAM ADMINISTRATION - FOR THE 2015-2019 LOCAL 01/2019 0.000 MISC 0.232
CAPITAL PROGRAM. TO MAINTAIN OPERATIONS AND LOCAL 01/2019 0.000 MISC 3.843
M708-01-06 MEET REQUIREMENTS FOR CONTINUED OPERATIONS. MTA 01/2019 0.000 MISC 11.000
8-MISC
<Exempt>
AQC:B1 SYSTEM-WIDE TPC: $12.5-$19 M TOTAL 5YR COST : 0.000 15.075 0.000 0.000 0.000 0.000 0.000 0.000

METRO-NORTH PROGRAM SCOPE DEVELOPMENT SYSTEM-WIDE TO LOCAL 01/2019 0.000 MISC 2.280
MAINTAIN OPERATIONS AND MEET REQUIREMENTS MTA 01/2019 0.000 MISC 3.600
M708-01-07 FOR CONTINUED OPERATIONS.
8-MISC
<Exempt>
AQC:C5 SYSTEM-WIDE TPC: $4.6-$7.5 M TOTAL 5YR COST : 0.000 5.880 0.000 0.000 0.000 0.000 0.000 0.000

301
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MTA - Metro North Railroad Listing Page 8 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

METRO-NORTH MISCELLANEOUS PROJECTS TO BE IDENTIFIED IN THE CMAQ 01/2020 5.704 MISC 5.704
NEXT CAPITAL PROGRAM (2020 - 2024) TO MAINTAIN LOCAL 01/2020 0.041 MISC 0.041
M808-01-XX STATE OF GOOD REPAIR. LOCAL 01/2020 0.878 MISC 0.878
8-MISC
MTA 01/2020 1.426 MISC 1.426
<Exempt>
FTA 5307 01/2020 65.094 MISC 65.094
LOCAL 01/2020 1.600 MISC 1.600
STATE 01/2020 1.600 MISC 1.600
MTA 01/2020 16.273 MISC 16.273
FTA 5337 01/2020 74.796 MISC 74.796
LOCAL 01/2020 15.700 MISC 15.700
LOCAL 01/2020 1.250 MISC 1.250
MTA 01/2020 18.699 MISC 18.699
CMAQ 01/2021 5.704 MISC 5.704
LOCAL 01/2021 0.041 MISC 0.041
LOCAL 01/2021 2.047 MISC 2.047
MTA 01/2021 1.426 MISC 1.426
FTA 5307 01/2021 65.094 MISC 65.094
LOCAL 01/2021 0.625 MISC 0.625
MTA 01/2021 16.273 MISC 16.273
FTA 5337 01/2021 74.796 MISC 74.796
LOCAL 01/2021 0.006 MISC 0.006
STATE 01/2021 0.264 MISC 0.264
LOCAL 01/2021 0.264 MISC 0.264
LOCAL 01/2021 12.750 MISC 12.750
STATE 01/2021 0.625 MISC 0.625
LOCAL 01/2021 0.625 MISC 0.625
MTA 01/2021 18.699 MISC 18.699
CMAQ 01/2022 5.704 MISC 5.704
LOCAL 01/2022 0.018 MISC 0.018
LOCAL 01/2022 2.395 MISC 2.395
MTA 01/2022 1.426 MISC 1.426
FTA 5307 01/2022 65.094 MISC 65.094
LOCAL 01/2022 0.037 MISC 0.037
LOCAL 01/2022 2.435 MISC 2.435
MTA 01/2022 16.273 MISC 16.273
FTA 5337 01/2022 59.734 MISC 59.734
LOCAL 01/2022 0.015 MISC 0.015
LOCAL 01/2022 3.348 MISC 3.348
MTA 01/2022 14.934 MISC 14.934
CMAQ 01/2023 5.704 MISC 5.704
LOCAL 01/2023 0.006 MISC 0.006
LOCAL 01/2023 0.110 MISC 0.110
MTA 01/2023 1.426 MISC 1.426
FTA 5307 01/2023 65.094 MISC 65.094
LOCAL 01/2023 0.756 MISC 0.756
LOCAL 01/2023 9.285 MISC 9.285

302
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 MTA - Metro North Railroad Listing Page 9 of 9

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

MTA 01/2023 16.273 MISC 16.273


FTA 5337 01/2023 74.796 MISC 74.796
LOCAL 01/2023 0.306 MISC 0.306
LOCAL 01/2023 2.633 MISC 2.633
MTA 01/2023 18.699 MISC 18.699
CMAQ 01/2024 5.704 MISC 5.704
LOCAL 01/2024 0.106 MISC 0.106
LOCAL 01/2024 0.705 MISC 0.705
MTA 01/2024 1.426 MISC 1.426
FTA 5307 01/2024 65.094 MISC 65.094
LOCAL 01/2024 0.530 MISC 0.530
LOCAL 01/2024 9.725 MISC 9.725
MTA 01/2024 16.273 MISC 16.273
FTA 5337 01/2024 74.796 MISC 74.796
LOCAL 01/2024 0.065 MISC 0.065
LOCAL 01/2024 0.845 MISC 0.845
MTA 01/2024 18.699 MISC 18.699
AQC:J1 SYSTEM-WIDE TPC:$0.9-$1.1 B TOTAL 5YR COST : 962.769 0.000 203.061 199.239 171.413 195.088 193.968 0.000

METRO-NORTH CMAQ ELIGIBLE PROJECTS TO BE IDENTIFIED IN THE CMAQ 01/2020 5.577 MISC 5.577
NEXT CAPITAL PROGRAM (2020 - 2024) TO MAINTAIN LOCAL 01/2020 0.029 MISC 0.029
M809-01-XX STATE OF GOOD REPAIR. LOCAL 01/2020 127.445 MISC 127.445
8-MISC
MTA 01/2020 1.394 MISC 1.394
<Exempt>
CMAQ 01/2021 5.577 MISC 5.577
LOCAL 01/2021 0.016 MISC 0.016
LOCAL 01/2021 300.000 MISC 300.000
MTA 01/2021 1.394 MISC 1.394
AQC:J1 SYSTEM-WIDE TPC:$397.7-$490.0 M TOTAL 5YR COST : 441.432 0.000 134.445 306.987 0.000 0.000 0.000 0.000

METRO-NORTH HAVERSTRAW-OSSINING FERRY: CONTINUE THE LEASE STBG FLEX 01/2019 0.000 MISC 1.600
OF EXISTING PARKING AND/OR IMPROVEMENTS TO MTA 01/2019 0.000 MISC 0.400
882218 EXISTING DOCK FACILITIES. ROCKLAND AND STBG FLEX 01/2021 1.600 MISC 1.600
TRANSIT WESTCHESTER COUNTIES. MTA 01/2021 0.400 MISC 0.400
<Exempt>
STBG FLEX 01/2023 1.600 MISC 1.600
MTA 01/2023 0.400 MISC 0.400
AQC:B1 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 4.000 2.000 0.000 2.000 0.000 2.000 0.000 0.000

303
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 New York State Thruway Authority Listing Page 1 of 1

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSTA COLLEGE ROAD OVER I-87 (MP 26.37). BRIDGE TWY 09/2019 0.000 CONINSP 0.480
REPLACEMENT TO ENSURE A STATE OF GOOD REPAIR; TWY 09/2019 0.000 CONST 6.000
B00491 ROCKLAND COUNTY
BRIDGE
<Exempt>
AQC:A19 ROCKLAND TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 6.480 0.000 0.000 0.000 0.000 0.000 0.000

NYSTA BRIDGE REPLACEMENT - NORTH AVE BRIDGE OVER I-95 TWY 07/2019 0.000 CONINSP 0.850
(PHASE 3),(MP 605.76)TO ENSURE A STATE OF GOOD TWY 07/2019 0.000 CONST 11.300
B02841 REPAIR. WESTCHESTER COUNTY.
BRIDGE
<Exempt>
AQC:A19 WESTCHESTER TPC: $12.5-$19 M TOTAL 5YR COST : 0.000 12.150 0.000 0.000 0.000 0.000 0.000 0.000

NYSTA 2021/22 ON-DEMAND BRIDGE REPAIR CONTRACT NEW TWY 08/2020 0.100 CONINSP 0.100
YORK DIVISION: TO ADDRESS STRUCTURAL AND TWY 08/2020 2.000 CONST 2.000
B07451 SAFETY DEFICIENCIES AS NEEDED. VARIOUS
BRIDGE COUNTIES
<Exempt>
AQC:A19 MULTI TPC: $1.2-$2.5 M TOTAL 5YR COST : 2.100 0.000 2.100 0.000 0.000 0.000 0.000 0.000

NYSTA 2020 BRIDGE WASHING: NEW ENGLAND THRUWAY(I-95): NHPP 02/2020 0.063 CONINSP 0.063
MAINTENANCE CLEANING FOR STEEL PRESERVATION TWY 02/2020 0.016 CONINSP 0.016
B07461 FOR 50+ BRIDGES TO EXTEND SERVICE LIFE. NHPP 02/2020 0.700 CONST 0.700
BRIDGE WESTCHESTER COUNTY.
<Exempt> TWY 02/2020 0.175 CONST 0.175

AQC:A2 WESTCHESTER TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.954 0.000 0.954 0.000 0.000 0.000 0.000 0.000

NYSTA CONCRETE PAVEMENT REPAIR AND SEAL JOINTS (MP NE TWY 02/2020 3.600 CONINSP 3.600
0.17 TO NE 14.1): I-95 PAVEMENT REPAIRS DUE TO TWY 02/2020 60.000 CONST 60.000
H03431 EXCESSIVE WEAR. BRONX & WESTCHESTER COUNTIES.
R&P
<Exempt>
AQC:A10 MULTI TPC: $50-$85 M TOTAL 5YR COST : 63.600 0.000 63.600 0.000 0.000 0.000 0.000 0.000

NYSTA PAVEMENT REHAB 1R MILL/INLAY: I-87; NYC LINE TO TWY 01/2021 1.332 CONINSP 1.332
TAXTER ROAD (MP 0 - 11 )DUE TO EXCESSIVE WEAR. TWY 01/2021 22.200 CONST 22.200
H10451 WESTCHESTER COUNTY
R&P
<Exempt>
AQC:A10 WESTCHESTER TPC: $21-$31 M TOTAL 5YR COST : 23.532 0.000 0.000 23.532 0.000 0.000 0.000 0.000

304
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 New York State Bridge Authority Listing Page 1 of 5

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSBA BEAR MOUNTAIN MAIN CABLE EVALUATION. MAIN OTHER 02/2019 0.000 MISC 0.025
CABLE INVESTIGATION - 10 YEAR CYCLE TO MAINTAIN
B0005 STATE OF GOOD REPAIR.
BRIDGE
<Exempt>
AQC:A19 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.025 0.000 0.000 0.000 0.000 0.000 0.000

NYSBA BEAR MOUNTAIN - BRIDGE APPROACH PAVING. DECK OTHER 01/2020 3.000 MISC 3.000
REPAIRS, MILL, PAVE AND NEW PAVEMENT MARKINGS OTHER 01/2022 0.500 CONST 0.500
B0006 TO MAINTAIN STATE OF GOOD REPAIR.
BRIDGE
<Exempt>
AQC:A19 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.500 0.000 3.000 0.000 0.500 0.000 0.000 0.000

NYSBA BIENNIAL BRIDGE INSPECTION - GENERAL OTHER 03/2019 0.000 CONINSP 0.600
CONSULTANT: DETAILED INSPECTION OF APPROACHES, OTHER 03/2019 0.000 MISC 0.090
S0001 STRUCTURES, AND DECKS WITH HANDS ON OTHER 03/2020 0.650 CONINSP 0.650
BRIDGE INSPECTION OF ALL FRACTURE CRITICAL MEMBERS TO OTHER 03/2020 0.090 MISC 0.090
<Exempt> MAINTAIN STATE OF GOOD REPAIR. ODD YEAR: KRB & OTHER 03/2021 0.700 CONINSP 0.700
NBB(S) EVEN YEAR: RVWB, MHB AND BMB
OTHER 03/2021 0.090 MISC 0.090
OTHER 03/2022 0.750 CONINSP 0.750
OTHER 03/2022 0.090 MISC 0.090
OTHER 03/2023 0.800 CONINSP 0.800
OTHER 03/2023 0.090 MISC 0.090
AQC:A19 MULTI TPC: $3.3-$5.6 M TOTAL 5YR COST : 3.260 0.690 0.740 0.790 0.840 0.890 0.000 0.000

NYSBA PERIODIC UNDERWATER BRIDGE INSPECTIONS: DIVER OTHER 03/2022 0.150 CONINSP 0.150
AND, VIDEO TAPE INSPECTIONS OF ALL AUTHORITY IN
S0002 WATER PIERS BELOW THE WATER SURFACE TO INCLUDE
BRIDGE ANALYSIS & RECOMMENDATIONS BY PROFESSIONAL
<Exempt> ENGINEERS, 5 YR CYCLE TO MAINTAIN STATE OF GOOD
REPAIR

AQC:A19 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.150 0.000 0.000 0.000 0.150 0.000 0.000 0.000

NYSBA SYSTEMWIDE MISCELLANEOUS MAINTENANCE: OTHER 03/2019 0.000 CONST 1.000


POTHOLE REPAIRS, SPOT RESURFACING, GUIDE RAIL OTHER 03/2019 0.000 DETLDES 0.310
S0003 REPLACEMENT AND REPAIR, DRAINAGE AND OTHER 03/2020 1.000 CONST 1.000
BRIDGE SHOULDER UPGRADES WHERE AND WHEN NEEDED TO OTHER 03/2020 0.310 DETLDES 0.310
<Exempt> MAINTAIN STATE OF GOOD REPAIR. VARIOUS COUNTIES OTHER 03/2021 1.000 CONST 1.000
OTHER 03/2021 0.310 DETLDES 0.310
OTHER 03/2022 1.000 CONST 1.000
OTHER 03/2022 0.310 DETLDES 0.310
OTHER 03/2023 1.000 CONST 1.000
OTHER 03/2023 0.310 DETLDES 0.310
AQC:A19 MULTI TPC: $6-$9.4 M TOTAL 5YR COST : 5.240 1.310 1.310 1.310 1.310 1.310 0.000 0.000

305
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 New York State Bridge Authority Listing Page 2 of 5

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSBA CAPITAL MAINTENANCE PROJECTS: STANDBY OTHER 03/2019 0.000 CONST 0.500
READINESS CONTRACT FOR URGENT BRIDGE AND OTHER 03/2020 0.500 CONST 0.500
S0004 HIGHWAY REPAIRS. VARIOUS COUNTIES OTHER 03/2021 0.500 CONST 0.500
BRIDGE
OTHER 03/2022 0.500 CONST 0.500
<Exempt>
OTHER 03/2023 0.500 CONST 0.500
AQC:A19 MULTI TPC: $2-$4 M TOTAL 5YR COST : 2.000 0.500 0.500 0.500 0.500 0.500 0.000 0.000

NYSBA SYSTEMWIDE, RIVER PIER BASE REPAIRS: MASONRY OTHER 03/2019 0.000 MISC 0.750
PIER POINTING, CONCRETE REPAIRS AND RIP-RAP
S0005 PLACEMENT AS RECOMMENDED FROM UNDERWATER
BRIDGE AND VISUAL INSPECTIONS.
<Exempt>
AQC:A19 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.000 0.750 0.000 0.000 0.000 0.000 0.000 0.000

NYSBA SYSTEMWIDE SUBSTRUCTURE REPAIRS. WORK OTHER 03/2020 0.500 CONST 0.500
INCLUDES PARTIAL DEPTH CONCRETE REPAIRS AND
S0006 SEALING VARIOUS LOCATIONS
BRIDGE
<Exempt>
AQC:A19 SYSTEM-WIDE TPC: < $0.75 M TOTAL 5YR COST : 0.500 0.000 0.500 0.000 0.000 0.000 0.000 0.000

NYSBA SYSTEMWIDE - EQUIPMENT PURCHASES-AQUISITION OTHER 03/2019 0.000 MISC 0.500


OF MAJOR EXTRAORDINARY VEHICLES AND OTHER 03/2020 0.500 MISC 0.500
S0007 EQUIPMENT NECESSARY TO OPERATE AND MAINTAIN OTHER 03/2021 0.750 MISC 0.750
BRIDGE THE BRIDGE SYSTEM. VARIOUS LOCATIONS OTHER 03/2022 0.500 MISC 0.500
<Exempt>
OTHER 03/2023 0.500 MISC 0.500
AQC:B4 MULTI TPC: $2-$4 M TOTAL 5YR COST : 2.250 0.500 0.500 0.750 0.500 0.500 0.000 0.000

NYSBA SYSTEMWIDE BRIDGE STEEL REPAIRS. WORK INCLUDES OTHER 03/2020 1.000 MISC 1.000
STEEL REPAIRS, CLEANING AND PAINTING OF BRIDGES
S0008 TO MAINTAIN STATE OF GOOD REPAIR. VARIOUS
BRIDGE LOCATIONS
<Exempt>
AQC:A19 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 1.000 0.000 1.000 0.000 0.000 0.000 0.000 0.000

NYSBA SYSTEMWIDE - EQUIPMENT PURCHASES, OTHER 01/2019 0.000 MISC 0.020


ADMINISTRATION: OPERATING FUND EQUIPMENT OTHER 01/2020 0.020 MISC 0.020
SA-0001 PURCHASES (FURNITURE, ETC.)TO MAINTAIN STATE OF OTHER 01/2021 0.020 MISC 0.020
BRIDGE GOOD REPAIR. VARIOUS COUNTIES. OTHER 01/2022 0.020 MISC 0.020
<Exempt>
OTHER 01/2023 0.020 MISC 0.020
AQC:B4 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.080 0.020 0.020 0.020 0.020 0.020 0.000 0.000

306
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 New York State Bridge Authority Listing Page 3 of 5

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSBA SYSTEMWIDE - BUSINESS APPLICATION OTHER 01/2019 0.000 MISC 0.020


ENHANCEMENT: 1) DOCUMENT IMAGING & WORK OTHER 01/2020 0.100 MISC 0.100
SA-0002 FLOW; AND 2) BUSINESS APPLICATION ENHANCEMENT OTHER 01/2021 0.050 MISC 0.050
BRIDGE UPGRADE. VARIOUS COUNTIES OTHER 01/2022 0.020 MISC 0.020
<Exempt>
OTHER 01/2023 0.020 MISC 0.020
AQC:B4 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.190 0.020 0.100 0.050 0.020 0.020 0.000 0.000

NYSBA SYSTEMWIDE - EQUIPMENT PURCHASES, OPERATIONS: OTHER 01/2019 0.000 MISC 0.035
1) OFFICE EQUIPMENT (COPIER, PRINTERS, PLOTTER); ID
SI-0001 CARD SYSTEM.
BRIDGE
<Exempt>
AQC:B4 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.035 0.000 0.000 0.000 0.000 0.000 0.000

NYSBA SYSTEMWIDE -PC UPGRADE (SYSTEM HARDWARE), OTHER 01/2019 0.000 MISC 0.040
ENHANCEMENTS TO MAINTAIN STATE OF GOOD REPAIR. OTHER 01/2020 0.030 MISC 0.030
SI-0002 VARIOUS COUNTIES OTHER 01/2021 0.022 MISC 0.022
BRIDGE
OTHER 01/2022 0.030 MISC 0.030
<Exempt>
OTHER 01/2023 0.032 MISC 0.032
AQC:A7 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.114 0.040 0.030 0.022 0.030 0.032 0.000 0.000

NYSBA SYSTEMWIDE - ID CARD SYSTEM UPGRADES. OTHER 01/2019 0.000 MISC 0.015
UPGRADES TO MAINTAIN STATE OF GOOD REPAIR. OTHER 01/2020 0.015 MISC 0.015
SI-0005 VARIOUS COUNTIES OTHER 01/2021 0.015 MISC 0.015
BRIDGE
OTHER 01/2022 0.015 MISC 0.015
<Exempt>
OTHER 01/2023 0.015 MISC 0.015
AQC:A7 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.060 0.015 0.015 0.015 0.015 0.015 0.000 0.000

NYSBA SYSTEMWIDE -ITS COMPONENTS UPGRADES: OTHER 01/2019 0.000 MISC 0.015
EQUIPMENT PURCHASES OF MULTIPLEXER, MODEMS, OTHER 01/2020 0.015 MISC 0.015
SI-0010 AND CABINETS. TO MAINTAIN STATE OF GOOD REPAIR. OTHER 01/2021 0.015 MISC 0.015
BRIDGE VARIOUS COUNTIES. OTHER 01/2022 0.015 MISC 0.015
<Exempt>
OTHER 01/2023 0.015 MISC 0.015
AQC:A7 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.060 0.015 0.015 0.015 0.015 0.015 0.000 0.000

NYSBA IT UPGRADES: ELECTRONIC DATA PROCESSING (EDP) OTHER 01/2019 0.000 MISC 0.165
UPGRADE-WINDOWS FILE SERVER AND WEB FILTER. OTHER 01/2020 0.121 MISC 0.121
SI-0013 SYSTEM ENHANCEMENTS TO MAINTAIN STATE OF OTHER 01/2021 0.117 MISC 0.117
BRIDGE GOOD REPAIR. VARIOUS COUNTIES OTHER 01/2022 0.165 MISC 0.165
<Exempt>
OTHER 01/2023 0.134 MISC 0.134
AQC:A7 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.537 0.165 0.121 0.117 0.165 0.134 0.000 0.000

307
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 New York State Bridge Authority Listing Page 4 of 5

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSBA ITS UPGRADES-DATA CABLING UPGRADES TO OTHER 01/2019 0.000 MISC 0.035
MAINTAIN STATE OF GOOD REPAIR. VARIOUS COUNTIES OTHER 01/2020 0.035 MISC 0.035
SI-0015 OTHER 01/2021 0.035 MISC 0.035
BRIDGE
OTHER 01/2022 0.035 MISC 0.035
<Exempt>
OTHER 01/2023 0.035 MISC 0.035
AQC:A7 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.140 0.035 0.035 0.035 0.035 0.035 0.000 0.000

NYSBA SYSTEMWIDE - ALL ELECTRONIC TOLLING (AET): OTHER 01/2020 7.000 MISC 7.000
CONVERSION TO AET WITH ELECTRONIC TOLLING OTHER 01/2021 5.000 MISC 5.000
SO-0003 HARDWARE. VARIOUS COUNTIES OTHER 01/2022 5.000 MISC 5.000
MOBIL
<Exempt>
AQC:A7 MULTI TPC: $15-$25 M TOTAL 5YR COST : 17.000 0.000 7.000 5.000 5.000 0.000 0.000 0.000

NYSBA SYSTEMWIDE TOLL SYSTEM UPGRADE TO MAINTAIN OTHER 01/2019 0.000 MISC 0.100
STATE OF GOOD REPAIR. WORK INCLUDES REPLACE OTHER 01/2020 0.100 MISC 0.100
SO-0004 TOLL GATES & MONITORS. VARIOUS COUNTIES. OTHER 01/2021 0.100 MISC 0.100
BRIDGE
OTHER 01/2022 0.100 MISC 0.100
<Exempt>
OTHER 01/2023 0.100 MISC 0.100
AQC:A19 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.400 0.100 0.100 0.100 0.100 0.100 0.000 0.000

NYSBA LANE USE SIGNALS (LUS), MISCELLANEOUS ITS OTHER 01/2019 0.000 MISC 0.025
COMPONENTS REPLACEMENT TO MAINTAIN STATE OF OTHER 01/2020 0.025 MISC 0.025
SO-0007 GOOD REPAIR. VARIOUS COUNTIES OTHER 01/2021 0.025 MISC 0.025
BRIDGE
OTHER 01/2022 0.025 MISC 0.025
<Exempt>
OTHER 01/2023 0.025 MISC 0.025
AQC:A19 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.100 0.025 0.025 0.025 0.025 0.025 0.000 0.000

NYSBA SYSTEMWIDE PLAZA & CENTRAL SERVER OTHER 01/2019 0.000 MISC 0.015
UPGRADES- TO MAINTAIN STATE OF GOOD REPAIR. OTHER 01/2020 0.015 MISC 0.015
SO-0008 VARIOUS LOCATIONS OTHER 01/2021 0.015 MISC 0.015
BRIDGE
OTHER 01/2022 0.015 MISC 0.015
<Exempt>
OTHER 01/2023 0.015 MISC 0.015
AQC:B4 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.060 0.015 0.015 0.015 0.015 0.015 0.000 0.000

NYSBA IT UPGRADES: UPS (UN-INTERRUPTABLE POWER OTHER 01/2019 0.000 MISC 0.010
SYSTEM) SYSTEMWIDE MAINTENANCE & OTHER 01/2020 0.010 MISC 0.010
SO-0011 BATTERIES - MAIN UPS BATTERY REPLACEMENT TO OTHER 01/2021 0.010 MISC 0.010
BRIDGE MAINTAIN STATE OF GOOD REPAIR. VARIOUS COUNTIES. OTHER 01/2022 0.010 MISC 0.010
<Exempt>
OTHER 01/2023 0.010 MISC 0.010
AQC:A19 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.040 0.010 0.010 0.010 0.010 0.010 0.000 0.000

308
** New York Metropolitan Transportation Council**
Thursday, July 18, 2019 New York State Bridge Authority Listing Page 5 of 5

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
<AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST
in millions PRE
FFY 2020 2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSBA ANNUAL MAINTENANCE: SUICIDE CALL BOXES OTHER 01/2019 0.000 MISC 0.005
REPLACEMENT & UPGRADE TO MAINTAIN STATE OF OTHER 01/2020 0.005 MISC 0.005
SO-0012 GOOD REPAIR. VARIOUS COUNTIES. OTHER 01/2021 0.005 MISC 0.005
BRIDGE
OTHER 01/2022 0.005 MISC 0.005
<Exempt>
OTHER 01/2023 0.005 MISC 0.005
AQC:A19 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.020 0.005 0.005 0.005 0.005 0.005 0.000 0.000

NYSBA SYSTEMWIDE - GASBOY FUEL DISPENSING UPGRADE. OTHER 01/2019 0.000 MISC 0.015
UPGRADES TO MAINTAIN STATE OF GOOD REPAIR. OTHER 01/2020 0.015 MISC 0.015
SO-0033 VARIOUS COUNTIES
BRIDGE
<Exempt>
AQC:A7 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.015 0.015 0.015 0.000 0.000 0.000 0.000 0.000

NYSBA SYSTEMWIDE CAMERA REPLACEMENTS. OTHER 01/2019 0.000 MISC 0.200


REPLACEMENT OF CAMERAS THAT HAVE REACHED OTHER 01/2020 0.200 MISC 0.200
SO-0034 THEIR USEFUL LIFE. VARIOUS LOCATIONS.
BRIDGE
<Exempt>
AQC:A7 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.200 0.200 0.200 0.000 0.000 0.000 0.000 0.000

Westchester Transit Project

AGENCY PROJECT DESCRIPTION TOTAL


PIN 5-YEAR PHASE 5-YEAR PROGRAM (FFY) Starting October 01, 2019
FUND SOURCES &
WORKTYPE PROGRAM
OBLIGATION DATE FFY FFY FFY FFY FFY POST
<AQ STATUS> in millions PRE
FFY 2020
2020 2021 2022 2023 2024 FFY 2024
AQ CODE COUNTY TOTAL PROJECT COST of dollars

Westchester PURCHASE ELECTRIC VEHICLES FOR THE BEE-LINE LOCAL 01/2020 2.000 MISC 2.000
FLEET. THIS PROJECT WILL INCLUDE VEHICLES AND
8TM106 CHARGING INFRASTRUCTURE, BOTH PLUG-IN AND
TRANSIT
<Exempt> OVERHEAD, NEEDED TO SUPPORT ELECTRIC
VEHICLES. TWO VEHICLES WILL BE INTRODUCED IN
THE INITIAL PHASE. WESTCHESTER COUNTY
AQC:B2 WESTCHESTER TPC: $1.2-$2.5 M TOTAL 5YR COST : 2.000 0.000 2.000 0.000 0.000 0.000 0.000 0.000

309
INTENTIONALLY BLANK
Section VII. Appendices

Appendix A

Appendix B

Appendix C

Appendix D

308
Appendix A
TIP Funding Codes

A-1
APPENDIX A: TIP Funding Codes
FEDERAL FUND SOURCES: the FAST ACT Continued the MAP-21 consolidated fund
sources from the previous transportation bill. Federal funds are usually 80% with a required
20% state or local fund match. HSIP are 90% Federal and 10% match. The Federal share
may not exceed 50 percent for FTA 5307 operating assistance. Federal funds are provided
from the Federal motor fuel tax deposited in the Highway Trust Fund. Although funds can
be flexed between modes, CMAQ and several STP fund sources have been flexed towards
transit projects.

Funds Administered by the Federal Transit Administration

FTA 5307 – FTA Section 5307 is a formula grant program for urbanized areas providing capital,
operating, and planning assistance for mass transportation. At least one percent of the
funding apportioned must be used for transit enhancement activities.

FTA 5309 – FTA Section 5309 is a major capital investment program for the establishment of
new rail or busway projects (New Starts and Small Stats), the improvement and maintenance
of existing rail and other fixed guideway systems that are more than seven years old, and the
upgrading of bus systems. FTA 5309 can also denote earmark funding if they were MAP 21
funds remaining before FFY 2014.

FTA 5309 NS – This is a continuation of the NEW STARTS program. Construction of new or
extensions to existing fixed guideway systems (New Starts).

FTA 5309 SS – This is a continuation of the SMALL STARTS program. Capital projects less
than $75 million and total capital cost less than $250 million (Small Starts).

FTA Enhanced 5310 – FTA Section 5310 is a program where funds are made available to meet
the special transportation needs of elderly persons and persons with disabilities. These funds
are apportioned to the Urbanized Areas and States annually by a formula that is based on the
number of elderly persons and persons with disabilities in each area.

FTA 5311 – FTA Section 5311 is a formula program to provide funding for public transportation
in rural areas.

FTA 5324 – FTA Section 5324 Emergency Relief assists states and public transportation systems
with emergency-related expenses. The program funds capital projects to protect, repair,
reconstruct, or replace equipment and facilities. It also funds transit agency operating costs
related to evacuation, rescue operations, temporary public transportation service, or changing
public transportation route service before, during, or after an emergency in an area directly
affected.

FTA 5324 CR – FTA Section 5324 Continuing Resolution provides emergency relief assistance
to states and public transportation systems with emergency-related expenses. The program
funds capital projects to protect, repair, reconstruct, or replace equipment and facilities. It

Appendix – A (TIP Funding Codes) A-1


also funds transit agency operating costs related to evacuation, rescue operations, temporary
public transportation service, or changing public transportation route service before, during,
or after an emergency in an area directly affected.

FTA 5337 – FTA Section 5337 State of Good Repair replaces the fixed guideway modernization
program under Section 5309. Funding is limited to fixed guideway systems (including rail,
bus rapid transit, and passenger ferries) and high intensity bus (high intensity bus refers to
buses operating in high occupancy vehicles (HOV) lanes). Projects are limited to
replacement and rehabilitation, or capital projects required to maintain public transportation
systems in a state of good repair.

FTA 5339 – FTA Section 5339 Bus and Bus Facilities is a new formula grant program replacing
the previous Section 5309 discretionary Bus and Bus Facilities program. This capital
program provides funding to replace, rehabilitate, and purchase buses and related equipment,
and to construct bus-related facilities.

FTA MISC – FTA funds not listed or for non‐traditional funds that are managed by FTA (e.g.
transit projects selected for USDOT’s TIGER II program). Can also be used for FHWA flex
funding that was transferred one year and granted a subsequent year. Funding should be
specified in the project description.

FTA NA – Indicates a non-federally funded entry which is accompanied by local funding. These
projects may be subject to federal approval such as the removal of federal-aid. This code is
used for electronic record routing purposes.

Funds Administered by the Federal Highway Administration

CMAQ – Congestion Mitigation and Air Quality is funds for projects that will assist an area in
reducing transportation-related emissions in “non-attainment” and “maintenance” areas. The
available funding is determined by a formula calculation based on population and EPA’s
severity classification for ozone and carbon monoxide air pollution.

DISCR FA – This funding category is for the Federal funding that is part of any of the several
discretionary programs such as: Scenic Byway, TCSP, TIFIA or any future discretionary
program that may surface in the future. Some discretionary programs still have the own fund
source for tracking purposes such as FBD and SAFE RT SCH. The specific funding source
is cited in the Project Description.

FBD – Ferryboat Discretionary funds are solicitated and administered by FHWA for the
construction of ferryboats and ferryboat terminal facilities.

FBP- Ferryboat program funding awarded by FHWA to support ferryboat operations and
facilities.

HPP – This funding category is for the miscellaneous Federal funding identified in various
transportation bill or legislation that is not one of the allocated programs or any of the

Appendix – A (TIP Funding Codes) A-2


discretionary programs. This is typically earmark funding and would include High Priority
Projects, Special Appropriation, any High Priority Programs, Federal DEMO Programs, or
Emergency Relief Funds.

HSIP – Highway Safety Improvement Program is a core funding program to achieve a


significant reduction in traffic fatalities and serious injuries on all public roads. Note:
Railway Highway Crossings is a set-aside programs of HSIP and have their own fund source
while High Risk Rural Road is part of this HSIP.

HSIP RAIL – HSIP Rail Safety Program, a set-aside program on HSIP-Safety, is for the
elimination of hazards at highway-rail crossings to include Protective Devices.

NHPP – National Highway Performance Program support condition and performance of the
NHS, for the construction of new facilities on the NHS, and to ensure that investments of
Federal-aid funds in highway construction are directed to support progress toward the
achievement of performance targets established in an asset management plan of a State for
the NHS.

NHFP – National Highway Freight Program purpose (NHFP) is to improve efficient movement
of freight on the National Highway Freight Network (NHFN).

OTHER FA –This code is used for non-traditional funds that are managed by FHWA to include
those for STIP purposes (e.g. projects selected for HUD or FRA Funding or USDOT’s
TIGER II program). The specific funding source is cited in the Project Description.

STBG FLEX – Surface Transportation Block Grant is the most versatile of the formula-based
funds used for a variety of transportation improvements including transit and capital projects.

STBG LG Urban – The Surface Transportation Block Grant is a formula-based funds sub
allocated for an urbanized area with over 200,000 population and used for a variety of
transportation improvements.

STBG-OFF – Surface Transportation Block Grant is for bridges not on Federal-aid highways
(off-system bridges).

TAP LG URBAN – Transportation Alternatives Program Large Urban is sub allocated for a
variety of alternative transportation projects that were previously eligible activities under
separately funded programs. Funds are sub-allocated to urbanized areas with over 200,000
population.

TAP FLEX – Transportation Alternatives Program Flex is sub allocated for Transportation
Alternatives Program for a variety of alternative transportation projects that were previously
eligible activities under separately funded programs.

Appendix – A (TIP Funding Codes) A-3


STP ENHANCE – The Surface Transportation Program (Enhancement Program) is a program
that has ten percent of the formula-based STP funds designated for transportation enhancement
activities to assist communities attain social, cultural, aesthetic, and environmental goals. Not
available with MAP 21, included for use of remaining funds.

LOCAL FUND SOURCES:

LOCAL - Local government or municipalities, to include authorities that are not MTA or NYS
Thruway.

MTA - Local Metropolitan Transportation Authority funding.

OTHER – Is a variety of funding sources that falls between LOCAL and STATE to include
funds from NYSDEC, Ports, Out of State, Utility Companies, NYS Bridge Authority, other
State Agencies, Private Funding, or Route 9A (NYS or LMDC).

SDF – State Dedicated Funds: A state dedicated fund source that is generated through a state
gasoline tax and is for projects throughout the state.

STATE – Funding from a variety of New York State sources that is not SDF which includes
NYS Legislative Member items, Marchiselli or SHIP programs, State Transit Operating
Assistance (STOA), NYS Bond Issues, NYS Match, or miscellaneous SDF (Rail, etc…).

TWY – Funds from the New York State Thruway Authority for used on NYS Thruway projects.

Appendix – A (TIP Funding Codes) A-4


Appendix B
TIP Project Category Definitions (Work-types)

B-1
Appendix B: TIP Project Category Definitions (Work-types)

The following work-types are based on the main objective of the projects:

1. BRIDGE – Construction, reconstruction, recondition, bridge preventive maintenance,


painting, inspections, or any bridge or viaduct related to include its approaches.

2. CONST – Construction of a new highway on a new alignment or added lanes on an existing


roadway to includes initial construction of an expressway or an arterial.

3. INTER – Projects where the primary objective is to provide operational improvements at


specific intersections.

4. MISC – Projects such as landscaping, noise barriers, soil boring, demonstrations (such as an
AQ Demo), freight, and non-transit funding blocks.

5. MOBIL – Traffic operations (channelization/signals, and other strategies), High Occupancy


Vehicle (HOV), Transportation System Management (TSM), incident management, demand
management (VTCS/ITS, park-and-ride, and other strategies).

6. RECON – Major reconstruction of existing highways including sub-base and pavement.

7. R&P – Recondition and Preservation, Rehabs, Preventive Maintenance, Resurfacing of


highways. Simple rehabilitations tend to be R&P.

8. SAFETY – Median barrier/guide rails, hazard elimination, drainage, striping, signing,


scoring, and lighting. “Where and When” roadway program falls into this category.

9. STUDY – Study of transportation alternatives with a specific corridor or route or a


transportation problem. Studies could be general, freight, land-use, air quality, surveys, etc...

10. TRAFFIC – Projects designed to improve the capacity and efficiency of the traffic network,
such as signalization.

11. TRANSIT – Projects that add service, capacity to the transit network (including ferries) or
projects that are capital or operating to include, stock, equipment, terminal rehabilitation,
yards, depots, shops, power, security, operating assistance, and transfer blocks.

12. Bike/Ped- Bicycle or Pedestrian Projects have a dedicated scope to add or enhance bicycle or
pedestrian facilities

Note that the MTA Rail Programs have a different breakdown of work-types.

Appendix – B (Work-types) B-1


Appendix C
Comments and Responses

C-1
NYMTC PROPOSED FEDERAL FISCAL YEARS (FFYs) 2020-
2024 TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

PUBLIC COMMENTS & RESPONSES (as of 8.30.19)

Comment 1
July 9, 2019
Mary Parisen-Lavelle, Chair, CURES

Tier 4 emissions: Why are ferry engines (Manhattan projects) being upgraded to Tier 3 instead of
Tier 4? Are public agencies sticking with favored suppliers who don't have the most
technologically advanced goods that give members of the public the cleanest air quality? That's
what we're seeing with locomotive procurement at LIRR.

There is no funding for Tier 4 locomotives: Although it's a NYMTC goal to replace Tier 0
freight locomotive fleets in the NYC region with Tier 4 locomotives, MTA-LIRR has no funding
in here to replace the four Tier 0 locomotives they sold to NYAR in violation of Public
Authorities law with Tier 4 locomotives, and no funding in here to replace the Tier 0
locomotives they lease to NYAR with Tier 4 locomotives. There's no funding in here to replace
LIRR's Tier 0 freight fleet with Tier 4 locomotives either.

Response: The application for federal Section 5307 Ferry Boat Discretionary funds by the
Port Authority of New York and New Jersey was submitted in October 2017. At that time, new
Category 1 engines were required to adhere to EPA Tier 3 emission standards. Prior to grant
obligation, a final determination will be made regarding vendor and whether to exceed the
Tier 3 standard. See PIN X82375 on page 68 of the proposed TIP.

C-2
Pilgrim State truck-rail terminal: Why is there still more than $37 million in here for
development of a truck-rail warehouse at Pilgrim State (see project below) when private
Brookhaven Rail Terminal, which has hundreds of acres, has not expanded as planned due to
lack of business? This is truck and rail freight that will be coming through Queens without any
mitigation, such as Tier 4 locomotives. This is another "wishful thinking" "build it and they will
come" government project (like Calverton) that benefits the New York & Atlantic Railway.
Companies that want sites will rail access already can have it at BRT and other
sites: https://www.thelirrtoday.com/2019/06/suffolk-county-transit-adjacent-land-
use.html?utm_source=LIRRToday-%23Distribution&utm_campaign=b31f7b2c5a-2019-06Jun-
17+LIRR+Today+Long_Form_Update&utm_medium=email&utm_term=0_357a112c00-
b31f7b2c5a-192622577

The questions that must be asked before any government money is spent on Pilgrim State are:

1. What are the names of customers that are signed up, committed to use this facility?

2. What is the amount of private funding that is being invested at this location?

Calverton was a "build it and they will come" government dud. Public money built it, and it's not
fully utilized. At one point, NYAR had the customer out there going by truck to BRT. Having
individual customers pick up at the same truck at a truck-rail facility saves NYAR time and
money. Let NYAR buy a site and build a truck-rail facility.

Also, we have seen from Tunnel Hill Partners' Suffolk County facilities and BRT, locating truck-
rail facilities in Suffolk County attracts trucks from NYC and even Westchester across East
River crossings and LI roadways. NYAR lists customers in Bedford, NY., Westchester County.
One annual report to NYSDEC showed that 70% of the "C&D Residue" processed by NYAR-
Coastal, Tunnel Hill Partners' facility at LIRR's Farmingdale Yard, came FROM NYC and was
trucked TO Suffolk County to be dumped and crushed in a rail car before being hauled back to
NYC. It's not a simple "every rail car gets four trucks off the road" equation because experience
has proved that truck-rail facilities don't get trucks off the road locally and on LI.

Expansion plans for rail freight terminals and other freight rail expansion on Long Island
still continue apace without commensurate mitigation plans! Why?! LIRR can't manage to
buy the cleanest Tier 4 Switcher locomotives to replace NYAR's harmful old unregulated
Switchers, and even sold four of them to NYAR in violation of public authorities law (in 2014
and 2017) despite NYS legislative appropriations of $21 million since 2013. NYSDOT plans a
new $37.5 million truck-rail terminal at Pilgrim State that will send more freight to Fresh Pond
Yard, the 10-acre rail yard where all rail freight coming on and off Long Island is classified,
switched, and handed off to CSX. PANY-NJ plans Cross Harbor Freight expansion involving

C-3
freight rail. Freight NYC has plans for more rail freight and new terminals served by freight rail.
Where are the TIP projects from these agencies to mitigate increased harmful pollution,
congestion, and noise that already adversely impact health, the environment, community air, and
quality of life in communities that must live with freight rail operations, and that their plans will
make worse?! There needs to be inter-=jurisdictional planning that addresses these already
serious problems with funded projects! Attached is an example of a project that is missing from
NYMTC's 5-year project plan, planning and funding for grade crossing improvements that will
support a Quiet Zone (see attached letter from federal, state, and city elected officials to
NYCDOT).

Why aren't NYSDOT and MTA-LIRR working with NYCDOT and these elected officials
to get this project funded?! It will improve quality of life and health by reducing night time
noise from the Fresh Pond Yard classification operations all these agencies are so keen to
increase! MTA-LIRR has many grade crossing and signal improvement TIP projects for
passenger rail in this plan. MTA-LIRR owns a freight railroad too and selected and renewed its
Transfer Agreement with a freight concessionaire that lacks the ethics and capacity to mitigate
increasing adverse impacts that are being planned and funded by public agencies' freight rail
expansion plans, including those funded by TIP projects (see attached files with 2-page letter
from MTA to state legislators)!

Responses: The New York State Department of Transportation is committed to advancing


strategies that mitigate congestion and reduce greenhouse gas emissions, including increasing
the efficiency of goods movement in the Long Island Region. The Long Island Truck-Rail
Intermodal (LITRIM) project is a potential longer-term strategy; however, it is not proposed to
be advanced during the period of the proposed Transportation Improvement Program. The
project now appears in the speculative “vision” element of the current Regional
Transportation Plan.

With regard to inter-jurisdictional planning, NYMTC’s members participate in the Multi-State


Freight Working Group to coordinate and collaborate on freight related matters in the four-
state metropolitan region. Through this mechanism, NYMTC and its members are pursuing
improved coordination in regional freight planning.

Comment 2
July 23, 2019
Honorable David Buchwald
New York State Assembly, 93rd Assembly District

Thank you for providing this opportunity to comment on the Draft FFY 2020-2024
Transportation Improvement Program. I write as a State Assemblyman and representative of
over 130,000 constituents in Westchester County. My comments are particularly directed at a
concern I had while reading the draft document that the needs of Lower Hudson Valley residents
may at times be given short shrift in this crucial document that lays out transportation planning
and funding for the broader New York City metropolitan region (within New York State).
Accordingly, what follows are some examples of the observations I made, and I relay them
understanding that the impression I’ve gotten may not at all be the intention of NYMTC, but

C-4
nonetheless I feel it is important to relay these concerns so that they can be addressed in the final
Transportation Improvement Program.

Under the section dedicated to the “Highway Safety Improvement Program (HSIP) and Safety
Performance Management” there is a subsection for “Anticipated Effects of the FFYs 2020-24
TIP” (pages 9-10). In it, Westchester County is left out altogether, and I believe it is the only part
of the NYMTC region to not be included. Unless the message is that there are no highway safety
needs in Westchester County, something with which I would vigorously disagree, I would
recommend that the safety needs of Westchester residents and transportation infrastructure users
be given greater prominence. (Similarly, Westchester (and Rockland) are left out of the
“Anticipated Effects of the FFYs 2020-24 TIP” section on “Transportation System Performance”
(pages 22-24). Is the idea that these two counties will not see improvements over the next 5 years
in their transportation system performance? I doubt that is the message NYMTC is seeking to
send, but that, alas, is what the draft TIP implicitly conveys.)

Response: The transportation performance section is developed to give some examples of how
programming impacts performance. We have now added sections to address Westchester
County specifically. All NYMTC members programs are built to support the statewide
performance goals. See added section on page 24 of the proposed TIP.

I note the similar absence, without explanation, of Westchester County in the “Anticipated
Effects of the FFYs 2020-24 TIP” subsection under “Infrastructure – Pavement and Bridge”
(pages 20-21) and “Transportation System Performance” (pages 22-24).

Response: See added section on page 21 of the proposed TIP.

Another section, “Transit Asset Management (TAM)” (pages 10-11 and continuing onto page
18) lists the transit providers in our region and classifies them as Tier I or Tier 2. However, left
out from this list is the HudsonLink bus system, run by the New York State Department of
Transportation. I recommend its inclusion somewhere in this section. Otherwise, residents of
Rockland and Westchester will be left with the impression that this newest of mass transit
options in our region is already being neglected.

Response: See PIN 882349 on Page 290 of the proposed TIP.

As best I can tell, the HudsonLink is also left out of the “NYMTC Transit Fund Summary
(Figure 2)” identification of funding sources on pages 49 and 50. As the Draft Transportation
Conformity Determination indicates, the HudsonLink project is perhaps the most regionally
significant project when it comes to dealing with the Lower Hudson Valley’s atmospheric
environment.

Response: The HudsonLink service is not included in the Transit Fund Summary since the
service does not currently utilize federal funds. The service is funded with state dedicated
funds. See PIN 882349 on page 290 of the proposed TIP.

C-5
Furthermore, the HudsonLink project only seems to appear in the draft TIP in the TIP project
listing at the back (specifically, pages 122-123). Its absence in the main discussion is significant,
as this east-west mass transit option will not be a success if NYMTC doesn’t push it forward.
Moreover, the description of the HudsonLink in the TIP project listing is woefully lacking, and
easily could lead to the conclusion that with respect to this project the report is affirmatively
neglectful. Take, for example, the first sentence of the project description on page 122: “The
Hudson Link transit service is a new public bus service developed to replace the Tappan Zee
Express Bus service, which will expire in the fall of 2018.”

Response: The description of the service has been updated.

The use of the future tense demonstrates that this description was simply copied and pasted from
an old report. Worse, on the same page, the Tappan Zee Express Bus Service, which shut down
in October 2018, is still slated to receive $1.840 million in NYMTC support in Federal Fiscal
Year 2020, which runs from October 1, 2019 to September 30, 2020.

I respectfully request that this money be dedicated to an account to improve the HudsonLink’s
service, including its planned expansion across the I-287 corridor to Port Chester. If any other
use of these funds is established in the final TIP outside of HudsonLink’s present and future
services, I believe a letter to my office explaining the diversion would be in order.

Response: At the decision of NYMTC’s members, the federal funding programmed in FFY
2020 for the Tappan Zee Express under the Surface Transportation Block Grant Program has
been transferred administratively to other projects in the lower Hudson Valley. A new PIN has
been established for the HudsonLink service by the New York State Department of
Transportation (NYSDOT) for operating funding. See PIN 882349 on page 290 of the
proposed TIP.

There are other well-established projects (e.g. Penn Station access for Metro-North and
construction of new stations in the Bronx, along with power substation improvements on the
Upper Harlem Line of Metro-North) that are not included in the draft TIP. I presume that these
omissions, and these are just some examples, relate to not being able to include in the TIP
projects for which specific funding sources have not been identified, and that therefore this is
more a reflection of the MTA’s financial issues (and the eventual adoption of the next MTA
capital plan), but if so, the draft TIP should include a clear disclaimer on the project listings to
this effect so that the public does not think that the draft TIP is indicating itself that these vital
projects won’t get done.

Response: See PIN G711-01-07 on page 295, PIN G711-01-04 on page 296, and PIN G711-
01-06 on page 299 of the proposed TIP.

Comment 3
July 23, 2019
Honorable David Carlucci
New York State Senate; 38th Senate District

C-6
Transportation is the cornerstone of any community. It is imperative that our roadways continue
to be upgraded to be as safe and effective as possible. While many improvements within my
district are on NYMTC's 2020-2024 Transportation Improvement Program, there are additional
projects I feel that should be added.

One of the most common complaints to my office is the condition of state roads. Specifically,
routes 9W, 45, 59, 303, 304 and 306 are in need of repairs. To date, it seems that little work has
been done aside from making temporary repairs to potholes. The persistent complaints to my
office demonstrate that far more needs to be done.

Drivers deserve safe and reliable roadways. State roads are crucial for day-to-day travel. It is
imperative that these heavily trafficked roads are properly maintained.

Respectfully, I request that plans to make permanent repairs to all state roadways within my
district be added to the 2020-2024 plan. Many constituents who contact my office express
frustration with the condition of the state roads in general. However, specific issues that my
office has heard of so far throughout 2019 are as follows:

• The need to pave Route 9W going from Congers to Upper Nyack, specifically through
Hook Mountain.
• A concern about large potholes on Route 45 between Scotland Road and Hungry Hollow
Road in Chestnut Ridge.
• Two complaints about the need to pave Route 59 going from Nanuet to Nyack.
• Two complaints about massive potholes on Route 59 in both directions throughout
Nyack.
• A complaint about the need to pave Route 304 going northbound from Nanuet to
Squadron Boulevard in New City.
• One constituent's vehicle was damaged due to the condition of Route 304 going
southbound through New City, near Laurel Road. Another's vehicle was damaged on
Route 304 going southbound through Bardonia, near Albertus Magnus High School.
• The need to pave Route 304 going southbound beginning in Nanuet.
• The need to address potholes on Route 306 near Kearsing Parkway in Monsey.

Many of these issues are not new and have been a detriment to the area for many years.
Residents deserve to see improvements made as soon as possible.
Furthermore, the safety of some state roadways is an issue that my office has dealt with that must
be addressed. Route 304 has tragically seen six deaths in the last two years. The Town of
Clarkstown has been in contact with my office about the corridor of Rt. 304 that goes through the
town. This is a heavily congested area with many side streets, so there are many abrupt stops
when vehicles turn. It is necessary that funding be allocated so this corridor can be studied, and
improvements can be made.

Additionally, the "five corners" intersection in Valley Cottage, which is composed of Ridge

C-7
Road, Lake Road, Christian Herald Road and Route 303, is often congested and has had over
200 accidents in the last five years. This is another area that must be studied and improved as
soon as possible.

The North Middle Town Road Bridge over the Palisades Interstate Parkway has been in need of
repair for years. This is an important roadway and funding its improvement will ensure that it
can continue to be so.

The Town of Ramapo has contacted my office regarding the need for sidewalks on Rt. 306, in
the area south of Rt. 59. Many residents walk in this area so it is important that they are able to
do so in the safest way possible. The Town also expressed the need for a widening of state roads
so a right turning lane can be added on Rt. 306 to enter Viola Road. Finally, The 4th Street Bridge
in Hillburn is in need of repair. This is a major roadway and serves as a primary entrance and
exit to and from the village. Funding is needed to resurface the decking. As of now, the surface
of the bridge is in very poor condition.

In the Village of Nyack, constituents have contacted my office about the need for sidewalks on
Rt. 59. In the east bound lane, across from Ingalls Street there is a lapse in sidewalk, which
requires pedestrians to walk on Rt. 59 until the sidewalk begins again. This is another area where
many residents walk, and the lack of sidewalks creates a dangerous situation. There is a curve in
the road, so pedestrians may appear rapidly for drivers. Adding a sidewalk in this location will
increase safety for all.

Residents have expressed the need to appropriate funds to conduct a study on easing traffic
congestion at the intersection of Route 133 and Route 9 in the Village of Ossining. Significant
traffic during morning and evening rush hours from residents and commuters moving North and
South on Route 9 and East and West on Route 133 often creates long wait times, speeding
through yellow lights, and cars stopping in intersections that impede both pedestrian traffic and
emergency vehicles. As the two main thoroughfares in the area, easing congestion on these roads
would be immensely beneficial to the local community.

The Village of Briarcliff shared concerns with my office about the conditions of the corridor of
Rt. 9A. The Village explained that the road infrastructure is very outdated, which results in a
lack of proper site distances and clearances, which results in a high volume of accidents. In 2018,
police responded to nearly 120 accidents on the two mile stretch of the road through the village.
Unfortunately, many of these accidents saw serious injuries and even some fatalities. There are
outdated entrance and exit ramps, extremely narrow lanes, and a lack of a proper clearance
height at the Pleasantville Road overpass. The Village also expressed the need to remove grade
crossings throughout the corridor. In addition, flooding often occurs when it rains due to poor
drainage infrastructure. The culvert under Rt. 9A at the south end of the village is unable to
handle the increased water flow from the Pocantico River. This causes Ash, Oak and Jackson
Roads to flood.

Finally, funding to allow for municipalities to implement smart street lighting will prove to be
cost effective, environmentally conscious and lead to safer roads. Smart streetlights can monitor
traffic flow and weather. These devices can also allow for noise and motion monitoring as well

C-8
as gunshot detection. Empowering municipalities to better protect our residents and environment
is crucial.

Funding projects to improve these various issues is critical. Residents deserve to have the safest
roadways possible. Thank you for your attention to this matter and for your work in improving
transportation in our region. Please do not hesitate to contact my office to discuss these issues
further.

Response: The New York State Department of Transportation (NYSDOT) -- as part of the
draft 2020-2024 TIP -- has committed approximately $145 million toward repaving state
highways in the Hudson Valley region over the planned period. Pavement preservation is an
ongoing NYSDOT goal. As resurfacing projects are developed, pavement segments are
prioritized to provide the most benefit to the public with the funding that is available.
NYSDOT will continue to assess pavement conditions in Rockland County and evaluate the
relative needs of the pavement segments when identifying future resurfacing project
candidates.

Additionally, the NYSDOT will continue to work with the local municipalities and members of
NYMTC to consider Routes 304 and 303 in the Town of Clarkstown and Routes 9 and 133 in
the Village of Ossining, as candidate locations for future transportation study consideration.

Comment 4
July 25, 2019
Rick Horan, President
Coalition for QueensRail

IN SUPPORT OF REACTIVATING THE ROCKAWAY BEACH BRANCH AS PART OF


THE 2020-2024 CAPITAL PLAN

Queens, especially south Queens, doesn’t just feel like a transportation desert, it is! According
to a recent study Queens residents were found to have the longest average commute in the
country.

The Rockaway Beach Branch, AKA QueensRail. Is a 3.5 mile right-of-way going through the
heart of Queens. It should be rebuilt as part of the subway system with a connection to the A
Train and AirTrain at Howard Beach on the south end and the Queens Blvd. subway lines in the
Rego Park on the north end.

This rail connection will halve the commute time between south Queens/JFK Airport and
midtown Manhattan. In the process, it will generate economic benefits for the entire City while
bringing economically challenged residents closer to education, employment, and recreational
opportunities. Other benefits include taking cars off of Van Wyck Expressway and Woodhaven
Blvd. while reducing pollution and increasing roads safety.

After nearly 60 years of transit isolation, Queens residents need the Rockaway Beach Branch
rebuilt.

C-9
Response: The Metropolitan Transportation Authority and MTA Long Island Rail Road are
conducting a feasibility analysis for the Rockaway Beach Branch called the JFK Airport One
Seat Ride Rail Study. The study report is currently considered a draft and the agencies
continue to meet with stakeholders and the study should be finalized by the end of the year.

Comment 5
July 23, 2019
Honorable Grace Meng,
US Congress, 6th District of New York

As you finalize the Transportation Improvement Program (TIP) for federal fiscal years (FFY)
2020-2024, I write to urge the New York City Department of Transportation (NYCDOT) to
include provisions for the planning and funding for grade crossing improvements that would
support establishing a Quiet Zone in Middle Village. Specifically, per my previous letter dated
May 24, 2019, I request the New York City Department of Transportation (NYCDOT) to apply
for a Federal Railroad Administration (FRA) designated quiet zone in Middle Village, Queens in
the region between Joseph F. Mafera Park and 80th Street.

As you know, public entities with law enforcement capabilities, including municipalities, are
authorized to request the designation of a quiet zone, thus prohibiting the use of train horns at
grade crossings. This area contains only one grade crossing, located at 73rd Street, referred to as
crossing number 338016J. The crossing is infrequently traversed by pedestrians and vehicles.
Additionally, this quiet zone prohibition of the sounding of train horns does not apply to
emergency situations, thus maintaining the priority of safety.

My constituents who live in communities with freight rail lines are forced to endure noxious
odors, loud noises, and idling polluting trains. Noise pollution is not just a minor inconvenience;
it is a health issue that needs to be addressed. Frequent exposure to noise is known to have short
and long-term negative health impacts, including hearing loss, stress, high blood pressure, and
diminished cognitive performance. Some of this can be alleviated by establishing a quiet zone,
thus decreasing noise exposure.

As you finalize the draft FFYs 2020-2024 TIP list for federal-funded transportation improvement
projects, I ask that my comments and our community's concerns be taken into consideration, and
thereby, I urge NYCDOT to apply for a quiet zone for this area. I will be happy to assist in any
part of the process and look forward to working with you to provide relief for our constituents.

Response: Commissioner Trottenberg replied to the May 24, 2019 letter on August 1, 2019.

Comment 6
July 23, 2019
Michael Preziosi, P.E.
Director – Department of Technical Services
Town of Cortlandt

C-10
The Town of Cortlandt has reviewed the Draft FFY 2020‐2024 Transportation Improvement
Program and Draft Transportation Conformity Determination. First, on behalf of the Town we
would like to extend a thank you for the various projects already contemplated within the Town
of Cortlandt.

The Town’s primary comment pertains to necessary improvements that are required to be studied
and implemented along the Route 202 / US 35 / Crompond Road / Bear Mountain Parkway
corridor specifically at the Bear Mountain Interchange.

The Town of Cortlandt has been working with various developers since the fall of 2015 to create
a Medical Oriented District (“MOD”) around the New York Presbyterian Hospital (1980
Crompond Road). Refer to Figure 1. The MOD is an economic development and job creation
strategy that incorporates sustainability goals and principles to reduce emission, increase
resiliency, and generate economic growth. The goal of MOD is to centralize and increase
connectivity to medical services and jobs, and provide walkable, neighborhood‐scale ancillary
uses around the hospital campus to service patients, visitors and residents of the district as well
as the surrounding neighborhoods. The MOD concept is one of 4 key planning strategies to come
out of Cortlandt’s recently adopted 2016 Sustainable Comprehensive Plan ― Envision
Cortlandt.

Since April of 2016, the Town of Cortlandt, its Consultant AKRF and the various developers
have progressed a traffic study as part of a Draft Generic Environmental Impact Statement
“DGEIS” for MOD. The potential for traffic impacts1 was identified in the early planning stages
of the MOD and the Town conducted a due diligence traffic study to evaluate the potential for
corridor impacts related to the MOD development.
The identified corridor impacts and potential mitigation for these impacts are currently being
evaluated as part of the DGEIS. These documents will be forwarded to interested and involved
agencies shortly.

The Traffic Impact Study “TIS” presented in the DGEIS outlines a variety of potential mitigation
measures to alleviate congestion and improve safety on the corridor. As part of the study,
impacts to the Bear Mountain State Parkway and Route 202/35 from the MOD and other planned
projects in the corridor were analyzed. Attached is a technical memorandum prepared by the
Town’s Traffic Consultant AKRF summarizing these impacts.
The Town is requesting that the State and NYMTC implement the Route 202/35/6 Bear
Mountain Parkway Sustainable Development Plan2, by furthering studying the corridor and place
improvements to this corridor on the TIP. As you will read in the attached technical
memorandum, build‐out in the surrounding communities (e.g., Peekskill/Yorktown and general
traffic growth will continue to extend travel times and vehicle delay along the corridor,
especially within the limits of the Town of Cortlandt. Improvements to the Bear Mountain
Interchange at Route 202 / Crompond Road and are essential to the continued economic health of
Cortlandt and the region.

While the MOD stakeholders and developers are expected to mitigate traffic impacts associated
with their developments, the Bear Mountain Interchange is a regional concern and requires
additional attention and planning.

C-11
Response: The New York State Department of Transportation (NYSDOT) will work with the
town and members of NYMTC to consider Route 202/35/6 Bear Mountain Parkway in the
Town of Cortlandt as a candidate location for future transportation study consideration.

Comment 7

July 23, 2019


Honorable Kenneth P. Zebrowski
New York State Assembly, 96th District, Rockland County

I am writing to you regarding the Draft Transportation Improvement Program (TIP) for fiscal
years 2020- 2024.
Reviewing the plan, I was pleased to see a number of projects addressing critical traffic and
safety needs across my district. From traffic signal timing adjustments on Route 202 in
Garnerville, to a reconstruction of the intersection of Germonds Road and the Palisades
Parkway ramps in New City, to sidewalks and a turning lane around the Pascack Road one-way
tunnel in Nanuet, these are vital projects that will greatly improve the safety and quality of life
for Rockland drivers and pedestrians.
There was however one critical project not included on the TIP, the rehabilitation of the
Palisades Interstate Parkway (PIP) between exits 10 and 13. It is unconscionable that
Rockland residents and travelers of the PIP are once again being asked to wait multiple years
for this project that was first planned nearly 20 years ago. We have already waited long
enough. This project had an estimated cost of
$55-60 million two years ago, which was a large increase over the estimated cost of $45 million
in 2016. Every year this project is left off the TIP is another increase in the cost to rehabilitate
this five mile stretch of road. The condition of the road has deteriorated significantly over the
years and something must be done imminently to address this project.
I urge NYMTC to work with NYSDOT to prioritize the critically needed rehabilitation of
the PIP between exits 10 and 13 for the 2020-2024 TIP. Please do not hesitate to contact my
office if you have any questions or concerns.
Response: Thank you for letting us know you are pleased with the number of projects in the
TIP addressing critical traffic and safety needs across your district.

Capital pavement investments are prioritized to provide the most benefit to the public with the
funding that is available. Since 2017, the New York State Department of Transportation
(NYSDOT) has completed two pavement restoration projects along the Palisades Interstate
Parkway totaling approximately $21 million. This year, NYSDOT anticipates the start of
construction to repave an additional 10 miles of the parkway from the New Jersey/New York
state line to North Middletown Road at a cost of approximately $11 million.

NYSDOT will continue to assess pavement conditions and evaluate relative needs when
identifying future rehabilitation project candidates. NYSDOT will consider rehabilitation of

C-12
the last remaining portion of the parkway (the segment between Exit 10 and Exit 13) in the
future as funding opportunities arise.

Supplementary Comment 1
August 9, 2019
Civics United for Railroad Environmental Solutions (CURES)

We did not see Pilgrim State in this final draft list of TIP projects. If this unjustified public
project has actually been taken off the table, major kudos to NYSDOT and NYMTC.

Response: See second response to Comment 1 above.

Re. the two LIRR TIP projects below: LIRR should not receive control over $26 million for
capital project management and consulting because LIRR managers in procurement and
contracting have demonstrated incompetence, corruption, and poor results, and they hire cronies
as consultants, including former LIRR managers. It's a well-known system that serves insiders
first, and the public and Authority poorly. Another reason not to give LIRR managers this money
is that the MTA reorganization in capital procurement is in process. The attached documents
provide specific examples of why that reorganization is needed, and how LIRR managers are
wasting money and other resources, including on crafting illegal procurements with former crony
vendors (former LIRR Chief Mechanical Officer Mark Sullivan employed now by LIRR-favorite
STV) and LIRR's own freight concessionaire -- which was manifestly unqualified and had
multiple conflicts of interest in this role. You will see in the attachments that LIRR's
procurement and contracting problems have been referred to the MTA OIG by MTA and the
NYS Inspector General. With all the transportation needs out there in the NYMTC region, please
spend scarce funding on something that yields real improvements! Don't give LIRR managers
what amounts in their hands to a consultant slush fund that will only aid and abet the old culture
that the MTA Board and Governor need to change, and have engaged in a major reorganization
to change. For $26M LIRR could buy @10 new Near Zero Emissions Switchers like the one
Waste Management has working well now east of Hudson, making measurable progress toward
achieving the Governor's and Legislature's goals in the Climate Leadership and Community
Protection Act by removing unnecessary diesel exhaust -- like 300,000 cars, compared to what
the Non Tier, unregulated Switcher locomotives in LIRR's and NYAR's ancient fleets emit today
-- in residential areas of NYC and greater Long Island.

L709/04/NL 08-MISC
L709/04/NQ 08-MISC

Response: The TIP enables funding programmed for individual projects sponsored by eligible
agencies. All projects must comply with federal regulations to receive funding reimbursement.
Once enabled to have project costs reimbursed federally, projects undergo environmental
assessment and detailed procurement processes as determined by federal regulation and
sponsor agency procurement procedures. Reimbursement of project costs is only possible after
these regional and project-level requirements are met.

C-13
Thank you to NYSDOT for fixing this railroad bridge: X77386.

Response: comment noted.

The Cross-Harbor Freight Program is a misguided waste of state funding.


http://www.rpa.org/article/testimony-on-cross-harbor-freight-study Not doing this would enable
worthy state-funded transportation projects to go forward, and perhaps free up millions for other
projects currently funded by federal dollars. We ask NYMTC to ask hard questions and raise
issues about the track records, business ethics, and professional competence of those requesting
funding before approving projects with funding you control. The current Cross Harbor program
manager was involved at LIRR in Shops and Yard when the NYS Comptroller identified
problems (see his Linked In bio and the Comptroller's report attached). It's another example of
the indifference to waste, and the potential for fraud and abuse that this lax, "there's endless
public funding where that came from" culture sets up, in which managers who control public
transportation funding may operate: X50201.

Response: The Regional Freight element of NYMTC’s current Regional Transportation Plan
identifies the Tier II Environmental Assessment of the Cross-Harbor Freight Program as a
planning initiative which supports the desired outcomes of the Regional Freight element and
addresses the priority issues and needs listed in the element. Thus, the funding programmed in
the proposed TIP is consistent with the Regional Freight element of the NYMTC Regional
Transportation Plan, as is required for inclusion in the TIP.

Supplementary Comment 2
August 22, 2019 – Mid-Hudson South TCC Executive Meeting
Honorable Kenneth P. Zebrowski
New York State Assembly, 96th District, Rockland County

Although the Palisades Interstate Parkway (PIP) was designed for leisure travel to parks, it is
now the major north-south commutation route through Rockland County. Around 1999-2000 the
PIP was rehabilitated (lengthened acceleration/deceleration lanes and widened shoulders) from
the New Jersey line to Exit 10. This was supposed to continue for the rest of the PIP, but never
happened and the cost estimates keep increasing with time. My top priority is to get an estimate
of when this project to rehabilitate the rest of the PIP in Rockland County will get added to the
TIP. Second, New York State DOT repaved from the bookstore to the Bear Mountain Circle,
and from Exit 13 to the bookstore, and now plans to repave from the New Jersey line to Exit 10.
My constituents are frustrated that the PIP from Exit 10 to 13 continues to get ignored. My
second priority is to at least get the PIP repaved between exits 10 & 13.

Response: See response to Comment 7 above.

C-14
Appendix D
Signed Resolutions

D-1
D-2
D-3
D-4
D-5