Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

4 3 2 1

NOTES:

1. All OS Monitor in Control Room area


equipped with Dual Monitor.

GPS
NTP Server
Firewall

D STOCK PREPARATION DIP Paper Machine BCTMP WH D


PM#7 Wet CCR PM#8 PM#7 Dry CCR PM#8 BCTMP CCR
WH CCR
SP CCR DIP CCR Large Screen x 2 Sets
Large Screen Large Screen Large Screen x 2 Sets Large Screen x 5 Sets

OS x 5 Sets ES OS x 3 Sets ES OS x 8 Sets ES 1 ES 2 OS x 8 Sets ES 1 ES 2 OS x 5 Sets ES OS ES

KVM

Terminal Bus
LEGEND:
OS x 5 History OPC OS x 8 OS x 8 OPC
Sets ES Server ES Server Sets ES 1 Sets ES Server OS Line Type
C Area C
Location
Line Color
OPC OS x 3 ES 2 History OS x 5 History ES
OS Sets OS ES 1
OS
OS ES 2
Server OS Ethernet TCP/IP
Server Server Sets Server
Server Server Server Server Redundant
Ethernet TCP/IP
Profibus
Fiber Optic Redundant
Plant Bus
New Panel

PCS 7 PCS 7 PCS 7 PCS 7 PCS 7 PCS 7 PCS 7 PCS 7 PCS 7 PCS 7 PCS 7
DCS Remote DCS Remote DCS Remote DCS Remote DCS Remote DCS
Cabinet I/O Cabinet I/O Cabinet I/O Cabinet I/O Cabinet I/O Cabinet

12-03-2020

SP Rack Room DIP Rack Room Wet Rack Room Dry Rack Room BCTMP Rack Room WH Rack Room

B FIRST ISSUED TBD TBD TBD


B
REV DATE DESCRIPTION BY CHK APPR

PCS 7 PCS 7 PCS 7 PCS 7 PCS 7


Remote MCC Remote Remote MCC MCC Remote Remote MCC
I/O I/O I/O I/O OWNER
I/O
PT. INDAH KIAT PULP & PAPER
SERANG MILL
PM#7 Wet PM#8 Wet PM#7 Dry PM#8 Dry
MCC Rack Room MCC Room MCC Room MCC Room MCC Room CONTRACTOR

SUPPLIER

PROJECT TITLE:

PM,
IKS SP,for
– DCS DIP and
PM7, BCTMP
PM8, SP & CK
DCS Upgrade
DRAWING TITLE:
A A
SYSTEM ARCHITECTURE

DWG NO:

SHEET: SCALE: SIZE: REV:


NTS A3 R.1

4 3 2 1
4 3 2 1
NOTES:

1. All OS Monitor in Control Room area


equipped with Dual Monitor.

GPS
NTP Server
D D
Firewall

WWT RB + EV RC RDF

WWT CCR RC CCR RDF CCR


RB + EV CCR

Large Screen OS OS x 4 Sets ES Screen x 2 Sets OS x 3 Sets Large Screen OS Large Screen

KVM

LEGEND:

Line Type
C Terminal Bus Area C
Location
Line Color
Ethernet TCP/IP
OS x 4 OPC Redundant
Sets Server
Ethernet TCP/IP
Profibus
Fiber Optic Redundant
New Panel

OS ES History
Server Server

Plant Bus
Compressor,
B Chiller, Chemical
TBD TBD TBD
B
12-03-2020 FIRST ISSUED
REV DATE DESCRIPTION BY CHK APPR
0.0

OWNER

PCS 7 PCS 7 PCS 7 PCS 7 PCS 7


PT. INDAH KIAT PULP & PAPER
Remote DCS MCC Remote Remote Remote SERANG MILL
I/O Cabinet I/O I/O I/O
CONTRACTOR

Compressor,
WWT Rack Room RB + EV Rack Chiller, Chemical SUPPLIER
Room MCC Room Rack Room RC Rack Room RDF Rack Room

PROJECT TITLE:

EV,–RB,
IKS DCS RC, RDFPM8,
for PM7, andSPWWT
& CK
DCS Upgrade
DRAWING TITLE:
A A
SYSTEM ARCHITECTURE

DWG NO:

SHEET: SCALE: SIZE: REV:


NTS A3 R.1

4 3 2 1