Notes:: SWCC 24 FOC Depth XX MP # 0001 Additional Info Project Name

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NOTES:

1. ALL DIMENSIONS ARE GIVEN IN METRES UNLESS OTHERWISE SPECIFIED.


2. FIRST BAND / STRIPE FROM TOP IS 350 MM.
3. BAND / STRIPE WIDTH IS 50 MM.
4. SPACE BETWEEN BANDS / STRIPE IS 50 MM.
5. MAXIMUM OF 400 METRES IN BETWEEN TWO (2) MARKER POST.
6. INSTALL ONE (1) MARKER POST FOR EVERY PULLING PIT, SPLICE PIT AND OTHER
PITS.
SECTION 7. INSTALL START AND END FOR EVERY HORIZONTAL DRILLING.
SCALE 1:10 8. INSTALL MARKER POST ON EVERY CHANGE OF DIRECTION.
9. DETAILS (INSCRIPTION) OF PIPELINE MARKERS HAS TO BE COORDINATED WITH
0.15 SWCC.
PLAN MARKER PLATE 10. FOUNDATION ACCORDING TO LOCAL SOIL CONDITIONS.
0.11
SCALE 1:2 SCALE 1:1
0.15

0.15
LEGEND:
0.025 0.10 0.025

SWCC
PROJECT NAME
24 FOC
DEPTH = XX
MP # 0001
A A ADDITIONAL INFO
6mm Ø BARS @ 150mm C/C

8mm Ø BARS (4 Pcs)

SCALE 1 : 2
50mm 0 100mm 200mm

SCALE 1 : 10
0,5m 0 0,5m 1m

REFERENCE DRAWINGS
DRAWING No.: DRAWING TITLE

SCALE 1:10

8 8 8 8
0.0 0.0 0.0 0.0
0.15

0.15

0.15

0.15
ENGINEER'S STAMP CONTRACTOR'S STAMP
0.20

0.20

0.20
2019 i:\atibk_projects\q915\6_cae\61_vp\36\dwg\4_typicaldrawings\pipelinetypicals\qp10-u-5456_typicalcablemarker.dwg

0.05 0.05 0.05 0.05 0.05

0.05 0.05 0.05

0.05
1.50

1.50

1.50

1.50
0 ISSUE FOR TENDER DOCUMENTS GÜNDÜZ MIMM 10.05.2019
REV DESCRIPTION DRAWN CHECKED DATE

SALINE WATER CONVERSION CORPORATION


0.60

0.60

0.60

0.60

KINGDOM OF SAUDI ARABIA

EASTERN PROVINCE - PHASE 4


WATER TRANSMISSION SYSTEM

LEAN CONCRETE, VALID FOR ALL TYPES


ILF & PARTNERS
(NOTE 10)
ENGINEERING PSC

SPLICE POINT START & END CHANGE STRAIGHT ROUTE


(SPLICE PIT) HORIZONTAL DRILLING DIRECTION (EVERY PULLING PIT EXCEPT INSIDE CITY)
LOCATION: DRAWING TITLE:

- TYPICAL CABLE MARKER

SCALE: DRAWING No.: SHEET REV.

0.50m²
1:1, 1:2, 1:10 QP10-U-5456 - 0