Professional Documents
Culture Documents
Sa 02
Sa 02
Sa 02
36)
IL1- (-2.86)
LEGEND
IL2- (-2.86)
A C C' D E A B B' C D - PPR pipe for cold water
(MH Depth=1.44m) Ø110 F/A Ø110 F/A
- PPR pipe for hot water
Ø110 T/MH Ø110 T/B - Gate valve
Ø110 F/A
1
Ø110 F/A
1 - One way valve
Ø110 T/B - uPVC waste pipe
200
FD
Ø110 F/HL
Ø110 T/MH
FD FD FD FD
- uPVC waste pipe
1' 1'
COUNTRY KITCHEN
LAUNDRY
KITCHEN
H.W. - Hand wash basin
-2.19
W.C. - flush water closet
150
S.T 2
0.00
2 UR. - Urenal
SH. - Shower
340
300
-2.19
-2.19
0.00
F.D. - Floor drain
200 CORRIDOR GUEST B.ROOM
F.G. - Floor Grain
UTILITY ROOM
0.51
E.W.H. - Electric Water Heater
SHOWER/
4
T/A - To above
4
T/B - To below
Ø110 F/A
Ø110 T/B F/A - From above
TL- (-1.36) TL- (-1.36)
Ø160 2% Slope Ø160 2% Slope
F/B - From below
IL1- (-2.11) IL1- (-1.69)
0.51
-1.36
T/LL - To lower level
1'
HIS
1'
+3.06
GYM
BALCONY STEAM
MASTER BATH ROOM ceramic tile ff
CO A=15.5m2 SAUNA
EXERCISE
OPEN TO DOWN BED ROOM-1
+6.12
+3.06
SHOWER
3
3
CO TERRACE +6.12
ceramic tile ff
A=48.51m2
SHOWER/TOILET
BALCONY
BED ROOM-2
PROJECT: G+2 RESIDENCE
4
4
+306
Ø110 T/A
+3.06 TITLE:
Ø110 T/B
SANITARY INSTALLATION DRAWINGS
FIRST FLOOR WASTE WATER DRAINAGE INSTALLATION PLAN SECOND FLOOR WASTE WATER DRAINAGE INSTALLATION PLAN OWNER :
ATO FESSHA HAILU
Scale 1:50 Scale 1:50
LOCATION : BOLE WOREDA - 12
Block No -
DESIGN BY: DRAWING No.
MULUGETA FEKADU PPSNE/031 SN-03/07
DATE SCALE
DRW. ELIYAS T.
Jan., 2019 1:50