Load Details
Included Loads
Properties Details
Soil Details
Boundary Subgrade Modulus Soil Height Above Mat Soil Density Applied Load due to Soil
MAT 12000.00kN/m2/m 1.70m 18.00kN/m3 30.60kN/m^2
Mat Dimension
Analysis Results
Max SQX 24 131 138.06 -18.36 0.00 0.00 0.00 -12.12 2.11 -6.16
Max SQY 3 131 -292.41 704.79 0.00 0.00 0.00 -24.56 54.85 21.32
Max SX 1 111 -8.40 79.43 0.00 0.00 0.00 -3.34 1.09 5.91
Max SY 1 111 -8.40 79.43 0.00 0.00 0.00 -3.34 1.09 5.91
Max SXY 1 111 -8.40 79.43 0.00 0.00 0.00 -3.34 1.09 5.91
Max MX 36 133 23.35 -12.26 0.00 0.00 0.00 -0.57 1.17 -1.10
Max MY 3 131 -292.41 704.79 0.00 0.00 0.00 -24.56 54.85 21.32
Max MXY 3 131 -292.41 704.79 0.00 0.00 0.00 -24.56 54.85 21.32
Min SQX 3 111 -300.83 659.24 0.00 0.00 0.00 -18.35 52.29 16.79
Min SQY 4 131 -282.87 -691.72 0.00 0.00 0.00 -24.95 52.32 -22.40
Min SX 1 111 -8.40 79.43 0.00 0.00 0.00 -3.34 1.09 5.91
Min SY 1 111 -8.40 79.43 0.00 0.00 0.00 -3.34 1.09 5.91
Min SXY 1 111 -8.40 79.43 0.00 0.00 0.00 -3.34 1.09 5.91
Min MX 10 131 -179.48 -88.14 0.00 0.00 0.00 -28.13 36.55 -10.48
Min MY 6 129 -8.60 -46.58 0.00 0.00 0.00 -2.71 0.16 -4.04
Min MXY 4 131 -282.87 -691.72 0.00 0.00 0.00 -24.95 52.32 -22.40
Contact Area
Load Case Area in Contact(m2) % of Total Area Area out of Contact(m2) % of Total Area
111 3.00 75.00 1.00 25.00
112 3.00 75.00 1.00 25.00
113 3.00 75.00 1.00 25.00
114 3.00 75.00 1.00 25.00
115 3.00 75.00 1.00 25.00
116 3.00 75.00 1.00 25.00
117 3.00 75.00 1.00 25.00
118 3.67 91.67 0.33 8.33
119 3.67 91.67 0.33 8.33
120 3.67 91.67 0.33 8.33
121 3.67 91.67 0.33 8.33
122 3.67 91.67 0.33 8.33
123 3.00 75.00 1.00 25.00
124 3.00 75.00 1.00 25.00
125 3.00 75.00 1.00 25.00
126 3.67 91.67 0.33 8.33
127 3.00 75.00 1.00 25.00
128 3.67 91.67 0.33 8.33
129 3.39 84.72 0.61 15.28
130 3.61 90.28 0.39 9.72
131 3.00 75.00 1.00 25.00
132 3.00 75.00 1.00 25.00
133 3.00 75.00 1.00 25.00
201 3.00 75.00 1.00 25.00
202 3.00 75.00 1.00 25.00
203 3.00 75.00 1.00 25.00
204 3.00 75.00 1.00 25.00
205 3.00 75.00 1.00 25.00
206 3.00 75.00 1.00 25.00
207 3.00 75.00 1.00 25.00
208 3.00 75.00 1.00 25.00
209 3.67 91.67 0.33 8.33
210 3.00 75.00 1.00 25.00
211 3.17 79.17 0.83 20.83
212 3.00 75.00 1.00 25.00
Sliding Check
Sliding Force, Fx Sliding Force, Fz Resisting Force FOS(x) FOS(z)
Load Case No
(kN) (kN) (kN) (Along X Direction) (Along Z Direction)
201 -0.40 -2.97 136.43 344 45
202 0.09 -3.40 143.46 1550 42
203 -0.45 -3.25 140.31 314 43
204 -0.03 -3.29 141.70 4777 43
205 -0.40 -2.97 136.43 344 45
206 -0.40 -2.97 136.43 344 45
207 -0.40 -2.97 136.43 344 45
208 -0.40 -2.97 136.43 344 45
209 10.72 -3.24 124.97 11 38
210 -11.51 -2.70 147.88 12 54
211 1.49 11.06 135.35 90 12
212 -2.28 -17.00 137.51 60 8
Overturning Check
Distance to Distance to
Critical Critical Overturning Overturning Resisting Resisting FOS(x) FOS(z)
Load Case
Location Location Moment, Mx Moment, Mz Moment, Rx Moment, Rz (About X (About Z
No
Along X Along Z (kNm) (kNm) (kNm) (kNm) Direction) Direction)
(m) (m)
201 -0.10 0.00 -1.19 0.16 691.40 -160.79 581 1014
202 1.90 0.00 -1.36 -0.04 691.40 160.79 508 4345
203 -0.10 0.00 -1.30 0.18 691.40 -160.79 532 901
204 -0.10 0.00 -1.32 0.01 691.40 -160.79 524 13551
205 -0.10 0.00 -1.19 0.16 691.40 -160.79 581 1014
Distance to Distance to
Critical Critical Overturning Overturning Resisting Resisting FOS(x) FOS(z)
Load Case
Location Location Moment, Mx Moment, Mz Moment, Rx Moment, Rz (About X (About Z
No
Along X Along Z (kNm) (kNm) (kNm) (kNm) Direction) Direction)
(m) (m)
206 -0.10 0.00 -1.19 0.16 691.40 -160.79 581 1014
207 -0.10 0.00 -1.19 0.16 691.40 -160.79 581 1014
208 -0.10 0.00 -1.19 0.16 691.40 -160.79 581 1014
209 1.90 0.00 -1.30 -4.29 691.40 160.79 533 37
210 -0.10 0.00 -1.08 4.61 691.40 -160.79 640 34
211 1.90 5.30 4.42 -0.60 -160.79 160.79 36 269
212 -0.10 0.00 -6.80 0.91 691.40 -160.79 101 176
Column No. Load Case Service Stress (kN/m) Corner 1 (kN/m) Corner 2 (kN/m) Corner 3 (kN/m) Corner 4 (kN/m) Design Status
55 131 1141.54 -665.95 -665.95 -665.95 -665.95 Pass
Design Parameters
Min Max
Top Bottom Pedestal Pedestal Min Max Wood and
Panel f 'c Pedestal Bar Bar
fy (kN/m2) Cover Cover Min Bar Max Bar Spacing Spacing Armer
Name (kN/m2) Cover(m) Size Size
(m) (m) Size (mm) Size (mm) (mm) (mm) Moment
(mm) (mm)
MAT 414000.07 21000.00 0.05 0.07 0.05 16 20 12 60 100.00 300.00 Used
Design Output
Zone = 3
= 0.0018
= 0.02
Where = 23.19
= 224.14 (kN/m^2)
As , Hence is acceptable
Reinforcement Details
Bar No = 16
---------------------------------------
Zone = 3
= 0.0018
= 0.02
Where = 23.19
= 136.69 (kN/m^2)
As , Hence is acceptable
Reinforcement Details
Bar No = 16
---------------------------------------
Zone = 3
= 0.0018
= 0.02
= 0.0018
Steel Percentage Required
Where = 23.19
= 108.44 (kN/m^2)
As , Hence is acceptable
Reinforcement Details
Bar No = 16
---------------------------------------
Zone = 3
= 0.0018
= 0.02
Where = 23.19
= 531.46 (kN/m^2)
As , Hence is acceptable
Reinforcement Details
Bar No = 16
---------------------------------------