05-KSCPP-B-1906 - A - Code 2

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

NOTES
P-EDMS DOCUMENT NO. : KS-CPP-EXE-MMHE-503-PRO-PID-1906
CONTRACTOR DOCUMENT NO. : 077711-1000-DW-1931-0004

A 1. THE NUMBER OF DELUGE NOZZLE SHOWN ARE INDICATIVE ONLY. ACTUAL NOZZLES QUANTITY TO BE
A
CONFIRMED.
2. PIPING TO CONFIRM ACTUAL DELUGE ROUTING.
This drawing is subjected to CPP LDR comments. To incorporate LDR comments accordingly. 3. TAPPING TO EACH EQUIPMENT TO BE TAKEN FROM TOP OF PIPE, 12 O'CLOCK POSITION.

4. PIPING ROUTING/ISOMETRIC TO ENSURE SYMMETRY OF PIPING TO AVOID UNEQUAL DISTRIBUTION.


5. BLIND FLANGE FOR FUTURE EQUIPMENT.

B B

80-FW53259-1P701-N

CONDENSATE COALESCER

80-FW53258-1P701-N
S-3002 A

80-FW53260-1P701-N

FIRE ZONE 8
C CONDENSATE COALESCER C
S-3002 B

INLET PIG RECEIVER INLET PIG RECEIVER CONDENSATE/WATER SEPARATOR 100-FW53262-1P701-N


R-2902 R-2901 V-3001
(FUTURE) (FUTURE)

100-FW53252-1P701-N
CONDENSATE FILTER

100-FW53261-1P701-N
S-3001 A
PETRONAS CARIGALI SDN BHD
INLET PIG RECEIVER 80-FW53249-1P701-N CHEMICAL INJECTION PACKAGE
R-2903 A-6820 Document Review Status
100-FW53263-1P701-N
(FUTURE) (FUTURE)
D CODE 1 : Approved D
EXPORT PIG LAUNCER
L-2901 CODE 2 : Accepted with Comments
CONDENSATE FILTER
NOTE 5 NOTE 5 NOTE 5 NOTE 5
S-3001 B CODE 3 : Rejected and Resubmit
80-FW53245-1P701-N 80-FW53246-1P701-N 80-FW53247-1P701-N 50-FW53256-1P701-N
200-FW53244-1P701-N CODE 4 : For Information
FROM DELUGE VALVE
(FIRE ZONE 8 & 9) Reviewed
250-FW53203-1P701-N
110488 KSCPP-B-1904 by
50-FW53250-1P701-N 80-FW53251-1P701-N 25-FW53254-1P701-N 25-FW53257-1P701-N

25-FW53231-1P701-N 50-FW53235-1P701-N 80-FW53241-1P701-N


E Approval does not relieve Contractor of their E

25-FW53253-1P701-N
DIESEL FILTER/COALESCER PACKAGE CONDENSATE METERING SKID DIESEL TRANSFER PUMP DIESEL LOADING FILTER
responsibilities to meet all requirements.
25-FW53230-1P701-N

50-FW53234-1P701-N

80-FW53240-1P701-N
DIESEL DISTRIBUTION PUMP CONDENSATE EXPORT PUMP CONDENSATE BOOSTER PUMP A-6710 A-3210 P-6701 A S-6701
P-6702 A P-3301 A P-3001 A
25-FW53255-1P701-N

25-FW53232-1P701-N 50-FW53236-1P701-N 80-FW53242-1P701-N

DIESEL TRANSFER PUMP


DIESEL DISTRIBUTION PUMP CONDENSATE EXPORT PUMP CONDENSATE BOOSTER PUMP P-6701 B
P-6702 B P-3301 B P-3001 B

F 150-FW53229-1P701-N F

150-FW53238-1P701-N
50-FW53237-1P701-N

LP FLARE KO/CLOSED DRAIN PUMP


P-6202 A

G G
25-FW53233-1P701-N 150-FW53239-1P701-N 150-FW53243-1P701-N

TREATED DIESEL FILTER LP FLARE KO/CLOSED DRAN PUMP INLET SEPARATOR


S-6702 P-6202 B V-2001

CELLAR DECK

H H

FIRE ZONE 9
CAD PRODUCED DRAWING - NO MANUAL REVISION ALLOWED
50-FW53264-1P701-N

I Nazreen Abdul Rahim


2019.11.08 12:01:38
WanNorAzianFaizan
WanNik
JagjitKaur
HarnekSingh
I
+08'00' 2019.11.08 11:49:20 2019.11.08
+08'00' 16:17:50 +08'00'

A ISSUED FOR REVIEW 08.11.19 BER/NAR WNAF JK


50-FW53265-1P701-N

DRAWN CHECKED APPROVED APPROVED


REV DESCRIPTION DATE
50-FW53266-1P701-N
CONTRACTOR PCSB

CONTRACT NO. CHO/2018/DKS/1001 CHECKED WNAF


LP FLARE KO/CLOSED DRAIN BOOSTER PUMP
P-6203 A JOB NO. DATE 08.11.19

J 50-FW53267-1P701-N DRAWN BY BER/NAR APPROVED JK J


DATE 08.11.19 DATE 08.11.19

LP FLARE KO/CLOSED DRAIN BOOSTER PUMP


SCALE N.T.S CONTRACTOR PCSB
P-6203 B
PROJECT TITLE:

PROVISION OF ENGINEERING, PROCUREMENT,


CONSTRUCTION, INSTALLATION & COMMISSIONING (EPCIC) OF
KASAWARI GAS DEVELOPMENT PROJECT
DRAWING TITLE:

K
PIPING AND INSTRUMENTATION DIAGRAM K
SYSTEM 53
SUMP DECK
FIXED FIREWATER SYSTEM - DELUGE DISTRIBUTION CELLAR
DECK / SUMP DECK
CONTRACTOR: CONSULTANT:
CAD FILE NAME :

05-KSCPP-B-1906-1of1-A.pdf
AREA: LOCATION:
L L
05 KSCPP
DISCIPLINE DRAWING NO. SHEET NO. REVISION NO

THE ORIGINAL AND ALL COPIES OF THE DRAWING TOGETHER WITH B 1906 1 OF 1 A
THE COPYRIGHT THEREOF ARE THE SOLE PROPERTY OF PCSB

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

You might also like