ELECTRIC POLES LIST PK 95+000 TO PK 105+000 - LHS

Distance from
S.No Chainage Side Type of Pole Remarks Scope of
proposed centre line
1 PK94+691 LHS 13.17 20KV POLE Not affected
2 PK94+788 LHS 13.70 20KV POLE Not affected
3 PK94+892 LHS 9.93 20KV POLE Construction area AFCONS
4 PK94+991 LHS 6.66 20KV POLE Construction area SAG
5 PK94+991 LHS 7.70 20KV POLE Construction area SAG
6 PK94+991 LHS 8.70 20KV POLE Construction area SAG
7 PK95+450 LHS 8.99 20KV POLE Construction area SAG
8 PK95+571 LHS 8.44 20KV POLE Construction area SAG
9 PK95+703 LHS 13.37 Simple Pole Not affected
10 PK95+740 LHS 5.58 20KV POLE Construction area AFCONS
11 PK95+779 LHS 12.48 Simple Pole Not affected
12 PK95+830 LHS 8.07 Simple Pole Construction area AFCONS
13 PK95+832 LHS 11.67 Simple Pole Not affected
14 PK95+836 LHS 6.25 Simple Pole Construction area AFCONS
15 PK95+890 LHS 8.17 20KV POLE Construction area AFCONS
16 PK95+890 LHS 26.10 20KV POLE Not affected
17 PK95+890 LHS 39.22 20KV POLE Not affected
18 PK95+907 LHS 36.10 Simple Pole Not affected
19 PK95+915 LHS 12.05 Simple Pole Not affected
20 PK96+040 LHS 8.29 20KV POLE Construction area SAG
21 PK96+217 LHS 7.98 20KV POLE Construction area SAG
22 PK96+390 LHS 7.96 20KV POLE Construction area SAG
23 PK96+524 LHS 11.86 20KV POLE Not affected
24 PK96+650 LHS 19.23 20KV POLE Not affected
25 PK96+768 LHS 7.08 20KV POLE Construction area SAG
26 PK96+768 LHS 8.20 20KV POLE Construction area SAG
27 PK96+768 LHS 9.00 20KV POLE Construction area SAG
28 PK97+100 LHS 8.85 20KV POLE Construction area SAG
29 PK97+100 LHS 9.20 20KV POLE Construction area SAG
30 PK97+247 LHS 7.50 20KV POLE Construction area SAG
31 PK97+395 LHS 6.94 20KV POLE Construction area SAG
32 PK97+500 LHS 8.06 20KV POLE Construction area SAG
33 PK97+597 LHS 5.98 20KV POLE Construction area SAG
34 PK97+695 LHS 7.43 20KV POLE Construction area SAG
35 PK97+757 LHS 7.82 Simple Pole Construction area SAG
36 PK97+808 LHS 7.66 Simple Pole Construction area SAG
37 PK97+821 LHS 26.13 20KV POLE Not affected
38 PK97+854 LHS 7.78 Simple Pole Construction area SAG
39 PK97+876 LHS 7.43 20KV POLE Construction area SAG
40 PK97+959 LHS 7.76 Simple Pole Construction area SAG
41 PK97+999 LHS 7.77 Simple Pole Construction area SAG
42 PK98+047 LHS 7.67 20KV POLE Construction area SAG
43 PK98+131 LHS 7.63 Simple Pole Construction area SAG
44 PK98+173 LHS 7.63 Simple Pole Construction area SAG
45 PK98+216 LHS 7.79 20KV POLE Construction area SAG
46 PK98+256 LHS 7.93 Simple Pole Construction area SAG
ELECTRIC POLES LIST PK 95+000 TO PK 105+000 - LHS
Distance from
S.No Chainage Side Type of Pole Remarks Scope of
proposed centre line
47 PK98+289 LHS 8.09 Simple Pole Construction area SAG
48 PK98+322 LHS 9.25 Simple Pole Construction area SAG
49 PK98+362 LHS 12.39 20KV POLE Construction area SAG
50 PK98+405 LHS 8.66 Simple Pole Construction area SAG
51 PK98+449 LHS 7.43 Simple Pole Construction area SAG
52 PK98+500 LHS 7.45 20KV POLE Construction area SAG
53 PK98+500 LHS 22.54 20KV POLE Not affected
54 PK98+500 LHS 37.54 20KV POLE Not affected
55 PK98+674 LHS 7.51 20KV POLE Construction area SAG
56 PK98+850 LHS 7.42 20KV POLE Construction area SAG
57 PK98+894 LHS 7.23 20kV POLE Construction area SAG
58 PK98+997 LHS 7.50 Simple Pole Construction area SAG
59 PK99+024 LHS 7.35 20KV POLE Construction area SAG
60 PK99+024 LHS 14.60 20KV POLE Not affected
61 PK99+024 LHS 23.11 20KV POLE Not affected
62 PK99+068 LHS 7.64 Simple Pole Construction area SAG
63 PK99+111 LHS 7.80 Simple Pole Construction area SAG
64 PK99+155 LHS 7.93 Simple Pole Construction area SAG
65 PK99+199 LHS 7.68 20KV POLE Construction area SAG
66 PK99+243 LHS 7.95 Simple Pole Construction area SAG
67 PK99+285 LHS 7.99 Simple Pole Construction area SAG
68 PK99+326 LHS 9.27 Simple Pole Construction area SAG
69 PK99+374 LHS 5.83 20KV POLE Construction area SAG
70 PK99+374 LHS 6.00 20KV POLE Construction area SAG
71 PK99+374 LHS 7.30 20KV POLE Construction area SAG
72 PK99+425 LHS 8.17 Simple Pole Construction area SAG
73 PK99+469 LHS 7.15 Simple Pole Construction area SAG
74 PK99+549 LHS 7.23 20KV POLE Construction area SAG
75 PK99+655 LHS 10.15 Simple Pole Construction area SAG
76 PK99+709 LHS 7.85 20KV POLE Construction area SAG
77 PK99+768 LHS 9.86 Simple Pole Not affected
78 PK99+826 LHS 9.73 Simple Pole Construction area AFCONS
79 PK99+886 LHS 11.69 20KV POLE Not affected
80 PK99+936 LHS 10.51 Simple Pole Not affected
81 PK10+024 LHS 14.22 20KV POLE Not affected
82 PK100+150 LHS 8.71 20KV POLE Construction area SAG
83 PK100+313 LHS 8.43 20KV POLE Construction area SAG
84 PK100+463 LHS 8.66 20KV POLE Construction area SAG
85 100+622 LHS 8.73 20KV POLE Construction area SAG
86 PK100+783 LHS 8.86 20KV POLE Construction area SAG
87 PK100+918 LHS 8.25 Simple Pole Construction area SAG
88 PK100+950 LHS 7.14 20KV POLE Construction area SAG
89 PK100+950 LHS 7.20 20KV POLE Construction area SAG
90 PK100+950 LHS 7.25 20KV POLE Construction area SAG
91 PK101+050 LHS 13.84 Simple Pole Not affected
92 PK101+097 LHS 8.00 Simple Pole Not affected
ELECTRIC POLES LIST PK 95+000 TO PK 105+000 - LHS
Distance from
S.No Chainage Side Type of Pole Remarks Scope of
proposed centre line
93 PK101+120 LHS 7.38 20KV POLE Construction area AFCONS
94 PK101+120 LHS 15.89 20KV POLE Not affected
95 PK101+120 LHS 22.16 20KV POLE Not affected
96 PK101+279 LHS 7.22 20KV POLE Construction area SAG
97 PK101+370 LHS 7.85 Simple Pole Construction area SAG
98 PK101+420 LHS 7.44 Simple Pole Construction area SAG
99 PK101+460 LHS 7.36 Simple Pole Construction area SAG
100 PK101+516 LHS 7.41 Simple Pole Construction area SAG
101 PK101+563 LHS 7.34 Simple Pole Construction area SAG
102 PK101+609 LHS 7.34 Simple Pole Construction area SAG
103 PK101+639 LHS 7.21 20KV POLE Construction area SAG
104 PK101+639 LHS 14.71 20KV POLE Construction area SAG
105 PK101+639 LHS 22.00 20KV POLE Not affected
106 PK101+679 LHS 6.99 Simple Pole Construction area SAG
107 PK101+728 LHS 7.41 Simple Pole Construction area SAG
108 PK101+769 LHS 5.72 20KV POLE Construction area SAG
109 PK101+769 LHS 6.50 20KV POLE Construction area SAG
110 PK101+769 LHS 7.55 20KV POLE Construction area SAG
111 PK101+810 LHS 7.67 Simple Pole Construction area SAG
112 PK101+850 LHS 8.81 Simple Pole Construction area SAG
113 PK101+890 LHS 13.91 20KV POLE Construction area SAG
114 PK102+110 LHS 7.23 20KV POLE Construction area SAG
115 PK102+224 LHS 7.42 20KV POLE Construction area SAG
116 PK102+376 LHS 7.66 20KV POLE Construction area SAG
117 PK102+376 LHS 7.68 20KV POLE Construction area SAG
118 PK102+550 LHS 8.07 20KV POLE Construction area SAG
119 PK102+700 LHS 8.33 20KV POLE Construction area SAG
120 PK102+870 LHS 8.32 20KV POLE Construction area SAG
121 PK102+992 LHS 6.50 Simple Pole Construction area SAG
122 PK103+032 LHS 7.83 20KV POLE Construction area SAG
123 PK103+087 LHS 7.27 Simple Pole Construction area SAG
124 PK103+140 LHS 7.85 Simple Pole Construction area SAG
125 PK103+192 LHS 7.71 20KV POLE Construction area SAG
126 PK103+192 LHS 15.38 20KV POLE Not affected
127 PK103+192 LHS 22.93 20KV POLE Not affected
128 PK103+239 LHS 7.94 Simple Pole Construction area SAG
129 PK103+284 LHS 7.91 Simple Pole Construction area SAG
130 PK103+329 LHS 7.83 Simple Pole Construction area SAG
131 PK103+374 LHS 7.68 20KV POLE Construction area SAG
132 PK103+424 LHS 7.39 Simple Pole Construction area SAG
133 PK103+474 LHS 7.61 Simple Pole Construction area SAG
134 PK103+526 LHS 7.25 20KV POLE Construction area SAG
135 PK103+578 LHS 7.74 Simple Pole Construction area SAG
136 PK103+628 LHS 7.78 Simple Pole Construction area SAG
137 PK103+681 LHS 7.82 20KV POLE Construction area SAG
138 PK103+727 LHS 8.23 Simple Pole Construction area SAG
ELECTRIC POLES LIST PK 95+000 TO PK 105+000 - LHS
Distance from
S.No Chainage Side Type of Pole Remarks Scope of
proposed centre line
139 PK103+784 LHS 7.88 Simple Pole Construction area SAG
140 PK103+836 LHS 7.32 20KV POLE Construction area SAG
141 PK103+988 LHS 6.05 20KV POLE Construction area SAG
142 PK103+988 LHS 7.10 20KV POLE Construction area SAG
143 PK103+988 LHS 8.20 20KV POLE Construction area SAG
144 PK104+159 LHS 7.38 20KV POLE Construction area SAG
145 PK104+233 LHS 15.13 Simple Pole Not affected
146 PK104+258 LHS 11.74 Simple Pole Not affected
147 PK104+310 LHS 10.25 20KV POLE Not affected
148 PK104+360 LHS 10.69 Simple Pole Not affected
149 PK104+415 LHS 9.17 Simple Pole Construction area SAG
150 PK104+470 LHS 8.03 20KV POLE Construction area SAG
151 PK104+523 LHS 8.17 Simple Pole Construction area SAG
152 PK104+580 LHS 9.94 Simple Pole Construction area SAG
153 PK104+633 LHS 7.77 20KV POLE Construction area SAG
154 PK104+687 LHS 7.82 Simple Pole Construction area SAG
155 PK104+740 LHS 7.84 Simple Pole Construction area SAG
156 PK104+793 LHS 7.83 20KV POLE Construction area SAG
157 PK104+793 LHS 15.38 20KV POLE Not affected
158 PK104+793 LHS 23.00 20KV POLE Not affected
159 PK104+840 LHS 13.26 Simple Pole Not affected
160 PK104+848 LHS 7.88 Simple Pole Construction area SAG
161 PK104+900 LHS 7.98 Simple Pole Construction area SAG
162 PK104+953 LHS 8.04 20KV POLE Construction area SAG
AFCONS SCOPE (nos.) 7
SAG SCOPE (nos.) 120
Not affected(nos.) 35
Total= 162
ELECTRIC POLES LIST PK 95+000 TO PK 105+000 - RHS
Distance from
S.No Chainage Side Type of Pole Remarks Scope of
proposed centre line
1 PK95+500 RHS 26.07 Simple Pole Not affected
2 PK95+555 RHS 23.18 Simple Pole not affected
3 PK95+600 RHS 16.38 Simple Pole not affected
4 PK95+650 RHS 15.66 Simple Pole Not affected
5 PK95+700 RHS 16.28 Simple Pole not affected
6 PK95+750 RHS 27.01 Simple Pole not affected
7 PK95+795 RHS 26.96 Simple Pole not affected
8 PK95+830 RHS 6.07 Simple Pole Construction area AFCONS
9 PK95+840 RHS 26.84 Simple Pole not affected
10 PK95+890 RHS 21.00 Simple Pole not affected
11 PK95+938 RHS 19.82 Simple Pole not affected
12 PK95+972 RHS 18.89 Simple Pole not affected
13 PK97+721 RHS 6.98 Simple Pole Construction area SAG
14 PK97+772 RHS 8.00 Simple Pole Construction area SAG
15 PK97+817 RHS 8.73 Simple Pole Construction area SAG
16 PK97+868 RHS 9.77 Simple Pole Construction area SAG
17 PK97+910 RHS 10.63 Simple Pole Construction area SAG
18 PK98+495 RHS 11.64 Simple Pole not affected
19 PK98+550 RHS 12.16 Simple Pole not affected
20 PK98+600 RHS 11.84 Simple Pole Not affected
21 PK98+650 RHS 12.04 Simple Pole Construction area AFCONS
22 PK98+700 RHS 12.17 Simple Pole Not affected
23 PK98+750 RHS 12.26 Simple Pole Not affected
24 PK98+790 RHS 12.20 Simple Pole Construction area AFCONS
25 PK98+850 RHS 11.10 Simple Pole Not affected
26 PK98+900 RHS 10.21 Simple Pole Not affected
27 PK98+955 RHS 8.69 Simple Pole Construction area SAG
28 PK99+000 RHS 7.52 Simple Pole Construction area
29 PK99+045 RHS 7.34 Simple Pole Construction area
30 PK99+086 RHS 7.46 Simple Pole Construction area
31 PK99+126 RHS 7.63 Simple Pole Construction area
32 PK99+338 RHS 7.70 Simple Pole Construction area
33 PK99+390 RHS 8.60 Simple Pole Construction area
34 PK99+430 RHS 9.21 Simple Pole Construction area
35 PK99+480 RHS 10.23 Simple Pole Not affected
36 PK99+530 RHS 10.23 Simple Pole Not affected
37 PK99+580 RHS 10.54 Simple Pole Not affected
38 PK99+632 RHS 6.50 Simple Pole Construction area AFCONS
39 PK99+680 RHS 7.85 Simple Pole Construction area AFCONS
40 PK99+771 RHS 11.96 Simple Pole Not affected
41 PK99+805 RHS 10.17 Simple Pole Not affected
42 PK99+845 RHS 8.02 Simple Pole Construction area AFCONS
43 PK99+886 RHS 5.97 Simple Pole Construction area AFCONS
44 PK100+865 RHS 10.65 Simple Pole Not affected
45 PK100+920 RHS 8.04 Simple Pole Construction area AFCONS
46 PK100+967 RHS 14.05 Simple Pole Not affected
47 PK101+018 RHS 8.85 Simple Pole Construction area AFCONS
ELECTRIC POLES LIST PK 95+000 TO PK 105+000 - RHS
Distance from
S.No Chainage Side Type of Pole Remarks Scope of
proposed centre line
48 PK101+071 RHS 11.84 Simple Pole Not affected
49 PK101+125 RHS 9.32 Simple Pole Construction area SAG
50 PK101+176 RHS 9.80 Simple Pole Construction area SAG
51 PK101+773 RHS 6.18 Simple Pole Construction area SAG
52 PK101+824 RHS 7.89 Simple Pole Construction area SAG
53 PK101+865 RHS 7.10 Simple Pole Construction area SAG
54 PK101+914 RHS 5.67 Simple Pole Construction area SAG
55 PK101+964 RHS 4.97 Simple Pole Construction area SAG
56 PK102+076 RHS 7.43 Simple Pole Construction area SAG
57 PK102+125 RHS 7.16 Simple Pole Construction area SAG
58 PK102+170 RHS 6.62 Simple Pole Construction area SAG
59 PK101+221 RHS 5.18 Simple Pole Construction area SAG
60 PK102+310 RHS 7.37 Simple Pole Construction area SAG
61 PK102+355 RHS 7.19 Simple Pole Construction area SAG
62 PK102+355 RHS 7.20 Simple Pole Construction area SAG
63 PK102+400 RHS 7.06 Simple Pole Construction area SAG
64 PK102+450 RHS 6.93 Simple Pole Construction area SAG
65 PK102+495 RHS 6.68 Simple Pole Construction area SAG
66 PK102+982 RHS 7.27 Simple Pole Construction area SAG
67 PK103+033 RHS 7.13 Simple Pole Construction area SAG
68 PK103+081 RHS 7.16 Simple Pole Construction area SAG
69 PK103+133 RHS 6.85 Simple Pole Construction area SAG
70 PK103+183 RHS 8.44 Simple Pole Construction area SAG
71 PK103+233 RHS 8.39 Simple Pole Construction area SAG
72 PK103+282 RHS 8.18 Simple Pole Construction area SAG
73 PK103+331 RHS 8.05 Simple Pole Construction area SAG
74 PK103+383 RHS 7.86 Simple Pole Construction area SAG
75 PK103+431 RHS 7.77 Simple Pole Construction area SAG
76 PK103+482 RHS 7.69 Simple Pole Construction area SAG
77 PK103+531 RHS 9.02 Simple Pole Construction area SAG
78 PK103+582 RHS 7.53 Simple Pole Construction area SAG
79 PK103+780 RHS 16.40 Simple Pole Construction area SAG
80 PK103+783 RHS 7.76 Simple Pole Construction area SAG
81 PK103+682 RHS 7.92 Simple Pole Construction area SAG
82 PK103+723 RHS 8.17 Simple Pole Construction area SAG
83 PK103+772 RHS 8.53 Simple Pole Construction area SAG
84 PK103+823 RHS 8.38 Simple Pole Construction area SAG
85 PK103+868 RHS 17.08 Simple Pole not affected
86 PK103+874 RHS 8.19 Simple Pole Construction area AFCONS
87 PK104+190 RHS 13.35 Simple Pole not affected
88 PK104+345 RHS 9.37 Simple Pole Construction area SAG
89 PK104+395 RHS 8.75 Simple Pole Construction area SAG
90 PK104+445 RHS 8.66 Simple Pole Construction area SAG
91 PK104+495 RHS 8.80 Simple Pole Construction area SAG
92 PK104+545 RHS 8.44 Simple Pole Construction area SAG
93 PK104+645 RHS 8.54 Simple Pole Construction area SAG
94 PK104+695 RHS 8.65 Simple Pole Construction area SAG
ELECTRIC POLES LIST PK 95+000 TO PK 105+000 - RHS
Distance from
S.No Chainage Side Type of Pole Remarks Scope of
proposed centre line
95 PK104+745 RHS 8.66 Simple Pole Construction area SAG
96 PK104+790 RHS 8.68 Simple Pole Construction area SAG
97 PK104+838 RHS 8.45 Simple Pole Construction area SAG
98 PK104+895 RHS 8.41 Simple Pole Construction area SAG
99 PK104+945 RHS 8.58 Simple Pole Construction area SAG
100 PK104+995 RHS 8.75 Simple Pole Construction area SAG
AFCONS SCOPE (nos.) 10
SAG SCOPE (nos.) 55
Not affected(nos.) 35
Total= 100
Legend :-
Proposed centerline based Ligne centrale proposée selon la conception
on Afcons design. de l'Afcons.
Toe Edge as per Afcons Design Conception d' Afcons pour Remblai
d'apres les plans d'Afcons
The limits of the rights of way sent by SAG les limites des emprises envoyer par SAG
via email dated 15/06/2021 via mail datè du 15/06/2021
Electric Pole Pôle simple
20 KV Electric Pole 20 KV Electric Pôle
Culvert Caniveau
Drain_Trapezoidal Drainage_Trapézoïdal
Drain_Triangular Drainage_Triangulaire
CLIENT: INDEPENDENT CONTROL OFFICER :- CONTRACTOR :- TITLE:-
EXISTING UTILITIES (POLES) TO BE SHIFTED Drawing No. CAD / DWG / AIL / 5267 / 0104
CONSULTING FROM PK 94+780 TO PK 105+000 Prepared by Reviewed by Approved by Scale Size Rev Sheet
AFCONS INFRASTRUCTURE LIMITED
ENGINEERS GROUP PROJECT:-
An ISO 9001:2008 Company AFCONS HOUSE, 16, SHAH INDUSTRIAL ESTATE, REHABILITATION & UPGRADATION OF 2-LANE
CEG Tower, B-11(G), Malviya Industrial Area, VEERA DESAI ROAD,ANDHERI(W), MUMBAI 400053 (INDIA). 1:2000 A3 R0 1/7
( QAP / IS / 456-2000 / 6.5 ) NATIONAL ROAD RN1 FROM PK24+000 TO PK105+000
Jaipur - 302017, Rajasthan India
Legend :-
Proposed centerline based Ligne centrale proposée selon la conception
on Afcons design. de l'Afcons.
Toe Edge as per Afcons Design Conception d' Afcons pour Remblai
d'apres les plans d'Afcons
The limits of the rights of way sent by SAG les limites des emprises envoyer par SAG
via email dated 15/06/2021 via mail datè du 15/06/2021
Electric Pole Pôle simple
20 KV Electric Pole 20 KV Electric Pôle
Culvert Caniveau
Drain_Trapezoidal Drainage_Trapézoïdal
Drain_Triangular Drainage_Triangulaire
CLIENT: INDEPENDENT CONTROL OFFICER :- CONTRACTOR :- TITLE:-
EXISTING UTILITIES (POLES) TO BE SHIFTED Drawing No. CAD / DWG / AIL / 5267 / 0104
CONSULTING FROM PK 94+780 TO PK 105+000 Prepared by Reviewed by Approved by Scale Size Rev Sheet
AFCONS INFRASTRUCTURE LIMITED
ENGINEERS GROUP PROJECT:-
An ISO 9001:2008 Company AFCONS HOUSE, 16, SHAH INDUSTRIAL ESTATE, REHABILITATION & UPGRADATION OF 2-LANE
CEG Tower, B-11(G), Malviya Industrial Area, VEERA DESAI ROAD,ANDHERI(W), MUMBAI 400053 (INDIA). 1:2000 A3 R0 2/7
( QAP / IS / 456-2000 / 6.5 ) NATIONAL ROAD RN1 FROM PK24+000 TO PK105+000
Jaipur - 302017, Rajasthan India
Legend :-
Proposed centerline based Ligne centrale proposée selon la conception
on Afcons design. de l'Afcons.
Toe Edge as per Afcons Design Conception d' Afcons pour Remblai
d'apres les plans d'Afcons
The limits of the rights of way sent by SAG les limites des emprises envoyer par SAG
via email dated 15/06/2021 via mail datè du 15/06/2021
Electric Pole Pôle simple
20 KV Electric Pole 20 KV Electric Pôle
Culvert Caniveau
Drain_Trapezoidal Drainage_Trapézoïdal
Drain_Triangular Drainage_Triangulaire
CLIENT: INDEPENDENT CONTROL OFFICER :- CONTRACTOR :- TITLE:-
EXISTING UTILITIES (POLES) TO BE SHIFTED Drawing No. CAD / DWG / AIL / 5267 / 0104
CONSULTING FROM PK 94+780 TO PK 105+000 Prepared by Reviewed by Approved by Scale Size Rev Sheet
AFCONS INFRASTRUCTURE LIMITED
ENGINEERS GROUP PROJECT:-
An ISO 9001:2008 Company AFCONS HOUSE, 16, SHAH INDUSTRIAL ESTATE, REHABILITATION & UPGRADATION OF 2-LANE
CEG Tower, B-11(G), Malviya Industrial Area, VEERA DESAI ROAD,ANDHERI(W), MUMBAI 400053 (INDIA). 1:2000 A3 R0 3/7
( QAP / IS / 456-2000 / 6.5 ) NATIONAL ROAD RN1 FROM PK24+000 TO PK105+000
Jaipur - 302017, Rajasthan India
Legend :-
Proposed centerline based Ligne centrale proposée selon la conception
on Afcons design. de l'Afcons.
Toe Edge as per Afcons Design Conception d' Afcons pour Remblai
d'apres les plans d'Afcons
The limits of the rights of way sent by SAG les limites des emprises envoyer par SAG
via email dated 15/06/2021 via mail datè du 15/06/2021
Electric Pole Pôle simple
20 KV Electric Pole 20 KV Electric Pôle
Culvert Caniveau
Drain_Trapezoidal Drainage_Trapézoïdal
Drain_Triangular Drainage_Triangulaire
CLIENT: INDEPENDENT CONTROL OFFICER :- CONTRACTOR :- TITLE:-
EXISTING UTILITIES (POLES) TO BE SHIFTED Drawing No. CAD / DWG / AIL / 5267 / 0104
CONSULTING FROM PK 94+780 TO PK 105+000 Prepared by Reviewed by Approved by Scale Size Rev Sheet
AFCONS INFRASTRUCTURE LIMITED
ENGINEERS GROUP PROJECT:-
An ISO 9001:2008 Company AFCONS HOUSE, 16, SHAH INDUSTRIAL ESTATE, REHABILITATION & UPGRADATION OF 2-LANE
CEG Tower, B-11(G), Malviya Industrial Area, VEERA DESAI ROAD,ANDHERI(W), MUMBAI 400053 (INDIA). 1:2000 A3 R0 4/7
( QAP / IS / 456-2000 / 6.5 ) NATIONAL ROAD RN1 FROM PK24+000 TO PK105+000
Jaipur - 302017, Rajasthan India
M
AT
CH
LI
NE
M
AT
CH
LI
NE
Legend :-
Proposed centerline based Ligne centrale proposée selon la conception
on Afcons design. de l'Afcons.
Toe Edge as per Afcons Design Conception d' Afcons pour Remblai
d'apres les plans d'Afcons
The limits of the rights of way sent by SAG les limites des emprises envoyer par SAG
via email dated 15/06/2021 via mail datè du 15/06/2021
Electric Pole Pôle simple
20 KV Electric Pole 20 KV Electric Pôle
Culvert Caniveau
Drain_Trapezoidal Drainage_Trapézoïdal
Drain_Triangular Drainage_Triangulaire
CLIENT: INDEPENDENT CONTROL OFFICER :- CONTRACTOR :- TITLE:-
EXISTING UTILITIES (POLES) TO BE SHIFTED Drawing No. CAD / DWG / AIL / 5267 / 0104
CONSULTING FROM PK 94+780 TO PK 105+000 Prepared by Reviewed by Approved by Scale Size Rev Sheet
AFCONS INFRASTRUCTURE LIMITED
ENGINEERS GROUP PROJECT:-
An ISO 9001:2008 Company AFCONS HOUSE, 16, SHAH INDUSTRIAL ESTATE, REHABILITATION & UPGRADATION OF 2-LANE
CEG Tower, B-11(G), Malviya Industrial Area, VEERA DESAI ROAD,ANDHERI(W), MUMBAI 400053 (INDIA). 1:2000 A3 R0 5/7
( QAP / IS / 456-2000 / 6.5 ) NATIONAL ROAD RN1 FROM PK24+000 TO PK105+000
Jaipur - 302017, Rajasthan India
Legend :-
Proposed centerline based Ligne centrale proposée selon la conception
on Afcons design. de l'Afcons.
Toe Edge as per Afcons Design Conception d' Afcons pour Remblai
d'apres les plans d'Afcons
The limits of the rights of way sent by SAG les limites des emprises envoyer par SAG
via email dated 15/06/2021 via mail datè du 15/06/2021
Electric Pole Pôle simple
20 KV Electric Pole 20 KV Electric Pôle
Culvert Caniveau
Drain_Trapezoidal Drainage_Trapézoïdal
Drain_Triangular Drainage_Triangulaire
CLIENT: INDEPENDENT CONTROL OFFICER :- CONTRACTOR :- TITLE:-
EXISTING UTILITIES (POLES) TO BE SHIFTED Drawing No. CAD / DWG / AIL / 5267 / 0104
CONSULTING FROM PK 94+780 TO PK 105+000 Prepared by Reviewed by Approved by Scale Size Rev Sheet
AFCONS INFRASTRUCTURE LIMITED
ENGINEERS GROUP PROJECT:-
An ISO 9001:2008 Company AFCONS HOUSE, 16, SHAH INDUSTRIAL ESTATE, REHABILITATION & UPGRADATION OF 2-LANE
CEG Tower, B-11(G), Malviya Industrial Area, VEERA DESAI ROAD,ANDHERI(W), MUMBAI 400053 (INDIA). 1:2000 A3 R0 6/7
( QAP / IS / 456-2000 / 6.5 ) NATIONAL ROAD RN1 FROM PK24+000 TO PK105+000
Jaipur - 302017, Rajasthan India
Legend :-
Proposed centerline based Ligne centrale proposée selon la conception
on Afcons design. de l'Afcons.
Toe Edge as per Afcons Design Conception d' Afcons pour Remblai
d'apres les plans d'Afcons
The limits of the rights of way sent by SAG les limites des emprises envoyer par SAG
via email dated 15/06/2021 via mail datè du 15/06/2021
Electric Pole Pôle simple
20 KV Electric Pole 20 KV Electric Pôle
Culvert Caniveau
Drain_Trapezoidal Drainage_Trapézoïdal
Drain_Triangular Drainage_Triangulaire
CLIENT: INDEPENDENT CONTROL OFFICER :- CONTRACTOR :- TITLE:-
EXISTING UTILITIES (POLES) TO BE SHIFTED Drawing No. CAD / DWG / AIL / 5267 / 0104
CONSULTING FROM PK 94+780 TO PK 105+000 Prepared by Reviewed by Approved by Scale Size Rev Sheet
AFCONS INFRASTRUCTURE LIMITED
ENGINEERS GROUP PROJECT:-
An ISO 9001:2008 Company AFCONS HOUSE, 16, SHAH INDUSTRIAL ESTATE, REHABILITATION & UPGRADATION OF 2-LANE
CEG Tower, B-11(G), Malviya Industrial Area, VEERA DESAI ROAD,ANDHERI(W), MUMBAI 400053 (INDIA). 1:2000 A3 R0 7/7
( QAP / IS / 456-2000 / 6.5 ) NATIONAL ROAD RN1 FROM PK24+000 TO PK105+000
Jaipur - 302017, Rajasthan India

You might also like