PILING CHECKLIST

S.No Description Yes No N/A


.

1. Working drawing checked and approved

2. Latest revision being used

3. Surveying and setting out for location of pile done?

4. Diameter of the pile as per drg.

5. Length of the pile is as per drg.?

6. Founding level of the pile reached as per drg?

7. Verticality of the pile maintained?

8. Bar bending schedules approved?

9. Bar bending and cutting satisfactory?

10. Corrosion treatment of bars, if required, satisfactory?

11. Bar sizes and Spacing correct?

12. Bar lap lengths as per the drawing?

13. Bar assembly rigid and adequately supported (including spacers/chair


supports)?

14. Cover to bottom bars, side bars, top bars correct?

15. Cover blocks approved including fixing?

16. Mix design for Pile approved? (specify Grade, Slump)

17. Theoretical concrete volume? (From founding level to cutoff level)

18 Any Other

19 Any other

Checked by Verified by Approved by

(Name & Signature) (Name & Signature) (Name & Signature)