Professional Documents
Culture Documents
Condensate Manifold / Steam Manifold / Razdelnik Pare 2egt31 Sabirnik Kondenzata 2Lcn31
Condensate Manifold / Steam Manifold / Razdelnik Pare 2egt31 Sabirnik Kondenzata 2Lcn31
Condensate Manifold / Steam Manifold / Razdelnik Pare 2egt31 Sabirnik Kondenzata 2Lcn31
STEAM / PARA
TP 2EGT11-1
2EGT20
PUMPNA STANICA
S DRUGOG STEPENA CEVNI MOST
IAS
STEAM / PARA
CONDENSATE /
KONDENZAT
PUMPNA STANICA
DRUGOG STEPENA CEVNI MOST
NAPOMENA / NOTE:
OD VENTILA 2EGD12 ILI 2EGD20
UVEK MORA BITI OTVOREN
BAREM JEDAN/ VALVES 2EGD12
OR 2EGD20, ALWAYS SHOULD BE
OPEN ONE OF THIS
F07241S-0601-J0301-001 ( 2 / 2 )
LEGENDA ARMATURE / LEGEND:
M TO HEAVY FUEL OIL TANK /
U REZERVOAR LOŽ ULJA
VENTIL / VALVE
- PARA/STEAM
M
SBMS - KONDENZAT/CONDENSATE
BURNERS SYSTEM /
SISTEM GORIONIKA
First and Last Name/Ime i prezime Signature/Potpis Building (structure) , Site location/Objekat , Mesto gradnje :
Resp. Designer/
Odg. projektant 道路与附属部分
B. Krunić, dipl. inž. maš. DBP110 INTERNAL ROADS AND EXTERNAL SPACE DESIGN
Licence number/
Broj licence 330 G313 08 DBP110 SAOBRAĆAJNICE, SPOLJAŠNJE INSTALACIJE I CEVOVODI
Date/ Type of technical documentation/ Scale/ Drawing Name/Naziv crteža :
Datum Vrsta tehničke dokumentacije: Razmera :
Design For Building Permit - DBP - P&I DIAGRAM - STAGE II
08.2021. Projekat Za Građevinsku Dozvolu - PGD
P&I DIJAGRAM - II STEPEN
6/5 - DESIGN OF MECHANICAL INSTALLATIONS
Part of design/ - Heavy oil connecting pipelines
Oznaka i naziv
dela projekta 6/5 - PROJEKAT MAŠINSKIH INSTALACIJA Drawing No. / Sheet/sheets
Crtež broj: List/listova : 1/1
- Međupogonski razvod cevovoda lož ulja