WPCE Enviro™ Wireline Grease Injection Control Head
WPCE Enviro™ Wireline Grease Injection Control Head
WPCE Enviro™ Wireline Grease Injection Control Head
Positioned at the uppermost point of the pressure When entering a well under pressure,
control equipment string, the Elmar Enviro™ Grease viscous grease is injected into the flotubes
Injection Control Head comprises two major sub- at a pressure greater than the existing well
assemblies, the Enviro™ Combination Stuffing Box pressure.The grease fills the annular space
Upper Bush (1) and Line Wiper and the Flotube Assembly. between the inner wall of the flotube and the
outside surface of the wireline, forming a liquid
The hydraulic stuffing box is designed to pack-off on seal that contains the well fluids while allowing
Upper Gland (1) a stationary wireline by means of a pack-off rubber, wireline movement.
the hydraulic line wiper will wipe excess grease from
Line Rubber (1)
a moving wireline. The Elmar Enviro™ Grease Injection Control Head
Spacer (1)
is supplied with a pin threaded connection on bottom
Packing (1) Two types of flotube assemblies are available, the and a wire tulip guide on top.
“solid” type and the “concentric” type, as described
Lower Gland (1) in this data sheet. The concentric flotube assembly When changing line size, a different line size kit is
To prepare for operations, the wireline is threaded Recommended flotube clearance + 0.003” to 0.008”.
through the components of the Elmar Enviro™
Grease Injection Control Head before the rope The bottom connection can be mated to a quick-
Flotube socket and wireline head are made-up. union, or a ball check valve/tool catcher combination.
PART NUMBERS
199
Part Number No. of Flotubes Working Srv. Bottom Connection Top Connection Seal Kit
Pressure
L-971443 3 10,000 psi H 2S 2”-10TPI Acme Pin Wire Tulip Guide L-971443K
L-971444 4 10,000 psi H 2S 2”-10TPI Acme Pin Wire Tulip Guide L-971444K
L-971445 5 10,000 psi H 2S 2”-10TPI Acme Pin Wire Tulip Guide L-971445K
Injection Check Valve
L-971446 6 10,000 psi H 2S 2”-10TPI Acme Pin Wire Tulip Guide L-971446K
L-971218 1 10,000 psi H 2S 2”-10TPI Acme Pin 2”-10TPI Acme Box L-971218K
ORDERING INFORMATION
Part number of Grease Injection Control Head (from table above)
If dual injection is required, order separately (qty 1) L-971218 in addition to the standard grease head with 1 x manifold
Additional Flotube
and Injection Coupling
Assembly L-971218
TEST FIXTURE
Part Number Description
Note: For go-nogo inspection gauge part number, add “IG” to the flotube part number. For example L-981444D179IG would be the go-nogo gauge for
Note: Parts included in Line Size Kit (1). Seal Kit (O-Ring and BURs)
flotube L-981444D179. See reverse for options.
does not include Line Size Kit Parts.
ORDERING TABLE