Professional Documents
Culture Documents
Timesheet - Raja Arif Ramoza 211016 - 07112016
Timesheet - Raja Arif Ramoza 211016 - 07112016
Done
Done
Done
Done
Done (RF module not detected)
Done
Swap Antenna Done, Insert FBBA not done(Fbba not available in office)
Standby
Integrasi Pending (X-connect Done)
Not Done Acces Limit, Problem in TRS
Done
Done
Done
Standby
Standby
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Idul Adha
N/A
N/A
Integrasi pending (FSMF Faulty) Test ping OK
Done
Done
Standby
Done
Done
Engineer Timesheet Report
Engineer Name : Raja Arif Ramoza
Project : Balinusra
Month : September - October