Engineer Timesheet Report

Engineer Name : Raja Arif Ramoza


Project : Balinusra
Month : 3 Agustus 2016 - 20 Agustus 2016

Date SITE ID Site Name Implementation Site Type

3-Aug-16 N/A Go to Lombok N/A


4-Aug-16 MTR205 Ampenan Mataram TBG Outdoor
5-Aug-16 MTR023 Pejanggik Kota Mataram TBG Outdoor
6-Aug-16 MTR079 Kaharudin Mataram 2 DMT Outdoor
7-Aug-16 Standby Standby Standby
8-Aug-16 GMG273 Dasantapen Praya PST Outdoor
9-Aug-16 GMG273 Dasantapen Praya PST Outdoor
10-Aug-16 SEL158,SEL160,SEL051 Pejanggik KLT,Raya Masbagik,Jurit Outdoor
11-Aug-16 MTR176 Karang Songkang Outdoor
12-Aug-16 MTR176 Karang Songkang Outdoor
13-Aug-16 GMG192 Kekait Outdoor
14-Aug-16 Standby Standby Standby
15-Aug-16 SEL162 raya masbagik 2 pst Outdoor
16-Aug-16 GMG016 Suranadi Outdoor
17-Aug-16 MTR143 Jaya Lengkara Outdoor
18-Aug-16 GMG238 Lombok City Center Outdoor
19-Aug-16 GMG238 Lombok City Center Outdoor
20-Aug-16 MTR405 Pawang Kunyit Outdoor
21-Aug-16 Standby Standby Standby
22-Aug-16
23-Aug-16
24-Aug-16
25-Aug-16
26-Aug-16
27-Aug-16
28-Aug-16
29-Aug-16
30-Aug-16
31-Aug-16
1-Sep-16
2-Sep-16
3-Sep-16
4-Sep-16
5-Sep-16
6-Sep-16
7-Sep-16
8-Sep-16
2-Sep-15
Tower Type BTS Type TRM Type Progress

N/A N/A N/A N/A


SST FMR GPON Integrasi NEW DCS & 3G Multisector
RT Pole FMR GPON Integrasi NEW DCS
SST FMR NEC Integrasi NEW DCS
Standby Standby Standby Standby
Triangle FMR NEC Integrasi NEW DCS
Triangle FMR NEC Integrasi NEW DCS
Triangle & SST FMR NEC Tshoot BTS Down & Fan failure
Triangle FMR NEC Instalasi & Precomm New DCS
Triangle FMR NEC SWAP Antenna & Precomm New DCS
Triangle FMR NEC SWAP Antenna & Integrasi New DCS
Standby Standby Standby Standby
Triangle FMR NEC Integrasi NEW DCS
SST FMR NEC Instalasi & Precomm New DCS
RT Pole FMR NEC Integrasi New 3G & 3rd carrier
RT Pole FMR GPON Integrasi New 3G & 3rd carrier
RT Pole FMR GPON Integrasi New 3G & 3rd carrier + add sector 3
SST FMR NEC Support X connect
Standby Standby Standby Standby
Nic Coordinator Detail of Work

N/A N/A N/A


Heri Rony Integrasi NEW DCS & 3G Multisector
Hady Rony Integrasi NEW DCS
Tony Rony Integrasi NEW DCS
Rony Standby
Eko Rony Integrasi NEW DCS
Hady Rony Integrasi NEW DCS
N/A Rony Troubleshoot BTS Down & Fan Failure
N/A Rony Instalasi & Precomm New DCS
N/A Rony SWAP Antenna & Precomm New DCS
Eko Januar Rony SWAP Antenna & Precomm New DCS
N/A Rony Standby
Ahmad Rony Integrasi NEW DCS
N/A Rony Instalasi & Precomm New DCS
Eko Riantono Rony Integrasi New 3G & 3rd carrier
Oman Rony Integrasi New 3G & 3rd carrier
Hady & Zuhdi Rony Integrasi New 3G & 3rd carrier + add sector 3
N/A Rony Support X connect
Rony Standby
Remark

Transit Bali, sampai di lombok jam 6 pagi.


Done
Done
Integrasi Done (Alarm: RF Module Faulty)
Standby
Integrasi Done (belum bisa text call) lanjut besok karena access limit.
Test Call Done
Done
Instalasi not done (Hujan & Access Limit)
Done
BTS OA not yet test call and test enva
Standby
Done
Done
Done
BTS OA, Not yet test call waiting create Lac Ci
Done
Baru 1 Hop di Bsc Panjitilar, tidak bisa dilanjutkan karena tidak ada permit
Standby
Engineer Timesheet Report
Engineer Name : Raja Arif Ramoza
Project : Balinusra
Month : September

Date SITE ID Site Name Implementation Site Type

21-Aug-16 MTR148 Pantai Sira MW Outdoor


22-Aug-16 SEL166 Kampung Banjar Kayangan TBG Outdoor
23-Aug-16 PYA143 STO Praya Outdoor
24-Aug-16 GMG192 Kekait DMT Outdoor
25-Aug-16 MTR280 Pemenang Barat Lombok Utara Outdoor
26-Aug-16 MTR145 Medana Tanjung LSP Outdoor
27-Aug-16 GMG219,GMG214 Sandik Gunung Sari PST,Jagaraga Outdoor
28-Aug-16 Standby Standby Standby
29-Aug-16 MTR280 Pemenang Barat Lombok Utara Outdoor
30-Aug-16 MTR280 Pemenang Barat Lombok Utara Outdoor
31-Aug-16 MTR280 Pemenang Barat Lombok Utara Outdoor
1-Sep-16 Standby Standby Tshoot Standby
2-Sep-16 MTR150 PERUMAHAN REMBIGA Outdoor
3-Sep-16 Standby pulang Standby pulang ijin urus skripsi Standby
4-Sep-16 Standby Standby Standby
5-Sep-16 ijin Ijin urus skripsi N/A
6-Sep-16 ijin Ijin urus skripsi N/A
7-Sep-16 ijin Ijin urus skripsi N/A
8-Sep-16 ijin Ijin urus skripsi N/A
9-Sep-16 ijin Ijin urus skripsi N/A
10-Sep-16 ijin Ijin urus skripsi N/A
11-Sep-16 ijin Ijin urus skripsi N/A
12-Sep-16 Idul Adha Idul Adha Idul Adha
13-Sep-16 ijin Ijin urus skripsi N/A
14-Sep-16 ijin Ijin urus skripsi N/A
15-Sep-16 SEL071 SELONG TELKOM Indoor
16-Sep-16 SEL097 Suwangi Outdoor
17-Sep-16 SEL229 Korleko Outdoor
18-Sep-16 Standby Standby Standby
19-Sep-16 SEL229 Korleko Outdoor
20-Sep-16 MTR224 Loang Baluk Outdoor
Tower Type BTS Type TRM Type Progress

SST FMR NEC Audit Antenna from 30M to 50M


Triangle FMR NEC Integrasi 2G Collocated
SST FMR NEC Test Call and Enva
Triangle FMR NEC Test Call and Enva
SST FMR NEC Integrasi 3G,Instalasi+precomm new dcs
SST FMR NEC Integrasi 2G Collocated
Triangle FMR NEC Swap Antenna, Insert FBBA
Standby Standby Standby Standby
SST FMR NEC Integrasi 2G Collocated & X-Connect
SST FMR NEC Integrasi 2G Collocated
SST FMR NEC Integrasi 2G Collocated
Standby Standby Standby Standby Tshoot
Pole FMR NEC CO NEC TO GPON
Standby Standby Standby Standby
Standby Standby Standby Standby
N/A N/A N/A Ijin urus skripsi
N/A N/A N/A Ijin urus skripsi
N/A N/A N/A Ijin urus skripsi
N/A N/A N/A Ijin urus skripsi
N/A N/A N/A Ijin urus skripsi
N/A N/A N/A Ijin urus skripsi
N/A N/A N/A Ijin urus skripsi
Idul Adha Idul Adha Idul Adha Idul Adha
N/A N/A N/A Ijin urus skripsi
N/A N/A N/A Ijin urus skripsi
SST FMR NEC INTEGRASI 3G MULTISECTOR
SST FMR NEC Integrasi 2G Upgrade
SST FMR NEC Integrasi 2G Upgrade
Standby Standby Standby Standby
SST FMR NEC Geotag & Tshoot Fan Failure
SST FMR NEC Finishing Instalasi 2G GSM
Nic Coordinator Detail of Work

N/A Rony Audit Antenna from 30M to 50M


Mirna & Muis Rony Integrasi 2G Collocated
Eko Januar Rony Test Call and Enva
Mirna Rony Test Call and Enva
Mirna Rony Integrasi 3G,Instalasi+precomm new dcs
Adi Utomo Rony Integrasi 2G Collocated
N/A Rony Swap Antenna, Insert FBBA
N/A Rony Standby
Endang Rony Integrasi 2G Collocated & X-Connect
Endang Rony Integrasi 2G Collocated
Endang Rony Integrasi 2G Collocated
N/A Rony Standby Tshoot
N/A Rony CO NEC TO GPON
Standby Rony Standby
N/A Rony Standby
N/A Rony Ijin urus skripsi
N/A Rony Ijin urus skripsi
N/A Rony Ijin urus skripsi
N/A Rony Ijin urus skripsi
N/A Rony Ijin urus skripsi
N/A Rony Ijin urus skripsi
N/A Rony Ijin urus skripsi
Idul Adha Rony Idul Adha
N/A Rony Ijin urus skripsi
N/A Rony Ijin urus skripsi
N/A Rony INTEGRASI 3G MULTISECTOR
Heri Rony Integrasi 2G Upgrade
Gerry Rony Integrasi 2G Upgrade
N/A Rony Standby
Gerry Rony Geotag & Tshoot Fan Failure
N/A Rony Finishing Instalasi 2G GSM
Remark

Done
Done
Done
Done
Done (RF module not detected)
Done
Swap Antenna Done, Insert FBBA not done(Fbba not available in office)
Standby
Integrasi Pending (X-connect Done)
Not Done Acces Limit, Problem in TRS
Done
Done
Done
Standby
Standby
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Idul Adha
N/A
N/A
Integrasi pending (FSMF Faulty) Test ping OK
Done
Done
Standby
Done
Done
Engineer Timesheet Report
Engineer Name : Raja Arif Ramoza
Project : Balinusra
Month : September - October

Date SITE ID Site Name Implementation Site Type

21-Sep-16 MTR299 Pejanggik Raya Rooftop


22-Sep-16 PYA131 Montong Gamang Outdoor
23-Sep-16 GMG242 Pelabuhan Lembar Outdoor
24-Sep-16 MTR300 Sapta Marga Mataram Rooftop
25-Sep-16 Standby Standby Standby
26-Sep-16 GMG237 Pagutan Lingkar selatan Outdoor
27-Sep-16 SEL215 Selongctr Outdoor
28-Sep-16 SEL215 Selongctr Outdoor
29-Sep-16 SEL160 Jalan Raya Masbagik Outdoor
30-Sep-16 MTR Mos 2 Site N/A
1-Oct-16 SEL174 Split Cell Tete Batu Outdoor
2-Oct-16 Standby Standby Standby
3-Oct-16 SEL174 Split Cell Tete Batu Outdoor
4-Oct-16 SEL Selong Kota,Poh Gading Outdoor
5-Oct-16 GMG262 TGH Mansyur Mataram Outdoor
6-Oct-16 GMG262 TGH Mansyur Mataram Outdoor
7-Oct-16 PYA075 BDBIL Makro Outdoor
8-Oct-16 SEL114 Sukaraja Outdoor
9-Oct-16 Standby Standby Standby
10-Oct-16 MTR078,MTR205,MTR412 Rembiga2,Ampenan2,Unram2 Outdoor
11-Oct-16 MTR256 Mataram Square DMT Outdoor
12-Oct-16 GMG004 Dasan Cermen Outdoor
13-Oct-16 GMG004 Dasan Cermen Outdoor
14-Oct-16 Standby Standby Troubleshoot Standby
15-Oct-16 MTR097 Karangsongkang Outdoor
16-Oct-16 Standby Standby Standby
17-Oct-16 MTR175 Pamenang Sepi Outdoor
18-Oct-16 MTR175 Pamenang Sepi Outdoor
19-Oct-16 MTR175 Pamenang Sepi Outdoor
20-Oct-16 SEL131 Anjani STMIK Outdoor
Tower Type BTS Type TRM Type Progress

RT Pole FMR NEC Instalasi New 3G


SST FMR NEC Instalasi 2G Upgrade
Monopole FMR GPON Tshoot Uptilt Mechanical
RT Pole FMR NEC Instalasi New 3G
Standby Standby Standby Standby
SST FMR GPON Tshoot Alarm BTS 3G
SST FMR GPON Geotag 2G Upgrade
SST FMR GPON Geotag 2G Upgrade
SST FMR NEC Tshoot BTS Down
N/A N/A N/A Mos 2 Site
SST FMR NY Mos New 2G and Instalasi
Standby Standby Standby Standby
SST FMR NY Finishing Instalasi
Tshoot X-Feeder (selong Kota) and main fail
SST FMR NEC (Pohgadin)
SST FMR GPON Pra SQI
SST FMR GPON SQI
SST FMR NEC Dismantle Bts Flexi Edge (dcs)
SST FMR NEC Tshoot channel Failure rate
Standby Standby Standby Standby
RT Pole & SST FMR GPON Audit Antenna Multisector
SST FMR GPON Audit Antenna Multisector
SST FMR GPON Tshoot Alarm DAC
SST FMR GPON Tshoot Alarm DAC
Standby Standby Standby Standby Troubleshoot
SST FMR GPON Test Ping 2G Collocated
Standby Standby Standby Standby
SST FMR NEC Pickup Antenna with mover
SST FMR NEC Reschedule Pickup Antenna with mover
SST FMR NEC Pickup Antenna with mover yuni
SST FMR NEC MOS,Instalasi, Integrasi & Geotag 2G Upgrade
Nic Coordinator Detail of Work

N/A Rony Instalasi New 3G


N/A Rony Instalasi 2G Upgrade
N/A Rony Tshoot Uptilt Mechanical
N/A Rony Instalasi New 3G
N/A Rony Standby
N/A Rony Tshoot Alarm BTS 3G
N/A Rony Geotag 2G Upgrade
N/A Rony Geotag 2G Upgrade
N/A Rony Tshoot BTS Down
N/A Rony Mos 2 Site
N/A Rony Mos New 2G and Instalasi
N/A Rony Standby
N/A Rony Finishing Instalasi
N/A Rony Tshoot X-Feeder (selong Kota) and main fail (Pohgadin)
N/A Rony Pra SQI
N/A Rony SQI
N/A Rony Dismantle Bts Flexi Edge (dcs)
N/A Rony Tshoot channel Failure rate
N/A Rony Standby
N/A Rony Audit Antenna Multisector
N/A Rony Audit Antenna Multisector
N/A Rony Tshoot Alarm DAC
N/A Rony Tshoot Alarm DAC
N/A Rony Standby Troubleshoot
N/A Rony Test Ping 2G Collocated
N/A Rony Standby
N/A Rony Pickup Antenna with mover
N/A Rony Reschedule Pickup Antenna with mover
N/A Rony Pickup Antenna with mover yuni, Tshoot masbagik3gam
N/A Rony MOS,Instalasi, Integrasi & Geotag 2G Upgrade
Remark

Not Done(site/ruko tutup)


Not done (tidak ada permit TP kin)
Done
Site masih Commcase
Standby
Done
Not Done (Hp Geotag Bermasalah)
Done
Done
Not Done ( mover tidak ada kendaraan untuk mos)
Mos Done,Instalasi 50%
Standby
Done
Tshoot X-feeder Done & Site Pohgading Commcase
Done
Done
Done
Done
Standby
Done
Done
Done
Done
Done
Done
Standby
Not Done (waiting info mover)
Not Done (waiting info mover)
Not Done (waiting info mover), Tshoot masbagik3gam Done
Instalasi Done, Integrasi not done (masalah License PE GSM)
Engineer Timesheet Report
Engineer Name : Raja Arif Ramoza
Project : Balinusra
Month : September - October

Date SITE ID Site Name Implementation Site Type

21-Oct-16 SEL131 Anjani Stimik Outdoor


22-Oct-16 SEL131 Anjani Stimik Outdoor
23-Oct-16 Standby Standby Standby
24-Oct-16 SEL131 Anjani Stimik Outdoor
25-Oct-16 GMG008 Kuripan Outdoor
26-Oct-16 PYA059 Beraim Outdoor
27-Oct-16 MTR261 Unram DMT, Monjok Outdoor
28-Oct-16 MTR261 Unram DMT Outdoor
29-Oct-16 PYA009 GantiMD Outdoor
30-Oct-16 Standby Standby Standby
31-Oct-16 PYA059 BeraimMG2 Outdoor
1-Nov-16 SEL071 Telkom Selong Indoor
2-Nov-16 PYA004 Penujak Lombok Tengah Indoor
3-Nov-16 PYA004 Penujak Lombok Tengah Indoor
4-Nov-16 PYA004 Penujak Lombok Tengah Indoor
5-Nov-16 Standby Go to Bali,GMG155 Standby Go to bali,Sandik Outdoor
6-Nov-16 Go to Bali Go to Bali N/A
7-Nov-16 Go to Bandung Go to Bandung N/A
Tower Type BTS Type TRM Type Progress Nic Coordinator

SST FMR NEC Instalasi & Integrasi 2G Upgrade Eko Rony


SST FMR NEC Instalasi & Integrasi 2G Upgrade N/A Rony
Standby Standby Standby Standby N/A Rony
SST FMR NEC Integrasi 2G Upgrade Ivan Rony
SST FMR NEC Integrasi 2G Upgrade Hady Rony
Instalasi 3G
Triangle FMR NEC N/A Rony
Collocated+Precomm
RT Pole FMR NEC Finishing instalasi N/A Rony
RT Pole FMR NEC Geotag N/A Rony
SST FMR NEC Tshoot active DPP N/A Rony
Standby Standby Standby Standby N/A Rony
SST FMR NEC Precomm + Test ping N/A Rony
SST FMR GPON Audit Antenna Multisector N/A Rony
SST FMR GPON MOS 4G LTE N/A Rony
SST FMR GPON Instalasi 4G LTE N/A Rony
SST FMR GPON Finishing instalasi 4G LTE N/A Rony
SST FMR NEC Instalasi Multisector N/A Rony
N/A N/A N/A Go to Bali N/A N/A
N/A N/A N/A Go to Bandung N/A N/A
Detail of Work Remark

Instalasi & Integrasi 2G Upgrade Instalasi Done,Integrasi Notdone


Instalasi & Integrasi 2G Upgrade Waiting License PE GSM
Standby Standby
Integrasi 2G Upgrade Done
Integrasi 2G Upgrade Done
Instalasi 3G Collocated+Precomm Instalasi 50% (hujan)
Finishing instalasi, Troubleshoot site Monjok Done
Geotag Not Done, Waiting material kurang
Tshoot active DPP Done
Standby Standby
Precomm + Test ping Done
Audit Antenna Multisector Done
MOS 4G LTE Done
Instalasi 4G LTE Instalasi SM Done
Finishing instalasi 4G LTE Not Done, Waiting RNP
Instalasi Multisector Waiting lacking material
Go to Bali Done
Go to Bandung Done