Sr.

no Description no L B D Qty Unit

1 Excavation for footing


C1 1 2.5 2.5 3.1 19.375 Cum
C2 1 2.5 2.5 3.1 19.375
C3 1 2.5 2.5 2.7 16.875
C4 1 2.5 2.5 2.5 15.625
C5 1 2.5 2.5 2.45 15.3125
C6 1 2.5 2.5 2.9 18.125
C7 1 2.5 2.5 2.6 16.25
C8 1 2.5 2.5 3.1 19.375
C9 1 2.5 2.5 2.7 16.875
C10 1 2.5 2.5 1.95 12.1875
C11 1 2.5 2.5 1.9 11.875
C12 1 2.5 2.5 2.9 18.125
C13 1 2.5 2.5 2.4 15
C14 1 2.5 2.5 2.8 17.5
C15 1 2.5 2.5 1.7 10.625
C16 1 2.5 2.5 1.9 11.875
C17 1 2.5 2.5 2.1 13.125
C18 1 2.5 2.5 2.9 18.125
C19 1 2.5 2.5 2.4 15
C20 1 2.5 2.5 2.5 15.625
C21 1 2.5 2.5 2.7 16.875
C22 1 2.5 2.5 2.5 15.625
C23 1 2.5 2.5 3.1 19.375
C24 1 2.5 2.5 2.5 15.625
C25 1 2.5 2.5 2.5 15.625
C26 1 2.5 2.5 1.9 11.875
C27 1 2.5 2.5 2.1 13.125
C28 1 2.5 2.5 2.8 17.5
C29 1 2.5 2.5 1.6 10
C30 1 2.5 2.5 2.15 13.4375
C31 1 2.5 2.5 2.7 16.875
C32 1 2.5 2.5 2.4 15
C33 1 2.5 2.5 2.3 14.375
C34 1 2.5 2.5 2.4 15
C35 1 2.5 2.5 2.3 14.375
C36 1 2.5 2.5 2.4 15
C37 1 2.5 2.5 2 12.5
C38 1 2.5 2.5 2 12.5
C39 1 2.5 2.5 2.2 13.75
C40 1 2.5 2.5 2.1 13.125
C41 1 2.5 2.5 1.8 11.25
C42 1 2.5 2.5 2.2 13.75

2 pcc M 15 FOOTING Cum


c1,c8,c12,c18,c23,c28,c35 7 1.8 2 0.1 2.52
c2,c4,c6,c16,c31,c33,c36,c38,c40,c41,c42 11 1.8 1.8 0.1 3.564
c3,c5,c7,c9,c10,c11,c13,c14,c15,c19,c20,c21,c24,c25,c
26,c29,c30,c32,37,c39 20 2 1.8 0.1 7.2
C17,C22,C27,C34 4 2 1.8 0.1 1.44

3 Plinth beam pcc Cum


3 40.92 0.53 0.1 6.50628
1 33.98 0.53 0.1 1.80094
2 45.25 0.53 0.1 4.7965
4 Column- conc- M25 0.55 0 Cum
c1, 1 0.4 0.5 3.15 0.63
c8 1 0.4 0.5 3.15 0.63
c12 1 0.4 0.5 2.95 0.59
c18 1 0.4 0.5 2.95 0.59
c23 1 0.4 0.5 3.15 0.63
c28 1 0.4 0.5 2.85 0.57
c35 1 0.4 0.5 2.35 0.47
0.45 0
c2, 1 0.4 0.4 3.25 0.52
c4 1 0.4 0.4 2.65 0.424
c6 1 0.4 0.4 3.05 0.488
c16 1 0.4 0.4 2.05 0.328
c31 1 0.4 0.4 2.85 0.456
c33 1 0.4 0.4 2.45 0.392
c36 1 0.4 0.4 2.55 0.408
c38 1 0.4 0.4 2.15 0.344
c40 1 0.4 0.4 2.25 0.36
c41 1 0.4 0.4 1.95 0.312
c42 1 0.4 0.4 2.35 0.376
0.55 0
c3 1 0.4 0.5 2.75 0.55
c5 1 0.4 0.5 2.5 0.5
c7 1 0.4 0.5 2.65 0.53
c9 1 0.4 0.5 2.75 0.55
c10 1 0.4 0.5 2 0.4
c11 1 0.4 0.5 1.95 0.39
c13 1 0.4 0.5 2.45 0.49
c14 1 0.4 0.5 2.85 0.57
c15 1 0.4 0.5 1.75 0.35
c19 1 0.4 0.5 2.45 0.49
c20 1 0.4 0.5 2.55 0.51
c21 1 0.4 0.5 2.75 0.55
c24 1 0.4 0.5 2.55 0.51
c25 1 0.4 0.5 2.55 0.51
c26 1 0.4 0.5 1.95 0.39
c29 1 0.4 0.5 1.65 0.33
c30 1 0.4 0.5 2.2 0.44
c32 1 0.4 0.5 2.45 0.49
c37 1 0.4 0.5 2.05 0.41
c39 1 0.4 0.5 2.25 0.45
0.55 0
c17 1 0.4 0.5 2.15 0.43
c22 1 0.4 0.5 2.55 0.51
c27 1 0.4 0.5 2.15 0.43
c34 1 0.4 0.5 2.45 0.49

5 Plum walls
a Excavation
wall 1 1 8.07 0.9 0.75 5.44725 Cum
wall 2 1 15.54 0.9 0.75 10.4895
wall 3 1 1.45 0.9 0.75 0.97875
wall 4 1 14 0.9 0.75 9.45
wall 5 1 1.73 0.9 0.75 1.16775
wall 6 1 38 0.9 0.75 25.65
b Concreting
wall 1 1 8.07 0.75 2.14 12.95235 Cum
wall 2 1 15.54 0.75 2.4 27.972
wall 3 1 1.45 0.75 2.4 2.61
wall 4 1 14 0.75 2.5 26.25
wall 5 1 1.73 0.75 2.5 3.24375
wall 6 1 38 0.75 2.2 62.7
Sr No Description No L B D Qty Total Qty

1 Excavation- Footings 3 2.1 2.1 1.5 19.845 30.105


For Plinth beams 2 6.95 0.5 0.8 5.56
1 11.75 0.5 0.8 4.7

2 PCC- footings 3 1.8 1.8 0.1 0.972 0.972


For Plinth beams 2 6.95 0.43 0.1 0.5977 1.10295
1 11.75 0.43 0.1 0.50525

3 Concrete M 25
Footings 3 1.5 1.5 0.35 2.3625 4.2807
For Plinth beams 2 6.95 0.23 0.6 1.9182
1 11.75 0.23 0.6 1.6215 1.6215

4 Columns 3 0.4 0.4 1 0.48 0.48


Sr No Description No L B D Qty

1 Excavation- Footings 2 2.1 2.1 1.7 14.994


4 2.1 2.3 1.7 32.844
For Plinth beams 2 9.5 0.5 0.8 7.6
1 19.155 0.5 0.8 7.662

2 PCC- footings 2 1.8 1.8 0.1 0.648


4 1.8 2 0.1 1.44
For Plinth beams 2 9.5 0.5 0.1 0.95
1 19.155 0.5 0.1 0.95775

3 Concrete M 25
Footings 2 1.5 1.5 0.35 1.575
4 1.5 1.7 0.45 4.59
For Plinth beams 2 9.5 0.23 0.6 2.622
1 19.155 0.23 0.6 2.64339

4 Columns 6 0.4 0.4 1.2 1.152