Professional Documents
Culture Documents
Piping and Instrumentation Diagram: Fixed Firewater System - Deluge Distribution Upper Deck / Main Deck System 53
Piping and Instrumentation Diagram: Fixed Firewater System - Deluge Distribution Upper Deck / Main Deck System 53
Piping and Instrumentation Diagram: Fixed Firewater System - Deluge Distribution Upper Deck / Main Deck System 53
NOTES
P-EDMS DOCUMENT NO. : KS-CPP-EXE-MMHE-503-PRO-PID-1905
CONTRACTOR DOCUMENT NO. : 077711-1000-DW-1931-0003
B
A 1. REFER DELUGE NOZZLE ARRANGEMENT KS-GEN-EXE-MMHE-503-HSE-RPT-0008 FOR BASIS OF NOZZLE QUANTITY A
B AND ARRANGEMENT.
2. PIPING TO CONFIRM ACTUAL DELUGE ROUTING.
3. TAPPING TO EACH EQUIPMENT TO BE TAKEN FROM TOP OF PIPE, 12 O'CLOCK POSITION.
CONDENSATE MERCURY AND CONDENSATE MERCURY AND 4. PIPING ROUTING/ISOMETRIC TO ENSURE SYMMETRY OF PIPING TO AVOID UNEQUAL DISTRIBUTION.
H2S ADSORBENT VESSEL H2S ADSORBENT VESSEL 5. BLIND FLANGE FOR FUTURE EQUIPMENT.
V-3601 B V-3601 A
NOZZLE TYPE
B B
MEDIUM VELOCITY, K = 32
40 40
FUTURE NOZZLES
40 40
C 40 40 C
100-FW53212-1P701-N
100-FW53211-1P701-N
40 40
TOP DECK
FROM DELUGE VALVE
(FIRE ZONE 2,3)
150-FW53201-1P701-N
110469 KSCPP-B-1904
D NO POCKET D
40
40-FW53214-1P701-N
50
40
50-FW53218-1P701-N
80-FW53216-1P701-N
40-FW53213-1P701-N
40-FW53215-1P701-N
40
LOW TEMPERATURE
CONDENSATE MERCURY AND SEPARATOR
H2S ADSORBENT DUST FILTER V-2213
S-3601 A CONDENSATE RECYCLE
COOLER
80-FW53217-1P701-N E-3001
UPPER DECK
F F
50-FW53224-1P701-N
G G
40 40
HP COMPRESSOR LP COMPRESSOR
SUCTION SCRUBBER SUCTION SCRUBBER
V1-2411 (FUTURE) V1-2401
40 40
80 80
40 40
40 40
H 50-FW53225-1P701-N H
HP COMPRESSOR 40 40
LP COMPRESSOR
SUCTION SCRUBBER SUCTION SCRUBBER
V2-2411 CAD PRODUCED DRAWING - NO MANUAL REVISION ALLOWED
(FUTURE) V2-2401
40 40
100-FW53223-1P701-N
40 40
40 40
JagjitKaur
HarnekSingh
Hansraj Rahul Chanda Kumar
Singh WanNorAzianFaizan WanNik 2020.06.12
2020.06.12 16:54:30 +08'00'
2020.06.12 17:39:05 +08'00'
18:46:16 +08'00'
I I
B ISSUED FOR APPROVAL 12.06.20 HR/NAR WNAF JK
MAIN DECK
50-FW53226-1P701-N A ISSUED FOR REVIEW 08.11.19 BER/NAR WNAF JK
40 40 DRAWN CHECKED APPROVED APPROVED
HP COMPRESSOR LP COMPRESSOR
SUCTION SCRUBBER SUCTION SCRUBBER REV DESCRIPTION DATE
NOTE 5 CONTRACTOR PCSB
V3-2411 (FUTURE) V3-2401
40 40
CONTRACT NO. CHO/2018/DKS/1001 CHECKED WNAF
100-FW53227-1P701-N
K
PIPING AND INSTRUMENTATION DIAGRAM K
SYSTEM 53
FIXED FIREWATER SYSTEM - DELUGE DISTRIBUTION
UPPER DECK / MAIN DECK
CONTRACTOR: CONSULTANT: CAD FILE NAME :
05-KSCPP-B-1905-1of1-B.pid
AREA: LOCATION:
L L
05 KSCPP
DISCIPLINE DRAWING NO. SHEET NO. REVISION NO
THE ORIGINAL AND ALL COPIES OF THE DRAWING TOGETHER WITH
THE COPYRIGHT THEREOF ARE THE SOLE PROPERTY OF PCSB
B 1905 1 OF 1 B
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16