Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

NOTES
P-EDMS DOCUMENT NO. : KS-CPP-EXE-MMHE-503-PRO-PID-1905
CONTRACTOR DOCUMENT NO. : 077711-1000-DW-1931-0003
B
A 1. REFER DELUGE NOZZLE ARRANGEMENT KS-GEN-EXE-MMHE-503-HSE-RPT-0008 FOR BASIS OF NOZZLE QUANTITY
A
AND ARRANGEMENT.
B
2. PIPING TO CONFIRM ACTUAL DELUGE ROUTING.

3. TAPPING TO EACH EQUIPMENT TO BE TAKEN FROM TOP OF PIPE, 12 O'CLOCK POSITION.

4. PIPING ROUTING/ISOMETRIC TO ENSURE SYMMETRY OF PIPING TO AVOID UNEQUAL DISTRIBUTION.


CONDENSATE MERCURY AND CONDENSATE MERCURY AND
H2S ADSORBENT VESSEL H2S ADSORBENT VESSEL 5. BLIND FLANGE FOR FUTURE EQUIPMENT.
V-3601 B V-3601 A

PETRONAS CARIGALI SDN BHD
NOZZLE TYPE
B Document Review Status MEDIUM VELOCITY, K = 32
B

40 40
CODE 1 : Approved FUTURE NOZZLES

CODE 2 : Accepted with Comments
40 40

CODE 3 : Rejected and Resubmit

C 40 40
CODE 4 : For Information C

100-FW53212-1P701-N

100-FW53211-1P701-N
Reviewed
40 40
by
TOP DECK
FROM DELUGE VALVE
(FIRE ZONE 2,3)
110469 KSCPP-B-1904
150-FW53201-1P701-N Approval does not relieve Contractor of their
D NO POCKET D
responsibilities to meet all requirements.
40

40-FW53214-1P701-N
50
40

CONDENSATE MERCURY AND


H2S ADSORBENT DUST FILTER 40
40
S-3601 B
E 40 E

50-FW53218-1P701-N

80-FW53216-1P701-N
40-FW53213-1P701-N

40-FW53215-1P701-N

40
LOW TEMPERATURE
CONDENSATE MERCURY AND SEPARATOR
H2S ADSORBENT DUST FILTER V-2213
S-3601 A CONDENSATE RECYCLE
COOLER
80-FW53217-1P701-N E-3001

UPPER DECK

F F

50-FW53224-1P701-N
G G
40 40
HP COMPRESSOR LP COMPRESSOR
SUCTION SCRUBBER SUCTION SCRUBBER
V1-2411 (FUTURE) V1-2401
40 40
80 80

40 40

40 40

H 50-FW53225-1P701-N H

HP COMPRESSOR 40 40
LP COMPRESSOR
SUCTION SCRUBBER SUCTION SCRUBBER
CAD PRODUCED DRAWING - NO MANUAL REVISION ALLOWED
V2-2411 (FUTURE) V2-2401
40 40
100-FW53223-1P701-N

40 40

40 40
J

I I
B ISSUED FOR APPROVAL 12.06.20 HR/NAR WNAF JK
MAIN DECK
50-FW53226-1P701-N A ISSUED FOR REVIEW 08.11.19 BER/NAR WNAF JK

40 40 DRAWN CHECKED APPROVED APPROVED


HP COMPRESSOR LP COMPRESSOR
SUCTION SCRUBBER SUCTION SCRUBBER REV DESCRIPTION DATE
NOTE 5 PCSB
V3-2411 (FUTURE) V3-2401 CONTRACTOR
40 40
100-FW53227-1P701-N

CONTRACT NO. CHO/2018/DKS/1001 CHECKED WNAF

JOB NO. DATE 08.11.19


40 40

J DRAWN BY BER/NAR APPROVED JK J


FROM DELUGE VALVE 40 40
DATE 08.11.19 DATE 08.11.19
(FIRE ZONE 4)
200-FW53202-1P701-N 150
110486 KSCPP-B-1904 SCALE N.T.S CONTRACTOR PCSB
NO POCKET
PROJECT TITLE:

PROVISION OF ENGINEERING, PROCUREMENT,


CONSTRUCTION, INSTALLATION & COMMISSIONING (EPCIC) OF
KASAWARI GAS DEVELOPMENT PROJECT
DRAWING TITLE:

K
PIPING AND INSTRUMENTATION DIAGRAM K
SYSTEM 53
FIXED FIREWATER SYSTEM - DELUGE DISTRIBUTION
UPPER DECK / MAIN DECK
CONTRACTOR: CONSULTANT:
CAD FILE NAME :

05-KSCPP-B-1905-1of1-B.pid
AREA: LOCATION:
L L
05 KSCPP
DISCIPLINE DRAWING NO. SHEET NO. REVISION NO

THE ORIGINAL AND ALL COPIES OF THE DRAWING TOGETHER WITH B 1905 1 OF 1 B
THE COPYRIGHT THEREOF ARE THE SOLE PROPERTY OF PCSB

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

You might also like