A B C D A B C D

±12.000 METERS ±12.000 METERS

0.40 METERS
±2.500 ±1.500 ±1.500 ±2.500 ±2.500 ±1.500 ±2.075 ±0.925 ±1.000 ±1.000 ±0.925 ±2.075 ±2.075 ±0.925 ±1.000
W F - 1 W F - 1
01 01 02
W F - 1 W F - 1 W F - 1 W F - 1
C3 - F2
R B - 1 R B - 1 R B - 1
5" CONCRETE
HOLLOW BLOCKS

W F - 1

W F - 1
W F - 1

W F - 1

W F - 1

R B - 1

R B - 1
±2.000

±2.000
U P

W F - 1

W F - 1
C3 - F2 C3 - F2

R B - 1
FINISHED FLOOR LINE

T B - 1 T B - 1 T B - 1
5" CONCRETE
02 03
C2 - F1 C2 - F1
02 F B - 1 03 03
F B - 1 F B - 1
03
10 mm Ø VERTICAL BARS HOLLOW BLOCKS 0.15x0.25m FLOOR BEAM
(FB) W/ 2-12mm Ø
C2 - F1 SPACED @ 0.80 MTS. GF. FIN FLR LN. STIRRUPS & 12mm Ø TIES

0.15
03 04 04 03 03 04 04 04 04
10 mm Ø HORIZONTAL BARS SPACED @ 0.20 m. O.C

F B - 1
C2 - F1 02
05 05
02 02
05 05 05 05
FLOOR SLAB

L B - 1

L B - 1
±3.000

±3.000
T B - 1

L B - 1
6" THK. CHB FOR

G B - 1
01 01 01
10 mm Ø HORIZONTAL BARS SPACED @ EVERY THIRD LAYER

VARIES
06 06 06 06 06

F B - 1
06
±3.480

±3.500

±3.500

F B - 1
S - 2 EXTERIOR WALL

VERIFY
U P 07 07 U P U P 07 07 07 S - 2 07
08 08 08 08 08 S - 2 08 SPACED @ EVERY THIRD LAYER 4" THK. CHB FOR
09 09 09 09 09 09
10mm Ø LATERAL TIES INTERIOR WALL

T B - 1
T B - 1
T B - 1

10 10 10 10 10 10
11 11 11 10 mm Ø LATERAL TIES SPACED @ 0.30 MTS. 12mm Ø VERT BARS
12 12 12 @ .60 M.O.C. & 12mm Ø &
SPACED @ 0.30 MTS.
N.G.L

±0.500

±0.500
13 13 13
HOR. BARS FOR EVERY
3 PCS.- 10 mm Ø

1.50
03 03
14 14 14 RD

15 15 15
3 LAYER OF CHB

0.30
±1.095

0.67
T B - 1 T B - 1 T B - 1 F B - 1 DWN DWN F B - 1 F B - 1 F B - 1 F B - 1DWN TEMPERATURE BAR 3 - 12 MMØ CONT.
U P
3 PCS.- 10 mm Ø 0.40 FTG. BARS W/
T B - 1

±2.500

F B - 1
F B - 1
C1 - F1 12mm Ø TIES @

T B - 1
±15.000 METERS

±15.000 METERS

F B - 1
C1 - F1 S - 2
TEMPERATURE BAR

F B - 1
S - 2 S - 2 .30M ON CENTER
T B - 1

S - 2

±4.000

±4.000
T B - 1
S - 2

±12.500 METERS
C1 - F1 C1 - F1 S - 2 0.40 METERS

±13.000 METERS
TYPICAL WALL SECTION
T B - 1
±2.925

L B - 1 L B - 1 L B - 1

L B - 1
L B - 1
L B - 1
F B - 1
±1.500
C1 - F1 C1 - F1
PLAN
C1 - F1

T B - 1 T B - 1 T B - 1
S - 2
S - 2 S - 2
WF-2
04 03

02
03

02 02
03
04 F B - 1 F B - 1 F B - 1

U P
01
U P
01
U P
01

WALL FOOTING DETAILS

T B - 1

F B - 1
T B - 1

F B - 1
±4.000

±4.000
F B - 1

F B - 1
S - 2 S - 2 S - 2

±5.000
100mm THK. SLAB ON FILL 125mm THK. SLAB ON FILL
T B - 1

12Ø 3 @ 0.20
±5.500

W/ 10mm Ø TEMP. W/ 12mm Ø TEMP.


BARS @ 0.60 M.O.C. BARS @ 0.30 M.O.C.
T B - 1

BOTHWAYS BOTHWAYS 3 - 10 MM
TEMP. BARS

±1.000

±0.500±1.000
C2 - F1 C2 - F1 S - 2 S - 2 S - 2
C2 - F1 C2 - F1
T B - 1 F B - 1 F B - 1 F B - 1
05 05
±0.500

±0.500
T B - 1 W F - 1 T B - 1 T B - 1

0.75
W F - 1 W F - 1

06 C3 - F1
±4.000
C3 - F1
±4.000
C3 - F1
±4.000
C3 - F1
±4.000 ±4.000 ±4.000
U N I T # 1 U N I T # 2 U N I T # 3 U N I T # 1 U N I T # 2 U N I T # 3 BEAM
±12.000 METERS ±12.000 METERS DRIP MOLD

0.50
F O U N D A T I O N P L A N S EC ON D F LOOR B E A M P LA N TYPICAL FOOTING DETAIL
S C A L E 1 : 1 0 0 m e t e r s S C A L E 1 : 1 0 0 m e t e r s
LEDGE DETAIL

SCHEDULE OF FOOTING:

SCHEDULE OF COLUMNS
ROOF BEAM

R.C. COL. 3
±0.300

0.20m VARRY 0.20m


MAIN FOOTING SIZE (m) DIMENSION IN MTS. REINFORCEMENT
MARK REMARK
4-12mm 0.30 THK 1.50x1.50 L W T ALONG 'L' ALONG 'W'
0.15mX0.30m RC BEAM
4-12mm ∅ THK HORIZONTAL BARS TIES 10mm
±2.700

10mm ∅ THK TIES 2 @ 0.05m, TYPICAL TO ECCENTRIC &


2 @ 0.10m, 2 @ 0.15m
F1 1.20 M 1.20 M 0.30 M 5 - 16MMØ 5 - 16MMØ

R.C. COL. 2
CONCENTRIC FOOTINGS
0.30m VARRY 0.20m
REST @ 0.20m
MAIN FOOTING SIZE (m)
TYPICAL TO ECCENTRIC &
2nd Floor SLAB 6-12mm 0.30 THK 1.50x1.50 F2 0.60 M 0.60 M 0.30 M 3 - 16MMØ 3 - 16MMØ
CONCENTRIC FOOTINGS
±0.300

2nd Floor SLAB TIES 10mm


0.15mX0.30m RC BEAM
4-12mm ∅ THK HORIZONTAL BARS W H T
TYPICAL COLUMN

R.C. COL. 1
2nd Floor BEAM
10mm ∅ THK TIES 2 @ 0.05m, 0.20m VARRY 0.40m
2 @ 0.10m, 2 @ 0.15m 0.20mX0.30m RC BEAM
MAIN FOOTING SIZE (m)
6-12mm ∅ THK HORIZONTAL BARS
REST @ 0.20m
10mm ∅ THK TIES 2 @ 0.05m,
0.30mX0.20m RC BEAM 8-12mm 0.30 THK 1.50x1.50 FOOTING DETAILS
±2.700

8-12mm ∅ THK HORIZONTAL BARS


2 @ 0.10m, 2 @ 0.15m TIES 10mm
10mm ∅ THK TIES 2 @ 0.05m,
3.00

3.00

REST @ 0.20m
2 @ 0.10m, 2 @ 0.15m
150mm THK SALB ON FILL
12mm ∅ THK CON. BARS
150mm THK SALB ON FILL
12mm ∅ THK CON. BARS
REST @ 0.20m
S C H E D U L E O F B E A M
SPACED @ 0.30m O.C.B.W. SPACED @ 0.30m O.C.B.W. FLOOR LEVEL MAIN REINFORCEMENT BARS
& 50mm THK GRAVEL BED & 50mm THK GRAVEL BED DIMENSION LEFT SUPPORT MIDSPAN RIGHT SUPPORT SPACING OF 12mm∅
MARK WIDTH DEPTH TOP / MID TOP / MID TOP / MID STIRRUPS
FFL FFL SECTION SECTION SECTION
±0.600

(mm) (mm) BOT BAR BOT BAR BOT BAR

4-12mm∅ 4-12mm∅ 4-12mm∅


±0.600

±0.600

L/4 L/4 L/4 L/4 L/4 L/4 3 @ 0.05 m , 5 @ 0.1 m


4-16mm ∅ THK VERT. BARS 6-16mm ∅ THK VERT. BARS 1 at 0.05M
# at 0.10M
1 at 0.05M
# at 0.10M
1 at 0.05M
# at 0.10M TB 200 400 rest @ 0.15 m O.C.
10mm ∅ THK TIES 10mm ∅ THK TIES GROUND LEVEL 1 at 0.05M 1 at 0.05M 1 at 0.05M 4-12mm∅ 4-12mm∅ 4-12mm∅
2 @ 0.05M, 2 @ 0.10M 2 @ 0.05M, 2 @ 0.10M 8-12mm ∅ THK VERT. BARS # at 0.10M Tension bars # at 0.10M Tension bars # at 0.10M Tension bars
NGL REST @ 0.15M
NGL REST @ 0.15M 10mm ∅ THK TIES Stirrups Stirrups Stirrups 6-12mm∅ 6-12mm∅
2-12mm∅ 3 @ 0.05 m , 5 @ 0.1 m
2 @ 0.05M, 2 @ 0.10M
REST @ 0.15M FB-1 200 300 rest @ 0.15 m O.C.
2-12mm∅ 6-12mm∅ 2-12mm∅
beam beam beam
VARY

VARY

VARY

0.20mX0.20m CONC. COL. 0.30mX0.20m CONC. COL. 2-12mm∅ 2-12mm∅ 2-12mm∅


4-16mm ∅ THK VERTICAL BARS 6-16mm ∅ THK VERTICAL BARS 3 @ 0.05 5@ 0.1
RB1 150 300
column

column

column

column
Compression bars Compression bars Compression bars REST @ 0.2 MM 0C
10mm ∅ THK TIES 3 @ 0.05m, 10mm ∅ THK TIES 3 @ 0.05m, 16mm ∅ THK BARS rest rest rest
2-12mm∅ 2-12mm∅ 2-12mm∅
3 @ 0.10m, 3 @ 0.15m 3 @ 0.10m, 3 @ 0.15m SPACED @ 0.15m O.C.B.
REST @ 0.20m REST @ 0.20m L/5 L/5 L/5
±0.600

±0.600

50mm THK LEAN CONC. L/5 L/5 L/5


W/ 50mm THK LEAN CONC. W/ 50mm THK LEAN CONC. 2-12mm∅ 2-12mm∅ 2-12mm∅ 3 @ 0.05 5@ 0.1
50mm THK GRAVEL BED
TIE BEAM
RB2 150 300
±0.600

BEAM DETAILS
50mm THL GRAVEL BED 50mm THL GRAVEL BED REST @ 0.2 MM 0C
0.40mX0.20m RC BEAM 2-12mm∅ 2-12mm∅ 2-12mm∅
8-12mm ∅ THK HORIZONTAL BARS
10mm ∅ THK TIES 2 @ 0.05m,
COLUKN 3 - FOOTING 2 COLUKN 2 - FOOTING 1 COLUKN 1 - FOOTING 1 2 @ 0.10m, 2 @ 0.15m
2-12mm∅ 2-12mm∅ 2-12mm∅ 3 @ 0.05 5@ 0.1
LB-1 150 200
COLUMN FOOTING DETAILS REST @ 0.20m
2-12mm∅ 2-12mm∅ 2-12mm∅
REST @ 0.2 MM 0C

CHECKED BY :
PROJECT TITLE : OWNER`S : SHEET CONTENT : REPUBLIC ACT 9266 SECTION 33 OWNER
DRAWINGS, SPECIFICATIONS AND OTHER CONTRACT
SHEET NO. :
DOCUMENT DULY SIGNED,STAMPED OR SEALED AS
INSTRUMENTS OF SERVICE, ARE THE PROPERTIES AND
APPROVED BY : C I V I L E N G I N E E R - SEE SHEETS CONTENT
DOCUMENTS OF THE ARCHITECT/ ENGINEER/DESIGNER
PRC NO. : WEATHER THE OBJECT FOR WHICH THEY ARE MADE IS
PROPOSED 2 STOREY 3 UNITS
DRAWN BY : LAWRENZ S. TAMAYO
CAD OPERATOR/PLANNER/
TIN NO. :

APARTMENT BUILDING
MR. JONATHAN C. MANIMBO
EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR
ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF
SAID DOCUMENTS FOR USE IN THE REPETITION OF AND
S
PTR NO. :

1
DESIGNER FOR OTHER PROJECTS OR BUILDINGS, WHETHER
EXECUTED PARTLY OR IN WHOLE, WITHOUT THE
ISSUED ON :
REVISED BY ; WRITTEN CONSENT OF ARCHITECT / ENGINEER/
ISSUED AT : DESIGNER OR SAID AUTHOR OF DOCUMENT`S.
LOCATION : STA. CRUZ, LUBAO, PAMPANGA ADDRESS : STA. CRUZ, LUBAO, PAMPANGA