QF/5267/QC/01/00

Project: EPC Contract for Permanent Anticipated Works between KP24 and KP105 of Transgabonaise National Road located in the Republic of Gabon

Material Testing And Approval Record


Location Test Report No

Material Date of Sampling

Representing section Date of Testing

Test Purpose Classification for Suitability Date of submission

Tested at Site Laboratory at Base Camp

Acceptance Criteria
Sl. No Test Performed Applicable Standard Test Results Accepted
TD-ER-PART III.02: 5.1

1 2 3 4 5 6
5.1.3: ≤ 45 %
1 LA (%) NF P18-573 or NF EN 1097-2
5.1.5: ≤ 45 % □Yes □No
5.1.3: ≤ 45 %
2 MDE (%) NF P18-572 or NF EN 1097-1 5.1.4: ≤ 45 %
5.1.5: ≤ 45 %
□Yes □No
3 Analysis Granulometric NF P94-056 - □Yes □No
5.1.1: < 35 %
4 Percentage of Fines (%) NF P94-056 5.1.4: < 35 %
5.1.5: < 10 %
□Yes □No
5.1.1: < 35 %
5 Plasticity Index (%) NF P94-051 5.1.2: < 30 %
5.1.4: < 25 %
□Yes □No
3
5.1.3: ≥ 2000 Kg/m
MDD (kg/m3)
6.1 NF P94-093 5.1.4: ≥ 2050 Kg/m
3
□Yes □No
5.1.5: ≥ 2050 Kg/m3

□Yes □No
OMC (%)
6.2 NF P94-093 -

5.1.1: < 1.0 %


5.1.2: < 1.0 %
7 Swell (%) NF P94-078
5.1.4: < 0.5 % □Yes □No
5.1.5: < 0.5 %

5.1.1: > 5 %
5.1.2: > 8 %
8 CBR, 4 days Immersion NF P94-078 5.1.3: > 30 %
5.1.4: > 30 %
□Yes □No
5.1.5: > 30 %

AFCONS Representative

Verified &Submitted by: Sign: Date:

ICO Representative

Remarks:

Approved by Sign: Date: