OCT 14, 2021
Discussion Action
Plant-I
Utilities 
Amm-I 

Urea-I 
Plant-II
Plant load limitation remained on F-4201 convection
 For Info.
section coils high TMT’s and Low CH4 content in NG.

Additional desulphurizer, R-4201A lines connection


 RT/PWHT of joints to be expedited.
and RT/HT remained is in progress.
V-4301 overhead condensate pump, MP-4306B stop
alarm (UA43004) chattering was observed and was
 To be kept under observation.
Amm-II rectified after its breaker status auxiliary contacts
cleaning.

Wash water Basin, S-4803 cleaning activity is


 Supervision and SOP to be followed.
planned today.

Boiler flame failure common alarm, UA-46036 was


rectified after adjustment of Burner# 01 and 02 pilot  To be kept under close observation.
flame scanners.
New MP decomposer lower exchanger, E-4102B
tubes and shell side ΔP is being critically controlled  To be kept under close monitoring.
to avoid steam / condensate contamination.

UREA-II Hydrolyzer feed pump, P-4115B seal flush filter


 Pump may be taken in service.
cooler coils were replaced.

Direct Bagging Test, DBT of P-II carried out. 17.37


 New DBT ratios to be used onwards.
MeT under-reporting was observed.

 Dust solution recovery at both plants to


B&S Urea Dust inventory is high in bulk store.
be started from today.